move | connect | experience Advisory Group Meeting #5. Potential Near-Term Mobility Strategies January 26, 2017. Ruth Fisher Board Room, Union Station. 6:00 - 8:00 pm. TABLE OF CONTENTS 1-2 Advisory Group: Near-Term Strategies Input 3-9 Surface Street Options: North-South Travel 10 Draft Guiding Principles 11-12 Surface Street Scenario Evaluation 13 Potential for On-Time Delivery 14 -15 Bus Service Restructuring Options 16-24 Potential Transit Service Concepts 25-30 Surface Street Options: Union, Pike, & Pine Streets

Upload: others

Post on 02-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

move | connect | experience

Advisory Group Meeting #5.Potential Near-Term Mobility StrategiesJanuary 26, 2017.Ruth Fisher Board Room, Union Station.6:00 - 8:00 pm.

TABLE OF CONTENTS

1-2 Advisory Group: Near-Term Strategies Input

3-9 Surface Street Options: North-South Travel

10 Draft Guiding Principles

11-12 Surface Street Scenario Evaluation

13 Potential for On-Time Delivery

14 -15 Bus Service Restructuring Options

16-24 Potential Transit Service Concepts

25-30 Surface Street Options: Union, Pike, & Pine Streets

Page 2: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

ADVISORY GROUPNear-Term Strategies Input

Helping Address Near-Term Mobility Challenges

• Seattle faces an enviable challenge - managing growth spurredby one of the nation’s strongest economies and the draw of avibrant city located in a spectacular region of the world.

• Growth is driving increased demand for access and mobility in atime when construction projects seem omnipresent.

• Sound Transit light rail will be extended to Northgate by 2021and Lynnwood and the Eastside (East Link) by 2023, providingimportant new access to the Center City.

• Seattle residents and regional commuters need safe, affordable,comfortable, reliable and convenient transportation options to,through, and within Center City.

• One Center City will identify a set of recommended strategies toaddress near-term mobility challenges and prioritize public realminvestments, providing safe and reliable options for all users.

JAN 12

1

Near-Term

Opportunities

and Challenges

JAN 26Presentation

on Potential

Strategies

FEB 9Discussion

of Potential

Strategies

MARCHRecommended

Strategies For

Further Evaluation

and Outreach

APRILPublic and

Stakeholder

Outreach

Council and

Board Decision

Processes

Page 3: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

Key Roles of the Advisory Group• Focus on alignment with adopted One Center City Draft Guiding

Principles.

• Consider the balance of bus service restructuring and surfacestreet capital projects to guide the technical team in developing adraft preferred set of strategies.

• Share feedback on specific proposals to help refine the concepts.This input will be considered before proposals move into abroader public involvement process.

• Members are not asked to be technical experts.

2

Final recommendations will require approval from the Seattle City Council,

the Metropolitan King County Council, and the Sound Transit Board of

Directors. In the coming months King County Metro Transit and Sound

Transit will seek customer comments on potential changes to bus routes.

In reviewing various projects and service options, we need your input on:

Values Alignment

How various service proposals, capital projects, and operationsstrategies align with the One Center City Draft GuidingPrinciples.

See One Center City Draft Guiding Principles sheet.

Balance

How should we prioritize limited rights-of-way? (Transit, SOVs,pedestrian, parking etc.)

How should we invest in operating bus routes differently vs.operating streets differently?

How can we accomodate mobility and access needs whilecreating vibrant, functional public spaces?

What issues are your communities going to be most interested inor most concerned about?

Are there other strategies that need to be on the table?

Stakeholder Interests and Communication

Changes to streets and public spaces affect many stakeholdergroups. Options and tradeoffs will be communicated morebroadly over the coming months. JOIN THE CONVERSATION

AND LEARN MORE AT:

onecentercity.org

Page 4: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

SURFACE STREET OPTIONS North-South Travel

What is the Challenge and the Opportunity?• Center City mobility and access demands are growing rapidly; there is very limited additional

public right-of-way on surface streets to accommodate travel growth.

Center City streets, particularly north-south avenues in downtown, have many mobility andaccess priorities to balance, including:

» Safe facilities for people walking and on bicycles

Curb uses, including commercial loading, passenger loading, and short-term parking

Transit operations and passenger facilities

General purpose traffic

Freight and commercial vehicle movements

Active uses of the public realm.

»

»

»

»

»

• Local and regional bus services provide critical access to Center City jobs and services.

Major changes in Center City, including the end of bus operations in the Downtown SeattleTransit Tunnel, opening of the Center City Streetcar, closure of the Alaskan Way Viaduct, andother regional projects, will put pressure on already strained surface streets.

If Downtown Seattle Transit Tunnel buses are moved on to surface streets in conjunction withthe Viaduct coming down and reduced capacity on 1st Avenue, projections show regionalbuses on 2nd and 4th Avenues will slow to speeds of just 3 to 4 miles per hour during theafternoon peak period without capital investments to improve surface operations.

What Options Will You Review?Four scenarios for 2019:

A. Baseline, representing 2019conditions with no One CenterCity actions or investments (“DoNothing”)

B. Operational Enhancements on2nd, 3rd, and 4th Avenues

C. 2019 4th Avenue & 5th AvenueTransit Couplet

D. 5th Avenue Transit Spine3

Page 5: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

JOIN THE CONVERSATION AND LEARN MORE AT:

onecentercity.org

What Do the Draft Options Include?• These options are packages of surface street projects representing different approaches to addressing

near-term access and mobility challenges.

Options for improving transit, bicycle facilities, pedestrian and public realm, and general purposetraffic operations were considered for each major corridor and the system as a whole.

Options emphasize solutions for transit following the end of bus operations in the Downtown TransitTunnel (as early as Fall 2018) and before future light rail extensions, which will reduce downtown busvolumes (2021/2023).

• Options assume all tunnel buses move to surface street pathways.

• Certain corridor projects can be implemented independently; others rely on other capitalimprovements or service adjustments.

• The Dashboard provides a comparison of each scenario to existing (2016) conditions.

1

4

What Happens Next with the Draft Options?One Center City Interagency Team members will review AdvisoryGroup input and consider it along with technical analysis, additionalstakeholder feedback, and public comment to develop a draft set ofpreferred near-term projects and strategies.

Draft Recommended Strategies will bepresented for Advisory Group review at theMarch meeting.

Before any decisions are made, surfacestreet options identified in the One CenterCity planning effort will go through aseparate public involvement process.

Page 6: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTNB NBSBSB

Streetcar StreetcarTravel Lane Travel Lane

NB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

NB

Bike LaneParking & Loading

NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

NB

Light-Rail

SB

Light-Rail

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Transit Only Lane

SB

Travel Lane

SB

Travel Lane

2-way

ProtectedBike Lane

Parking /Loading& Left-Turn

NBSB

Travel Lane

SB

Travel Lane Travel Lane

NB

Travel Lane

NB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

NB

Bike LaneParking & Loading

NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

NB

Light-Rail/ Bus

SB

Light-Rail/ Bus

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Transit Only Lane

SB

Travel Lane

SB

Travel Lane

2-way

ProtectedBike Lane

Parking /Loading& Left-Turn

NB = NorthboundSB = Southbound

Exi

stin

g

1st Ave 2nd Ave 3rd Ave Downtown SeattleTransit Tunnel 4th Ave 5th Ave 6th Ave

* Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change.

Op

tio

n A

Co

ncep

tW

hat

is C

hang

ing

?

• Center City ConnectorStreetcar

• One lane each directionrepurposed for transit lane

• Same as today• Downtown Seattle TransitTunnel bus routes operatesouthbound on 2nd Ave

• Existing 2-Way protectedbike lane is extendednorth to Denny and southto Jackson (current SDOTproject)

• Traffic volumes increase10-15% due to temporaryAlaskan Way closure andlane repurposing on 1st Ave

• Same as today

OPTION A:

BASELINE OR “DO NOTHING” (2019)

• Downtown Seattle Transit Tunnelbus routes operate northboundon 4th Ave

• Traffic volumes increase 10-15%due to temporary Alaskan Wayclosure and lane repurposing on1st Ave

• Light rail only

• Light rail headwaysame as today

• Same as today

5

KEY TAKEAWAYS:Bus trips are longer and less reliable for transit customers on 2nd, 4th, and 5th Avenues

Transit agencies pay more to maintain current service levels

Several key bus stops are overcrowded during the PM peak, affecting pedestrian movements

Light rail reliability improves in Downtown Seattle Transit Tunnel

Drivers have longer peak trips due to traffic shifting from Alaskan Way and 1st Avenue and increased bus volumes

Challenging to implement northbound and southbound protected bike lane east of 3rd Ave

Page 7: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTNB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

NB

Bike LaneParking & Loading

NB

Light-Rail/ Bus

SB

Light-Rail/ Bus

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Transit Only Lane

SB

Travel Lane

SB

Travel Lane

2-way

ProtectedBike Lane

Parking /Loading& Left-Turn

NB NBSBSB

Streetcar StreetcarTravel Lane Travel Lane

SB

ProtectedBike Lane

SB

Travel Lane

SB

Travel Lane

SB

ProtectedBike Lane

SB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Transit Only Lane

SB

Travel Lane

SB

Travel Lane

2-way

ProtectedBike Lane

Parking /Loading& Left-Turn

Protected/permissive right-turn phasing

NB

ProtectedBike Lane

NB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

Protected/permissive right-turn phasing

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

NB

Light-Rail

SB

Light-Rail

With sidewalk reduction

With lane reduction

NB = NorthboundSB = Southbound

NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

Exi

stin

g

1st Ave 2nd Ave 3rd Ave Downtown SeattleTransit Tunnel 4th Ave 5th Ave 6th Ave

* Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change.

Op

tio

n B

Co

ncep

tW

hat

is C

hang

ing

?

NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

NBSB

Travel Lane

SB

Travel Lane Travel Lane

NB

Travel Lane

• Same as Baseline • Opportunities to speedboarding at bus stops arepursued

• Allows some buses torelocate from 2nd & 4thAves

• Improvements topassenger environment &organization at crowdedbus stops

• Intersection improvements atwestbound cross streets (i.e.,Madison & Columbia)

• Signal phasing that allowstransit lane to clear of rightturning vehicles

• Southbound protectedbike lane would requirerepurposing a travellane or moving curbsand possibly removingtrees

• Reduction to two travellanes would requireadditional investment intwo-way 6th Ave

• Intersection improvements ateastbound cross streets (i.e.,Cherry, Marion, Spring, Pike)

• Signal phasing that allows transitlane to clear of right turningvehicles

• Northbound protected bike lane(assume paired with southboundlane on 5th Ave)

• Same as Baseline • Same as Baseline

OPTION B:

OPERATIONAL ENHANCEMENTS ON 2ND, 3RD, 4TH, & 5TH AVENUES (2019)

KEY TAKEAWAYS:

6

Modest operational improvements for transit on 2nd and 4th Avenues, but potential improvements to speed boarding allowsome regional routes to relocate to 3rd Avenue

Opportunity to implement 4th and 5th Avenue protected bike lane couplet

Low capital investment allows easier implementation before Fall 2018

Page 8: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTNBSB

Travel Lane

SB

Travel Lane Travel Lane

NB

Travel Lane

NB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

NB

Bike LaneParking & Loading

NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

NB

Light-Rail/ Bus

SB

Light-Rail/ Bus

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Transit Only Lane

SB

Travel Lane

SB

Travel Lane

2-way

ProtectedBike Lane

Parking /Loading& Left-Turn

NB

Transit Only Lane

NB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

Protected/permissive right-turn phasing

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Transit Only Lane

NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

5

SB

Transit Only Lane

SB

Travel Lane

SB

Travel Lane

2-way

ProtectedBike Lane

Parking /Loading& Left-Turn

Protected/permissive right-turn phasing

Spring to UniversityNB

Light-Rail

SB

Light-Rail

To SB I-5NB = NorthboundSB = Southbound

Exi

stin

g

1st Ave 2nd Ave 3rd Ave Downtown SeattleTransit Tunnel 4th Ave 5th Ave 6th Ave

* Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change.

Op

tio

n C

Co

ncep

tW

hat

is C

hang

ing

?

NB NBSBSB

Streetcar StreetcarTravel Lane Travel Lane

• Same as Baseline • Same as Baseline• Intersection improvements atwestbound cross streets (i.e.,Madison, Columbia)

• Signal phasing that allowstransit lane to clear of rightturning vehicles

• One lane repurposedto create southboundtransit lane

• More bus service movedto 5th Avenue to takeadvantage of transitlane

• One travel lanes northof Madison, three southof Madison

• Does not allow room forbike lane

• Second northbound transit laneadded

• Dual transit lane adds capacityfor buses

• Current skip stop patternretained

• Signal phasing that allows transitlane to clear of right turningvehicles

• Does not allow room for bike lane

• Same as Baseline • Converted to two-waystreet between Stewartand Marion

• Southbound travel laneprovides additionalcapacity for I-5 accessfrom North Downtown,Denny Triangle,Belltown, and SouthLake Union

• 5th Ave transit lane isdependent on two-way6th Ave

OPTION C:

4TH & 5TH AVENUE TRANSIT COUPLET (2019)

KEY TAKEAWAYS:

7

Adds one full lane of transit capacity northbound and southbound

Repurposing lane for transit on 5th Avenue necessitates new southbound lane on 6th Avenue; important for access to I-5 South

Very difficult to implement northbound or southbound protected bike lane east of 3rd Avenue

Sidewalk crowding is an issue on 2nd, 4th, and 5th Avenues

Bus passengers may have to walk further uphill/downhill to access transit

Has the most significant reduction in on-street parking and loading during the peak period

More intensive capital projects such as two-way 6th Avenue will require expedited process to implement by Fall 2018

Page 9: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTNB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

NB

Bike LaneParking & Loading

NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

NB

Light-Rail/ Bus

SB

Light-Rail/ Bus

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Travel Lane

SB

Transit Only Lane

SB

Travel Lane

SB

Travel Lane

2-way

ProtectedBike Lane

Parking /Loading& Left-Turn

NB NBSBSB

Streetcar StreetcarTravel Lane Travel Lane

NB

Travel Lane

NB

Travel Lane

NB

Travel Lane

2-way

ProtectedBike Lane

Peak GP / Off-Peak Parking

NB

Parking /Loading& Left-Turn

SB

Travel Lane

SB

Travel Lane

2-way

Protected Bike Lane

Peak GP / Off-Peak Parking

SB NB

Transit Only Lane

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

NB

Travel Lane

NB

Travel Lane

SB

Travel Lane

5

Spring to University

Note: Center lane alternates between NB and SB to allow buses to pass at stops.

NB

Transit Only Lane

SB

Transit Only Lane

SB

Transit Only LaneBus StopNB

Light-Rail

SB

Light-Rail

NB = NorthboundSB = Southbound

Exi

stin

g

1st Ave 2nd Ave 3rd Ave Downtown SeattleTransit Tunnel 4th Ave 5th Ave 6th Ave

* Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change.

Op

tio

n D

Co

ncep

tW

hat

is C

hang

ing

?

NBSB

Travel Lane

SB

Travel Lane Travel Lane

NB

Travel Lane

• Same as Baseline • Same as Baseline• Southbound transit laneremoved

• West curb lane used forgeneral traffic during peakand parking/loading duringoff peak

• Most transit service relocatedto 5th Ave

• Transit only during peakperiods from Stewart toJackson

• Operates similar to 3rdAve Transit Spine; transitonly at peaks with limitedaccess and delivery

• Most bus servicesusing 2nd & 4th Avesconsolidate to 5th Ave

• Signficantly altersthe existing 5th Avestreetscape and tree line

• Northbound transit lane removed

• East curb lane used for generaltraffic during peak and parking/loading during off peak

• Most transit service relocated to5th Ave

• Same as Baseline • Converted to two-waystreet between Stewartand Marion

• Southbound travel laneprovides additionalcapacity for I-5 accessfrom North Downtown,Denny Triangle, Belltown,and South Lake Union

• 5th Ave peak transit onlyoperation is dependenton two-way 6th Ave

OPTION D:

5TH AVENUE TWO-WAY TRANSIT SPINE (2019)

KEY TAKEAWAYS:

8

Concentrates transit service on 1st, 3rd, and 5th Avenues

During peak, most surface transit is operating in a transit-only lane

Simplifies street operation as there are very limited turn movements from 5th Avenue during peak periods

Simplified traffic operations reduce driver delay, but would change access to some buildings & garages

Bus passengers may have to walk further uphill/downhill to access transit

Introducing new bus stops on 5th Avenue would require impact streetscape and require some tree removal

5th and 6th Avenue project elements are capital intensive; design/outreach would make Fall 2018 completion challenging

Page 10: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTChange in Transit Travel

Time & Reliability (Downtown Bus Riders)

Additional Downtown Transit Operating Costs

(Bus Only)

Pedestrian Experience at Hubs and Major Bus Zones

Surface Street Project Capital Cost

Potential for On-Time Delivery

General Purpose TrafficTravel Time

Change in On-Street Parking & Loading Spaces

Change from Today

Opportunity to Implement Northbound and Southbound

Protected Bike Lane (East of 3rd Ave)

+$7-$8M annually

N/A

+3.5 min.per rider during peak period

Travel Time:

Reliability:

2ND

4TH

3RD

5TH

No Change

Northbound:

+0.3 min.average of 4th & 6th Ave

Southbound:

+3.0 min.average of 2nd, 5th, & 6th Ave

LOW N/A

+$1.5-$2.5M

annually

$11-$14M

+1.9 min.per rider during peak period

Travel Time:

Reliability:

2ND

4TH

3RD

5TH

Northbound:

No Changeaverage of 4th & 6th Ave

Southbound:

+2.8 min.average of 2nd, 5th, & 6th Ave

MED HIGHMED

+$0.5-$1M

annually

$14-$17M

+1.7 min.per rider during peak period

Travel Time:

Reliability:

2ND

4TH

3RD

5TH

Northbound:

+1.2 min.average of 4th & 6th Ave

Southbound:

+3.4 min.average of 2nd, 5th, & 6th Ave

LOW MEDMED

+/-$0M annually

$22-$28M

No Change

per rider during peak period

Travel Time:

Reliability:

2ND

4TH

3RD

5TH

Northbound:

+0.7 min.average of 4th & 6th Ave

Southbound:

No Changeaverage of 2nd, 5th, & 6th Ave

MED LOWHIGH

during PM peak period

ParkingStalls: -25

PassengerLoad Zones: -4

CommercialLoad Zones: -1

during PM peak period

ParkingStalls: -45

PassengerLoad Zones: -19

CommercialLoad Zones: -6

during PM peak period

ParkingStalls: -36

PassengerLoad Zones: -4

CommercialLoad Zones: -3

Op

tio

n A

: 2

019

Bas

elin

e

Op

tio

n B

: O

per

atio

nal

Enh

ance

men

ts t

o2n

d,

3rd

, 4t

h, &

5th

Op

tio

n C

: 4

th &

5th

Ave

nue

Tra

nsit

Co

uple

t

Op

tio

n D

: 5

th A

venu

e T

wo

-Way

Tra

nsit

Sp

ine

LOW

NORTH/SOUTH SURFACE STREET OPTIONS OVERVIEW

9

Page 11: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

The draft guiding principles below were developed based upon feedback received at the November 10 Advisory Group meeting as well as a follow-up meeting between agency staff and several Advisory Group member volunteers held on November 22. These include refinements from the January 12 meeting.

Draft Guiding Principles

Equity: Design for the health, safety and well-being of all who live in our community using established race and social justice guidelines.

Flexibility: Create flexible systems that can evolve over time by taking a system-wide view and challenging long-held assumptions.

Optimization: Optimize use of limited street and sidewalk space for people and goods.

Public space: Design the street experience and public realm so that they are inviting, engaging, safe and supportive of social connections and community-building.

Stewardship: Reduce vehicles and emissions and use sustainable building practices.

Transportation: Provide safe, affordable, comfortable, reliable and convenient transportation options for all users of all abilities – daytime and nighttime, commuters and non-commuters, and those needing timely multiple connections.

User experience: Create an easy to use and intuitive system by prioritizing accessibility, pedestrian mobility, wayfinding, and multimodal connectivity.

Well-being: Support social sustainability and economic prosperity for all.

10

Page 12: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

SURFACE STREET SCENARIO EVALUATIONPreliminary Measures used for Surface Street Dashboard

The following can be used as a reference sheet for reviewing potential Surface Street Options and the preliminary measures that were used to assess them.

11

Measure

Change in Transit Travel Time and Reliability: Downtown Bus Riders

Guiding Principles

Supported

User experience

Transportation

Equity

Stewardship

What Are We

Measuring?

Change in travel time and reliability for bus riders traveling to and through downtown.

How Was the Rating

Calculated?

Calculated using trafficand bus stop operations model, includes travel time and reliability on 2nd, 4th, and 5th Ave.

Key Assumptions or

Qualifier

Bus riders on transit tunnel routes currently experience higher travel speeds and better reliability through downtown, and will experience a greater degradation than bus riders using current surface street routes.

Additional Downtown Transit Operating Costs Well-being

Change in annual bus transit operating costs resulting from increased travel times for buses operating on surface streets

Additional transit delay compared to existing conditions.

Calculated using a bus stop operations model that evaluates:

Delay because busesare backed up at busstopsAdditional dwell timedue to increasedpassenger volumesAdditional time toreach layover

Does not account for other changes in downtown traffic ortransit operations such as changes related to East Link construction and waterfront construction.

All costs in 2016 dollars, does not include Light Rail operating costs.

General Purpose Traffic Travel Time Transportation

Equity

Stewardship

Average amount of additional time auto drivers and passengers spend traveling through downtown during afternoon peak period.

Modeled using trafficoperations models that simulate traffic operationsincluding general purpose traffic, buses,bicycles, and pedestrians.

Traffic pattern changesresulting from lane changes on 1st Avenue due to Center City Connector streetcar andtemporary closure of Alaskan Way taken into account.

Includes travel north or south on 2nd, 4th, 5th, and 6th Aves, or east or west on Pike and Pine Streets.

Page 13: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

Measure

Opportunity to Implement Protected Bike Lane

Guiding Principles

Supported

What Are We

Measuring?

Opportunity to implement a new protected bike lane in both the northbound and southbound directions east of 3rd Ave, and in both directions on the Pike-Pine Corridor.

How Was the Rating

Calculated?

Evaluated performance of general purpose auto and transit with inclusion of protected bike lane using Vissim traffic operationsmodel.

Key Assumptions or

Qualifier

User experience

Optimization

Flexibility

has limited impact on travel times for

transit and auto travelers

has some impact, but impact may be

reduced if combined with other strategies (surface street or service intervention) has significant

impact on travel times for transit and auto

Pedestrian Experience at Transportation Hubs and Major Bus Stops

User experience

Optimization

Public space

sidewalks operate well for pedestrians

passing bus stop

pedestrianmovements are

constrained during peak periods

waiting bus passengers

regularly block pedestrian movement

The degree to which waiting bus passengers impede pedestrian movement on sidewalks where bus stops are located.

All costs in 2016 dollars.

significant riskconstruction will

not be complete by fall 2018

moderate risk construction will

not be complete by fall 2018

very low risk construction will

not be complete by fall 2018

HIGH

MED

LOW

HIGH

MED

LOW

LOW

MED

HIGH

12

Estimated density of waiting bus passengers, pedestrian volumes, and other physical impediments from street furniture, etc.

Surface Street Capital Project Costs Well-being

Optimization

The total capital cost of all surface street improvements included in the scenario.

Calculated using SDOT capital costing tools and unit costs from recent projects.

Change in On Street Parking and Loading Spaces

User experience

Transportation

Public space

Flexibility

The change in number of on-street parking and loading stops resulting from scenario projects and number of driveways that have access patterns affected (not required to close) .

Counted number of on-street parking, and commercial and passenger loading areas displaced by capital project options.

Potential for On Time Delivery Well-being

Flexibility

Likelihood to design, receive environmental clearances, contract, and construct the set of projects within the fall 2018 timeline

Detailed schedule assessment using SDOT’s capital project assessment tool.

Schedule assessment considered a number of possible options for expedited design and delivery.

Page 14: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

POTENTIAL FOR ON-TIME DELIVERY Implementation Timeline And Risks

The surface street capital projects listed below are those considered in developing the rating shown on the Surface Street Options (N-S Avenues) sheets. They are rated High to Low, with High meaning the project has a high potential for on-time delivery and Low meaning the project has low potential for on-time delivery.

Public, Customer, Other Capital Projects Improvement Strategy Construction Timeline

Stakeholder Conflict2nd Ave Spot Improvements + P/P Right Turn Phasing

HIGH Standard schedule HIGH

Minimal change to street operations

HIGHNone

4th Ave Spot Improvements + P/P Right Turn Phasing

HIGH Standard schedule HIGH

Minimal change to street operations

HIGH None

4th Ave Dual Transit Lane

MED Need expedited schedule MED

Moderate change to street operations

HIGH None

5th Ave SB Transit Lane

MED Need expedited schedule MED

Moderate change to streetoperations

MEDDenny Substation & UW Tower Project

5th Ave Two-Way Transit Spine

LOW

Need expedited schedule, environmental determination of non-significanceand streamlined public process

LOW

Major change to transit routings, street operations, driveway access and parking facilities

LOWDenny Substation, UW Tower Project

6th Ave Two-Way Operations

LOW

Need expedited schedule, environmental determination of non-significanceand streamlined public process

MED

Major change to street operations, driveway access and parking facilities

MED Denny Substation

13

Page 15: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

BUS SERVICE RESTRUCTURING OPTIONS

What is the Challenge and the Opportunity?• Current planning is for buses to stop using the Downtown Seattle Transit Tunnel as early as Fall of

2018. This will provide more frequent and reliable train service, as planned when the tunnel wasbuilt.

There is limited capacity on Center City surface streets to carry the additional buses that will moveout of the tunnel without capital investment to improve surface street operations..

Light rail trains provide substantial capacity to move people reliably into and out of Center Cityneighborhoods. With buses no longer in the tunnel, Sound Transit Link efficiency will improve.

Why Restructure Bus Services?• Increase mobility for bus operations and transit customers on Center City surface streets during busy

commute hours.

Increase travel reliability by removing buses from congested corridors, and having more people uselight rail.

Move bus stop activity to transportation hubs designed to handle higher volumes of waiting andtransferring passengers and improve loading time at existing busy bus stops.

Make the best use of light rail capacity and increase service reliability.

How Were Draft Bus Service Restructuring Options Identified?• King County Metro, Sound Transit, Community Transit and SDOT staff worked together to develop a

long list of service restructuring options that met some or all of the following objectives:

» Maintained or improved customer experience and reliability.

Consideration of any adverse impacts on minority or low-income populations.

Reduced bus volumes on Center City surface streets, particularly regional bus pathways such as2nd and 4th Avenues.

»

»

• The long list of over 30 options was refined and reduced based on technical analysis that reviewed:

» Alignment of the proposal with long-term transit network plans.

How the proposal affected travel time and service reliability for transit customers

The number of peak period buses removed from congested Center City surface streets and keychoke points.

The ability for sidewalks and bus stops to accommodate waiting bus passengers.

»

»

»

14

Page 16: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

JOIN THE CONVERSATION AND LEARN MORE AT:

onecentercity.org

What Options Will You Review?• Based on the detailed technical analysis, the agencies identified

seven (7) options for bus service restructuring, which aredescribed in the one-page sheets that accompany this summary.

Some options align with restructuring strategies that SoundTransit and King County will seek public input on beginning inspring 2017.

What Happens Next with the Draft Service Proposals?

• King County Metro, Sound Transit, and Community Transit allhave well established and comprehensive public involvementprocesses that allow community members and stakeholders toreview and provide input on proposed changes to bus service.

Before any decisions are made, service restructuringrecommendations identified in the One Center City planningeffort will go through a more detailed analysis and separatepublic involvement process that may include:

» Citizen advisory panels

Community stakeholder outreach

Public meetings

Surveys

Targeted outreach to underrepresented populations

»

»

»

»

• Final decision on any service restructuring proposal will bemade by King County Council the Sound Transit Board, or theCommunity Transit Board

15

Page 17: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

SR 520 Routes Service to University of Washington Station DRAFT FOR DISCUSSION ONLY

×545

×KCM

×LINK

LakeWashington

PugetSound

LakeUnion

UV99

UV

513

UV99

NICKERSONST

ALASKANW

AY

15TH

AV

E

MADISON ST

34TH ST

WE

STL

AK

EA

VE

PA

CIF

ICST

24

TH

AV

E

2ND AVE

DENNY WAY

MERCER ST

!"#5

!"#5

0 0.25 0.5Miles

Sources: King County Metro,Sound Transit

×252 ×255

×257 ×268

×311

Potential KCM Routes:

UV520

University of WashingtonStation

University ofWashington

Station

Link Light Rail

PotentialMontlake

Alignment

Current KingCounty Metro

Alignment

Current Rt 545Alignment

×545

Potential ST Route:

POTENTIALSERVICE

CONCEPT

Benefit to Regional Mobility

High

Service Reliability

Improves for all riders by avoiding I-5 and downtown congestion

16

Rider Travel Time (Change from Today)

2019 with Destination 2019 Baseline Restructure

Westlake Station 3+ Minutes No Change

International District/ 5+ Minutes No ChangeChinatown Station

Key DetailsPotentially reorient four peak-only routes and two all-day routes to serve University of Washington Station atMontlake Hub and the University District

Permanent change with high benefit for downtown mobility, minimal travel time impact, and improvedreliability for riders

Limits transit travel time and reliability impacts of major construction projects such as Portage Bay Bridgereconstruction (2020-2026), Washington State Convention Center Addition (2018-2020), and others

A Sound Transit internal analysis underway will identify any opportunities to increase capacity within theDowntown Seattle Transit Tunnel

$2 – $3 M capital investment required at Montlake Hub to accommodate more buses and provide improvedpassenger experience

Considered for Sound Transit and King County Metro evaluation and comprehensive public involvementprocess on potential 2018 service changes

Page 18: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

ST Route 550 (Bellevue - Seattle) Service to International District/Chinatown Station DRAFT

FOR DISCUSSION ONLY

×550

PugetSound

LakeWashington

UV519

U

UV99

ALASKANW

AY

5TH AVE

EL L IOTTAVE

JACKSON ST

23RD

AV

E

PINE ST MADISON ST

RAIN

IER AVE

MERCER ST

BOREN

AVE9T

H A

VE

1ST

AV

E

2ND AVE

EA

ST

LA

KE

AV

E!"#5

!"#90

×LINK

Sources: Sound Transit

InternationalDistrictStation

To Bellevue

0 0.25 0.5Miles

InternationalDistrict Station

Link Light Rail

Potential 550 Alignment

Existing 550Alignment

POTENTIALSERVICE

CONCEPT

Benefit to Regional Mobility

Medium

Service Reliability

Improves for Westlake Station riders

Rider Travel Time (Change from Today)

2019 with Destination 2019 Baseline Restructure

Westlake Station 3+ Minutes No Change

International District/Chinatown Station No Change No Change

Key Details• Potentially reorient one all-day route that currently operates in the tunnel to International District/Chinatown

Station

A Sound Transit internal analysis underway will identify any opportunities to increase capacity within the Downtown Seattle Transit Tunnel

Temporary change until East Link extension opens in 2023

$1.5 – $2.5 M capital investment required at International District/Chinatown Station to accommodate more buses and provide improved passenger experience

Considered for Sound Transit evaluation and comprehensive public involvement process on potential 2018 service changes

17

Page 19: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

West Seattle/Burien/Vashon Peak RoutesService to First Hill DRAFT FOR DISCUSSION ONLY

×LINK

PugetSound

LakeUnion

EA

ST

ALASKAN WAY

ELL IOTTAVE

RAIN

IER AVE

23RD

AV

E

JACKSON ST

PINE ST

MADISON ST

ROY ST

BOREN

AVE

9TH

AV

E

1ST

AV

E

3RD A

VE

YESLER WAY

CHERRY ST

JAMES ST

4TH

AV

E S !"#90

!"#5

0 0.25 0.5Miles

Sources: King County Metro

Link Light Rail

PotentialTransit

Alignment

CurrentTransit

Alignment

PotentialWest Seattle Peak Routes:

×37 ×55

×56 ×57Potential BurienPeak Routes:

×113 ×121

×122 ×123

Potential Vashon Island Peak Routes:

UV519

UV99

PioneerSquareStation

PioneerSquare Station

×116 ×118

×119

POTENTIALSERVICE

CONCEPT

Benefit to Regional Mobility

High

Service Reliability

Improves for Westlake Station riders by avoiding downtown congestion

Rider Travel Time (Change from Today)

2019 with Destination 2019 Baseline Restructure

First Hill No Change -5 Minutes

Westlake Station 2+ Minutes 2+ Minutes

International District/Chinatown Station No Change No Change

Key Details• Potentially reorient 11 peak-only routes from the communities of West Seattle, Burien, and Vashon Island to

First Hill

Permanent change that will free up capacity on 3rd Avenue during the busiest commute times while providingmore service to First Hill

No additional capital improvements needed to implement change

Considered for King County Metro evaluation and comprehensive public involvement process on potential 2018service changes

18

Page 20: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

Route 41 Service to Westlake StationDRAFT FOR DISCUSSION ONLY

PugetSound

UV519UV99

ALASKAN WAY

7TH AVE

23R

D A

VE

JACKSON ST

FAIR

VIE

W A

VE

BROAD S

T

MADISON ST

6TH AVE

MERCER ST

BOREN

AVE9

TH

AV

E2ND AVE

ELLIOTT AVE

PIKE ST

UNION ST

×LINK

0 0.25 0.5Miles

Sources: King County Metro,Sound Transit

!"#5

!"#5

×41

Potential 41 Alignment

Current 41Alignment

(when DSTT is closed)

Link Light Rail

To Northgtate

Link TransferStations

WestlakeStation

UniversityStreet

Station

POTENTIALSERVICE

CONCEPT

Benefit to Regional Mobility

Medium

Service Reliability

Improves for International District/Chinatown Station riders by avoiding

downtown congestion

Rider Travel Time (Change from Today)

2019 with Destination 2019 Baseline Restructure

Westlake Station No Change No Change

International District/Chinatown Station 5+ Minutes 3+ Minutes

Key Details• Potentially end one all-day route in Westlake Station that currently operates in the tunnel

Being evaluated concurrent with Pike/Pine protected bike lane options

Temporary change until Northgate Link extension opens in 2021

$1.5 – $2.5 M capital investment needed to accommodate additional buses and passengers

Considered for King County Metro evaluation and comprehensive public involvement process on potential 2018 service changes

19

Page 21: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

ST Pierce County Routes Service to International District/Chinatown Station or South Lake Union DRAFT

FOR DISCUSSION ONLY

PugetSound

LakeWashington

ALASKANW

AY

5TH AVE

EL L IOTTAVE

JACKSON ST

23RD

AV

E

PINE ST

MADISON ST

RAIN

IER AVE

MERCER ST

BOREN

AVE9T

H A

VE

1ST

AV

E

2ND AVE

!"#90

×LINK

0 0.25 0.5Miles

Sources: Sound Transit

UV519

U

UV99!"#5Potential

ST Routes to IDS: ×590 ×594

×595

PotentialST Routes to SLU: ×577 ×578

×592

WestlakeStation

InternationalDistrictStation

Link TransferStations

LinkLight Rail

PotentialInternational

District StationAlignment

Current STPierce County

Alignment

PotentialSouth Lake Union

Alignment

POTENTIALSERVICE

CONCEPT

Benefit to Regional Mobility

High

Service Reliability

No significant change

Rider Travel Time for SLU Routes (Change from Today)

2019 with Destination 2019 Baseline Restructure

Westlake Station 3+ Minutes No Change

International District/Chinatown Station No Change 5+ Minutes

Key Details• Potentially reorient Sound Transit peak and all-day services from Pierce County to International District/

Chinatown Station or South Lake Union

Service to South Lake Union would use 6th Ave and Westlake, providing direct access to Westlake Station and South Lake Union while service to International District/Chinatown Station would use SODO Busway

$1.5 – $2.5 M capital investment required at International District Station to accommodate more buses and passengers

Considered for Sound Transit evaluation and comprehensive public involvement process beyond 2018 service changes due to technical constraints.

20

Page 22: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

Community Transit Service to International District/Chinatown Station DRAFT FOR DISCUSSION ONLY

PugetSound UV99

ALASKAN WAY

EA

STLA

KE

AV

E

23

RD

AV

E

JACKSON ST

BROAD S

T

MADISON ST

6TH AVE

MERCER ST

BOREN

AVE

9T

HA

VE

4TH AVE2ND AVE

ELLIOTT AVE

STEW

ART S

T5TH

AVE

!"#90

×LINK

0 0.25 0.5Miles

Sources: Community Transit

InternationalDistrictStation

PotentialCT Routes: ×412 ×413

×416 ×421

×425 ×435

!"#5

InternationalDistrictStation

Link Light Rail

PotentialTransit

AlignmentCurrentTransit

Alignment

POTENTIALSERVICE

CONCEPT

Benefit to Regional Mobility

High

Service Reliability

No significant change

Rider Travel Time (Change from Today)

2019 with Destination 2019 Baseline Restructure

South Lake Union 5+ Minutes 5+ Minutes

Westlake Station 3+ Minutes 3+ Minutes

International District/Chinatown Station No Change No Change

Key Details• Potentially reorient six peak-only routes to International District/Chinatown Station via the Cherry St I-5 Express

ramps

Temporary change until Lynnwood Link extension opens in 2023

No additional capital improvements needed to implement change

Considered for Community Transit evaluation and comprehensive public involvement process beyond 2018 service changes due to technical constraints.

21

Page 23: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

Snohomish County Routes Service to South Lake Union & Westlake DRAFT FOR DISCUSSION ONLY

×LINK

PugetSound

UV519UV99

ALASKAN WAY

OL IVE

WAY

7TH AVE

23R

D A

VE

JACKSON ST

PINE STFA

IRV

IEW

AV

E

BROAD S

T

MADISON ST

6TH AVE

MERCER ST

BOREN

AVE

9T

HA

VE

4TH AVE2ND AVE

ELLIOTT AVE

5TH AVE

0 0.25 0.5Miles

Sources: Community Transit

WestlakeStation

WestlakeStation

LinkLight Rail

PotentialST & CT

Alignment

Current CTAlignment

Current STAlignment

PotentialCT Routes: ×402 ×405

×410 ×415

×417 ×422

×424

PotentialST Routes: ×510 ×511

×513

!"#5 POTENTIALSERVICE

CONCEPT

Benefit to Regional Mobility

High

Service Reliability

No significant change

Rider Travel Time (Change from Today)

2019 with Destination 2019 Baseline Restructure

South Lake Union No Change -5 Minutes

Westlake Station No Change No Change

International District/Chinatown Station 5+ Minutes 3+ Minutes

Key Details• Potentially reorient ten peak-only routes operated by Sound Transit and Community Transit to South Lake

Union and Westlake Hub

Improves South Lake Union access from Snohomish County

$1.0 – $1.5 M capital investment required at Westlake Hub to accommodate more buses and passengers

Temporary change until Lynnwood Link extension opens in 2023

Considered for Sound Transit and Community Transit evaluation and comprehensive public involvement processbeyond 2018 service changes due to technical constraints.

22

Page 24: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

Bus Stop Concepts Description Necessary Improvements

New Bus Stop All-day drop-off stop for passengers Transit Lane

2 Existing Bus Stop All-day pick-up stop for passengers

Enhanced Stop, Offboard Fare Payment, Queueing Management

3 Existing Bus Stop All-day drop-off stop for passengers Enhanced Stop, Transit Lane

4 New Bus Stop All-day drop-off stop for passengers Enhanced Stop

SR

99

1ST

AV

E S

S MAIN ST

YESLER WAY

S JACKSON ST

7T

H A

VE

S

8T

H A

VE

S

S WASHINGTONST

S KING ST

RA

ILRO

AD

WA

Y S

S DEARBORN ST

S LANE ST

S WELLER ST

10T

H A

VE

S

JAMES ST

AIRPORT WAY S

5T

H A

VE

S

OC

CID

EN

TA

L A

VE

S

2ND

EX

T

AV

E S

2N

D A

VE

S

3R

D A

VE

S

3RD

AV

E

4T

H A

VE

5TH

AV

E

2ND

AV

E

6T

H A

VE

1ST A

VE

S CHARLES ST

6T

H A

VE

S

PO

ST A

VE

10T

H A

VEBR

OA

DW

AY

E F IR ST

WE

ST

ER

NA

VE

8T

H A

VE

CHERRY ST

SPRUCE ST

ALDER ST

JEFFERSON ST

9T

H A

VE

MA

YN

AR

D A

LY S

SR

99

10T

H A

VE

S

S KING ST

5T

H A

VE

S

8T

H A

VE

S

OC

CID

EN

TA

L A

VE

S 4T

H A

VE

S

*

* *1

3

2

4

*

Snohomish County service via I-5 Cherry St Express Ramp

Sound Transit Pierce County

service via 4th/5th Ave and SODO

Busway

INTERNATIONAL DISTRICT STATIONPLAZA

PotentialBellevue

Service

Potential PierceCounty Service

PotentialSnohomish

County ServicePotential

Bellevue ServiceAlternative

Bellevue service via 4th/5th Ave and I-90

Weller St Pedestrian Bridge

to King Street Station

Public RealmImprovements *

Link LightRail Station

King StreetStation

Bellevue service alternative via Dearborn St

IncludedBus Stops #

0 500250

Feet

Conceptual International District/Chinatown Station Hub Improvements

BUS

BUS

Concept Details • International District/Chinatown

Station currently serves as atransfer hub for Sound Transitbuses from Bellevue and PierceCounty, and Community Transitbuses from Snohomish County

• Riders can connect to Link LightRail, frequent bus service, Sounder,and shared mobility options

DEDICATED BUS LANES Bus-only lanes separate transit from traffic

ENHANCED FARE COLLECTION Offboard payment using card readers and other tools at stations allows passengers to board more quickly.

ENHANCED BUS STOPSBus stops could include larger shelters, real-time arrival infor-mation, and other passenger amenities.

QUEUING MANAGEMENT Organizing waiting passengers at busy stops to maintain a pedestrian through-zone.

Key Improvements

PUBLIC REALMImprovements for pedestrians and waiting bus passengers may include wayfinding,lighting, and other improve-ments.

January 26. 2017

23

1

Page 25: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

SR 520

NE PACIFIC ST

E SHELBY ST

E HAMLIN ST

MO

NT

LA

KE

BLV

D N

E

NE PACIFIC PLNE CO

LUM

BIA RD

WA

LL

A W

AL

LA

RD

NE

24

TH

AV

E E

MO

NT

LA

KE

BLV

D E

LAKE WASHINGTON BLVD E

NESAN

JUANRD

E STEVENS WAY NE

15T

HA

VE

NE NE CANA L RD

NE WA LLA WALLA RD

NE

JEFFERSON RD

E P

AR

K D

R E

W P

AR

K D

R E

19T

H A

VE

E

SR 520

1

5

3

4

2

6

7

Brickyard, Kingsgate, and Woodinville P&R

service could continue north on Montlake Blvd

UW STATIONPLAZA

IncludedBus Stops

Potential Kirkland/Redmond Service

Potential I-405Commuter Service

#

Kirkland and Redmond service could continue

to the U District via Pacific St

Link LightRail Station

Pedestrian Bridges to University of Washington

UW MEDICAL CENTER

0 500250

Feet

Conceptual Montlake Hub Improvements

Concept Details • University of Washington Station

currently serves as a transfer hub between bus service in Northeast Seattle and Link Light Rail service to downtown Seattle

• Buses using SR 520 to reach downtown Seattle today can be reoriented to use this existing transfer hub

• Some routes will continue to the University District while others may serve Seattle Children’s Hospital or the UW campus loop

BUS

BUS

DEDICATED BUS LANES Bus-only lanes separate transit from traffic

ENHANCED FARE COLLECTION Off-board payment using card readers and other tools at stations allows passengers to board more quickly.

ENHANCED BUS STOPSBus stops could include larger shelters, real-time arrival infor-mation, and other passenger amenities.

TRANSIT PRIORITY Intersection improvements allow buses to bypass congestion.

Key Improvements

January 26. 2017

24

Bus Stop Concepts Description Necessary Improvements

1 Existing Bus Stop All-day drop-off stop for passengers Enhanced Stop

2 Existing Bus Stop Morning drop-off stop for passengers None

3 Existing Bus Stop All-day pick-up stop for passengers

Enhanced Stop, Offboard Fare Payment, Bus Lane and Transit Priority

4 New Bus Stop Morning drop-off stop for passengers Limited Improvements

5 New Bus Stop All-day drop-off stop for passengers Limited Improvements

6 Existing Bus Stop Afternoon pick-up stop for passengers Enhanced Stop, Offboard Fare Payment

7 New Bus Stop Afternoon pick-up stop for passengers Enhanced Stop, Offboard Fare Payment

Page 26: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

SURFACE STREET OPTIONS(Union, Pike, & Pine Streets)

What is the Challenge and the Opportunity?• King County Metro Route 41 will continue to be a critical connection between Northgate and Downtown

until the 2021 extension of Link light rail opens. Union and Pike Streets are proposed to serve as atemporary downtown routing for Route 41 (until 2021). This Northgate express service has very highridership and new stops on Union and Pike would have very high passenger volumes.

The Pike-Pine corridor a critical multimodal connection between Capitol Hill, Westlake/ConventionCenter, Downtown, and Seattle Waterfront. Directness, street connections over I-5, limited gradecompared to other downtown streets, and access to many major destinations and transit make this streetpair an important focus of future investment.

Pike and Pine Streets are designated to connect Broadway and 2nd Avenue protected bike lanes withan east-west protected bike lane connection. The grade in this corridor is more favorable to cyclists thanother east-west connections.

Many planned public and private development projects will bring new investment to the Pike–PineCorridor, including: Seattle Waterfront Project investments, Pike–Pine Streetscape Project, theWashington State Convention Center, and others.

These investments offer the opportunity to create a world-class corridor linking neighborhoods andmaking great places for people.

What Options Will You Review?• Three options for operating a multimodal Union, Pike, and Pine corridor.

• Option A (the baseline scenario) is identical to today’s street layout but with 2019 traffic and busvolumes.

Options B and C are largely identical west of 8th Avenue (within downtown), and include repurposingstreet space for a single protected bike lane on Pike and Pine Streets running in the direction of travelon each street. Options B and C also include both improved and new bus stops along Pike and UnionStreets west of 6th Avenue for Route 41.

East of 8th Avenue, B and C are distinctly different:

• Option B: Streets remain bi-directional for auto traffic and transit east of 8th. New curbsideprotected bike lanes run in both directions on Pike between 8th Ave and Broadway.

Option C: Pike and Pine Streets operate as a couplet, with traffic, bikes, and transit alloperating eastbound on Pike and westbound on Pine.

• Note: See following page for maps of Pike-Pine multimodal corridor options

25

Page 27: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

JOIN THE CONVERSATION AND LEARN MORE AT:

onecentercity.org

Pike-Pine Multimodal Corridor OptionsE E

SE AVE

EHARVARD AVE

E

BOYLSTON AVEBELMONT AVE

MELRO

E

HO

WE

LL S

T

SUMMIT AVE

What Happens Next with Union, Pike, and Pine Options?

Members of the One Center City Interagency Team will reviewAdvisory Group input and consider this input along withtechnical analysis, additional stakeholder feedback, and publiccomment to develop a draft set of preferred near-term projectsand strategies.

Draft projects and strategies will be presented for AdvisoryGroup review at the March Advisory Group meeting.

Union, Pike, and Pine corridor design recommended forimplementation will be developed with stakeholder input.

PIN

E

ST

PIK

E

ST

1ST AVE

5TH AVE

8TH AVE

4TH AVE

3RD AVE

2ND AVE

BOREN AVE

7TH AVE

E

PIK

E S

T

9TH AVE

PIN

E S

T

OL

IVE

W

AY

E

UN

ION

ST

BROADWAY

SUMMIT AVE

MINOR AVE

HO

WE

LL

ST

EO

L IV

DE

NN

Y W

AY

10TH AVE

P IKE PL

UN

IVE

RS

ITY

S

T

TERRY AVEUN

ION

ST

UN

IVE

RS

ITY

S

T

PI N

ES

T

BOYLSTON AVE

6TH AVE

SE

NE

CA

S

T

SP

RIN

GS

T

2ND AVE

1ST AVE

0 630315Feet

ProtectedBike Lane

Bus Lane

StandardBike Lane

Bike LaneDirection

Bus LaneDirection

Change toCar TravelDirection

New orImprovedBus Stop

PIN

E

ST

PIK

E

ST

1ST AVE

5TH AVE

8TH AVE

4TH AVE

3RD AVE

2ND AVE

BOREN AVE

7TH AVE

E

PIK

E S

T

9TH AVE

E P

INE

ST

OL

IVE

W

AY

E

UN

ION

ST

BROADWAY

SUMMIT AVE

MINOR AVE

HARVARD AVE

HO

WE

LL

ST

EO

L IV

E D

EN

NY

WA

Y

10TH AVE

BOYLSTON AVE

P IKE PL

UN

IVE

RS

ITY

S

T

BELMONT AVE

MELROSE AVE

TERRY AVEUN

ION

ST

UN

IVE

RS

ITY

S

TP

I NE

ST

E

HO

WE

LL S

T

BOYLSTON AVE

6TH AVE

SE

NE

CA

S

T

SP

RIN

GS

T

SUMMIT AVE

2ND AVE

1ST AVE

0 630315Feet

ProtectedBike Lane

Bus Lane

StandardBike Lane

Bike LaneDirection

Bus LaneDirection

Change toCar TravelDirection

New orImprovedBus Stop

PIN

E

ST

PIK

E

ST

1ST AVE

5TH AVE

8TH AVE

4TH AVE

3RD AVE

2ND AVE

BOREN AVE

7TH AVE

E

PIK

E S

T

9TH AVE

E P

INE

ST

OL

IVE

W

AY

E

UN

ION

ST

BROADWAY

SUMMIT AVE

MINOR AVE

HARVARD AVE

HO

WE

LL

ST

EO

L IV

E

E D

EN

NY

WA

Y

10TH AVE

BOYLSTON AVE

P IKE PL

UN

IVE

RS

ITY

S

T

BELMONT AVE

MELROSE AVE

TERRY AVEUN

ION

ST

UN

IVE

RS

ITY

S

T

PI N

ES

T

E

HO

WE

LL S

T

BOYLSTON AVE

6TH AVE

SE

NE

CA

S

T

SP

RIN

GS

T

SUMMIT AVE

2ND AVE

1ST AVE

0 630315Feet

ProtectedBike Lane

Bus Lane

StandardBike Lane

Bike LaneDirection

Bus LaneDirection

Change toCar TravelDirection

New orImprovedBus Stop

Option A: Baseline Option B: Downtown Couplet with PBL Pair on Pike East of 8th Ave

Option C: Pike and Pine One-Way Couplet

26

Page 28: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTWB

Bike LaneParking & Loading

WB

GP Lane

EB

GP Lane

EB

Bike LaneParking & Loading

WB

GP LaneCenter

Turn Lane

EB

GP LaneParking & Loading

Parking & Loading

EB

Transit Only Lane

EB

GP Lane

EB

GP LaneParking &Loading

Parking /Loading& Right-Turn

WB

GP Lane

WB

GP LaneParking /Loading& Right-Turn

Parking /Loading& Left-Turn

WB

GP Lane

WB

GP Lane

WB

GP LaneParking /Loading& Right-Turn

Parking /Loading& Left-Turn

WB

GP Lane

Sou e Only 3 travel lanes west of 4th Ave

Only 3 travel lanes west of 4th Ave

WB

Bike LaneParking & Loading

WB

GP Lane

EB

GP Lane

EB

Bike LaneParking & Loading

WB

GP LaneCenter

Turn Lane

EB

GP LaneParking & Loading

Parking & Loading

EB

Transit Only Lane

EB

GP Lane

EB

GP LaneParking &Loading

Parking /Loading& Right-Turn

WB

Transit Only Lane

WB

GP Lane

WB

GP Lane

South curb has parking/loading west of 5th AveEB = Eastbound

WB = Westbound

Op

tio

n A

Co

ncep

tE

xist

ing

Pine St Pike St Union St Pine St Pike St

1st Avenue to 8th Avenue 8th Avenue to Broadway

* Typical cross sections between Belmont Ave and Boylston Ave looking east.* Typical cross sections between 5th Ave and 6th Ave looking east.

Wha

t is

Cha

ngin

g?

WB

Transit Only Lane

WB

GP Lane

WB

GP Lane

th curb has parking/loading west of 5th Av

• No change in configuration of streets

• Small increase in traffic volumes from today due to growth

• May be construction impacts to Pike and/or Pine from Washington State Convention Center Expansion

• No change in configuration of streets

• Small increase in traffic volumes from today due to growth

OPTION A:

BASELINE OR “DO NOTHING” (2019)

KEY TAKEAWAYS:

27

Operations and street experience similar to today

Slight increases in delay for transit passengers and drivers due to growth

Analysis does not account for Washington State Convention Center construction impacts

Page 29: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTWB

Bike LaneParking & Loading

WB

Travel Lane

EB

Travel Lane

EB

Bike LaneParking & Loading

WB

Travel LaneCenter

Turn Lane

EB

Travel LaneParking & Loading

Parking & Loading

Parking & Loading

WB

Travel Lane

EB

Travel LaneParking & Loading

WB

Transit Only Lane

WB

Travel Lane

WB

Protected Bike Lane

WB

Travel Lane

EB

Travel Lane

EB

Protected Bike Lane

WB

Protected Bike Lane

EB

Transit Only Lane

EB

Travel Lane

EB

Travel LaneParking &Loading

Parking /Loading& Right-Turn

WB

Transit Only Lane

WB

Travel Lane

WB

Travel Lane

WB

Travel Lane

WB

Travel LaneParking /Loading& Right-Turn

Parking /Loading& Left-Turn

WB

Travel Lane

WB

Travel Lane

WB

Travel LaneParking /Loading& Right-Turn

Parking /Loading& Left-Turn

WB

Travel Lane

South curb has parking/loading west of 5th Ave Only 3 travel lanes west of 4th Ave

Only 3 travel lanes west of 4th Ave

Parking /Loading& Right-Turn

Center Turn Lane

EB

Transit Only Lane

EB

Travel Lane

EB

ProtectedBike Lane

Curb Bulb /Sidewalk

Bus Stop /Curb Bulb

EB = EastboundWB = Westbound

Op

tio

n B

Co

ncep

tE

xist

ing

Pine St Pike St Union St Pine St Pike St

Wha

t is

Cha

ngin

g?

1st Avenue to 8th Avenue 8th Avenue to Broadway

* Typical cross sections between Belmont Ave and Boylston Ave looking east.* Typical cross sections between 5th Ave and 6th Ave looking east.

• Westbound travel lanerepurposed for single-directionprotected bike lane

• Route 41 operates westboundfrom I-5 to 1st Ave

• New Route 41-only bus stopbetween 4th and 3rd Aves

• Eastbound travel lanerepurposed for single-directionprotected bike lane

• Improvements to existingbus stops at 4th and 6th Avesto accommodate Route 41passengers

• Single-direction protected bikelane on each curb

• On-street parking and loadingretained on south side of streetadjacent to protected bike lane

• Center turn lane eliminatedeast of Boren Ave andone eastbound traffic laneeliminated between Boren Aveand 8th Ave

• Existing bike lanes removed

• Center turn lane added

OPTION B: DOWNTOWN COUPLET WITH PIKE STREET

PROTECTED BIKE LANE PAIR EAST OF 8TH AVENUE

KEY TAKEAWAYS:

28

Changes have minimal effect on transit speed or reliability downtown

Traffic modeling shows significant congestion eastbound on Pike Street during PM peak period

Route 41 would require improved and new bus stops and potential boarding improvements to avoid sidewalk crowding

This option has most significant loss of curb parking and loading

Page 30: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

DRAFTDRAFTWB

Bike LaneParking & Loading

WB

Travel Lane

EB

Travel Lane

EB

Bike LaneParking & Loading

WB

Travel LaneCenter

Turn Lane

EB

Travel LaneParking & Loading

Parking & Loading

EB

Transit Only Lane

EB

Travel Lane

EB

Travel LaneParking &Loading

Parking /Loading& Right-Turn

WB

Transit Only Lane

WB

Travel Lane

WB

Protected Bike Lane

WB

Travel Lane

WB

Travel LaneParking /Loading& Right-Turn

Parking /Loading& Left-Turn

WB

Travel Lane

WB

Travel Lane

WB

Travel LaneParking /Loading& Right-Turn

Parking /Loading& Left-Turn

WB

Travel Lane

South curb has parking/loading west of 5th Ave Only 3 travel lanes west of 4th Ave

Only 3 travel lanes west of 4th Ave

EB

Transit Only Lane

EB

Travel Lane

EB

ProtectedBike Lane

Curb Bulb /Sidewalk

Bus Stop /Curb Bulb

EB

Travel LaneParking & Loading

EB

Transit OnlyLane

EB

Travel Lane

EB

Protected Bike Lane

Parking & Loading

WB

Protected Bike Lane

WB

Travel Lane

WB

Transit OnlyLane

WB

Travel Lane

EB = EastboundWB = Westbound

Parking & Loading

WB

Protected Bike Lane

WB

Travel Lane

WB

Travel Lane Parking & Loading

EB

Travel Lane Parking & Loading

EB

Travel Lane

EB

Protected Bike Lane

Parking & Loading

Transit lane option:(not evaluated in metrics below)

Parking &loadinglane option:(evaluated in metrics below)

Transit lane option:(not evaluated in metrics below)

Parking &loadinglane option:(evaluated in metrics below)

Op

tio

n C

Co

ncep

tE

xist

ing

Pine St Pike St Union St Pine St Pike St

1st Avenue to 8th Avenue 8th Avenue to Broadway

* Typical cross sections between Belmont Ave and Boylston Ave looking east.* Typical cross sections between 5th Ave and 6th Ave looking east.

KEY TAKEAWAYS:

Wha

t is

Cha

ngin

g?

WB

Transit Only Lane

WB

Travel Lane

WB

Travel Lane

• Westbound travel lanerepurposed for single-directionprotected bike lane

• Route 41 operates westboundfrom I-5 to 1st Ave

• New Route 41-only bus stopbetween 4th and 3rd Aves

• Eastbound travel lanerepurposed for single-directionprotected bike lane

• Improvements to existingbus stops at 4th and 6th Avesto accommodate Route 41passengers

• One-way eastbound for allmodes

• One-way protected bike lane

• Two traffic lanes

• One flexible lane – could beused for transit, parking, andloading

• One-way westbound for allmodes

• One-way protected bike lane

• Two traffic lanes

• One flexible lane – could beused for transit, parking, andloading

OPTION C:

ONE-WAY COUPLET ON PIKE & PINE STREETS

• Changes have minimal effect on transit speed or reliability downtown

Potential to improve transit speed and reliability if flexible lane east of I-5 is dedicated to transit (peak or all day)

Traffic modeling shows significant congestion eastbound on Pike Street during PM peak period

Route 41 would require improved and new bus stops and potential boarding improvements to avoid sidewalk crowding

Directional changes require greater capital investment and would take longer to design and construct

29

Page 31: Potential Near-Term Mobility Strategies January 26, 2017 ... · • Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation

EAST/WEST SURFACE STREET OPTIONS OVERVIEW

30

DRAFTDRAFT

Transit Travel Tim(Corridor Bus Riders)

e General Purpose TrafficTravel Time

(Between 1st Ave & Broadway)

Pedestrian Experience at Major Bus ZonesAdditional Downtown Transit

Operating Costs (Bus Only)Change in On-Street Parking

and Loading SpacesPotential for On-Time

Delivery

Change from Today

Surface Street Project Capital Cost

No Change existing Pike/Pine bus routes

-$0.5M annually for route 41

+0.5 min.(2%)

between 1st Ave & Broadway

Westbound (Pine):

+1.0 min.

Eastbound (Pike):

No Change

No Change

No Change existing Pike/Pine bus routes

-$0.5M annually for route 41

+0.5 min.(2%)

between 1st Ave & Broadway Eastbound (Pike):

+4.2 min.

No Change existing Pike/Pine bus routes

-$0.5M annually for route 41

No Changebetween 1st Ave & Broadway

Westbound (Pine):

+0.5 min.

Eastbound (Pike):

+3.4 min.

ParkingStalls: -78

PassengerLoad Zones: -22

CommercialLoad Zones: -16

ParkingStalls: -30

PassengerLoad Zones: -19

CommercialLoad Zones: -8

assumes parking & loading laneoption on Pine

Westbound (Pine):

+0.5 min.

N/A

UnderDevelopment

UnderDevelopment

assumes parking & loading lane option on Pike & Pine - transit lane option may reduce transit

travel times

N/AMED

HIGHMED

LOWMED

Op

tio

n A

: 2

019

Bas

elin

e

Op

tio

n B

:D

ow

nto

wn

Co

uple

t w

ith

Pik

eP

BL

Pai

r E

ast

of

8th

Ave

Op

tio

n C

: O

ne-W

ay C

oup

let

on

Pik

e &

Pin

e St

reet

s