    11..00 IntroductionIntroduction

    severalseveral situationssituations inin constructionconstruction.. TheThe constructionconstruction ofof deepdeepbasementsbasements requiresrequires shoringshoring systemssystems toto retainretain thethe toptop soilsoil // fillfill

    materialsmaterials downdown toto thethe competentcompetent rockrock depthdepth..

    OneOne problemproblem thatthat appearsappears alwaysalways isis thatthat thethe designerdesigner utilizesutilizes

    systemsystem..

    considerationconsideration ofof thethe necessitynecessity ofof aa shoringshoring systemsystem..

  • 8/13/2019 Practical Shoring Systems Presentation

    3/53

    andand utilizedutilized shoringshoring systemssystems thatthat willwill notnot taketake significantsignificant spacespacefromfrom thethe landland areaarea andand havehave provedproved veryvery feasiblefeasible systemssystems forfor fillfill

    // toptop soilsoil heightsheights fromfrom 331515mm..

    TheThe systemssystems areare::

    11.. Soldier Piles and Rock Nails. The soldier piles areSoldier Piles and Rock Nails. The soldier piles are

    constructed at an angle ofconstructed at an angle of 77oo 99oo with the vertical.with the vertical.

    22.. SoilSoil Nailing.Nailing.

  • 8/13/2019 Practical Shoring Systems Presentation

    4/53

    22..00 Soldier Piles and RockSoldier Piles and Rock NailsNails

    The main components of the system shown in FigureThe main components of the system shown in Figure 11 are:are:

    II.. GroundGround / Rock Nails / Anchors/ Rock Nails / Anchors

    TheThe employedemployed systemsystem usesuses groundground nailsnails thatthat consistconsist ofof

    reinforcementreinforcement barsbars usuallyusually 3232mmmm inin diameterdiameter installedinstalledtoto thethe re uiredre uired len thlen th inin holesholes ofof diameterdiameter 1010 1515cmcm

    andand thethe bondedbonded lengthlength isis groutedgrouted byby cementcement groutgroutusuallyusually withwith nonnon--shrinkshrink additivesadditives.. TheseThese nailsnails areare

    usuallyusually anchoredanchored inin rockrock hence,hence, thethe namename althoughalthough theythey

    areare notnot prepre--stressedstressed.. TheThe steelsteel barsbars areare justjust tightenedtightened

    andand lockedlocked inin placeplace..

  • 8/13/2019 Practical Shoring Systems Presentation

    5/53

    FigureFigure 11: Soldier Piles and Rock: Soldier Piles and RockNailsNails

  • 8/13/2019 Practical Shoring Systems Presentation

    6/53

    UsuallyUsually steelsteel II oror HH beamsbeams areare installedinstalled inin prepre--drilleddrilled

    ..

    steelsteel beamsbeams asas alsoalso groutedgrouted toto fixfix itit inin rockrock..

    III.III. Waler Waler BeamsBeams

    WalerWaler beamsbeams usuallusuall consistconsist ofof twotwo steelsteel channelschannels

    installedinstalled atat thethe anchoranchor locationslocations..

  • 8/13/2019 Practical Shoring Systems Presentation

    7/53

    Several options for lagging may be used:Several options for lagging may be used:

    11. Steel. Steel PlatesPlates

    ThicknessThickness ofof thethe platesplates maymay bebe asas smallsmall asas 33mmmm..

    thesethese steelsteel platesplates areaarea reinforcedreinforced withwith steelsteel anglesangles atatcertaincertain intervalsintervals..

    22. Wood. Wood LaggingLagging

    WouldWould purlins may also be usedpurlins may also be used..

  • 8/13/2019 Practical Shoring Systems Presentation

    8/53

    TheThe connectionconnection consistsconsists ofof steelsteel plateplate andand nutnut atat thethe

    ..

    toto designdesign..

  • 8/13/2019 Practical Shoring Systems Presentation

    9/53

    22..22..11 MethodologyMethodology

    TheThe designdesign basesbases isis similarsimilar toto anyany shoringshoring systemsystem inin

    termsterms ofof analysisanalysis andand distributiondistribution ofof bendingbending momentsmomentsandand shearshear forcesforces toto anchors,anchors, walerswalers,, andand soldiersoldier pilespiles..

    EarthEarth ressureressure includinincludin surchar esurchar e loadsloads andand anan

    waterwater pressure)pressure) cancan bebe selectedselected basedbased onon thethe wellwell--establishedestablished PecksPecks RulesRules..

  • 8/13/2019 Practical Shoring Systems Presentation

    10/53

  • 8/13/2019 Practical Shoring Systems Presentation

    11/53

    thatthat thethe maximummaximum forcesforces areare transmittedtransmitted toto thethe lowerloweranchorsanchors (usually(usually wellwell embeddedembedded inin rock),rock), activeactive

    conditionsconditions havehave beenbeen usedused successfullysuccessfully inin allall designeddesigned

    projectsprojects.. ThisThis approachapproach hashas beenbeen verifiedverified byby plaxisplaxisanalysisanalysis (finite(finite element)element) andand byby actualactual monitoringmonitoring ofof

    displacementsdisplacements atat severalseveral sitessites..

    AnAn excelexcel sheetsheet hashas beenbeen developeddeveloped specificallyspecifically forfor thisthiss stems stem andand hashas beenbeen usedused inin allall ro ectsro ects.. HandHand

    calculationscalculations toto verifyverify thethe designsdesigns areare alsoalso usedused..

    deformationsdeformations ofof thethe systemsystem asas wellwell asas thethe settlementsettlement ofof

    thethe groundground..

  • 8/13/2019 Practical Shoring Systems Presentation

    12/53

    22..22..22 DesignDesign ParametersParameters

    1.1. Height of fill / top soil H in m.Height of fill / top soil H in m.

    .. , ., .

    3.3. Surcharge loads.Surcharge loads.

    4.4. Spacing between soldier piles.Spacing between soldier piles.5.5. Yield stress of steel.Yield stress of steel.

    6.6. Hole diameter.Hole diameter.

    7.7. Yield stress of steel bar for anchors.Yield stress of steel bar for anchors.

    8.8. Allowable stresses for grout (grout / soil and grout /Allowable stresses for grout (grout / soil and grout /

    steel).steel).

    .. . .

    10.10. Properties of steel plates and steel angles.Properties of steel plates and steel angles.

  • 8/13/2019 Practical Shoring Systems Presentation

    13/53

  • 8/13/2019 Practical Shoring Systems Presentation

    14/53

    11.. Active earth pressure is calculated using the firstActive earth pressure is calculated using the first 33

    , , ., , .

    22.. Analysis and Design:Analysis and Design:

    a)a) CheckCheck thethe cantilevercantilever momentmoment..

    ..

    c)c) SelectSelect sectionsection forfor largestlargest (moment(moment spacing)spacing)..

    d)d) DesignDesign steelsteel platesplates basedbased onon averageaverage

    max mummax mum momenmomen ..

  • 8/13/2019 Practical Shoring Systems Presentation

    15/53

    f)f) DetermineDetermine forcesforces inin anchorsanchors basedbased onon tributarytributaryareasareas..

    gg

    lengthlength ofof anchorsanchors determinedetermine thethe totaltotal lengthlength..

    h)h) DetermineDetermine thethe diameterdiameter ofof holehole..

  • 8/13/2019 Practical Shoring Systems Presentation

    16/53

  • 8/13/2019 Practical Shoring Systems Presentation

    17/53

  • 8/13/2019 Practical Shoring Systems Presentation

    18/53

    TheThe forcesforces inin anchors,anchors, bendingbending momentsmoments cancan bebe

    ..

    thosethose calculated,calculated, determinedetermine deformationdeformation ofof thethe

    structurestructure andand settlementssettlements ofof thethe groundground..

    NoteNote thatthat plaxisplaxis requirerequire thethe propertiesproperties ofof rockrock forfor thethe

    modelmodel.. ItIt alsoalso showsshows thethe deformationsdeformations inin rockrock..

  • 8/13/2019 Practical Shoring Systems Presentation

    19/53

    .. ..

    TheThe shownshown exampleexample showsshows thatthat therethere isis aa goodgood matchmatch

    calculationcalculation..

    ThisThis systemsystem requiresrequires competentcompetent rockrock atat aa depthdepth..

  • 8/13/2019 Practical Shoring Systems Presentation

    20/53

  • 8/13/2019 Practical Shoring Systems Presentation

    21/53

  • 8/13/2019 Practical Shoring Systems Presentation

    22/53

  • 8/13/2019 Practical Shoring Systems Presentation

    23/53

    33..00 Soil NailingSoil Nailing SystemSystem

    The main components of the system shown in FigureThe main components of the system shown in Figure 22 are:are:

    I.I. Soil NailsSoil Nails

    TheThe soilsoil nailsnails areare holesholes drilleddrilled intointo thethe groundground withwith

    diameterdiameter rangingranging fromfrom 100100 200200mmmm toto thethe designdesign lengthlength..AA steelsteel barbar ofof thethe desi neddesi ned diameter,diameter, usuallusuall 2020 3232mm,mm,

    isis installedinstalled atat thethe centercenter ofof thethe holehole withwith thethe helphelp ofofspacersspacers.. TheThe holehole isis fullyfully groutedgrouted.. TheThe soilsoil nailsnails areare

    generallygenerally spacedspaced atat 11..00 22..00mm horizontallyhorizontally andand verticallyvertically..

  • 8/13/2019 Practical Shoring Systems Presentation

    24/53

    ..

    ShotcreteShotcrete withwith thicknessthickness varyingvarying fromfrom 100100 150150mmmm areare

    ..

    strengthstrength isis usuallyusually 3030N/mmN/mm22 atat 2828--daysdays..

    III.III. WalerWaler BarsBars

    UsuallUsuall 22--horizontal andhorizontal and 22--vertical steel bars are used asvertical steel bars are used as

    wailers connecting the nails. The common size used iswailers connecting the nails. The common size used is1818mm.mm.

  • 8/13/2019 Practical Shoring Systems Presentation

    25/53

    ..

    OneOne layerlayer ofof wiremeshwiremesh isis requiredrequired forfor thethe shotcreteshotcrete.. InIn

    ,,

    ofof wiremeshwiremesh maymay bebe usedused..

    V.V. ConnectionConnection

    AA latelate andand notnot isis re uiredre uired atat thethe endend ofof steelsteel barbar onon toto

    ofof thethe walerwaler barsbars..

  • 8/13/2019 Practical Shoring Systems Presentation

    26/53

    ing

    ing

    Nail

    Nail

    So

    il

    So

    il

    ical

    ical

    :Ty

    :Ty

    ure

    uretion

    tion

    F

    ig

    F

    ig

    S

    e

    S

    e

  • 8/13/2019 Practical Shoring Systems Presentation

    27/53

    (The(The DesignDesign BasisBasis areare AdoptedAdopted fromfrom ManualManual forfor DesignDesign &&

    .. ..

    DepartmentDepartment ofof TransportationTransportation FederalFederal HighwayHighway

    Administration)Administration)..

    TheThe basicbasic designdesign conceptconcept isis toto reinforcereinforce thethe soilsoil.. DueDue toto thethe

    interactioninteraction betweenbetween andand thethe soilsoil aa tensiontension loadload isis developeddeveloped

    ..

    loadsloads oftenoften consideredconsidered asas dividingdividing thethe soilsoil massmass intointo twotwo

    separateseparate zoneszones;; anan activeactive zonezone closeclose toto thethe facingfacing wherewhere

    groundground andand aa resistantresistant zonezone wherewhere thethe shearshear stressesstresses areare

    directeddirected inwardinward andand tendtend toto restrainrestrain thethe reinforcementreinforcement..

  • 8/13/2019 Practical Shoring Systems Presentation

    28/53

    Ultimate Pullout ResistanceUltimate Pullout Resistance QuQu

    uu = n t t mate on stress x= n t t mate on stress x

    Ultimate bond stressUltimate bond stress CohesionlessCohesionless soilssoils

  • 8/13/2019 Practical Shoring Systems Presentation

    29/53

  • 8/13/2019 Practical Shoring Systems Presentation

    30/53

    NailsNails areare usuallyusually drilleddrilled atat anan angleangle ofof 1515oo.. TheThe toptop rowrow

    ..

    usuallyusually atat 00..7575mm..

    Factors to consider in design:Factors to consider in design:

    1.1. S acin of Nails and An le.S acin of Nails and An le.

    2.2. Nail Length and Hole Diameter.Nail Length and Hole Diameter.

    3.3. ThicknessThickness ofof ShotcreteShotcrete and Details ofand Details of WiremeshWiremesh..

    unc ng ear an omen apac yunc ng ear an omen apac y

    4.4. Plate ThicknessPlate Thickness..

  • 8/13/2019 Practical Shoring Systems Presentation

    31/53

  • 8/13/2019 Practical Shoring Systems Presentation

    32/53

  • 8/13/2019 Practical Shoring Systems Presentation

    33/53

    44..00 ConclusionsConclusions

    of space for the shoring works in addition it:of space for the shoring works in addition it:

    aa . .

    b)b) Does not require heavy machinery to construct.Does not require heavy machinery to construct.

    c)c) Does not require great experience in installation.Does not require great experience in installation.

  • 8/13/2019 Practical Shoring Systems Presentation

    34/53

  • 8/13/2019 Practical Shoring Systems Presentation

    35/53

  • 8/13/2019 Practical Shoring Systems Presentation

    36/53

  • 8/13/2019 Practical Shoring Systems Presentation

    37/53

  • 8/13/2019 Practical Shoring Systems Presentation

    38/53

  • 8/13/2019 Practical Shoring Systems Presentation

    39/53

  • 8/13/2019 Practical Shoring Systems Presentation

    40/53

  • 8/13/2019 Practical Shoring Systems Presentation

    41/53

  • 8/13/2019 Practical Shoring Systems Presentation

    42/53

  • 8/13/2019 Practical Shoring Systems Presentation

    43/53

  • 8/13/2019 Practical Shoring Systems Presentation

    44/53

  • 8/13/2019 Practical Shoring Systems Presentation

    45/53

  • 8/13/2019 Practical Shoring Systems Presentation

    46/53

  • 8/13/2019 Practical Shoring Systems Presentation

    47/53

  • 8/13/2019 Practical Shoring Systems Presentation

    48/53

  • 8/13/2019 Practical Shoring Systems Presentation

    49/53

  • 8/13/2019 Practical Shoring Systems Presentation

    50/53

  • 8/13/2019 Practical Shoring Systems Presentation

    51/53

  • 8/13/2019 Practical Shoring Systems Presentation

    52/53

  • 8/13/2019 Practical Shoring Systems Presentation

    53/53