post-processing methods for probabilistic convection ... · conversion into cosmo-de grid...

27
Post-processing methods for probabilistic convection forecasts based on the limited-area ensemble COSMO-DE-EPS of DWD Lars Wiegand, Christoph Gebhardt German Meteorological Service (DWD), Germany

Upload: vudieu

Post on 25-Dec-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

Post-processing methods for probabilistic

convection forecasts based on the limited-area

ensemble COSMO-DE-EPS of DWD

Lars Wiegand, Christoph Gebhardt

German Meteorological Service (DWD), Germany

Page 2: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Content

EPS convection project

set-up COSMO-DE-EPS

methodology

observation

forecast – probabilistic products (case study)

Bayes theorem

LASSO

data

result

further researches

product design

SESAR (Single European Sky)

conclusion

Page 3: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

model chain at DWD

COSMO-DE: 2.8 km

convection-permitting forecast model

50 vertical levels

modelrun every 3 hours: + 27 h

GME: 20 km

COSMO-EU: 7 km

set-up COSMO-DE-EPS further details: see talk SCI-PS166.01

Susanne Theis: Tue 13:30, room 524A

Page 4: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

COSMO-DE COSMO-DE-EPS

„variations“

within the system

ensemble

members

set-up COSMO-DE-EPS further details: see talk SCI-PS166.01

Susanne Theis: Tue 13:30, room 524A

Page 5: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

COSMO-DE-EPS

1 2 3 4 5

GME

IFS

GSM

GFS

20 members

set-up COSMO-DE-EPS further details: see talk SCI-PS166.01

Susanne Theis: Tue 13:30, room 524A

Page 6: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

project „EPS Convection“

predictability of small scale processes with non-linear and stochastic

processes (e.g. convection) is strongly limited

i.e. leads to strong uncertainty already at short lead times

severe events and high impact weather are highly important for warnings in

general or in aviation in particular

“charakteristics of HIW” and “limited predictability” leads to use of probabilistic

estimation of high-resulotion forecasts of deep convection based on

COSMO-DE-EPS

aims at supporting aviation weather forecasts and general weather warning

process at DWD

Page 7: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

methodology

probabilistic products for convective parameters from COSMO-DE-EPS

DMO (direct model output) variables as well as direct calculatable variables

(e.g. KO-index) from DMO

IMO (indirect model output), e.g. thunderstorms produced with regression

methods

requirements for IMO (thunderstorm) forecasts:

observation of IMO (thunderstorm) as predicand radar + lightning

EPS DMO forecasts as predictor(s)

Page 8: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

observation thunderstorm

combination of radar reflectivity and lightning

RX product

advantages: warning criterias are known within DWD (28, 37, 46, … dBz), high spatial/temporal

resolution

adaptions:

conversion into COSMO-DE grid

adjustment possible for used lead times

use of quality product QY

lightning from NCM network

very accurate observations – only 0,02% of all lightnings have errors >2,8km

detection of 90% of any light lightning and nearly 100% of strong lightnings

adaptions:

every grid point within 3km gets a distance weighted amount of a lightning measure

Page 9: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

case study – thunderstorms 28th July 2013

Page 10: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

case study – thunderstorms 28th July 2013

Page 11: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

case study – thunderstorms 28th July 2013

Page 12: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

case study – thunderstorms 28th July 2013

Page 13: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

case study – thunderstorms 28th July 2013

Page 14: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

case study – thunderstorms 28th July 2013

Page 15: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Bayes theorem

variables: CAPE, CIN,

TWATER, OMEGA,

DBZ_CMAX, TOT_PREC

period: summer (Apr-

Sept) 2012

forecast: 00UTC +

0/6/12/18h

based on grid points

1/0 event occurs/does not occur

X = variable from COSMO-DE(-EPS)

Page 16: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Bayes theorem

variable: TWATER (total

water content)

forecast: 00UTC + 0h

period: summer (Apr-

Sept) 2012

Page 17: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Bayes theorem

variable: TWATER (total

water content)

forecast: 00UTC + 18h

period: summer (Apr-

Sept) 2012

Page 18: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Bayes theorem

variable: DBZ_CMAX

(radar reflectivity column

maximum)

forecast: 00UTC + 12h

period: summer (Apr-

Sept) 2012

Page 19: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Bayes theorem

variable: OMEGA (vertical

velocity)

forecast: 00UTC + 0h

period: summer (Apr-

Sept) 2012

Page 20: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

LASSO –

least absolute shrinkage and selection operator

(Tibshirani 1996)

search for suitable predictors

comparison of predictors (variables (DMO) and their probabilistic products)

choose of predictors, which depict the observation best

tool: R statistic software (package glmnet + dependences)

logistic regression:

optimal for extreme values

Input/output can be probabilities

error measure: RMSE

Page 21: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

COSMO-DE-EPS

forecast: daily 03UTC + 21h

40 days in summer 2012 (22th July – 30th August)

93 variables (CAPE, CIN, T2m, TWATER, TQ, TI, …)

EPS products: mean, minimum, maximum

5 days, i.e. 8 calculations

observation: 1h radar maximum and lightning sum

radar: 16:30 – 17:25 UTC (available every 5 minutes)

lightning: 16:30 – 17:29 UTC (exact to the second)

LASSO summer 2012 (40 days)

data basis

Page 22: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

mean TWATER

maximum TQ (Graupel)

maximum radar reflectivity (maximum RR in atmospheric column)

all 3 variables are amongst the first 5 predictors for the 8 calculations

maximum TWATER in 5 out of 8 calculations within the first 5 predictors

to check: stability of predictors for longer time periods

result just shows the predictors for 8 x 5 days in summer 2012

result - predictors

LASSO summer 2012 (40 days)

Page 23: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

further research

LASSO

longer time periods statistical robustness

quantiles and probabilities as predictors

time offset

neighborhood method

different synoptical regimes (convective time scale)

generation of thunderstorm forecast product from 3 or more predictors

Page 24: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

product design

Page 25: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Objectives

To develop ensemble post-processing techniques in order to provide consistent

short-range probabilistic NWP products of convective risks across Europe,

at the highest possible NWP resolution

combination of three convection-permitting ensembles systems.

AROME-EPS (MF), COSMO-DE-EPS (DWD) and the UKV-EPS(UKMO)

Super-Ensemble Mesoscale Forecast of Convection (SESAR-JU WP11.2.1, lead Meteo France)

generation of consistent, blended probability

products for ATC

2 data phases

Summer 2012 (mid July – end August)

Spring 2014 (mid April – end June)

Page 26: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Example: combined mean radar refelectivity

Page 27: Post-processing methods for probabilistic convection ... · conversion into COSMO-DE grid adjustment possible for used lead times use of quality product QY lightning from NCM network

WWOSC 2014 Montréal, Canada Lars Wiegand, DWD 18th August 2014

Thanks for your

attention!

Comments?

Questions?