    MGR OPERATION PRACTICES

    1) TOTAL MGR CIRCUIT IS DIVIDED IN 3 CONTROLSTATIONS.2) MOVEMENT OF RAKE/LOCOMOTIVE , FROM ONE

    STATION TO ANOTHER , AFTER GETTING LINECLEARANCE THROUGH PRIVATE NUMBER EXCHANGE& RECEIVING SLOT.

    3) ALL MOVEMENTS DONE WITH SIGNALS ONLYWHEREEVER PROVIDED.

    4) STATION WORKING RULE FRAMMED & DISPALYED ATALL CONTROL STATIONS.

    5) ABSOLUTE BLOCK WORKING FOLLOWED DURINGRAILWAY MOVEMENT THROUGH DUDHICHUA CIRCUIT

    ,WHERE ONLY ONE PARTY OPERATES AT A TIME

  • 7/31/2019 Practices & Procedures

    2/29

    SAFETY ASPECTS IN MGR

    OPERATING SYSTEM1) STRICT ADHERENCE OF STAION WORKING

    RULE & MOVEMENT THROUGH SIGNALS .2) REGULAR BRAKE POWER TESTING OF

    RUNNING RAKES , AT LEAST ONCE IN AWEEK.3) SIGNAL OVERSHOOT PROTECTION SYSTEM

    PERIODICALLY TESTED.4) MONTHLY SAFETY AUDIT THROUGH VSTPP

    SFAETY TEAM & TECHICAL AUDIT THROUGHCORPORATE CENTRE TEAM.5) YEARLY SAFETY AUDIT IS PLANNED

    THROUGH RAILWAY EXPERTS.6) REGULAR FOOT PLATE INSPECTION BY

    DEPARTMENTAL HEAD & OTHER SENIOROFFICIALS

  • 7/31/2019 Practices & Procedures

    3/29

    MAGOR ACHIEVEMEVTS OF

    MGR OPERATING GROUP1) COAL TRANSPORTATION --

    In a Single Day 58,835.96 (Dt = 25/03/2007)

    In a Month

    14,14,867.55 (March -2007)In a year 117.29 Lakhs

    2) No Mishap in MGR System since last 16 years.

    3) Safe movement in MGR Circuit , with multiple

    sources of coal off take including Railways,materialising a steady off take of more than45,000 MT/day, the highest among all NTPCProjects as on date .

  • 7/31/2019 Practices & Procedures

    4/29

    BEST PRACTICES OF MGR

    OPERATING SYSTEM, VSTPP1) Operating Rake Size of 50 wagons (Highest

    among NTPC Projects ) with Guard Van as LastVehicle.

    2) Confirmation of Last Vehicle at each controlstations.3) Checking Brake Pressure at the last vehicle

    during every Tripp checking on Empty run atMGR Control Room.

    4) The outer Signal of any Control station(despatching end) is interlocked with SLOT , tobe received from the Control station in advance(sending end)

    5) All Control station are Provided with Hot LineTelephone, in addition to NTPC Telephone &Wireless Communication.

  • 7/31/2019 Practices & Procedures

    5/29

    DETAILS WDM2A WDS6 WDG-3A Number of Locos 2 4 4

    HP 2400 1200 3100

    Max Speed(KMPH) 120 60 100

    HSD Tank Cap(Lts) 5100 4100 6000

    Weight 120 MT 126 MT 112MT

  • 7/31/2019 Practices & Procedures

    6/29

    Type of Wagon BSCL CIMMCO TEXMACO

    No of Wagons 43 67 39 +119 Total 268 Nos

    Year of Commng !988-89 1990-91 2000-01

    2005-06

    DOM System Single Link Single Link Double

    Axle Load(Ton) 22.9 22.9 22.9

    Length(M) 13.41 13.41 13.41

    ROLLING STOCK(WAGON)

    (All wagons are BOBR Type)

  • 7/31/2019 Practices & Procedures

    7/29

    LOCO MAINTENANCE

    Light Schedule: T1,T2,M1,M2 including

    trouble shooting in MGR Work Shop.

    Heavy Schedule: M4 &M6 includingBreakdown Maintenance in MGR Work

    Shop.

    Major Schedule: M 24 & M 48 in Railway

    Diesel Shed( like Patratu E.C.Rly)

    POH:M 96 at Railway Workshops Golden

    Rock(Trichy)

  • 7/31/2019 Practices & Procedures

    8/29

    Details of Major Overhauling

    of Locos Done at Golden

    Rock/Trichy During 2006-07 LOCO TYPE OF TOTAL

    NO SCH EXPENDITURE

    V-001 M-96(POH) 93,34,741

    V-002 M-96(POH) 89,02,220

  • 7/31/2019 Practices & Procedures

    9/29

    Major Overhauling Planned at

    2007-08

    LOCO NO TYPE Of SCH

    S-006(WDS-6) M-96 AT GOCTRICHY

    2520(WDM2) M-96 AT GOC

    TRICHY

    2537(WDM2) M-96 AT GOC

    TRICHY

  • 7/31/2019 Practices & Procedures

    10/29

    DETAILS OF WAGON

    MAINTENANCE Monthly Maintenance of 4 Rakes (50

    Wagons)

    Overhauling of DOM Systems includingSpool Valves, Brake Systems including

    Distrubutor Valves.

    Wheel Changing &

    Overhauling/Reclamation of Axle

    Bearings.

    Reclamation of Wagon Doors.

  • 7/31/2019 Practices & Procedures

    11/29

    Major Jobs Planned 2007-08

    Wagon POH of 20 Wagons.

    Overhauling of 100 Bearings.

    150 nos of Wheel Changing, FlangeWelding , Tyre Turning & UTS

    Reclamation of Wagon Doors Brake

    Beams .

    Overhauling of Distrubutor & Spool

    Valves

  • 7/31/2019 Practices & Procedures

    12/29

    CRITICAL ISSUES

    LIMITED SPACE FOR MGR

    WORKSHOP- NOTE SHEET MOVED

    IN 2002 BUT TURNED DOWN.AGAINMOVED IN 2006, NOW WITH ENGG.

  • 7/31/2019 Practices & Procedures

    13/29

    CRITICAL ISSUES

    TWO NOS LOCO REQUIRED IN

    ADDITION TO 9 LOCOS ATPRESENT.ONE LOCO ARRANGED ON

    TEMPRORY BASIS FROM NTPC SIPAT.

  • 7/31/2019 Practices & Procedures

    14/29

    Length of main MGR coal circuit 19.6 Km.

    Total 52 Track Kilometer (including DCH &

    Non-coal track) is maintained by MGR/VSTPP

    Almost 40% i.e.7.8 Km of main MGR are in

    curvature

    Steepest Gradient 1 in 125 Dn.

    52 Kg rail, short welded rail panel, T-12 rails for

    main line and T-18 for yard lines in use.

    SALIENT FEATURES OF

    MGR TRACK

  • 7/31/2019 Practices & Procedures

    15/29

    No of Points & Crossings in total :1 in 8 48 nos1 in 12 03 nos

    Sleeper density M+7 in main line andM+4 in yard lines. PRC sleepers laid

    throughout main MGR track Total number of bridges & culverts -

    34, Longest being 78 M steel girderbridge at DCH line.

    SALIENT FEATURES OF

    MGR TRACK

  • 7/31/2019 Practices & Procedures

    16/29

    Daily patrolling of the entire track by foot

    Packing of track at locations where slackness

    found Through packing of entire track once in a year

    Lifting of track at required locations

    Overhauling of track Replacement of worn out rails and sleepers

    Maintenance of Hand lever operated points

    ROUTINE TRACK MNTCE

  • 7/31/2019 Practices & Procedures

    17/29

    Re-alignment of curvature where distorted.

    Lubrication of fish-plated joints yearly.

    Greasing of gauge face of curvature track.

    Removing spillage coal from track in W/Shop

    areas . Drain cleaning & de-weeding along the track.

    ROUTINE TRACK MNTCE

  • 7/31/2019 Practices & Procedures

    18/29

    1. Supply & spreading of ballast 5400 M3 for MGR track to makeup deficiency .

    2 Laying new Crossover between L/Line & E/line near MGRW/Shop for increasing operational facility .

    3. Reshaping & strengthening of track embankment at differentlocations for improving safety of track .

    3. Replacement of worn out rails/tongue rails & crossings - 150Nos

    4. Overhauling of Points & Crossings - 21 sets

    5. Replacement of worn out bridge timber 10 Nos at BalliaNallah bridge at DCH6. Realignment of track curvature for 3000 M.7. Through packing of track for the entire main MGR and DCH

    track .

    MAJOR MNTCE DONE IN

    2006-07

  • 7/31/2019 Practices & Procedures

    19/29

    1. Supply & spreading of ballast 6000 M3 for MGRtrack to make up ballast deficiency

    2.Replacement of bridge timber 300 Nos on all the 4 nos

    of steel girder bridges with steel channel sleepers.

    3. Replacement of worn out rails/crossings 100 Nos

    4. Replacement of worn out wooden sleepers of

    Points & Crossings102 Nos

    MAJOR TRACK MNTCE

    TARGETS FOR 2007-08

  • 7/31/2019 Practices & Procedures

    20/29

    MAJOR MNTCE TARGETS

    FOR 2007-08 Inspection of steel girder bridges by outside expert

    agency.

    Scheduled to Carry out U S F D on entire length

    of MGR track . Deep screening of nominated track.

    Replacement of existing wooden P&C with PRClayout.

    Replacement of existing steel sleeper with PRCsleeper.

    Painting of 04 no. steel girder bridge.

  • 7/31/2019 Practices & Procedures

    21/29

    5. Re-alignment of curvature - 3000M .6. Overhauling of track - 10000M .

    7. Lifting of track & Points Crossings - 2500M

    8. One round through packing of the entire track length.9. Reshaping & strengthening of embankment at different

    locations for safety of track.

    MAJOR MNTCE TARGETS

    FOR 2007-08

  • 7/31/2019 Practices & Procedures

    22/29

    Signalling system with wireless communication

    is fully operational for safe train movement

    Multi-aspect Colour light signalling withmotorised operation of Points

    System is operable from a interlocked Control

    Panel with mimic diagrams located in Cabins

    Real time movement of trains are monitored

    thro Panel

    SIGNAL & TELECOM SYSTEM

    OF MGR

  • 7/31/2019 Practices & Procedures

    23/29

    Vulnerable areas of the track are electrically

    circuited which are activated by the passage of

    trains for ensuring maxm safety in trainoperation

    Inter slotting system between the Cabins

    ensures tangible involvement of two Cabins for

    receiving & despatching of trains

    Apart from the Signals, communication

    channel between the Control & Driver is

    established thro Wireless & Walkie Talkie

    sets.

    SIGNAL & TELECOM SYSTEM

    OF MGR

  • 7/31/2019 Practices & Procedures

    24/29

    Maintenance of Secondary cells numbering 300

    Nos

    Checking & adjustment of Point machines 33 Nosfor correct setting in Normal & Reverse positions

    Maintenance of 50 Nos Track Circuits

    Adjustment of Voltage & correct focussing of

    Signals

    Checking of interlocking circuits for proper

    correspondence between Panel & Site

    ROUTINE S&T MNTCE

  • 7/31/2019 Practices & Procedures

    25/29

    Visual inspection of Relays

    Maintenance of Wireless and Walkie Talkie

    sets Maintenance of 2 Nos DG sets (for Standby

    Power supply)

    ROUTINE S&T MNTCE

  • 7/31/2019 Practices & Procedures

    26/29

    Replacement of 30 Nos Secondary cells

    500 Mtr Signalling cable laying between MGRrelay room & location near point 11

    Introduction of signal overshoot protectionsystem in MGR circuit.

    New signal no.26 installed with necessary

    cable laying and circuitry modifications &commissioned at NGH cabin area to improvesafety in train operation.

    MAJOR S&T MNTCE DONE

    IN 2006-07

  • 7/31/2019 Practices & Procedures

    27/29

    2000mtr length 30core x 1.5 sq mm slotcable laying done from jayant silo(35point) to wharf wall

    24c x1.5 sq mm size, 500mtr length cablelaying done at IOC point area DCH line

    Replacement of old cable with new one 300 mtrat T/H area.

    MAJOR MNTCE DONE IN

    2006-07

  • 7/31/2019 Practices & Procedures

    28/29

    5o nos secondary cells to be replaced

    Insatalling signals at DCH line

    location near point 31&30 24c x1.5 sq mm size, 4000mtr length

    cable laying for signalling restorationwork

    Making track circuits and restoringsignalling system on DCH line at IOCpoint area.

    MAJOR S&T MNTCE

    TORGET FOR 2007-08