28
PROCESS FOR DOMESTIC WASTE TREATMENT THREE VERSIONS OF TRANSFORMATION. 1 ° ELECTRIC ENERGY & FERTILIZER 2 ° 100% DEDICATED ELECTRIC POWER 3 ° POWER PLUS RENEWABLE RDF FUELS

Upload: atef-gresat

Post on 18-Aug-2015

41 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: Presentation 60,000 tpy of msw   english (4)

PROCESS FOR DOMESTIC WASTE TREATMENTTHREE VERSIONS OF TRANSFORMATION.

1 ° ELECTRIC ENERGY & FERTILIZER2 ° 100% DEDICATED ELECTRIC POWER3 ° POWER PLUS RENEWABLE RDF FUELS

Page 2: Presentation 60,000 tpy of msw   english (4)

MANDATORY ENVIRONMENTAL PARAMETERS - Quantity of waste to be treated (waste characterization)- Presence of towns and villages within 40 km- Presence of several areas of quarry- Extraction of lime or limestone- Existence of an organized collection

Page 3: Presentation 60,000 tpy of msw   english (4)

COMPARISON OF CURRENT TECHNIQUES- Incineration via plasma arc (cost and maintenance)- Biogas (performance, cost and maintenance, inertia)- A more technical approach without generating pollution- Our technology is centered around generating producer synthesis gas- Recovering 90% in the treatment of waste pollution is simplified, without process reactivity 3 hours (without inertia) smokeless, odorless and sanitized. - All non-recyclable waste is approximately 10% (mostly inorganic ash with recoverable metals and REEs)

Page 4: Presentation 60,000 tpy of msw   english (4)

THE CONTEXT OF OUR PROJECTthe waste treatment to date

Page 5: Presentation 60,000 tpy of msw   english (4)

TREATMENT & PROCESSING TO DATE

- Consulting Work- Recycling improvements for urban centers- Sourcing appropriate equipment (trucks, bins ...)- Assembly of on-site manual screening systems- Capacity development for new urban collection points

Page 6: Presentation 60,000 tpy of msw   english (4)

THE CONTEXT OF OUR PROJECT

- Organization of national collection and treatment- Identify and deploy collection systems used- Waste treated in landfill (another type to validate)- Develop enhanced recycling and recovery

Page 7: Presentation 60,000 tpy of msw   english (4)

Diversified view of waste streams

Review of containers currently in use

Updating of the service trucks

Transportation of waste to landfill

Mechanical methods of landfill

Screening and preparation of MSW

ACTUAL MAINSTREAM SITUATION

Page 8: Presentation 60,000 tpy of msw   english (4)

COMPACTION Is not a sustainable solution

For the 21st century

Page 9: Presentation 60,000 tpy of msw   english (4)

CURRENT INCONVENIENCES- Visual pollution, odor, impact on groundwater ...- This new design improves comfort and regional ecological health, economic and social prosperity.

Page 10: Presentation 60,000 tpy of msw   english (4)

TECHNICAL PROPOSAL

Page 11: Presentation 60,000 tpy of msw   english (4)

Easing of access to containers

Collection performed by a single operator

Manual and mechanical separation

Compacting recyclable materials

Production of fertilizer

Production of synthesis gas

Harvesting of landfill gas

Production of fuels and chemicals

Electricity generation

TECHNICAL EXPERTISE

Page 12: Presentation 60,000 tpy of msw   english (4)

PROJECT DESCRIPTION

- Annual capacity starting at 60,000 tons / year working two shifts of eight hours- 50% Organic Waste Composition- Inorganic waste processing capacity.- Direct employment 80 (factory 400 T / day in 2 x 8 H)

Page 13: Presentation 60,000 tpy of msw   english (4)

TYPICAL INTEGRATED BIOREFINERY

- Start-up capacity of 60 000 tons of unsorted waste per year gross- Renewable fuels refining and power generation at 350 days per year- No direct incineration of waste- Autonomy energy (including renewable)- Capable of processing unit 160 t / d requires 4 hectares of land, a building area of 8,000 m², including storage, screening processing, access and range of motion- Including RDF operation will require additional 6 hectares of land.

Page 14: Presentation 60,000 tpy of msw   english (4)

FERTILIZER SOLUTION # 1:TRANSFORMATION OF ENERGY INWET ORGANIC WASTE THROUGH A.D. AND COMPOSTING

- Minimum electricity (surplus production capacity of 200 kW) from first AD organic waste dome.- Fertilizers (annual output 20,000 T per year or 160T / d) 95% to agriculture.- Selection of materials (plastics, metals, ferrous and non-ferrous metals, glass, PVC, PET ...) prior to organic processing.- Optional additional opportunity to increase raw material- Secondary site processes cellulosic feedstocks for solid and liquid fuels.

Page 15: Presentation 60,000 tpy of msw   english (4)

BENEFITS ASSOCIATED WITHWASTE RECOVERY of ECO (FERTILIZER)

- Granules (ease of application) organic fertilizer.- Stabilizes soil pH organo-calcium and anti-acid- Content of heavy metals PPM 130 (European standard PPM 4000)- 2 T = 1T containing urea fertilizer + 3% of fertilizer (nitrogen, phosphorus, potassium)- Less susceptible to runoff and infiltration (bacterial microflora improved)

Page 16: Presentation 60,000 tpy of msw   english (4)

SOLUTION # 2:DEDICATED ELECTRICITY GENERATION

- Energy production 5mW derived from syn-gas gen-sets- 24 hours 350 days a year annual production of 42,000 MWh / year- Sorting materials (plastic, ferrous and non-ferrous metals, glass, PVC, PET ...)- Optional additional opportunity to increase raw material secondary site (plastics, greases, rubber, sludge ...)

Page 17: Presentation 60,000 tpy of msw   english (4)

OPTIONS

- Selective recovery of plastics (25 tons per day)- PE, HDPE, PVC and PET ...- Recovery of hospital waste- Recovery of dried sludge and trap greases for fuels vs landfiling - Harvesting available biogas for additional power generation- Gas recovery for trucking operations

Page 18: Presentation 60,000 tpy of msw   english (4)

HOSPITAL WASTE TREATMENT SOLUTIONS

- Capacity between 375 kg and 250 kg / 40 min- The waste materials can be normally processed waste or CET

Page 19: Presentation 60,000 tpy of msw   english (4)

BENEFITS INCLUDED

- General study and details of the process parameter options- Plans finalized according to local codes- Supply, delivery, installation and commissioning of equipment within the first month of contract signing - Buildings and infrastructure attachment / construction- Utilities (electricity, lighting ...)- Training of personnel for operation and maintenance- Room for intervention of process and sale for end products

Page 20: Presentation 60,000 tpy of msw   english (4)

- Provide handling equipment (bucket loaders, backhoe clips ...)- Customs Procedures- Administrative Monitoring Project- Project architecture or infrastructure- Resource dedication- Providing project land grants

CUSTOMERS ARE NOT OBLIGATED TO:

Page 21: Presentation 60,000 tpy of msw   english (4)

EIGHT YEARS PRACTICAL EXPERIENCE IN FRENCH WTE &RDF PROJECTS

Page 22: Presentation 60,000 tpy of msw   english (4)

PRINCIPAL EQUIPMENT

- Screen Opener bags (no drilling)- Split screen and cabin screening- Various phase separation and baling- Bio digester suited for wet garbage- Onsite power generation and rCNG for city waste recovery- Two cabins composting- Utilities (electricity LV / HV, lighting, supervision ...- Producer gas generation systems for liquid fuels production

Page 23: Presentation 60,000 tpy of msw   english (4)

TIMETABLE FOR IMPLEMENTATION

- Feasibility study: three months- Job creation: ten months- Reception provisionally: ten months- Final acceptance: twelve months- Execution of contracts and commercial funding (from the signing of the partnership PPP or public-private partnership with DSP State guarantee for Africa and 10 years for the purchase of fertilizer and energy)

Page 24: Presentation 60,000 tpy of msw   english (4)

ESTIMATED PROJECT INVESTMENT Average cost of building the facilities

- Solution # 1: Energy Fertilizer between € 25 million and € 30 million on a project basis, including various options.- Solution # 2: Energy between € 30 million and € 37 million on a project basis, including various options.- Solution # 3: Renewable fuels from recoverable hydrocarbons and cellulose between € 25 million and € 175 million

Page 25: Presentation 60,000 tpy of msw   english (4)

- Investors public, private or mixed- In case of inability to finance We have in-house finance available and we can invest subject to obtaining guarantees for feedstocks and off-take agreements- Example A 10-year purchase agreement for fertilizer or energy, solid or liquid fuels produced by the plant Exclusive supply 400 tons of waste per day and 350 days / year.

INVESTING WORLDWIDE

Page 26: Presentation 60,000 tpy of msw   english (4)

OUR ENVIRONMENTAL STEWARDSHIP

- Project management for landfill waste reduction, waste recycling- Construction Process for exothermal landfill gas recovery.- Treatment of flue gas to European incinerators standardization (can include waste gas recovery for algae growth}- Treatment of metals and plastics- Water treatment (network design, treatment)

Page 27: Presentation 60,000 tpy of msw   english (4)

EXAMPLE OF PROJECT FINANCING- Norges bank available asset or lender leader- Buyer Municipal Authority in partnership with Fernando HC Reis- Warranty or condition of the central bank of Norway- Amount of the loan (Mr Reis, principal) up to 100%- Payback period of 10 years based on longterm investment plan- Interest rate 4.5%- After 10 years the possibility to restructure ownership of the plant