precast column loads

Upload: harikrishnan-p

Post on 03-Jun-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Precast Column loads

    1/4

    Project Name

    Calculation Location Sheet Number

    of

    Drawing Reference Originator Date

    Ref.

    Brief Estimating the Loads in Columns

    Span of Planks = m Corbel size = mm

    Span of beams = m Eccentricity = mm

    Span of edge beams = m Column size = mm

    1.0 ) Internal Column

    (1.1) Maximum Axial Load P = kN

    Location: Ground Storey, G/5 M = kNm

    Loading: All floors fully loaded

    Axial Load, P = 9.410.85(13.6+13.6+13.6+13.75+11.35)

    = kN kN

    (1.2) Unbalanced Moment

    Location: Ground Storey, G/5 P = kN

    Loading: All floors fully loaded except first floor. 1st floor loaded only on one side. M = kNm

    Axial Load, P = 9.410.85(13.6+13.6+13.75+11.35) + 13.610.859.4/2 + 7.210.859.4/2

    = kN kN

    Moment, M = (13.6 - 7.2) 0.5 (10.859.4/2) = kNm

    2.0 ) Edge Column(2.1) Maximum Axial Load + Bending Moment

    Location: Ground storey I/4

    Loading: All spans loaded P = kN

    Axial Load, P = 9.44.725/2 (13.6+13.6+13.6+13.75+11.35) M = kNm

    = kN kN

    Moment, M = 9.44.725/2 13.6 0. = kNm kN

    (2.2) Minimum Axial Load + Bending Moment

    Location: Future roof level I/4

    Loading: All spans loaded P = kN

    Axial Load, P = 9.44.725/2 11.35 M = kNm

    = kN kN

    Moment, M = P e = 2750.5 = kNm kN

    ULS

    11.35

    13.7513.6

    13.6

    13.6

    1616

    1.4 DL 1.2 DL+1.6LL

    13.7513.6

    13.6

    13.6

    10.95

    9.4

    10.85

    Future Roof 2 6.1 0.75 8.1 7.25 11.35

    14

    11.3511.2

    11.2

    11.28

    500

    200

    Ground

    7.2

    7.2

    7.5 2.5 2.5 10

    0.1 0 2.5

    Future Roof 100 125 2.5 3 0.6 0 6.1

    100

    0.6

    0.5

    0.5

    0.5

    0

    Level 1

    Level 3

    Level 2

    Roof

    Ground

    ThicknessLevel

    SDL

    6.1

    6

    6

    6

    Loads

    2.4

    Topping Screed

    2.5 3

    2.5 3

    2.5 3

    2.5 3

    0

    125

    125

    125

    125

    Topping ServicesScreed Ceiling

    100

    100

    100

    100

    0

    0

    0

    0

    9

    DL 0.9 DL

    7.257.22.5

    2.5

    2.5

    8.18

    8

    Date

    HP May 2014

    Job Number

    Riyadh Metro - Package 3 - Park & Ride P41 123456789

    Rev.

    Column Sizes 1 AA

    Checker

    Calculations Output

    SW SDL LL/ LLr

    22

    2

    2

    6.16

    6

    6

    2.5

    Level

    Roof

    Level 3

    Level 2

    Level 1

    4.725

    1463 1475

    800

    151 175

    1475

    175

    252.1 275

    137.5 150

    275

    150

    175

    6725

    0

    6400

    175

    6721 6725

    6395 6400

    163.2

  • 8/12/2019 Precast Column loads

    2/4

  • 8/12/2019 Precast Column loads

    3/4

    Project Name

    Calculation Location Sheet Number

    of

    Drawing Reference Originator Date

    Ref. Calculations Output

    Date

    HP May 2014

    Job Number

    Riyadh Metro - Package 3 - Park & Ride P41 123456789

    Rev.

    Column Sizes 3 AA

    Checker

  • 8/12/2019 Precast Column loads

    4/4

    Prokon Input

    1 (1.1) Maximu 6725 0 0 0 0

    2 (1.2) Unbalanc 6400 175 0 0 0

    3 (2.1) Maximu 1475 175 0 0 0

    3 (2.2) Minimum 275 150 0 0 0

    2136.283004 16

    28.48377339 134