S preadsheet Problem Type ofC ontract M arkup C ontractP rice 1. Lum p sum M = (R +R 1 )E B = (1 + R + R 1 )E 2. Unitprice M = (R +R 2 )E B = (1 + R + R 2 )E 3. C ostplus fixed % M = RA = RE B = (1 + R )E 4. C ostplus fixed fee M = RE B = (1 + R )E 5. C ostplus variable % M = R (2E -A)= R E B = (1 + R )E 6. Targetestim ate M = R E + N(E -A)= R E B = (1 + R )E 7. G uaranteed m axim um price M = (R +R 3 )E B = (1 + R + R 3 )E Type ofC ontract M arkup C ontractP rice 1. Lum p sum =(0.1+0.02)*6000 =(1+0.1+0.02)*6000 2. Unitprice =(0.1+0.01)*6000 =(1+0.1+0.01)*6000 3. C ostplus fixed % =0.1*6000 =(1+0.1)*6000 4. C ostplus fixed fee =0.1*6000 =(1+0.1)*6000 5. C ostplus variable % =0.1*(2*6000-6000) =(1+0.1)*6000 6. Targetestimate =0.1*6000+0.5*(6000-6000) =(1+0.1)*6000 7. G uaranteed m axim um price =(0.1+0.05)*6000 =(1+0.1+0.05)*6000 Solved Hom ew ork due 27-Feb-02 Original E stimated C ontract P rices (in $ thousands) A nalyze the follow ing construction project,com paring the relative costs of each of the seven contracts types presented in class. The contractor's original estim ate is $6,000,000, and the m arkup percentages are: R = 10% , R 1 = 2% , R 2 = 1% , and R 3 = 5% . The shared savings factoris .5. D eterm ine the contractor's m arkup and the original contract price (B )foreach of the contract types. Original E stimated C ontract P rices U niversity ofD elaw are D epartm entofC iviland Environm entalEngineering C onstruction M ethods & M anagem ent C IEG 467/667-012

Upload: trinhtu

Post on 02-May-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Spreadsheet Problem

Type of Contract Markup Contract Price

1. Lump sum M = (R+R1)E B = (1 + R + R1)E2. Unit price M = (R+R2)E B = (1 + R + R2)E3. Cost plus fixed % M = RA = RE B = (1 + R)E

4. Cost plus fixed fee M = RE B = (1 + R)E5. Cost plus variable % M = R(2E - A) = RE B = (1 + R)E6. Target estimate M = RE + N(E - A) = RE B = (1 + R)E7. Guaranteed maximum price M = (R+R3)E B = (1 + R + R3)E

Type of Contract Markup Contract Price1. Lump sum =(0.1+0.02)*6000 =(1+0.1+0.02)*60002. Unit price =(0.1+0.01)*6000 =(1+0.1+0.01)*60003. Cost plus fixed % =0.1*6000 =(1+0.1)*60004. Cost plus fixed fee =0.1*6000 =(1+0.1)*60005. Cost plus variable % =0.1*(2*6000-6000) =(1+0.1)*60006. Target estimate =0.1*6000+0.5*(6000-6000) =(1+0.1)*60007. Guaranteed maximum price =(0.1+0.05)*6000 =(1+0.1+0.05)*6000

Solved Homework due 27-Feb-02

Original Estimated Contract Prices (in $ thousands)

Analyze the following construction project, comparing the relative costs of each of the seven contracts types presented in class. The contractor's original estimate is $6,000,000, and the markup percentages are: R = 10%, R1 = 2%, R2 = 1%, and R3 = 5%. The shared savings factor is .5. Determine the contractor's markup and the original contract price (B) for each of the contract types.

Original Estimated Contract Prices

University of DelawareDepartment of Civil and Environmental Engineering

Construction Methods & ManagementCIEG 467/667-012

Page 2: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Solved Homework due 27-Feb-02Spreadsheet ProblemAnalyze the following construction project, comparing the relative costs of each of the seven contracts types presented in class. The contractor's original estimate is $6,000,000, and the markup percentages are: R = 10%, R1 = 2%, R2 = 1%, and R3 = 5%. The shared savings factor is .5. Determine the contractor's markup and the original contract price (B) for each of the contract types.

Original Estimated Contract PricesType of Contract Markup Contract Price

1. Lump sum M = (R+R1)E B = (1 + R + R1)E2. Unit price M = (R+R2)E B = (1 + R + R2)E3. Cost plus fixed % M = RA = RE B = (1 + R)E4. Cost plus fixed fee M = RE B = (1 + R)E5. Cost plus variable % M = R(2E - A) = RE B = (1 + R)E6. Target estimate M = RE + N(E - A) = RE B = (1 + R)E7. Guaranteed maximum price M = (R+R3)E B = (1 + R + R3)E

Original Estimated Contract Prices (in $ thousands)Type of Contract Markup Contract Price

1. Lump sum 720 67202. Unit price 660 66603. Cost plus fixed % 600 66004. Cost plus fixed fee 600 66005. Cost plus variable % 600 66006. Target estimate 600 66007. Guaranteed maximum price 900 6900

University of DelawareDepartment of Civil and Environmental Engineering

Construction Methods & ManagementCIEG 467/667-012

Page 3: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine is excavating sand and gravel

Bucket Fill Factor (average) = 0.95 (Table 3-2)

Load Factor = 0.89 (Table 2-5)

Page 4: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine is excavating sand and gravel

Bucket Loadbank = heaped volume x bucket fill factor x load factor

= 2.10 x 0.95 x 0.89 = 1.78 BCY

= 1.6 x 0.95 x 0.89 = 1.35 BCM

Page 5: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

3-3. A 2-CY (1.53 CM) dragline is being used to excavate a canal in common earth. The average swing angle is 70º, the average depth of cut is 8.9 ft. (2.7 m), and the job efficiency is 50 min/hr. Estimate the dragline’s hourly production in loose measure.

Page 6: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Job efficiency = 50/60 = 0.83

Swing-depth factor = 1.06 (Table 3-9) (70º swing, 90% optimum depth)

2.73.0% optimum depth = x 100 = 90%

8.99.9 90%x 100 =% optimum depth =

Ideal output = 230 BCY/hr (176 BCM/hr) (Table 3-7)

Optimum depth = 9.9 ft. (3.0 m) (Table 3-8)

Page 7: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Production = ideal output x swing-depth x job efficiency

= 230 x 1.06 x 0.83 = 202 BCY/hr

= 176 x 1.06 x 0.83 = 155 BCM/hr

Page 8: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

3-5. An hydraulic excavator-backhoe is excavating the basement for a building. Heaped bucket capacity is 1.5 CY (1.15 CM). The material is common earth with a bucket fill factor of 0.90. Job efficiency is estimated to be 50min/hr. The machine’s maximum depth is of cut 24 ft (7.3 m) and the average digging depth is 13 ft (4.0 m). Average swing angle is 90º. Estimate the hourly production in bank measure.

Standard cycles/hr = 160 (Table 3-3)

% maximum depth = 1324 x 100 = 54%

% maximum depth = 4.07.3 x 100 = 54%

Page 9: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Swing-depth factor = 1.08 (Table 3-3) (90º swing, 54% maximum depth)

Heaper bucket volume = 1.5 LCY or 1.15 LCM

Bucket Fill Factor = 0.90 (Table 3-2)

Job efficiency = 50/60 = 0.83

Load factor = 0.80

Page 10: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Production (loose) = C x S x V x B x E

= 160 x 1.08 x 1.5 x 0.90 x 0.83 = 194 LCY/hr

194 LCY x 0.80 = 155 BCY/hr

= 160 x 1.08 x 1.15 x 0.90 x 0.83 x 0.80 = 119 BCM/hr

Page 11: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

3-6. A small hydraulic excavator will be used to dig a trench in soft clay (bucket fill factor = 0.90). The minimum trench size is 24” (0.61 m) wide by 6’ (1.83 m) deep. The excavator bucket available is 30” (0.76) wide and has a heaped capacity of ¾ CY (0.57 CM). The maximum digging depth of the excavator is 17.5’ (5.3 m). The average swing angle is expected to be 90º. Estimate the hourly trench production in LF (m) if the job efficiency is 50 min/hr.

30 112 27x 6 x Actual volume/LF of trench =

= 0.55 BCY

= 1.39 BCM

or

Page 12: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

(Table 2-5)

Standard cycles/hr = 200 (Table 3-3)

Load factor = 0.77

% maximum depth = 6.017.5 x 100 = 34%

% maximum depth = 1.835.3 x 100 = 34%

Page 13: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Swing-depth factor = 1.14 (Table 3-3) (90º swing, 34% maximum depth)

Heaped bucket volume = 0.75 LCY (0.57 LCM)Job efficiency factor = 0.83Trench adjustment factor = 0.92 (Table 3-5)Bucket fill factor = 0.90

Page 14: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

= 200 x 1.14 x 0.75 x 0.90 x 0.83 = 128 LCY/hr 128 LCY x 0.77 = 99 BCY/hr= 200 x 1.14 x 0.57 x 0.90 x 0.83 x 0.77 = 75 BCM/hr

Production (loose) = C x S x V x B x E

990.55

Trench production = = 180 LF/hr

751.39

Trench production = = 54 m/hr

Page 15: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

4-2. The tractor-scraper whose travel-time curves are shown in Figures 4-4 and 4-5 hauls its rated payload 4,000’ (1220 m) up a 5% grade from the cut to the fill and returns empty over the same route. The rolling resistance factor for the haul road is 120 lb/ton (60kg/t). Estimate the scraper travel time.

Effective grade:

120206010

Haul = 5 + = 11%

11%=5 +Haul =

Page 16: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

Effective grade:

120206010

1%

Return = -5 + = 1%

Return = -5 + =

Haul time = 6.4 min (Figure 4-4)Return time = 1.6 min (Figure 4-5)

Travel time = 8.0 min

Page 17: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

4-6. How many hours should it take an articulated wheel loader equipped with a 4 CY (3.06 CM) bucket to load 3,000 CY (2294 CM) of gravel from a stockpile into rail cars if the average haul distance is 300’ (91.5 m) one way? The area is level with a rolling resistance factor of 120 lb/ton (60 kg/t). Job efficiency is estimated at 50 min/hr.

Bucket fill factor = 0.95 (Table 3-2)

Bucket volume = 4.0 x 0.95 = 3.8 LCY Bucket volume = 3.06 x 0.95 = 2.91 LCM

Basic cycle time = 0.35 min (Table 4-6)

Page 18: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

12020

Effective grade = = 6%

6010

Effective grade = = 6%

Travel time = 0.5 min (Figure 4-14)

Cycle time = 0.35 + 0.50 = 0.85 min

500.85

224 LCY/hr Production = 3.8 x =

500.85

Production = 2.91 x = 171 LCM/hr

Page 19: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

5-1. The data in the accompanying table resulted from performing Modified Proctor Tests on a soil. Plot the data and determine the soil’s laboratory optimum moisture content. What minimum field density must be achieved to meet job specifications which require compaction to 90% of Modified AASHTO Density?

Page 20: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped
Page 21: PowerPoint Presentation 486/Ans t… · PPT file · Web view · 2002-10-143-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped

5-5. Estimate the production in compacted CY (CM) per hour of a self-propelled tamping foot roller under the following conditions: average speed = 5 mph (8.0 km/hr), compacted lift thickness = 6” (15.2 cm), effective roller width = 10’ (3.05 m), job efficiency = 0.75, and number of passes = 8.

16.3 x W x S x L x EP

10 x W x S x L x EP

CCY/hr

CCM/hr

Production = =

Production = =

16.3 x 10 x 5 x 6 x 0.758

10 x 3.05 x 8.0 x 15.2 x 0.75P

Production = =

Production = =

458 CCY/hr

348 CCM/hr