![Page 1: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/1.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
Task SIS18-1:h=2 Cavity
P. Hülsmann
GSI, Gesellschaft für Schwerionenforschung mbHPlanckstraße 1D-64291 Darmstadt
EU-FP6 Kick Off Meeting, December 1 - 2, 2005
![Page 2: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/2.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
Task SIS18-1: h=2 Cavity
1) Present Status
2) Technical Description
3) Organizational Issues
4) Time Schedule
5) General Strategy for Construction
6) Cost Overview
Content
![Page 3: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/3.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
Objectives
Development of new RF accelerating cavity based on the novel magnetic alloy materials (MA-materials) for operation at harmonic number h=2 (f = 0.43 to 2.5 MHZ) to provide the necessary accelerating voltage for SIS18 injector operation with high intensity heavy ion beams in a fast operation mode with four cycles per second.
Additional InformationPresently the SIS18 rf – system operates at the fourth harmonic.At the end of the SIS18 upgrade program the harmonic number two system will replace one of the old cavities in order to enable a double harmonic rf operation with the remaining cavity.It is important to point out that the existing SIS18 rf system does not provide enough bucket area in order to accelerate intense bunches in the 4 Hz SIS12 mode.
1) Present StatusTask SIS18-1: h=2 Cavity
![Page 4: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/4.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
Boundary conditions for the h=2 rf system
• Due to the many insertions which were additionally implemented into the synchrotron ring SIS12/18 in the meantime, the available length in SIS12/18 for one cavity is very short.
• Thus, the priority objective is a cavity which has a length of not more than 2 m.
• The gap voltage requirement with space charge effects but without beam loading is 40 kV in the frequency region of 0,429-1,168 MHz.
• In order to leave a safety margin we demand a total voltage of not less than 50 kV.
• If an ordinary ferrite is used for the cavity the total length would be more than 5 m.
1) Present StatusTask SIS18-1: h=2 Cavity
![Page 5: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/5.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
2) Technical Description: The rf-systemTechnical Subsystems
CavityConsists of two independent units with two gaps eachThe two gaps of a unit are connected in parallelCavity is filled with a total of 24 magnetic alloy ring coresThe ring cores are directly cooled by silicon oil
Power amplifierOne push pull amplifier for each unitOne amplifier consists of two 300 kW RS 2042 SK tubesOne amplifier delivers 180 kW rf output power
Supply unitLow Level RF and PLC
Task SIS18-1: h=2 Cavity
Ceramic Gap
Beam Pipe
MA Ring Cores
Coupling Capacitor
RF Choke Anode voltage UA
Tetrode RS 2042 SK (300 kW)
Screen grid
Control grid
Anode
Kathode
Supply Unit IScreen Grid Voltage Supply UG2 = 1500 V
Control Grid Voltage Supply UG1 = - 210 V
Anode Voltage SupplyUA = 8,3 kV, IA = 37 A,PDC = 307 kW
Kathode Heating, 2 x 100 A, 6 kW
Coupling Capacitor
RF Choke
Anode voltage UA
Driver Amplifier2 kW
Supply Unit IIScreen Grid Voltage Supply UG2 = 1500 V
Control Grid Voltage Supply UG1 = - 210 V
Anode Voltage SupplyUA = 8,3 kV, IA = 37 A,PDC = 307 kW
Kathode Heating, 2 x 100 A, 6 kW
Low Level Control
PLC
Controls Cooling Fluid (not water)
Temperature, Fluid Flow, Pressure
Controls Cooling Fluid (not water)
Temperature, Fluid Flow, Pressure
Low Level Control
PLC
Driver Amplifier2 kW
![Page 6: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/6.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
Table 1: Geometical data to the Finemet FT-3M ring cores
Inner radius ri 150 mm
Outer radius ra 475 mm
Ring core hight h 35 mm
Surface for cooling 2 x 0,64 m2
Table 2: The cavity
Number of ceramic gaps 4
Number of ring cores per halfcavity
3
Number of ring cores in both units
24
Overall surface of all ring cores31 m2
2) Technical Description: CavityTask SIS18-1: h=2 Cavity
![Page 7: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/7.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
Personnel
Task LeaderGSI: P. Hülsmann
Posts at GSI 1 new Scientist (advertisement for post not yet completed) 1 new Engineer (contract start 01.02.2006)
108 person-months
1.12 M€ investments
3) Organisational Issues
Task SIS18-1: h=2 Cavity
![Page 8: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/8.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
4) Schedule (Description of Work)
Personnel not yet available
Task SIS18-1: h=2 Cavity
![Page 9: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/9.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
Task SIS18-1: h=2 Cavity
5) General strategy for construction
Subsystems to be purchased by industrial companies or institutesMain focus on system integration
Risks
Organisational risksStaffing (delayed hiring, adjustment to new job)Tough time schedule due to FAIR-overall planning
Technical risksExtraordinary technical requirementsReliability
![Page 10: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/10.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
6) Cost Overview
Task SIS18-1: h=2 Cavity
2005 2006 2007 2008 2009 TotalScientists 1 1 1 1 4
0 € 84.000 € 84.000 € 84.000 € 84.000 € 336.000 €Engineers 1 1 1 1 4
0 € 84.000 € 84.000 € 84.000 € 84.000 € 336.000 €Technicians 0,50 € 0,50 € 1
42.000 € 42.000 € 84.000 €Personnel 0 € 168.000 € 168.000 € 210.000 € 210.000 € 756.000 €Investment 260.000 € 820.000 € 40.000 € 1.120.000 €
GSI
No collaboration partner for this task (CERN has withdrawn its participation because of manpower problems)
Task SIS18-1: h=2 Cavity
![Page 11: Peter Hülsmann, GSI RF-Group, Email: P.Huelsmann@gsi.de, Tel: +49 6159 71 2066 Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung](https://reader036.vdocuments.mx/reader036/viewer/2022082422/56649eaa5503460f94baee12/html5/thumbnails/11.jpg)
Peter Hülsmann, GSI RF-Group, Email: [email protected], Tel: +49 6159 71 2066
SIS18 h=2 MA-Broadband-RF-System for AccelerationSIS18 h=2 MA-Broadband-RF-System for Acceleration(Duty Cycle 50% => directly cooled, 13 kW / Ring Core)(Duty Cycle 50% => directly cooled, 13 kW / Ring Core)
Parameters Continous operation
Frequency (MHz) 0,4 – 2,5
Gap-Voltage (kV) 40
Duty Cycle 50%
Total Power (kW) 600
SIS18 h=2 acceleration: cost estimatons per unit
System Additional InformationCost
s [k€]
Cavity(broadband => no bias current)
Number of MA-Cores=24,four Gaps, two are connected in parallel, no bias windings
280
Power AmplifierPRFout=360 kW, PAD=900 kW
Tube=4 x RS 2042 SK (300 kW)
300
Supply UnitUA=8,3 kV, IAmax=65 A
UG2=1,5 kV, PTh=6 kW360
Driver Amplifier 2 x 2 kW (0,4-2,5 MHz) 60LLRF 90Cabling, Accessories
30
Sum 1120
EU FP6 construction ->non-commercial, reduced price