practices & procedures
TRANSCRIPT
-
7/31/2019 Practices & Procedures
1/29
MGR OPERATION PRACTICES
1) TOTAL MGR CIRCUIT IS DIVIDED IN 3 CONTROLSTATIONS.2) MOVEMENT OF RAKE/LOCOMOTIVE , FROM ONE
STATION TO ANOTHER , AFTER GETTING LINECLEARANCE THROUGH PRIVATE NUMBER EXCHANGE& RECEIVING SLOT.
3) ALL MOVEMENTS DONE WITH SIGNALS ONLYWHEREEVER PROVIDED.
4) STATION WORKING RULE FRAMMED & DISPALYED ATALL CONTROL STATIONS.
5) ABSOLUTE BLOCK WORKING FOLLOWED DURINGRAILWAY MOVEMENT THROUGH DUDHICHUA CIRCUIT
,WHERE ONLY ONE PARTY OPERATES AT A TIME
-
7/31/2019 Practices & Procedures
2/29
SAFETY ASPECTS IN MGR
OPERATING SYSTEM1) STRICT ADHERENCE OF STAION WORKING
RULE & MOVEMENT THROUGH SIGNALS .2) REGULAR BRAKE POWER TESTING OF
RUNNING RAKES , AT LEAST ONCE IN AWEEK.3) SIGNAL OVERSHOOT PROTECTION SYSTEM
PERIODICALLY TESTED.4) MONTHLY SAFETY AUDIT THROUGH VSTPP
SFAETY TEAM & TECHICAL AUDIT THROUGHCORPORATE CENTRE TEAM.5) YEARLY SAFETY AUDIT IS PLANNED
THROUGH RAILWAY EXPERTS.6) REGULAR FOOT PLATE INSPECTION BY
DEPARTMENTAL HEAD & OTHER SENIOROFFICIALS
-
7/31/2019 Practices & Procedures
3/29
MAGOR ACHIEVEMEVTS OF
MGR OPERATING GROUP1) COAL TRANSPORTATION --
In a Single Day 58,835.96 (Dt = 25/03/2007)
In a Month
14,14,867.55 (March -2007)In a year 117.29 Lakhs
2) No Mishap in MGR System since last 16 years.
3) Safe movement in MGR Circuit , with multiple
sources of coal off take including Railways,materialising a steady off take of more than45,000 MT/day, the highest among all NTPCProjects as on date .
-
7/31/2019 Practices & Procedures
4/29
BEST PRACTICES OF MGR
OPERATING SYSTEM, VSTPP1) Operating Rake Size of 50 wagons (Highest
among NTPC Projects ) with Guard Van as LastVehicle.
2) Confirmation of Last Vehicle at each controlstations.3) Checking Brake Pressure at the last vehicle
during every Tripp checking on Empty run atMGR Control Room.
4) The outer Signal of any Control station(despatching end) is interlocked with SLOT , tobe received from the Control station in advance(sending end)
5) All Control station are Provided with Hot LineTelephone, in addition to NTPC Telephone &Wireless Communication.
-
7/31/2019 Practices & Procedures
5/29
DETAILS WDM2A WDS6 WDG-3A Number of Locos 2 4 4
HP 2400 1200 3100
Max Speed(KMPH) 120 60 100
HSD Tank Cap(Lts) 5100 4100 6000
Weight 120 MT 126 MT 112MT
-
7/31/2019 Practices & Procedures
6/29
Type of Wagon BSCL CIMMCO TEXMACO
No of Wagons 43 67 39 +119 Total 268 Nos
Year of Commng !988-89 1990-91 2000-01
2005-06
DOM System Single Link Single Link Double
Axle Load(Ton) 22.9 22.9 22.9
Length(M) 13.41 13.41 13.41
ROLLING STOCK(WAGON)
(All wagons are BOBR Type)
-
7/31/2019 Practices & Procedures
7/29
LOCO MAINTENANCE
Light Schedule: T1,T2,M1,M2 including
trouble shooting in MGR Work Shop.
Heavy Schedule: M4 &M6 includingBreakdown Maintenance in MGR Work
Shop.
Major Schedule: M 24 & M 48 in Railway
Diesel Shed( like Patratu E.C.Rly)
POH:M 96 at Railway Workshops Golden
Rock(Trichy)
-
7/31/2019 Practices & Procedures
8/29
Details of Major Overhauling
of Locos Done at Golden
Rock/Trichy During 2006-07 LOCO TYPE OF TOTAL
NO SCH EXPENDITURE
V-001 M-96(POH) 93,34,741
V-002 M-96(POH) 89,02,220
-
7/31/2019 Practices & Procedures
9/29
Major Overhauling Planned at
2007-08
LOCO NO TYPE Of SCH
S-006(WDS-6) M-96 AT GOCTRICHY
2520(WDM2) M-96 AT GOC
TRICHY
2537(WDM2) M-96 AT GOC
TRICHY
-
7/31/2019 Practices & Procedures
10/29
DETAILS OF WAGON
MAINTENANCE Monthly Maintenance of 4 Rakes (50
Wagons)
Overhauling of DOM Systems includingSpool Valves, Brake Systems including
Distrubutor Valves.
Wheel Changing &
Overhauling/Reclamation of Axle
Bearings.
Reclamation of Wagon Doors.
-
7/31/2019 Practices & Procedures
11/29
Major Jobs Planned 2007-08
Wagon POH of 20 Wagons.
Overhauling of 100 Bearings.
150 nos of Wheel Changing, FlangeWelding , Tyre Turning & UTS
Reclamation of Wagon Doors Brake
Beams .
Overhauling of Distrubutor & Spool
Valves
-
7/31/2019 Practices & Procedures
12/29
CRITICAL ISSUES
LIMITED SPACE FOR MGR
WORKSHOP- NOTE SHEET MOVED
IN 2002 BUT TURNED DOWN.AGAINMOVED IN 2006, NOW WITH ENGG.
-
7/31/2019 Practices & Procedures
13/29
CRITICAL ISSUES
TWO NOS LOCO REQUIRED IN
ADDITION TO 9 LOCOS ATPRESENT.ONE LOCO ARRANGED ON
TEMPRORY BASIS FROM NTPC SIPAT.
-
7/31/2019 Practices & Procedures
14/29
Length of main MGR coal circuit 19.6 Km.
Total 52 Track Kilometer (including DCH &
Non-coal track) is maintained by MGR/VSTPP
Almost 40% i.e.7.8 Km of main MGR are in
curvature
Steepest Gradient 1 in 125 Dn.
52 Kg rail, short welded rail panel, T-12 rails for
main line and T-18 for yard lines in use.
SALIENT FEATURES OF
MGR TRACK
-
7/31/2019 Practices & Procedures
15/29
No of Points & Crossings in total :1 in 8 48 nos1 in 12 03 nos
Sleeper density M+7 in main line andM+4 in yard lines. PRC sleepers laid
throughout main MGR track Total number of bridges & culverts -
34, Longest being 78 M steel girderbridge at DCH line.
SALIENT FEATURES OF
MGR TRACK
-
7/31/2019 Practices & Procedures
16/29
Daily patrolling of the entire track by foot
Packing of track at locations where slackness
found Through packing of entire track once in a year
Lifting of track at required locations
Overhauling of track Replacement of worn out rails and sleepers
Maintenance of Hand lever operated points
ROUTINE TRACK MNTCE
-
7/31/2019 Practices & Procedures
17/29
Re-alignment of curvature where distorted.
Lubrication of fish-plated joints yearly.
Greasing of gauge face of curvature track.
Removing spillage coal from track in W/Shop
areas . Drain cleaning & de-weeding along the track.
ROUTINE TRACK MNTCE
-
7/31/2019 Practices & Procedures
18/29
1. Supply & spreading of ballast 5400 M3 for MGR track to makeup deficiency .
2 Laying new Crossover between L/Line & E/line near MGRW/Shop for increasing operational facility .
3. Reshaping & strengthening of track embankment at differentlocations for improving safety of track .
3. Replacement of worn out rails/tongue rails & crossings - 150Nos
4. Overhauling of Points & Crossings - 21 sets
5. Replacement of worn out bridge timber 10 Nos at BalliaNallah bridge at DCH6. Realignment of track curvature for 3000 M.7. Through packing of track for the entire main MGR and DCH
track .
MAJOR MNTCE DONE IN
2006-07
-
7/31/2019 Practices & Procedures
19/29
1. Supply & spreading of ballast 6000 M3 for MGRtrack to make up ballast deficiency
2.Replacement of bridge timber 300 Nos on all the 4 nos
of steel girder bridges with steel channel sleepers.
3. Replacement of worn out rails/crossings 100 Nos
4. Replacement of worn out wooden sleepers of
Points & Crossings102 Nos
MAJOR TRACK MNTCE
TARGETS FOR 2007-08
-
7/31/2019 Practices & Procedures
20/29
MAJOR MNTCE TARGETS
FOR 2007-08 Inspection of steel girder bridges by outside expert
agency.
Scheduled to Carry out U S F D on entire length
of MGR track . Deep screening of nominated track.
Replacement of existing wooden P&C with PRClayout.
Replacement of existing steel sleeper with PRCsleeper.
Painting of 04 no. steel girder bridge.
-
7/31/2019 Practices & Procedures
21/29
5. Re-alignment of curvature - 3000M .6. Overhauling of track - 10000M .
7. Lifting of track & Points Crossings - 2500M
8. One round through packing of the entire track length.9. Reshaping & strengthening of embankment at different
locations for safety of track.
MAJOR MNTCE TARGETS
FOR 2007-08
-
7/31/2019 Practices & Procedures
22/29
Signalling system with wireless communication
is fully operational for safe train movement
Multi-aspect Colour light signalling withmotorised operation of Points
System is operable from a interlocked Control
Panel with mimic diagrams located in Cabins
Real time movement of trains are monitored
thro Panel
SIGNAL & TELECOM SYSTEM
OF MGR
-
7/31/2019 Practices & Procedures
23/29
Vulnerable areas of the track are electrically
circuited which are activated by the passage of
trains for ensuring maxm safety in trainoperation
Inter slotting system between the Cabins
ensures tangible involvement of two Cabins for
receiving & despatching of trains
Apart from the Signals, communication
channel between the Control & Driver is
established thro Wireless & Walkie Talkie
sets.
SIGNAL & TELECOM SYSTEM
OF MGR
-
7/31/2019 Practices & Procedures
24/29
Maintenance of Secondary cells numbering 300
Nos
Checking & adjustment of Point machines 33 Nosfor correct setting in Normal & Reverse positions
Maintenance of 50 Nos Track Circuits
Adjustment of Voltage & correct focussing of
Signals
Checking of interlocking circuits for proper
correspondence between Panel & Site
ROUTINE S&T MNTCE
-
7/31/2019 Practices & Procedures
25/29
Visual inspection of Relays
Maintenance of Wireless and Walkie Talkie
sets Maintenance of 2 Nos DG sets (for Standby
Power supply)
ROUTINE S&T MNTCE
-
7/31/2019 Practices & Procedures
26/29
Replacement of 30 Nos Secondary cells
500 Mtr Signalling cable laying between MGRrelay room & location near point 11
Introduction of signal overshoot protectionsystem in MGR circuit.
New signal no.26 installed with necessary
cable laying and circuitry modifications &commissioned at NGH cabin area to improvesafety in train operation.
MAJOR S&T MNTCE DONE
IN 2006-07
-
7/31/2019 Practices & Procedures
27/29
2000mtr length 30core x 1.5 sq mm slotcable laying done from jayant silo(35point) to wharf wall
24c x1.5 sq mm size, 500mtr length cablelaying done at IOC point area DCH line
Replacement of old cable with new one 300 mtrat T/H area.
MAJOR MNTCE DONE IN
2006-07
-
7/31/2019 Practices & Procedures
28/29
5o nos secondary cells to be replaced
Insatalling signals at DCH line
location near point 31&30 24c x1.5 sq mm size, 4000mtr length
cable laying for signalling restorationwork
Making track circuits and restoringsignalling system on DCH line at IOCpoint area.
MAJOR S&T MNTCE
TORGET FOR 2007-08
-
7/31/2019 Practices & Procedures