  • 8/21/2019 Precommissioning Procedure

    1/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    41578/A/0001/UK/En PIPELINE PRE-COMMISSIONING

    PRE-QUALIFICATION DOCUMENT

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    Offshore Const ruction Specialists (OCS)20 Toh Guan Road

    CJ GLS Building #07-02Singapore 608839

    Tel: +65 6567-9080Fax: +65 6567-8082

    Web: http://www.offshore-ocs.com/index.html

    Contact Information

    Contact Company Position Email Address.

    Keith Jackson Managing and Technical Director [email protected] 

    Seto Jian Operations Manager [email protected] 

    William Wijaya Project Manager [email protected] 

    Loke Kah Poh Project Manager [email protected] 

    Rakul Remanan Engineering Manager [email protected] 

    Henry Chuy Subcontracts & Procurement Manager [email protected] 

     Alastair Wong Senior Project Engineer [email protected]

    Fery Wijaya Project Engineer [email protected] 

  • 8/21/2019 Precommissioning Procedure

    2/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    TABLE OF CONTENTS

    1. 

    INTRODUCTION .................................................................................................................................... 3 

    2.  OCS ORGANISATION CHART ............................................................................................................ 4 

    3. 

    TYPICAL PRECOMMISSIONING ORGANISATION CHART................................................................ 6 

    4.  PIPELINE PRECOMMISSIONING ACTIVITIES .................................................................................... 7 

    5.  SAFETY AND SAFE WORKING PRACTICES. ..................................................................................... 7 

    6.  ENGINEERING AND PROCEDURES. .................................................................................................. 8 

    7.  PROCUREMENT. .................................................................................................................................. 8 

    8. 

    FABRICATION. ...................................................................................................................................... 8 

    9.  PIPELINE FLOODING, CLEANING AND GAUGING. .......................................................................... 8 

    10. 

    PIPELINE INTELLIGENT AND CALLIPER PIGGING. .......................................................................... 8 

    11.  PIPELINE HYDROTESTING ................................................................................................................. 8 

    12.  PIPELINE BULK DEWATERING ........................................................................................................... 8 

    13.  PIPELINE AIR DRYING. ........................................................................................................................ 8 

    14. 

    PIPELINE VACUUM DRYING ............................................................................................................... 8 

    15.  NITROGEN PACKING ........................................................................................................................... 8 

    16. 

    EXISTING AND PAST CLIENTS ........................................................................................................... 9 

    17.  COMPLETED PROJECTS ................................................................................................................... 10 

    18.  EQUIPMENT DATA SHEETS .............................................................................................................. 18 

    19. 

    ISO CERTIFICATION........................................................................................................................... 37 

  • 8/21/2019 Precommissioning Procedure

    3/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    1. INTRODUCTION

    Offshore Construction Specialists (OCS) was formed in 2007 from a core group of marineconstruction engineers to provide construction management, engineering and strategic supportequipment services primarily to the offshore oil and gas sector.

    Our key personnel come from previous careers at J.Ray McDermott in the marine operationsdepartment. Our managing and technical director Mr Keith Jackson worked for 17 years in thegroup the last 5 years as the marine division manager.

     As a matter of policy under Mr Jackson J.Ray McDermott would execute work peripheral to thatbeing undertaken by the major work vessel (normally executed using third party subcontractors)

    using in-house resources. Pipeline pre-commissioning, pre and post trenching, flexible flowline /umbilical lay are examples of work that was routinely carried out in-house and not subcontracted.One of the main reasons for doing this was that it prevented the activities of the subcontractorimpinging on the work of the high cost marine spread. The work was always planned withmaximum operational synergy in mind

    In JRM large pipeline pre-commissioning projects such as the 650 km West Natuna gasgathering pipeline network and many other major projects were planned and executed in-house.

    OCS has taken the model developed in JRM and applied it to our own activities. Our equipmentis managed and operated by people who come from the same background as the main marinecontractor. We help the marine contractor plan the work such that the pre-commissioning has

    the least impact on operations. We are proactive in highlighting potential issues and ensuringboth parties win. Our engineering capabilities are very sophisticated and significantly moreadvanced than our competitors.

    OCS has now completed a range of pre-commissioning projects for many different customerswith great success. OCS is certified by Nata for pipeline hydrotesting which is the preeminentqualification for pre-commissioning contractors. The OCS organisation has also been qualified toIS0 9001 since 2009.

    Our in-house equipment spread has grown significantly and is described in detail in thisdocument. OCS is equipped to handle the full range of pre-commissioning activities including

    flooding, cleaning, gauging, hydrotesting, dewatering, drying and nitrogen packing. We work withestablished intelligent and caliper pig suppliers to complement our service. We have establishedlong term relationships with key Singapore and overseas vendors.

    OCS is equipped to handle large projects or discrete project elements depending on the specificneeds of the customer.

    The company has grown steadily since incorporation and now employs 60 personnel of whom 30are civil/structural and mechanical engineers working with our pre-commissioning technicians.

    The company office in Toh Guan Rd, Singapore has been leased until 2014 and has room foradditional expansion. The office can accommodate customer representatives for liaison as

    necessary.

  • 8/21/2019 Precommissioning Procedure

    4/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    2. OCS ORGANISATION CHART

    KEY PERSONNEL CONTACTS

    Keith Jackson Managing and Technical Director [email protected] 

    Seto Jian Operations Manager [email protected] 

    William Wijaya Project Manager [email protected] 

    Loke Kah Poh Project Manager [email protected] 

    Rakul Remanan Engineering Manager [email protected] 

    Henry Chuy Subcontracts & Procurement Manager [email protected] 

     Alastair Wong Senior Project Engineer [email protected] 

    Fery Wijaya Project Engineer [email protected] 

  • 8/21/2019 Precommissioning Procedure

    5/68

     

    PRE QUALIFICATION Offshore Construction Specialists Pte Ltd.

    KEITH JACKSON

    MANAGING & TECHNICAL DIRECTOR  

    PROJECT & CONSTRUCTIONMANAGEMENT

    SETO JIAN

    OPERATIONS MANAGER KP LOKE

    PROJECT MANAGER 

    NG

     ACCOUNTS

    CONSTRUCTIONENGINEERING

    FIELD CONSTRUCTIONOPERATIONS

    SAYED DEDY

    PRE-COMMENGINEER  

    DRAFTING

    PR

    SEN

    SUDHA

     ANDY

    PRIYA

    ZIA AL

    STRUC

    CHANIN

    SRIYAPORN 

    SNR.DRAFTING

     ALASTAIR WONG

    SNR PROJECTENGINEER/ 

    PRE-COMM MANAGER  FERY WIJAYA  

    PROJECT MANAGER 

    BODIE

    MALLET 

    SETTHA Y. 

    IVAN CHAI 

    (OPERATIONS/SNR. FIELDENGINEER)

    LE

    CU

    KRISBEL 

    BUDIMAN 

    ZACK  

    INDRA  

    IDHAM 

    TECHNICIANS MECHANICS

     

    OPERATIONS ADMINISTRATION

    UDAY

    MOH

    SENIOEN

    JU

     AD

     ARYO PRAKOSO

    SNR. DRAFTSMAN

    OCS ORGANISATION CHART 

    PLANT &EQUIPMENT 

     ADI CAHYA 

     AARON LIAN 

    TRACY EE 

    ZHONG ZHIYUAN 

    DAVID SHAW 

     CHEAH WIN LOONG 

    CHATCHAI W. 

    SEAN SIA TIN WEI

    DANIEL CAO 

    FIELD ENGINEERS

    ENGINEERING

    RAMIL ZAPANTA  

     VINOTH KUMAR 

     DRAFTSMAN 

    RAKULREMANAN

    ENGINEERINGMANAGER 

    OPERATIONS

    STRATEGICEQUIPMENT

    TEAM FIELD

    CONSTRUCTIONSUPERVISION

    TEAM

    JAMIE

    JACOBSEN 

    LEON COAD 

    DAVID WOOD 

    FIELD FOREMANS

    JAMES CARROLL

    FIELDSUPERINTENDENT

    D

    EQUIPMENT

     WILLIAM WIJAYA 

     EQUIPMENT MANAGER 

    *ADMINITRATION 

    *ADMINITRATION SUPPORTTEAM: TRACY & URISA  

    JAW LE 

    E & MCOORDINATOR 

     

    RONI 

    GROUTINGSUPERVISOR  

    TO

    IT

    REMARK: 

    HERYA

    TAUFA

    SAINU

    SAVOY

     AMITH

    NAVA

  • 8/21/2019 Precommissioning Procedure

    6/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    3. TYPICAL PRECOMMISSIONING ORGANISATION CHART

    OCS Pre-commissioning Team offshore

    ONSHORE

    OFFSHORE

    Note* : Project Managers, Project Engineers & Pre-commissioning Engineers will be selected from thepersonnel pool shown for each categary.

    CLIENT

    KP LOKE

    WILLIAM WIJAYA

    PROJECT 

    MANAGERS

    RAKUL 

    REMANAN

    ENGINEERING 

    MANAGER

    PRAVIN THORAT

    HERY LEMBANG

    SUDHAKAR 

    SUBRAMANIAM

    UDAYSARATHY

    MOHAN

    ZIA AKBAR

    TAUFAN SIREGAR

    PRIYA PANJIROSA

    AMITH PRASAD

    SAVOY

    SAINUL ABID

    CONSTRUCTION 

    SUPPORT 

    ENGINEERS

    CHANIN 

    SRIYAPORN

    ARYO PAKOSO

    RAMIL ZAPANTA

    VINOTH

    DRAFTING

    ALASTAIR WONG

    FERY WIJAYA

    PROJECT 

    ENGINEERS

    SAYED DEDY 

    MAHDI

    ADI CAHYA

    BODIE MALLET

    SETTHA Y.

    IVAN CHAI

    CHONG CHIA YAN

    AARON LIAN

    DAVID SHAW

    CHEAH WIN 

    LOONG

    CHATCHAI

    SEAN SIA

    FIELD ENGINEERS

    HENRY CHUY

    SUBCONTRACTS & 

    PROCUREMENT 

    MANAGER

    JOYCE 

    LIM

    EXPEDITOR/ BUYER

    CHARLES TAN

    BUYER/ SUBCONTRACTS 

    EXECUTIVE

  • 8/21/2019 Precommissioning Procedure

    7/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    4. PIPELINE PRECOMMISSIONING ACTIVITIES

    OCS experience embraces the full range of pipeline pre-commissioning activities from the initialflooding, cleaning, gauging and hydrotesting to dewatering, drying and nitrogen purging andpacking.

    Specific activities undertaken by OCS:

    No. Description

    1 Flooding, Cleaning and Gauging.

    2 Calliper and Intelligent Pigging.

    2 Hydrotesting

    3 Dewatering/ Swabbing

    4 Air Drying

    5 Vacuum Drying

    6 Nitrogen Purging

    7 Nitrogen Packing

    OCS provides a cradle to grave pipeline pre-commissioning services including completeengineering, procurement, fabrication and execution services. Our in-house inventory isextensive and our personnel are well trained.

    5. SAFETY AND SAFE WORKING PRACTICES

    OCS is acutely aware of the dangers involved in the marine construction industry in general and inpipeline pre-commissioning particularly where high pressure water and air and heavy equipment,chemicals etc combine to create a range of potential hazards if not managed properly.

     All OCS activities on specific projects are the subject of hazids and risk assessments to ensure

    levels of risk are reduced to as low as reasonably practical. These risk assessments are ideallyattended by the main contractor and the ultimate client.

    Other specific safety and operational measures that are taken:

    i) All OCS personnel have appropriate Bosiet offshore sea survival trainingii) OCS technicians are Nata qualified and well trained for their specific dutiesiii) All OCS equipment is provided with a specific safety passport.iv) Offshore hazardous areas are barricaded as required and unauthorized personnel are

    excluded.v) All installation aids are properly engineered and subject to structural checks by the OCS

    CSE group.

    vi) Appropriate Hazchem sheets are posted in areas where chemicals are in use.

  • 8/21/2019 Precommissioning Procedure

    8/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    6. ENGINEERING AND PROCEDURES

    OCS prepares project specific engineering and procedures for each job undertaken. What setsOCS apart from other pre-commissioning contractors is our engineering skills base which meansthat all structural, mechanical, hydrodynamic and aerodynamic considerations are addressed in-house. OCS procedures will address:

    i) Project specific procurement requirements.ii) Equipment specification requirements and preparations.iii) Designs of Pig launchers and receivers for Flooding, Cleaning and Gauging.iv) Designs of Hydrotest heads.v) Designs of Pig Launchers and Receivers for Dewatering and Drying.vi) Pig Requirements and Designations.

    vii) Intelligent and Calliper Pigging requirements.viii) Chemical injection requirements.ix) Hydrotesting pressurization, strength and leak tests.x) Bulk Dewatering.xi) Drying Procedures using Air or Vacuum drying techniques.xii) Nitrogen Packing.

    7. PIPELINE PRE-COMMISSIONING PROCEDURES

    PLEASE REFER TO APPENDIX 1 

    8. FABRICATION

    9. PIPELINE FLOODING, CLEANING AND GAUGING

    10. PIPELINE INTELLIGENT AND CALLIPER PIGGING

    11. PIPELINE HYDROTESTING

    12. PIPELINE BULK DEWATERING

    13. PIPELINE AIR DRYING

    14. PIPELINE VACUUM DRYING

    15. NITROGEN PACKING

  • 8/21/2019 Precommissioning Procedure

    9/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    8 EXISTING AND PAST CLIENTS

    OCS has built up a significant customer base during four (4) years of operations. OCS past andpresent clients are listed below. References can be provided on request.

    No. Client Name

    1 Star Petroleum ( Indonesia)

    2 HESS ( Indonesia)

    3 Asia Petroleum Developments (Salamander)

    ( Indonesia)4 Kangean Energy ( Indonesia)

    5 NuCoastal ( Thailand)

    6 Chevron (Thailand)

    7 EMAS ( Singapore) 

    8 Larsen & Toubro ( Malaysia/ India) 

    9 SapurasAcergy ( Malaysia) 

    10 TLO SapuraCrest ( Malaysia) 

    11 Heerema (Holland) 

    12 NorCe ( Singapore) 

    13 Offshore Marine Contractors

    14 Vietsovpetro (VSP) (Vietnam)

    15 Timas Suplindo ( Indonesia)

    16 Nippon Steel (Indonesia)

    17 Newfield Peninsula Malaysia ( Malaysia)

    18 Franklin Offshore ( Singapore)

    19 M3 Energy ( Malaysia)

    20 Sarku ( Malaysia)

    21 Hako Offshore ( Singapore)

    22 Global Industries ( Malaysia)

    23 Sea Drill ( Singapore)

    24 Origin Energy (Australia)

    25 Swiber ( Singapore)

    26 Galoc ( Philipines)

    27 GFI ( Thailand)

  • 8/21/2019 Precommissioning Procedure

    10/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    9.  COMPLETED PROJECTS

    Year Project Title ClientPipelineDia (“ )

    Length(km)

    Scope Of Work Location

    2007 GFI EOCP EMASoffshore

    Constructionand

    Production

    10”

    6” Flexible

    0.8

    0.1

    Flood, Clean,Gauge and

    Hydrotest/Leaktest

    Gulf ofThailand

    2008 GalocDevelopment

    Project

    EOCP EMASoffshore

    Construction

    andProduction

    6 “ Spool6” Flexible

    0.7 Leak Test 65km offNorth West

    Coast of

    PalawanIsland

    2008 Nexus Australia-Bass Strait 

    Nexus PLEM &StartupHeads

    - Leak Test Singapore

    2009 Asia PetroleumDevelopment

    (APD) – GlagahKambuna FieldDevelopment

    PT Timas 14 “ 42 Flood, Clean,Gauge andHydrotest

    From theKambunaplatform

    offshore NorthSumatera to a

    landfallNortheast ofMedan

    2009 Star PetroleumKakap Field

    Redevelopment

    PT Timas 10”

    6”

    6”

    11.2

    2

    2.3

    Flood, Clean,Gauge andHydrotest

    Kakap Fieldlocated in theIndonesian

    West NatunaSea

    2009 M3nergy JDASdn Bhd/Carigali-

    PTTEPI-JDABlock B-17

    FranklinOffshore

    11” Flexible 0.24 Leak Test OffshoreMalaysia

    2010 HESS UjungPangkah

    Development

    PT Timas 6”

    12”

    16”

    5.5

    5.5

    5.5

    Flood, Clean,Gauge,

    Hydrotest,Dewater, Air &Vacuum Dryand Nitrogen

    Packing

    UjungPangkah,Gresik inSurabayaIndonesia

  • 8/21/2019 Precommissioning Procedure

    11/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    Year Project Title Client

    Pipeline

    Dia (“ )

    Length

    (km) Scope Of Work Location

    2011 KangeanEnergy

    IndonesiaLimited – TSBDevelopment

    PT Timas 18”20”20”

    255.55.5

    Flood, Clean,Gauge andHydrotest,

    Dewater, Dryand Nitrogen

    Packing

    Bali Sea,approximately120km fromPagerubgan

    Island

    2011 Kodeco Project PT Timas 6” 7 km &6km

    Flood, Clean,Gauge andHydrotest

    Java Sea

    2011 Chevron

    (Thailand)

    EMAS 10”

    16”

    35 km &35 km

    Flood, Clean,Gauge andHydrotest

    Gulf OfThailand

    2011 TSB Kangean PT Timas 18”

    20”

    25.745km &5.2km

    Flood, Clean,Gauge andHydrotest,

    Dewater, Dryand Nitrogen

    Packing 

    Java Sea

    2012 Bawal PT Timas 14” 40 km Flood, Clean,Gauge andHydrotest

    Natuna Sea

    2012 Bien Dong DOF Subsea 6” flexible 400m LeakTest Vietnam

    2013 Zawtika L&T 18”

    18”

    11.3 km &9.7km

    Flood, Clean,Gauge andHydrotest

    Myanmar

    2013 PTTEP BongkotRiser

    Replacement

    DOF Subsea 6” 80m LeakTest Gulf OfThailand

    2013 Pertamina EPMOL Project

    LeightonOffshore

    12” 28km Flood, Clean,Gauge,

    Hydrotest andDewater

    Java Sea

    2012 Pertamina ULProject

    PT Timas 12” 12 km Flood, Clean,Gauge andHydrotest

    Java Sea

    2012

    Pertamina EPL-Parigi

    PT Timas 20’ / 14” 500m/3.3

    km

    Flood, Clean,

    Gauge,Hydrotest

    Java Sea

  • 8/21/2019 Precommissioning Procedure

    12/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    2014 Petronas

    Ketapang

    PT Timas 12” 111 km Flood, Clean,

    Gauge,Hydrotest,

    Dewater, Dry,N2 Pack.

    2014 PetronasKetapang

    PT Timas 8/12”/16” 700 meach

    Flood, Clean,Gauge,

    Hydrotest, .

  • 8/21/2019 Precommissioning Procedure

    13/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    GFI (Thailand) Pigging and Hydrotesting Photos (Nov 2007 to Jan 2008)

    Flexible Riser Leak For M3nergy JDA Sdn Bhd / Carigali-PTTEPI - JDA Block B-17,Offshore Malaysia. ( Sep 2009) Photos

  • 8/21/2019 Precommissioning Procedure

    14/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    Star Energy (KAKAP) Pipeline Project– Pigging & Hydrotest (Oct 2009) Photos

     Asia Petroleum Development (APD) Pigging and Hydrotest ing. - Glagah Kambuna FieldDevelopment Pro ject (Mar 2009) Photos  

  • 8/21/2019 Precommissioning Procedure

    15/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    HESS (UJUNG PANGKAH) Pipeline Project–

    Pigging, Hydrotest, Dewatering, Drying & N2 Pack (Jan – Feb 2010) Photos

    Chevron Thailand ProjectPigging & Hydrotest (Jan – July 2010) Photos

  • 8/21/2019 Precommissioning Procedure

    16/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    Kangean Project

    Pigging, Hydrotest, Dewatering, Air drying and N2 packing (Aug- Nov 2011) Photos

    Kodeco ProjectPigging & Hydrotest (Oct - Dec 2011) Photos

  • 8/21/2019 Precommissioning Procedure

    17/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    Zawtika Project, 2013

    Pigging & Hydrotest Photos

  • 8/21/2019 Precommissioning Procedure

    18/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    18. EQUIPMENT DATA SHEETS

    OCS operates a comprehensive range of pre-commissioning equipment. Each piece ofequipment has it own equipment passport which is maintained from project to project. This helpsensure that only appropriately maintained equipment is supplied to projects.

     A sample of our equipment passport is included below.

    7.1. FLOODING PUMP SERIES 1 

    FLOODING PUMP  - 03 Nos. 

    Capacity 320 Cu.m / Hr

    Maximum Head 171 meters

    Engine Make Detroit Diesel 8V-92TA 450BHP

    Pump Make SLD 280-43 3

  • 8/21/2019 Precommissioning Procedure

    19/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

  • 8/21/2019 Precommissioning Procedure

    20/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

  • 8/21/2019 Precommissioning Procedure

    21/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.2. FEED PUMP 

    FLOODING PUMP  - 02 Nos. 

    Capacity 1590 Cu.m / Hr

    Maximum Head 25 meters

    Engine Make Detroit Diesel 8V-92TA 450BHP

    Pump Make SLOW350-380B

  • 8/21/2019 Precommissioning Procedure

    22/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

  • 8/21/2019 Precommissioning Procedure

    23/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

  • 8/21/2019 Precommissioning Procedure

    24/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.3. DIESEL DRIVEN FLOODING / JETTING PUMP SERIES 2

    (HIGH PERFORMANCE) 

    FLOODING PUMP - 02 Nos. 

    Capacity 335 Cu.m / Hr

    Maximum Head 260 meters

    Engine Make Detroit Diesel 12V-149TI 1130BHP

    Pump Make 250SLD 450-60 4

  • 8/21/2019 Precommissioning Procedure

    25/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

  • 8/21/2019 Precommissioning Procedure

    26/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

  • 8/21/2019 Precommissioning Procedure

    27/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.4. DIESEL DRIVEN HIGH PRESSURE PUMP SERIES 2 (HIGH

    PERFORMANCE) 

    HIGH PRESSURE DISEL DRIVENPUMP

    - 01 Nos. 

    Capacity 180 liters / Minute

    Maximum Pressure 7250 psig

    Engine Make Johndeere 160kw 6 cylinder diesel engine

    Pump Make Woma 2502 P40

  • 8/21/2019 Precommissioning Procedure

    28/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

  • 8/21/2019 Precommissioning Procedure

    29/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.5. HIGH PRESSURE DISEL DRIVEN PUMP SERIES 1 

    HIGH PRESSURE DISEL DRIVENPUMP

    - 01 Nos. 

    Capacity 35-37 liters / Minute

    Maximum Pressure 8000 psig

    Engine MakeIsuzu 50 HP-4 cylinder (turbocharged & water

    cooled)

    Pump Make Den-Jet CD 40-550

    7.6. HIGH PRESSURE AIR DRIVEN PUMP 

    HIGH PRESSURE AIR DRIVENPUMP

    - 01 Nos. 

    Capacity 20 liters / Minute

    Maximum Pressure 7,500 psig

    Maximum Air Supply Pressure 125 psig

    Pump Make Haskel Model TP600-GSF-60

  • 8/21/2019 Precommissioning Procedure

    30/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    HIGH PRESSURE AIR DRIVENPUMP

    - 04 Nos. 

    Capacity 4 liters / Minute

    Maximum Pressure 600 psig

    Maximum Air Supply Pressure 120 psig

    Pump Make Hydraulics International HI Model 5L-SS-60

  • 8/21/2019 Precommissioning Procedure

    31/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.7. DEAD WEIGHT TESTER 

    DEAD WEIGHT TESTER + WEIGHTSET

    - 02 Nos. 

    Make DH –BUDENBERG MODEL 580 DX

    Range 0-700 bar

     Accuracy 0.025 %

    Least Count 0.069 bar

  • 8/21/2019 Precommissioning Procedure

    32/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.8. PRESSURE/TEMPERATURE RECORDER 

    PRESSURE RECORDER - 03 Nos. 

    Make BARTON

    Range 0-5000 psi

     Accuracy ± 1 % FS

    TEMPERATURE RECORDER - 02 Nos. 

    Make SCOTECH

    Range 0-50o C

     Accuracy ± 1 % FS

    PRESSURE-TEMPERATURE DUALRECORDER

    - 02 Nos. 

    Make BARTON

    Range 0-5000 psi/0-100o C

     Accuracy ± 1 % FS

  • 8/21/2019 Precommissioning Procedure

    33/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.9. 8 X 10 FT BREAK TANK (18 Cu.m Capacity) - 01 Nos 

    For storage and introducing freshwater slug during pigging/ dewatering of pipelines

  • 8/21/2019 Precommissioning Procedure

    34/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.10. VACUUM PUMP 

    VACUUM PUMP  - 01 Nos. 

    Capacity 1020 Cu.m / Hr

    Booster MakeEdwards mechanical booster Model EH1200,

    Hydrokinetic Drive

    Pump MakeEdwards high vacuum pump Serial 220. EIM

    275

    7.11. PRESSURE TRANSDUCER & READOUT) 

    - 03 Nos. 

    Type 750C, ABSOLUTE PRESSURE TRANSDUCER 

    Make/ Range MKS 

     Accuracy/ Input/ Output

    10 MILLIBAR , 100 MILLIBAR , 1000 MILLIBAR

    1% OF FULL SCALE

    +13 TO +32 VDCINPUT, 0-10VDC O/P

    - 02 Nos. 

    Type DIGITAL SUPPLY AND READOUT

    Make/ Range MKS

    Input Power220VAC

  • 8/21/2019 Precommissioning Procedure

    35/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.12. HEATED REGENERATIVE DESICCANT AIR DRYER & AIR COOLED AFTER

    COOLER 

    Regenerative compressed air dryer use desiccant to absorb water vapour from the compressedairstream. In the twin tower design, one tower dries the air from the After-cooler while thedessicant in the other tower is being regenerated to provide continuous operation. A heater isadded to heat the purge air. It not only benefits the regeneration effect but also decreasesregeneration purge loss.

    Desiccant: activated alumina + molecular sievePurge air:

  • 8/21/2019 Precommissioning Procedure

    36/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    7.13. LIQUID N2 CONVERTER 

    1. Operating parameters:

      Design temperature load bearing/pressure retaining –20 Deg to + 50 Deg C.

      Design temperature machinery –20 Deg to + 50 Deg C.2. Diesel Engine

      Detroit Diesel model 8V 71T

      Rated to produce 420 BHP @ 2100 RPM. (Continuous)3.. Gearbox

      Marco 3 pad hydraulic pump drive gearbox

      Marco Gearbox will be enclosed coupled on engine flywheel4. Start System

      Air starter5 . Hydraulic System

      Twin Commercial hydraulic pumps for Low and High pumping rate, motors and relief valves.  heat exchanger.

    6. Cryogenic High Pressure System

      Paul triplex.

      Max. Pressure: 10,000 psi.

      Flow Rate: 3,000 SCFM.

      Discharge Temperature: 70oF.

    7. Control Panel

      A stainless steel control panel8. Skid/Frame

  • 8/21/2019 Precommissioning Procedure

    37/68

     

    OFFSHORE CONSTRUCTION SPECIALISTS

    PIPELINE PRE-COMMISSIONINGPRE-QUALIFICATION DOCUMENT

    19. ISO CERTIFICATION

  • 8/21/2019 Precommissioning Procedure

    38/68

     

    Page 11 of 12

     ATTACHMENT # 5

    OCS NATA Certification

  • 8/21/2019 Precommissioning Procedure

    39/68

     

    NATA Accredited Laboratory

    National Association of Testing Authorities, Australia(ABN 59 004 379 748)

    has accredited

    Offshore Construction Specialists Pte Ltd

    Singapore

    following demonstration of its technical competenceto operate in accordance with

    ISO/IEC 17025

    This facility is accredited in the field of

    MECHANICAL TESTING

    for the tests, calibrations and measurements shown on theScope of Accreditation issued by NATA

    Jennifer EvansChief Executive Officer

    Date of accreditation:15 July 2013 Accreditation number:19122

  • 8/21/2019 Precommissioning Procedure

    40/68

     

    Page 12 of 12

     ATTACHMENT # 6

    OCS Personnel CVs

  • 8/21/2019 Precommissioning Procedure

    41/68

     

    Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel:+65 6567 9080 Fax: +65 6567 8082

    Sayed Dedy Mahdy

    Career Summary

    •  4 Months University Field Practical, Tunu Field Development “Tunu Phase 8 EPSC3 Project”- TotalFinaElf Indonesie.

    •  9 Months as Field Engineer for PT. McConnell Dowell Indonesia.•  1 year and 8 months working with PT McDermott Indonesia•  Currently working with Offshore Construction Specialists Pte. Ltd.

    Experience

    Field EngineerJune 2009 - January 2010Amerada Hess Ujung Pangkah Phase 2, Indonesia

    Offshore Construction Specialists Pte Ltd•  Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 3

    subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.

    •  Manage the offshore operation at site, together with the barge supt & the other fieldengineers. Work included the wellhead platform, WHP B installation, 6”, 12” and 16”flowline installation between WHP B and WHP A. Post trenching of 6”, 12” and 16”flowline.

    Field EngineerSept 2008 – May 2009Asia Petroleum Development (APD) - Glagah Kambuna Project, Indonesia  Offshore Construction Specialists Pte Ltd

    •  Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 42 km14” gas export pipeline from the Kambuna platform offshore North Sumatera to a

    landfall north east of Medan.

    •  Manage the offshore operation at site, together with the barge supt & the other fieldengineers. Work included 5 km beach approach, Pre and Post trenching of 13 km ofthe pipeline to a cover of 2.0 metres. Topsides installation and Hook up.

  • 8/21/2019 Precommissioning Procedure

    42/68

     

    Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel:+65 6567 9080 Fax: +65 6567 8082

    Field EngineerNovember 2007 - January 2008

    GFI Bualuang field development project, Bualuang Field, ThailandOffshore Construction Specialists Pte Ltd

    •  Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 800mtrpipeline, Flexible risers and spools.

    •  Manage the offshore operation at site, together with the barge supt & the other fieldengineers. 1 jacket(sidelift & upend) + 1 deck + 2 pipeline (10 in) + 1 SPC + 1PLEM+ 4 sp tie in (10 in) + 2 flexible riser (6 in) + 1 mooring hawser

    Field EngineerNovember 2006 – October 2007Project : Kerisi Field Development Phase II CPP Jacket and Deck Installation

    PT. McDERMOTT INDONESIA

    Working with procedures and instruments preparation for 12”∅and 16”∅  spoolshydrotesting. Responsible for almost all load out preparation for 3 material barges, 4 nos ofCentral Processing modules over 1000MT and 8 Legs Jacket load out for CentralProcessing Platform

    Field EngineerNovember 2006 – October 2007Project : Angel Project – Substructure Installation and Pipelay

    PT. McDERMOTT INDONESIAManage and supervise technical on field for fabrication of 5 sections Articulated Stinger andrefurbishment 3 sections Articulated Stinger.

    Field EngineerJanuary 2007 – August 2007Project : SSB T&I

    PT. McDERMOTT INDONESIAManage and supervise technical on field for structural modification 5 sections ArticulatedGulf Of Mexico Stinger and refurbishment 3 sections Articulated Stinger and 1 section trussstinger.

    Field EngineerAugust 2006 – September 2006Project : Kerisi Field Development Phase I

    PT. McDERMOTT INDONESIAManage and supervise readiness of marine installation on field in subcontractor yard of 1420

    MT Wellhead Platform and 1113 MT Jacket load out.

    Field EngineerJuly 2006 – August 2006Project : PM3 Camau – Gas Pipeline

    PT. McDERMOTT INDONESIAAs-built for survey for over 289 KM from Bunga Raya (Malaysian Area) to GDS (Vietnamesearea) in Gulf Thailand. J. Ray McDermott Engineer representative on board to identification

  • 8/21/2019 Precommissioning Procedure

    43/68

     

    Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel:+65 6567 9080 Fax: +65 6567 8082

    free span and correction of the found free span. Over 45 days was spent offshore on boardof Setouchi, Fugro Survey vessel

    Field EngineerJanuary 2006 – April 2006Project : EMEPMI Seligi A- To Tapis Pump Pipeline Replacement

    PT. McDERMOTT INDONESIAPrepared and manage of fabrication and refurbishment for engineering installation aid for

    18”∅  crude pipeline installation, assisting in procedures and instruments preparationassociated with pigging and hydrotesting. Over 60 days was spent offshore time on board

    DB30 to manage 21,2 KM 18”∅  crude pipeline installation, riser and two sub sea spooltrough the commissioning stage.

    Field Engineer

    December 2005 – January 2006Contract Value USD 2.5m – PT. NewMont NTT. Batu Hijau-Scavenger Maintenance Phase I

    PT. McCONNELL DOWELL INDONESIAPerformance as Project Planner for Scavenger Shut Down Project on PT. NewMont NTT.Project Mobilization coordinator and controlling material take off.

    Field EngineerApril 2005 – December 2005Contract Value USD 4.6m + USD 1,2m Variation – Kaltim Prima Coal Service Wharf andShiploader Jetty Refurbishment.

    PT. McCONNELL DOWELL INDONESIAEmployed with PT McConnell Dowell Indonesia to manage the shiploader jetty and servicewharf rehabilitation works contract. Contract involves the partial demolition andreinstatement of 15years old reinforced concrete service wharf at KPC and rehabilitation of

    Structural steel shiploader jetty paintwork.

    Field PracticalApril 2002 - June 2002Contract Value – USD 3.5m - Tunu Field Development Phase 8-EPSC 3, Aerial Pipe

    Installation

    PT. CITRA PANJI MANUNGGAL•  Preparing Pilling Equipment that Needed for Pilling Activit ies•  Responsible for daily Report

    •  Assisting Surveying•  Liaise with third Party Inspector Badan Kualifikasi Indonesia (BKI)•  Assisting with application of work Permit

    •  Assisting with safety procedures

  • 8/21/2019 Precommissioning Procedure

    44/68

     

    Offshore Construction Specialists Pte. Ltd.20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel:+65 6567 9080 Fax: +65 6567 8082

    Education

    Bachelor of Engineering (Civil),Diponegoro University, 2004

    On Job Training and Courses

    HUET – MSTS ASIA SDN. BHD, Johor Malaysia, 2006Sea Survival – MSTS ASIA SDN. BHD, Johor Malaysia, 2006

    Fire Fighting – MSTS ASIA SDN. BHD, Johor Malaysia, 2006Wire Rope Inspector - Carl Stahl Evita Ltd, Batam Indonesia, February 2007

    Field Engineer training 1st Module : General Topics, Singapore, 2007Field Engineer training 2nd Module : Structural Installation, Singapore 2007

    Incident Investigation training, Batam, Indonesia 2007Task Risk Assessment training, Batam, Indonesia 2007

    FirmsNov 2007 Offshore Construction SpecialistJan 2006 to 8 Oct 2007 PT McDermott IndonesiaApr 2005 to Dec 2005 PT Mc Connell Dowell Indonesia

    Personal Details

    Date of Birth : November 29, 1979Age : 34Nationality : Indonesian CitizenshipLanguages : Bahasa Indonesia – oral & written

    English – oral & writtenContacts : Mobile +62-8127011155

  • 8/21/2019 Precommissioning Procedure

    45/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 1 of 2

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    PERSONAL DATA 

    Name : Roni

    DOB : 20 August 1975

    Place / DOB : Belawan

    Sex : ale

    a!ital Status : a!!ie"Nationalit# : $n"onesia

    Religion : oslem

    DOCUMENT

    No Document Number Date Of Issued Date Of Expir P!ace Of Issued

    1 Pass%o!t & 259'7( )0 No* 2010 )0 No* 2015 Batam

    CERTI"ICATE O" COMPETENC#

    No Certificate Number Date O"

    issued

    Date Of

    Expir

    P!ace Of

    Issued

    1+ BOS$,- . -!a*el Sael#

    # Boat

    2( No* 2010 2) No*

    201(

    Batam

    $OR% E&PERIENCES

    Pre'Comm Super(isor

     August 2013 to present

    Oso!e 3onst!uction S%ecialists Pte 4t"

    Res%onsile o! te maintaining ig P!essu!e %um%s an" 6loo"ing Pum%s in goo" con"ition ate!

    %!oect an" %!e%a!e8 unction test o ig P!essu!e %um%s an" 6loo"ing Pum%s eo!e oso!e wo!+

    O%e!ate an" ensu!e ig P!essu!e Pum%s an" 6loo"ing %um% wo!ing in goo" con"ition o! P!e

    commissioning wo!+

  • 8/21/2019 Precommissioning Procedure

    46/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 2 of 2

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    Comp!eted Pro)ect*

    No Compan Pro)ect position Location C!ient +esse! Name Periode

    1+ Ne%tune SONSB ;!outing

    -ec

    -ailan" P-- BODO

    SP4$,R

    10 Aug 200(

    25 Se%t 200(

    2+ Ne%tune SA$P, ;!outing

    -ec

    3inese SA$P, ,RA$D

    O66SOR,

    1< =un 200'

    29 =ul 200'

    )+ Ne%tune >NDA$ ;!outing

    -ec

    $n"onesia/

    ?alimantan

    -O-A4 >NDA$

    O66SOR, 1

    09 =ul 2007

    20 Aug 2007

    (+ Ne%tune S&$B,R ;!outing

    -ec

    B!unei BSP S,44 SAR? 2000 0' Oct 2007

    )0 Dec 2007

    5+ Ne%tune S&$B,R ;!outing

    -ec

    B!unei BSP S,44 S&$B,R

    ;4OR$OS 

    07 a# 200<

    11 =ul 200<

    '+ Ne%tune SBS,A 7 ;!outing

    -ec

    ala#sia P,-RONAS RO3? &A-,R

    2

    15 Se%t 200<

    20 Oct 200<

    7+ Ne%tune S&$B,R ;!outing

    -ec

    B!unei BSP S,44 S&$B,R

    R,SO4-,

    05 =an 2009

    10 a! 2009

  • 8/21/2019 Precommissioning Procedure

    47/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    NAME: KRISBEL SIMANJUNTAK

    DATE OF BIRTH  4 May 1963

    NATIONALITY  Indonesian

    MARITAL STATUS  Married

    EDUCATION/TRAINING  :

      May 07, 2007. Basic Offshore Safety Induction & Emergency Training Including Additional

    OLF Modules (OPITO Approved)

      February 06, 2007. Confine Space Entry and Rescue.

    LANGUAGES  Bahasa Indonesian (written and spoken)

    English (Fair Spoken)

    Career Summary

    Over 26 years experience in maintain heavy equipment, engines, High Pressure pumps and floodingpumps, pipe fittings, operating related machinery.

    Work Experience

    Mechanic Mar 2009 to presentOffshore Construction Specialists Pte Ltd

    Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after

    project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.

    Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-

    commissioning work.

    Completed Projects

    Oct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd

    Project : Leighton Offshore

    Location : Jakarta - CirebonS513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services

  • 8/21/2019 Precommissioning Procedure

    48/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Task Description

    Jetting Technician April 2013 – May 2013Offshore Construction Specialists Pte Ltd

    Project : Brunei Shell Petroluem – Domgas Pipeline Installation ProjectLocation : Bulan Bulan Field Development - Brunei

    Jetting services for the Pile Refusal Remedial Project

    Task Description 

    Jetting Technician responsible for operating of jetting spread, monitoring the performance of

    equipment and troubleshooting the jetting equipment in the event of equipment breakdown.

    Jetting Technician August 2012 – January 2013Offshore Construction Specialists Pte Ltd

    Project : Chevron (Australia)  – Domgas Pipeline Installation ProjectLocation : Domgas Field Development, North West Coast of Australia

    Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation

    Task Description 

    Jetting Technician responsible for operating of jetting spread, monitoring the performance of

    equipment and troubleshooting the jetting equipment in the event of equipment breakdown.

    Mechanic April 2012 to May 2012Offshore Construction Specialists Pte LtdProject : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea 

    Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawalwells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigidspools. 

    MechanicOctober 2011 – November 2011Offshore Construction Specialists Pte LtdProject : Korea Development Company LTD. – Gas Li ft Compression Project.Location : Poleng Field – Gresik, West Java, Indonesia. 

    Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PPand 6” Gas Lift DW-PP in total length 6.3 Km.

    MechanicSeptember 2011 – October 2011Offshore Construction Specialists Pte Ltd

    Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilit iesof TSB Field Development 

  • 8/21/2019 Precommissioning Procedure

    49/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Location : TSB Field, Kangean Block – Bali Sea Indonesia.

    Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid

    Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines

    MechanicFebruary 2011 – July 2011Offshore Construction Specialists Pte LtdProject : CHEVRON 2011 INSTALLATION CAMPAIGN.

    PLATFORMS AND PIPELINES INSTALLATIONLocation : Chevron Thailand Oil and Gas Fields, Gulf of Thailand

    Flooding and gauging work of newly laid pipelines:16” NPPLL, 5.4 Km Long Pipeline10” FUPLP, 5.9 Km Long Pipeline

    10” PDPLB, 6,7 Km Long Pipeline10” KPPLG, 2.7 Km Long Pipeline10” ERPLZC, 2.4 Km Long Pipeline

     As well leak testing of spools before subsea tie in of:NPWL Platform (3 ea x 16” Spools)FUWP Platform (2 ea x 10” Spools)PDWB Platform (5 ea x 10” Spools)KPWG Platform (2 ea x 10” Spools)ERWZC Platform (2 ea x 10” Spools)

    Mechanic

    January 2010 – March 2010Offshore Construction Specialists Pte Ltd

    Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project.Location : Ujung Pangkah oil & gas field, East Java. IndonesiaPigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B andWHP A.

    Mechanic August 2009 to November 2009

    Offshore Construction Specialists Pte Ltd

    Project : Star Energy Ltd. – Kakap Gas Development Project. Location : Kakap Field West Natuna, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline:

      6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform,

      6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform

      10” pipeline 11.2 Km long. KG Platform to KF Platform

    Mechanic and Project Leader ManMarch 2009 - June 2009Offshore Construction Specialists Pte Ltd

    Project : Serica Energy – Asia Petroleum Development Project

  • 8/21/2019 Precommissioning Procedure

    50/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Location : Gelagah Kambua Field Development, Malacca Strait, North Sumatra, Indonesia

    Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities,5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtrTOP. Pre-commissioning of laid pipeline

    Task DescriptionMechanic & Leader man on 5KM trenching work from near shore to shore for beach pull operation,ensure the generator, air compressor and 2 unit of excavator running in good condition for 24hrstrenching operation. Maintain 24hrs operation on 5 unit jetting pumps during jetting operation and pre-commissioning job including pigging operation and hydrotesting of Dia. 14”, 42 KM pipeline.

    Mechanic 1February 2002 – August 2008

    J.Ray McDermott,Location : Batam, Indonesia 

    Marine onshore facility maintenance and projects preparation.

    Task Description Maintain all running heavy equipments in marine onshore facilities to ensure working in bestperformance. Refurbish and prepare including function test of marine E&M equipment before send tooffshore for project including forklift, loader, Skagit Winch, Hydraulic Hammer, Generators,Compressors.Special in preparing flooding pumps and high pressures pumps for offshore use.

    Mechanic and Project Leader ManMarch 2006 – July 2006J.Ray McDermottProject : PM3-Camau (Offshore Gas Pipeline Installation)Location : Vietnam

    Dia.16” 300KM long Pipeline installation. Beach pull preparation, 6KM trenching from near shore toshore operation to buried pipeline in various depth from 4mtr near shore to 6mtr at offshore

    Task DescriptionMechanic & Leader man on 6KM trenching work from near shore to shore for beach pull operation,

    ensure the generator, air compressor and 2 unit of excavators running in good condition for 24hrstrenching operation. Maintain 24hrs operation on 6 unit jetting pumps during jetting operation.

    Mechanic 1May 1990 – July 1999PT. McDermott IndonesiaLocation : Batam, Indonesia

    Fabrication yard facility maintenance

    Task Description Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift,

    hydraulic crane, loader, generators and compressors.

  • 8/21/2019 Precommissioning Procedure

    51/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Mechanic Helper August 1987 – June 1989

    PT. Barakaz Lumber CoyLocation : Riau, Indonesia 

    Logging Operation

    Task DescriptionHelping mechanic in maintain heavy equipment including Bulldozer, Low Vehicle Trailer, Fork Lift,Compressors and Generators.

  • 8/21/2019 Precommissioning Procedure

    52/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 65679080 / Fax: +65 65678082

    CURRICULUM VITAE 

    Mohd Zakaria Bin Abdul Aziz

    Mechanic / TechnicianNationality: Malaysian

    Date of Birth: 11-March-1986Marital Status: SingleLanguages: English and Bahasa Melayu

    Education / Training

      High School Graduate

      Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules and

    Travel Safety By Boat (OPITO Approved)-Validity 06-Jan-2015

    Career Summary

    Eight years of experience in offshore construction and engineering as a technician commissioning

    team. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging,

    Commissioning & Decommissioning

    He start his career in November 2004 in Oil and Gas Pipeline Installation and commissioning and he’s

    project completion and work experience in Malaysia and Singapore.

    During his time as a technician, he gained much experience in the offshore jobs for Cleaning, Hydro

    Testing, Dewatering, Drying and Nitrogen Packing.

    He is also familiar with the Blowing, Flushing and Leak Testing jobs.

    Work Experience

    Mechanic Jan 2010 to presentOffshore Construction Specialists Pte Ltd

  • 8/21/2019 Precommissioning Procedure

    53/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 65679080 / Fax: +65 65678082

    CURRICULUM VITAE 

    Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after

    project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.

    Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-

    commissioning work.

    Completed Projects:

    Mechanic July 2013 – August 2013Offshore Construction Specialists Pte LtdProject : TIMAS-EHMRS Location : Indonesia – South China Sea

    Provision of Engineering Services and Subcontract Equipment associated with the installation ofFlexible flowlines for COPI Belanak Project

    Precom Technican

    July 2013Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin –Grouting Project

    Location: North Malay Basin (Kota Bahru)

    Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel Lewek Arunothai.

    Mechanic January 2013 – April 2013Offshore Construction Specialists Pte Ltd

    Project : Asian Energy Services – AES VSP Dangdo Thang Long Launch  Location : Su Tu Vang Field, Thang Long-Dong Do Field, Vietnam

    The preparation, rig up and execution of the jacket launch. The jacket weighed 4100mT was loadedand launch off the launch engineering, procedure preparation, physical barge rig up and sitesupervision and management of the launch operation, while Asian Energy performed the launch and

    transportation engineering.

    Mechanic August 2012 – January 2013Offshore Construction Specialists Pte Ltd

    Project : Chevron (Australia) – Domgas Pipeline Installation ProjectLocation : Domgas Field Development, North West Coast of Australia

    Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation

    Task Description 

    Jetting Technician responsible for operating of jetting spread, monitoring the performance ofequipment and troubleshooting the jetting equipment in the event of equipment breakdown.

  • 8/21/2019 Precommissioning Procedure

    54/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 65679080 / Fax: +65 65678082

    CURRICULUM VITAE 

    Mechanic April 2012 to May 2012Offshore Construction Specialists Pte LtdProject : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea 

    Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawalwells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigidspools. 

    Mechanic 

    September 2011 – October 2011Offshore Construct ion Specialists Pte LtdProject : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for SubseaFacilit ies of TSB Field Development

    Location : TSB Field, Kangean Block – Bali Sea Indonesia.Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” RigidPipeline and 2 nos of 5.2km x 20” Rigid Pipelines 

    Mac 2011 – May 2011Offshore Construct ion Specialists Pte LtdProject : Dai Hung Field Development VSP -WHP DH2 JACKET LAUNCH ProjectLocation : VietsovPetro, Vung Tau, Vietnam

    Commence reeving of port side sheave blocks using a messenger to pull 56mm wire through 500Tconstruction blocks back to 70t hydraulic winch. ‘Straight’ lace configuration. Launched with VSP-05(WD ~100m)

      EMAS - Chevron Offshore (Thailand) Ltd.

      HESS (Indonesia-Pangkah) Ltd Phase II Transportation and InstallationLocation - Surabaya, East Java Sea, IndonesiaTransport of CPP Deck, AUP Deck and LQ, Compression module, Bridges and flareboom 

    CPP and AUP Jackets were installed during the first campaign in the 4th Quarter 2010utilizing the DLB QP 2000. CPP and AUP jackets are 4 legged jackets with anapproximate unit weight of 300 tonne and 48” diameter steel pile foundations. The pileswere driven with a MHU270T to 95 meter penetration. 

      HESS Ujung Pangkah –Phase 1 Location - East Java Sea, IndonesiaTransporation and Installation of one 8 legged Well Head platform (WHP-B) and 3 pipelines (6”Gas lift, 12” Oil and 16” Gas) x ~5.5km between WHP-B and WHP-A (existing) including pre-commissioning.

  • 8/21/2019 Precommissioning Procedure

    55/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 65679080 / Fax: +65 65678082

    CURRICULUM VITAE 

      Kakap Field KG Gas Development Project – Provision of EPCI of KG Gas Development ProjectServices including pre-commissioning. 

    Project: REINSTATEMENT TEST FOR CAKERAWALATOP SIDE N2 HE LEAK TEST FOR BULAN A

    Client: Pertonas CarigaliYear: (Dec) 2007Scope of work: Leak testing.

    Project: EPCC of Segamat Compressor Station Expansion ProjectClient: PETRONAS GASYear: (July) 2007

    Scope of work: Blowing,Flushing,Hydrotesting and Nitrogen Packing

    Project: EPCC of Nutral Gas Disiribution to SemenyihFL stage 1/05 Jalan Persekutuan 1 Semenyih-Beranang

    Client: Gas MalaysiaYear: (Mar) 2007

    SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGENPACKING.

    Project: EPCC of Nutral Gas Disiribution to KundangFL DL stage 1/05 Kundang Sungai Buloh Selangor.

    Client: Gas MalaysiaYear: (Jan) 2006Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing

    Project: EPCC of Nutral Gas Disiribution to Setiawan

    FL stage 2/05 Setiawan Perak.Client: Gas MalaysiaYear: (Feb)2006Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.

    Project: EPCC of Nutral Gas Disiribution to KaparFL stage 1/05,Kapar Klang Selangor.

    Client: Gas MalaysiaYear: (Jan) 2006Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.

  • 8/21/2019 Precommissioning Procedure

    56/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 65679080 / Fax: +65 65678082

    CURRICULUM VITAE 

    Project: EPCC of Nutral Gas Distribution System to Sungai BulohFL Stage 3/05, Sungai Buloh selango

    Client: Gas Malaysia.Year: (Dec)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

    Project: EPCC of GPRW at Road B15 From SKVE to KVDT Precint 11,Putrajaya Selangor.

    Client: Gas Malaysia.Year: (Dec)2005Scope of Work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

    PROJECT: EPCC OF NUTRAL GAS DISTRIBUTION SYSTEM TO NORTH PORTFL DL STAGE 1/05, PORT KLANG SELANGOR.

    Client: Gas Malaysia.Year: (Nov)2005Scope of Work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

    Project: EPCC of Nutral Gas Disiribution to Bukit RambaiFL DL Stage 1/05 Bukit Rambai Melaka

    Client: Gas MalaysiaYear: (Oct) 2005Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing

    Project: EPCC of Nutral Gas Disiribution to Tangga BatuFL DL Stage 1/05 Tangga Batu Area Melaka.

    Client: Gas MalaysiaYear: (Sept)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying, Nitrogen Packing.

    Project: EPCC of Nutral Gas Disiribution System to Ayer KerohFL DL Stage 1/04, Industri Area Ayer Keroh Melaka.

    Client: Gas Malaysia.Year: (Sept)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

    Project: EPCC of Nutral Gas Disiribution to IjokFL Stage 1/05, Ijok, Kuala Selangor

    Client: Gas MalaysiaYear: (Jun) 2005

  • 8/21/2019 Precommissioning Procedure

    57/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 65679080 / Fax: +65 65678082

    CURRICULUM VITAE 

    SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGENPACKING.

    Project: EPCC of Nutral Gas Disiribution System to Pasir GudangFL DL Stage 1/05, Pan Century Edible Oils Sdn Bhd.

    Client: Gas Malaysia.Year: (Sept)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

    Project: EPCC of Nutral Gas Disiribution to Pulau Indah-WestportFL Stage 1/05, Pulau Indah Port Klang, Selangor .

    Client: Gas MalaysiaYear: (May)2005Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

  • 8/21/2019 Precommissioning Procedure

    58/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 1 of 3

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    NAME: INDRA JAYA

    DATE OF BIRTH  24 February 1979

    NATIONALITY  Indonesian

    MARITAL STATUS  Married

    EDUCATION/TRAINING  :

    •  Technical High School, Dabo Singkep

    •  Alkon, “Pressure vessel training”

    •  JRM, In-house, “Confined Space Entry And Rescue Training”

    •  JRM, In-house, “PTW Performing Training”

    •  JRM, In-house, “Pressure Vessel Training”

    •  JRM, In-house, “Dead Weight Tester Operating Training”

    •  AST, “ Over Head Crane Training”

    •  JRM, In-house, “BBSM”

    LANGUAGES  Bahasa Indonesian (written and spoken)

    English (Fair Spoken)

    Career Summary

    Over 7 years experience in repair and maintain instrumentation for pressure, temperature and flowmeasurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, TemperatureGauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device,for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar withrigging certification system and operating related machinery.

    Instrument Technician  March 2012 to presentOffshore Construction Specialists Pte Ltd

    Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow

    measurement device for Pigging and hydrotesting operation and grouting for the following projects in

    Indonesia, Brunei and Myammar.

  • 8/21/2019 Precommissioning Procedure

    59/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 2 of 3

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    Current Project:

    Work Experience

    Technician/Mechanic  

    Oct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd

    Project : Leighton OffshoreLocation : Jakarta - Cirebon

    S513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services

    Task Description

    Sep to Oct 2013Offshore Construction Specialists Pte Ltd

    Project : Su Tu Vang North East Development Project Location : Vietnam

    Task Description

    Responsible for performing the cleaning, gauging, flooding, hydrostatic testing of pipelinesHydrotesting & Precommissioning.

    April 2013 – May 2013Offshore Construction Specialists Pte LtdProject : Swiber Shell - Air Lift JettingLocation : Bulan Bulan Field Development - Brunei

    Jetting services for the Pile Refusal Remedial Project

    Task Description  Jetting Technician responsible for operating of jetting spread, monitoring the performance ofequipment and troubleshooting the jetting equipment in the event of equipment breakdown.

    MechanicJanuary 2013 – April 2013Offshore Construction Specialists Pte LtdProject : PTTEPI – Installation of WP1, 2 and 3 well platforms and Intrafield SealinesLocation : Zawtika Field Development Project Phase I - Myamar

    Offshore Pigging and Hydrotesting work on LTS 3000 for installation of WP1, 2, 3 Well Platformsincluding Jackets, Piles, jacket appurtenances and decks and WP2-ZPQ and WP3-ZPQ infieldpipelines. 

  • 8/21/2019 Precommissioning Procedure

    60/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 3 of 3

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    MechanicApril 2012 to May 2012

    Offshore Construction Specialists Pte LtdProject : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea 

    Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells

    (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.

    Hydrotesting Instrument Technician  26 January 2006 to 28 Feb 2012PT. McDermott Indonesia

    Responsible for the maintaining all hydrotesting instrumentations and related equipment and gears in

    good condition for onshore and offshore pre-commissioning work. Preparation of all related

    instrumentation and hydrotesting gears, work side by side with field engineer for offshore work.

    Maintenance of all JRM stinger for all air lines and water lines and tanks in good and water tight

    condition.

    Project Involved :

    •  Camau Project

    •  Kerisi Project

    •  Esso Project•  SUTUVANG Project

    •  Sutuden Project

    •  Rubi Project

    •  Guntong A Project

    •  Guntong B Project

    •  Dai Hung Project

    •  Bien Dong Project

    •  TGT Project

    •  Angel Project

      Chevron Project•  Sakhalin Project

    •  Macedon Project

  • 8/21/2019 Precommissioning Procedure

    61/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 1 of 5

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    NAME: BUDIMAN SAGALA

    DATE OF BIRTH  16 Jul 1983

    NATIONALITY  Indonesian

    MARITAL STATUS  Single

    MOBIL :+6281370977227 +6281372223565 EDUCATION/TRAINING  :

    •  May 03, 2008 (MSTS) Tropical Basic Offshore Safety Induction & Emergency with EBS

    •  May 18, 2007 (J.Ray McDermott) Permit To Work

    •  December 21, 2006 (J.Ray McDermott) Confined Space Entry And Rescue

    •  November 27, 2006 (Indonesia Labor Department) Hoist Crane Operator

    •  May 2006, (DH. Budenberg) Dead Weight Tester Usage and Maintenance

    •  April, 2004 (Carl Stahl Evita Ltd), Level 1, Wire Rope Inspector

    LANGUAGES  Bahasa Indonesian (written & spoken)

    English (fair spoken)

    Career Summary

    Over 12 years experience in repair and maintain instrumentation for pressure, temperature and flowmeasurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, TemperatureGauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device,for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar withrigging certification system and operating related machinery.

    Work Experience

    Instrument Technician  March 2009 to presentOffshore Construction Specialists Pte Ltd

    Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow

    measurement device for Pigging and hydrotesting operation for the following projects in Indonesia,

    Thailand and Myammar.

  • 8/21/2019 Precommissioning Procedure

    62/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 2 of 5

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    Completd Project:

    Technician

    Jul 2013 – Sep 2013Offshore Construction Specialists Pte Ltd

    Project : PERTAMINA EP - REROUTE GAS PL L-PARIGI-CILAMAYA Location : PT TIMAS SUPLINDO,INDONESIA

    Provision of Engineering Services associated with the Provision of Hot Tap and pipeline Limacomplex by pass, perform the pipeline pre-commissioning on the assumption that the scope is asFlooding and gauging, hydrotesting, bulk dewatering and nitrogen packing to 5 psi pressure.

    TechnicianNov – Dec 2013Offshore Construction Specialists Pte Ltd

    Project : PT Timas SuplindoLocation : Jakarta

    UL ProjectPre-commissiong Services

    Task DescriptionOct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd

    Project : Leighton OffshoreLocation : Jakarta - Cirebon

    S513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services

    Task DescriptionJan 2013 – Apr 2013Offshore Construction Specialists Pte Ltd

    Project : PTTEP MYANMAR  – L&T-Zawtika Grouting Project Location : PTTEP INTERNTIONAL LIMITED, Gulf of Moattama, Myanmar

    Zawtika Field Development Project Phase 1A EPCI for WP1, WP2, WP3 and Intrafield Sealines –

    Flooding, Gauging and Hydrotesting of pipeline.

    TechnicianNovember 2012Offshore Construction Specialists Pte LtdProject : Galoc Ph 2 Development – Leak Testing for 6” Flexible pipeline ProjectLocation : Bien Dong Development Field - VietnamLeak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3”Fuel Gas Flowline (2060 m length, 76.2 mm ID)

  • 8/21/2019 Precommissioning Procedure

    63/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 3 of 5

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    2 off 7” condensate riser (355.7 m and 365.5 m length, 177.8 mm ID) + 7” condensate flowline (2060m length, 177.8 mm ID).Task Description  

    Leak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3”Fuel Gas Flowline (2060 m length, 76.2 mm ID) and 2 off 7” condensate riser (355.7 m and 365.5 mlength, 177.8 mm ID) + 7” condensate flowline (2060 m length, 177.8 mm ID).

    TechnicianOctober 2011 – November 2011Offshore Construction Specialists Pte LtdProject : Korea Development Company LTD. – Gas Lift Compression Project.Location : Poleng Field – Gresik, West Java, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PP and 6” GasLift DW-PP in total length 6.3 Km. 

    TechnicianSeptember 2011 – October 2011Offshore Construction Specialists Pte LtdProject : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilitiesof TSB Field DevelopmentLocation : TSB Field, Kangean Block – Bali Sea Indonesia.Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and2 nos of 5.2km x 20” Rigid Pipelines

    TechnicianFebruary 2011 – July 2011Offshore Construction Specialists Pte LtdProject : CHEVRON 2011 INSTALLATION CAMPAIGN.

    PLATFORMS AND PIPELINES INSTALLATIONLocation : Chevron Thailand Oil and Gas Fields, Gulf of Thailand

    Flooding and gauging work of newly laid pipelines:16” NPPLL, 5.4 Km Long Pipeline10” FUPLP, 5.9 Km Long Pipeline10” PDPLB, 6,7 Km Long Pipeline10” KPPLG, 2.7 Km Long Pipeline10” ERPLZC, 2.4 Km Long Pipeline

    As well leak testing of spools before subsea tie in of:NPWL Platform (3 ea x 16” Spools)FUWP Platform (2 ea x 10” Spools)PDWB Platform (5 ea x 10” Spools)KPWG Platform (2 ea x 10” Spools)ERWZC Platform (2 ea x 10” Spools)

    Technician  January 2010 – March 2010

  • 8/21/2019 Precommissioning Procedure

    64/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 4 of 5

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    Offshore Construction Specialists Pte Ltd

    Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project.

    Location : Ujung Pangkah oil & gas field, East Java. IndonesiaPigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B andWHP A.

    TechnicianAugust 2009 to November 2009Offshore Construction Specialists Pte Ltd

    Project : Star Energy Ltd. – Kakap Gas Development Project. Location : Kakap Field West Natuna, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline:

    •  6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform,

    •  6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform10” pipeline 11.2 Km long. KG Platform to KF Platform 

    TechnicianNovember 2008 – June 2009Offshore Construction Specialists Pte LtdProject : Gelagah Kambuna Field DevelopmentLocation : Malacca Strait, North Sumatra, Indonesia

    Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities,5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtrTOP. Pre-commissioning of laid pipeline

    Task DescriptionPreparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Set up offshoreflooding and pigging operation for Diameter 14” 42 Km long newly laid Pipeline ensure sea waterchemical treatment composition against sea water as per company spec. Set up hydrotesting ofDiameter 14” 42 Km long newly laid Pipeline, operating Dead weight tester, monitor pressure andvolume indicator on hydrotesting operation on site under supervision of Pre-commissioning/ProjectEngineer.

    TechnicianNovember, 2008 – June, 2009J.Ray McDermott

    Project : Shell MalaysiaLocation : Terengganu, Malaysia

    Task DescriptionPreparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Ensure allrequired fittings to be complete for Pigging and hydrotesting set up. Set up offshore flooding andpigging operation for Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, ensuresea water chemical treatment composition against sea water as per company spec. Set uphydrotesting of Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, operating Dead

  • 8/21/2019 Precommissioning Procedure

    65/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 5 of 5

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    weight tester, monitor pressure and volume indicator on hydrotesting operation on site undersupervision of Pre-commissioning/Project Engineer.

    Instrumentation TechnicianJuly 2001 – October 2008J.Ray McDermott

    Marine Instrumentation and Rigging Certification Division

    Task DescriptionPrepare of instrumentation for offshore pre-commissioning work. Ensure all pressure and temperaturemeasurement device i.e. Dead Weight Tester, Pressure Gauges, Temperature Gauge, PressureRecorder, Temperature Recorder, Holiday Detector, Pinger, Pinger Detector, Turbine Flowmeter andetc. in valid certificate and in-house checking all the mentioned instrumentation after project formaintenance.

    Responsible of Leak test for offshore project installation aid fabricated in marine workshop i.e. PigLauncher, Pig Receiver, Spool Pipe and Test Header and etc.

    Function test all the J.Ray McDermott Asia Pacific Stinger after maintenance in Batam, Marine facilitybefore attached to all J.Ray McDermott Pipe Lay Barge.

    Responsible as well for ensure all rigging and lifting gears to be color coded and ensure all rigging tobe with valid certificate before send to offshore project.

  • 8/21/2019 Precommissioning Procedure

    66/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 1 of 3

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    NAME: IDHAM JAWAHIR

    DATE OF BIRTH  1 Jul 1972

    NATIONALITY  IndonesianMARITAL STATUS  Married

    LANGUAGES  Bahasa Indonesian (written & spoken)

    English (fair spoken) 

    Career Summary

    Over 8 years’ of experience in offshore construction and engineering as a technician commissioningteam. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging,Commissioning & Decommissioning.

    Work Experience

    Grouting/Pre-com  March 2012 to presentOffshore Construction Specialists Pte Ltd

    Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition afterproject and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-

    commissioning work.

    Completed Project:

    Precom Supervisor

    September to October 2013Offshore Construction Specialists Pte Ltd

    Oct 2013 – Nov 2013Offshore Construction Specialists Pte Ltd

    Project : Leighton OffshoreLocation : Jakarta - Cirebon

    S513 Main Oil Line from X-Ray Field to Balongan Plant ProjectPost Trenching, Free Span Correction, and Pre-commissiong Services

    Task Description

    Project : Su Tu Vang North East Development Project Location : Vietnam

  • 8/21/2019 Precommissioning Procedure

    67/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Page 2 of 3

    Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressedpermission is granted by Offshore Construction Specialists Pte Ltd.

    Task Description

    Responsible for performing the cleaning, gauging, flooding, hydrostatic testing of pipelines the

    Hydrotesting & Precommissioning

    Precom Supervisor

    July 2013Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin

     – Grouting ProjectLocation: North Malay Basin (Kota Bahru)

    Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel LewekArunothai.

    Precom SupervisorJanuary 2013 – April 2013

    Project : PTTEP MYANMAR  – L&T-Zawtika Grouting Project Location : PTTEP INTERNTIONAL LIMITED, Gulf of Moattama, Myanmar

    Zawtika Field Development Project Phase 1A EPCI for WP1, WP2, WP3 and Intrafield Sealines –Flooding, Gauging and Hydrotesting of pipeline.

    Jetting TechnicianAugust 2012 – January 2013Offshore Construction Specialists Pte Ltd

    Project : Chevron (Australia) – Domgas Pipeline Installation ProjectLocation : Domgas Field Development, North West Coast of Australia

    Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation

    Task Description  Jetting Technician responsible for operating of jetting spread, monitoring the performance ofequipment and troubleshooting the jetting equipment in the event of equipment breakdown.

    MechanicApril 2012 to May 2012Offshore Construction Specialists Pte Ltd

    Project : Conoco Philips Indonesia – Develop the Bawal FieldLocation : Bawal Field – Natuna Sea 

    Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells

    (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools. 

    Senior MechanicMay 2005 – Dec 2011PT. Sea Struck Indonesia

  • 8/21/2019 Precommissioning Procedure

    68/68

      Offshore Construction Specialists Pte Ltd.

    20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839

    Tel: +65 6567-9080 / Fax: +65 6567-8082

    CURRICULUM VITAE 

    Location : Batam, Indonesia

    Fabrication yard facility maintenance

    Task Description  Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift,hydraulic crane, loader, generators and compressors.