OFFSHORE CONSTRUCTION SPECIALISTS
41578/A/0001/UK/En PIPELINE PRE-COMMISSIONING
PRE-QUALIFICATION DOCUMENT
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
Offshore Const ruction Specialists (OCS)20 Toh Guan Road
CJ GLS Building #07-02Singapore 608839
Tel: +65 6567-9080Fax: +65 6567-8082
Web: http://www.offshore-ocs.com/index.html
Contact Information
Contact Company Position Email Address.
Keith Jackson Managing and Technical Director [email protected]
Seto Jian Operations Manager [email protected]
William Wijaya Project Manager [email protected]
Loke Kah Poh Project Manager [email protected]
Rakul Remanan Engineering Manager [email protected]
Henry Chuy Subcontracts & Procurement Manager [email protected]
Alastair Wong Senior Project Engineer [email protected]
Fery Wijaya Project Engineer [email protected]
-
8/21/2019 Precommissioning Procedure
2/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
TABLE OF CONTENTS
1.
INTRODUCTION .................................................................................................................................... 3
2. OCS ORGANISATION CHART ............................................................................................................ 4
3.
TYPICAL PRECOMMISSIONING ORGANISATION CHART................................................................ 6
4. PIPELINE PRECOMMISSIONING ACTIVITIES .................................................................................... 7
5. SAFETY AND SAFE WORKING PRACTICES. ..................................................................................... 7
6. ENGINEERING AND PROCEDURES. .................................................................................................. 8
7. PROCUREMENT. .................................................................................................................................. 8
8.
FABRICATION. ...................................................................................................................................... 8
9. PIPELINE FLOODING, CLEANING AND GAUGING. .......................................................................... 8
10.
PIPELINE INTELLIGENT AND CALLIPER PIGGING. .......................................................................... 8
11. PIPELINE HYDROTESTING ................................................................................................................. 8
12. PIPELINE BULK DEWATERING ........................................................................................................... 8
13. PIPELINE AIR DRYING. ........................................................................................................................ 8
14.
PIPELINE VACUUM DRYING ............................................................................................................... 8
15. NITROGEN PACKING ........................................................................................................................... 8
16.
EXISTING AND PAST CLIENTS ........................................................................................................... 9
17. COMPLETED PROJECTS ................................................................................................................... 10
18. EQUIPMENT DATA SHEETS .............................................................................................................. 18
19.
ISO CERTIFICATION........................................................................................................................... 37
-
8/21/2019 Precommissioning Procedure
3/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
1. INTRODUCTION
Offshore Construction Specialists (OCS) was formed in 2007 from a core group of marineconstruction engineers to provide construction management, engineering and strategic supportequipment services primarily to the offshore oil and gas sector.
Our key personnel come from previous careers at J.Ray McDermott in the marine operationsdepartment. Our managing and technical director Mr Keith Jackson worked for 17 years in thegroup the last 5 years as the marine division manager.
As a matter of policy under Mr Jackson J.Ray McDermott would execute work peripheral to thatbeing undertaken by the major work vessel (normally executed using third party subcontractors)
using in-house resources. Pipeline pre-commissioning, pre and post trenching, flexible flowline /umbilical lay are examples of work that was routinely carried out in-house and not subcontracted.One of the main reasons for doing this was that it prevented the activities of the subcontractorimpinging on the work of the high cost marine spread. The work was always planned withmaximum operational synergy in mind
In JRM large pipeline pre-commissioning projects such as the 650 km West Natuna gasgathering pipeline network and many other major projects were planned and executed in-house.
OCS has taken the model developed in JRM and applied it to our own activities. Our equipmentis managed and operated by people who come from the same background as the main marinecontractor. We help the marine contractor plan the work such that the pre-commissioning has
the least impact on operations. We are proactive in highlighting potential issues and ensuringboth parties win. Our engineering capabilities are very sophisticated and significantly moreadvanced than our competitors.
OCS has now completed a range of pre-commissioning projects for many different customerswith great success. OCS is certified by Nata for pipeline hydrotesting which is the preeminentqualification for pre-commissioning contractors. The OCS organisation has also been qualified toIS0 9001 since 2009.
Our in-house equipment spread has grown significantly and is described in detail in thisdocument. OCS is equipped to handle the full range of pre-commissioning activities including
flooding, cleaning, gauging, hydrotesting, dewatering, drying and nitrogen packing. We work withestablished intelligent and caliper pig suppliers to complement our service. We have establishedlong term relationships with key Singapore and overseas vendors.
OCS is equipped to handle large projects or discrete project elements depending on the specificneeds of the customer.
The company has grown steadily since incorporation and now employs 60 personnel of whom 30are civil/structural and mechanical engineers working with our pre-commissioning technicians.
The company office in Toh Guan Rd, Singapore has been leased until 2014 and has room foradditional expansion. The office can accommodate customer representatives for liaison as
necessary.
-
8/21/2019 Precommissioning Procedure
4/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
2. OCS ORGANISATION CHART
KEY PERSONNEL CONTACTS
Keith Jackson Managing and Technical Director [email protected]
Seto Jian Operations Manager [email protected]
William Wijaya Project Manager [email protected]
Loke Kah Poh Project Manager [email protected]
Rakul Remanan Engineering Manager [email protected]
Henry Chuy Subcontracts & Procurement Manager [email protected]
Alastair Wong Senior Project Engineer [email protected]
Fery Wijaya Project Engineer [email protected]
-
8/21/2019 Precommissioning Procedure
5/68
PRE QUALIFICATION Offshore Construction Specialists Pte Ltd.
KEITH JACKSON
MANAGING & TECHNICAL DIRECTOR
PROJECT & CONSTRUCTIONMANAGEMENT
SETO JIAN
OPERATIONS MANAGER KP LOKE
PROJECT MANAGER
NG
ACCOUNTS
CONSTRUCTIONENGINEERING
FIELD CONSTRUCTIONOPERATIONS
SAYED DEDY
PRE-COMMENGINEER
DRAFTING
PR
SEN
SUDHA
ANDY
PRIYA
ZIA AL
STRUC
CHANIN
SRIYAPORN
SNR.DRAFTING
ALASTAIR WONG
SNR PROJECTENGINEER/
PRE-COMM MANAGER FERY WIJAYA
PROJECT MANAGER
BODIE
MALLET
SETTHA Y.
IVAN CHAI
(OPERATIONS/SNR. FIELDENGINEER)
LE
CU
KRISBEL
BUDIMAN
ZACK
INDRA
IDHAM
TECHNICIANS MECHANICS
OPERATIONS ADMINISTRATION
UDAY
MOH
SENIOEN
JU
AD
ARYO PRAKOSO
SNR. DRAFTSMAN
OCS ORGANISATION CHART
PLANT &EQUIPMENT
ADI CAHYA
AARON LIAN
TRACY EE
ZHONG ZHIYUAN
DAVID SHAW
CHEAH WIN LOONG
CHATCHAI W.
SEAN SIA TIN WEI
DANIEL CAO
FIELD ENGINEERS
ENGINEERING
RAMIL ZAPANTA
VINOTH KUMAR
DRAFTSMAN
RAKULREMANAN
ENGINEERINGMANAGER
OPERATIONS
STRATEGICEQUIPMENT
TEAM FIELD
CONSTRUCTIONSUPERVISION
TEAM
JAMIE
JACOBSEN
LEON COAD
DAVID WOOD
FIELD FOREMANS
JAMES CARROLL
FIELDSUPERINTENDENT
D
EQUIPMENT
WILLIAM WIJAYA
EQUIPMENT MANAGER
*ADMINITRATION
*ADMINITRATION SUPPORTTEAM: TRACY & URISA
JAW LE
E & MCOORDINATOR
RONI
GROUTINGSUPERVISOR
TO
IT
REMARK:
HERYA
TAUFA
SAINU
SAVOY
AMITH
NAVA
-
8/21/2019 Precommissioning Procedure
6/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
3. TYPICAL PRECOMMISSIONING ORGANISATION CHART
OCS Pre-commissioning Team offshore
ONSHORE
OFFSHORE
Note* : Project Managers, Project Engineers & Pre-commissioning Engineers will be selected from thepersonnel pool shown for each categary.
CLIENT
KP LOKE
WILLIAM WIJAYA
PROJECT
MANAGERS
RAKUL
REMANAN
ENGINEERING
MANAGER
PRAVIN THORAT
HERY LEMBANG
SUDHAKAR
SUBRAMANIAM
UDAYSARATHY
MOHAN
ZIA AKBAR
TAUFAN SIREGAR
PRIYA PANJIROSA
AMITH PRASAD
SAVOY
SAINUL ABID
CONSTRUCTION
SUPPORT
ENGINEERS
CHANIN
SRIYAPORN
ARYO PAKOSO
RAMIL ZAPANTA
VINOTH
DRAFTING
ALASTAIR WONG
FERY WIJAYA
PROJECT
ENGINEERS
SAYED DEDY
MAHDI
ADI CAHYA
BODIE MALLET
SETTHA Y.
IVAN CHAI
CHONG CHIA YAN
AARON LIAN
DAVID SHAW
CHEAH WIN
LOONG
CHATCHAI
SEAN SIA
FIELD ENGINEERS
HENRY CHUY
SUBCONTRACTS &
PROCUREMENT
MANAGER
JOYCE
LIM
EXPEDITOR/ BUYER
CHARLES TAN
BUYER/ SUBCONTRACTS
EXECUTIVE
-
8/21/2019 Precommissioning Procedure
7/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
4. PIPELINE PRECOMMISSIONING ACTIVITIES
OCS experience embraces the full range of pipeline pre-commissioning activities from the initialflooding, cleaning, gauging and hydrotesting to dewatering, drying and nitrogen purging andpacking.
Specific activities undertaken by OCS:
No. Description
1 Flooding, Cleaning and Gauging.
2 Calliper and Intelligent Pigging.
2 Hydrotesting
3 Dewatering/ Swabbing
4 Air Drying
5 Vacuum Drying
6 Nitrogen Purging
7 Nitrogen Packing
OCS provides a cradle to grave pipeline pre-commissioning services including completeengineering, procurement, fabrication and execution services. Our in-house inventory isextensive and our personnel are well trained.
5. SAFETY AND SAFE WORKING PRACTICES
OCS is acutely aware of the dangers involved in the marine construction industry in general and inpipeline pre-commissioning particularly where high pressure water and air and heavy equipment,chemicals etc combine to create a range of potential hazards if not managed properly.
All OCS activities on specific projects are the subject of hazids and risk assessments to ensure
levels of risk are reduced to as low as reasonably practical. These risk assessments are ideallyattended by the main contractor and the ultimate client.
Other specific safety and operational measures that are taken:
i) All OCS personnel have appropriate Bosiet offshore sea survival trainingii) OCS technicians are Nata qualified and well trained for their specific dutiesiii) All OCS equipment is provided with a specific safety passport.iv) Offshore hazardous areas are barricaded as required and unauthorized personnel are
excluded.v) All installation aids are properly engineered and subject to structural checks by the OCS
CSE group.
vi) Appropriate Hazchem sheets are posted in areas where chemicals are in use.
-
8/21/2019 Precommissioning Procedure
8/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
6. ENGINEERING AND PROCEDURES
OCS prepares project specific engineering and procedures for each job undertaken. What setsOCS apart from other pre-commissioning contractors is our engineering skills base which meansthat all structural, mechanical, hydrodynamic and aerodynamic considerations are addressed in-house. OCS procedures will address:
i) Project specific procurement requirements.ii) Equipment specification requirements and preparations.iii) Designs of Pig launchers and receivers for Flooding, Cleaning and Gauging.iv) Designs of Hydrotest heads.v) Designs of Pig Launchers and Receivers for Dewatering and Drying.vi) Pig Requirements and Designations.
vii) Intelligent and Calliper Pigging requirements.viii) Chemical injection requirements.ix) Hydrotesting pressurization, strength and leak tests.x) Bulk Dewatering.xi) Drying Procedures using Air or Vacuum drying techniques.xii) Nitrogen Packing.
7. PIPELINE PRE-COMMISSIONING PROCEDURES
PLEASE REFER TO APPENDIX 1
8. FABRICATION
9. PIPELINE FLOODING, CLEANING AND GAUGING
10. PIPELINE INTELLIGENT AND CALLIPER PIGGING
11. PIPELINE HYDROTESTING
12. PIPELINE BULK DEWATERING
13. PIPELINE AIR DRYING
14. PIPELINE VACUUM DRYING
15. NITROGEN PACKING
-
8/21/2019 Precommissioning Procedure
9/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
8 EXISTING AND PAST CLIENTS
OCS has built up a significant customer base during four (4) years of operations. OCS past andpresent clients are listed below. References can be provided on request.
No. Client Name
1 Star Petroleum ( Indonesia)
2 HESS ( Indonesia)
3 Asia Petroleum Developments (Salamander)
( Indonesia)4 Kangean Energy ( Indonesia)
5 NuCoastal ( Thailand)
6 Chevron (Thailand)
7 EMAS ( Singapore)
8 Larsen & Toubro ( Malaysia/ India)
9 SapurasAcergy ( Malaysia)
10 TLO SapuraCrest ( Malaysia)
11 Heerema (Holland)
12 NorCe ( Singapore)
13 Offshore Marine Contractors
14 Vietsovpetro (VSP) (Vietnam)
15 Timas Suplindo ( Indonesia)
16 Nippon Steel (Indonesia)
17 Newfield Peninsula Malaysia ( Malaysia)
18 Franklin Offshore ( Singapore)
19 M3 Energy ( Malaysia)
20 Sarku ( Malaysia)
21 Hako Offshore ( Singapore)
22 Global Industries ( Malaysia)
23 Sea Drill ( Singapore)
24 Origin Energy (Australia)
25 Swiber ( Singapore)
26 Galoc ( Philipines)
27 GFI ( Thailand)
-
8/21/2019 Precommissioning Procedure
10/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
9. COMPLETED PROJECTS
Year Project Title ClientPipelineDia (“ )
Length(km)
Scope Of Work Location
2007 GFI EOCP EMASoffshore
Constructionand
Production
10”
6” Flexible
0.8
0.1
Flood, Clean,Gauge and
Hydrotest/Leaktest
Gulf ofThailand
2008 GalocDevelopment
Project
EOCP EMASoffshore
Construction
andProduction
6 “ Spool6” Flexible
0.7 Leak Test 65km offNorth West
Coast of
PalawanIsland
2008 Nexus Australia-Bass Strait
Nexus PLEM &StartupHeads
- Leak Test Singapore
2009 Asia PetroleumDevelopment
(APD) – GlagahKambuna FieldDevelopment
PT Timas 14 “ 42 Flood, Clean,Gauge andHydrotest
From theKambunaplatform
offshore NorthSumatera to a
landfallNortheast ofMedan
2009 Star PetroleumKakap Field
Redevelopment
PT Timas 10”
6”
6”
11.2
2
2.3
Flood, Clean,Gauge andHydrotest
Kakap Fieldlocated in theIndonesian
West NatunaSea
2009 M3nergy JDASdn Bhd/Carigali-
PTTEPI-JDABlock B-17
FranklinOffshore
11” Flexible 0.24 Leak Test OffshoreMalaysia
2010 HESS UjungPangkah
Development
PT Timas 6”
12”
16”
5.5
5.5
5.5
Flood, Clean,Gauge,
Hydrotest,Dewater, Air &Vacuum Dryand Nitrogen
Packing
UjungPangkah,Gresik inSurabayaIndonesia
-
8/21/2019 Precommissioning Procedure
11/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
Year Project Title Client
Pipeline
Dia (“ )
Length
(km) Scope Of Work Location
2011 KangeanEnergy
IndonesiaLimited – TSBDevelopment
PT Timas 18”20”20”
255.55.5
Flood, Clean,Gauge andHydrotest,
Dewater, Dryand Nitrogen
Packing
Bali Sea,approximately120km fromPagerubgan
Island
2011 Kodeco Project PT Timas 6” 7 km &6km
Flood, Clean,Gauge andHydrotest
Java Sea
2011 Chevron
(Thailand)
EMAS 10”
16”
35 km &35 km
Flood, Clean,Gauge andHydrotest
Gulf OfThailand
2011 TSB Kangean PT Timas 18”
20”
25.745km &5.2km
Flood, Clean,Gauge andHydrotest,
Dewater, Dryand Nitrogen
Packing
Java Sea
2012 Bawal PT Timas 14” 40 km Flood, Clean,Gauge andHydrotest
Natuna Sea
2012 Bien Dong DOF Subsea 6” flexible 400m LeakTest Vietnam
2013 Zawtika L&T 18”
18”
11.3 km &9.7km
Flood, Clean,Gauge andHydrotest
Myanmar
2013 PTTEP BongkotRiser
Replacement
DOF Subsea 6” 80m LeakTest Gulf OfThailand
2013 Pertamina EPMOL Project
LeightonOffshore
12” 28km Flood, Clean,Gauge,
Hydrotest andDewater
Java Sea
2012 Pertamina ULProject
PT Timas 12” 12 km Flood, Clean,Gauge andHydrotest
Java Sea
2012
Pertamina EPL-Parigi
PT Timas 20’ / 14” 500m/3.3
km
Flood, Clean,
Gauge,Hydrotest
Java Sea
-
8/21/2019 Precommissioning Procedure
12/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
2014 Petronas
Ketapang
PT Timas 12” 111 km Flood, Clean,
Gauge,Hydrotest,
Dewater, Dry,N2 Pack.
2014 PetronasKetapang
PT Timas 8/12”/16” 700 meach
Flood, Clean,Gauge,
Hydrotest, .
-
8/21/2019 Precommissioning Procedure
13/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
GFI (Thailand) Pigging and Hydrotesting Photos (Nov 2007 to Jan 2008)
Flexible Riser Leak For M3nergy JDA Sdn Bhd / Carigali-PTTEPI - JDA Block B-17,Offshore Malaysia. ( Sep 2009) Photos
-
8/21/2019 Precommissioning Procedure
14/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
Star Energy (KAKAP) Pipeline Project– Pigging & Hydrotest (Oct 2009) Photos
Asia Petroleum Development (APD) Pigging and Hydrotest ing. - Glagah Kambuna FieldDevelopment Pro ject (Mar 2009) Photos
-
8/21/2019 Precommissioning Procedure
15/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
HESS (UJUNG PANGKAH) Pipeline Project–
Pigging, Hydrotest, Dewatering, Drying & N2 Pack (Jan – Feb 2010) Photos
Chevron Thailand ProjectPigging & Hydrotest (Jan – July 2010) Photos
-
8/21/2019 Precommissioning Procedure
16/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
Kangean Project
Pigging, Hydrotest, Dewatering, Air drying and N2 packing (Aug- Nov 2011) Photos
Kodeco ProjectPigging & Hydrotest (Oct - Dec 2011) Photos
-
8/21/2019 Precommissioning Procedure
17/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
Zawtika Project, 2013
Pigging & Hydrotest Photos
-
8/21/2019 Precommissioning Procedure
18/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
18. EQUIPMENT DATA SHEETS
OCS operates a comprehensive range of pre-commissioning equipment. Each piece ofequipment has it own equipment passport which is maintained from project to project. This helpsensure that only appropriately maintained equipment is supplied to projects.
A sample of our equipment passport is included below.
7.1. FLOODING PUMP SERIES 1
FLOODING PUMP - 03 Nos.
Capacity 320 Cu.m / Hr
Maximum Head 171 meters
Engine Make Detroit Diesel 8V-92TA 450BHP
Pump Make SLD 280-43 3
-
8/21/2019 Precommissioning Procedure
19/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
-
8/21/2019 Precommissioning Procedure
20/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
-
8/21/2019 Precommissioning Procedure
21/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.2. FEED PUMP
FLOODING PUMP - 02 Nos.
Capacity 1590 Cu.m / Hr
Maximum Head 25 meters
Engine Make Detroit Diesel 8V-92TA 450BHP
Pump Make SLOW350-380B
-
8/21/2019 Precommissioning Procedure
22/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
-
8/21/2019 Precommissioning Procedure
23/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
-
8/21/2019 Precommissioning Procedure
24/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.3. DIESEL DRIVEN FLOODING / JETTING PUMP SERIES 2
(HIGH PERFORMANCE)
FLOODING PUMP - 02 Nos.
Capacity 335 Cu.m / Hr
Maximum Head 260 meters
Engine Make Detroit Diesel 12V-149TI 1130BHP
Pump Make 250SLD 450-60 4
-
8/21/2019 Precommissioning Procedure
25/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
-
8/21/2019 Precommissioning Procedure
26/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
-
8/21/2019 Precommissioning Procedure
27/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.4. DIESEL DRIVEN HIGH PRESSURE PUMP SERIES 2 (HIGH
PERFORMANCE)
HIGH PRESSURE DISEL DRIVENPUMP
- 01 Nos.
Capacity 180 liters / Minute
Maximum Pressure 7250 psig
Engine Make Johndeere 160kw 6 cylinder diesel engine
Pump Make Woma 2502 P40
-
8/21/2019 Precommissioning Procedure
28/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
-
8/21/2019 Precommissioning Procedure
29/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.5. HIGH PRESSURE DISEL DRIVEN PUMP SERIES 1
HIGH PRESSURE DISEL DRIVENPUMP
- 01 Nos.
Capacity 35-37 liters / Minute
Maximum Pressure 8000 psig
Engine MakeIsuzu 50 HP-4 cylinder (turbocharged & water
cooled)
Pump Make Den-Jet CD 40-550
7.6. HIGH PRESSURE AIR DRIVEN PUMP
HIGH PRESSURE AIR DRIVENPUMP
- 01 Nos.
Capacity 20 liters / Minute
Maximum Pressure 7,500 psig
Maximum Air Supply Pressure 125 psig
Pump Make Haskel Model TP600-GSF-60
-
8/21/2019 Precommissioning Procedure
30/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
HIGH PRESSURE AIR DRIVENPUMP
- 04 Nos.
Capacity 4 liters / Minute
Maximum Pressure 600 psig
Maximum Air Supply Pressure 120 psig
Pump Make Hydraulics International HI Model 5L-SS-60
-
8/21/2019 Precommissioning Procedure
31/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.7. DEAD WEIGHT TESTER
DEAD WEIGHT TESTER + WEIGHTSET
- 02 Nos.
Make DH –BUDENBERG MODEL 580 DX
Range 0-700 bar
Accuracy 0.025 %
Least Count 0.069 bar
-
8/21/2019 Precommissioning Procedure
32/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.8. PRESSURE/TEMPERATURE RECORDER
PRESSURE RECORDER - 03 Nos.
Make BARTON
Range 0-5000 psi
Accuracy ± 1 % FS
TEMPERATURE RECORDER - 02 Nos.
Make SCOTECH
Range 0-50o C
Accuracy ± 1 % FS
PRESSURE-TEMPERATURE DUALRECORDER
- 02 Nos.
Make BARTON
Range 0-5000 psi/0-100o C
Accuracy ± 1 % FS
-
8/21/2019 Precommissioning Procedure
33/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.9. 8 X 10 FT BREAK TANK (18 Cu.m Capacity) - 01 Nos
For storage and introducing freshwater slug during pigging/ dewatering of pipelines
-
8/21/2019 Precommissioning Procedure
34/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.10. VACUUM PUMP
VACUUM PUMP - 01 Nos.
Capacity 1020 Cu.m / Hr
Booster MakeEdwards mechanical booster Model EH1200,
Hydrokinetic Drive
Pump MakeEdwards high vacuum pump Serial 220. EIM
275
7.11. PRESSURE TRANSDUCER & READOUT)
- 03 Nos.
Type 750C, ABSOLUTE PRESSURE TRANSDUCER
Make/ Range MKS
Accuracy/ Input/ Output
10 MILLIBAR , 100 MILLIBAR , 1000 MILLIBAR
1% OF FULL SCALE
+13 TO +32 VDCINPUT, 0-10VDC O/P
- 02 Nos.
Type DIGITAL SUPPLY AND READOUT
Make/ Range MKS
Input Power220VAC
-
8/21/2019 Precommissioning Procedure
35/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.12. HEATED REGENERATIVE DESICCANT AIR DRYER & AIR COOLED AFTER
COOLER
Regenerative compressed air dryer use desiccant to absorb water vapour from the compressedairstream. In the twin tower design, one tower dries the air from the After-cooler while thedessicant in the other tower is being regenerated to provide continuous operation. A heater isadded to heat the purge air. It not only benefits the regeneration effect but also decreasesregeneration purge loss.
Desiccant: activated alumina + molecular sievePurge air:
-
8/21/2019 Precommissioning Procedure
36/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
7.13. LIQUID N2 CONVERTER
1. Operating parameters:
Design temperature load bearing/pressure retaining –20 Deg to + 50 Deg C.
Design temperature machinery –20 Deg to + 50 Deg C.2. Diesel Engine
Detroit Diesel model 8V 71T
Rated to produce 420 BHP @ 2100 RPM. (Continuous)3.. Gearbox
Marco 3 pad hydraulic pump drive gearbox
Marco Gearbox will be enclosed coupled on engine flywheel4. Start System
Air starter5 . Hydraulic System
Twin Commercial hydraulic pumps for Low and High pumping rate, motors and relief valves. heat exchanger.
6. Cryogenic High Pressure System
Paul triplex.
Max. Pressure: 10,000 psi.
Flow Rate: 3,000 SCFM.
Discharge Temperature: 70oF.
7. Control Panel
A stainless steel control panel8. Skid/Frame
-
8/21/2019 Precommissioning Procedure
37/68
OFFSHORE CONSTRUCTION SPECIALISTS
PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT
19. ISO CERTIFICATION
-
8/21/2019 Precommissioning Procedure
38/68
Page 11 of 12
ATTACHMENT # 5
OCS NATA Certification
-
8/21/2019 Precommissioning Procedure
39/68
NATA Accredited Laboratory
National Association of Testing Authorities, Australia(ABN 59 004 379 748)
has accredited
Offshore Construction Specialists Pte Ltd
Singapore
following demonstration of its technical competenceto operate in accordance with
ISO/IEC 17025
This facility is accredited in the field of
MECHANICAL TESTING
for the tests, calibrations and measurements shown on theScope of Accreditation issued by NATA
Jennifer EvansChief Executive Officer
Date of accreditation:15 July 2013 Accreditation number:19122
-
8/21/2019 Precommissioning Procedure
40/68
Page 12 of 12
ATTACHMENT # 6
OCS Personnel CVs
-
8/21/2019 Precommissioning Procedure
41/68
Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel:+65 6567 9080 Fax: +65 6567 8082
Sayed Dedy Mahdy
Career Summary
• 4 Months University Field Practical, Tunu Field Development “Tunu Phase 8 EPSC3 Project”- TotalFinaElf Indonesie.
• 9 Months as Field Engineer for PT. McConnell Dowell Indonesia.• 1 year and 8 months working with PT McDermott Indonesia• Currently working with Offshore Construction Specialists Pte. Ltd.
Experience
Field EngineerJune 2009 - January 2010Amerada Hess Ujung Pangkah Phase 2, Indonesia
Offshore Construction Specialists Pte Ltd• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 3
subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.
• Manage the offshore operation at site, together with the barge supt & the other fieldengineers. Work included the wellhead platform, WHP B installation, 6”, 12” and 16”flowline installation between WHP B and WHP A. Post trenching of 6”, 12” and 16”flowline.
Field EngineerSept 2008 – May 2009Asia Petroleum Development (APD) - Glagah Kambuna Project, Indonesia Offshore Construction Specialists Pte Ltd
• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 42 km14” gas export pipeline from the Kambuna platform offshore North Sumatera to a
landfall north east of Medan.
• Manage the offshore operation at site, together with the barge supt & the other fieldengineers. Work included 5 km beach approach, Pre and Post trenching of 13 km ofthe pipeline to a cover of 2.0 metres. Topsides installation and Hook up.
-
8/21/2019 Precommissioning Procedure
42/68
Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel:+65 6567 9080 Fax: +65 6567 8082
Field EngineerNovember 2007 - January 2008
GFI Bualuang field development project, Bualuang Field, ThailandOffshore Construction Specialists Pte Ltd
• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 800mtrpipeline, Flexible risers and spools.
• Manage the offshore operation at site, together with the barge supt & the other fieldengineers. 1 jacket(sidelift & upend) + 1 deck + 2 pipeline (10 in) + 1 SPC + 1PLEM+ 4 sp tie in (10 in) + 2 flexible riser (6 in) + 1 mooring hawser
Field EngineerNovember 2006 – October 2007Project : Kerisi Field Development Phase II CPP Jacket and Deck Installation
PT. McDERMOTT INDONESIA
Working with procedures and instruments preparation for 12”∅and 16”∅ spoolshydrotesting. Responsible for almost all load out preparation for 3 material barges, 4 nos ofCentral Processing modules over 1000MT and 8 Legs Jacket load out for CentralProcessing Platform
Field EngineerNovember 2006 – October 2007Project : Angel Project – Substructure Installation and Pipelay
PT. McDERMOTT INDONESIAManage and supervise technical on field for fabrication of 5 sections Articulated Stinger andrefurbishment 3 sections Articulated Stinger.
Field EngineerJanuary 2007 – August 2007Project : SSB T&I
PT. McDERMOTT INDONESIAManage and supervise technical on field for structural modification 5 sections ArticulatedGulf Of Mexico Stinger and refurbishment 3 sections Articulated Stinger and 1 section trussstinger.
Field EngineerAugust 2006 – September 2006Project : Kerisi Field Development Phase I
PT. McDERMOTT INDONESIAManage and supervise readiness of marine installation on field in subcontractor yard of 1420
MT Wellhead Platform and 1113 MT Jacket load out.
Field EngineerJuly 2006 – August 2006Project : PM3 Camau – Gas Pipeline
PT. McDERMOTT INDONESIAAs-built for survey for over 289 KM from Bunga Raya (Malaysian Area) to GDS (Vietnamesearea) in Gulf Thailand. J. Ray McDermott Engineer representative on board to identification
-
8/21/2019 Precommissioning Procedure
43/68
Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel:+65 6567 9080 Fax: +65 6567 8082
free span and correction of the found free span. Over 45 days was spent offshore on boardof Setouchi, Fugro Survey vessel
Field EngineerJanuary 2006 – April 2006Project : EMEPMI Seligi A- To Tapis Pump Pipeline Replacement
PT. McDERMOTT INDONESIAPrepared and manage of fabrication and refurbishment for engineering installation aid for
18”∅ crude pipeline installation, assisting in procedures and instruments preparationassociated with pigging and hydrotesting. Over 60 days was spent offshore time on board
DB30 to manage 21,2 KM 18”∅ crude pipeline installation, riser and two sub sea spooltrough the commissioning stage.
Field Engineer
December 2005 – January 2006Contract Value USD 2.5m – PT. NewMont NTT. Batu Hijau-Scavenger Maintenance Phase I
PT. McCONNELL DOWELL INDONESIAPerformance as Project Planner for Scavenger Shut Down Project on PT. NewMont NTT.Project Mobilization coordinator and controlling material take off.
Field EngineerApril 2005 – December 2005Contract Value USD 4.6m + USD 1,2m Variation – Kaltim Prima Coal Service Wharf andShiploader Jetty Refurbishment.
PT. McCONNELL DOWELL INDONESIAEmployed with PT McConnell Dowell Indonesia to manage the shiploader jetty and servicewharf rehabilitation works contract. Contract involves the partial demolition andreinstatement of 15years old reinforced concrete service wharf at KPC and rehabilitation of
Structural steel shiploader jetty paintwork.
Field PracticalApril 2002 - June 2002Contract Value – USD 3.5m - Tunu Field Development Phase 8-EPSC 3, Aerial Pipe
Installation
PT. CITRA PANJI MANUNGGAL• Preparing Pilling Equipment that Needed for Pilling Activit ies• Responsible for daily Report
• Assisting Surveying• Liaise with third Party Inspector Badan Kualifikasi Indonesia (BKI)• Assisting with application of work Permit
• Assisting with safety procedures
-
8/21/2019 Precommissioning Procedure
44/68
Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel:+65 6567 9080 Fax: +65 6567 8082
Education
Bachelor of Engineering (Civil),Diponegoro University, 2004
On Job Training and Courses
HUET – MSTS ASIA SDN. BHD, Johor Malaysia, 2006Sea Survival – MSTS ASIA SDN. BHD, Johor Malaysia, 2006
Fire Fighting – MSTS ASIA SDN. BHD, Johor Malaysia, 2006Wire Rope Inspector - Carl Stahl Evita Ltd, Batam Indonesia, February 2007
Field Engineer training 1st Module : General Topics, Singapore, 2007Field Engineer training 2nd Module : Structural Installation, Singapore 2007
Incident Investigation training, Batam, Indonesia 2007Task Risk Assessment training, Batam, Indonesia 2007
FirmsNov 2007 Offshore Construction SpecialistJan 2006 to 8 Oct 2007 PT McDermott IndonesiaApr 2005 to Dec 2005 PT Mc Connell Dowell Indonesia
Personal Details
Date of Birth : November 29, 1979Age : 34Nationality : Indonesian CitizenshipLanguages : Bahasa Indonesia – oral & written
English – oral & writtenContacts : Mobile +62-8127011155
-
8/21/2019 Precommissioning Procedure
45/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 1 of 2
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
PERSONAL DATA
Name : Roni
DOB : 20 August 1975
Place / DOB : Belawan
Sex : ale
a!ital Status : a!!ie"Nationalit# : $n"onesia
Religion : oslem
DOCUMENT
No Document Number Date Of Issued Date Of Expir P!ace Of Issued
1 Pass%o!t & 259'7( )0 No* 2010 )0 No* 2015 Batam
CERTI"ICATE O" COMPETENC#
No Certificate Number Date O"
issued
Date Of
Expir
P!ace Of
Issued
1+ BOS$,- . -!a*el Sael#
# Boat
2( No* 2010 2) No*
201(
Batam
$OR% E&PERIENCES
Pre'Comm Super(isor
August 2013 to present
Oso!e 3onst!uction S%ecialists Pte 4t"
Res%onsile o! te maintaining ig P!essu!e %um%s an" 6loo"ing Pum%s in goo" con"ition ate!
%!oect an" %!e%a!e8 unction test o ig P!essu!e %um%s an" 6loo"ing Pum%s eo!e oso!e wo!+
O%e!ate an" ensu!e ig P!essu!e Pum%s an" 6loo"ing %um% wo!ing in goo" con"ition o! P!e
commissioning wo!+
-
8/21/2019 Precommissioning Procedure
46/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 2 of 2
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
Comp!eted Pro)ect*
No Compan Pro)ect position Location C!ient +esse! Name Periode
1+ Ne%tune SONSB ;!outing
-ec
-ailan" P-- BODO
SP4$,R
10 Aug 200(
25 Se%t 200(
2+ Ne%tune SA$P, ;!outing
-ec
3inese SA$P, ,RA$D
O66SOR,
1< =un 200'
29 =ul 200'
)+ Ne%tune >NDA$ ;!outing
-ec
$n"onesia/
?alimantan
-O-A4 >NDA$
O66SOR, 1
09 =ul 2007
20 Aug 2007
(+ Ne%tune S&$B,R ;!outing
-ec
B!unei BSP S,44 SAR? 2000 0' Oct 2007
)0 Dec 2007
5+ Ne%tune S&$B,R ;!outing
-ec
B!unei BSP S,44 S&$B,R
;4OR$OS
07 a# 200<
11 =ul 200<
'+ Ne%tune SBS,A 7 ;!outing
-ec
ala#sia P,-RONAS RO3? &A-,R
2
15 Se%t 200<
20 Oct 200<
7+ Ne%tune S&$B,R ;!outing
-ec
B!unei BSP S,44 S&$B,R
R,SO4-,
05 =an 2009
10 a! 2009
-
8/21/2019 Precommissioning Procedure
47/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
NAME: KRISBEL SIMANJUNTAK
DATE OF BIRTH 4 May 1963
NATIONALITY Indonesian
MARITAL STATUS Married
EDUCATION/TRAINING :
May 07, 2007. Basic Offshore Safety Induction & Emergency Training Including Additional
OLF Modules (OPITO Approved)
February 06, 2007. Confine Space Entry and Rescue.
LANGUAGES Bahasa Indonesian (written and spoken)
English (Fair Spoken)
Career Summary
Over 26 years experience in maintain heavy equipment, engines, High Pressure pumps and floodingpumps, pipe fittings, operating related machinery.
Work Experience
Mechanic Mar 2009 to presentOffshore Construction Specialists Pte Ltd
Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after
project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.
Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-
commissioning work.
Completed Projects
Oct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd
Project : Leighton Offshore
Location : Jakarta - CirebonS513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services
-
8/21/2019 Precommissioning Procedure
48/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Task Description
Jetting Technician April 2013 – May 2013Offshore Construction Specialists Pte Ltd
Project : Brunei Shell Petroluem – Domgas Pipeline Installation ProjectLocation : Bulan Bulan Field Development - Brunei
Jetting services for the Pile Refusal Remedial Project
Task Description
Jetting Technician responsible for operating of jetting spread, monitoring the performance of
equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Jetting Technician August 2012 – January 2013Offshore Construction Specialists Pte Ltd
Project : Chevron (Australia) – Domgas Pipeline Installation ProjectLocation : Domgas Field Development, North West Coast of Australia
Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation
Task Description
Jetting Technician responsible for operating of jetting spread, monitoring the performance of
equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Mechanic April 2012 to May 2012Offshore Construction Specialists Pte LtdProject : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawalwells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigidspools.
MechanicOctober 2011 – November 2011Offshore Construction Specialists Pte LtdProject : Korea Development Company LTD. – Gas Li ft Compression Project.Location : Poleng Field – Gresik, West Java, Indonesia.
Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PPand 6” Gas Lift DW-PP in total length 6.3 Km.
MechanicSeptember 2011 – October 2011Offshore Construction Specialists Pte Ltd
Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilit iesof TSB Field Development
-
8/21/2019 Precommissioning Procedure
49/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Location : TSB Field, Kangean Block – Bali Sea Indonesia.
Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid
Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines
MechanicFebruary 2011 – July 2011Offshore Construction Specialists Pte LtdProject : CHEVRON 2011 INSTALLATION CAMPAIGN.
PLATFORMS AND PIPELINES INSTALLATIONLocation : Chevron Thailand Oil and Gas Fields, Gulf of Thailand
Flooding and gauging work of newly laid pipelines:16” NPPLL, 5.4 Km Long Pipeline10” FUPLP, 5.9 Km Long Pipeline
10” PDPLB, 6,7 Km Long Pipeline10” KPPLG, 2.7 Km Long Pipeline10” ERPLZC, 2.4 Km Long Pipeline
As well leak testing of spools before subsea tie in of:NPWL Platform (3 ea x 16” Spools)FUWP Platform (2 ea x 10” Spools)PDWB Platform (5 ea x 10” Spools)KPWG Platform (2 ea x 10” Spools)ERWZC Platform (2 ea x 10” Spools)
Mechanic
January 2010 – March 2010Offshore Construction Specialists Pte Ltd
Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project.Location : Ujung Pangkah oil & gas field, East Java. IndonesiaPigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B andWHP A.
Mechanic August 2009 to November 2009
Offshore Construction Specialists Pte Ltd
Project : Star Energy Ltd. – Kakap Gas Development Project. Location : Kakap Field West Natuna, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline:
6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform,
6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform
10” pipeline 11.2 Km long. KG Platform to KF Platform
Mechanic and Project Leader ManMarch 2009 - June 2009Offshore Construction Specialists Pte Ltd
Project : Serica Energy – Asia Petroleum Development Project
-
8/21/2019 Precommissioning Procedure
50/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Location : Gelagah Kambua Field Development, Malacca Strait, North Sumatra, Indonesia
Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities,5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtrTOP. Pre-commissioning of laid pipeline
Task DescriptionMechanic & Leader man on 5KM trenching work from near shore to shore for beach pull operation,ensure the generator, air compressor and 2 unit of excavator running in good condition for 24hrstrenching operation. Maintain 24hrs operation on 5 unit jetting pumps during jetting operation and pre-commissioning job including pigging operation and hydrotesting of Dia. 14”, 42 KM pipeline.
Mechanic 1February 2002 – August 2008
J.Ray McDermott,Location : Batam, Indonesia
Marine onshore facility maintenance and projects preparation.
Task Description Maintain all running heavy equipments in marine onshore facilities to ensure working in bestperformance. Refurbish and prepare including function test of marine E&M equipment before send tooffshore for project including forklift, loader, Skagit Winch, Hydraulic Hammer, Generators,Compressors.Special in preparing flooding pumps and high pressures pumps for offshore use.
Mechanic and Project Leader ManMarch 2006 – July 2006J.Ray McDermottProject : PM3-Camau (Offshore Gas Pipeline Installation)Location : Vietnam
Dia.16” 300KM long Pipeline installation. Beach pull preparation, 6KM trenching from near shore toshore operation to buried pipeline in various depth from 4mtr near shore to 6mtr at offshore
Task DescriptionMechanic & Leader man on 6KM trenching work from near shore to shore for beach pull operation,
ensure the generator, air compressor and 2 unit of excavators running in good condition for 24hrstrenching operation. Maintain 24hrs operation on 6 unit jetting pumps during jetting operation.
Mechanic 1May 1990 – July 1999PT. McDermott IndonesiaLocation : Batam, Indonesia
Fabrication yard facility maintenance
Task Description Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift,
hydraulic crane, loader, generators and compressors.
-
8/21/2019 Precommissioning Procedure
51/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Mechanic Helper August 1987 – June 1989
PT. Barakaz Lumber CoyLocation : Riau, Indonesia
Logging Operation
Task DescriptionHelping mechanic in maintain heavy equipment including Bulldozer, Low Vehicle Trailer, Fork Lift,Compressors and Generators.
-
8/21/2019 Precommissioning Procedure
52/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
Mohd Zakaria Bin Abdul Aziz
Mechanic / TechnicianNationality: Malaysian
Date of Birth: 11-March-1986Marital Status: SingleLanguages: English and Bahasa Melayu
Education / Training
High School Graduate
Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules and
Travel Safety By Boat (OPITO Approved)-Validity 06-Jan-2015
Career Summary
Eight years of experience in offshore construction and engineering as a technician commissioning
team. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging,
Commissioning & Decommissioning
He start his career in November 2004 in Oil and Gas Pipeline Installation and commissioning and he’s
project completion and work experience in Malaysia and Singapore.
During his time as a technician, he gained much experience in the offshore jobs for Cleaning, Hydro
Testing, Dewatering, Drying and Nitrogen Packing.
He is also familiar with the Blowing, Flushing and Leak Testing jobs.
Work Experience
Mechanic Jan 2010 to presentOffshore Construction Specialists Pte Ltd
-
8/21/2019 Precommissioning Procedure
53/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after
project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.
Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-
commissioning work.
Completed Projects:
Mechanic July 2013 – August 2013Offshore Construction Specialists Pte LtdProject : TIMAS-EHMRS Location : Indonesia – South China Sea
Provision of Engineering Services and Subcontract Equipment associated with the installation ofFlexible flowlines for COPI Belanak Project
Precom Technican
July 2013Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin –Grouting Project
Location: North Malay Basin (Kota Bahru)
Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel Lewek Arunothai.
Mechanic January 2013 – April 2013Offshore Construction Specialists Pte Ltd
Project : Asian Energy Services – AES VSP Dangdo Thang Long Launch Location : Su Tu Vang Field, Thang Long-Dong Do Field, Vietnam
The preparation, rig up and execution of the jacket launch. The jacket weighed 4100mT was loadedand launch off the launch engineering, procedure preparation, physical barge rig up and sitesupervision and management of the launch operation, while Asian Energy performed the launch and
transportation engineering.
Mechanic August 2012 – January 2013Offshore Construction Specialists Pte Ltd
Project : Chevron (Australia) – Domgas Pipeline Installation ProjectLocation : Domgas Field Development, North West Coast of Australia
Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation
Task Description
Jetting Technician responsible for operating of jetting spread, monitoring the performance ofequipment and troubleshooting the jetting equipment in the event of equipment breakdown.
-
8/21/2019 Precommissioning Procedure
54/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
Mechanic April 2012 to May 2012Offshore Construction Specialists Pte LtdProject : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawalwells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigidspools.
Mechanic
September 2011 – October 2011Offshore Construct ion Specialists Pte LtdProject : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for SubseaFacilit ies of TSB Field Development
Location : TSB Field, Kangean Block – Bali Sea Indonesia.Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” RigidPipeline and 2 nos of 5.2km x 20” Rigid Pipelines
Mac 2011 – May 2011Offshore Construct ion Specialists Pte LtdProject : Dai Hung Field Development VSP -WHP DH2 JACKET LAUNCH ProjectLocation : VietsovPetro, Vung Tau, Vietnam
Commence reeving of port side sheave blocks using a messenger to pull 56mm wire through 500Tconstruction blocks back to 70t hydraulic winch. ‘Straight’ lace configuration. Launched with VSP-05(WD ~100m)
EMAS - Chevron Offshore (Thailand) Ltd.
HESS (Indonesia-Pangkah) Ltd Phase II Transportation and InstallationLocation - Surabaya, East Java Sea, IndonesiaTransport of CPP Deck, AUP Deck and LQ, Compression module, Bridges and flareboom
CPP and AUP Jackets were installed during the first campaign in the 4th Quarter 2010utilizing the DLB QP 2000. CPP and AUP jackets are 4 legged jackets with anapproximate unit weight of 300 tonne and 48” diameter steel pile foundations. The pileswere driven with a MHU270T to 95 meter penetration.
HESS Ujung Pangkah –Phase 1 Location - East Java Sea, IndonesiaTransporation and Installation of one 8 legged Well Head platform (WHP-B) and 3 pipelines (6”Gas lift, 12” Oil and 16” Gas) x ~5.5km between WHP-B and WHP-A (existing) including pre-commissioning.
-
8/21/2019 Precommissioning Procedure
55/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
Kakap Field KG Gas Development Project – Provision of EPCI of KG Gas Development ProjectServices including pre-commissioning.
Project: REINSTATEMENT TEST FOR CAKERAWALATOP SIDE N2 HE LEAK TEST FOR BULAN A
Client: Pertonas CarigaliYear: (Dec) 2007Scope of work: Leak testing.
Project: EPCC of Segamat Compressor Station Expansion ProjectClient: PETRONAS GASYear: (July) 2007
Scope of work: Blowing,Flushing,Hydrotesting and Nitrogen Packing
Project: EPCC of Nutral Gas Disiribution to SemenyihFL stage 1/05 Jalan Persekutuan 1 Semenyih-Beranang
Client: Gas MalaysiaYear: (Mar) 2007
SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGENPACKING.
Project: EPCC of Nutral Gas Disiribution to KundangFL DL stage 1/05 Kundang Sungai Buloh Selangor.
Client: Gas MalaysiaYear: (Jan) 2006Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing
Project: EPCC of Nutral Gas Disiribution to Setiawan
FL stage 2/05 Setiawan Perak.Client: Gas MalaysiaYear: (Feb)2006Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution to KaparFL stage 1/05,Kapar Klang Selangor.
Client: Gas MalaysiaYear: (Jan) 2006Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.
-
8/21/2019 Precommissioning Procedure
56/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
Project: EPCC of Nutral Gas Distribution System to Sungai BulohFL Stage 3/05, Sungai Buloh selango
Client: Gas Malaysia.Year: (Dec)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Project: EPCC of GPRW at Road B15 From SKVE to KVDT Precint 11,Putrajaya Selangor.
Client: Gas Malaysia.Year: (Dec)2005Scope of Work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
PROJECT: EPCC OF NUTRAL GAS DISTRIBUTION SYSTEM TO NORTH PORTFL DL STAGE 1/05, PORT KLANG SELANGOR.
Client: Gas Malaysia.Year: (Nov)2005Scope of Work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution to Bukit RambaiFL DL Stage 1/05 Bukit Rambai Melaka
Client: Gas MalaysiaYear: (Oct) 2005Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing
Project: EPCC of Nutral Gas Disiribution to Tangga BatuFL DL Stage 1/05 Tangga Batu Area Melaka.
Client: Gas MalaysiaYear: (Sept)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying, Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution System to Ayer KerohFL DL Stage 1/04, Industri Area Ayer Keroh Melaka.
Client: Gas Malaysia.Year: (Sept)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution to IjokFL Stage 1/05, Ijok, Kuala Selangor
Client: Gas MalaysiaYear: (Jun) 2005
-
8/21/2019 Precommissioning Procedure
57/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGENPACKING.
Project: EPCC of Nutral Gas Disiribution System to Pasir GudangFL DL Stage 1/05, Pan Century Edible Oils Sdn Bhd.
Client: Gas Malaysia.Year: (Sept)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution to Pulau Indah-WestportFL Stage 1/05, Pulau Indah Port Klang, Selangor .
Client: Gas MalaysiaYear: (May)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
-
8/21/2019 Precommissioning Procedure
58/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 1 of 3
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
NAME: INDRA JAYA
DATE OF BIRTH 24 February 1979
NATIONALITY Indonesian
MARITAL STATUS Married
EDUCATION/TRAINING :
• Technical High School, Dabo Singkep
• Alkon, “Pressure vessel training”
• JRM, In-house, “Confined Space Entry And Rescue Training”
• JRM, In-house, “PTW Performing Training”
• JRM, In-house, “Pressure Vessel Training”
• JRM, In-house, “Dead Weight Tester Operating Training”
• AST, “ Over Head Crane Training”
• JRM, In-house, “BBSM”
LANGUAGES Bahasa Indonesian (written and spoken)
English (Fair Spoken)
Career Summary
Over 7 years experience in repair and maintain instrumentation for pressure, temperature and flowmeasurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, TemperatureGauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device,for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar withrigging certification system and operating related machinery.
Instrument Technician March 2012 to presentOffshore Construction Specialists Pte Ltd
Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow
measurement device for Pigging and hydrotesting operation and grouting for the following projects in
Indonesia, Brunei and Myammar.
-
8/21/2019 Precommissioning Procedure
59/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 2 of 3
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
Current Project:
Work Experience
Technician/Mechanic
Oct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd
Project : Leighton OffshoreLocation : Jakarta - Cirebon
S513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services
Task Description
Sep to Oct 2013Offshore Construction Specialists Pte Ltd
Project : Su Tu Vang North East Development Project Location : Vietnam
Task Description
Responsible for performing the cleaning, gauging, flooding, hydrostatic testing of pipelinesHydrotesting & Precommissioning.
April 2013 – May 2013Offshore Construction Specialists Pte LtdProject : Swiber Shell - Air Lift JettingLocation : Bulan Bulan Field Development - Brunei
Jetting services for the Pile Refusal Remedial Project
Task Description Jetting Technician responsible for operating of jetting spread, monitoring the performance ofequipment and troubleshooting the jetting equipment in the event of equipment breakdown.
MechanicJanuary 2013 – April 2013Offshore Construction Specialists Pte LtdProject : PTTEPI – Installation of WP1, 2 and 3 well platforms and Intrafield SealinesLocation : Zawtika Field Development Project Phase I - Myamar
Offshore Pigging and Hydrotesting work on LTS 3000 for installation of WP1, 2, 3 Well Platformsincluding Jackets, Piles, jacket appurtenances and decks and WP2-ZPQ and WP3-ZPQ infieldpipelines.
-
8/21/2019 Precommissioning Procedure
60/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 3 of 3
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
MechanicApril 2012 to May 2012
Offshore Construction Specialists Pte LtdProject : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells
(BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.
Hydrotesting Instrument Technician 26 January 2006 to 28 Feb 2012PT. McDermott Indonesia
Responsible for the maintaining all hydrotesting instrumentations and related equipment and gears in
good condition for onshore and offshore pre-commissioning work. Preparation of all related
instrumentation and hydrotesting gears, work side by side with field engineer for offshore work.
Maintenance of all JRM stinger for all air lines and water lines and tanks in good and water tight
condition.
Project Involved :
• Camau Project
• Kerisi Project
• Esso Project• SUTUVANG Project
• Sutuden Project
• Rubi Project
• Guntong A Project
• Guntong B Project
• Dai Hung Project
• Bien Dong Project
• TGT Project
• Angel Project
•
Chevron Project• Sakhalin Project
• Macedon Project
-
8/21/2019 Precommissioning Procedure
61/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 1 of 5
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
NAME: BUDIMAN SAGALA
DATE OF BIRTH 16 Jul 1983
NATIONALITY Indonesian
MARITAL STATUS Single
MOBIL :+6281370977227 +6281372223565 EDUCATION/TRAINING :
• May 03, 2008 (MSTS) Tropical Basic Offshore Safety Induction & Emergency with EBS
• May 18, 2007 (J.Ray McDermott) Permit To Work
• December 21, 2006 (J.Ray McDermott) Confined Space Entry And Rescue
• November 27, 2006 (Indonesia Labor Department) Hoist Crane Operator
• May 2006, (DH. Budenberg) Dead Weight Tester Usage and Maintenance
• April, 2004 (Carl Stahl Evita Ltd), Level 1, Wire Rope Inspector
LANGUAGES Bahasa Indonesian (written & spoken)
English (fair spoken)
Career Summary
Over 12 years experience in repair and maintain instrumentation for pressure, temperature and flowmeasurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, TemperatureGauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device,for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar withrigging certification system and operating related machinery.
Work Experience
Instrument Technician March 2009 to presentOffshore Construction Specialists Pte Ltd
Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow
measurement device for Pigging and hydrotesting operation for the following projects in Indonesia,
Thailand and Myammar.
-
8/21/2019 Precommissioning Procedure
62/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 2 of 5
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
Completd Project:
Technician
Jul 2013 – Sep 2013Offshore Construction Specialists Pte Ltd
Project : PERTAMINA EP - REROUTE GAS PL L-PARIGI-CILAMAYA Location : PT TIMAS SUPLINDO,INDONESIA
Provision of Engineering Services associated with the Provision of Hot Tap and pipeline Limacomplex by pass, perform the pipeline pre-commissioning on the assumption that the scope is asFlooding and gauging, hydrotesting, bulk dewatering and nitrogen packing to 5 psi pressure.
TechnicianNov – Dec 2013Offshore Construction Specialists Pte Ltd
Project : PT Timas SuplindoLocation : Jakarta
UL ProjectPre-commissiong Services
Task DescriptionOct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd
Project : Leighton OffshoreLocation : Jakarta - Cirebon
S513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services
Task DescriptionJan 2013 – Apr 2013Offshore Construction Specialists Pte Ltd
Project : PTTEP MYANMAR – L&T-Zawtika Grouting Project Location : PTTEP INTERNTIONAL LIMITED, Gulf of Moattama, Myanmar
Zawtika Field Development Project Phase 1A EPCI for WP1, WP2, WP3 and Intrafield Sealines –
Flooding, Gauging and Hydrotesting of pipeline.
TechnicianNovember 2012Offshore Construction Specialists Pte LtdProject : Galoc Ph 2 Development – Leak Testing for 6” Flexible pipeline ProjectLocation : Bien Dong Development Field - VietnamLeak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3”Fuel Gas Flowline (2060 m length, 76.2 mm ID)
-
8/21/2019 Precommissioning Procedure
63/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 3 of 5
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
2 off 7” condensate riser (355.7 m and 365.5 m length, 177.8 mm ID) + 7” condensate flowline (2060m length, 177.8 mm ID).Task Description
Leak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3”Fuel Gas Flowline (2060 m length, 76.2 mm ID) and 2 off 7” condensate riser (355.7 m and 365.5 mlength, 177.8 mm ID) + 7” condensate flowline (2060 m length, 177.8 mm ID).
TechnicianOctober 2011 – November 2011Offshore Construction Specialists Pte LtdProject : Korea Development Company LTD. – Gas Lift Compression Project.Location : Poleng Field – Gresik, West Java, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PP and 6” GasLift DW-PP in total length 6.3 Km.
TechnicianSeptember 2011 – October 2011Offshore Construction Specialists Pte LtdProject : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilitiesof TSB Field DevelopmentLocation : TSB Field, Kangean Block – Bali Sea Indonesia.Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and2 nos of 5.2km x 20” Rigid Pipelines
TechnicianFebruary 2011 – July 2011Offshore Construction Specialists Pte LtdProject : CHEVRON 2011 INSTALLATION CAMPAIGN.
PLATFORMS AND PIPELINES INSTALLATIONLocation : Chevron Thailand Oil and Gas Fields, Gulf of Thailand
Flooding and gauging work of newly laid pipelines:16” NPPLL, 5.4 Km Long Pipeline10” FUPLP, 5.9 Km Long Pipeline10” PDPLB, 6,7 Km Long Pipeline10” KPPLG, 2.7 Km Long Pipeline10” ERPLZC, 2.4 Km Long Pipeline
As well leak testing of spools before subsea tie in of:NPWL Platform (3 ea x 16” Spools)FUWP Platform (2 ea x 10” Spools)PDWB Platform (5 ea x 10” Spools)KPWG Platform (2 ea x 10” Spools)ERWZC Platform (2 ea x 10” Spools)
Technician January 2010 – March 2010
-
8/21/2019 Precommissioning Procedure
64/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 4 of 5
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd
Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project.
Location : Ujung Pangkah oil & gas field, East Java. IndonesiaPigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B andWHP A.
TechnicianAugust 2009 to November 2009Offshore Construction Specialists Pte Ltd
Project : Star Energy Ltd. – Kakap Gas Development Project. Location : Kakap Field West Natuna, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline:
• 6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform,
• 6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform10” pipeline 11.2 Km long. KG Platform to KF Platform
TechnicianNovember 2008 – June 2009Offshore Construction Specialists Pte LtdProject : Gelagah Kambuna Field DevelopmentLocation : Malacca Strait, North Sumatra, Indonesia
Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities,5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtrTOP. Pre-commissioning of laid pipeline
Task DescriptionPreparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Set up offshoreflooding and pigging operation for Diameter 14” 42 Km long newly laid Pipeline ensure sea waterchemical treatment composition against sea water as per company spec. Set up hydrotesting ofDiameter 14” 42 Km long newly laid Pipeline, operating Dead weight tester, monitor pressure andvolume indicator on hydrotesting operation on site under supervision of Pre-commissioning/ProjectEngineer.
TechnicianNovember, 2008 – June, 2009J.Ray McDermott
Project : Shell MalaysiaLocation : Terengganu, Malaysia
Task DescriptionPreparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Ensure allrequired fittings to be complete for Pigging and hydrotesting set up. Set up offshore flooding andpigging operation for Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, ensuresea water chemical treatment composition against sea water as per company spec. Set uphydrotesting of Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, operating Dead
-
8/21/2019 Precommissioning Procedure
65/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 5 of 5
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
weight tester, monitor pressure and volume indicator on hydrotesting operation on site undersupervision of Pre-commissioning/Project Engineer.
Instrumentation TechnicianJuly 2001 – October 2008J.Ray McDermott
Marine Instrumentation and Rigging Certification Division
Task DescriptionPrepare of instrumentation for offshore pre-commissioning work. Ensure all pressure and temperaturemeasurement device i.e. Dead Weight Tester, Pressure Gauges, Temperature Gauge, PressureRecorder, Temperature Recorder, Holiday Detector, Pinger, Pinger Detector, Turbine Flowmeter andetc. in valid certificate and in-house checking all the mentioned instrumentation after project formaintenance.
Responsible of Leak test for offshore project installation aid fabricated in marine workshop i.e. PigLauncher, Pig Receiver, Spool Pipe and Test Header and etc.
Function test all the J.Ray McDermott Asia Pacific Stinger after maintenance in Batam, Marine facilitybefore attached to all J.Ray McDermott Pipe Lay Barge.
Responsible as well for ensure all rigging and lifting gears to be color coded and ensure all rigging tobe with valid certificate before send to offshore project.
-
8/21/2019 Precommissioning Procedure
66/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 1 of 3
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
NAME: IDHAM JAWAHIR
DATE OF BIRTH 1 Jul 1972
NATIONALITY IndonesianMARITAL STATUS Married
LANGUAGES Bahasa Indonesian (written & spoken)
English (fair spoken)
Career Summary
Over 8 years’ of experience in offshore construction and engineering as a technician commissioningteam. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging,Commissioning & Decommissioning.
Work Experience
Grouting/Pre-com March 2012 to presentOffshore Construction Specialists Pte Ltd
Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition afterproject and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-
commissioning work.
Completed Project:
Precom Supervisor
September to October 2013Offshore Construction Specialists Pte Ltd
Oct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd
Project : Leighton OffshoreLocation : Jakarta - Cirebon
S513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services
Task Description
Project : Su Tu Vang North East Development Project Location : Vietnam
-
8/21/2019 Precommissioning Procedure
67/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Page 2 of 3
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.
Task Description
Responsible for performing the cleaning, gauging, flooding, hydrostatic testing of pipelines the
Hydrotesting & Precommissioning
Precom Supervisor
July 2013Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin
– Grouting ProjectLocation: North Malay Basin (Kota Bahru)
Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel LewekArunothai.
Precom SupervisorJanuary 2013 – April 2013
Project : PTTEP MYANMAR – L&T-Zawtika Grouting Project Location : PTTEP INTERNTIONAL LIMITED, Gulf of Moattama, Myanmar
Zawtika Field Development Project Phase 1A EPCI for WP1, WP2, WP3 and Intrafield Sealines –Flooding, Gauging and Hydrotesting of pipeline.
Jetting TechnicianAugust 2012 – January 2013Offshore Construction Specialists Pte Ltd
Project : Chevron (Australia) – Domgas Pipeline Installation ProjectLocation : Domgas Field Development, North West Coast of Australia
Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation
Task Description Jetting Technician responsible for operating of jetting spread, monitoring the performance ofequipment and troubleshooting the jetting equipment in the event of equipment breakdown.
MechanicApril 2012 to May 2012Offshore Construction Specialists Pte Ltd
Project : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells
(BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.
Senior MechanicMay 2005 – Dec 2011PT. Sea Struck Indonesia
-
8/21/2019 Precommissioning Procedure
68/68
Offshore Construction Specialists Pte Ltd.
20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839
Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
Location : Batam, Indonesia
Fabrication yard facility maintenance
Task Description Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift,hydraulic crane, loader, generators and compressors.