Prinsip kerja dan spesifikasi PLTU Tanjung Jati BTRANSCRIPT
![Page 1: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/1.jpg)
PLTU
Adhitya Fauzan Hidayat 21060113120062Zya Jamaluddin Al-Rasyid 21060113120066Rizki Amali Husni 21060113120069Afan Risena 21060113120070Eko Satrio Danu 21060113120073Iqbal Anggiawan 21060113120095
![Page 2: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/2.jpg)
PLTU itu?
PLTU merupakan pembangkit listrik berbahan bakar batubara untuk memanaskan air murni untuk menghasilkan uap. Uap tersebut yang digunakan untuk memutar turbin.
![Page 3: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/3.jpg)
Proses Produksi Listrik dari PLTU
![Page 4: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/4.jpg)
Proses Produksi Listrik PLTU
![Page 5: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/5.jpg)
Air laut instalasi pengolahan air tawar bagian preteatment & tipe osmosis balik
tanki air murni (make up water) instalasi permunian
Hasil akhir : air tawar tanpa mineral (demineralized water)
Pengelolaan Air
![Page 6: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/6.jpg)
Circulating Water Pump memompa air laut ke sistem air pendingin, diolah menjadi air tawar di Desalination Plant. Air tawar diolah di Water Treatment Plant menjadi air denim -> kemudian dipompa untuk mengisi Boiler melalui Kondensor. Dialirkan lagi -> ke laut (open cycle)
Proses produksi air laut
![Page 7: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/7.jpg)
Kapal Coal Stockpile Coal
Silo
Ship unloader, conveyor Stacker reclaimer, conveyor
Ruang Bakar (Furnace) Coal pulverizer
Pengelolaan Batu Bara
![Page 8: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/8.jpg)
Proses produksi batu bara
•Batu bara diangkut menggunakan kapal, kemudian ditampung pada Coal Stockpile, kemudian disalurkan dan dihaluskan pada Coal Sile, dan Coal Pulvizer menuu ruang bakar untuk memanaskan Boiler.
•Bahan bakar yang digunakan pada PLTU adalah batubara dan bahan bakar minyak HSD. Minyak HSD digunakan saat start up, saat beban rendah dibawah 160MW.
![Page 9: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/9.jpg)
Proses produksi uap
•Air denim dipompa ke Deaerator Tank melalui 3 LP Heater untuk pemanasan awal.
•Air dipompa Boiler Feed Pump (BFP) ke Boiler Drum melalui 3 HP Heater dan Ekonomiser untuk pemanasan lanjut.
•Air yang menjadi uap berpisah dibagian atas Boiler Drum.
![Page 10: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/10.jpg)
•Uap basah di panaskan lanjut di Superheater menjadi uap kering
•Uap kering dipanaskan lagi di Reheater untuk memutar IP Turbin dan selanjutnya 2 buah LP Turbin untuk memutar Rotor.
•Uap buangan di embunkan kembali sehingga menjadi air di Kondensor -> dipompa ke Deareator Tank untuk siklus tertutup berikutnya.
![Page 11: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/11.jpg)
Penyaluran Energi Listrik
•Dengan berputarnya rotor turbin, generator juga ikut berputar, menghasilkan tegangan 22,8 kV -> dinaikan menggunakan trafo tenaga -> 500 kV.
![Page 12: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/12.jpg)
PLTU Tanjung Jati B
![Page 13: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/13.jpg)
PLTU TANJUNG JATI BDesa Tubanan, Kecamatan Kembang,
Kabupaten Jepara, Jawa Tengah.Nomor Surat keputusan Direksi PT. PLN
(Persero) : 171.K/010/DIR/2003 tanggal 27 Juni 2003.
Daya kotor 2 x 719 MW.Daya bersih 2 x 661 MW.
![Page 14: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/14.jpg)
Komponen pada PLTU Tanjung Jati B
![Page 15: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/15.jpg)
Boiler adalah salah satu alat penukar panas. Dalam Boiler, terjadi pembakaran bahan bakar (batubara).Konstruksi boiler terdiri dari ribuan tube (tube raiser, tube saturated, dan superheated steam)
Boiler
![Page 16: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/16.jpg)
Turbin berfungsi untuk mengubah energi potensial menjadi energi kinetik
Type Three cylinder Impulse type, Tandem Compound Reheat Condensing Turbine
Max. T-MCR 719MW Rated Output 710MW Heat rated (at ECR) 1861 kcal/kWh Steam Flow (at T-MCR) 2213.1 ton/hour Speed 3,000 rpm Steam pressure 167 bar abs Steam Temperature 538°C Reheat temp. at comb. heat vlv
538 °C
Exhaust pressure 0.0832 bar abs HP Turbine Bypass Capacity 35 % (at 176 bar)LP Turbine Bypass Capacity HP bypass steam flow + desuperheating spray water
flow
Turbin
![Page 17: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/17.jpg)
Generator
Generator adalah peralatan pengubah energi kinetik menjadi energi listrik
Type 3 phase synchronous gen. totally enclosed
Stator Wind. Cool Direct water cooled
Stator Core Cooling Hydrogen cooled
Rotor Wind. Cool. Direct hydrogen cooled
Excitation System Static excitation with thyristor rectifier
Active Power 721.8 MW
Apparent Power 802 MVA
Power Factor 0.9 (lag) - 0.95 (lead)
Voltage 22.8 kV
Speed Rotation 3,000 rpm
Frequency 50 Hz
Rated H2 Pressure 4.12 bar
![Page 18: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/18.jpg)
Ada dua jenis transformer utama, yakni step up dan step down
Rated power 786 MVA at 65°C winding temp.
Phase 3
Voltage 22.8/525 kV
Vector Groups YNd11
Cooling ODAF
Tap Changer NO-LOAD, .± 5 %, 5 steps
Transformer
![Page 19: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/19.jpg)
Kondensor berfungsi untuk mengembunkan uap air yang telah digunakan untuk memutar turbin menjadi air kondensat
Kondensasi dan Pendinginan
![Page 20: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/20.jpg)
![Page 21: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/21.jpg)
Perhitungan PLTU
![Page 22: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/22.jpg)
Perhitungan Daya PLTU
•1 hari2 x 661 x 24= 31.728 MWh
= 31,728 x 106 KWh•1 bulan (30 hari)
31,728 x 106 KWh x 30 = 951,840 x 106 KWh
•1 tahun (365 hari)31,728 x 106 KWh x 365 = 11580,72 x 106 KWh
![Page 23: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/23.jpg)
Perhitungan Kebutuhan Batubara0,7 kg batubara 1 KWh
•1 hari31,728 x 106 KWh x 0,7 = 22,2096 x 106 kg
=22.209,6 ton•1 bulan (30 hari)
22.209,6 ton x 30 = 666.288 ton •1 tahun (365 hari)
22.209,6 ton x 365 = 8.106.504 ton
![Page 24: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/24.jpg)
Perhitungan Estimasi Biaya Batubara
Dengan estimasi harga batubara sebesar 60 US$ per ton, dengan kurs 1US$=Rp 13.000
• 1 tahun (365 hari)8.106.504 ton x 60 x 13.000 = Rp 6.323.073.120.000
• Harga kotor per KWhRp 6.323.073.120.000 : 11580,72 x 106 KWh = Rp 546
Namun harga tersebut belum termasuk perhitungan rugi-rugi daya serta biaya operasional PLTU, sehingga harga ideal per KWh diatas Rp 546
![Page 25: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/25.jpg)
Distribusi daya
•dialirkan ke System Interkoneksi Jawa Bali Madura melalui:▫Sistem SUTET 500 kV, dari GIS 500 kV
Tanjung Jati -> GI 500 kV Ungaran.▫Sistem SUTT 150 kV, dari Trafo IBT
500/150 kV Tanjung Jati ke GI 150 kV Jepara.
▫Sistem 20 kV, melalui Town Feeder Trafo 15020 kV untuk Jaringan Distribusi 20 kV sekitar PLTU Tanjung Jati B.
![Page 26: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/26.jpg)
Sistem Pengendalian Lingkungan PLTU Tanjung Jati B
![Page 27: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/27.jpg)
Untuk menangkap abu yang terbang dengan kemampuan 99.3% abu terbang dapat ditangkap
Electro static precipitator (ESP)
![Page 28: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/28.jpg)
Untuk menurunkan kadar sulfur dalam gas buang menggunakan batu kapur
Flue Gas Desulphurization (FGD)
![Page 29: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/29.jpg)
Untuk menampung abu hasil pembakaran batu bara
Ash pond
![Page 30: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/30.jpg)
Wasta Water Treatment Plant (WWTP)
Untuk mengolah limbah padat dan cair
![Page 31: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/31.jpg)
Kelebihan dan Kekurang PLTU
![Page 32: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/32.jpg)
Kelebihan PLTU
•Dapat dibangun di dekat pusat beban•Mampu menghasilkan daya yang besar•Pembangunannya relatif cepat dan murah
![Page 33: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/33.jpg)
Kekurangan PLTU
•Biaya bahan bakar mahal•Proses start up lama•Dibandingkan dengan pembangkit lain,
PLTU termasuk pembangkit yang kurang ramah lingkungan
![Page 34: PLTU Tanjung Jati B](https://reader030.vdocuments.mx/reader030/viewer/2022033005/563db986550346aa9a9e2845/html5/thumbnails/34.jpg)