CLIENT: PIPING LINE LIST By: PROJECT TITLE: Checked: PROJECT LOCATION: Approved: UNIT NUMBER: Issue Date: PROJECT NUMBER: Page: CLIENT PROJECT NUMBER: LEGEND AND GENERAL NOTES Revision: Abbreviations & Symbols GENERAL NOTES GENERAL Fluid State/Condition: Insulation Types: X-Ray Symbols (NDE Level): 1) Pressure - Temperature limitations for flanges shall L - Liquid (See PIP INEG2000 for detailed description) a) ASME B16.1 for 125 and 250 lb. cast iron flanges. M - Multiphase A - 100% Radiographic Examination. High Pressure or Severe Cyclic service. b) ASME B16.5 for all steel flange sizes & ratings u AMB - Ambient S - Solid AC - Acoustic Control High Pressure: "Service where owner specifies chapter IX for design and con c) ASME B16.47 for steel flange sizes & ratings abov ATM - Atmospheric SF - Slug Flow CC - Cold Service B - 20% Radiographic Examination. Category M Fluid Service. BAS - Basis SL - Slurry CP - Condensation Control "Can produce irreversable harm to humans when exposed to small quantit 2) °F - Degrees Fahrenheit V - Vapor FP - Fire Protection C- 5% Radiographic Examination. Outside of the rules of categories D, M, Sever °C - Degrees Celsius HC - Heat Conservation Includes Caustic a) Determination of piping design pressure and tempe GALV - Galvanized Stress Relief Basis (per ASME B31.3): PF - Freeze Protection D - 0% Radiographic Examination. Category D Fluid Service. b) Calculation of pipe wall thickness. IN - Inch A - Process Requirement PP - Personnel Protection c) Determination of piping test pressure. N/R - Not Required B - Per ASME B31.1/ASME B31.3. PS - Process Stability d) Pipe fabrication, heat treatment (when required), OPER - Operating C - Client Requirements TR - Traced (See Tracing Type) PRES - Pressure N - None Required 3) PSIG - Pounds Per Sq. Inch (Gage) Heat Tracing Types: Paint Systems: PWHT - Post Weld Heat Treatment Fluid Category (per ASME B31.3): (See PIP INEG1000 for detailed description) REL - Relief D - Category D fluid service CJ - Chilled Fluid Jacketed (See PIP CTCE1000 for detailed environment selection criteria for pipe.) 4) REV - Revision M - Category M fluid service CT - Chilled Fluid SERV - Service H - High Pressure fluid service ET - Electric STR - Stress N - Normal service HJ - Hot Fluid Jacketed Design Conditions Basis Code: 5) TEMP - Temperature HC - High Cyclical HT - Hot Fluid THK - Thickness SJ - Steam Jacketed Number designation indicates operating condition inside the following short term limits. Y/N - Yes/No Test Method: ST - Steam 1- (See PIP PNSC0021 for detailed description) P - Pneumatic Stress Analysis Level Codes: 2- S- (See PIP PNC00004 for detailed descriptio H - Hydrotest I - Visual Analysis 3- O - Other (see remarks) II - Formal Analysis III - Comprehensive Analysis Line Service Codes Letter designation indicates operating condition outside of short term limits. (See PIP PIC001 Appendix A-3) A - Relief accumulation pressure (A, A1, A2 or A3 case, see above for definition) AV - ATMOSPHERIC VENT GLR - GLYCOL RETURN PC - PROCESS CONDENSATE BA - BREATHING AIR GLS - GLYCOL SUPPLY PR - PROPYLENE REFRIGERANT B - Maximum pump suction plus normal D P (B, B1, B2 or B3 case, see above for definition) BD - BLOWDOWN H - HYDROGEN PW - PROCESS WATER BFW - BOILER FEED WATER HS - HIGH PRESSURE STEAM QO - QUENCH OIL C - Normal pump suction plus maximum D P (C, C1, C2 or C3 case, see above for definition) BRR - BRINE RETURN IA - INSTRUMENT AIR RS - RECOVERED SLOPS BRS - BRINE SUPPLY IS - INTERMEDIATE PRESSURE STEAM RV - RELIEF VENT D - Maximum pump suction, plus maximum D P (Tower OH pumps only) CC - CONTAMINABLE CONDENSATE LNG - LIQUIFIED NATURAL GAS RW - RAW WATER (D, D1, D2 or D3 case, see above for definition) LO - LUBE OIL SC - STEAM CONDENSATE CF - COLD FLARE LPG - LIQUIFIED PETROLEUM GAS SG - SYNTHESIS GAS E - Steam out conditions (E, E1, E2 or E3 case, see above for definition) CHS - CHEMICAL SEWER LS - LOW PRESSURE STEAM SO - SEAL OIL CV - COLD VENT ME - METHANOL SS - SANITARY SEWER F - Compressor maximum discharge pressure (F, F1, F2 or F3 case, see above for definition) CWR - COOLING WATER RETURN MR - MIXED REFRIGERANT STS - STORM SEWER CWS - COOLING WATER SUPPLY MS - MEDIUM PRESSURE STEAM SW - SERVICE WATER G - Operating and safety margin (G, G1, G2 or G3 case, see above for definition) DMW - DEMINERALIZED WATER N - NITROGEN SWR - SEA WATER RETURN DR - DRAIN NA - CAUSTIC SWS - SEA WATER SUPPLY H - Other (See Remarks) (H, H1, H2 or H3 case, see above for definition) DS - DILUTION STEAM NAS - CAUSTIC SEWER TWR - TEMPERED WATER RETURN DW - DRINKING WATER NG - NATURAL GAS TWS - TEMPERED WATER SUPPLY R - Auto refrigeration (R, R1, R2 or R3 case, see above for definition) ER - ETHYLENE REFRIGERANT NH - AMMONIA VC - VACUUM CONDENSATE FF - FLUSHING FLUID OWS - OILY WATER SEWER VE - VACUUM EXHAUST FG - FUEL GAS OX - OXYGEN WF - WARM FLARE FO - FUEL OIL P - GENERAL PROCESS WO - WASH OIL FW - FIRE WATER PA - PLANT AIR WW - WASTE WATER (See PIP PIC001 Appendix A-1 for additional abbreviations) Unless noted otherwise, the following shall conform to ASME B31.3 or other industry standards as applicable: When cycles in the system exceed 7000 in the life of the <150 psi, between -20 and 366 degrees Fahrenheit. Wall thicknesses for pipe in vacuum services and lines which are jacketed shall be calculated for external pressure per Note 2. All buried pipe shall be protected against corrosion in accordance with the requirements of the applicable job specification. For all transitions between above ground and below ground piping, protective coating requirements shall Short term upset, maximum of 10 hours per upset & 100 hours per year. Maximum allowable pressure overstress is 33% of design. Short term upset, maximum of 50 hours per upset & 500 hours per year. Maximum allowable pressure overstress is 20% of design. operating pressure Short term self limiting (i.e. PSV accumulation), maximum of 50 hours per upset and 500 hours per year. Maximum allowable pressure overstress is 20% of design. This case permits process to match piping design to equipment design and let the short term upset handle the accumulation.

Upload: omgmatt

Post on 03-Jan-2016

147 views

Category:

Documents


6 download

DESCRIPTION

Line List

TRANSCRIPT

Page 1: PIP Line List

CLIENT:

PIPING LINE LISTBy:

PROJECT TITLE: Checked:

PROJECT LOCATION: Approved:

UNIT NUMBER: Issue Date:

PROJECT NUMBER: Page:

CLIENT PROJECT NUMBER: LEGEND AND GENERAL NOTES Revision:

Abbreviations & Symbols GENERAL NOTES

GENERAL Fluid State/Condition: Insulation Types: X-Ray Symbols (NDE Level): 1) Pressure - Temperature limitations for flanges shall conform to the following:

(See PIP PIC001 Appendix A-1 for additional abbreviations)L - Liquid (See PIP INEG2000 for detailed description) a) ASME B16.1 for 125 and 250 lb. cast iron flanges.

M - Multiphase A - 100% Radiographic Examination. High Pressure or Severe Cyclic service. b) ASME B16.5 for all steel flange sizes & ratings up to 24 inches.AMB - Ambient S - Solid AC - Acoustic Control High Pressure: "Service where owner specifies chapter IX for design and construction." c) ASME B16.47 for steel flange sizes & ratings above 24 inchesATM - Atmospheric SF - Slug Flow CC - Cold Service B - 20% Radiographic Examination. Category M Fluid Service.BAS - Basis SL - Slurry CP - Condensation Control "Can produce irreversable harm to humans when exposed to small quantities." Client Defined. 2)

°F - Degrees Fahrenheit V - Vapor FP - Fire Protection C - 5% Radiographic Examination. Outside of the rules of categories D, M, Severe Cyclic.°C - Degrees Celsius HC - Heat Conservation Includes Caustic a) Determination of piping design pressure and temperature.

GALV - Galvanized Stress Relief Basis (per ASME B31.3): PF - Freeze Protection D - 0% Radiographic Examination. Category D Fluid Service. b) Calculation of pipe wall thickness.IN - Inch A - Process Requirement PP - Personnel Protection When cycles in the system exceed 7000 in the life of the <150 psi, between -20 and 366 degrees Fahrenheit. c) Determination of piping test pressure.

N/R - Not Required B - Per ASME B31.1/ASME B31.3. PS - Process Stability d) Pipe fabrication, heat treatment (when required), inspection, and leak testing.OPER - Operating C - Client Requirements TR - Traced (See Tracing Type)PRES - Pressure N - None Required 3)PSIG - Pounds Per Sq. Inch (Gage) Heat Tracing Types: Paint Systems:

PWHT - Post Weld Heat Treatment Fluid Category (per ASME B31.3): (See PIP INEG1000 for detailed description)REL - Relief D - Category D fluid service CJ - Chilled Fluid Jacketed (See PIP CTCE1000 for detailed environment selection criteria for pipe.) 4)REV - Revision M - Category M fluid service CT - Chilled Fluid

SERV - Service H - High Pressure fluid service ET - ElectricSTR - Stress N - Normal service HJ - Hot Fluid Jacketed Design Conditions Basis Code: 5)

TEMP - Temperature HC - High Cyclical HT - Hot FluidTHK - Thickness SJ - Steam Jacketed Number designation indicates operating condition inside the following short term limits.Y/N - Yes/No Test Method: ST - Steam 1 -

(See PIP PNSC0021 for detailed description)P - Pneumatic Stress Analysis Level Codes: 2 -

S - In Service test at normal operating pressure (See PIP PNC00004 for detailed description)H - Hydrotest I - Visual Analysis 3 -

O - Other (see remarks) II - Formal AnalysisIII - Comprehensive Analysis

Line Service Codes Letter designation indicates operating condition outside of short term limits.(See PIP PIC001 Appendix A-3) A - Relief accumulation pressure (A, A1, A2 or A3 case, see above for definition)

AV - ATMOSPHERIC VENT GLR - GLYCOL RETURN PC - PROCESS CONDENSATEBA - BREATHING AIR GLS - GLYCOL SUPPLY PR - PROPYLENE REFRIGERANT B - Maximum pump suction plus normal D P (B, B1, B2 or B3 case, see above for definition) BD - BLOWDOWN H - HYDROGEN PW - PROCESS WATER

BFW - BOILER FEED WATER HS - HIGH PRESSURE STEAM QO - QUENCH OIL C - Normal pump suction plus maximum D P (C, C1, C2 or C3 case, see above for definition)BRR - BRINE RETURN IA - INSTRUMENT AIR RS - RECOVERED SLOPSBRS - BRINE SUPPLY IS - INTERMEDIATE PRESSURE STEAM RV - RELIEF VENT D - Maximum pump suction, plus maximum D P (Tower OH pumps only)

CC -CONTAMINABLE CONDENSATE

LNG - LIQUIFIED NATURAL GAS RW - RAW WATER (D, D1, D2 or D3 case, see above for definition)LO - LUBE OIL SC - STEAM CONDENSATE

CF - COLD FLARE LPG - LIQUIFIED PETROLEUM GAS SG - SYNTHESIS GAS E - Steam out conditions (E, E1, E2 or E3 case, see above for definition)CHS - CHEMICAL SEWER LS - LOW PRESSURE STEAM SO - SEAL OIL

CV - COLD VENT ME - METHANOL SS - SANITARY SEWER F - Compressor maximum discharge pressure (F, F1, F2 or F3 case, see above for definition)CWR - COOLING WATER RETURN MR - MIXED REFRIGERANT STS - STORM SEWERCWS - COOLING WATER SUPPLY MS - MEDIUM PRESSURE STEAM SW - SERVICE WATER G - Operating and safety margin (G, G1, G2 or G3 case, see above for definition)DMW - DEMINERALIZED WATER N - NITROGEN SWR - SEA WATER RETURN

DR - DRAIN NA - CAUSTIC SWS - SEA WATER SUPPLY H - Other (See Remarks) (H, H1, H2 or H3 case, see above for definition)DS - DILUTION STEAM NAS - CAUSTIC SEWER TWR - TEMPERED WATER RETURNDW - DRINKING WATER NG - NATURAL GAS TWS - TEMPERED WATER SUPPLY R - Auto refrigeration (R, R1, R2 or R3 case, see above for definition)ER - ETHYLENE REFRIGERANT NH - AMMONIA VC - VACUUM CONDENSATEFF - FLUSHING FLUID OWS - OILY WATER SEWER VE - VACUUM EXHAUSTFG - FUEL GAS OX - OXYGEN WF - WARM FLAREFO - FUEL OIL P - GENERAL PROCESS WO - WASH OILFW - FIRE WATER PA - PLANT AIR WW - WASTE WATER

Unless noted otherwise, the following shall conform to ASME B31.3 or other industry standards as applicable:

Wall thicknesses for pipe in vacuum services and lines which are jacketed shall be calculated for external pressure per Note 2.

All buried pipe shall be protected against corrosion in accordance with the requirements of the applicable job specification.

For all transitions between above ground and below ground piping, protective coating requirements shall be maintained for 12" minimum above grade.

Short term upset, maximum of 10 hours per upset & 100 hours per year. Maximum allowable pressure overstress is 33% of design.

Short term upset, maximum of 50 hours per upset & 500 hours per year. Maximum allowable pressure overstress is 20% of design.

Short term self limiting (i.e. PSV accumulation), maximum of 50 hours per upset and 500 hours per year. Maximum allowable pressure overstress is 20% of design. This case permits process to match piping design to equipment design and let the short term upset handle the accumulation.

Page 2: PIP Line List

CLIENT:

PIPING LINE LISTBy:

PROJECT TITLE: Checked:

PROJECT LOCATION: Approved:

UNIT NUMBER: Issue Date:

PROJECT NUMBER: Page:

CLIENT PROJECT NUMBER: U.S. CUSTOMARY UNITS Revision:

UNIT/

SE

RV

ICE

CO

DE LINE LINE LINE INSULATION P&ID FLUID FLUID FROM TO SPECIFIC OPERATING FLEX DESIGN SYSTEM TEST MIN. STRESS

ND

E L

EV

EL

PA

INT

NOMINAL CORR. HEAT STRESS STRESS PRIORITY REMARKS REV.

AREA NO. SIZE CLASS NUMBER CATEGORY STATE GRAVITY CONDITIONS TEMP CONDITIONS NUMBER REQ'D RELIEF WALL ALLOW. TRACE ANALYSIS CALC PIPING NO.

NO. (SPEC) WALL (PWHT) THK. LEVEL NO.

THK. I

TYPE/ THK PRES TEMP MIN MAX PRES TEMP BASIS PRES METHOD (Y/N) BASIS II

(in) CODE (in) (psig) (°F) (°F) (°F) (psig) (°F) CODE (psig) (in) (in/sch) (in) III