plant design management system.pdf plant design management system.pdf

Upload: zafar-ahmad

Post on 04-Jun-2018

260 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    1/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Plant Design And Management SystemsPlant Design And Management Systems

    PresentationPresentation

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    2/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Pdms 11.5 sp1 Review Reality 5.3

    Catview (Freeware) 11.3

    Operating System Windows 2000

    Version

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    3/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    WHY PDMSWHY PDMS??

    CONSISTENT AND RELIABLE COMPONENT DATA.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    4/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    ENSURES CORRECT GEOMETRY & CONNECTIVITY

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    5/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    AVOIDS COMPONENT INTERFERENCE

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    6/45

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    7/45

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    8/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Review Reality

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    9/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Review Reality

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    10/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Pdms Design

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    11/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Pdms Draft

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    12/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Pdms Draft

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    13/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Pdms Isodraft

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    14/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    15/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    16/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    17/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    PDMS MODULES

    11 DESIGN.DESIGN. EQUIPMENT

    PIPEWORK

    CABLE TRAYS

    HVAC

    STRUCTURAL BEAMS & COLUMNS.

    PANELS & PLATES. WALLS & FLOORS.

    ACCESS STAIRS & LADDERS

    MDS

    DESIGN TEMPLATES

    22 SPECONSPECON..

    33 PARAGON .PARAGON .

    44 LEXICON .LEXICON .

    INPUT MODULESINPUT MODULES

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    18/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    OUTPUT MODULESOUTPUT MODULES

    11 DRAFT.DRAFT.GENERAL

    DIMENSIONSLABELLING2D DRAFTINGADPADMINISTRATIONSHEET LIBRARIES.SYMBOL LIBRARIES.ISODRAFT LIBRARIES.

    LABEL LIBRARIES.AUTODRAFTSTYLE LIBRARIES.REPRESENTATION LIBRARIES.DRAWLIST LIBRARIES.TAGGING RULES.

    22 ISODRAFT .ISODRAFT .

    33 SPOOLING .SPOOLING .44 REVIEW.REVIEW.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    19/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    DESIGN

    EQUIPMENT - MODULE

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    20/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    /*

    Site

    ZoneEqui

    SUBE (Primitives)

    CYL1

    BOXRTOR

    CTOR

    DISH

    CONE

    SLSY

    SNOUNOZZ

    /STABI/STABI/EQUI-00000

    /2EA - 101

    /2EA-101/2ZA-102

    /2EA-101/N1

    WORLD

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    21/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    BOX Element (BOX)Attributes:

    Name /name

    Lock falseOwner /name

    Position E 0mm N 0mm U 0mm

    Orient Y is N and Z is U

    Obstruct 2

    Level 0 10

    Xlength 0mm

    Ylength 0mm

    Zlength 0mm

    Figure 5-6 The BOX Element

    Legal Owners: EQUI, STRU, SUBS, PTRA, SUBE, PJOI, SJOI, FITT

    Legal Members: NBOX, NCYL, NCON, NPYR, NSLC, NCTO,

    NSNO, NRTO, NDIS,NXTR, NREV, NRUL

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    22/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Cylinder Element (CYLI)Attributes:

    Name /name

    Lock falseOwner /name

    Position E 0mm N 0mm U 0mm

    Orient Y is N and Z is U

    Obstruct 2

    Level 0 10

    Diameter 0mm Diameter

    Height 0mm Axial height

    Figure 5-7 The CYLInder Element

    Legal Owners: EQUI, STRU, SUBS, PTRA, SUBE, PJOI, SJOI, FITT

    Legal Members: NBOX, NCYL, NCON, NPYR, NSLC, NCTO, NSNO, NRTO,

    NDIS, NXTR, NREV, NRUL

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    23/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    CONE ElementAttributes:

    Name /name

    Lock false

    Position E 0mm N 0mm U 0mmOrient Y is N and Z is U

    Owner /name

    Level 0 10

    Obstruct 2

    Dtop 0mm Diameter of top surface

    Dbottom 0mm Diameter of bottom surface

    Height 0mm Axial height

    Figure 5-8 The CONE Element

    Legal Owners: EQUI, STRU, SUBS, PTRA, SUBE, PJOI, SJOI, FITT

    Legal Members: NBOX, NCYL, NCON, NPYR, NSLC, NCTO, NSNO,

    NRTO, NDIS,NXTR, NREV, NRUL

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    24/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    PIPING MODULE

    WORLD

    The principal elements are Pipes and their subordinate

    Branches.

    Each Pipe can represent any portion of the overall piping

    network, while each Branch represents a single section of aPipe which runs between two, and only two, points (called the

    Branch Headand the Branch Tail).

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    25/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Checking for Design DataInconsistencies and Clash

    Check that components which

    are to be connected together arealigned on a common axis:

    Checks that components which are

    to be connected together are aligned

    in the same direction:

    Checks that components which are to be

    connected together have consistent bores:

    Checks that components which are to be

    connected together have compatible

    connection types:

    Checks that no length of

    tube is less than a

    prescribed minimum

    (which may dependon its bore)

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    26/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    DraftDraft

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    27/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Isodraft

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    28/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    29/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    30/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    31/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    32/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Administration

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    33/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    34/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FLOW CHART FOR CONCRETE MODEL IN PDMS

    Civil concrete Model is prepared based on :

    i) Frozen arrangement drawings issued for engineering.

    ii) Preliminary Foundation / Beam / Column / Pile / Pile caps whose

    preliminary maximum size / type & Locations are decided in

    consultation with Civil.

    Prepare & Issue Civil arrangement drawing to Civil for design of building / foundation

    Receipt of Civil arrangement Drawings marked with

    i) Member sizes.

    ii) Additional members required, if any, due to design of the building.

    iii) Location of members as per the design of the building.

    Update PDMS model as per above mark up drawing & clash check of the members done.

    Corrections required due to clashes are done either in locating the member to avoid clash orshifting of clashing item to clear the concrete member.

    Issue of Civil arrangement drawing from PDMS & RCC details drawings from Auto cad

    for construction.

    NOTES:-1) Sometimes if the Client is not happy with the PDMS arrangement drawings , the same

    are drawn in Autocad.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    35/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FLOWCHART FOR CIVIL STRUCTURAL MODEL IN PDMS

    Structural Members are Created in PDMS Model based on

    i) Frozen Arrangement drawings issued for Engineering.

    ii) Location & Preliminary maximum member sizes decided in

    consultation with Civil Design Department.

    Structural arrangement Drawings are Defined in PDMS & issued to Civil for Building Design.

    Receipt of Structural arrangement Drawings marked with

    i) Member sizes.

    ii) Additional members required, if any, due to design of the building.

    iii) Location of members as per the design of the building.

    Update PDMS model as per above mark up drawing & clash check of the members done.

    Corrections required due to clashes are done eitherin locating the member to avoid clash or

    shifting of clashing item to clear the structural member.

    Structural arrangement drawing (generated in PDMS) issued for Construction along with the

    detail drawing prepared in Autocad (e.g.Moment connection or shear connection detail) .

    Normally the cutouts of say 500 mm size or higher are released at this stage.

    Smaller cutouts required in grating due to pipe passing through floor or support plate

    resting on steel member are released when all thelines are released for construction.

    NOTES:-

    1) Sometimes if the Client is not happy with the PDMS arrangement drawings , the same are drawn in Autocad.

    2) In some cases the structural members are released progressively based on the engineering status.e.g a) After arrangement plans are frozen the columns & main beams are released for fabrication.

    b) After equipment drawings are approved & big bore pipes are finalised the secondary beams for equipment

    support & pipe supports are released for fabrication.

    c) The tertiary members (for grating support) & bracings are released for fabrication, when the piping is finalised for

    all isometrics.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    36/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FLOWCHART FOR EQUIPMENT MODEL IN PDMS

    Equipment modeling in PDMS. Basis are

    i) Dimensions - Equipment Data Sheet.

    ii) Location - Licensors Arrangement Plan.

    Review of PDMS model for freezing the arrangement drawing & Issue of the

    same for Detail Engineering.(Necessity of Operating Platform required if any, is checked)

    Locating the nozzles as per Piping Study. Basis are

    i) Elevation - as per equipment data sheet.

    ii) Orientation - as per Piping Study.

    Generate Nozzle Orientation sheet & Check the same for

    i) Dimensions of Equipment.

    ii) Nozzle Size, Rating, Facing.

    iii) Location of Equipment .

    Update the Equipment as per the Order Specification of the Equipment.

    Issue -

    - the Nozzle Orientation sheet for Fabrication.

    - Pipe Support clip / Platform clips / Ladder Clips for Fabrication.

    Update the Equipment as per the approved Vendor Drawing.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    37/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FLOW CHART FOR PIPING MODEL IN PDMS

    Issue XYZ BOM based

    on PIDS & Plot Plans.

    Prepare PIPING Study.

    Model the pipelines in PDMS

    as per study, including pipe

    support, check clash, consistency

    & out of spec. items & take

    corrective action if required.

    Review of Pipe line by

    Process,Instrument, PipingDept.

    Do Stress Analysis

    of Pipelines.

    Stress Analysis

    required

    Update PDMS model based

    on Stress Analysis, Review

    comments & Model Special

    Support.

    Review of Pipeline

    Update PDMS

    Model based on

    review comments.

    Update Pipelines as per

    vendor information.

    Instrument dimensions

    final P&IDs etc.

    Transfer Line list

    data by using macro

    for each

    line in PDMS.

    Issue of ISOS for

    Construction along

    with MTO for

    order updating.

    Do final Checking

    of Isometrics

    w.r.t. latest P&IDs.

    Issue of Special

    Supports Sketches

    for Construction.

    ForPipelinesrequiring

    modificationdueto

    StressAnalysis

    Stressa

    nalysis

    notreq

    uired

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    38/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FLOW CHART FOR ELECTRICAL MODEL IN PDMS

    Model Electrical cable trays / junction boxes/

    switches/fittings etc.based on the information

    received from Electrical in the form of markup on

    arrangement drawings.

    Check all Electrical items for clash &

    take corrective action if necessary.

    Issue PDMS arrangement drawings to

    Electrical for preparing the drawings in Autocad.

    Receive the final arrangement drawings from Electrical

    & update the PDMS model as per the same.Check for

    clashes & take corrective action , if required.

    Issue markup to Electrical.

    Issue the final Electrical arrangement drawings

    by Electrical based on the comments from piping.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    39/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FLOW CHART FOR INSTRUMENT MODEL IN PDMS

    Model Instrumentation cable trays /

    Junction boxes / Air headers based

    on preliminary Instrument plot plan.

    Check all Instrumentation items for

    clash and take corrective action,

    if needed.

    Issue PDMS Instrument plot plans

    for Instrumentation comments .

    Update PDMS model based on

    review comments.

    Check all Instrumentation items for clash

    and take corrective action, if needed.

    Update cable trays / Junction boxes

    /Air headers based on final

    Instrumentation plot plans.

    Whether Approved

    for construction

    drawings from

    PDMS.

    YES NO

    Update PDMS

    drawings and

    issue them as

    Approved for

    construction.

    Update PDMS

    drawings and

    issue them for

    further Autocad

    work to

    instrumentation.

    Receive Cad drawings and check

    PDMS drawings with Cad drawings

    and take necessary correctiveactions.

    Check all Instrumentation items

    for clash and take corrective

    action, if needed.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    40/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FLOW CHART FOR CATALOGUE WORK - PIPING SPEC.

    Name all Piping Items in PMS as per 7 digit naming convention

    Create categories and by using bolt macro

    Create bolts for each categories

    Those which are new in PDMS .

    Check the COCO table & take corrective action,

    if required.

    Create Pipe classe by using Catview and add all

    Categories as per PMS

    Create the bolt table and by using macro

    create bolt spe .

    Assign bolt spec.to pipe class

    Assign correct symbol key,Material

    and description for Each spec component

    Update the catalogue for Vendor info. dependent items like valves,

    Instruments, bellows etc.

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    41/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    MISCELLANEOUS MODEL

    Build all miscellaneous items like

    existing items, battery limit nozzles,roads, storm water drains, material

    handling items, hume pipes, wastewater pits, etc. as per frozen

    overall arrangement plans, underground layout, materialhandling plans, road layout.

    Check all items for clash and take

    corrective action, if needed.

    Issue drawings / review files forcomments from Process / EL / CI /

    Client / Statutory bodies

    for comments.

    Receive comments and update the

    PDMS model.

    Check all items for clash and take

    corrective action, if needed.

    Update PDMS model as per final

    drawings / information of existing

    items, battery limits, roads, storm

    water drains, material handling,

    hume pipes, waste water pit etc.

    Whether Approved

    for construction

    drawings from

    PDMS.

    YES NO

    Update PDMS

    drawings and

    issue them as

    Approved for

    construction.

    Receive Cad drawings and check

    PDMS drawings with Cad drawings

    and take necessary corrective

    actions.

    Update PDMS

    drawings and

    issue them for

    further autocad

    work .

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    42/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Progress Monitoring-Piping

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    43/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Chagaleshs Macros

    Macro is set of programs which will do repeatative Work and Save Time

    LineList Data TransferReview File CreationFitting CreationConsistency Out of spec checking etcInstruments CreationPipe Status Report etcAnd Many others Functions

    Design Utility MacroDraft Utility Macro

    Dimension Creation and Placement

    Label Creation and Placement

    And Many others Functions

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    44/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    Category , Check Print Creation & Bolting Macro

    Creation of bolts as per Ansi B16.5 and 16.47 Series A & B

    List All Categories with similar names and

    Select and copy it

    Produce Check Print

  • 8/14/2019 plant design management system.pdf plant design management system.pdf

    45/45

    2005 Chagalesh Consulting EngineersJan 30, 2005

    FEED BACK