1 Power Generation Operation and Control Laboratory User Manual Department of Electrical and Computer Engineering University of Minnesota July31, 2014 Textbook: Power Generation Operation and Control, Allen J. Wood, Bruce F. Wollenberg, Gerald B. Sheblé, 3 rd Edition, John-Wiley and Sons, 2014 Program Files: The program files mentioned in this lab manual are all in Matlab and available on the web site.

Upload: ngohuong

Post on 12-Feb-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

1

Power Generation Operation and Control

Laboratory User Manual

Department of Electrical and Computer

Engineering

University of Minnesota

July31, 2014

Textbook: Power Generation Operation and Control, Allen J. Wood, Bruce F. Wollenberg, Gerald B. Sheblé, 3rd Edition, John-Wiley and Sons, 2014 Program Files: The program files mentioned in this lab manual are all in Matlab and available on the web site.

Page 2: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

2

Table of Contents

Contents Lab 1. Economic Dispatch .................................................................................................................................. 3

Lab 2. Unit Commitment ..................................................................................................................................... 5

Lab 3. Fuel Scheduling ........................................................................................................................................ 9

Lab 4. Hydro Scheduling ................................................................................................................................... 11

Lab 5. Power Flow and Incremental Losses ...................................................................................................... 13

Lab 6. Power System Security........................................................................................................................... 15

Lab 7. DC powerflow Optimal Power Flow ..................................................................................................... 18

Lab 8. AC powerflow OPF ................................................................................................................................ 21

Lab 9. State Estimation...................................................................................................................................... 26

Lab 10. Simulation of a Market Auction with the DC power flow OPF ......................................................... 31

Lab 11. Calculation of Financial Transmission Rights .................................................................................... 36

Note: If you are using an earlier version of Microsoft Excel you may have to convert the Lab xlsx files to xls

to work on them. You can do this and store them as xls as the Matlab programs are set up to read either forma

of spreadsheet file.

Page 3: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

3

Lab 1.Lab 1.Lab 1.Lab 1. Economic DispatchEconomic DispatchEconomic DispatchEconomic Dispatch

This lab takes the student through a number of exercises in economic dispatch. Objectives:

1) To show the result of changes in the generator cost function data 2) To show the different methods of performing the economic dispatch

To run this Lab the student goes to the Lab 1 directory and enters: edc_lab_prob1 The first example uses three generators (see file edc_lab1_gendata.xlsx ) with data as follows:

Gen Number Pg Pmax Pmin a_coeff b_coeff c_coeff

Fuel Cost

1 110 500 150 2000 25 0.05 1

2 50 700 200 1250 15 0.04 1

3 50 750 220 1700 10 0.03 1

If we dispatch these generators to a total load of 900 MW we get the following: numgen = 3 Pload = 900 unit 1 Pmin = 150 dfdp = 40.00 Pmax = 500 dfdp = 75.00 unit 2 Pmin = 200 dfdp = 31.00 Pmax = 700 dfdp = 71.00 unit 3 Pmin = 220 dfdp = 23.20 Pmax = 750 dfdp = 55.00 Largest_dfdp = 75 Smallest_dfdp = 23.2000 Lambda = 49.10 P1 P2 P3 = 241.00 426.25 651.67 Total Gen = 1318.92 Lambda = 23.20 P1 P2 P3 = 150.00 200.00 220.00 Total Gen = 570.00 Lambda = 36.15 P1 P2 P3 = 150.00 264.37 435.83 Total Gen = 850.21 Lambda = 42.62 P1 P2 P3 = 176.25 345.31 543.75 Total Gen = 1065.31 Lambda = 39.39 P1 P2 P3 = 150.00 304.84 489.79 Total Gen = 944.64 Lambda = 37.77 P1 P2 P3 = 150.00 284.61 462.81 Total Gen = 897.42 Lambda = 38.58 P1 P2 P3 = 150.00 294.73 476.30 Total Gen = 921.03 Lambda = 38.17 P1 P2 P3 = 150.00 289.67 469.56 Total Gen = 909.23 Lambda = 37.97 P1 P2 P3 = 150.00 287.14 466.18 Total Gen = 903.32 Lambda = 37.87 P1 P2 P3 = 150.00 285.87 464.50 Total Gen = 900.37 Lambda = 37.82 P1 P2 P3 = 150.00 285.24 463.66 Total Gen = 898.90 Lambda = 37.84 P1 P2 P3 = 150.00 285.56 464.08 Total Gen = 899.64 Lambda = 37.86 P1 P2 P3 = 150.00 285.72 464.29 Total Gen = 900.00 Gencost = 1.0e+04 * 0.6875 0.8801 1.2810 Total_gen_cost = 2.8486e+04

Page 4: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

4

And the following graphic appears on the screen:

In the figure above, the solid black horizontal line is the Lambda that the ED algorithm converges to. Where it intersects each generator incremental cost curve is the value for that generator’s output. Thus Gen 1 is at its low limit of 150 MW, Gen 2 is at 285.72 MW and Gen 3 is at 464.29 MW All changes to the cases to run the further tests given below are done by changing the numbers on the spreadsheet. Note that the spreadsheet has two worksheets: Parameters and GenData. When you make a change you must SAVE the spreadsheet and then just rerun the Matlab program edc_lab_prob1.m and when it runs you will be asked to select the Excel file in a small window that pops up. Just double click on the file and the program reads the spreadsheet and executes. Perform the following exercises on the edc program:

1) Set the Pload parameter in the Parameters worksheet to 900 (a load of 900 MW) and save and rerun edc_lab_prob1.m explain the results

2) Set the Pload parameter in the Parameters worksheet to 1800 (a load of 1800 MW) and save and rerun edc_lab_prob1.m explain the results

3) Leave the Pload parameter at 1800 on the Paramters worksheet. On the GenData worksheet change the fuelcost for generator 2 from 1 to 0.8 and save and rerun. Compare the results to those in part 2 and explain.

4) Leaving the changes to Pload and fuelcost as in the above two steps, change the “c_coeff” value for generator 3 from 0.03 to 0.045. Compare the results to part 3 above and explain.

0 200 400 600 800 10000

10

20

30

40

50

60

70

80

90

100

MW Generator Output

Lambda ($/M

Wh)

Generator Incremental (Marginal) Cost Functions

Gen 1 solid line

Gen 2 dashed line

Gen 3 dotted line

Page 5: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

5

Lab 2.Lab 2.Lab 2.Lab 2. Unit CommitmentUnit CommitmentUnit CommitmentUnit Commitment

You are going to run a full one week unit commitment program with 11 generating units. There are two types of Excel spreadsheet files that you use to build the data for the unit commitment program.

To run this Lab the student goes to the Lab 5 directory and enters: unit_commitment The first Excel Spreadsheet file is the Generator data file that has the following parameters for each generator:

Generator number Initial generator MW Max Capacity Limit Min Capacity Limit Start Up Cost Ramp UP Limit in % of unit capacity per hour Ramp DOWN Limit in % of unit capacity per hour Minimum down time in hours "A" coefficient "B" coefficient "C coefficient Fuel Cost Start up cost Ramp up rate as percent Ramp down as percent Min Down Time in hours Min up time in hours Where the cost function for each generator i = A(i) + B(i)*P(i) + C(i)*P(i)^2 For example for the data with 15 % ramp limits: (file: UCdata_LargeUnits15percentRampLim_gendata.xlsx)

Other data sets are provided as follows:

UCdata_LargeUnits10percentRampLim_gendata.xlsx with 15 % ramp limits and some units with min up down time set to large numbers

UCdata_LargeUnits25percentRampLim_gendata.xlsx UCdata_LargeUnits50percentRampLim_gendata.xlsx UCdata_LargeUnitsNoRampLim_gendata.xlsx (ramp limits are set to 100%)

Gen Number Pg Pmax Pmin a_coeff b_coeff c_coeff Fuel CostStartup Cost Ramp UpRamp DownMindown TimeMinup Time

1 100 800 100 5 4 0.001 1 0 15 15 1 1

2 100 800 100 5 6 0.002 1 0 15 15 1 1

3 80 400 80 20 8 0.0025 1 0 15 15 1 1

4 80 400 80 20 10 0.0025 1 0 15 15 1 1

5 60 300 60 30 10 0.002 1 0 15 15 1 1

6 60 300 60 30 12 0.002 1 0 15 15 1 1

7 50 200 50 40 14 0.0015 1 0 15 15 1 1

8 50 200 50 40 16 0.0015 1 0 15 15 1 1

9 25 100 25 55 15 0.0012 1 0 15 15 1 1

10 25 100 25 55 17 0.0012 1 0 15 15 1 1

11 25 100 25 55 17 0.0012 1 0 15 15 1 1

Page 6: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

6

UCdata_LargeUnits15percentRampLimMindowntime_gendata.xlsx this is a special case with some minimum up and down times.

UCdata_SmallUnits50percentRampLim_gendata.xlsx Total capacity 2900MW (set with 50% ramp limits and smaller gen units)

UCdata_SmallUnitsNoRampLim_gendata.xlsx Total capacity 2900MW

The next Excel Spreadsheet file is the load data file: The load data file has parameters to run the unit commitment as follows:

numhours 168 Number of hours for unit commitment

maxpload 3000 Max peak load over the time period

alpha1 0.01 alpha adjust constant 1

alpha2 0.002 alpha adjust constant 2

MaxIter 30 Maximum iterstions

gap_error 0.01 Value of duality gap to converge

datadump 1 set this multiplier to 1 for data output or 0 for no output

plotload 1 set plotload to 1 for a plot of the loads for each hour

edc_tolerance

1.00E-

09 EDC convergence tolerance

The student will be asked to change the maxpload – which is the maximum peak load for the week. The other tables allow the program to build a simulated week of load data having 168 hours. There are two tables used to do this: The 24 Hour Indices are a set of indices of load during the 24 hour day. All days have the same shape only the peak load during the day is different and the shape is stretched out to accommodate the peak.

Hour

Load

Index

0 3.5

1 3.4

2 3.3

3 3.25

4 3.3

5 3.4

6 3.5

7 3.7

8 3.9

9 4.3

10 4.7

11 5.3

12 5.6

13 5.7

14 5.65

15 5.5

16 5.5

17 5.3

18 5.2

Page 7: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

7

19 5.1

20 5

21 4.4

22 4.2

23 3.7

The second type of data is the day multiplier which give the relative peak load during the days of the week:

DayMult Day

1 Sunday

1.2 Monday

1.35 Tuesday

1.35 Wednesday

1.4 Thursday

1.6 Friday

1.05 Saturday

1.05

Note that the final entry in column 1 should be repeated to give 8 entries. The resulting load for the 168 hour week for a 3000 MW peak looks like this:

There are three load files:

Largegen_set_loaddata.xlsx Smallgen_set_loaddata.xlsx Largegen_set_fastrise_loaddata.xlsx

0 20 40 60 80 100 120 140 160 1801000

1200

1400

1600

1800

2000

2200

2400

2600

2800

3000

Page 8: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

8

The solution for the first 24 hours, large genset loaddata appears like this: The Unit commitment Schedule Hour Load Total Gen Gen Gen Gen Gen Gen Gen Gen Gen Gen Gen Sum MW Gen 1 2 3 4 5 6 7 8 9 10 11 Cost 1 1151 1151 800.0 351.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6205 2 1118 1118 800.0 318.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5963 3 1086 1086 800.0 285.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5726 4 1069 1069 800.0 269.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5609 5 1086 1086 800.0 285.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5726 6 1118 1118 800.0 318.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5963 7 1151 1151 800.0 351.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6205 8 1217 1217 800.0 417.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6701 9 1283 1283 800.0 482.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7214 10 1414 1414 800.0 534.5 80.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8304 11 1546 1546 800.0 636.7 109.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9406 12 1743 1743 800.0 746.3 197.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11136 13 1842 1842 800.0 800.0 242.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12033 14 1875 1875 800.0 800.0 275.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12339 15 1859 1859 800.0 800.0 258.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12186 16 1809 1809 800.0 782.9 226.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11732 17 1854 1854 800.0 800.0 254.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12147 18 1831 1831 800.0 794.8 235.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11928 19 1839 1839 800.0 799.3 239.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12003 20 1845 1845 800.0 800.0 245.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12064 21 1850 1850 800.0 800.0 250.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12109 22 1664 1664 800.0 702.5 162.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10433 23 1623 1623 800.0 679.6 143.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10073 24 1461 1461 800.0 580.5 80.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8683

The first column is the hour number, the second is the load, and the other comumns are the generator MW output for each unit (0.0 being a unit that is off)

Exercises: Perform the following exercises on the unit commitment:

1) Run the program with maxpload set to 3000 MW with the following generator sets, use the Largegen_set_loaddata.xlsx load file for all:

a. NoRampLim b. 50percentRampLim c. 25percentRampLim d. 15percentRampLim

Explain the results noting that as the generators are restricted to lower ramp limits it contributes to difficulty in following fast changing load.

e. Run with the 15 percent ramp limits and the minup.mindown time limits case.

2) Change the peak load to 2000 MW and rerun the above sets. Explain results. 3) Run with the smallgen load set file and the two smallgen generator sets. 4) Run with the Largegen_set_fastrise_loaddata.xlsx and the same set of ramp limits (cases a, b,c,d

and e) of 1 above.

Page 9: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

9

Lab 3.Lab 3.Lab 3.Lab 3. Fuel SchedulingFuel SchedulingFuel SchedulingFuel Scheduling

You are going to run experiments and explain results for the coal delivery example in the textbook example 5C. In this example a train is scheduled to leave a coal mine each week and deliver coal to two power plants as shown in the figure below:

To run this Lab the student goes to the Lab 3 directory and enters: Fuel_scheduling_with_LP_ex5C The parameters for the problem are found in the text. The lab comes with four sets of data with parameter data as shown here:

Pload1 1200 Pload week 1

Pload2 1500 Pload week 2

Pload3 800 Pload week 3

V1_initial_volume 70000 Initial volume in coal pile 1

V2_initial_volume 70000 Initial volume in coal pile 2

Total_Delivery1 40000 Total coal delivered week 1 (must be <= 40000.)

Total_Delivery2 40000 Total coal delivered week 2 (must be <= 40000.)

Total_Delivery3 40000 Total coal delivered week 3 (must be <= 40000.)

Any of these parameters may be changed by the student.

Page 10: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

10

The data files to be used are: 1) Fuel_scheduling_example5C_fuelscheddata (this has the same data as the textbook example 5C) 2) Fuel_scheduling_example5C_set1_fuelscheddata 3) Fuel_scheduling_example5C_set2_fuelscheddata 4) Fuel_scheduling_example5C_set3_fuelscheddata The first set of data is the same as the textbook example 5C, run it and check that it matches the textbook.

Exercises:

The three other data sets have variations in load, initial volume of coal piles, and coal delivered. Run each of them and explain the results.

Page 11: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

11

Lab 4.Lab 4.Lab 4.Lab 4. Hydro SchedulingHydro SchedulingHydro SchedulingHydro Scheduling

The hydro scheduling lab is an extension of problem 5.11 in the text third edition. The student can run three different cases and can make adjustments to parameters for each. The input to the program comes in spreadsheet files such as:

1) HydroSched_data_hydrodata.xlsx 2) HydroSched_dataset2_hydrodata.xlsx 3) HydroSched_dataset3_hydrodata.xlsx

To run this Lab the student goes to the Lab 4 directory and enters: Hydro_sched_dynamic_prog There are two worksheets in these files: Parameters:

inflow 1000 Water inflow into reservoir in AF/hour

Volume_step 2000 Volume step in AF (must be one of these values 2000, 1000, 500, 200, 100, 50)

initial_volume 6000 Volume of water in reservoir at the start (all volume values must be between 18000 and 6000)

end_volume 6000 Volume of water in reservoir at the end (all volume values must be between 18000 and 6000)

nperiodhours 2 Number of hours per period

diagnostic_trace 0 set = 1 program will show all variables each step, = 0 no such output

tables_dump 0 set = 1 program will show all tables, = 0 no such output

Number of hours per period can be 1, 2, 4, 6, … If student wants to get the inside picture of how the DP works turn on the diagnostic or tables dump. Hourly Load

Hour

Load

MW

1 600

2 1000

3 900

4 500

5 400

6 300

The student can simulate a hydro plan operating for 24 hours with six equal time periods of 4 hours each. Or 12 periods of 2 hours each, or 24 periods of one hour each. The sample file shave 6 period data and 12 period data.

Exercises: Run the first data set HydroSched_data_hydrodata.xlsx then make the following changes:

1) Set the volume step to 1000 2) Set the volume step to 500 3) Set the volume step to 200 4) Set the volume step to 100

Note any differences in the results and explain them.

Page 12: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

12

Run set 2 data file HydroSched_dataset2_hydrodata.xlsx

1) Change the inflow from 1000 to 2000 and change the end volume to 18000 AF Note the schedule produced and explain. The student should go back to the text and note that the DP can have a very detailed hudro plant model and in the case of problem 5.11 there is a variable head feature (see also ch 1 for variable head). Can you explain what it is doing?

Page 13: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

13

Lab 5.Lab 5.Lab 5.Lab 5. Power Flow and Incremental LossesPower Flow and Incremental LossesPower Flow and Incremental LossesPower Flow and Incremental Losses

In this lab students will be running the Newton power flow and then calculating the incremental losses using the method given section 6.22 of the text (3rd Edition). Once the penalty factors are calculated, the program applies the penalty factors to the economic dispatch program which calculates new values for each generator Pgen. The program then applies the resulting Pgen values back into the power flow and recalculates the penalty factors, and reruns the edc, etc.

To run this Lab the student goes to the Lab 5 directory and enters: runedcbeta

There are two types of files read by the program:

1. 6Buscase_networkdata.xlsx – containing all power flow network data 2. 6Buscase_gendata.xlsx - containing the generator data (identical to generator data for Lab1)

Later we will include an alternate generator data file. When the program starts the student has to double click first on the network data file, and then when it comes up the generator data file. The program starts with a base or preliminary power and the output looks like this: Case ID: 6Buscase_networkdata.xlsx Case ID: 6Buscase_gendata.xlsx Iter MAXDP MAXDPbus MAXDQ MAXDQbus 1 0.825895 6 0.649412 4 2 0.049751 2 0.080792 5 3 0.000373 2 0.000575 5 Power Flow with Total Pgen = 312.956 Total Qgen = 30.014 Total PLoad= 300.000 Total Qload= 45.000 Total MW Losses = 12.956 Bus Vmag angle Pgen Qgen Pload Qload To Bus Pline Qline 1 1.070 0.00 212.956 -10.759 0.000 0.000 2 62.181 -18.280 4 82.797 5.868 5 67.978 1.652 2 1.050 -7.18 50.000 21.757 0.000 0.000 1 -58.580 20.986 3 14.764 -5.995 4 28.859 8.661 5 21.944 0.849 6 43.013 -2.744 3 1.050 -9.16 50.000 19.016 0.000 0.000 2 -14.662 -0.110 5 12.434 2.879 6 52.228 16.246 4 1.027 -0.15 100.000 15.000 1 -79.774 1.823 2 -28.438 -9.977 5 8.212 -6.847 5 1.022 -0.18 100.000 15.000 1 -64.731 3.955 2 -21.499 -3.808 3 -12.231 -7.808 4 -8.071 -1.271 6 6.532 -6.068 6 1.025 -0.21 100.000 15.000 2 -41.839 0.720 3 -51.679 -15.651 5 -6.483 -0.068

This is the same format as introduced in the text for power flow output.

Page 14: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

14

Next the program calculates the beta factors, the incremental losses and penalty factors: beta = 1.0000 1.0903 1.1137 1.1056 1.1322 1.1426 dPlossdP = 0 -0.0903 -0.1137 -0.1056 -0.1322 -0.1426 Penfac = 1.0000 0.9172 0.8979 0.9045 0.8833 0.8752

Next the economic dispatch program applies the penalty factors and calculates the ecomonic values of Pgen using Lambda search: basePgen = 2.1296 0.5000 0.5000 Ptarget = 312.9556 Lambda = 11.9450 P1 P2 P3 = 50.00 150.00 166.71 Total Gen = 366.71 Lambda = 10.0891 P1 P2 P3 = 50.00 37.50 45.00 Total Gen = 132.50 Lambda = 11.0171 P1 P2 P3 = 50.00 94.40 96.97 Total Gen = 241.37 Lambda = 11.4811 P1 P2 P3 = 50.00 122.85 131.84 Total Gen = 304.69 Lambda = 11.7131 P1 P2 P3 = 50.00 137.08 149.27 Total Gen = 336.35 Lambda = 11.5971 P1 P2 P3 = 50.00 129.97 140.55 Total Gen = 320.52 Lambda = 11.5391 P1 P2 P3 = 50.00 126.41 136.20 Total Gen = 312.61 Lambda = 11.5681 P1 P2 P3 = 50.00 128.19 138.37 Total Gen = 316.56 Lambda = 11.5536 P1 P2 P3 = 50.00 127.30 137.28 Total Gen = 314.59 Lambda = 11.5463 P1 P2 P3 = 50.00 126.86 136.74 Total Gen = 313.60 Lambda = 11.5427 P1 P2 P3 = 50.00 126.63 136.47 Total Gen = 313.10 Lambda = 11.5409 P1 P2 P3 = 50.00 126.52 136.33 Total Gen = 312.85 Lambda = 11.5418 P1 P2 P3 = 50.00 126.58 136.40 Total Gen = 312.98 Lambda = 11.5413 P1 P2 P3 = 50.00 126.55 136.37 Total Gen = 312.92 Lambda = 11.5415 P1 P2 P3 = 50.00 126.56 136.38 Total Gen = 312.95 Lambda = 11.5417 P1 P2 P3 = 50.00 126.56 136.38 Total Gen = 312.95 Total_gen_cost = 4.3153e+03

The student can then observe that a new power flow is calculated, then a new beta calculation and a new edc, etc. for five iterations. A variation of the use of penalty factors is to make the generator cost functions all equal, then then the minimum cost dispatch simply minimizes the total Pgen for the three generators. In so doing, the system losses are minimized. There is a separate generator data file for this called 6Buscase_minLoss_gendata.xlsx Exercises:

1. Run the base network data with the generator data (not min losses) and note the results. a. Change the fuel cost for generator 3 to 1.2 and compare the results for the economic dispatch and

for the power flow (for example, what happened to losses with a fuel cost change, explain). b. Reset the fuel costs to all be 1.0. Now go to the network data and set go to the Parameters page

and set the parameter “casemult” to 1.5 and save the spreadsheet. The casemult parameter is multiplied times all load and generation values, so setting it to 1.5 raises the load and generation by a factor of 1.5 everywhere in the powerflow. Now rerun the program. Note the increase in load, are the generation units still the same dispatch? Are any generators at their limit?

Page 15: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

15

Lab 6.Lab 6.Lab 6.Lab 6. Power System SecurityPower System SecurityPower System SecurityPower System Security

There are two programs that students can use and there are four powr flow cases you can use for this lab. The programs are: DC powerflow contingency analysis (to run enter: run_DCpowerflow_cont_anal in Lab 6 directory) AC powerflow contingency analysis (to run enter: run_ACpowerflow_cont_anal in Lab 6 directory) The DC powerflow contingency analysis runs an AC power flow to set a base line for all calculations, and then runs a DC power flow and calculates contingency outages with LODF factors. The DC power flow program starts with an AC powr flow to set the base: Total Pgen = 312.96 MW Total Qgen = 30.01 MVAR Total PLoad = 300.00 MW Total Qload = 45.00 MVAR Total PLosses = 12.96 MW Total QLosses = -14.99 MVAR Bus Pmin Pgen Pmax Qmin Qgen Qmax Pload Qload Vmin Vbus Vbus Vmax MW MW MW MVAR MVAR MVAR MW MVAR pu pu kV pu 1 50.0 213.0 450.0 -100.0 -10.8 150.0 0.0 0.0 0.95 1.07 UL 246.1 1.07 2 37.5 50.0 150.0 -100.0 21.8 150.0 0.0 0.0 0.95 1.05 241.5 1.07 3 45.0 50.0 180.0 -100.0 19.0 120.0 0.0 0.0 0.95 1.05 241.5 1.07 4 100.0 15.0 0.95 1.03 236.3 1.07 5 100.0 15.0 0.95 1.02 235.1 1.07 6 100.0 15.0 0.95 1.02 235.7 1.07 Bus Vmag angle Pgen Qgen Pload Qload To Bus Pline Qline Max kV deg MW MVAR MW MW MW MVAR Flow MW 1 246.1 0.00 212.96 -10.76 0.00 0.00 2 62.18 -18.28 100 4 82.80 5.87 100 5 67.98 1.65 100 2 241.5 -7.18 50.00 21.76 0.00 0.00 1 -58.58 20.99 100 3 14.76 -5.99 60 4 28.86 8.66 60 5 21.94 0.85 60 6 43.01 -2.74 60 3 241.5 -9.16 50.00 19.02 0.00 0.00 2 -14.66 -0.11 60 5 12.43 2.88 60 6 52.23 16.25 60 . . . Then the LODF matrix is printed: LINE OUTAGE DISTRIBUTION FACTOR (LODF) MATRIX Monitored Outage of one circuit Line From - To 1 to 2 1 to 4 1 to 5 2 to 3 2 to 4 2 to 5 2 to 6 3 to 5 … 1 to 2 0.0000 0.6353 0.5427 -0.1127 -0.5031 -0.2103 -0.1221 -0.1369 1 to 4 0.5948 0.0000 0.4573 -0.0331 0.6121 -0.0618 -0.0359 -0.0403 1 to 5 0.4052 0.3647 0.0000 0.1458 -0.1090 0.2721 0.1580 0.1772 2 to 3 -0.1029 -0.0323 0.1783 0.0000 0.1242 0.2262 0.4662 -0.3995 2 to 4 -0.5884 0.7647 -0.1708 0.1591 0.0000 0.2969 0.1724 0.1933

(Note the last three columns and the last six rows are truncated here to fit it all on this page) Finally the DC power flow is run and then a contingency analysis with the LODF factors:

Page 16: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

16

BASE TRANSMISSION LOADING DC POWERFLOW Path From To Low Flow High Percent Loading 5 1 2 -100.0 60.65 100.0 60.6 5 1 4 -100.0 76.66 100.0 76.7 5 1 5 -100.0 62.69 100.0 62.7 5 2 3 -60.0 13.68 60.0 22.8 5 2 4 -60.0 32.03 60.0 53.4 5 2 5 -60.0 22.26 60.0 37.1 5 2 6 -60.0 42.67 60.0 71.1 5 3 5 -60.0 12.54 60.0 20.9 5 3 6 -60.0 51.14 60.0 85.2 5 4 5 -60.0 8.69 60.0 14.5 5 5 6 -60.0 6.18 60.0 10.3 CONTINGENCY OVERLOAD contflow contlimit rating overload% drop 1 to 2 mon 1 to 4 112.73 100.0 100.0 112.7 CONTINGENCY OVERLOAD contflow contlimit rating overload% drop 1 to 4 mon 1 to 2 109.35 100.0 100.0 109.4 CONTINGENCY OVERLOAD contflow contlimit rating overload% drop 1 to 4 mon 2 to 4 90.65 60.0 60.0 151.1 CONTINGENCY OVERLOAD contflow contlimit rating overload% drop 1 to 5 mon 1 to 4 105.33 100.0 100.0 105.3 CONTINGENCY OVERLOAD contflow contlimit rating overload% drop 2 to 6 mon 3 to 6 78.38 60.0 60.0 130.6 CONTINGENCY OVERLOAD contflow contlimit rating overload% drop 3 to 6 mon 2 to 6 72.55 60.0 60.0 120.9 ************* OVERLOADS DETECTED *************** ************************************************

The AC powerflow runs an AC power flow (Newton’s method) in each single line outage and calculates the PI for voltage and flows and collects the results in a table at the end. This program produces a great deal of output. If the student wants to save all the output it is best to use the Matlab diary feature by first setting up a diary file, then running the program, and then closing the diary, such as:

diary (‘AC contingency analysis results.txt’) run_ACpowerflow_cont_anal diary off The diary file AC contingency analysis results.txt will now contain all the output for each contingency case. Each contingency analysis is done with the full AC power flow. At the end of the power flow you will see a line like this: PI_flow = 11.769 PI_volt = 7.048 Worst flow violation = 20.742 Worst volt violation = 0.000 Worst_bus = 0

This is a summary of the case giving the PI for both flows and voltage as explained in the text. The actual wors flow and voltage limit violation is also given, if the worst bus is given as 0 then there was no voltage violation. Finally these summary for all cases is given in a table at the end: CONTINGENCY RESULTS Contingency No From Bus To Bus PI voltage %Violation PI flows %Violation Contingency 1 from 1 to 2 7.048 0.000 11.769 20.742 Contingency 2 from 1 to 4 7.036 0.000 146.114 55.156 Contingency 3 from 1 to 5 7.030 0.000 13.229 19.688 Contingency 4 from 2 to 3 7.047 0.000 0.705 0.000 Contingency 5 from 2 to 4 7.034 0.000 2.437 1.067 Contingency 6 from 2 to 5 7.032 0.000 0.978 0.000 Contingency 7 from 2 to 6 7.031 0.000 33.905 33.599 Contingency 8 from 3 to 5 7.034 0.000 2.113 0.000 Contingency 9 from 3 to 6 7.101 0.000 17.616 26.919

Page 17: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

17

Contingency 10 from 4 to 5 7.040 0.000 0.792 0.000 Contingency 11 from 5 to 6 7.043 0.000 1.375 0.000

The student can see that the second contingency outage results in some serious line overloads and that none of the contingencies results in serious voltage problems. There are four cases that can be tried with these two programs: 6bus case (taken from textbook) IEEE14bus case IEEE118bus case IEEE RTS Test case (developed as the “Reliability Test System” by IEEE PES committees) The student can use any of them in the lab but note that the 118 and the RTS test case are going to produce large amounts of output for the AC contingency analysis. Note: The contingency analysis programs do not read separate generator data files. The power flow data files have sufficient generator data to execute the contingency analysis. Exercises:

1) Pick a power flow case, say the 6 bus case. Run the DC powerflow contingency analysis. Note the flows produced by the DC power flow and compare to the AC power flow. Are there any differences if so explain as best you can.

2) Now run the AC powerflow contingency analysis on the same case. Do the results differ from the DC power flow results using the LODF factors? Are there voltages out of limit on any contingencies.

Page 18: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

18

Lab 7.Lab 7.Lab 7.Lab 7. DC powerflowDC powerflowDC powerflowDC powerflow Optimal Power FlowOptimal Power FlowOptimal Power FlowOptimal Power Flow

This is an OPF based on the linear (or DC) power flow. Some of its features are:

• User can adjust the total load of the system using parameter casemult

• User can choose to have the OPF solve with line flow limits (flow limit constraints). These can be turned on or off using the parameter Line_flow_limits

• User can solve with contingency analysis using LODF factors and have active contingency overloads incorporated into the OPF (contingency constraints). These can be turned on or off using the parameter

Contingency_Limits

• User can have the contingency analysis based on a limit that is higher than the normal line flow limit by using the climadj parameter.

To run this Lab the student goes to the Lab 7 directory and enters: runDCOPF_QP The program then presents a list of case files that can be used. Lab 7 is set up to run any of the supplied network analysis cases:

6bus case (taken from textbook) IEEE14bus case IEEE118bus case IEEE RTS Test case (developed as the “Reliability Test System” by IEEE PES committees)

When the student double clicks on one of the cases the program begins by displaying its internal steps: Case ID: 6BusCase_networkdata.xlsx Optimization terminated. exitflag= 1 QP solution successful CONTINGENCY ANALYSIS Add new active contingency constraint, number of active limits = 1 Drop line 1 4 Overload on 2 4 Flow = 95.49 Limit = 90.00 Optimization terminated. exitflag= 1 QP solution successful CONTINGENCY ANALYSIS No new contingencies added to active set

As shown above, it first performs an optimization of the system and then it does a contingency analysis. In the case above with the 6bus system, one contingency, dropping line 1 to 4 produces an overload on line 2 to 4. It then runs another optimization with the contingency constraint added and then checks for more contingencies. In the case shown there are no new contingency constraints added. The output then displays the following:

Page 19: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

19

LIST OF BINDING line LIMITS flow limit from 3 to 6 flow= 60.0 limit= 60.0 LIST OF ACTIVE CONTINGENCY CONSTRAINTS CONTINGENCY OVERLOAD contflow contlimit rating overload% drop 1 to 4 overload on 2 to 4 90.0 90.0 60.0 100.0 Loads pay a total of : 7403.45 Generators receive a total of : 3848.29 Transmission congestion charges: 3555.16 TOTAL VARIABLE GENERATION COST = 4267.2 TOTAL GENERATION BID = 530.0 TOTAL GENERATION SUPPLIED = 300.0 TOTAL VARIABLE LOAD = 0.0 TOTAL FIXED LOAD = 300.0 TOTAL LOAD = 300.0

Here the program lists all line flow constraints and contingency constraints that are active and then some data for the OPF solution. Last of all the program displays the generation dispatch, the generation and load at each bus with its Lambda (Locational Marginal Price), the flows with the constrained flow Lambda, and the contingency flows with its contingency constraint Lambda. GENERATION AND LOAD RESULTS Bid Bid Bcoeff Ccoeff Min Max Generator Generator Number bus Constant Constant MW MW MW Incremental Cost Cost 1 1 11.67 0.00533 50.0 200.0 181.9 13.61 2512.42 2 2 10.33 0.00889 37.5 150.0 44.2 11.12 674.36 3 3 10.83 0.00741 45.0 180.0 73.8 11.93 1080.40 NO LOAD SHED GENERATION and LOAD by Bus Bus Generation Load Bus Number at bus at bus Lambda 1 181.93 0.00 13.608 2 44.23 0.00 11.119 3 73.85 0.00 11.927 4 0.00 100.00 41.008 5 0.00 100.00 17.323 6 0.00 100.00 15.703 RESULTING TRANSMISSION LOADING:- Path From To Low Flow High Percent Loading line Lambda 1 1 2 -100.0 53.8 100.0 53.8 -0.00 2 1 4 -100.0 71.4 100.0 71.4 -0.00 3 1 5 -100.0 56.7 100.0 56.7 -0.00 4 2 3 -60.0 5.2 60.0 8.7 -0.00 5 2 4 -60.0 35.4 60.0 58.9 0.00 6 2 5 -60.0 20.9 60.0 34.8 0.00 7 2 6 -60.0 36.5 60.0 60.9 -0.00 8 3 5 -60.0 19.1 60.0 31.8 0.00 9 3 6 -60.0 60.0 60.0 100.0 5.53 10 4 5 -60.0 6.8 60.0 11.4 -0.00 11 5 6 -60.0 3.5 60.0 5.8 -0.00 CONTINGENCY OUTAGES RESULTING IN FLOWS CLOSE TO LIMIT contingency CONTINGENCY contflow contlimit rating overload% lambda drop 1 to 4 overload on 2 to 4 90.0 90.0 60.0 100.0 35.82

Exercises see next page.

Page 20: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

20

Exercises:

1) First the student should run one of the cases. If you select the large 118 bus system you may need to use the diary function to capture all output. Run this first test with Contingency_Limits = 0 so no contingency analysis is performed.

2) Next run with Contingency_Limits = 1, to see how it adds contingency overload constraints. If there is no solution (see error messages when the optimization is executed) then try setting climadj to a higher value to force it to bring the solution within larger limits. Making climadj larger always makes the solution easier to reach.

3) Next Adjust the casemult parameter up or down to see the effect on how many contingencies are captured.

4) Optional: Set the printfactorsflag = 1 and rerun to see the AFACT, PTDF, and LODF matrices.

Page 21: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

21

Lab 8.Lab 8.Lab 8.Lab 8. AC powerflow OPFAC powerflow OPFAC powerflow OPFAC powerflow OPF

To run this Lab the student goes to the Lab 8 directory and enters: runAC_LPOPF_QP The AC Optimal Power Flow uses the “iterative LP” method of solution. The steps in this solution are:

• 1) Solve a base case power flow • 2) Linearize the objective function around the solution • 3) Linearize the constraints around the solution • 4) Set variable limits (window size) • 5) Solve the LP (all LP variables are deltas) • 6) If significant change in any variable go back to step 1, else done.

The figure below gives an idea of how this works:

The 6 bus system with line flow limits solution of an AC OPF first solves an AC power flow based on the initial conditions:

Page 22: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

22

Case ID: 6BusCase_networkdata.xlsx Constraint Setup Bus Pgen Qgen Vgen RUN BASE POWER FLOW ON INPUT DATA Iter MAXDP MAXDPbus MAXDQ MAXDQbus NumVARlim NumVlim 1 0.825895 6 0.649412 4 0 1 2 0.049751 2 0.080792 5 0 1 3 0.000373 2 0.000575 5 0 1 POWER FLOW RESULTS Power Flow with Total Pgen = 312.956 Total Qgen = 30.014 Total PLoad= 300.000 Total Qload= 45.000 Total MW Losses = 12.956 Total MVAR Losses = -14.986 Bus Pmin Pgen Pmax Qmin Qgen Qmax Pload Qload Vmin Vbus Vmax kv LambdaP LambdaQ 1 50.0 213.0 200.0 -100.0 -10.8 150.0 0.0 0.0 0.95 1.07UL 1.07 123.1 0.0000 0.0000 2 37.5 50.0 150.0 -100.0 21.8 150.0 0.0 0.0 0.95 1.05 1.07 120.8 0.0000 0.0000 3 45.0 50.0 180.0 -100.0 19.0 120.0 0.0 0.0 0.95 1.05 1.07 120.8 0.0000 0.0000 4 100.0 15.0 0.95 1.03 1.07 118.1 0.0000 0.0000 5 100.0 15.0 0.95 1.02 1.07 117.5 0.0000 0.0000 6 100.0 15.0 0.95 1.02 1.07 117.8 0.0000 0.0000

Bus Vmag angle Pgen Qgen Pload Qload To Bus Pline Qline 1 1.070 0.00 212.956 -10.759 0.000 0.000 2 62.181 -18.280 4 82.797 5.868 5 67.978 1.652 2 1.050 -7.18 50.000 21.757 0.000 0.000 1 -58.580 20.986 3 14.764 -5.995 4 28.859 8.661 5 21.944 0.849 6 43.013 -2.744 3 1.050 -9.16 50.000 19.016 0.000 0.000 2 -14.662 -0.110 5 12.434 2.879 6 52.228 16.246 4 1.027 -8.45 100.000 15.000 1 -79.774 1.823 2 -28.438 -9.977 5 8.212 -6.847 5 1.022 -10.53 100.000 15.000 1 -64.731 3.955 2 -21.499 -3.808 3 -12.231 -7.808 4 -8.071 -1.271 6 6.532 -6.068 6 1.025 -11.76 100.000 15.000 2 -41.839 0.720 3 -51.679 -15.651 5 -6.483 -0.068 limits_indicator Bus Pgen Qgen Vgen 1 212.96 -10.76 1.0700 UL 2 50.00 21.76 1.0500 3 50.00 19.02 1.0500 Iteration: 1 Objective: 4478.8448 delta: 0.100000 sigma: 0.000000

Note that only bus one is at its high voltage limit, note that no flows are at limit and the cost is 4478. The results at the end of the optimization are seen on the next page:

Page 23: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

23

Power Flow with Total Pgen = 307.457 Total Qgen = 10.685 Total PLoad= 300.000 Total Qload= 45.000 Total MW Losses = 7.457 Total MVAR Losses = -34.315 Bus Pmin Pgen Pmax Qmin Qgen Qmax Pload Qload Vmin Vbus Vmax kv LambdaP LambdaQ 1 50.0 105.9 200.0 -100.0 -5.1 150.0 0.0 0.0 0.95 1.07UL 1.07 123.1 12.7983 -0.0000 2 37.5 129.3 150.0 -100.0 6.6 150.0 0.0 0.0 0.95 1.07UL 1.07 123.0 12.6311 0.0000 3 45.0 72.3 180.0 -100.0 9.2 120.0 0.0 0.0 0.95 1.07UL 1.07 122.5 11.9040 0.0162 4 100.0 15.0 0.95 1.04 1.07 119.4 13.9546 0.1263 5 100.0 15.0 0.95 1.04 1.07 119.1 13.5625 0.0595 6 100.0 15.0 0.95 1.04 1.07 119.8 14.3065 0.0088

Bus Vmag angle Pgen Qgen Pload Qload To Bus Pline Qline 1 1.070 0.00 105.906 -5.082 0.000 0.000 2 15.297 -9.624 4 48.673 4.619 5 41.937 -0.076 2 1.070 -1.90 129.288 6.603 0.000 0.000 1 -15.046 5.547 3 11.284 -3.432 4 60.000 4.506 5 29.987 1.098 6 43.063 -1.116 3 1.065 -3.32 72.262 9.163 0.000 0.000 2 -11.229 -3.128 5 23.497 -1.029 6 59.995 13.319 4 1.038 -4.85 100.000 15.000 1 -47.617 -4.842 2 -58.413 -3.556 5 6.031 -6.602 5 1.036 -6.38 100.000 15.000 1 -40.700 -1.939 2 -29.191 -3.147 3 -22.909 -3.215 4 -5.953 -1.844 6 -1.246 -4.856 6 1.042 -6.27 100.000 15.000 2 -41.927 -1.214 3 -59.323 -12.181 5 1.250 -1.605 limits_indicator Bus Pgen Qgen Vgen 1 105.91 -5.08 1.0700 UL 2 129.29 6.60 1.0700 UL 3 72.26 9.16 1.0650 UL Line Overloads Detected From Bus To bus Pflow PflowMax Pflow Lambda 2 4 60.00 60 1.0397 3 6 59.99 60 2.7828

Now all three grnerator buses are at their high voltage limit, the flows on lines 2 to 4 and 3 to 6 are also being driven to their high limit, and the cost has been reduced to 4254. Three graphs are printed at the end of the solution to show how the objective was reduced. These are on the next page:

Page 24: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

24

Th top plot shows the objective function as the solution progresses through the 14 iterations, the second plot shows the control variables changes as the solution converges, the final plot simply shows the changes in the objective function. Student exercises are on the next page:

0 5 10 154250

4300

4350

4400

4450

4500

Iteration

Objective Function Value

Objective Function Value

0 2 4 6 8 10 12 1410

-4

10-3

10-2

10-1

100

Iteration

Control Variable Error

Control Variable Error

0 2 4 6 8 10 12 1410

-2

10-1

100

101

102

103

Iteration

Objective Function Value Error

Objective Function Value Error

Page 25: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

25

Exercises: Students can pick the 6bus, 14 bus or the 118 bus (use the diary ftn to capture the output).

1) Run the base solution using in the spreadsheet provided. 2) Run the same case and increase total load by setting the casemult parameter to 1.05 to increase the

load by 5%. Does your case converge? Are more limits being hit? 3) Run the 6Buscase_minLoss_gendata case which has the three generators with identical cost

functions so that the minimization reduces losses. Now go back to Lab 5 where we did the same thing but with the optimization using only the standard EDC with calculated penalty factors. Are the losses lower with the full AC OPF?

Page 26: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

26

Lab 9.Lab 9.Lab 9.Lab 9. State EstimationState EstimationState EstimationState Estimation

The state estimator requires students to use three separate programs: 1) Power flow program sets up the base case. The entire solution is saved into a binary file:

PowerFlowOutput.mat 2) SCADA program reads a measurement description file and then extracts the measured values from

the power flow solution generated in step 1 above. The entire measurement set is saved in a binary file: StateEstimatorData.mat

3) The State estimator reads the two binary files saved in steps 1 and 2 above and carries out the state estimate calculation.

Note: all three steps in succession can be run by entering run_all which runs the powerflow, followed by SCADA, followed by the State estimator. The figure below shows all the programs and data paths.

Power flow program

Network dataSpreadsheet files

PowerFlowOutput.mat(binary file)

State Estimator

StateEstimatorData.mat(binary file)

run_powerflow

run_estimator

Measurement data spreadsheet files

SCADA

run_scada

Display

Powerflow

Output

Display

Measurement

Data

Display

estimator

results

Page 27: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

27

Power Flow Program This step can be run separately by entering run_powerflow or it will be called if the user has started the run_all command. The power flow allows the user to select the power flow case from among the stored spreadsheet data files. When the data is read the program prints the power flow results and saves the PowerFlowOutput.mat binary file and exits. Typical power flow output appears like this: Case ID: 6BusCase_networkdata.xls Iter MAXDP MAXDPbus MAXDQ MAXDQbus 1 0.825895 6 0.618486 6 2 0.097117 2 0.142304 5 3 0.001265 2 0.002313 5 Power Flow with Total Pgen = 328.581 Total Qgen = 67.737 Total PLoad= 300.000 Total Qload= 45.000 Total MW Losses = 43.020 Bus Vmag angle Pgen Qgen Pload Qload To Bus Pline Qline 1 1.070 0.000 228.581 -32.176 0.000 0.000 2 123.575 -35.594 4 179.938 23.881 5 105.006 3.418 2 1.050 -14.455 50.000 75.714 0.000 0.000 1 -109.268 59.712 3 11.351 -5.420 4 93.093 17.198 5 15.599 5.296 6 39.225 -1.072

SCADA This program is run by entering run_scada or it will be called if the user has started the run_all command. The SCADA program mimics what a SCADA (Supervisor Control and data Acquisition) system does, in this case it allows the user to select a measurement set from among the measurement data spreadsheets stored in the Lab 9 directory and then reads the PowerFlowOutput.mat binary file so it can extract the actual measured values for each measurement and store them in a new data set. The user can select some options from a menu as given below:

Option 1 allows the user to add random noise which is normally distributed, zero mean, variance matching the measurement’s variance specification. This simulates the type of data received by real state estimator which is generally corrupted by noise sue to measurement errors and variations in the measured quantities. Option 2 allows the user to edit the measured data, again there is a menu:

Page 28: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

28

Options 1,2, and 3 require the user to enter a bus number and then a new measurement value. Option 4 requires the user to enter a from bus and a to bus followed by a new measurement value. Options 3 and 4 allow the user to enter a new P and anew Q value for the measurement. Example of editing a voltage measurement. Note that the user here is given a per unit voltage and enters a new per unit value. The final printout of measurements shows the kV values. Case ID: 6bus_Vand_noAmeas_measurementdata.xls which volt measurement would you like to edit? volt meas number Vmeasbus Vmeasvalue 1 1 1.070 2 2 1.050 3 3 1.050 4 4 0.991 5 5 1.014 6 6 1.023 volt measurement number:2 Volt bus: 2 Please input a new value to the voltage measurement data for the bus you have selected Vmeasnew: 1.1 Now the new voltage data become: volt meas number Vmeasbus Vmeasvalue 1 1 1.070 2 2 1.100 3 3 1.050 4 4 0.991 5 5 1.014 6 6 1.023

At this point the program returns to the main menu and you can edit another measurement if you like. When all measurement data editing is done, the user clicks on option 5 and the SCADA program goes back to the initial Scada menu where the user can add noise, edit or store the data and exit. If the user elects option 3 to store and exit the program prints out all the measurements on the screen and stores the StateEstimatorData.mat binary file. The printout looks like this: Measurement Base Case Value Measured Value Name Status kV MW MVAR kV MW MVAR Bus 1 MV1 1 246.1 246.1 MA1 1 0.0 0.0 MG1 1 228.6 -32.2 228.6 -32.2 M12 1 123.6 -35.6 123.6 -35.6 M14 1 179.9 23.9 179.9 23.9 M15 1 105.0 3.4 105.0 3.4

Page 29: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

29

Bus 2 MV2 1 241.5 253.0 MA2 1 -14.5 -14.5 MG2 1 50.0 75.7 50.0 75.7 M21 1 -109.3 59.7 -109.3 59.7 M23 1 11.4 -5.4 11.4 -5.4 M24 1 93.1 17.2 93.1 17.2 M25 1 15.6 5.3 15.6 5.3 M26 1 39.2 -1.1 39.2 -1.1 Etc.

State Estimator The state estimator allows the user to make one selection at the start:

The user can elect to detect and identify dad data, or this can be ignored completely. Since we changed the bus

2 voltage we will run the Detect bad data option and show what the estimator does:

Estimator iteration summary Iteration Residual Number Active Degrees of Bad Data Threshold Largest Bad J Measurements Freedom Tj Normalized Measurement Residual at 1 485939.820 2 1491.078 3 1288.259 4 1282.595 5 1278.994 6 1276.619 67 56 69.063 Bad Data Detected 35.737 MV2 1 613.153 2 2.029 66 55 67.940 Final State Estimator Result Measurement Base Case Value Measured Value Estimated Value Name Status kV MW MVAR kV MW MVAR kV MW MVAR Bus 1 MV1 1 246.1 246.1 246.1 MA1 1 0.0 0.0 0.0 MG1 1 228.6 -32.2 228.6 -32.2 226.4 -32.0 M12 1 123.6 -35.6 123.6 -35.6 122.3 -35.5 M14 1 179.9 23.9 179.9 23.9 178.6 23.8 M15 1 105.0 3.4 105.0 3.4 104.1 3.4 Bus 2 MV2 0 241.5 253.0 241.6 MA2 1 -14.5 -14.5 -14.5 MG2 1 50.0 75.7 50.0 75.7 50.9 76.1 M21 1 -109.3 59.7 -109.3 59.7 -108.3 59.0 M23 1 11.4 -5.4 11.4 -5.4 11.2 -5.2 M24 1 93.1 17.2 93.1 17.2 93.1 17.6 M25 1 15.6 5.3 15.6 5.3 15.6 5.5 M26 1 39.2 -1.1 39.2 -1.1 39.2 -0.8

The first part of the estimator output shows the value of the residual as the estimator converges. The threshold

Tj here is 69.063 and the estimator is showing a J of 1276.619 so there is most likely bad data. The estimator

Page 30: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

30

identifies this as MV2 (Voltage Measurement on bus 2) and removes it from the measurement set. Then reruns

the estimator and the J is now 2.029, well below the new value of Tj=67.94 so it accepts this solution. Note that

the voltage magnitude measurement value displayed for bus 2 of 253.0 kV is much different from the base

value od 241.5kV. This is because we changed it from 1.05 to 1.1 per unit volt in the SCADA editor.

Exercises: The network data set give you is:

6BusCase_networkdata.xls The measurement data sets available are:

6bus_bus1onlypseudos_measurementdata.xls 6bus_buses1and2only_measurementdata.xls 6bus_Vand_noAmeas_measurementdata.xls

1) Run the basic estimator and use the 6BusCase_networkdata.xls file and the

6bus_Vand_noAmeas_measurementdata.xls file and do not add noise or edit any measurements. Run the estimator with or without detection of bad data.

2) Run the same data files as above, but this time, edit the injection measurement at bus 6 so that P and Q

are set to +100 and +15 (instead of -100 and -15). Run the estimator with bad data detection. Did it find the bad data at bus 6? Did it eliminate the bad data and what values did it then estimate.

3) Run the estimator and use the 6BusCase_networkdata.xls file and the 6bus_buses1and2only_measurementdata.xls files. Note here that there are no measurements beyond those at buses 1 and 2, yet the estimator does a reasonable job of estimating the remainder of the network.

4) Run the estimator with the 6BusCase_networkdata.xls file and the 6bus_bus1onlypseudos_measurementdata.xls files. Here the injections measurements at buses 2,3,and 6 are set to be “pseudo” measurements (i.e. measurements with large variance) note how the solution differs from that found in the first three exercises.

5) Run the basic estimator and use the 6BusCase_networkdata.xls file and the 6bus_Vand_noAmeas_measurementdata.xls file and add noise at the SCADA step. Note the differences in solution.

Page 31: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

31

Lab 10.Lab 10.Lab 10.Lab 10. Simulation of a Market Auction with the DC power flow OPFSimulation of a Market Auction with the DC power flow OPFSimulation of a Market Auction with the DC power flow OPFSimulation of a Market Auction with the DC power flow OPF

This lab allows students to experiment with a market simulation on either the textbook 6 bus case or the IEEE

118 bus case. Students are encouraged to experiment with different bidding and transactions by changing the

spreadsheet files for these data inputs.

The idea here is to simulate both generators bidding into a spot market as well as loads bidding in with a

negative cost indicating that the load will actually be reduced if the network conditions cannot be satisfied.

The program uses Linear Programming to solve the OPF and it models the networks with the DC power flow.

Contingency analysis is carried out using LODF factors and contingency constraints are added to the LP when

there are overloads.

The transactions spreadsheet allows students to experiment with a variety of fixed transactions representing

bilateral contract sales that are in place on the network and must be accommodated with the spot market.

To run this Lab the student goes to the Lab 10 directory and enters: runMARKET

The program then asks the student to select from the input case files:

We will demonstrate the program running the 6 bus case, but the student exercises will ask you to use the 118

bus case so that more complexity can be investigated.

When the program starts it asks for the three types of data to be selected:

Case ID: 6Buscase_networkdata.xlsx Case ID: 6buscase_biddingdata.xlsx Case ID: 6buscase_transactionsdata.xlsx BASE CASE TRANSACTIONS :- Transaction From To MW Number bus bus 1 6 4 20.0 2 5 4 20.0 number_of_islands = 1

Note that the transactions entered are displayed at the start. The network data is the same basic information as used previously in power flow, security analysis, and OPF labs. The bidding data in the biddingdata spreadsheet looks like this:

bid A bid B bid C bidmin bidmax bidbus

0 12 0 0 450 1

0 10 0 0 150 2

0 11 0 0 180 3

0 -200 0 0 40 4

0 -200 0 0 40 5

0 -200 0 0 40 6

Page 32: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

32

The bidding data gives a linear cost number for each generator and each load (load costs are entered as negative). Then the generator or load’s min and max P and finally the bus where the generator or load is located. The next piece of data is read is the transactions table. Transactions are fixed MW point to point transactions. The spreadsheet looks like this:

frombus tobus MW

6 4 20

5 4 20

Here two transactions of 20 MW are scheduled, one from 6 to 4 and one from 5 to 4. Next the program starts by performing a spot market calculation minimizing the cost of generation bids minus the cost of load shedding (see textbook chapter 11). Then it runs a contingency analysis and reruns the LP over and over until all contingency constraints are satisfied: ******************************************************** **************SPOT MARKET SIMULATION ******************** ******************************************************** OPFcalc LP EXECUTION WITH 0 CONTINGENCY CONSTRAINTS Optimization terminated. add contingency constraint 2 5 0.76 66.00 LP EXECUTION WITH 1 CONTINGENCY CONSTRAINTS Optimization terminated. add contingency constraint 4 9 -0.62 66.00 add contingency constraint 8 9 0.60 66.00 add contingency constraint 9 4 -0.53 66.00 LP EXECUTION WITH 4 CONTINGENCY CONSTRAINTS Optimization terminated.

Finally the solution summary is output:

NO BINDING CIRCUIT LIMITS FOUND LIST OF BINDING CONTINGENCY LIMITS CONTINGENCY OVERLOAD contflow contlimit rating overload drop 1 to 4 ckt= 2 mon 2 to 4 ckt= 5 66.0 66.0 60.0 100.0 drop 2 to 3 ckt= 4 mon 3 to 6 ckt= 9 66.0 66.0 60.0 100.0 drop 3 to 5 ckt= 8 mon 3 to 6 ckt= 9 65.1 66.0 60.0 98.6 TRANSACTIONS CHARGES :- Transaction From To MW Transaction Charge Number bus bus 1 6 4 20.0 $ 3706.16 2 5 4 20.0 $ 3248.50 Loads pay a total of : $ 11275.67 Transactions pay a total of : $ 6954.66 Generators receive a total of : $ 1615.62 Transmission congestion revenues: $ 16614.62 TOTAL VARIABLE GENERATION COST = $ 1615.62 TOTAL GENERATION BID = 780.0 TOTAL GENERATION SUPPLIED = 143.3 TOTAL LOAD BID = 150.0 TOTAL LOAD SUPPLIED = 143.3 bus bus bus bus Bus Net Flow Number Lambda Generation Load Transactions MW 1 12.00 39.2 0.0 0.0 39.2 2 -5.12 0.0 0.0 0.0 0.0 3 11.00 104.1 0.0 0.0 104.1

Page 33: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

33

4 200.00 0.0 43.3 -40.0 -83.3 5 37.57 0.0 50.0 20.0 -30.0 6 14.69 0.0 50.0 20.0 -30.0

Several points must be made here:

1) The contingency limits are set to 10% above the normal limits by setting climadj to 1.1 on the

parameters page of the network data file.

2) Four contingency constraints were in the LP but only three of them are sufficiently close to limit to

print out. Two of them are held at the limit and one is at 98.6% of the limit.

3) The program calculates the charge to transactions as the difference in bus lambda at the ends of the

transaction times the MW of the transaction.

4) The bus lambda at bus 2 is negative and it has shut down that generator entirely.

5) Bus 4 lambda is at 200 and its load has been shed.

6) Note that the parameter casemult does not have any effect here because the loads are variable and

are set in the bidding input.

The final output is:

GENERATION AND LOAD BIDDING RESULTS Bid Bid BidB BidC Max MW Generator Generator Number bus Constant Inc Cost MW Sold/Purchased Lambda Cost 1 1 12.00 0.0000 450.0 39.2 12.00 470.27 2 2 10.00 0.0000 150.0 0.0 0.00 0.00 3 3 11.00 0.0000 180.0 104.1 11.00 1145.34 4 4 -200.00 0.0000 50.0 43.3 5 5 -200.00 0.0000 50.0 50.0 6 6 -200.00 0.0000 50.0 50.0 bus Load Not Supplied Number MW 1 0.00 2 0.00 3 0.00 4 6.69 5 0.00 6 0.00 TOTAL LOAD NOT SUPPLIED = 6.7 RESULTING TRANSMISSION LOADING :- From To ckt Low Flow High Percent Loading circuit Lambda 1 2 1 -100.0 6.2 100.0 6.2 0.00 1 4 2 -100.0 28.3 100.0 28.3 0.00 1 5 3 -100.0 4.7 100.0 4.7 0.00 2 3 4 -60.0 -28.0 60.0 46.7 -0.00 2 4 5 -60.0 44.3 60.0 73.9 0.00 2 5 6 -60.0 0.6 60.0 1.0 0.00 2 6 7 -60.0 -10.8 60.0 17.9 -0.00 3 5 8 -60.0 27.6 60.0 46.0 0.00 3 6 9 -60.0 48.5 60.0 80.8 0.00 4 5 10 -60.0 -10.6 60.0 17.7 -0.00 5 6 11 -60.0 -7.8 60.0 12.9 -0.00 RESULTING CONTINGENCY ANALYSIS CONTINGENCY OVERLOAD contflow contlimit rating overload contingency lambda drop 1 to 4 ckt= 2 mon 2 to 4 ckt= 5 66.0 66.0 60.0 100.0 245.77 drop 2 to 3 ckt= 4 mon 3 to 6 ckt= 9 66.0 66.0 60.0 100.0 5.97 drop 3 to 5 ckt= 8 mon 3 to 6 ckt= 9 65.1 66.0 60.0 98.6 0.00

Page 34: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

34

The first table shows the generator and load bidding information and the results of the market calculations. The

nest table is a list of load that was shed, followed by the DC power flows calculated at the market solution and

the list of contingency constraints that are binding at the solution.

Note: This program can reach a point where it cannot solve. There are two cases where this can happen. The

first is when the Linear Program routine finds that the contingency limits have forced it into an infeasible

solution. In this case you will get this message:

*************************************************** CASE TERMINATED LP CANNOT BE SOLVED PROGRAM WILL NOW PAUSE AND YOU SHOULD HIT CTRL+C ***************************************************

When this happens you need to press the Ctrl key and the C key together (control C is a standard way to force

programs to exit. The other case where the program needs to abort occurs when too many contingency

constraints are forced. This can easily happen if the transactions input is set to a large MW transaction amount

for one or more transactions which will cause a large number of contingency overloads. The program arbitrarily

sets the limit at 100 contingency overloads and then quits and you will see this: (next page)

*************************************************** CASE TERMINATED TOO MANY CONTINGENCIES PROGRAM WILL NOW PAUSE AND YOU SHOULD HIT CTRL+C ***************************************************

Again, you should hit the Ctrl and C keys together to abort. (Be sure to hit the Ctrl and C right away, Maplab is waiting for some input due to the pause and will not let you do anything until it get something.)

Exercises:

1) Students should load the transactions file for the 6 bus case into the Excel spreadsheet program and

adjust the transactions amount to be both zeros. What effect does this have? Now try setting them at 30

MW and rerun the OPF. What is the effect now. How high can you make the transaction MW before the

market cannot accommodate the transactions.

2) Bus 4 is not receiving the load it is bidding, if it raises its willingness to pay price from 200 to a higher

value it should get the full load. Try raising the willingness to pay price from 200 to a higher value and

see how high that must be to have bus 4 receive its full load MW. (note always enter this as a negative

value, for example if you wish to make it $300/MWh willingness to pay then enter -300 for bus 4 bid as

as shown below):

bid A bid B bid C bidmin bidmax bidbus

0 12 0 0 450 1

0 10 0 0 150 2

0 11 0 0 180 3

0 -300 0 0 50 4

0 -200 0 0 50 5

0 -200 0 0 50 6

Page 35: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

35

3) How much load can this market supply, assuming all load buses are bidding the same MW amount at

$200/MWh. For example, if they all bid 40 MW then you set up the bidding table as:

bid A bid B bid C bidmin bidmax bidbus

0 12 0 0 450 1

0 10 0 0 150 2

0 11 0 0 180 3

0 -200 0 0 40 4

0 -200 0 0 40 5

0 -200 0 0 40 6

Try running with the bidding spreadsheet set as above. Are all loads satisfied? How high a load (again,

loads equal on each load bus) until load is shed?

4) Try running the 118 bus case. The transactions are set up so that the market calculation works out a

solution with two of the eight contingency constraints found are near limit. How much more can the

transactions be raised until the case cannot solve?

Page 36: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

36

Lab 11.Lab 11.Lab 11.Lab 11. Calculation of Financial Transmission RightsCalculation of Financial Transmission RightsCalculation of Financial Transmission RightsCalculation of Financial Transmission Rights

The calculation of Financial Transmission Rights (FTRs) is designed to show how much various transaction paths can carry while meeting other obligations of the transmission system. Participants who want to use the transmission system need to have a means for guaranteeing that their transactions from a specified source point to a specified delivery point can be made. If the transaction is not allowed, then the FTR acts as an insurance policy that pays the participant. To obtain an FTR, the participant bids into an auction for a desired MW transaction amount from a source to a delivery point. Thus the participants needing to purchase FTR’s are competing with each other and may raise their offer accordingly. An excellent introduction to this topic is the paper by Ma, Sun, and Ott1

To run this Lab the student goes to the Lab 11 directory and enters: runFTR The first date read is the network data which is the same as in the power flow, security analysis, and OPF programs. Next the program reads in the FTR bids and the NITS data. The transmission operator, IOS’s in the United States, has an obligation to provide transmission service to what are termed Network Integrated Transmission Service (NITS) defined as follows:

Network Integration Transmission Service allows a Transmission Customer to integrate, plan, economic dispatch and regulate its Network Resources to serve its Network Load in a manner comparable to that in which the Transmission Provider utilizes its Transmission System to serve its Native Load customers. Network Integration transmission Service also may be used by the Transmission Customer to deliver non-firm energy purchases to its Network Load without additional charge.2

The NITS service is be simulated by placing a set of fixed transactions on the network to simulate the source and delivery of such entities as electric companies who own the transmission and need to supply their loads. For our 6bus system the NITS transactions simulate supply of 50 MW loads at buses 4, 5, and 6:

FromBus ToBus MaxMW

1 4 50

3 5 50

3 6 50

These are entered into the 6buscase_FTRdata.xlsx spreadsheet file in the NITS worksheet. Next, the FTR calculation takes into account all the FTR bids as a MW amount from a source to a delivery point. Each bid also has an offer price. For the 6bus system the FTR bids are:

FromBus ToBus MaxMW PriceBid

3 4 100 20.00

2 4 100 20.00

These are entered into the 6buscase_FTRdata.xlsx spreadsheet file in the FTRbids worksheet.

1 Implementation of the PJM Financial Transmission Rights Auction Market System, Xingwang Ma, David I. Sun, and Andy Ott, available in IEEE Explore, Transactions on Power Systems 2 The Power Marketing Association Electricity Glossary, http://www.powermarketers.com/gloss-b.html

Page 37: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

37

The program performs an island check to remove any lines from the contingency analysis that will split the system if taken out. Then it performs an LP with the FTR bids as the only variables, the results are then put into a security analysis using the LODF factors as with the MARKET simulation. Case ID: 6Buscase_networkdata.xlsx Case ID: 6buscase_FTRdata.xlsx number_of_islands = 1 ******************************************************** ******************** FTR AUCTION *********************** ******************************************************** LP EXECUTION WITH 0 CONTINGENCY CONSTRAINTS Optimization terminated. add contingency constraint 2 5 0.76 72.00 add contingency constraint 4 9 -0.62 72.00 add contingency constraint 8 9 0.60 72.00 LP EXECUTION WITH 3 CONTINGENCY CONSTRAINTS Optimization terminated. NO BINDING CIRCUIT LIMITS FOUND LIST OF BINDING CONTINGENCY LIMITS CONTINGENCY OVERLOAD contflow contlimit rating overload drop 1 to 4 ckt= 2 mon 2 to 4 ckt= 5 72.0 72.0 60.0 100.0 drop 3 to 5 ckt= 8 mon 3 to 6 ckt= 9 72.0 72.0 60.0 100.0

Here are the results. Note that two transaction bids shown above do not result in 100 MW transaction rights for the bidders: Bus Summary bus bus bus bus Number Lambda Generation Load 1 -72.42 0.0 0.0 2 -74.22 31.5 0.0 3 -74.22 3.8 0.0 4 -54.22 0.0 35.3 5 -69.68 0.0 0.0 6 -71.35 0.0 0.0 Network Integrated Transmission Service Summary From To NITS Bus Bus MW 1 4 50.0 3 5 50.0 3 6 50.0 Resulting FTR Summary From To FTR FTR Bus Lambda FTR MW Bus Bus Max Price Difference Cleared 3 4 100.0 20.00 20.00 3.8 2 4 100.0 20.00 20.00 31.5 Here the FTR’s allowed are a 3.8 MW transaction from bus 3 to 4 and a 31.5 MW transaction allowed from 2 to 4.

Page 38: Power Generation Operation and Control Lab Manualcusp.umn.edu/assets/PGOC_Lab_Manual.pdf · Power Generation Operation and Control Laboratory User Manual Department of Electrical

38

Finally, the FTR program displays the DC power flow results and the binding contingencies: RESULTING TRANSMISSION LOADING :- From To ckt Low Flow High Percent Loading circuit Lambda 1 2 1 -100.0 6.7 100.0 6.7 0.00 1 4 2 -100.0 30.9 100.0 30.9 0.00 1 5 3 -100.0 12.5 100.0 12.5 0.00 2 3 4 -60.0 -20.3 60.0 33.8 -0.00 2 4 5 -60.0 48.4 60.0 80.7 0.00 2 5 6 -60.0 8.1 60.0 13.4 0.00 2 6 7 -60.0 2.0 60.0 3.3 0.00 3 5 8 -60.0 28.8 60.0 48.0 0.00 3 6 9 -60.0 54.7 60.0 91.2 0.00 4 5 10 -60.0 -6.1 60.0 10.1 -0.00 5 6 11 -60.0 -6.7 60.0 11.2 -0.00 RESULTING CONTINGENCY ANALYSIS CONTINGENCY OVERLOAD contflow contlimit rating overload contingency lambda drop 1 to 4 ckt= 2 mon 2 to 4 ckt= 5 72.0 72.0 60.0 100.0 23.85 drop 3 to 5 ckt= 8 mon 3 to 6 ckt= 9 72.0 72.0 60.0 100.0 3.75

If the student now goes back to the MARKET simulation, Lab 10, and changes the transactions to reflect the FTR results:

frombus tobus MW

3 4 3.8

2 4 31.5

The MARKET program will allow these transactions without any load reductions.

Exercises:

1) The student should run the FTR program with the basic 6 bus data shown in the lab write up above. Then go back to the Lab 10 directory, change the 6buscase_transactionsdata.xlsx file to equal the transactions shown above (3 to 4 for 3.8 MW and 2 to 4 for 31.5 MW).

2) Rerun the FTR program as many times as necessary with the offer amount for the 3 to 4 transaction changed to a higher value until the FTR program allows more than 3.8 MW. What effect does this have on the other transaction bid?

3) Run the FTR program with the 118 bus system. Note that the FTR bids are for transactions that cross the system from one end to the other ( bus 112 to bus 1 for 100 MW) and for another that goes from bottom to top (bus 27 to bus 2 for 100 MW). Which transaction was completely fulfilled and which was cut?

4) In exercise 3 one transaction FTR was cut, try rerunning the FTR program on the 118 bus case with changes to the FTRbids worksheet that show a higher price for the transaction that was cut until it makes a difference. What happened?

5) Run the 5busPJM case and compare results to the paper by Ma, Sun and Ott given in the footnote shown previously.