Small Exercise

• Risk

• Quality

• Scope

• Procurement

• Communication

• Time

• Integration

• Cost

• Human Resources

Page 3: Pm 4 scope

http://www.radiantminds.co.in

Small Exercise

• Defining contracts and choose the contractor to do the work

• Keeping everybody working towards the same goal and dealing with changes

• Budgeting and tracking the money you are spending

• Getting the people who will do the work and keeping them motivated

Page 4: Pm 4 scope

http://www.radiantminds.co.in

Small Exercise

• Planning for the things that could happen in +veor –ve way

• Making sure that you build the right product as effectively as possible

• Figuring out who should talk and whom to keep in loop

• Estimating how long the things will take

• Defining what needs to be done

Page 5: Pm 4 scope

http://www.radiantminds.co.in

SCOPE Management

Page 6: Pm 4 scope

http://www.radiantminds.co.in

Scope Management

• Once you know what needs to be done – exact problem statement

• You need to define the boundaries for the problem statement

• Undefined boundaries cause project to fail

• You can not accommodate all changes at all time

Page 7: Pm 4 scope

http://www.radiantminds.co.in

Scope Management

• CGW III on-line game –

– Web site got larger and larger and took almost as much time for the game itself

– Last minute story changes

– Artwork changes that cause re-write at the last-minute

– The game was over a year late

Write one line soln. to these problems

Page 8: Pm 4 scope

http://www.radiantminds.co.in

• CWG III Game – Solution

– Keep the team away from doing unnecessary work

– Plan ahead and avoid late breaking changes

– Get started on the artwork changes sooner

– Figure out what team is going to do before the start

Page 9: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Project Objective

• Product Scope Description

• Project requirements

• Project Boundaries

• Project Deliverables

• Product acceptance criteria

• Project constraints

• Project assumption

• Initial Project Organization

Page 10: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Project Objectives

– Project team must release CGW III within the next year. Project must return at least 5% revenue increase over CGW II and keep our loyal customers happy

Page 11: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Product Scope Description

– The product must contain 34 levels, 4 playable characters and must run on Mac & PC platforms

Page 12: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Project Requirements

– The product must meet it’s schedule so that it can be released at the 14th annual gaming convention in SFO. The product must meet established quality standards to be considered ready to release

Page 13: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Project Boundaries

– This project does not include web-site that will be developed by another project team

Page 14: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Project Deliverables

– Game, Design document, Contract, Test plan, Test Reports, Budget Plan, Source Code, Defect reports, Project management plan, Schedule and Change request analysis

Page 15: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Product Acceptance Criteria

– The product must not have an adverse impact on existing system.

– All defects found must be judge of low enough priority and severity to be acceptable to all stakeholders

Page 16: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Project Constraints

– Artwork from the previous games can not be used

Page 17: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Project Assumptions

– The developers will be asked to work on any other projects

Page 18: Pm 4 scope

http://www.radiantminds.co.in

Scope Statement

• Initial project organization

– This team will start with the project manager, 5 developers, 4 testers, 5 creative staff members, 1 documentation person

Page 19: Pm 4 scope

http://www.radiantminds.co.in

Exercise

Write high level WBS

for artwork and packaging

Page 20: Pm 4 scope

http://www.radiantminds.co.in

Scope Control Process

• Change Control System

– Change Request, Change control board

• Variance Analysis

• Re-planning

– Start with Updating the scope document

• Configuration Management System

Page 21: Pm 4 scope

http://www.radiantminds.co.in

Change Control Flow

1

•We need some changes

•Scope Management Plan

2

•Change analysis estimate

•Change control board

3

•Approval

•Project Management Plan & WBS

•Make A change and update Doc.