piping rehabilitation & replacement

31
Pipe Rehabilitation & Replacement Superior Linings & Coatings Roger Baker Jim Baglier 4608 Golf Creek Drive 51194 Romeo Plank Toledo OH 43623 Macomb, MI 48042 [email protected] [email protected] 419-269-5525 810-499-9318

Upload: others

Post on 01-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Piping Rehabilitation & Replacement

Pipe Rehabilitation& Replacement

Superior Linings & CoatingsRoger Baker Jim Baglier

4608 Golf Creek Drive 51194 Romeo Plank

Toledo OH 43623 Macomb, MI 48042

[email protected] [email protected]

419-269-5525 810-499-9318

Page 2: Piping Rehabilitation & Replacement

AVG PIPE LIFE EXPECTANCY AND YEAR FAILURES BEGIN

Commercially Available <---- PIPE FAILURES BEGINPredominant Use ---→PIPE REHAB or REPLACEMENT

Avg Estm Pipe Life

100 Yrs. (Steel Pipe) Failure Begins

120 Yrs. (Hor./Vert. Cast CIP) Hor. & Vert. Cast Gray Lead/Leadite Joint CIP Failure Begins

100 Yrs. (Spun Cast CIP ended 1985) ----- ----- ----- ----- Spun Cast Gray CIP l Failure Begins

90 Yrs (Concrete Pipe) ----- ----- ----- Reinforced Conc. Pipe & Conc. Cylinder Pipe Failure Begins

75 Yrs. (AWWA Standardized CIP) ----- ----- ----- ----- ----- ----- -- Std. Gray CIP - 28% of all pipe Failure Begins

60 yrs. (Asbestos Cement -AC) ----- ----- ----- ----- ----- ----- AC Failure Begins

90 Yrs. (Polyvinylchloride - PVC) ----- ----- ----- ----- ----- ----- -- -- PVC - 23% of all pipe *Failure Begins

1955-1975 DIP not lined

80 Yrs. (Ductile Iron) Leaks from external corrosion occur anytime DIP - 28% of all pipe *Failure Begins

70 Yrs. (Polyethylene/HDPE) ----- ----- ----- ----- ----- ----- PE/HDPE (Mains) *Failure Begins

NOW

2019

19th Century

Period 1

First 1/2 20th Century

Period 2

Post WW II

(Period 3)

1800 1900 1920 1945 1965 2000

2100

1950 2010

1800 1900 1920 1945 1965 2000

*Failure is affected by pipe spec, installation, PE encasement, lining, soil corrosivity, disinfectant, temperature,

turbulance, bedding, etc.

2100

MAJOR INSTALLATION PERIODS DUE TO

POPULATION GROWTH

1960

2045

1970 2040

1800 1900 1920 1945 2010 2050

2020 2035 2050

Superior Linings & Coatings 2

Page 3: Piping Rehabilitation & Replacement

State of Technology

• PIPE REHABILITATION or REPLACEMENT REPLACEMENT:

Normally involves open cut replacement

REHABILITATION:

o Should include: Pipe Cleaning, Repair, & Preparation

Types of Rehabilitation:

o Pipe Bursting

o Slip Lining

o Inserted Hose Lining

o Cured in Place Pipe (CIPP); Bag/Sock Liners, and

o Spray in Place Pipe (SIPP), the focus of this Presentation

Superior Linings & Coatings 3

Page 4: Piping Rehabilitation & Replacement

State of SIPP Technology• SUCCESSFUL REHABILITATION REQUIRES:

PIPE CLEANING -- PIPE REPAIR -- PREPARATION

PIPE CLEANINGPIPE REPAIR PIPE REPAIR

Existing Pipe

Point Repair Using Packer Packer in pipe

Cleaned Pipe

• REQUIRED FOR IC 202 PIPE PREPARATIONS:Temp. between -20 deg F & 240 deg F and 5-degrees above the Dew Point and Rising

Superior Linings & Coatings 4

Page 5: Piping Rehabilitation & Replacement

Cost to Rehabilitate / Replace Pipe

• Over the next 20-30 years, between 0.5 Trillion ($500 Billion) to 3.5 Trillion ($3,500 Billion) will be spent in U.S. on rehabilitation and replacement of potable water lines.

• Sustaining a water distribution system requires rehabilitating/replacing between 1.5% & 2.0% of the total water line length each and every year.

• 1.5% => 75 year effective life of the system pipe; 2% => 50 year effective life of the system pipe

Superior Linings & Coatings 5

Page 6: Piping Rehabilitation & Replacement

Rehabilitation Using IC 202 Polymeric Resin Spray-In-Place Pipe (SIPP)

IC 202 Characteristics:• ANSI/NSF 61 Certified for use in potable water systems.• IC 202 resin can be applied as a barrier coating or a

structural liner.• Lining bonds to host pipe• Additional lining may be added in the future.• IC 202 resin is a fast-setting (<10 sec.), thermoset-cure

material.• Lined pipe can be put back in service after 1-hour. Mostly

cures in 4 hours.• Formulations can provide a 300% or more elastomeric

lining to a rigid structural lining, as conditions require.

Superior Linings & Coatings 6

Page 7: Piping Rehabilitation & Replacement

IC 202 Polymeric Resin, cont.

IC 202 Characteristics:

• It is an adhesive & bonds to most any surface.

• Normally used in 5-inch to unlimited size pipe.

• Chemical resistance allows IC 202 to be used to line most chemical storage tanks.

• Polymeric Resin contains 100% solids, no VOCs, and has >50-year life expectancy.

• Cost to line pipe is typically around half the cost of pipe replacement.

Superior Linings & Coatings 7

Page 8: Piping Rehabilitation & Replacement

Applicable Technical Standards

ASTM F 3182-16Application of Spray-Applied Polymeric Liners Inside Pipelines for Potable Water

AWWA C620-17Spray-Applied In-Place Lining of Water Pipelines 3-inches and Larger (as being revised).

AWWA M28As being revised, Manual of Practice M28 will include SIPP. Publication is expected to occur by the end of 2019.

NSF/ANSI 61 Product Certification for Contact with Potable Water

Superior Linings & Coatings 8

Page 9: Piping Rehabilitation & Replacement

Texaco Promotional Video

Superior Linings & Coatings 9

Page 10: Piping Rehabilitation & Replacement

Cleaning Small Pipe Using Feeder Twister (Linked Video)

Superior Linings & Coatings 10

Page 11: Piping Rehabilitation & Replacement

Cleaning Large Pipe Using Dual Head Centralizer (Linked Video)

Superior Linings & Coatings 11

Page 12: Piping Rehabilitation & Replacement

Cleaning Pipe Through Hydrant (Linked Video)

Superior Linings & Coatings 12

Page 13: Piping Rehabilitation & Replacement

Service Tap in Large Conc. Pipe (Linked Video)

Superior Linings & Coatings 13

Page 14: Piping Rehabilitation & Replacement

Service Taps

Looking into Pipe from outside Looking at tap from inside of Pipe

Robotic Grinder (if needed)

Superior Linings & Coatings 14

Page 15: Piping Rehabilitation & Replacement

Spraying 72-inch Pipe

Superior Linings & Coatings 15

Page 16: Piping Rehabilitation & Replacement

Spray Lining 24 inch Steel Pipe (Linked Video)

Superior Linings & Coatings 16

Page 17: Piping Rehabilitation & Replacement

IC 202 Burst Tests

Superior Linings & Coatings 17

Page 18: Piping Rehabilitation & Replacement

IC 202 Polymeric Resin Summary

IC 202 IS DESIGNED FOR THE SPECIFIC APPLICATION

A. Barrier Coat - For Corrosion Control; To Minimize Maintenance; & To Eliminate Water Quality Issues

B. Semi-Structural Liner – All of A. above, plus extends pipe life while providing some structural support

C. Structural Liner – A stand-alone pipe within a pipe that meets set internal pressure & external load conditions

IC 202 IS NSF 61 CERTIFIED

A. Required for Potable Water Applications

Superior Linings & Coatings 18

Page 19: Piping Rehabilitation & Replacement

Polymeric Resin, cont. SPECIAL DESIGN OF BLENDED RESIN:

• To transport liquids other than water (chemicals; that are at high temperatures; that are abrasive or corrosive)

• To provide either more or less hardness and flexibility, as needed

• Composite lining systems for special needs

• To minimize environment issues (lead, asbestos, TTHMs, PCBs, PAHs, etc.)

• To change gel rates & cure times

• To resist exposure from H2S, Chlorides, Sulfates, etc.

IC 202 IS AN IDEAL SOLUTION FOR:• Potable Water Lines & Force Mains

• Storm & Sanitary Sewers; Manholes, Concrete Structures

• Water & Wastewater Treatment Process Equipment, Tanks & Basins

• Industrial & Commercial Applications

Superior Linings & Coatings 19

Page 20: Piping Rehabilitation & Replacement

Polymeric Resin, cont.

SPECIAL FEATURES

• Short Gel Time (<10 Sec.); Offers same day back in service

• Bonds to host pipe, producing composite sidewall and leaves no annulus.

• Accommodates various pipe inside diameters & shapes.

• Taps & laterals remain open and clear after liner is installed.

• Reduces pipe rehabilitation cost

Superior Linings & Coatings 20

Page 21: Piping Rehabilitation & Replacement

Project Profiles (Time Permitting)

• Toledo 12-inch Storm Sewer Repair

• 72” Storm Drain under I-480 – Cleveland, Ohio

• 6-inch & 10-inch Water Pipe Lining; V-Dorian, Quebec

• Exxon Mobile, Singapore

Superior Linings & Coatings 21

Page 22: Piping Rehabilitation & Replacement

Toledo 12” Sewer Point Repair

Superior Linings & Coatings 22

Page 23: Piping Rehabilitation & Replacement

72-Inch Pipe Lining

PIPE UNDER I-480 in CLEVELAND, OHIO

• Robotic Spray-In-Pipe Lining – 2014

• 500 LF; 72-Inch; I-480 Conc. Storm Drain;

Power washed & Repaired before lining.

Currently in good condition.

• Self Deployed 360 deg. coverage Structural

liner (750 mils/0.75 inches)

Superior Linings & Coatings 23

Page 24: Piping Rehabilitation & Replacement

City of Vaudreuil-Dorion, QuebecRepair: Structural Rehabilitation - 2008

Location: Brouillard, Chevrier and Valois Streets,

Historic: Eight (8) leaks repaired in year prior to lining

Diameters, age and lengths :

150mm (6 in.) – 35 years - 315 meters (1050 LF)

250mm (10 in.) – 50 years - 1250 meters (4125 LF)

Pipe Material: Cast and ductile iron

Soil: Corrosive

Superior Linings & Coatings 24

Page 25: Piping Rehabilitation & Replacement

Superior Linings & Coatings 25

Page 26: Piping Rehabilitation & Replacement

Rehab 12 Seawater Cooling Lines, Exxon Mobil, Singapore 2013

Summary• We were contracted by ExxonMobil to inspect, clean, and internally apply

IC 202 on 12 seawater pipelines carrying cooling water at the Jurong Island Refinery. The specified pipe were compromised by a failing 1/8” epoxy liner, section loss, corrosion, and encrustation growth.

Pipes Lined – 12 Sections• 24” , 30”, and 36” carbon steel pipeChallenges• Constrained work environment near sensitive process equipment.

Multiple bends.Solution and Process• The pipelines were cleaned using a centralized water blasting apparatus. • IC 202 was applied to the thickness of 0.170” to meet or exceed the design

load and prevent further pipe wall deterioration. Results• The liner restored pipe integrity and arrested further wall loss.• Restoration of the pipeline with robotic centralizer cost 1/4 that of the

estimated replacement cost; Time limitations were met to accommodate critical production schedules.

Superior Linings & Coatings 26

Page 27: Piping Rehabilitation & Replacement

Exxon Mobil, Cont. – Photos -

Before Cleaning After Cleaning Before lining After Lining Lining Thickness

Superior Linings & Coatings 27

Page 28: Piping Rehabilitation & Replacement

Questions?

Thank You

Superior Linings & Coatings• Roger Baker Jim Baglier

• 4608 Golf Creek Drive 51194 Romeo Plank

• Toledo OH 43623 Macomb, MI 48042

[email protected] [email protected]

• 419-269-5525 810-499-9318

Superior Linings & Coatings 28

Page 29: Piping Rehabilitation & Replacement

New & Existing Service TapsRed is New Tap, Blue is Existing Tap

Superior Linings & Coatings 29

Page 30: Piping Rehabilitation & Replacement

Pipe Rehabilitation Stages

Existing

Cleaned

Lined

Superior Linings & Coatings 30

Page 31: Piping Rehabilitation & Replacement

VIDEO RUN TIMES

• 1-Vtac video 4:24 min./Sec

• Feeder-Twister 1:00

• Clean Lg Pipe 2:16

• Clean thru Hydrant 0:16

• Tap 24” conc Pipe 0:20

• Sprayin2 1:06

• Totals = 6 minutes + 1Vtac (9 minutes, shorten to 4 minutes)

Superior Linings & Coatings 31