PLTU MALUKU 2 X 15 MW AMBON
Contract No. 144.PJ/041/DIR/2010
MINUTES OF MEETING KlCK OFF MEETING FOR PLTU MALUKU 2 X 15 MW AMBON
MINUTES REVIEWED AND AGREED
Consortium of PT. Sakti Mas Mulia-Wuhan Kaidi Electric Power Co., Ltd.-PT.
Hilmanindo Slgnintama
PLTU MALUKU 2 X 15 MW AMBON Contract No. 144.PJ/041/D1Rl2010
Venue : Meeting Room PT. PLN (Persero) KIT SULMAPA
Date : May llm, 2010 Time : 10.00 AM - finish
Issue Date : May 11'. 2010
~ o d n n T. Napltupulu Project Director
Objectives: KlCK OFF MEETING FOR PLTU MALUKU 2 X 15 MW AMBON
Minutes of Kick OR Mmting
PT. PLN (Persero) JMK
Meeting between: PT. PLN (Persero) KIT SULMAPA PT. PLN (Persero) Wilayah Maluku PT. PLN (Persero) JMK PT. PLN (Persero) JASER PT. PLN Enjiniring Consortium of PT. Sakti Mas Mulia-Wuhan Kaidi Electric Power Co., Ltd.-PT. Hilmanindo Signintama
Sutan l n d h SS II K
PT. PLN (Pepero) KIT SULMAPA
PT. PLN Enjiniring
/
Ahmad Rofik Senior Manager Pem bang kitan
PT. PLN (Persero) JASER
Joko Sutono K k" a Tim 10.000 IiIlW
PT. PLN (Persero) Wllayah Maluku
~ v o d a n S. Astawa General Manager
? PLTU MALUKU 2 X 15 MW AMBON j Contract No. 144.PJ/041/DIR/2010
Meeting was opened and led by acting General Manager PLN KIT SULMAPA and attended by:
a. PT. PLN (Persero) KIT SULMAPA b. PT. PLN (Persero) Wilayah Maluku c. PT. PLN (Persero) JMK d. PT. PLN (Persero) JASER e. PT. PLN Enjiniring f. Consortium of PT. Sakti Mas Mulia-Wuhan Kaidi Electric
Power Co., Ltd.-PT. Hilmanindo Signintama
Issue Date : May 1lth, 2010
Effective Date of Work Contract was signed on April 27'h 2010, handover of land is on May 12'~ 2010. Therefore : "Effective date of work was committed on May 12'~, 2010." The Commercial Operation Date (COD) for unit one (1) May 12'~, 2012 (24 months) and for unit two (2) July 12'~, 2012 (26 months). However incase the down payment can be realized less than ninety (90) days, the Contractor committed to complete the project propositional with advance payment.
PLTU Maluku - Ambon
CONTRACTOR
Act ion b y No
1
3
Engineering Document Approval PLN remind the Contractor to submit drawing list and submission drawing : a. Engineering Document Approval stated in document contract
Book II clause 4.3A.2 Data and Drawing Submission. b. PLN KIT SULMAPA explained that the Contractor have to submit
three (3) copies of design for approval, consists of : one (1) original of design approval for PLN KIT SULMAPA and two (2) copies of design approval for PLN-E.
c. PLN KIT SULMAPA suggested that the Contractor should arrange the regular meeting with PLN-E for design review.
I t e m
Introduction
4
Permit and License PLN KIT SULMAPA described about the permit to be managed by the Contractor as soon as possible, consisting of :
Building construction license (IMB)
Basic Communication PLN KIT SULMAPA explained Basic Communication procedure to be followed by the Contractor. Detail basic communication is attached.
Jetty Permit : location, construction, and operation. EPC Contractor requested to identify all the documentation required to manage permit which mean supporting letter from
PLN KIT SULMAPA
lnvoice and Payment Procedure PLN KIT SULMAPA explained lnvoice and Payment Procedure to be
followed by the Contractor. Detail invoice and payment procedure is attached.
CONTRACTOR
PLN KIT SULMAPA
PLN KIT SULMAPA
1 PLTU MALUKU 2 X 15 MW AMBON Contract No. 144.PJ/041/DIW2010
Reports The reports should be prepared by the Contractor consisting o f : a. Monthly Report b. Weekly Report c. Bank Report Format of Monthly Report and Weekly Report are attached. Example of Bank Report will be given later after bank already decided by PLN.
Meetings Meeting will consist of : a. Monthly Meeting b. Weekly Meeting Monthly meeting is usually held at office of PLN KIT SULMAPA in Surabaya at 4th week every month. The Contractor will be invited starting monthly meeting of May 2010. Weekly meeting is held at Site every week, led by PLN JMK.
Environmental Assessment Environtmental assessment (UKL/UPL) should be done every semester (six months). The Contractor should hire certified institution or local university (UNPATI).
PLN KIT SULMAPA
CONTRACTOR
TKDN PLN KIT SULMAPA informed : a. Coordinator team of TKDN in PLN Mr. Edy Sulistyo. b. The Contractor is requested to coordinate with consultant of
TKDN already hired by PLN (PT. Surveyor Indonesia) to calculate used of local contain.
c. PLN KIT SULMAPA will inform soon to PT. Surveyor Indonesia to start for assessment regularly of local content achieved by Contractor.
Sub VendorISub Contractor EPC Contractor is requested to proceed for Sub Vendor/Sub Contractor as follow : a. To notify to PLN KIT SULMAPA of selected of Sub vendor/Sub
Contractor, as long as there is no change of candidate as depicted to Book IV Schedule 3.11 Vendor Preference.
b. To submit for approval to PLN KIT SULMAPA i f candidate of Sub Vendor/Sub Contractor is change from Book IV Schedule 3.11 Vendor Preference.
PLN KIT SULMAPA
CONTRACTOR
Regional Tax (Pajak Galian C) PLN KIT SULMAPA remind the Contractor when selecting Sub Contractor for civil work will use quarry from local should include payment of Pajak Galian C. The selected Sub Contractor should have SlPD (Surat lzin
' Pertambangan Daerah) from local government. I
CONTRACTOR
Submitted Engineering Document List The contractor committed to submit one (1) month after receiving down payment. Submitted drawing list also indicate key date of submission, complete with required calculation.
CONTRACTOR
uo!lnq!Jls!p AY oz Bu!ls!xa IsaJeau pa~e301 aq 01 palsa88ns pue '(.xa 'alqe3 '~alu~o4sue~l 'slaued) AY 02 40 uo!le(lelsu! Ile a~eda~d plnoys ~ol3e~luo3 ayl
'(q~n lad O~ET du) eunB!~(nlu 44!Jel ~I!M 'AY oz 40 leu!wJal 3e QAY 001 Aluo s! uoqwv-nynlew nlid 40 uo!nnJlsuo3 JOJ passame aq ue3 Ja~0d ayl ley1 pawJ!juoD nynlew yeAel!M id
JaMOd UO!pnJJSUO3
QdQWlnS II)I Nld
.Bu!laaw Ma!AaA uB!sap I!elap 40 a(npay3s a~eda~d 01 pa~sanba~ s! ~ol~e~luo3 ayl
.luauAedu~op ayl Bu!h!a~a~ Jaye syluow (E) aayl eu!y3 u! play aq 01 uB!sap ~!seq JOJ pasodo~d ~ope~luo3 ayl
Ma!nau u%!saa l!ejaa pue u%!saa qse~ 40 alnpaq3~
uo!ss!wqnp BU!M~IQ pue elea Z'QE'~ asnel3 p ued (1 yoog lualua~!nbaA ~01104 plnoys paU!wqns aq 01 lualun3op Bu!~aau!Bua 40
'OTOZ aunr Apes AlaA!lelual id u!yl!~ Bu!laalu uo!leu!pJoo3 Jaye paluJoJu! aq II!M uoqwv-nynlew rind yl!~ pale!3osse A? OL 40 slualsAs
AY OL Pup M OZ 40 "J~VAS
OIOZMIWIPOITd'BPI 'ON J3e-lJu03 j. I$ . NO~MIV MMI SI x z nmwm *
9'1
BASIC COMMUNICATION AND CORRESPONDENCE ( REVISION 3) POWER PLANT CONSTRUCTION PROJECT FOR 10.000 M W
PEMBANGKITAN SULAWESI, MALUKU DAN PAPUA (PLTU GORONTALO, PLTU 2 SULUT, PLTU SULTRA, PLTU SULSEL, PLTU MALUT, PLTU 2 PAPUA)
GM PT PLN (Perrero) Proyek lnduk Pembangkit
Manejer Bidang Perencanaan
Coordinator Managernen Group
Manajer Bidang Operarl
Manajer Bidang Adrninirtrari & Keuangan
Deputi Direktur Perencanaan. Pengendalian Anggaran dan Kinerja
Deputl Direktur Akvntanri, Pajak dan Arunransi
Deputi Dorektur Pernbendaharaan
Deputi Direktur Perencanaan Sirtern
Direktur Konrtrukri Strategis
Deputi Direktur Superviri Pengadaan Konrtrukri
Deputi Direklur Superviri Konrtruksi Pernbangkit
Deputi Direktur Adrnintrtrari Konstrukli
Ketua Xm Adrninistrasi Kepabeanan
PT PLN (Perrera) Jara Enjiniringatau PLN E
General Manager
Project ream Leader
Akan diinforrnarikan J ika k o n s u l t a n Supe rv i s i d a n Konsu l t an QAIQC a d a l a h k o n s u l t a n y a n g sama,
17 HO
18 SO
CONSULTANT FOR W I Q C
19 HO
20 so
2 1 CONTRACTAM4NDEMEN TEAM
Head of ice m a k a d o k u m e n t cukup dikir im ke salah sa tu konsultan
Sile Office
Akan dt~nformarikan
Head Office
Site Ofice
Tim Evaluari Amandemen (Kerja Tambah dartfatau Kerja Kurang) pada Pembangunan Proyek Percepatan PLTU . PLN Purat
Prepared by : Sub Directorate of Treasury
PAYMENT PROCEDURE FOR IDR AND OR USD PORTION
KDIV ANG(BUDGET)
•Apply for Budget•Allocation Issuance
CONTRACTOR DIRECTOR OF OPERATION ON EAST IND
DIRECTOR OFFINANCEGM KIT SULMAPA OPERATION ON EAST IND FINANCE
•Invoice•Receipt•A/P Guarantee•Faktur Pajak
•Payment Certificate•Letter to Diropit•Contractor’s Invoice + Supporting DocumentsP j t R t
Recommendation / Verification Letter for Payment
• Budget Allocation Approved
• Payment Approval
•Progress Report •Project Report
LENDER
b. For Progress Payment(Budget Allocation is not required)
KDIV BDH
Transfer of Payment
CONTRACTOR’SBANK
Completed With :•Application for Payment Signed by Dir. Of Finance•Invoices + Supporting Documents•Payment : Once in a month, 5 or 6 working days from application received by lender Transfer of Payment
a. For Advance Payment
Prepared by : Sub Directorate of Treasury
PAYMENT PROCEDURE FOR USD PORTION
M t Li t
A. Opening L/C
2
DIROPIT
•Master List•Draft L/C•Application Letter•Schedule of Disbursement of L/C •Recommendation Letter
S h d l f Di b t f
GM KIT SULMAPA
1
2
3
CONTRACTORDIRECTOR OF
FINANCE
•Schedule of Disbursement of L/C reviewed and approved
Application for L/C
PLN’S BANKCONTRACTOR’S
46
7Drawdown Request for L/C payment
L/C opened
PLN’S BANKBANK
LENDER
5
8Loan is converted to USD and kept in Escrow Account LENDERkept in Escrow Account
Prepared by : Sub Directorate of Treasury
PAYMENT PROCEDURE FOR USD PORTION
LENDER
B. Disbursement L/C
Disbursed from PLN’s Escrow Account
No Deviation1
5 4
2
CONTRACTOR PLN’S BANK
Document Presented for Payment
CONTRACTOR’SBANK
Claim for Payment
PLN
No ev at o
Approval for Payment
3.a
3 b
Request for Confirmation
3.b
KDIV BDH GM KITSULMAPA
Confirmation
Deviation
PT PLN (PERSERO) JASA SERTlFlKASl
DIAGRAM ALUR INSPEKSI/KOMISIONING
TEST PROCEDURE 1 ENGIMEERtNG :
- Dokumen kontrak - Design enginering - Gambar konstruksi
-----
Pemyataan TOP
I REKOMENDASI
I LAlK PEMBERIAN TEGANGAN&
I PERCOBAAN BERBEBANI
LAlK SINKRON
alam keadaan bertegangan / . I Evaluasi hasil'
N Pemeriksaan & pengullan Y
I L e a c i a a n befiegangan>-1
\ berbeban ,
PT PLN (PERSERO) JASA SERTlFlKASl FLOW CHART OF
INSPECTION/ COMMISSIONING
4
I --------
lnstallatioi I I I
4 I P A - - . - - - - -
I r - - I I I I I I I I ,-----.----,-----,,LL
r - - - - - - - - - - - . - - - - - - - 1 - v ----I- -
J JASER (LMK) I 1 L
S
1 1 I
I a I I
L al a =
1 I eck docum* Y
Improvement * g 1 I 81 Approval test
procedur a 2 - I I I I I I
I Commissioning
1 I I I I I 1 I I Y
I I
mprovement r ! I 1
- Contract document 'reparation and submit - Design enginering
Test prosedure - Construction drawing
A I -Technical specification - Test report /FAT
Document FS (AMDF ' '
r
RECOMENDATION iOR ENERGIZING & LOADING TESTOR
SYNCHRON TO GRID
FLOW CHART OF REVIEW TEST PROCEDURE
Preparation and submit Test prosedure
(contractual : 3 month before test is performed)
I - --
JASER : I
1
- Test form - Acceptance criteria
Testing I---+- 7
- Supervision
kl38VUJlnN 3NOHdaNWH ANV~ W~~/NOILISO~ 3WWN I Pz
I 'ON