POWER GRID CORPORATION OF INDIA LTD. GRID EVENTS AND ISSUES. in 3rd SRPC MEETING 19 th February 2007 Bangalore. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. POWER SUPPLY POSITION FOR THE PERIOD FROM OCT 06 TO FEB 07. Current Year : 2006 - 07 Last Year : 2005 - 06. MAXIMUM DEMAND MET: - PowerPoint PPT PresentationTRANSCRIPT
POWER GRID CORPORATION OF INDIA LTD
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
in
3rd SRPC MEETING
19th February 2007
Bangalore
GRID EVENTS AND ISSUES
POWER SUPPLY POSITION FOR THE PERIOD FROM OCT 06 TO FEB 07
MAXIMUM DEMAND MET:
STATE WISE MAXIMUM DEMAND MET:
MW MUsCURRENT YEAR 23,434 523.36LAST YEAR 23,164 462.86
AGENCY Current Year (MW)
Last Year (MW)
Current Year (MUs)
Last Year (MUs)
ANDHRA PRADESH 8,158 8,210 174.68 165.75
KARNATAKA 5,758 5,478 130.02 120.83
KERALA 2,669 2,519 43.16 39.74
TAMIL NADU 8,319 7,902 175.77 157.26
0
10
20
30
40
50
60
70
80
90
100
% O
F T
IME
---
>
Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 (upto12th)
DATE --->
<49.0HZ <49.5HZ <50.0HZ
FREQUENCY SPECTRUM FROM OCT 06 TO FEB 07 (UPTO 12TH FEB 07)
< 49.0 HZ < 49.5 HZ < 50.0 HZ 49 - 50.5 HZ >50.0HZ >50.2HZ >50.5 HZ
Oct-06 10.53 52.20 88.30 89.46 11.70 1.91 0.01
Nov-06 0.69 51.06 95.14 99.30 4.86 0.98 0.01
Dec-06 10.40 88.46 99.88 89.60 0.12 0.00 0.00
Jan-06 9.26 87.87 99.65 90.69 0.35 0.15 0.05
Feb-07 (upto 12th) 3.73 88.93 99.58 96.23 0.43 0.18 0.04
Date: 17th October 2006
PRESS RELEASE
CERC directs PowerGrid to ensure grid stability
1. In order to take action for violating the Indian Electricity Grid Code (IEGC) by drawing electricity in excess of their schedule drawal, the Central Electricity Regulatory Commission (CERC) has directed PowerGrid to furnish the list of States and their quantum of overdrawals in the time-blocks when the frequency in the extended Central Grid was below 49.0 Hz during the period 9th to 15th October 2006.
2. The Commission has further directed all the RLDCs to keep a strict watch over the Grid Code violations, which can possibly endanger the grid stability and promptly inform the Commission about the defaulters with appropriate recommendation regarding remedial action.
3. The maintenance of satisfactory grid frequency has assumed added importance after synchronization of Northern Regional Grid with Central Grid comprising Western, Eastern and North-Eastern Regional Grids. In this context, the IEGC requires that the various beneficiary States shall always endeavor to restrict their net drawal from the grid to their respective drawal schedules, whenever the system frequency is below 49.5 Hz and when the frequency falls below 49.0 Hz, the requisite load shedding shall be carried out by the concerned State to curtail its over drawal.
S. K. ChatterjeeAssistant Secretary
STATE OVER DRAWAL @ <49.0 & 49.5HZ
FOR OCT & DEC 2006
STATE No of
BlocksO/D Mus < 49.0Hz
AVG MW
No of Blocks
O/D Mus < 49.5Hz
AVG MW
AP 554 18.97 137 3443 237.82 276
KAR 665 21.10 127 3347 114.48 137
KER 63 0.64 41 640 4.56 29
TN 649 21.02 130 2251 68.55 122
PONDY 685 4.32 25 2627 13.49 21
GOA 370 1.34 14 1635 6.02 15
326(31%) TIME BLOCKS FREQ WAS BELOW 49Hz
1014(96%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz
State No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
TAMIL NADU 293 (28%) 10566 144 638 (60%) 21529 135
KARNATAKA 247 (23%) 5178 84 881 (83%) 39630 180
ANDHRA PRADESH 132 (13%) 2327 71 487 (46%) 20269 166
PUDUCHERRY 235 (22%) 898 15 485 (46%) 2032 17
GOA 77 (7%) 118 6 229(22%) 324 6
KERALA 5 (0%) 27 22 172(16%) 971 23
STATE OVER DRAWAL @ <49.0 & 49.5HZ
JAN 01 – 11, 2007
74(8%) TIME BLOCKS FREQ WAS BELOW 49Hz
870(91%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz
State No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
TAMIL NADU 54 (6%) 920 68 314 (33%) 5781 74
KARNATAKA 65 (7%) 1790 110 821 (86%) 49580 242
ANDHRA PRADESH 30 (3%) 488 65 539 (56%) 34242 254
PUDUCHERRY 9 (1%) 16 7 73 (8%) 171 9
GOA 31 (3%) 96 12 323 (34%) 841 10
KERALA 18 (2%) 137 30 449 (47%) 2048 18
STATE OVER DRAWAL @ <49.0 & 49.5HZ
JAN 12 – 21, 2007
76(11%) TIME BLOCKS FREQ WAS BELOW 49Hz
646(96%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz
State No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
TAMIL NADU 41 (6%) 497 48 189 (28%) 2983 63
KARNATAKA 65 (10%) 1851 114 570 (85%) 27835 195
ANDHRA PRADESH 57 (8%) 1622 114 432 (64%) 25496 236
PUDUCHERRY 4 (1%) 4 4 11 (2%) 15 5
GOA 19 (3%) 14 3 102 (15%) 113 4
KERALA 8 (1%) 21 11 289 (43%) 888 12
STATE OVER DRAWAL @ <49.0 & 49.5HZ
JAN 22 – 28, 2007
53(8%) TIME BLOCKS FREQ WAS BELOW 49Hz
601(89%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz
State
No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
No.of time blocks in
which state overdrew
MWH Overdrawal
Average MW overdrawn
ANDHRA PRADESH 24 (4%) 474 79 381 (57%) 25161 264
KARNATAKA 44 (7%) 1405 128 574 (85%) 38176 266
KERALA
14 (2%) 121 35 328 (49%) 1584 19
TAMIL NADU 32 (5%) 489 61 179 (27%) 2787 62
PUDUCHERRY 8 (1%) 16 8 58 (9%) 145 10
GOA 29 (4%) 100 14 280 (42%) 794 11
STATE OVER DRAWAL @ <49.0 & 49.5HZ
JAN 15 – 21, 2007
STATE
No. of Time Blocks
(overdrew)MWH
OverdrawaAverage MW overdrawn
TAMILNADU 110 7146 260
KARNATAKA 70 3351 191
ANDHRA PRADESH 53 1782 134
PUDUCHERRY 109 1439 53
GOA 86 314 15
KERALA 0 0 0
Summary of ODs at Freq. LT 49 HZ. During the week
STATE
No. of Time Blocks
(overdrew)MWH
Overdrawa
Average MW
overdrawn
TAMILNADU 108 2976 110
KARNATAKA 105 2856 109
ANDHRA PRADESH 52 1663 128
PUDUCHERRY 139 1101 32
GOA 107 458 17
KERALA 19 254 53
09-10-06 TO 15-10-06 16-10-06 TO 22-10-06
STATE
No. of Time Blocks
(overdrew)MWH
OverdrawaAverage MW overdrawn
KARNATAKA 123 6577 212
ANDHRA PRADESH 42 1443 136
TAMILNADU 54 947 72
PUDUCHERRY 120 695 24
KERALA 25 280 44
GOA 44 85 8
23-10-06 TO 29-10-06
STATE
No. of Time Blocks
(overdrew)MWH
OverdrawaAverage MW overdrawn
ANDHRA PRADESH 171 6290 147
KARNATAKA 163 4156 102
KERALA 61 661 43
TAMIL NADU 364 25429 279
PUDUCHERRY 396 4331 44
GOA 260 1182 18
Summary of ODs at Freq. LT 49.5 HZ. During the week
STATE
No. of Time Blocks
(overdrew)MWH
Overdrawa
Average MW
overdrawn
ANDHRA PRADESH 322 31714 394
KARNATAKA 358 11040 123
KERALA 112 817 29
TAMIL NADU 248 6380 103
PUDUCHERRY 424 2860 27
GOA 420 1594 15
09-10-06 TO 15-10-06 16-10-06 TO 22-10-06
STATE
No. of Time Blocks
(overdrew)MWH
OverdrawaAverage MW overdrawn
ANDHRA PRADESH 399 39578 397
KARNATAKA 473 23170 196
KERALA 176 1577 36
TAMIL NADU 151 2259 60
PUDUCHERRY 297 1124 15
GOA 172 422 10
23-10-06 TO 29-10-06
STATE
No. of Time Blocks for which State
overdrew below 49 Hz.
MWH Overdrawal below 49 Hz
Average MW overdrawn
below 49 Hz
ANDHRA PRADESH 647 17995 111
KARNATAKA 858 21049 98
KERALA 64 375 23
TAMIL NADU 844 23801 113
PUDUCHERRY 554 1924 14
GOA 317 801 10
Summary of ODs at Freq. LT 49 HZ. During the week 01-12-06 TO 04-02-07
STATE
No. of Time Blocks for which State
overdrew below 49.5 Hz.
MWH Overdrawal
below 49.5 Hz
Average MW overdrawn
below 49.5 Hz
TAMILNADU 4248 257342 242
KARNATAKA 5228 226957 174
ANDHRA PRADESH 1618 7372 18
PUDUCHERRY 2906 73643 101
GOA 1878 6407 14
KERALA 1524 3443 9
Summary of ODs at Freq. LT 49.5 HZ. During the week 01-12-06 TO 04-02-07
Message Type Brief Details
Type A Caution Message when constituent overdraws at frequency <49.2 Hz. (issued in line with IEGC clause 6.4.4)
Type B Violation Message when constituent overdraws at frequency <49 Hz. (issued in line with IEGC clause 6.4.4)
Type C Violation Message when constituent continues to overdraw at frequency <49.0 Hz., in spite of RLDC’s instruction to terminate the over drawal(issued in line with IEGC clause 6.4.9 and Section 29(2) of I.E. Act 2003)
AVAILABILTY OF GENERATION IN NLC AND NPC STATIONS
NEYVELI TS 2 NEYVELI TPS I (EXP)
NPC, MAPSNPC, KAPS
MONTHSInstalled Capacity (Ex-bus)
Average available generation
(Ex-bus)
Average available
generation (%)
Apr-06 1323 707 53.428
May-06 1323 807 60.967
Jun-06 1323 921 69.590
Jul-06 1323 876 66.194
Aug-06 1323 738 55.795
Sep-06 1323 675 51.008
Oct-06 1323 453 34.275
Nov-06 1323 547 41.369
Dec-06 1323 676 51.096
Jan-07 1323 1028 77.709
MONTHSInstalled Capacity (Ex-bus)
Average available generation
(Ex-bus)
Average available generation (%)
Apr-06 380 259 68.271
May-06 380 346 91.132
Jun-06 380 362 95.316
Jul-06 380 323 85.089
Aug-06 380 352 92.550
Sep-06 380 371 97.531
Oct-06 380 248 65.265
Nov-06 380 382 100.494
Dec-06 380 370 97.279
Jan-07 380 356 93.782
MONTHSInstalled Capacity (Ex-bus)
Average available
generation (Ex-bus)
Average available
generation (%)
Apr-06 396 251 63.471
May-06 396 273 69.030
Jun-06 396 273 68.848
Jul-06 396 195 49.164
Aug-06 396 183 46.158
Sep-06 396 273 68.862
Oct-06 396 273 68.875
Nov-06 396 228 57.480
Dec-06 396 273 68.888
Jan-07 396 274 69.314
MONTHSInstalled Capacity
(Ex-bus)
Average available generation (Ex-
bus)
Average available generation (%)
Apr-06 396 300 75.854
May-06 396 313 78.981
Jun-06 396 190 48.009
Jul-06 396 203 51.232
Aug-06 396 265 67.030
Sep-06 396 268 67.775
Oct-06 396 265 67.018
Nov-06 396 267 67.372
Dec-06 396 220 55.469
Jan-07 396 256 64.748
0
100
200
300
400
500
600
0000
-001
5
0100
-011
5
0200
-021
5
0300
-031
5
0400
-041
5
0500
-051
5
0600
-061
5
0700
-071
5
0800
-081
5
0900
-091
5
1000
-101
5
1100
-111
5
1200
-121
5
1300
-131
5
1400
-141
5
1500
-151
5
1600
-161
5
1700
-171
5
1800
-181
5
1900
-191
5
2000
-201
5
2100
-211
5
2200
-221
5
2300
-231
5
TIME BLOCKS ---->
UI
IN M
W -
----
--->
48.5
49.0
49.5
50.0
50.5
51.0
51.5
52.0
52.5
53.0
53.5
FR
EQ
IN H
Z -
-->
TYPICAL DAY UI IMPORT FROM CENTRAL GRID23rd OCT 2006
0
100
200
300
400
500
600
700
800
0000
-001
5
0100
-011
5
0200
-021
5
0300
-031
5
0400
-041
5
0500
-051
5
0600
-061
5
0700
-071
5
0800
-081
5
0900
-091
5
1000
-101
5
1100
-111
5
1200
-121
5
1300
-131
5
1400
-141
5
1500
-151
5
1600
-161
5
1700
-171
5
1800
-181
5
1900
-191
5
2000
-201
5
2100
-211
5
2200
-221
5
2300
-231
5
TIME BLOCKS ---->
UI
IN M
W -
----
--->
48.5
49.0
49.5
50.0
50.5
51.0
51.5
52.0
52.5
53.0
53.5
FR
EQ
IN H
Z -
-->
TYPICAL DAY UI IMPORT FROM CENTRAL GRID24th OCT 2006
0
100
200
300
400
500
600
700
800
900
0000
-001
5
0100
-011
5
0200
-021
5
0300
-031
5
0400
-041
5
0500
-051
5
0600
-061
5
0700
-071
5
0800
-081
5
0900
-091
5
1000
-101
5
1100
-111
5
1200
-121
5
1300
-131
5
1400
-141
5
1500
-151
5
1600
-161
5
1700
-171
5
1800
-181
5
1900
-191
5
2000
-201
5
2100
-211
5
2200
-221
5
2300
-231
5
TIME BLOCKS ---->
UI
IN M
W -
----
--->
48.5
49.0
49.5
50.0
50.5
51.0
51.5
52.0
52.5
53.0
53.5
FR
EQ
IN H
Z -
-->
TYPICAL DAY UI IMPORT FROM CENTRAL GRID4th FEB 2007
-500
-450
-400
-350
-300
-250
-200
-150
-100
-50
000
00-0
015
0100
-011
5
0200
-021
5
0300
-031
5
0400
-041
5
0500
-051
5
0600
-061
5
0700
-071
5
0800
-081
5
0900
-091
5
1000
-101
5
1100
-111
5
1200
-121
5
1300
-131
5
1400
-141
5
1500
-151
5
1600
-161
5
1700
-171
5
1800
-181
5
1900
-191
5
2000
-201
5
2100
-211
5
2200
-221
5
2300
-231
5
TIME BLOCKS ---->
UI
IN M
W -
----
--->
48.5
49.0
49.5
50.0
50.5
51.0
51.5
52.0
52.5
53.0
53.5
FR
EQ
IN H
Z -
-->
TYPICAL DAY UI EXPORT TO CENTRAL GRID4th NOV 2006
IR EXCHANGES OF SR IN THE FORM OF UI TILL 04.02.2007 (214 WEEK)
TRANSACTION WITH WR
TRANSACTION WITH ER
Energy Imported
928 MU (IMPORT BY SR)
994 MU(IMPORT BY SR)
Net Saving to each SR and WR/ER Constituents due to
differential tariff
Rs. 86 Cr. Rs. 70 Cr.
Energy Exported 767 MU (EXPORT BY SR)
453 MU(EXPORT BY SR)
Net Saving to each SR and WR/ER Constituents due to
differential tariff
Rs. 77 Cr. Rs. 52 Cr.
IR EXCHANGES OF SR IN THE FORM OF UI FROM 03.04.2006 TO 04.02.2007 (44 WEEK)
TRANSACTION WITH WR
TRANSACTION WITH ER
Energy Imported
181 MU (IMPORT BY SR)
152 MU(IMPORT BY SR)
Net Saving to each SR and WR/ER Constituents due to
differential tariff
Rs. 42 Cr. Rs. 35 Cr.
Energy Exported 113 MU (EXPORT BY SR)
140 MU(EXPORT BY SR)
Net Saving to each SR and WR/ER Constituents due to
differential tariff
Rs. 30 Cr. Rs. 27 Cr.
IR EXCHANGES OF SR IN THE FORM OF UI FROM 02.10.2006 TO 04.02.2007 (18 WEEK)
TRANSACTION WITH WR
TRANSACTION WITH ER
Energy Imported
54 MU (IMPORT BY SR)
58 MU(IMPORT BY SR)
Net Saving to each SR and WR/ER Constituents due to
differential tariff
Rs. 28 Cr. Rs. 28 Cr.
Energy Exported 24 MU (EXPORT BY SR)
59 MU(EXPORT BY SR)
Net Saving to each SR and WR/ER Constituents due to
differential tariff
Rs. 26 Cr. Rs. 22 Cr.
0
10
20
30
40
50
60
70
80
90
100
% O
F T
IME
---
>
Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06
DATE --->
<49.0HZ <49.5HZ <50.0HZ
FREQUENCY SPECTRUM FOR 2005-06
0
10
20
30
40
50
60
70
% O
F T
IME
---
>
Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06
DATE --->
>50.2 HZ >50.5 HZ
< 49.0
HZ< 49.5
HZ< 50 HZ
49 - 50.5 HZ
>50.2HZ
>50.5 HZ
Apr-05 0.01 7.81 86.73 99.92 1.00 0.07
May-05 6.37 45.57 95.09 93.61 0.49 0.02
Jun-05 1.91 37.11 91.33 98.06 1.22 0.03
Jul-05 0.28 9.05 69.82 98.36 9.73 1.36
Aug-05 0.06 0.38 22.95 99.03 26.72 0.91
Sep-05 0.00 0.11 5.78 94.38 61.11 5.62
Oct-05 0.00 0.03 3.96 97.47 52.58 2.53
Nov-05 0.12 1.58 21.40 98.24 29.79 1.64
Dec-05 0.20 3.69 52.61 99.75 8.97 0.05
Jan-06 0.08 5.47 73.95 99.87 3.57 0.05
Feb-06 8.55 41.96 97.63 91.39 0.26 0.06
Mar-06 10.24 56.79 96.08 89.68 0.81 0.08
Avg 2.32 17.46 59.78 96.65 16.35 1.04
0
10
20
30
40
50
60
70
80
90
100
% O
F T
IME
--->
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06(upto 20th)
DATE --->
<49.0HZ <49.5HZ <50.0HZ
FREQUENCY SPECTRUM FROM APRIL 06 TO OCT 06 (UPTO 20TH OCT 06)
0
5
10
15
20
25
% O
F T
IME
--->
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06(upto 20th)
DATE --->
>50.2 HZ >50.5 HZ
< 49.0 HZ < 49.5 HZ < 50.0 HZ 49 - 50.5 HZ >50.2HZ >50.5 HZ
Apr-06 23.7 82.7 98.28 76.2 0.34 0.1
May-06 4.32 51.98 89.79 95.6 2.06 0.08
Jun-06 1.2 8.5 81.06 98.73 3.42 0.06
Jul-06 0.48 8.23 61.89 99.4 6.68 0.11
Aug-06 0.37 6.93 34.82 99.22 22.75 0.41
Sep-06 1.38 29.62 63.95 98.61 12.27 0.02
Oct-06 (upto 20th) 10.54 44.74 83.42 89.47 2.66 0.02
POWER SUPPLY POSITION FOR 2006-07, 2005-06 & 2004-05
MAXIMUM DEMAND MET:
STATE WISE MAXIMUM DEMAND MET:
MW MUs
2006 – 07 (Upto Feb 07) 23,520 523.36
2005 – 06 23,372 517.52
2004 – 05 22,364 481.26
AGENCY 2006 – 07 (MW)
2005 – 06 (MW)
2004 – 05 (MW)
2006 – 07 (MUs)
2005 – 06 (MUs)
2004 – 05 (MUs)
ANDHRA PRADESH
8,281 8,239 7,613 174.68 173.83 166.48
KARNATAKA 5,758 5,558 5,612 130.02 125.76 115.44
KERALA 2,669 2,578 2,420 45.02 43.81 41.05
TAMIL NADU 8,371 8,209 7,473 175.77 172.41 159.14