plug electric vehicle (pev) plc based...

10
Plugin Electric Vehicle (PEV) PLC based Communications Slav Berezin General Motors

Upload: others

Post on 25-Feb-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

Plug‐in Electric Vehicle (PEV)PLC based Communications

Slav BerezinGeneral Motors

Page 2: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

PEV Communications Demand

PEVHAN/EMS

Grid/Operators

EVSE(AC/DC)

Owner

PEV has become a desired communications node

Else

December 14, 2011 2Slav Berezin, General Motors

Page 3: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

PEV Side of Communications• OEMs need to control the number of potential on‐board

communication interfaces.

• Optimization and streamlining of these interfaces willsimplify choices of connecting to PEV for other parties aswell.

• Wired link is required for PEV Communications for DC Off‐board charging control and to ensure proper association withEVSE for Smart Energy support.

• Design of the SAE J1772™ Conductive Charging connectorwas targeting reduction of the coupler interface, eliminationof the need for mechanical assist, and increasing reliability(fewer pins are better).

December 14, 2011 3Slav Berezin, General Motors

Page 4: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

EVSE

System configurations (a year ago)

Home AreaNetwork(HAN)

PEV

J1772TM Cordset

PLC – SE2 only

GW

PLC

Home AreaNetwork(HAN)

EVSE

PEV

J1772TM Cordset

PLCPLCSE2 and DC Charging

GW

PLC

DC Charger

Scenario 1: AC Charging – EVSE is “passing through” Smart Energy 2.0 (SE2) Communication over J1772 cordset L1/N directly from vehicle to HAN gateway and to utility. 

Scenario 2: DC Charging with active EVSE‐‐DC charge control messages and SE2 Communications (bridged in EVSE) over J1772 cordset L1/N or P/G wires.

Logical Message Flow

J1772CordsetL1 L2

DC Charge Control

Bridge

PLC

PLC

PhysicalLinks

Mains

SE2

© 2011 Electric Power Research Institute, Inc. All rights reserved.

Complexity

PLC

Page 5: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

Potential scenario Implementations

December 14, 2011 Slav Berezin, General Motors 5© 2011 Electric Power Research Institute, Inc. All rights reserved.

Page 6: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

Road to a single PLC solution

• PLC “competitions” and preliminary tests were run by IEC/ISOand EPRI/SAE teams as well as internal studies by some OEMs.

• Major OEMs came together and agreed to come up with acommon, single PLC Communications solution (for both ACand DC Charging) for as many markets as possible.

• HomePlug GreenPHY technology on the J1772™ Control Pilotwire has been accepted as a working assumption .

December 14, 2011 6Slav Berezin, General Motors

Page 7: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

EVSE‐PEV Link Architecture*

HPGP Link Layer

J1772™ Charging cable (Pilot/GND)

Network Layer Network Layer

Transport Layer

DC Charging Application Layer

HPGP Link LayerHAN* Link Layer

Network Layer

Router

Network Layer

DC Charging Application Layer

Vehicle CAN bus“The Cloud”

CAN Link Layer

Interaction Layer

Transport Layer

* Example, not all layers are not shown

December 14, 2011 7Slav Berezin, General Motors

Page 8: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

PEV PLC‐based System Setup

Now HPGP on CP of J1772™ charging cord

PEV‐EVSE link

PLCCellular/PLC/Wi‐FiWi‐MAX/ZigBee

December 14, 2011 8Slav Berezin, General Motors

Page 9: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

< TAKE‐AWAY >• PEV‐EVSE HPGP‐over‐CP link is being developed as thecommon standard for PEV DC Charging and UtilityCommunications.

• EVSE has an important role to play completing PEV toHAN/Utility communications path redirecting andsending all relevant information bi‐directionally as abridge/gateway/router as required.

• This architecture offers much needed flexibility todayproviding HAN/PEV/Utility with necessary connectivityoptions.

December 14, 2011 9Slav Berezin, General Motors

Page 10: Plug Electric Vehicle (PEV) PLC based Communicationsmydocs.epri.com/docs/publicmeetingmaterials/1112/PDNNSH5Q3Z2/Day 2 PlugIn Electric...Road to a single PLC solution • PLC “competitions”

Thank you!

December 14, 2011 Slav Berezin, General Motors 10