permit applications table
TRANSCRIPT
Permit Applications Table
Permit Type Application Date Permit Action Total Facility Operating Permit October 12, 2011 001 Additional Material February 29, 2012 001
TABLE OF CONTENTS
Notice to the Permittee Permit Shield Facility Description
Table A: Limits and Other Requirements Table B: Submittals Appendix I: Insignificant Activities Appendix II: Odor Management Plan Appendix III: Modeled Parameters
NOTICE TO THE PERMITTEE: Your stationary source may be subject to the requirements of the Minnesota Pollution Control Agency’s (MPCA) solid waste, hazardous waste, and water quality programs. If you wish to obtain information on these programs, including information on obtaining any required permits, please contact the MPCA general information number at: Metro Area 651-296-6300 Outside Metro Area 1-800-657-3864 TTY 651-282-5332 The rules governing these programs are contained in Minn. R. chs. 7000-7105. Written questions may be sent to: Minnesota Pollution Control Agency, 520 Lafayette Road North, St. Paul, Minnesota 55155-4194. Questions about this air emission permit or about air quality requirements can also be directed to the telephone numbers and address listed above. PERMIT SHIELD: Subject to the limitations in Minn. R. 7007.1800, compliance with the conditions of this permit shall be deemed compliance with the specific provision of the applicable requirement identified in the permit as the basis of each condition. Subject to the limitations of Minn. R. 7007.1800 and 7017.0100, subp. 2, notwithstanding the conditions of this permit specifying compliance practices for applicable requirements, any person (including the Permittee) may also use other credible evidence to establish compliance or noncompliance with applicable requirements.
FACILITY DESCRIPTION: Hometown BioEnergy produces electricity by combusting biogas which is created onsite through anaerobic digestion. The facility has four 2-MW reciprocating engines (EU 001-EU 004) paired with generators. Each of the engines is controlled with a CO catalyst (CE 001-CE 004) which reduces carbon monoxide (CO) and hazardous air pollutants (HAPs). The anaerobic digester uses agricultural and food processing residuals for feedstock to create biogas. Hydrogen sulfide (H2S) and moisture are removed from the biogas through the use of a biofilter before being used in the engines. The exhaust heat from the engines is used to dry the solids that remain after anaerobic digestion (EU 006). The dried solids are taken off-site for use as solid fuel. The facility has a 10 MMBtu/hr propane-fired boiler (EU 005). A flare (EU 007) is maintained with a propane-fired pilot for the purpose of combusting excess biogas in the event that more biogas is created than can be used or stored onsite.
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-1
Table A contains limits and other requirements with which your facility must comply. The limits are located in the first column ofthe table (What To do). The limits can be emission limits or operational limits. This column also contains the actions that you musttake and the records you must keep to show that you are complying with the limits. The second column of Table A (Why to do it)lists the regulatory basis for these limits. Appendices included as conditions of your permit are listed in Table A under total facilityrequirements.
Subject Item: Total Facility
What to do Why to do itSOURCE-SPECIFIC REQUIREMENTS hdr
Permit Appendices: This permit contains two appendices as listed in the permitTable of Contents. The Permittee shall comply with all requirements contained inthe appendices.
Minn. R. 7007.0800, subp. 2
Application for a major permit amendment: If any GP 001 CO emission factorverification test measures at 0.88 g/hp-hr or greater, the Permittee shall submit anapplication for a major amendment. The application shall propose a reduction of the31,000 hr/yr GP 001 operating limit to a level that will limit GP 001 CO emissions tono greater than 85.0 tons per year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
This requirement is repeated under Subject Item GP 001.
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200
Application for a major permit amendment: If any GP 001 formaldehyde emissionfactor verification test measures at 0.60 lb/hr or greater, the Permittee shall submitan application for a major amendment. The application shall propose a reduction ofthe 31,000 hr/yr GP 001 operating limit to a level that will limit GP 001formaldehyde to less than 9.0 tons/year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
This requirement is repeated under Subject Item GP 001.
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200
OPERATIONAL REQUIREMENTS hdr
Circumvention: Do not install or use a device or means that conceals or dilutesemissions, which would otherwise violate a federal or state air pollution control rule,without reducing the total amount of pollutant emitted.
Minn. R. 7011.0020
Air Pollution Control Equipment: Operate all pollution control equipment wheneverthe corresponding process equipment and emission units are operated.
Minn. R. 7007.0800, subp. 2; Minn. R. 7007.0800,subp. 16(J)
Operation and Maintenance Plan: Retain at the stationary source an operation andmaintenance plan for all air pollution control equipment. At a minimum, the O & Mplan shall identify all air pollution control equipment and control practices and shallinclude a preventative maintenance program for the equipment and practices, adescription of (the minimum but not necessarily the only) corrective actions to betaken to restore the equipment and practices to proper operation to meet applicablepermit conditions, a description of the employee training program for properoperation and maintenance of the control equipment and practices, and the recordskept to demonstrate plan implementation.
Minn. R. 7007.0800, subps. 14 and 16(J)
Operation Changes: In any shutdown, breakdown, or deviation the Permittee shallimmediately take all practical steps to modify operations to reduce the emission ofany regulated air pollutant. The Commissioner may require feasible and practicalmodifications in the operation to reduce emissions of air pollutants. No emissionsunits that have an unreasonable shutdown or breakdown frequency of process orcontrol equipment shall be permitted to operate.
Minn. R. 7019.1000, subp. 4
Fugitive Emissions: Do not cause or permit the handling, use, transporting, orstorage of any material in a manner which may allow avoidable amounts ofparticulate matter to become airborne. Comply with all other requirements listed inMinn. R. 7011.0150.
Minn. R. 7011.0150
Noise: The Permittee shall comply with the noise standards set forth in Minn. R.7030.0010 to 7030.0080 at all times during the operation of any emission units.This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.
Minn. R. 7030.0010 - 7030.0080
Inspections: The Permittee shall comply with the inspection procedures andrequirements as found in Minn. R. 7007.0800, subp. 9(A).
Minn. R. 7007.0800, subp. 9(A)
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-2
The Permittee shall comply with the General Conditions listed in Minn. R.7007.0800, subp. 16.
Minn. R. 7007.0800, subp. 16
PERFORMANCE TESTING hdr
Performance Testing: Conduct all performance tests in accordance with Minn. R.ch. 7017 unless otherwise noted in Tables A, B, and/or C.
Minn. R. ch. 7017
Performance Test Notifications and Submittals:
Performance Tests are due as outlined in Table A of the permit.See Table B for additional testing requirements.
Performance Test Notification (written): due 30 days before each Performance TestPerformance Test Plan: due 30 days before each Performance TestPerformance Test Pre-test Meeting: due 7 days before each Performance TestPerformance Test Report: due 45 days after each Performance TestPerformance Test Report - Microfiche Copy: due 105 days after each PerformanceTest
The Notification, Test Plan, and Test Report may be submitted in an alternativeformat as allowed by Minn. R. 7017.2018.
Minn. R. 7017.2018; Minn. R. 7017.2030, subps. 1-4,Minn. R. 7017.2035, subps. 1-2
Limits set as a result of a performance test (conducted before or after permitissuance) apply until superseded as stated in the MPCA's Notice of Complianceletter granting preliminary approval. Preliminary approval is based on formal reviewof a subsequent performance test on the same unit as specified by Minn. R.7017.2025, subp. 3. The limit is final upon issuance of a permit amendmentincorporating the change.
Minn. R. 7017.2025, subp. 3
MONITORING REQUIREMENTS hdr
Monitoring Equipment Calibration: The Permittee shall calibrate all requiredmonitoring equipment at least once every 12 months (any requirements applying tocontinuous emission monitors are listed separately in this permit).
Minn. R. 7007.0800, subp. 4(D)
Operation of Monitoring Equipment: Unless otherwise noted in Tables A, B, and/orC, monitoring a process or control equipment connected to that process is notnecessary during periods when the process is shutdown, or during checks of themonitoring systems, such as calibration checks and zero and span adjustments. Ifmonitoring records are required, they should reflect any such periods of processshutdown or checks of the monitoring system.
Minn. R. 7007.0800, subp. 4(D)
RECORDKEEPING hdr
Recordkeeping: Retain all records at the stationary source, unless otherwisespecified within this permit, for a period of five (5) years from the date of monitoring,sample, measurement, or report. Records which must be retained at this locationinclude all calibration and maintenance records, all original recordings forcontinuous monitoring instrumentation, and copies of all reports required by thepermit. Records must conform to the requirements listed in Minn. R. 7007.0800,subp. 5(A).
Minn. R. 7007.0800, subp. 5(C)
Recordkeeping: Maintain records describing any insignificant modifications (asrequired by Minn. R. 7007.1250, subp. 3) or changes contravening permit terms (asrequired by Minn. R. 7007.1350, subp. 2), including records of the emissionsresulting from those changes.
Minn. R. 7007.0800, subp. 5(B)
If the Permittee determines that no permit amendment or notification is requiredprior to making a change, the Permittee must retain records of all calculationsrequired under Minn. R. 7007.1200. For nonexpiring permits, these records shall bekept for a period of five years from the date that the change was made. The recordsshall be kept at the stationary source for the current calendar year of operation andmay be kept at the stationary source or office of the stationary source for all otheryears. The records may be maintained in either electronic or paper format.
Minn. R. 7007.1200, subp. 4
REPORTING/SUBMITTALS hdr
Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of aplanned shutdown of any control equipment or process equipment if the shutdownwould cause any increase in the emissions of any regulated air pollutant. If theowner or operator does not have advance knowledge of the shutdown, notificationshall be made to the Commissioner as soon as possible after the shutdown.However, notification is not required in the circumstances outlined in Items A, Band C of Minn. R. 7019.1000, subp. 3.
At the time of notification, the owner or operator shall inform the Commissioner ofthe cause of the shutdown and the estimated duration. The owner or operator shallnotify the Commissioner when the shutdown is over.
Minn. R. 7019.1000, subp. 3
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-3
Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdownof more than one hour duration of any control equipment or process equipment ifthe breakdown causes any increase in the emissions of any regulated air pollutant.The 24-hour time period starts when the breakdown was discovered or reasonablyshould have been discovered by the owner or operator. However, notification is notrequired in the circumstances outlined in Items A, B and C of Minn. R. 7019.1000,subp. 2.
At the time of notification or as soon as possible thereafter, the owner or operatorshall inform the Commissioner of the cause of the breakdown and the estimatedduration. The owner or operator shall notify the Commissioner when the breakdownis over.
Minn. R. 7019.1000, subp. 2
Notification of Deviations Endangering Human Health or the Environment: As soonas possible after discovery, notify the Commissioner or the state duty officer, eitherorally or by facsimile, of any deviation from permit conditions which could endangerhuman health or the environment.
Minn. R. 7019.1000, subp. 1
Notification of Deviations Endangering Human Health or the Environment Report:Within 2 working days of discovery, notify the Commissioner in writing of anydeviation from permit conditions which could endanger human health or theenvironment. Include the following information in this written description:1. the cause of the deviation;2. the exact dates of the period of the deviation, if the deviation has been corrected;3. whether or not the deviation has been corrected;4. the anticipated time by which the deviation is expected to be corrected, if not yetcorrected; and5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of thedeviation.
Minn. R. 7019.1000, subp. 1
Application for Permit Amendment: If a permit amendment is needed, submit anapplication in accordance with the requirements of Minn. R. 7007.1150 throughMinn. R. 7007.1500. Submittal dates vary, depending on the type of amendmentneeded.
Minn. R. 7007.1150 - 7007.1500
Extension Requests: The Permittee may apply for an Administrative Amendment toextend a deadline in a permit by no more than 120 days, provided the proposeddeadline extension meets the requirements of Minn. R. 7007.1400, subp. 1(H).Performance testing deadlines from the General Provisions of 40 CFR pt. 60 andpt. 63 are examples of deadlines for which the MPCA does not have authority togrant extensions and therefore do not meet the requirements of Minn. R.7007.1400, subp. 1(H).
Minn. R. 7007.1400, subp. 1(H)
Emission Inventory Report: due on or before April 1 of each calendar year followingpermit issuance, to be submitted on a form approved by the Commissioner.
Minn. R. 7019.3000 - 7019.3100
Emission Fees: due 60 days after receipt of an MPCA bill. Minn. R. 7002.0005 - 7002.0095
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-4
Subject Item: GP 001 Generator Engines
Associated Items: EU 001 Generator Engine
EU 002 Generator Engine
EU 003 Generator Engine
EU 004 Generator Engine
What to do Why to do itEMISSION LIMITS hdr
Opacity: less than or equal to 20 percent once operating temperatures have beenattained.
Minn. R. 7011.2300, subp. 1
Sulfur Dioxide: less than or equal to 0.50 lbs/million Btu heat input . The potentialto emit from the unit is 0.21 lb/MMBtu due to equipment design and allowable fuels.
Minn. R. 7011.2300, subp. 2
Hydrogen Sulfide: less than or equal to 300 parts per million in conditioned biogas. Minn. R. 7005.0100, subp. 35a; 40 CFR 241.3; Minn.R. 7011.2300, subp. 2; Minn. Stat. Section 116.07,subds. 4a & 9; Minn. R. 7007.0100, subp. 7(A), 7(L), &7(M); Minn. R. 7007.0800, subps. 1, 2 & 4; Minn. R.7009.0010-7009.0080
Operating Hours: less than or equal to 31,000 hours/year total for the fourgenerator engines (EU 001, EU 002, EU 003, EU 004), calculated monthly by thelast day of each month. This limit may be revised through a major amendmentbased on results from CO emission factor testing required by this permit.
During the initial 12 months of operation, the applicable operating hours limit as ofmonth 'n' shall be the following:
month 1 = 2,976 hrsmonth 2 = 5,856 hrsmonth 3 = 8,832 hrsmonth 4 = 11,712 hrsmonth 5 = 14,688 hrsmonth 6 = 17,568 hrsmonth 7 = 20,544 hrsmonth 8 = 23,424 hrsmonth 9 = 26,400 hrsmonth 10 = 29,280 hrsmonth 11 = 30,140 hrsmonth 12 = 31,000 hrs
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200
OPERATING CONDITIONS hdr
Application for a major permit amendment: If any GP 001 CO emission factorverification test measures at 0.88 g/hp-hr or greater, the Permittee shall submit anapplication for a major amendment. The application shall propose a reduction of the31,000 hr/yr GP 001 operating limit to a level that will limit GP 001 CO emissions tono greater than 85.0 tons per year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200
Application for a major permit amendment: If any GP 001 formaldehyde emissionfactor verification test measures at 0.60 lb/hr or greater, the Permittee shall submitan application for a major amendment. The application shall propose a reduction ofthe 31,000 hr/yr GP 001 operating limit to a level that will limit GP 001formaldehyde to less than 9.0 tons/year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200
Fuel Usage: limited to biogas produced onsite through anaerobic digestion ofapproved feedstock material defined below.
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200;Minn. R. 7005.0100, subp. 35a
Materials authorized in this permit as feedstock:Agricultural material including: vegetable processing residuals, silage, manure,grasses, hays, snack foods, cereals, and cellulosic biomass.
40 CFR Section 241
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-5
The Permittee shall operate and maintain the catalysts (CE 001-004) any time thatany process equipment controlled by the engine catalyst is in operation. ThePermittee shall document periods of non-operation of the control equipment.See GP 002 for control equipment requirements.
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
The engines in this group (EU 001, EU 002, EU 003, EU 004) separately must beequipped with non-resettable hour meters.
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200;40 CFR Section 60.4243(a)(2)(iii)
FUEL TESTING REQUIREMENTS hdr
Initial Fuel Analysis: due 30 days after Initial Startup. Analysis of conditionedbiogas for hydrogen sulfide (H2S) following ASTM Method D-5504 and EPAMethod 18.
Fuel sample must be obtained from the fuel feed pipe to the engines. For the initialfuel analysis only: laboratory sample analysis shall performed to confirm onsitesample analysis.
Minn. R. 7007.0800, subp. 4
Fuel Analysis: due 30 days after Initial Fuel Analysis for H2S following ASTMMethod D-5504 and EPA Method 18. Fuel sample must be obtained from the fuelfeed pipe to the engines.
After a total of 12 sampling events, fuel sampling and analysis may be changed toquarterly sampling if the monthly data results are below 150 ppm.
Minn. R. 7007.0800, subp. 4
Additional Fuel Analysis for H2S when the digester feedstock makeup changes by30% or more on a dry weight basis following ASTM Method D-5504 and EPAMethod 18.
Minn. R. 7007.0800, subp. 4
PERFORMANCE TESTING hdr
Initial Performance Test: due 90 days after Initial Startup for formaldehyde. Minn. R. 7017.2020, subp. 1
Performance Test: due 180 days after Initial Performance Test to test formaldehydeemissions, not to exceed 6 months between test dates. After a total of three tests,if the average of the results are below 0.40 lb/hr, the Permittee shall notify theMPCA in writing that testing for formaldehyde will be discontinued. If the average ofthe results are above 0.40 lb/hr, the Permittee shall submit a test frequency plan tothe MPCA.
If any results are over 0.60 lb/hr the Permittee shall submit an application for amajor amendment. The application shall propose a reduction of the 31,000 hr/yr GP001 operating limit to a level that will limit GP 001 formaldehyde emissions to nogreater than 9.0 tons per year.
Minn. R. 7017.2020, subp. 1
Initial Performance Test: due 90 days after Initial Startup for arsenic Minn. R. 7017.2020, subp. 1
Performance Test: due 180 days after Initial Performance Test for arsenicemissions, not to exceed 6 months between test dates. After a total of three tests, ifthe results are negligible, the Permittee shall notify the MPCA in writing that testingfor arsenic will be discontinued.
Minn. R. 7017.2020, subp. 1
Initial Performance Test: due 90 days after Initial Startup for hydrochloric acid Minn. R. 7017.2020, subp. 1
Performance Test: due 180 days after Initial Performance Test for HCl emissions,not to exceed 6 months between test dates. After a total of three tests, if theresults are negligible, the Permittee shall notify the MPCA in writing that testing forHCl will be discontinued.
Minn. R. 7017.2020, subp. 1
RECORDKEEPING REQUIREMENTS hdr
Monthly Calculations:By the last day of the month, the Permittee shall calculate and record the following:1) Total hours of operation for the month for all emission units in GP 001.2) The 12 month rolling sum of operating hours for the previous 12 month period bysumming the monthly operating hours for the previous 12 months.
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200;Minn. R. 7007.0800, subp. 4 and 5
NSPS JJJJ REQUIREMENTS hdr
Nitrogen Oxides: less than or equal to 1.0 grams/horsepower-hour or 82 ppmvd at15% oxygen.
40 CFR Section 60.4233(e)
Carbon Monoxide: less than or equal to 2.0 grams/horsepower-hour or 270 ppmvdat 15% oxygen.
40 CFR Section 60.4233(e)
Volatile Organic Compounds: less than or equal to 0.70 grams/horsepower-hour 40 CFR Section 60.4233(e)
Air-to-fuel ratio controllers shall be used with the operation of three-waycatalysts/non-selective catalytic reduction. The AFR controller must be maintainedand operated appropriately in order to ensure proper operation of the engine andcontrol device to minimize emissions at all times.
40 CFR Section 60.4243(g)
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-6
A non-certified stationary SI internal combustion engine shall demonstratecompliance by:- keeping a maintenance plan and records of conducted maintenance- maintaining and operate the engine in a manner consistent with good air pollutioncontrol practice for minimizing emissions, to the extent practicable- conducting an initial performance test within 1 year of engine startup andconducting subsequent performance testing every 8,760 hours or 3 years,whichever comes first, thereafter.
40 CFR Section 60.4243(a)(2), 40 CFR Section60.4243(a)(2)(iii)
Initial Performance Test: due 365 days after Startup of each engine for NOx. Thisrequirement applies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 1.0g/hp-hr.
40 CFR Section 60.4243(a)(2), 40 CFR Section60.4243(a)(2)(iii)
Initial Performance Test: due 365 days after Startup of each engine for CO. Thisrequirement applies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 2.0g/hp-hr. If results are at or greater than 0.88 g/hp-hr see operating condition aboveregarding submitting a major permit amendment.
40 CFR Section 60.4243(a)(2), 40 CFR Section60.4243(a)(2)(iii)
Initial Performance Test: due 365 days after Initial Startup of each engine forVOCs. This requirement applies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 0.70g/hp-hr.
40 CFR Section 60.4243(a)(2), 40 CFR Section60.4243(a)(2)(iii)
Performance Test: due before end of each 36 months following Initial PerformanceTest or 8,760 hours of operation, whichever comes first for NOx. This requirementapplies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 1.0g/hp-hr.
40 CFR Section 60.4243(a)(2), 40 CFR Section60.4243(a)(2)(iii)
Performance Test: due before end of each 36 months following Initial PerformanceTest or 8,760 hours of operation, whichever comes first for CO. This requirementapplies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 2.0g/hp-hr. If results are at or greater than 0.88 g/hp-hr see operating condition aboveregarding submitting a major permit amendment.
40 CFR Section 60.4243(a)(2), 40 CFR Section60.4243(a)(2)(iii)
Performance Test: due before end of each 36 months following Initial PerformanceTest or 8,760 hours of operation, whichever comes first for VOCs. This requirementapplies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 0.70g/hp-hr.
40 CFR Section 60.4243(a)(2), 40 CFR Section60.4243(a)(2)(iii)
The Permittee shall keep records of the following:(1) All notifications submitted to comply with Subpart JJJJ and all documentationsupporting any notification;(2) Maintenance conducted on the engine;(3) If the engine is certified, documentation from the manufacturer that the engine iscertified to meet the emission standards and information as required in 40 CFRParts 90 and 1048; and(4) If the engine is non-certified or is certified but operating in a non-certifiedmanner and subject to 40 CFR Section 60.4243(a), documentation that the enginemeets the emission standards.
40 CFR Section 60.4245(a)
The Permittee shall follow the procedures in 40 CFR Section 60.4244(a) through (f)when conducting performance tests.
40 CFR Section 60.4244
The Permittee must submit an initial notification as required in 40 CFR Section60.7(a)(1). The notification must include the following information:1) Name and address of the Permittee;2) The address of the affected source;3) Engine information including make, model, engine family, serial number, modelyear, maximum engine power, and engine displacement;4) Emission control equipment; and5) Fuel used.
40 CFR Section 60.4245(c)
The Permittee must submit a copy of each performance test as conducted in 40CFR Section 60.4244 within 60 days after the test has been completed.
40 CFR Section 60.4245(d)
NESHAP ZZZZ REQUIREMENTS hdr
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-7
EU 001, EU 002, EU 003, EU 004 are new affected sources as defined under 40CFR pt. 63, subp. ZZZZ, and the facility is an area source as defined at 40 CFRSection 63.2. The Permittee shall meet the requirements of 40 CFR pt. 63, subp.ZZZZ by meeting the requirements of 40 CFR pt. 60, subp. JJJJ. No furtherrequirements of 40 CFR pt. 63, subp. ZZZZ apply to EU 001, EU 002, EU 003, EU004.
40 CFR Section 63.6590(c); Minn. R. 7011.8150
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-8
Subject Item: GP 002 CO Catalysts
Associated Items: CE 001 Catalytic Oxidizer
CE 002 Catalytic Oxidizer
CE 003 Catalytic Oxidizer
CE 004 Catalytic Oxidizer
What to do Why to do itEMISSION AND OPERATIONAL LIMITS hdr
The Permittee shall operate and maintain the engine catalyst any time that anyprocess equipment controlled by the engine catalyst is in operation. The Permitteeshall document periods of non-operation of the control equipment.
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for Volatile Organic Compounds: greater thanor equal to 60 percent control efficiency
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for Carbon Monoxide: greater than or equal to60 percent control efficiency
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for HAPs - Total: greater than or equal to 60percent control efficiency
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for Formaldehyde: greater than or equal to 60percent control efficiency
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
Temperature: greater than or equal to 550 degrees F and less than or equal to1250 degrees F using 3-hour Rolling Average unless a new limit is set pursuant toMinn. R. 7017.2025, subp. 3 based on the values recorded during the most recentMPCA-approved performance test where compliance was demonstrated. The newlimit shall be implemented upon receipt of the Notice of Compliance letter grantingpreliminary approval. The limit is final upon issuance of a permit amendmentincorporating the change. If the temperature is below the minimum inlettemperature limit, the CO, VOC and HAPs used during that time shall beconsidered uncontrolled until the inlet temperature is above the minimumtemperature limit. This shall be reported as a deviation.
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
MONITORING AND RECORDKEEPING hdr
Sample Analysis: due before end of each 24 months following Startup. ThePermittee shall send a representative sample of the catalyst to a laboratory to testthe catalyst's activity. If test results show a activity of less than 60%, the Permitteeshall follow the corrective actions contained in the Operation and MaintenancePlan.
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
Daily Monitoring: The Permittee shall physically verify the operation of thetemperature recording device at least once each operating day to verify that it isworking and recording properly. The Permittee shall maintain a written record of thedaily verifications.
Minn. R. 7007.0800, subps. 4 and 5
Monitoring Equipment: The Permittee shall install and maintain thermocouples formeasuring the temperatures as required by this permit. The monitoring equipmentmust be installed, in use, and properly maintained whenever the monitored controlequipment is required to be operated.
Minn. R. 7007.0800, subp. 4
The Permittee shall maintain and operate a thermocouple monitoring device thatcontinuously indicates and records both the inlet and outlet temperatures of thecatalytic oxidizer. The monitoring device shall have a margin of error less than thegreater of +/- 0.75 percent of the temperature being measured or +/- 2.5 degreesCelsius. The recording device shall also calculate the three-hour rolling averageinlet temperature.
Minn. R. 7007.0800, subps. 4 and 5
The Permittee shall maintain a continuous hard copy readout or computer disk fileof the inlet and outlet temperatures and the calculated three-hour rolling averageinlet temperature.
Title I Condition: To avoid classification as a majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200; Minn. R. 7007.0800, subps. 4 and 5
Monthly Monitoring: At least once each month during normal operation, thePermittee shall record the temperature rise across the catalyst (outlet temp. - inlettemp.) while the process is running. If it is determined that the catalyst reactivityhas been impaired, by comparison of the observed temperature rise to the pasttemperature rise records, the Permittee shall follow the corrective actions in theOperation and Maintenance Plan. The Permittee shall maintain written records ofthe monitoring and any corrective actions taken.
Minn. R. 7007.0800, subps. 4, 5, and 14
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-9
Quarterly Inspections: At least once per calendar quarter, or more frequently ifrequired by the manufacturer specifications, the Permittee shall inspect the controlequipment internal and external system components, including but not limited to therefractory, heat exchanger, and electrical systems. The Permittee shall maintain awritten record of the inspection and any corrective actions taken resulting from theinspection.
Minn. R. 7007.0800, subps. 4, 5, and 14
Annual Calibration: The Permittee shall calibrate the temperature monitor at leastannually and shall maintain a written record of the calibration and any actionresulting from the calibration.
Minn. R. 7007.0800, subps. 4, 5, and 14
For periods when the catalytic oxidizer is operated above the minimum inlettemperature, the Permittee shall use either one of the following when completingcalculations as required elsewhere in this permit:a. The overall control efficiency limit specified in this permit for this equipment(60%); orb. The overall control efficiency determined during the most recent MPCA approvedperformance test. If the tested efficiency is less than the efficiency limit in thispermit, the Permittee must use the tested value in all calculations until theefficiency is demonstrated to be above the permit limit through a new test
Title I Condition: To avoid classification as majorsource under 40 CFR Section 70.2 and Minn. R.7007.0200, Minn. R. 7007.0800, subps. 2 and 14
Corrective Actions: If the temperature is below the minimum specified by this permitor if the catalytic oxidizer or any of its components are found during the inspectionsto need repair, the Permittee shall take corrective action as soon as possible.Corrective actions shall return the temperature to at least the permitted minimumand/or include completion of necessary repairs identified during the inspection, asapplicable. Corrective actions include, but are not limited to, those outlined in the O& M Plan for the catalytic oxidizer. The Permittee shall keep a record of the typeand date of any corrective action taken.
Minn. R. 7007.0800, subps. 4, 5, and 14
The Permittee shall operate and maintain the CO Catalyst in accordance with theOperation and Maintenance (O & M) Plan. The Permittee shall keep copies of theO & M Plan available onsite for use by staff and MPCA staff.
Minn. R. 7007.0800, subp. 14
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-10
Subject Item: EU 005 Boiler
Associated Items: SV 002 Hot Water Boiler
What to do Why to do itFuels allowed: propane, by equipment design. Minn. R. 7005.0100, subp. 35a
Total Particulate Matter: less than or equal to 0.40 lbs/million Btu heat input . Thepotential to emit from the unit is 0.008 lb/MMBtu due to equipment design andallowable fuels.
Minn. R. 7011.0515, subp. 1
Opacity: less than or equal to 20 percent except for one six-minute period per hourof not more than 60 percent opacity.
Minn. R. 7011.0515, subp. 2
Recordkeeping: By the last day of each calendar month, the Permittee shall recordthe amount of propane combusted in the boiler during the previous calendar month.These records shall consist of purchase records, receipts, or fuel meter readings.
40 CFR Section 60.48c(g); Minn. R. 7011.0570
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-11
Subject Item: EU 006 Solid Fuel Drying and Prep
Associated Items: SV 003 Solid fuel drying and prep
What to do Why to do itTotal Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011.0735.
Minn. R. 7011.0715, subp. 1(A)
Opacity: less than or equal to 20 percent Minn. R. 7011.0715, subp. 1(B)
Initial Performance Test: due 365 days after Initial Startup of EU 006 to verify theVOC emission factor (this is not a test for compliance determination).
The VOC emission factor for this unit is 2.90 lbs/hr.
Minn. R. 7017.2020, subp. 1
Initial Performance Test: due 365 days after Initial Startup of EU 006 to verify thePM, PM10 and PM2.5 emission factor (this is not a test for compliancedetermination).
The PM, PM10 and PM2.5 emission factor for this unit is 0.00 lbs/hr.
Minn. R. 7017.2020, subp. 1
TABLE A: LIMITS AND OTHER REQUIREMENTSHometown BioEnergy
07900050 - 001
Facility Name:
Permit Number:
05/07/12A-12
Subject Item: EU 007 Flare
Associated Items: SV 004 Flare
What to do Why to do itOperating Hours: less than or equal to 200 hours/year using 12-month Rolling Sum. Calculated by the 15th of the month for the preceding month.
Title I Condition: To avoid major source classificationunder 40 CFR Section 70.2 and Minn. R. 7007.0200
Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011.0735.
Minn. R. 7011.0610, subp. 1(A)(1) and Minn. R.7011.0735
Opacity: less than or equal to 20 percent except for one six-minute period per hourof not more than 60 percent opacity.
Minn. R. 7011.0610, subp. 1(A)(2)
The Permittee shall keep records of hours of operation on a daily basis. Minn. R. 7007.0800, subp. 5
TABLE B: SUBMITTALSFacility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
05/07/12B-1
Also, where required by an applicable rule or permit condition, send to the Permit Document Coordinator notices of:- accumulated insignificant activities,- installation of control equipment,- replacement of an emissions unit, and- changes that contravene a permit term.
Send any application for a permit or permit amendment to:
AQ Permit Document Coordinator Industrial Division Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota 55155-4194
Unless another person is identified in the applicable Table, send all other submittals to:
AQ Compliance Tracking Coordinator Industrial Division Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota 55155-4194
Each submittal must be postmarked or received by the date specified in the applicable Table. Those submittals required by parts7007.0100 to 7007.1850 must be certified by a responsible official, defined in Minn. R. 7007.0100, subp. 21. Other submittals shallbe certified as appropriate if certification is required by an applicable rule or permit condition.
Send submittals that are required to be submitted to the U.S. EPA regional office to:
Mr. George Czerniak Air and Radiation Branch EPA Region V 77 West Jackson Boulevard Chicago, Illinois 60604
Send submittals that are required by the Acid Rain Program to:
U.S. Environmental Protection Agency Clean Air Markets Division 1200 Pennsylvania Avenue NW (6204N) Washington, D.C. 20460
Table B lists most of the submittals required by this permit. Please note that some submittal requirements may appear in Table Aor, if applicable, within a compliance schedule located in Table C. Table B is divided into two sections in order to separately listone-time only and recurrent submittal requirements.
TABLE B: RECURRENT SUBMITTALSFacility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
05/07/12B-2
What to send When to send Portion of Facility AffectedSemiannual Deviations Report due 30 days after end of each calendar
half-year following Permit Issuance. The firstsemiannual report submitted by the Permitteeshall cover the calendar half-year in which thepermit is issued. The first report of eachcalendar year covers January 1 - June 30.The second report of each calendar yearcovers July 1 - December 31. If no deviationshave occurred, the Permittee shall submit thereport stating no deviations.
Total Facility
Compliance Certification due 31 days after end of each calendar yearfollowing Permit Issuance (for the previouscalendar year). The Permittee shall submitthis to the Commissioner on a form approvedby the Commissioner. This report covers alldeviations experienced during the calendaryear.
Total Facility
APPENDIX I Facility Name: Hometown BioEnergy Permit Number: 07900050-001
Insignificant Activities and General Applicable Requirements
The permit is required to include periodic monitoring for all emissions units, including insignificant activities, per EPA guidance. The insignificant activities at this Facility are only subject to general applicable requirements.
Insignificant Activity General Applicable
Emission limit
Discussion
Fuel use: space heaters fueled by, kerosene, natural gas, or propane, less than 420,000 Btu/hr
PM < 0.6 or 0.4 lb/MMBtu, depending on year constructed Opacity < 20% with exceptions
(Minn. R. 7011.0510/515)
Based on the fuels used and EPA published emissions factors, it is highly unlikely that it could violate the applicable requirement. In addition, these types of units are typically operated and vented inside a building, so testing for PM or opacity is not feasible.
Emissions from gasoline storage tanks as defined in MInn. R. 7007.1300, subp. 3 (E)
Combined capacity less than 100,000 gallons.
Emissions from a laboratory, as defined in Minn. R. 7007.1300, subp. 3 (G)
PM, variable depending on airflow Opacity < 20%
(Minn. R. 7011.0710/715)
These are very small, intermittent, bench-top operations that typically do not even have any emissions. It is highly unlikely that they could violate the applicable requirement.
Brazing, soldering or welding equipment
PM, variable depending on airflow Opacity < 20%
(Minn. R. 7011.0710/715)
For these units, based on EPA published emissions factors, it is highly unlikely that they could violate the applicable requirement. In addition, these units are typically operated and vented inside a building, so testing for PM or opacity is not feasible.
Cleaning operations: alkaline/phosphate cleaners and associated cleaners and associated burners
PM, variable depending on airflow Opacity < 20%
(Minn. R. 7011.0610+ Minn. R. 7011.0710/715)
For these units, there are some factors available for the burners, but very little information regarding the cleaning operation itself. However, based on general knowledge of how they operate, it is highly unlikely that they could violate the applicable requirement or that testing would be feasible.
Infrequent use of spray paint equipment for routine housekeeping or plant upkeep activities not associated with primary production processes at the stationary source
PM, variable depending on airflow or process weight rate Opacity < 20%
(Minn. R. 7011.0715)
While spray equipment will have the potential to emit particulate matter, these particular activities are those not associated with production, so they would be infrequent and usually occur outdoors. Testing or monitoring is not feasible.
APPENDIX II Facility Name: Hometown BioEnergy Permit Number: 07900050-001 Best Management Practices Plan - Odor Prevention This best management practices (BMP) addresses potential odors from the planned Hometown BioEnergy anaerobic digestion facility to be located in Le Sueur, Minnesota. The plan describes the potential odor sources and the odor abatement BMPs in place to minimize the possibility of odors. MMPA intends to be a good neighbor and will be responsive to complaints raised. However, if odors from the facility occur during normal operations and the odor complaints are confirmed by the City of Le Sueur or the MPCA, Hometown BioEnergy will implement this response plan. The facility is intended to operate an average of 16 hours per day and is not expected to produce odor during normal operations.
I. Possible Sources of Odorous Emissions
Raw material receiving: The facility will receive agricultural feedstock materials daily for same day incorporation into the digester process. Feedstock receiving occurs in an enclosed area and short term, temporary storage of feedstock supply in contained indoors. The feedstock storage room is ventilated to a biofilter. Anaerobic Digestion Process and Vessels: Digestion of feedstock occurs, necessarily, in sealed vessels to capture the resulting biogas. Raw biogas is conditioned to reduce the moisture and hydrogen sulfide content. Biogas is stored in unpressurized gas vessels. Biogas conditioning upsets or over pressurization conditions will be controlled by flaring. Digester Solids Drying: The primary odor causing components in the digestate remaining after the biogas production stage are primarily volatile organic compounds (VOCs) in the form of small amounts of residual volatile fatty acids. Anaerobic digestion of volatile fatty acid conversion in the digesters will be nearly complete and most of the residual volatile fatty acids will partition to the liquid fraction during screw press separation and be transferred to the liquid by-product storage pond. Very little residual volatile fatty acids will be associated with the separated solids, which will reduce the potential for odor emissions during the drying process. Biofilter: A biofilter will be used to control odors from feedstock material receiving. The biofilter consists primarily of a bed of woodchips that provides a microbial growth support medium with sufficient residence time for the air stream to have contact with the bacteria that breakdown odor compounds. Silage storage: Hometown BioEnergy will use sweet corn silage as a primary feedstock and will store a one-year supply on site. The silage storage pile will include a soil cement pad plus a cover to contain the silage and to prevent the infiltration of precipitation. The cover will be opened as silage continues to be retrieved to supply the digestion process. Storage Ponds: Nutrient rich supernatant recovered from the dewatering process will be stored on-site in covered, lined storage ponds and seasonally applied to nearby agricultural land as a soil amendment. A portion of the liquid will be recycled and used in the feedstock pretreatment process to prepare the feedstock for digestion.
II. Odor Abatement Practices and Controls
Potential odors from facility sources, if they occur, will be controlled as described below: Raw material receiving: Normal odor control from feedstock receiving is provided enclosure and by ventilation to the biofilter. In the event of a receiving system breakdown and extended feedstock storage, the ventilation system and biofilter will continue to operate to control odor. If the ventilation or biofilter systems experience a temporary shutdown or breakdown, the feedstock continues to be enclosed to avoid odor outside of the facility.
Anaerobic Digestion Process and Vessels: Any leaks on the digesters would not allow for the production and capture of biogas; therefore, the digester would be taken off line for repair. Any biogas that needs to be vented to accommodate repairs or to reset a malfunction will be controlled by flaring. The flare is on continuous standby to control any biogas that cannot be handled along normal procedures. Digester Solids Drying: Odor emissions from solids drying may be addressed by confirming that the minimum dryer exhaust velocities are being achieved and take corrective actions if needed. Hometown BioEnergy will also assess the plant’s solids retention times (SRT) in the anaerobic digestion process and VFA levels in the separated solids, if needed, prior to the drying operation.
Biofilter: The biofilter is monitored by an O&M plan, which includes a weekly odor check and biofilter inspection if excessive odor is detected. Biofilter media is replaced if the pressure drop exceeds the recommended range.
Silage storage: If odor from silage storage is excessive, Hometown BioEnergy will inspect the silage cover to determine that the covering is effective.
Storage Ponds: The storage pond covers will be inspected regularly to avoid both the escape of odor or drainage of stormwater into the ponds. Temporary, small amounts of biogas or hydrogen sulfide production from the ponds are possible if residual solids reach the ponds, but it is not normal operation. Options for gas emissions would include routing the gas to the biogas conditioning system or the flare.
APPENDIX III Facility Name: Hometown BioEnergy Permit Number: 07900050-001 Modeled Parameters
SCREEN3 Modeling Input Scenario 1 Scenario 2
All flow to SV 001
66% of flow to SV 001
34% of flow to SV 003
Source Type Point Point Point Emission rate (g/s) 1 1 1 Stack Height (m) 15.2 15.2 15.2 Stack Inside Diameter (m) 0.9 0.9 0.9 Stack Inside Velocity (m/s) 43.7 28.9 14.9 Stack Gas Exit Temp (K) 723.7 723.7 338.2 Ambient Air Temp (K) 293 293 293 Receptor Height 0 0 0 Urban/Rural Option Rural Rural Rural Building Height (m) 12.3 12.3 12.3 Min Horiz Bldg Dim (m) 17.7 17.7 17.7 Max Horiz Bldg Dim (m) 30.5 30.5 30.5 Min Receptor Distance (m) 61 61 42.7 Max Receptor Distance (m) 1000 1000 1000
SCREEN3 Modeling Outputs
Scenario 1 Scenario 2
All flow
to SV 001 66% of Flow
to SV 001 34% of Flow
to SV 003
Total Target Levels Stack Height:
15.2 m Stack Height:
15.2 m Stack Height:
15.2 m Ambient Air Impact ug/m3 ug/m3 ug/m3 ug/m3 ug/m3 PM10 24-hr 150 2.1 1.8 2.3 4.1 PM2.5 24-hr 35 2.1 1.8 2.3 4.1 SO2 1-hr 196 41.9 36.0 47.5 83.5 NO2 1-hr * 188 69.1 59.3 78.2 137.6 CO 1-hr 35,000 151.8 130.3 171.9 302.2 CO 8-hr 10,000 106.2 91.2 120.3 211.6
*The ambient air impact for NO2 is reported as 20% less than the total NOx concentration.
Technical Support Document, Permit Action Number: 07900050-001 Page 1 of 8 Date: 5/7/2012
TECHNICAL SUPPORT DOCUMENT For
AIR EMISSION PERMIT NO. 07900050-001 This technical support document (TSD) is intended for all parties interested in the permit and to meet the requirements that have been set forth by the federal and state regulations (40 CFR § 70.7(a)(5) and Minn. R. 7007.0850, subp. 1). The purpose of this document is to provide the legal and factual justification for each applicable requirement or policy decision considered in the preliminary determination to issue the permit.
1. General Information
1.1 Applicant and Stationary Source Location:
Table 1. Applicant and Source Address
Applicant/Address Stationary Source/Address (SIC Code: 4931)
Hometown BioEnergy LLC 200 South Sixth Street, Suite 300 Minneapolis, MN 55402
Hometown BioEnergy LLC State Highway 112 & County Road 115 Le Sueur, Le Sueur County
Contact: Kelsey Dahlen Phone: 612-349-6868
1.2 Facility Description
Hometown BioEnergy is designed to produce electricity by combusting biogas that has been created onsite through anaerobic digestion. The facility will have four 2-MW reciprocating engines (EU 001- EU 004) paired with generators. Each of the engines will be controlled with a CO catalyst (CE 001 – CE 004) which will reduce carbon monoxide (CO) and hazardous air pollutants (HAPs). The anaerobic digester will use agricultural and food processing residuals as feedstock to create biogas. Hydrogen sulfide (H2S) and moisture will be removed from the biogas through the use of a biofilter before being used in the engines. The exhaust heat from the engines will be used to dry the solids that remain after anaerobic digestion (EU 006). The dried solids will be taken off-site for use as solid fuel.
The facility will have a 10 MMBtu/hr propane-fired boiler (EU 005). A flare (EU 007) will be maintained with a propane-fired pilot for the purpose of combusting excess biogas in the event that more biogas is created than can be used or stored onsite.
1.3 Description of any Changes Allowed with this Permit Issuance
This is a first-time total facility permit.
Technical Support Document, Permit Action Number: 07900050-001 Page 2 of 8 Date: 5/7/2012
1.4 Facility Emissions:
Table 2. Total Facility Potential to Emit Summary
PM tpy
PM10 Tpy
PM2.5
tpy SO2 tpy
NOx tpy
CO tpy
CO2e Tpy
VOC tpy
SingleHAP tpy
All HAPstpy
Total Facility Limited Potential Emissions
17.0 6.0 4.0 8.5 55.3 89.2 44,399 21.0 6.1 8.9
Total Facility Actual Emissions
NA NA NA NA NA NA * NA *
*Not reported in MN emission inventory.
Table 3. Facility Classification
Classification Major/Affected Source
Synthetic Minor/Area Minor/Area
PSD x
Part 70 Permit Program x
Part 63 NESHAP x
2. Regulatory and/or Statutory Basis
New Source Review
The facility is a minor source under New Source Review regulations.
Part 70 Permit Program
The facility has accepted limits to be classified as a minor source under the Part 70 permit program.
New Source Performance Standards (NSPS)
EU 001-EU 004 are subject to 40 CFR Part 60 Subpart JJJJ - Standards of Performance for Stationary Spark Ignition Internal Combustion Engines.
EU 005 is subject to 40 CFR Part 60 Subpart Dc—Standards of Performance for Small Industrial-Commercial-Institutional Steam Generating Units.
National Emission Standards for Hazardous Air Pollutants (NESHAP)
EU 001-EU 004 are subject to 40 CFR Part 63 Subpart ZZZZ - National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines. The conditions of Subpart ZZZZ are met through complying with 40 CFR Part 60 Subpart JJJJ - Standards of Performance for Stationary Spark Ignition Internal Combustion Engines.
Technical Support Document, Permit Action Number: 07900050-001 Page 3 of 8 Date: 5/7/2012
Compliance Assurance Monitoring (CAM)
This facility is not subject to CAM because it is minor for Part 70.
Environmental Review & AERA
The facility is voluntarily conducting an Environmental Assessment Worksheet (EAW).
Minnesota State Rules
Portions of the facility are subject to the following Minnesota Standards of Performance:
• Minn. R. 7011.0515 Standards of Performance for New Indirect Heating Equipment • Minn. R. 7011.0610 Standards of Performance for Fossil-Fuel-Burning Direct Heating Equipment • Minn. R. 7011.0715 Standards of Performance for Post-1969 Industrial Process Equipment • Minn. R. 7011.2300 Standards of Performance for Stationary Internal Combustion Engines
Table 4. Regulatory Overview of Facility
Level* Applicable Regulations Comments:
GP 001
Title I Condition: To avoid major source classification under 40 CFR § 70.2 and Minn. R. 7007.0200
Annual operating hour limit to prevent CO emissions from exceeding the Part 70 emissions threshold.
Minn. R. 7011.2300 Standards of Performance for Stationary Internal Combustion Engines. Limits for opacity and SO2
40 CFR Part 241 Solid Wastes Used as Fuels or Ingredients in Combustion Units. Requirements to ensure the biogas is classified as fuel and not solid waste.
40 CFR pt. 60, subp. JJJJ Standards of Performance for Stationary Spark Ignition Internal Combustion Engines. Determination of applicable limits from rule:
• The units are manufactured post-2011
• Maximum engine power is ≥ 1,350 HP
• The fuel is limited to biogas and closest to natural gas in composition.
40 CFR pt. 63, subp. ZZZZ National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines (RICE). Determination of applicable limits from rule:
• The engines are new stationary RICE located at an area source.
Technical Support Document, Permit Action Number: 07900050-001 Page 4 of 8 Date: 5/7/2012
Level* Applicable Regulations Comments:
EU 005 Minn. R. 7011.0515 Standards of Performance for New Indirect Heating Equipment. Determination of applicable limits from rule:
• This facility is located outside Minneapolis-St. Paul and Duluth
• This unit does not combust solid fuel.
40 CFR pt. 60, subp. Dc Standards of Performance for Small Industrial-Commercial-Institutional Steam Generating Units. Determination of applicable limits from rule:
• The unit combusts only natural gas as defined in 40 CFR pt. 60, subp. Dc
EU 006 Minn. R. 7011.0715 Standards of Performance for Post-1969 Industrial Process Equipment. Limits for PM and opacity.
EU 007
Title I Condition: To avoid major source classification under 40 CFR § 70.2 and Minn. R. 7007.0200
Annual operating hours limit to prevent exceeding the Part 70 emissions threshold.
Minn. R. 7011.0610 Standards of Performance for Fossil-Fuel-Burning Direct Heating Equipment. Determination of applicable limits from rule:
• This facility is located outside Minneapolis-St. Paul and Duluth
• This unit does not combust solid fuel.
*Where the requirement appears in the permit (e.g., EU, SV, GP, etc.).
3. Technical Information
SCREEN3
Attachment 2 to this TSD contains details of SCREEN3 analysis of National Ambient Air Quality Standards (NAAQS). Both operating options were evaluated with SCREEN3; based on the results of the SCREEN3 model, none of the NAAQS would be exceeded from this project. Modeling parameters are listed in Appendix I to the permit.
40 CFR 241 – Solid Wastes Used as Fuels or Ingredients in Combustion Units
The facility is required to demonstrate compliance with 40 CFR 241 because biogas is being combusted at the facility and not a “traditional fuel.” The biogas must contain contaminants at levels comparable in concentration or lower than those in traditional fuels which the combustion unit is designed to burn (natural gas). The facility has chosen to demonstrate this by testing the biogas for H2S and other possible contaminants.
Hydrogen Sulfide Sampling
Technical Support Document, Permit Action Number: 07900050-001 Page 5 of 8 Date: 5/7/2012
The facility will conduct monthly sampling of the biogas from the fuel feed pipe to the engines for H2S following ASTM Method D-5504 and EPA Method 18. This method of sampling is suggested as a sampling requirement in an EPA letter dated January 30, 2012 (Attachment 3) to Riverview LLC, a facility that operates engines combusting digester gas. The letter allows that monthly sampling can be relaxed to quarterly sampling if sample results show little variability in the fuel. The facility will have a laboratory with the capability to perform sample analysis onsite. The initial fuel analysis will be analyzed by the onsite laboratory and confirmed by third-party laboratory analysis.
Odor Management
Feedstock, other than silage, will be received in an enclosed building. The feedstock trucks will unload in the enclosed receiving area and be rinsed to ensure all feedstock enters the process. The unloading area will be operated under negative pressure. The air from the receiving area will be routed to a biofilter. The Operation and Maintenance (O&M) Plan for the biofilter is included as Attachment 4 to this TSD. The facility will follow the Odor Management Plan which is Appendix II to the permit.
3.1 Calculations of Potential to Emit
Attachment 1 to this TSD contains a detailed spreadsheet with calculations and a summary of the PTE of the Facility that was prepared by the MPCA and the Permittee.
3.2 Periodic Monitoring
In accordance with the Clean Air Act, it is the responsibility of the owner or operator of a facility to have sufficient knowledge of the facility to certify that the facility is in compliance with all applicable requirements.
In evaluating the monitoring included in the permit, the MPCA considered the following:
• The likelihood of the facility violating the applicable requirements; • Whether add-on controls are necessary to meet the emission limits; • The variability of emissions over time; • The type of monitoring, process, maintenance, or control equipment data already available for
the emission unit; • The technical and economic feasibility of possible periodic monitoring methods; and • The kind of monitoring found on similar units elsewhere.
Table 5 summarizes the periodic monitoring requirements for those emission units for which the monitoring required by the applicable requirement is nonexistent or inadequate.
Technical Support Document, Permit Action Number: 07900050-001 Page 6 of 8 Date: 5/7/2012
Table 5. Periodic Monitoring
Level* Requirement (basis) Additional Monitoring Discussion GP 001 (Engines)
Annual operation ≤ 31,000 hrs/year (Title I limit to avoid Part 70) SO2 ≤ 0.50 lb/mmBtu (Minn. R. 7011.2300) H2S ≤ 300 ppm in fuel 40 CFR 241 CO ≤ 2.0 g/hp-hr (NSPS Subpart JJJJ) NOx ≤ 1.0 g/hp-hr (NSPS Subpart JJJJ) VOC ≤ 0.70 g/hp-hr (NSPS Subpart JJJJ)
Recordkeeping: Daily records of operating time; monthly calculations of rolling sum. Monthly fuel sample for H2S. Monthly fuel sample for H2S. Performance testing for CO every 8,760 hours of operation. Performance test for NOx every 8,760 hours of operation Performance test for VOCs every 8,760 hours of operation
The annual operation limit is the combined operating time of all four engines. Limit on H2S to demonstrate that the biogas does not contain contaminants in a concentration greater than the traditional fuel the unit is capable of combusting.The limits from NSPS Subpart JJJJ are for engines burning natural gas. Because the composition of biogas is similar to natural gas, it is reasonable to use the limits for units combusting natural gas.
GP 002
(CO Catalyst)
CO: Control Efficiency ≥ 60%
VOC: Control Eff. ≥ 60%
HAPs: Control Eff. ≥ 60%
Formaldehyde: Control Eff. ≥ 60%
Temperature: ≥ 550 degrees F and ≤ 1250 degrees F
(Title I to avoid Part 70)
Daily recordkeeping of temperature, periodic inspection and catalysis activity analysis.
EU 005
(Hot Water Boiler)
PM: < 0.40 lb/MMBtu
Opacity: < 20 % with exceptions
(Minn. R. 7011.0515)
None The PTE for this equipment design and allowable fuel is 0.008 lb/MMBtu, significantly lower than the limit.
EU 006
(Solid Fuel Drying)
PM: < 0.30 grains/dscf
(Minn. R. 7011.0715)
One-time performance test to verify emission factor for PM and VOCs.
Based on the PTE for this equipment it is highly unlikely that the limit will be exceeded.
Technical Support Document, Permit Action Number: 07900050-001 Page 7 of 8 Date: 5/7/2012
Level* Requirement (basis) Additional Monitoring Discussion
EU 007
(Flare)
Operation < 200 hrs/yr on a 12-month rolling sum
(Title I to avoid Part 70)
PM: < 0.30 grains/dscf
Opacity: < 20 % with exceptions
(Minn. R. 7011.0610)
Daily recordkeeping, monthly calculations for 12 month rolling sum.
Based on the PTE for this equipment it is highly unlikely that the limit will be exceeded.
*Where the requirement appears in the permit (e.g., EU, SV, GP, etc.).
3.3 Insignificant Activities
Hometown BioEnergy has several operations which are classified as insignificant activities under the MPCA’s permitting rules. These are listed in Appendix I to the permit.
3.4 Permit Organization
In general, the permit meets the MPCA Delta Guidance for ordering and grouping of requirements. One area where this permit deviates slightly from Delta guidance is in the use of appendices. While appendices are fully enforceable parts of the permit, in general, any requirement that the MPCA thinks should be electronically tracked (e.g., limits, submittals, etc.), should be in Table A or B of the permit. The main reason is that the appendices are word processing sections and are not part of the electronic tracking system. Violation of the appendices can be enforced, but the computer system will not automatically generate the necessary enforcement notices or documents. Staff must generate these
3.5 Comments Received Public Notice Period: February 23, 2012 – March 24, 2012
Comments were received from the public during the public notice period. Six comment letters were received and are included as Attachment 7 to this document. The MPCA’s response to comments are included as Attachment 8 to this document. The comments resulted in changes to the permit. One requirement was split into two requirements for clarity; requirements were added to EU 006 to test for VOC and PM to confirm the emission factor used in the calculations; and the points calculation for additional fees was corrected.
4. Permit Fee Assessment
This permit action is the issuance of an individual State Permit based on an application received October 12, 2011. Attachment 6 to this TSD contains the MPCA’s assessment of Application and Additional Points used to determine the permit application fee for this permit action as required by Minn. R. 7002.0019. The permit action includes limits to avoid Part 70, two NSPSs, one NESHAP, and the EAW for which additional points apply.
Technical Support Document, Permit Action Number: 07900050-001 Page 8 of 8 Date: 5/7/2012
5. Conclusion
Based on the information provided by Hometown BioEnergy, the MPCA has reasonable assurance that the proposed operation of the emission facility, as described in the Air Emission Permit No. 07900050-001 and this TSD, will not cause or contribute to a violation of applicable federal regulations and Minnesota Rules.
Staff Members on Permit Team: Adriane Lenshek (permit writer/engineer) Jennifer Carlson (enforcement) Jim Kohler (stack testing) Jeff Hedman (peer reviewer)
AQ File No. 4494; DQ 3698 Attachments: 1. PTE Summary and Calculation Spreadsheets
2. SCREEN3 3. EPA Letter to Riverview LLC 4. Biofilter O&M Plan 5. Facility Description and CD-01 Forms 6. Points Calculator 7. Public Comments 8. Response to Comments
Hom
etow
n Bi
oEne
rgy
Emis
sion
Inve
ntor
y Se
ptem
ber
2011
Tabl
e A
- 1
Hom
etow
n B
ioEn
ergy
Air
Emis
sion
Inve
ntor
yJa
nuar
y 2
012
Sta
ckV
ent
Em
issi
onFa
ctor
(per
Con
trol
Effi
cien
cy
Flow
thro
ugh
SV
001
Not
esID
IDD
escr
iptio
n(u
nits
/hr)
(uni
ts/y
r)U
nits
(lb/U
nit)
(lb/h
r)(to
n/yr
)(%
)lb
/hr
ton/
yr(lb
/hr)
(ton/
yr)
(%)
PM
2,82
6--
-hp
0.00
007
0.75
3.3
-0.
753.
30.
752.
966
[1],
[2],
[3]
PM
102,
826
---
hp0.
0000
70.
753.
3-
0.75
3.3
0.75
2.9
66[1
], [2
], [3
]
PM
2.5
2,82
6--
-hp
0.00
007
0.75
3.3
-0.
753.
30.
752.
966
[1],[
2],[3
],[19
]
SO
22,
826
---
hp0.
0017
820
.18
88.4
902.
028.
82.
027.
866
[1],
[2],
[3]
NO
x2,
826
---
hp0.
0011
012
.46
54.6
-12
.46
54.6
12.4
648
.366
[1],
[2],
[3]
VO
C2,
826
---
hp0.
0005
15.
7325
.160
2.29
10.0
2.29
8.9
66[1
], [2
], [3
], [4
]
CO
2,82
6--
-hp
0.00
4954
.83
240.
160
21.9
396
.121
.93
85.0
66[1
], [2
], [3
], [4
]
mm
btu
1.90
576
CO
2 (G
HG
in k
g/M
MB
tu)
---
---
---
---
---
---
---
103.
3745
2.8
103.
3740
0.6
66[2
1]
CO
2(G
HG
in k
g/M
MB
tu)
18.4
416
1,53
4M
MB
tu52
.07
3840
.733
644.
4-
3,84
0.7
33,6
44.4
3840
.729
765.
366
[2],
[3],
[5]
CH
4(G
HG
in k
g/M
MB
tu)
18.4
416
1,53
4M
MB
tu0.
6850
.42
441.
6-
50.4
441.
650
.42
390.
766
[1],
[2],
[3]
N2O
(GH
G in
kg/
MM
Btu
)18
.44
161,
534
MM
Btu
0.00
063
0.05
0.4
-0.
00.
40.
050.
466
[2],
[3],
[6]
CO
2e(G
HG
in k
g/M
MB
tu)
18.4
416
1,53
4M
MB
tu66
.62
4913
.843
045.
1-
4,91
3.8
43,0
45.1
4913
.838
082.
166
[3],
[7],
[8]
Hig
hest
Sin
gle
HA
P
(For
mal
dehy
de)
18.4
416
1,53
4M
MB
tu0.
053.
8917
.160
1.56
6.8
1.56
6.0
66[1
], [2
], [3
], [4
], [9
]
Tota
l HA
P5.
3323
.360
2.13
9.3
2.13
8.3
66[1
][2]
[3][
4][9
]
Sta
ckV
ent
Em
issi
onFa
ctor
Con
trol
Effi
cien
cy
Flow
from
Eng
ines
Not
es
IDID
Des
crip
tion
(uni
ts/h
r)(u
nits
/yr)
Uni
ts(lb
/Uni
t)(lb
/hr)
(ton/
yr)
(%)
lb/h
rto
n/yr
(lb/h
r)(to
n/yr
)(%
)
SV
003
EU
006
PM
34[1
0]P
M10
34[1
0]
PM
2.5
34[1
0], [
19]
SO
234
[10]
NO
x34
[10]
VO
C13
1511
,521
,700
Lite
rs0.
0022
2.9
12.7
-2.
912
.72.
911
.234
[10]
CO
34[1
0]C
O2
(GH
G in
kg/
MM
Btu
)34
[10]
, [22
]
CO
2(G
HG
in k
g/M
MB
tu)
34[1
0]
CH
4(G
HG
in k
g/M
MB
tu)
34[1
0]
N2O
(GH
G in
kg/
MM
Btu
)34
[10]
CO
2e(G
HG
in k
g/M
MB
tu)
34[1
0]
Tota
l HA
P34
[10]
Gen
erat
orE
ngin
es
Sol
id F
uel
Dry
ing
and
Pre
para
tion
SV
001
EU
001,
E
U00
2,E
U00
3,E
U00
4
Em
issi
on S
ourc
eP
ollu
tant
Max
imum
Thr
ough
put
Unc
ontro
lled
PTE
Con
trolle
d P
TElim
ited
cont
rolle
d P
TE
Em
issi
on S
ourc
eP
ollu
tant
Max
imum
Thr
ough
put
(per
Eng
ine)
Unc
ontro
lled
PTE
(all
engi
nes)
Con
trolle
d P
TE
(all
engi
nes)
limite
d co
ntro
lled
PTE
(all
engi
nes)
Hom
etow
n Bi
oEne
rgy
Emis
sion
Inve
ntor
y Se
ptem
ber
2011
Tabl
e A
- 1
Hom
etow
n B
ioEn
ergy
Air
Emis
sion
Inve
ntor
yJa
nuar
y 2
012
Sta
ckV
ent
Em
issi
onFa
ctor
Con
trol
Effi
cien
cyID
IDD
escr
iptio
n(u
nits
/hr)
(uni
ts/y
r)U
nits
(lb/U
nit)
(lb/h
r)(to
n/yr
)(%
)lb
/hr
ton/
yr(lb
/hr)
(ton/
yr)
Not
es
SV
002
EU
005
PM
1087
,600
MM
Btu
0.00
770.
080.
34-
0.08
0.34
0.08
0.34
[11]
PM
1010
87,6
00M
MB
tu0.
0077
0.08
0.34
-0.
080.
340.
080.
34[1
1]10
MM
Btu
/hr
PM
2.5
1087
,600
MM
Btu
0.00
770.
080.
34-
0.08
0.34
0.08
0.34
[11]
, [19
]P
ropa
ne-fi
red
SO
210
87,6
00M
MB
tu0.
016
0.16
0.72
-0.
160.
720.
160.
72[1
1], [
12]
NO
x10
87,6
00M
MB
tu0.
141.
426.
22-
1.42
6.22
1.42
6.22
[11]
VO
C10
87,6
00M
MB
tu0.
011
0.11
0.48
-0.
110.
480.
110.
48[1
1]C
O10
87,6
00M
MB
tu0.
082
0.82
3.59
-0.
823.
590.
823.
59[1
1]C
O2
(GH
G in
kg/
MM
Btu
)10
87,6
00M
MB
tu61
.46
614.
653
83.9
-61
4.60
5,38
3.9
614.
653
83.9
[13]
CH
4(G
HG
in k
g/M
MB
tu)
1087
,600
MM
Btu
0.00
300.
030.
26-
0.03
0.26
0.03
0.26
[13]
N2O
(GH
G in
kg/
MM
Btu
)10
87,6
00M
MB
tu0.
0006
0.01
0.05
-0.
010.
050.
010.
05[1
3]C
O2e
(GH
G in
kg/
MM
B10
87,6
00M
MB
tu61
.761
7.1
5405
.7-
617.
095,
405.
761
7.1
5405
.7[7
]
Sta
ckV
ent
Em
issi
onFa
ctor
Con
trol
Effi
cien
cyID
IDD
escr
iptio
n(u
nits
/hr)
(uni
ts/y
r)U
nits
(lb/U
nit)
(lb/h
r)(to
n/yr
)(%
)lb
/hr
ton/
yr(lb
/hr)
(ton/
yr)
Not
es
SV
004
EU
007
PM
0.00
544
MM
Btu
0.00
770.
0000
40.
0002
-0.
000.
0002
0.00
004
0.00
02[1
1]P
M10
0.00
544
MM
Btu
0.00
770.
0000
40.
0002
-0.
000.
000.
0000
40.
0002
[11]
PM
2.5
0.00
544
MM
Btu
0.00
770.
0000
40.
0002
-0.
000.
000.
0000
40.
0002
[11]
, [19
]S
O2
0.00
544
MM
Btu
0.01
60.
0001
0.00
04-
0.00
0.00
0.00
008
0.00
04[1
1], [
12]
NO
x0.
005
44M
MB
tu0.
140.
0007
0.00
31-
0.00
0.00
0.00
070.
0031
[11]
VO
C0.
005
44M
MB
tu0.
011
0.00
010.
0002
-0.
000.
000.
0000
50.
0002
[11]
CO
0.00
544
MM
Btu
0.08
0.00
040.
0018
-0.
000.
000.
0004
0.00
18[1
1]P
M75
657,
000
MM
Btu
0.00
760.
62.
5-
0.6
0.06
0.6
0.06
[23]
PM
1075
657,
000
MM
Btu
0.00
760.
62.
5-
0.6
0.06
0.6
0.06
[23]
PM
2.5
7565
7,00
0M
MB
tu0.
0076
0.6
2.5
-0.
60.
060.
60.
06[2
3]S
O2
7565
7,00
0M
MB
tu0.
0006
0.0
0.2
-0.
00.
000.
00.
00[2
3]N
Ox
7565
7,00
0M
MB
tu0.
100
7.5
32.9
-7.
50.
757.
50.
75[2
3]V
OC
7565
7,00
0M
MB
tu0.
0055
0.4
1.8
-0.
40.
040.
40.
04[2
3]C
O75
657,
000
MM
Btu
0.08
56.
427
.9-
6.4
0.64
6.4
0.64
[23]
CO
2(G
HG
in k
g/M
MB
tu)
7565
7,00
0M
MB
tu54
.71
4103
.335
944.
5-
4,10
3.3
410.
341
03.3
410.
3[1
3]C
H4
(GH
G in
kg/
MM
Btu
)75
657,
000
MM
Btu
0.00
100.
080.
66-
0.1
0.01
0.08
0.01
[13]
N2O
(GH
G in
kg/
MM
Btu
)75
657,
000
MM
Btu
0.00
010.
010.
07-
0.01
0.00
0.01
0.00
[13]
CO
2e(G
HG
in k
g/M
MB
tu)
7565
7,00
0M
MB
tu54
.841
07.2
3597
8.6
-4,
107.
241
0.7
4107
.241
0.7
[7]
Hig
hest
Sin
gle
HA
P
(For
mal
dehy
de)
18.4
416
1,53
4M
MB
tu0.
0000
740.
0054
0.02
380.
000.
0054
0.02
376
0.00
540.
0237
6[2
3]To
tal H
AP
18.4
416
1,53
4M
MB
tu0.
140.
598
0.00
0.14
0.60
0.14
0.59
8[2
3]
Boi
ler (
Hot
W
ater
)
Flar
e - p
ilot
gas
and
flarin
g em
issi
ons;
5,00
0 B
tu/h
r pr
opan
e pi
lot
75 M
MB
tu/h
r ca
paci
tydu
ring
emer
genc
yfir
ing
limite
d co
ntro
lled
PTE
Em
issi
on S
ourc
eP
ollu
tant
Max
imum
Thr
ough
put
Unc
ontro
lled
PTE
Con
trolle
d P
TElim
ited
cont
rolle
d P
TE
Em
issi
on S
ourc
eP
ollu
tant
Max
imum
Thr
ough
put
Unc
ontro
lled
PTE
Con
trolle
d P
TE
Hom
etow
n Bi
oEne
rgy
Emis
sion
Inve
ntor
y Se
ptem
ber
2011
Tabl
e A
- 1
Hom
etow
n B
ioEn
ergy
Air
Emis
sion
Inve
ntor
yJa
nuar
y 2
012
Em
issi
onFa
ctor
Con
trol
Effi
cien
cyN
otes
IDD
escr
iptio
n(u
nits
/hr)
(uni
ts/y
r)U
nits
(lb/U
nit)
(lb/h
r)(to
n/yr
)(%
)lb
/hr
ton/
yr(lb
/hr)
(ton/
yr)
Truc
k Tr
affic
PM
---
4,50
0V
MT
3.98
---
9.0
-9.
0--
-9
[15]
, [17
](R
aw M
ater
ial)
PM
10--
-4,
500
VM
T0.
80--
-1.
8-
1.8
---
2[1
5], [
17]
PM
2.5
---
4,50
0V
MT
0.20
---
0.4
-0.
4--
-0.
4[1
5], [
17]
Truc
k Tr
affic
PM
---
2,40
0V
MT
3.98
---
4.8
-4.
8--
-5
[16]
, [17
](L
iqui
d Fe
rtiliz
eP
M10
---
2,40
0V
MT
0.80
---
1.0
-1.
0--
-1
[16]
, [17
]P
M2.
5--
-2,
400
VM
T0.
20--
-0.
2-
0.2
---
0.2
[16]
, [17
]
FS00
2C
H4
(GH
G in
kg/
MM
Btu
)--
-5
acre
s--
---
-22
.4-
22.4
---
22[1
8]
CO
2e (G
HG
in k
g/M
MB
---
5ac
res
---
---
500.
2-
500.
2--
-50
0[1
8]
Insi
g.A
ctiv
ity
Rec
eivi
ngA
rea/
Pro
cess
Pla
nt to
B
iofil
ter
VO
C3.
0E+0
62.
6E+1
0cf
m-
0.8
3.5
900.
080.
350.
080.
31[2
0]
Tota
l em
issi
ons
by p
ollu
tant
:
(lb/h
r)(to
n/yr
)P
M1.
3919
.9P
M10
1.39
8.9
PM
2.5
1.39
6.8
SO
220
.39
89.3
NO
x21
.494
VO
C9
40C
O62
272
CO
2e (M
etric
tons
/yr)
9,63
884
,930
Hig
hest
Sin
gle
HA
P (F
orm
alde
hyde
)4
17To
tal H
AP
524
* U
ncon
trolle
d P
TE =
eng
ine
oper
atio
n w
ith n
o co
ntro
l equ
ipm
ent,
oper
atin
g 8,
760
hour
s/ye
ar*
Con
trolle
d P
TE =
eng
ine
oper
atio
n w
ith c
ontro
l equ
ipm
ent,
oper
atin
g 8,
760
hour
s/ye
ar*
Lim
ited
Con
trolle
d P
TE =
eng
ine
oper
atio
n w
ith c
ontro
l equ
ipm
ent,
oper
atin
g 7,
750
hour
s/ye
ar*
Max
imum
Sta
te P
erm
it E
mis
sion
s =
Rep
rese
nts
Fede
ral T
otal
Fac
ility
PTE
Thr
esho
lds
* 86
% o
f CO
2 is
bio
geni
c
10.0
25.0
100.
010
0.0
100.
010
0.0
100,
000.
0
Max
imum
Sta
te
Per
mit
Em
issi
ons
(ton/
yr)
100.
010
0.0
100.
0
20.6
89.2
44,3
98.8
6.1
8.9
17.0
6.0
4.0
8.5
55.3
Liqu
id B
y-P
rodu
ctLa
goon
Unc
ontro
lled
PTE
(Ent
ire F
acili
ty)
Con
trolle
d P
TE
(Ent
ire F
acili
ty)
(ton/
yr)
17.4
6.4
4.3
9.6
limite
d co
ntro
lled
PTE
FS00
1
Em
issi
on S
ourc
eP
ollu
tant
Max
imum
Thr
ough
put
Unc
ontro
lled
PTE
Con
trolle
d P
TE
61.6
23.3
100.
349
,361
.76.
89.
9
Lim
ited
Con
trolle
d P
TE (E
ntire
Fac
ility
)
(ton/
yr)
Hom
etow
n Bi
oEne
rgy
Emis
sion
Inve
ntor
y Se
ptem
ber
2011
Tabl
e A
- 1
Hom
etow
n B
ioEn
ergy
Air
Emis
sion
Inve
ntor
yJa
nuar
y 2
012
Not
es: [1
]
[2]
Num
ber o
f eng
ines
4M
axim
um O
pera
ting
Hou
rs p
er y
ear
8760
hrs/
engi
neE
stim
ated
Act
ual O
pera
ting
Hou
rs p
er y
ear
7,75
0hr
s/en
gine
[3]
[4]
[5]C
O2
Em
issi
on F
acto
r for
bio
gas
obta
ined
from
40
CFH
R 9
8 S
ubpa
rt C
Tab
le C
-1.
[6]N
2O E
mis
sion
fact
or fo
r bio
gas
obta
ined
from
40
CFR
98
Sub
part
C T
able
C-2
.[7
]Glo
bal W
arm
ing
Pot
entia
ls o
btai
ned
from
CFR
Titl
e 40
, Par
t 98,
Sub
part
C, T
able
A-1
.
CO
2 1
C
H4
21
N2O
31
0
[8]
CO
2 fro
m th
e en
gine
s is
the
resu
lt of
bio
gas
com
bust
ion
whi
ch is
not
cou
nted
for m
anda
tory
repo
rting
.[9
][1
0]
[11]
[12]
[13]
[14]
[Not
es c
ontin
ued
on n
ext p
age}
34%
of a
ir flo
w g
ener
ated
by
the
four
gen
erat
or e
ngin
es is
em
itted
thro
ugh
SV
003.
See
"Air
Flow
Dia
gram
" for
flow
rate
s. V
OC
em
issi
ons
incl
ude
a po
rtion
of
the
engi
nes
and
VO
Cs
from
the
drye
rs;
drye
r par
ticul
ate
emis
sion
s ar
e ne
glig
ible
from
a b
elt d
ryer
, par
ticul
ate
emis
sion
s fro
m th
e en
gine
s di
verte
d th
roug
h dr
yers
are
repr
esen
ted.
Pro
pane
em
issi
on fa
ctor
s fro
m A
P-4
2: 1
.5 L
ique
fied
Pet
role
um G
as C
ombu
stio
n, T
able
1.5
-1, c
onve
rted
to lb
/MM
Btu
usi
ng 9
1.5
MM
BTU
/1,0
00 g
al p
ropa
neS
ulfu
r con
cent
ratio
n ba
sed
on G
as P
roce
ssor
s A
ssoc
iatio
n E
ngin
eerin
g D
ata
Boo
k (N
inth
Edi
tion,
197
2), F
igur
e 15
-50
(GP
A L
ique
fied
Pet
role
um G
as
Spe
cific
atio
ns, r
ev. 1
979)
, Com
mer
cial
Pro
pane
= 1
5 gr
/100
scf
GH
G E
mis
sion
fact
ors
for p
ropa
ne o
btai
ned
from
40
CFR
98
Sub
part
C T
able
C-1
and
Tab
le C
-2.
Flar
es a
re n
ot in
lcud
ed in
GH
G e
mis
sion
s pe
r CFR
Titl
e 40
, Par
t 98,
Sub
part
C, p
ages
725
-726
.
HA
P e
mis
sion
fact
ors
and
calc
ulat
ions
can
be
foun
d in
Tab
le A
- 3
HA
P -
Eng
ines
Em
issi
on fa
ctor
s (P
M, P
M10
, NO
x, C
O, V
OC
(NM
HC
), C
H4)
fro
m m
anuf
actu
rer's
dat
a fo
r Cum
min
s Q
SV
91 s
erie
s en
gine
; Unc
ontro
lled
SO
2em
issi
ons
are
less
than
the
stat
e pe
rmit
thre
shol
d an
d ar
e ba
sed
on a
n H
2S c
once
ntra
tion
of 1
,000
ppm
in ra
w b
ioga
s. R
aw b
ioga
s is
con
ditio
ned
to re
mov
e 90
% o
f H2S
an
d to
redu
ce m
oist
ure
cont
ent t
o m
eet a
des
ired
fuel
gas
spe
cific
atio
n (S
ee A
pp G
), w
hich
incl
udes
an
H2S
con
cent
ratio
n of
100
ppm
.
Eng
ine
info
rmat
ion
for t
hrou
ghpu
t is
on "C
umm
ins
QS
V91
Info
" wor
shee
t tab
Max
imum
ann
ual t
hrou
ghpu
t and
est
imat
ed a
nnua
l thr
ough
put t
o ca
lcul
ate
PTE
and
Est
imat
ed E
mis
sion
s, re
spec
tivel
y, u
se th
e fo
llow
ing
annu
al h
ours
of
oper
atio
n:
66%
of a
ir flo
w g
ener
ated
by
the
four
gen
erat
or e
ngin
es is
em
itted
thro
ugh
SV
001.
The
rem
aini
ng p
ortio
n is
rout
ed to
the
Fuel
Dry
ing
and
Pre
para
tion
Dry
ers.
S
ee "A
ir Fl
ow D
iagr
am" f
or fl
ow ra
tes.
Inlc
udes
60
% c
ontro
l fro
m C
O c
atal
yst i
n C
ontro
lled
PTE
and
Est
imat
ed A
ctua
l PTE
to s
how
a c
onse
rvat
ive
emis
sion
est
imat
eC
O C
atal
yst s
peci
ficat
ions
pro
vide
90%
con
trol f
or C
O. C
atal
ytic
con
trol w
ill b
e a
surr
ogat
e fo
r org
anic
HA
P e
mis
sion
s. S
ee A
ppen
dix
G fo
r spe
cific
atio
ns.
CO2e
Con
vers
ion
Fact
ors
Hom
etow
n Bi
oEne
rgy
Emis
sion
Inve
ntor
y Se
ptem
ber
2011
Tabl
e A
- 1
Hom
etow
n B
ioEn
ergy
Air
Emis
sion
Inve
ntor
yJa
nuar
y 2
012 [15]
Max
thro
ughp
ut:
150,
000
tons
Qua
ntity
per
truc
k:25
tons
/truc
kN
umbe
r of t
ruck
s:6,
000
truck
s
Add
itio
inal
Cor
n S
ilage
Tru
cks
3,00
0tru
cks
Tota
l Raw
Mat
eria
l Tru
cks
9,00
0tru
cks
Mile
s tra
vele
d:0.
5m
iles/
truck
Tota
l Raw
Mat
eria
l Mile
age:
4,50
0V
MT
[16]
Max
imum
liqu
id fe
rtiliz
er s
hipp
ed b
y tru
ckV
olum
e of
Liq
uid
Ferti
lizer
Lag
oon:
gallo
nsC
apac
ity p
er tr
uck:
5,00
0ga
l/tru
ckN
umbe
r of t
ruck
s:4,
800
truck
sM
iles
trave
led:
0.5
mile
s/tru
ckTo
tal L
iqui
d Fe
rtiliz
er M
ileag
e:2,
400
VM
T[1
7]P
M/P
M10
Em
issi
ons
calc
ulat
ed u
sing
the
AP
-42
equa
tion
for P
aved
Roa
ds, C
hapt
er 1
3, S
ectio
n 2,
Equ
atio
n 1,
Jan
uary
201
1.E
mis
sion
Fac
tor =
k
* (s
L)0.
91 *
(W)1.
02
Var
iabl
eD
escr
iptio
nP
MP
M10
PM
2.5
k =
Par
ticle
siz
e m
ultip
lier f
or p
artic
le s
ize
rang
e an
d un
its o
f int
eres
t0.
011
0.00
220.
0005
4sL
=R
oad
surfa
ce s
ilt lo
adin
g*, g
/m2
15.8
15.8
15.8
W =
Ave
rage
wei
ght (
tons
) of t
he v
ehic
les
trave
ling
the
road
27.5
027
.50
27.5
Em
issi
on F
acto
r =E
mis
sion
Fac
tor (
lb/v
ehic
le m
iles
trave
led
(VM
T))
3.98
0.80
0.20
[18]
[19]
PM
2.5
is a
ssum
ed to
be
equa
l to
PM
10[2
0]
[21]
The
CO
2 em
issi
ons
repr
esen
t the
por
tion
of C
O th
at is
con
vert
ed to
CO
2 dur
ing
com
bust
ion.
[22]
[23]
200
hour
s/ye
ar
The
CO
2 em
issi
ons
com
bine
the
CO2 e
mis
sion
s ge
nera
ted
from
the
engi
nes
plus
the
CO2 e
mis
sion
s as
a r
esul
t of C
O c
onve
rsio
n du
ring
com
bust
ion
Bio
gas
bypa
ss c
ombu
stio
n ca
lcul
atio
ns fo
r the
flar
e us
e em
issi
on fa
ctor
s fro
m A
P-4
2: 1
.4 N
atur
al G
as C
ombu
stio
n, T
able
s 1.
4-1
thro
ugh
1.4-
4; u
sing
the
full
engi
ne c
apac
ity to
est
imat
e ga
s go
ing
to th
e fla
re is
con
serv
ativ
e be
caus
e th
e en
gine
s ar
e ex
pect
ed to
ope
rate
onl
y 12
-16
hour
s pe
r day
; fla
re is
lim
ited
to
200
hour
s of
ope
ratio
n pe
r yea
r.
Max
imum
thro
ughp
ut is
am
ount
of r
aw m
ater
ial d
eliv
ered
ann
ually
by
truck
.
Dur
ing
the
mon
ths
of A
ugus
t and
Sep
tem
ber,
swee
t cor
ns s
ilage
load
s w
ill b
e de
liver
ed 2
tim
es p
er h
our,
24 h
ours
a d
ay in
add
ition
to n
orm
ally
sch
edul
ed
deliv
erie
s
24,0
00,0
00
*Silt
load
ing
fact
or is
bas
ed o
n sa
mpl
ing
done
by
Bar
r at a
n et
hano
l pla
nt in
cen
tral I
owa.
The
val
ue is
the
aver
age
from
22
sam
plin
g ev
ents
in 2
006-
2008
. Th
e fa
cilit
y at
whi
ch th
e sa
mpl
es w
ere
take
n in
clud
ed a
90%
con
trol e
ffici
ency
due
to s
wee
ping
and
wat
erin
g. T
he fa
ctor
use
d he
re a
ssum
es n
o co
ntro
ls. T
he
fact
or u
sed
is w
ithin
the
rang
e of
indu
stria
l sou
rces
list
ed in
AP
-42.
Odo
r em
issi
ons
from
the
rece
ivin
g an
d pl
ant a
rea
vent
ilatio
n is
bas
ed o
n am
bien
t mea
sure
men
ts o
f odo
r com
poun
ds p
erfo
rmed
for v
eget
able
was
te
com
post
ing.
Thi
s is
a c
onse
rvat
ive
mea
sure
men
t for
Hom
etow
n B
ioE
nerg
y ra
w m
ater
ial r
ecei
pts
whi
ch w
ill a
rriv
e da
ily a
nd b
e pr
oces
sed
daily
. O
dor d
ata
take
n fro
m Q
uant
ifyin
g O
dour
Em
issi
on fr
om C
ompo
stin
g; P
. Hob
bs1,
R. N
oble
2, J
. Will
iam
s1, A
. Dob
rovi
n-P
enni
ngto
n2; 1
Inst
itute
of G
rass
land
and
E
nviro
nmen
tal R
esea
rch,
Nor
th W
yke
Res
earc
h S
tatio
n, O
keha
mpt
on,
Dev
on E
X20
2S
B 2
Hor
ticul
ture
Res
earc
h In
tern
atio
nal,
Wel
lesb
ourn
e, W
arw
ick.
C
V35
9E
F; S
usta
inab
le O
rgan
ic W
aste
Man
agem
ent f
or E
nviro
men
tal P
rote
ctio
n an
d Fo
od S
afet
y; T
able
1; P
age
239.
C
alcu
latio
n de
tail
prov
ided
in T
able
A-
6. 9
0% R
emov
al e
ffici
ency
Sou
rce:
Odo
ur C
ontro
l of F
ood
Pro
cess
ing
Ope
ratio
ns b
y A
ir C
lean
ing
Tech
nolo
gies
(Bio
filtra
tion)
Liqu
id F
ertil
izer
Lag
oon
GH
G E
mis
sion
s ca
lcul
atio
ns c
an b
e fo
und
in T
able
A -
5. E
mis
sion
s ar
e i
tit
Tabl
e A
-2H
omet
own
BioE
nerg
yIn
form
atio
n on
Cum
min
s N
atur
al g
as g
ener
ator
set
QSV
91 s
erie
s en
gine
, upd
ated
7/1
9/20
11Ja
nuar
y 2
012
RP
M15
14Em
issi
on S
pecs
wit
hout
CO
cat
alys
t*R
ated
Ele
ctric
al O
utpu
t (kW
e)1
2,00
0g/
hp-h
rlb
/hp-
hrD
uty
Cont
inuo
usPM
0.03
6.61
E-05
Com
pres
sion
Rat
io12
.5PM
100.
036.
61E-
05C
ycle
s P
er S
ec (H
ertz
)SO
20.
810
1.78
E-03
Cyl
inde
rsN
OX
0.5
1.10
E-03
Sta
rting
Sys
tem
NM
HC
0.23
5.07
E-04
RP
M15
14CO
2.2
4.85
E-03
Rat
ed E
lect
rical
Out
put (
kWe)
2,00
0CH
44.
469.
83E-
03B
rake
Hor
sepo
wer
2826
* pr
ovid
ed b
y Cu
mm
ins
Fuel
Inpu
t (M
MB
TU/H
r)18
.44
73.7
6C
alcu
late
d Fu
el In
put @
Ful
l Loa
d (B
TU/b
hp-h
r)65
25C
alcu
late
d Fu
el C
onsu
mpt
ion
Rat
e (c
f/hr)
42,9
84E
xhau
st G
as F
low
Mas
s (lb
/hr)
2777
1E
xhau
st G
as F
low
Vol
ume
(cfm
)15
212
Cal
ulat
ion
of S
O2
Em
issi
on F
acto
rN
otes
H2S
Con
tent
of r
aw d
iges
ter g
as (m
g H
2S/m
3)10
00Pr
ojec
t des
ign
basi
sE
lect
rical
out
put (
btu/
scf)
429
From
"Cu
mm
ins,
pos
t-pr
opos
al D
ocs,
7/2
6/11
" PD
F M
olec
ular
wei
ght o
f H2S
34.0
8g/
mol
Mol
ecul
ar w
eigh
t of S
O2
64.0
64g/
mol
cubi
c fe
et p
er c
ubic
met
er35
.314
7co
nver
sion
fact
orm
illig
ram
s pe
r gra
m10
00co
nver
sion
fact
or
SO
2 em
issi
on fa
ctor
0.81
0g/
bhp-
hr
** A
por
tion
of th
e en
gine
exh
aust
gas
will
be
rout
ed to
sup
ply
air f
low
to th
e dr
yers
. The
por
tion
not r
oute
d to
the
drye
rs w
ill b
e ro
uted
thro
ugh
SV
001
S
ee "
Air
Flo
w D
iagr
am"
1 gr
am =
15.
432
grai
ns30
8.64
gram
s/10
0cuf
tN
atur
al g
as h
as 2
0 gr
ains
per
100
ft3
3.08
64g/
ft3
108.
9807
84g/
m3
C200
0
Tabl
e A
-3H
omet
own
BioE
nerg
yN
SPS
JJJJ
Cal
cula
tion
sJa
nuar
y 2
012
Cum
min
s C2
000
Spec
sRP
M15
14
Rate
d El
ectr
ical
Out
put (
kWe)
12,
000
Dut
yCo
ntin
uous
Com
pres
sion
Rat
io12
.5Cy
cles
Per
Sec
(Her
tz)
Cylin
ders
Star
ting
Syst
emRP
M15
14Ra
ted
Elec
tric
al O
utpu
t (kW
e)2,
000
Brak
e H
orse
pow
er28
26Fu
el In
put (
MM
BTU
/Hr)
18.4
4Ca
lcul
ated
Fue
l Inp
ut @
Ful
l Loa
d (B
TU/b
hp-h
r)65
25Ca
lcul
ated
Fue
l Con
sum
ptio
n Ra
te (c
f/hr
)42
,984
Exha
ust G
as F
low
Mas
s (lb
/hr)
2777
1Ex
haus
t Gas
Flo
w V
olum
e (c
fm)
1521
2
Pollu
tant
NSP
S JJ
JJ E
mis
sion
St
anda
rd [1
]g/
HP-
hrlb
/hr
tpy
NO
x2.
012
.46
54.6
CO5.
031
.15
136.
4VO
C1.
06.
2327
.3
[1] S
ubpa
rt JJ
JJ T
able
1: L
andf
ill/D
iges
ter
Gas
HP
> 50
0, M
anuf
actu
re d
ate
afte
r 7/
1/20
10 E
mis
sion
Sta
ndar
ds[2
] Lim
ited
Emis
sion
s ca
lcul
ated
for
Form
GI-0
7
Lim
ited
Emis
sion
s pe
r en
gine
[2]
Table A-4Hometown BioEnergyHAP Emissions Calculations - EnginesJanuary 2012
HAP
EmissionFactor [1]
lb/MMBtu,fuel input
UncontrolledPTE,
each enginelb/hr
UncontrolledPTE -
combinedtpy
ControlEfficiency [2]
ControlledPTE - all
engines tpy
LimitedControlled
PTE [3]tpy
1,1,2,2-Tetrachloroethane 4.00E-05 7.38E-04 1.29E-02 60% 5.17E-03 4.57E-031,1,2-Trichloroethane 3.18E-05 5.86E-04 1.03E-02 60% 4.11E-03 3.64E-031,1-Dichloroethane 2.36E-05 4.35E-04 7.62E-03 60% 3.05E-03 2.70E-031,2-Dichloroethane 2.36E-05 4.35E-04 7.62E-03 60% 3.05E-03 2.70E-031,2-Dichloropropane 2.69E-05 4.96E-04 8.69E-03 60% 3.48E-03 3.08E-031,3-Butadiene 2.67E-04 4.92E-03 8.63E-02 60% 3.45E-02 3.05E-021,3-Dichloropropene 2.64E-05 4.87E-04 8.53E-03 60% 3.41E-03 3.02E-032-Methylnaphthalene 3.32E-05 6.12E-04 1.07E-02 60% 4.29E-03 3.80E-032,2,4-Trimethylpentane 2.50E-04 4.61E-03 8.08E-02 60% 3.23E-02 2.86E-02Acenaphthene 1.25E-06 2.31E-05 4.04E-04 60% 1.62E-04 1.43E-04Acenaphthylene 5.53E-06 1.02E-04 1.79E-03 60% 7.15E-04 6.32E-04Acetaldehyde 8.36E-03 1.54E-01 2.70E+00 60% 1.08E+00 9.56E-01Acrolein 5.14E-03 9.48E-02 1.66E+00 60% 6.64E-01 5.88E-01Benzene 4.40E-04 8.11E-03 1.42E-01 60% 5.69E-02 5.03E-02Benzo(b)fluoranthene 1.66E-07 3.06E-06 5.36E-05 60% 2.15E-05 1.90E-05Benzo(e)pyrene 4.15E-07 7.65E-06 1.34E-04 60% 5.36E-05 4.74E-05Benzo(g,h,i)perylene 4.14E-07 7.63E-06 1.34E-04 60% 5.35E-05 4.73E-05Biphenyl 2.12E-04 3.91E-03 6.85E-02 60% 2.74E-02 2.42E-02Carbon Tetrachloride 3.67E-05 6.77E-04 1.19E-02 60% 4.74E-03 4.20E-03Chlorobenzene 3.04E-05 5.61E-04 9.82E-03 60% 3.93E-03 3.48E-03Chloroethane 1.87E-06 3.45E-05 6.04E-04 60% 2.42E-04 2.14E-04Chloroform 2.85E-05 5.26E-04 9.21E-03 60% 3.68E-03 3.26E-03Chrysene 6.93E-07 1.28E-05 2.24E-04 60% 8.96E-05 7.92E-05Ethylbenzene 3.97E-05 7.32E-04 1.28E-02 60% 5.13E-03 4.54E-03Ethylene Dibromide 4.43E-05 8.17E-04 1.43E-02 60% 5.72E-03 5.06E-03Fluoranthene 1.11E-06 2.05E-05 3.59E-04 60% 1.43E-04 1.27E-04Fluorene 5.67E-06 1.05E-04 1.83E-03 60% 7.33E-04 6.48E-04Formaldehyde 0.05 0.97 1.71E+01 60% 6.82E+00 6.04E+00Methanol 2.50E-03 4.61E-02 8.08E-01 60% 3.23E-01 2.86E-01Methylene Chloride 2.00E-05 3.69E-04 6.46E-03 60% 2.58E-03 2.29E-03n-Hexane 1.11E-03 2.05E-02 3.59E-01 60% 1.43E-01 1.27E-01Naphthalene 7.44E-05 1.37E-03 2.40E-02 60% 9.61E-03 8.51E-03PAH 2.69E-05 4.96E-04 8.69E-03 60% 3.48E-03 3.08E-03Phenanthrene 1.04E-05 1.92E-04 3.36E-03 60% 1.34E-03 1.19E-03Phenol 2.40E-05 4.43E-04 7.75E-03 60% 3.10E-03 2.74E-03Pyrene 1.36E-06 2.51E-05 4.39E-04 60% 1.76E-04 1.55E-04Styrene 2.36E-05 4.35E-04 7.62E-03 60% 3.05E-03 2.70E-03Tetrachloroethane 2.48E-06 4.57E-05 8.01E-04 60% 3.20E-04 2.84E-04Toluene 4.08E-04 7.52E-03 1.32E-01 60% 5.27E-02 4.66E-02Vinyl Chloride 1.49E-05 2.75E-04 4.81E-03 60% 1.93E-03 1.70E-03Xylene 1.84E-04 3.39E-03 5.94E-02 60% 2.38E-02 2.10E-02Total HAP 1.33 23.3 9.3 8.26Highest Single HAP 0.97 17.1 6.8 6.04Notes:[1] HAP Emission factors from AP-42, Section 3.2, Table 3.2-2 for natural gas fired 4-stroke lean burn engines[2] Inlcudes 60 % control from CO catalyst in PTE and Estimated Emissions[3] Number of engines 4 Maximum Operating Hours per year 8760 hrs/engine Limited Operating Hours per year 7,750 hrs/engine
Table A-4Hometown BioEnergyHAP Emissions Calculations - Emergency Flare EmissionsJanuary 2012
HAP
Emission Factor [1]
lb/MMBtu, fuel input
UncontrolledPTE, bypass
from all engineslb/hr
Uncontrolled PTE - bypass from all
engines combinedtpy [2]
ControlEfficiency
Controlled PTE tpy
Limited / controlled tpy
Benzene 2.06E-06 1.52E-04 6.65E-04 - 6.65E-04 1.52E-05Dichlorobenzene 1.18E-06 8.68E-05 3.80E-04 - 3.80E-04 8.68E-06Formaldehyde 7.35E-05 5.42E-03 2.38E-02 - 2.38E-02 5.42E-04Hexane 1.76E-03 1.30E-01 5.70E-01 - 5.70E-01 1.30E-02Naphthalene 5.98E-07 4.41E-05 1.93E-04 - 1.93E-04 4.41E-06Toluene 3.33E-06 2.46E-04 1.08E-03 - 1.08E-03 2.46E-05Benzo(a)anthracene 1.76E-09 1.30E-07 5.70E-07 - 5.70E-07 1.30E-08Benzo(a)pyrene 1.18E-09 8.68E-08 3.80E-07 - 3.80E-07 8.68E-09Benzo(b)fluoranthene 1.76E-09 1.30E-07 5.70E-07 - 5.70E-07 1.30E-08Benzo(k)fluoranthene 1.76E-09 1.30E-07 5.70E-07 - 5.70E-07 1.30E-08Chrysene 1.76E-09 1.30E-07 5.70E-07 - 5.70E-07 1.30E-08Dibenzo(a,h)anthracene 1.18E-09 8.68E-08 3.80E-07 - 3.80E-07 8.68E-09Indeno(1,2,3-cd)pyrene 1.76E-09 1.30E-07 5.70E-07 - 5.70E-07 1.30E-08PAH Total 8.65E-08 6.38E-06 2.79E-05 - 2.79E-05 6.38E-07POM - Polycyclic organic ma 8.65E-08 6.38E-06 2.79E-05 - 2.79E-05 6.38E-07Arsenic (7440-38-2) 1.96E-07 1.45E-05 6.33E-05 - 6.33E-05 1.45E-06Beryllium (744-43-0-9) 1.18E-08 8.68E-07 3.80E-06 - 3.80E-06 8.68E-08Cadmium (7440-43-9) 1.08E-06 7.95E-05 3.48E-04 - 3.48E-04 7.95E-06Chromium 1.37E-06 1.01E-04 4.43E-04 - 4.43E-04 1.01E-05Cobalt 8.24E-08 6.07E-06 2.66E-05 - 2.66E-05 6.07E-07Manganese (74439-96-5) 3.73E-07 2.75E-05 1.20E-04 - 1.20E-04 2.75E-06Mercury (7439-97-6) 2.55E-07 1.88E-05 8.24E-05 - 8.24E-05 1.88E-06Nickel (7440-02-0) 2.06E-06 1.52E-04 6.65E-04 - 6.65E-04 1.52E-05Selenium (7782-49-2) 2.35E-08 1.74E-06 7.60E-06 - 7.60E-06 1.74E-07Total HAP 0.14 0.6 - 0.598 0.0137Highest Single HAP 0.13 0.6 - 0.570 0.0130
Notes:[1] HAP Emission factors from AP-42, Section 1.4, Tables 1.4-3 and 1.4-4 for natural gas fired 4-stroke lean burn engines[2] Maximum Fuel Throughput per engine = 18.44 MMBtu/hr PTE is limited to 200 flare operating hours per year[3] Number of engines 4 Maximum Flare Operating Hours per year 200 hrs Estimated Flare Actual Operating Hours pe 20 hrs
Table A-4aHometown BioEnergyHAP Emissions Calculations - DryerJanuary 2012
lb/hr tpy lb/hr tpy1,1,2,2-Tetrachloroethane 4.00E-05 34% 4.06E-04 1.78E-03 4.06E-04 1.57E-031,1,2-Trichloroethane 3.18E-05 34% 3.22E-04 1.41E-03 3.22E-04 1.25E-031,1-Dichloroethane 2.36E-05 34% 2.39E-04 1.05E-03 2.39E-04 9.27E-041,2-Dichloroethane 2.36E-05 34% 2.39E-04 1.05E-03 2.39E-04 9.27E-041,2-Dichloropropane 2.69E-05 34% 2.73E-04 1.19E-03 2.73E-04 1.06E-031,3-Butadiene 2.67E-04 34% 2.71E-03 1.19E-02 2.71E-03 1.05E-021,3-Dichloropropene 2.64E-05 34% 2.68E-04 1.17E-03 2.68E-04 1.04E-032-Methylnaphthalene 3.32E-05 34% 3.37E-04 1.47E-03 3.37E-04 1.30E-032,2,4-Trimethylpentane 2.50E-04 34% 2.53E-03 1.11E-02 2.53E-03 9.82E-03Acenaphthene 1.25E-06 34% 1.27E-05 5.55E-05 1.27E-05 4.91E-05Acenaphthylene 5.53E-06 34% 5.61E-05 2.46E-04 5.61E-05 2.17E-04Acetaldehyde 8.36E-03 34% 8.48E-02 3.71E-01 8.48E-02 3.28E-01Acrolein 5.14E-03 34% 5.21E-02 2.28E-01 5.21E-02 2.02E-01Benzene 4.40E-04 34% 4.46E-03 1.95E-02 4.46E-03 1.73E-02Benzo(b)fluoranthene 1.66E-07 34% 1.68E-06 7.37E-06 1.68E-06 6.52E-06Benzo(e)pyrene 4.15E-07 34% 4.21E-06 1.84E-05 4.21E-06 1.63E-05Benzo(g,h,i)perylene 4.14E-07 34% 4.20E-06 1.84E-05 4.20E-06 1.63E-05Biphenyl 2.12E-04 34% 2.15E-03 9.41E-03 2.15E-03 8.33E-03Carbon Tetrachloride 3.67E-05 34% 3.72E-04 1.63E-03 3.72E-04 1.44E-03Chlorobenzene 3.04E-05 34% 3.08E-04 1.35E-03 3.08E-04 1.19E-03Chloroethane 1.87E-06 34% 1.90E-05 8.30E-05 1.90E-05 7.35E-05Chloroform 2.85E-05 34% 2.89E-04 1.27E-03 2.89E-04 1.12E-03Chrysene 6.93E-07 34% 7.03E-06 3.08E-05 7.03E-06 2.72E-05Ethylbenzene 3.97E-05 34% 4.02E-04 1.76E-03 4.02E-04 1.56E-03Ethylene Dibromide 4.43E-05 34% 4.49E-04 1.97E-03 4.49E-04 1.74E-03Fluoranthene 1.11E-06 34% 1.13E-05 4.93E-05 1.13E-05 4.36E-05Fluorene 5.67E-06 34% 5.75E-05 2.52E-04 5.75E-05 2.23E-04Formaldehyde 0.05 34% 5.35E-01 2.34E+00 5.35E-01 2.07E+00Methanol 2.50E-03 34% 2.53E-02 1.11E-01 2.53E-02 9.82E-02Methylene Chloride 2.00E-05 34% 2.03E-04 8.88E-04 2.03E-04 7.86E-04n-Hexane 1.11E-03 34% 1.13E-02 4.93E-02 1.13E-02 4.36E-02Naphthalene 7.44E-05 34% 7.54E-04 3.30E-03 7.54E-04 2.92E-03PAH 2.69E-05 34% 2.73E-04 1.19E-03 2.73E-04 1.06E-03Phenanthrene 1.04E-05 34% 1.05E-04 4.62E-04 1.05E-04 4.09E-04Phenol 2.40E-05 34% 2.43E-04 1.07E-03 2.43E-04 9.43E-04Pyrene 1.36E-06 34% 1.38E-05 6.04E-05 1.38E-05 5.34E-05Styrene 2.36E-05 34% 2.39E-04 1.05E-03 2.39E-04 9.27E-04Tetrachloroethane 2.48E-06 34% 2.51E-05 1.10E-04 2.51E-05 9.74E-05Toluene 4.08E-04 34% 4.14E-03 1.81E-02 4.14E-03 1.60E-02Vinyl Chloride 1.49E-05 34% 1.51E-04 6.62E-04 1.51E-04 5.85E-04Xylene 1.84E-04 34% 1.87E-03 8.17E-03 1.87E-03 7.23E-03Total HAP 0.7 3.2 0.7 2.8Highest Single HAP 0.5 2.3 0.5 2.1Notes:[1] HAP Emission factors from AP-42, Section 3.2, Table 3.2-2 for natural gas fired 4-stroke lean burn engines[2] Emissions represented here are also represented in the engine HAP emissions for EU001 - EU004[3] Maximum Operating Hours per year 8760 Limited Hours 7,750
HAP
EmissionFactor [1]
lb/MMBtu,fuel input
Flow From Engines
Estimated Controlled PTE through SV003 (portion of
engine PTE included) [2], [3]
Limited PTE through SV003 (portion of engine PTE
included) [2], [3]
Tabl
e A
-5H
omet
own
Bio
Ener
gyM
ass
Bal
ance
Ja
nuar
y 2
012
Tota
lSo
lids
Solid
sVo
latil
eSo
lids
Iner
tsW
ater
Com
pute
dSo
lids
MTP
D [1
]%
MTP
D [1
]M
TPD
[1]
MTP
D [1
]M
TPD
[1]
%Fe
edst
ock
In32
5.0
23.0
%74
.867
.37.
525
0.3
23.0
%A
dd S
uper
nata
nt19
8.8
2.5%
3.8
2.3
1.5
195.
01.
9%A
fter S
uper
nata
nt A
dd52
3.8
78.6
69.6
9.0
445.
215
.0%
Not
Con
verte
d to
Met
hane
20.0
%10
0%D
iges
ter D
isch
arge
470.
05.
3%24
.815
.89.
044
5.2
5.3%
Pre
ssat
e fro
m P
ress
to D
ryer
47.3
30.0
%14
.29.
15.
233
.1P
ress
Wat
er42
2.7
2.5%
10.6
6.7
3.8
412.
1R
ecirc
Per
cent
0.5
Less
Rec
ircul
atio
n19
8.8
2.5%
5.0
3.2
1.8
193.
9W
ater
To
Land
App
licat
ion
223.
82.
5%5.
63.
62.
021
8.2
Rec
ircul
atio
n19
8.8
2.5%
3.8
2.3
1.5
195.
01.
9%S
olid
s Fl
ow to
Dry
er
47.3
30.0
%14
.29.
34.
933
.1H
eat F
low
req
per t
on o
f wat
er re
mov
ed (m
mbt
u/to
n)S
olid
Fue
l fro
m D
ryer
@ 9
0% S
olid
s15
.890
.0%
14.2
9.3
4.9
1.6
Hea
t Flo
w to
Dry
er @
120
0 bt
u/lb
of w
ater
eva
pW
ater
rem
oved
in d
ryer
31
.631
.6W
ater
rem
oved
in d
ryer
(lbs
/hr)
4340
.443
40.4
Flow
Fro
m B
elt P
ress
223.
82.
5%5.
63.
62.
021
8.2
Not
esA
nnua
l Sol
ids
to d
ryer
(tpy
)[2
]A
nnua
l Sol
ids
from
dry
er (t
py)
[3]
Wat
er re
mov
ed in
dry
er (L
/day
)V
OC
Con
tent
in w
ater
rem
oved
by
drye
r (m
g/L)
500
1000
#RE
F!V
OC
Con
tent
in w
ater
rem
oved
by
drye
r (lb
/L)
0.00
110.
0022
VO
C re
leas
ed (k
g/da
y)15
.831
.6V
OC
rele
ased
(MTP
D)
0.02
0.03
Max
VO
C e
mis
sion
s fro
m D
ryer
(tpy
)6.
312
.7#R
EF!
Not
es[1
]M
TPD
= m
etric
tonn
es p
er d
ay[4
] V
OC
's re
leas
ed fr
om th
e dr
yers
are
exp
ecte
d to
rang
e fro
m 5
00 m
g/L
to 1
000
mg/
L[2
]S
olid
s co
nten
t of s
tream
ent
erin
g dr
yers
is 3
0%[5
] M
ax V
OC
em
issi
ons
from
dry
er a
re b
ased
on
a V
OC
con
tent
of 1
000
mg/
L[3
]So
lids
cont
ent o
f str
eam
exi
ting
drye
rs is
90%
Dry
er
Land
App
licat
ion
Dry
er V
OC
Em
issi
ons
Der
ivat
ion
VOC
Bal
ance
19,0
116,
337
31,5
66
Dig
este
rs
Bel
t Pre
ss
Tabl
e A
-6H
omet
own
Bio
Ener
gyPo
tent
ial t
o Em
it G
reen
hous
e G
as C
alcu
latio
ns -
Liqu
id S
tora
ge P
ond
Janu
ary
201
2
Dig
este
d Li
quid
Man
ure
Bas
ins:
Val
ueS
ourc
eV
olat
ile S
olid
s Lo
adin
g to
Bas
ins,
afte
r dig
estio
n an
d so
lids
sepa
ratio
n (k
g V
S/y
r) =
1,30
1,46
3Ta
ble
A-6
Max
imum
met
hane
pro
duci
ng c
apac
ity o
f vol
atile
sol
ids
(m3C
H4/k
g V
S) =
0.24
[1]
Vol
ume
of m
etha
ne (m
3/yr
) =31
2,35
1C
arbo
n D
ioxi
de d
ensi
ty a
t STP
(kg/
m3 ) =
1.80
Met
hane
den
sity
at S
TP (k
g/m
3 ) =0.
65A
nnua
l Bas
in T
empe
ratu
re (o C
) =10
[1]
Met
hane
con
vers
ion
fact
or b
ased
on
T, fo
r cru
st-c
over
ed b
asin
s (%
) =10
%[2
]M
etha
ne C
arbo
n In
tens
ity F
acto
r =21
% T
otal
Are
aC
H4 (
tpy)
CO
2 [3]
(tpy
)C
O2e
(tpy
)10
0.00
%22
.430
.250
0.2
[2] A
lthou
gh th
e st
orag
e ba
sin
does
not
hav
e a
"cru
st c
over
", it
will
hav
e a
synt
hetic
cov
er.
The
met
hane
con
vers
ion
fact
or fo
r cru
st-c
over
ed s
ettli
ng b
asin
s is
ther
efor
e ap
plie
d.
[3] C
arbo
n di
oxid
e em
issi
ons
from
bio
gas
gene
ratio
n in
the
basi
n is
bas
ed o
n a
volu
met
ric fr
actio
n of
74%
met
hane
in th
e bi
ogas
, whi
ch im
plie
s 26
% c
arbo
n di
oxid
e by
diff
eren
ce.
Saf
ley
L.
M. a
nd W
este
rman
P. W
. 199
2. P
erfo
rman
ce o
f a lo
w te
mpe
ratu
re la
goon
dig
este
r. B
iore
sour
ce T
echn
olog
y 41
(2):
167-
175.
Var
iabl
e
Bas
inS
urfa
ce A
rea
(ft2 )
Mem
bran
e C
over
ed S
tora
ge P
ond
217,
800
[1] D
ata
take
n fro
m 4
0 C
FR 9
8 S
ubpa
rt JJ
Tab
les
JJ-2
,JJ-
3, a
nd J
J-4.
Scr
ew p
ress
es fo
r sol
ids
sepa
ratio
n.
Figu
re A
-7H
omet
own
Bio
Ener
gyEn
gine
/Dry
er A
ir Fl
ow D
iagr
amJa
nuar
y 2
012
Exh
aust
flow
to E
ngin
e S
tack
72,9
14
Lb
s/hr
@ 8
43 F
Cum
min
s C
2000
N6C
2000
KW
Gen
set
Cum
min
s C
2000
N6C
2000
KW
Gen
set
Cum
min
s C
2000
N6C
2000
KW
Gen
set
27,7
71 lb
s/hr
@ 8
43 F
27,7
71 lb
s/hr
@ 8
43 F
27,7
71 lb
s/hr
@ 8
43 F
Total Exhaust Flow =111,084 lbs/hr @ 843 F
Exh
aust
to D
ryer
38
,170
lbs/
hr @
843
Amb Air 29,756 lbs/hr @ 60 F
Hea
ted
air t
o D
ryer
67,9
26 lb
/hr @
500
FD
iges
tate
Dry
er4,
213
lbs/
hr w
ater
re
mov
ed
Dry
er E
xhau
st72
,139
lbs/
hr @
149
F
Ava
nt E
nerg
y
Cum
min
s C
2000
N6C
2000
KW
Gen
set
Cum
min
s C
2000
N6C
2000
KW
Gen
set
27,7
71 lb
s/hr
@ 8
43 F
27,7
71 lb
s/hr
@ 8
43 F
Total Exhaust Flow =111,084 lbs/hr @ 843 F
Ava
nt E
nerg
y
Tabl
e A
-8H
omet
own
Bio
Ener
gyR
ecei
ving
and
Pla
nt A
rea
Vent
ilatio
n O
dor E
mis
sion
s Es
timat
eJa
nuar
y 2
012
Com
poun
ds w
hich
wer
e fo
und
with
GC-
MS
to e
xcee
d th
eir
OD
T by
the
grea
test
ord
er o
fm
agni
tude
wer
e, in
dec
reas
ing
orde
r: H
2S, D
MS,
but
anoi
c ac
id, m
etha
neth
iol a
nd tr
imet
hyla
min
e.Su
lphi
des
wer
e th
e m
ajor
com
pone
nts
cont
ribu
ting
tow
ards
the
odou
r. T
here
was
a c
lear
rela
tions
hip
betw
een
the
com
bine
d co
ncen
trat
ion
of H
2S a
nd D
MS
to th
e ol
fact
ory
resp
onse
.
Ass
umed
Cont
rolle
dCm
pdPr
ewet
(ug/
m3)
Phas
e I (
ug/m
3)ug
/m3
Flow
rate
(cfm
)lb
/hr
Unc
PTE
PTE
(90%
)**
Buta
noic
aci
d 48
1 (5
) 212
9(±3
271)
14.
4 ra
ncid
, sou
r48
150
000
0.09
0.39
0.04
Dim
ethy
l sul
phid
e 16
67(±
3290
)352
8(±6
921)
5.9
dec
ayed
veg
etab
le16
6750
000
0.31
1.37
0.14
Dim
ethy
l dis
ulph
ide
657(
±162
6)28
7(±8
96) 4
7.9
foul
657
5000
00.
120.
540.
05D
imet
hyl t
risu
lphi
de 8
3(±1
70)1
30(±
292)
8.7
8350
000
0.02
0.07
0.01
Hyd
roge
n su
lphi
de 7
30(±
1310
)436
2(±5
369)
25.
7 ro
tten
egg
730
5000
00.
140.
600.
06M
etha
neth
iol2
11(±
246)
126
(±16
5) 2
.1 r
otte
n ca
bbag
e21
150
000
0.04
0.17
0.02
Trim
ethy
lam
ine
435(
3) 5
82(±
924)
5.9
am
mon
ical
, fis
hy43
550
000
0.08
0.36
0.04
Tota
l:42
640.
803.
50.
3
† m
ean
and
± st
anda
rd d
evia
tion
of 1
1 co
mpo
stin
g si
te s
ampl
es; c
ompo
unds
with
out s
tand
ard
devi
atio
ns w
ere
iden
tifie
din
less
than
six
sam
ples
, num
ber
show
n in
ital
ics.
*mea
sure
d w
ith g
as d
etec
tion
tube
s.**
90%
Rem
oval
eff
icie
ncy
Sour
ce: O
dour
Con
trol
of F
ood
Proc
essi
ng O
pera
tions
by
Air
Cle
anin
g Te
chno
logi
es (B
iofil
trat
ion)
: ht
tp:/
/ww
w.c
ip.u
kcen
tre.
com
/sm
ell.h
tm: T
able
V
Qua
ntify
ing
Odo
ur E
mis
sion
from
Com
post
ing;
P. H
obbs
1, R
. Nob
le2,
J. W
illia
ms1
, A. D
obro
vin-
Penn
ingt
on2;
1In
stit
ute
of G
rass
land
and
En
viro
nmen
tal R
esea
rch,
Nor
th W
yke
Rese
arch
Sta
tion
, Oke
ham
pton
, D
evon
EX2
0 2S
B 2H
orti
cult
ure
Rese
arch
Inte
rnat
iona
l, W
elle
sbou
rne,
War
wic
k. C
V35
9EF
; Sus
tain
able
Org
anic
Was
te M
anag
emen
t for
Env
irom
enta
l Pro
tect
ion
and
Food
Saf
ety;
Tab
le 1
; Pag
e23
9.
()
()
sQ
CE
scm
hrlb
mg
××
××
=� ��
� ��−
6010
242
.68
/
Hometown�BioEnergySCREEN3�Modeling�InputFebruary�2012
Scenario�1�
All�flow�to�SV00166%�of�Flow�to�
SV00134%�of�Flow�to�
SV003
Source�Type Point Point PointEmission�rate�(g/s) 1 1 1Stack�Height�(m) 15.2 15.2 15.2Stack�Inside�Diameter�(m) 0.9 0.9 0.9Stack�Inside�Velocity�(m/s) 43.7 28.9 14.9Stack�Gas�Exit�Temp�(K) 723.7 723.7 338.2Ambient�Air�Temp�(K) 293 293 293Receptor�Height 0 0 0Urban/Rural�Option Rural Rural RuralBuilding�Height�(m) 12.3 12.3 12.3Min�Horiz�Bldg�Dim�(m) 17.7 17.7 17.7Max�Horiz�Bldg�Dim�(m) 30.5 30.5 30.5Min�Receptor�Distance�(m) 61.0 61.0 42.7Max�Receptor�Distance�(m) 1000 1000 1000
Scenario�2
Hom
etow
n�Bi
oEne
rgy
SCRE
EN3�
Mod
elin
g�O
utpu
tFe
brua
ry�2
012
Scen
ario
�1�
All�
flow
�to�S
V001
66%
�of�F
low
�to�
SV00
134
%�o
f�Flo
w�to
�SV
003
Stac
k�H
eigh
t:�
15.2
�mSt
ack�
Hei
ght:
�15
.2�m
Stac
k�H
eigh
t:�1
5.2�
m
Am
bien
t�Air
�Impa
ctug
/m3
ug/m
3ug
/m3
ug/m
3ug
/m3
PM
10 2
4-hr
150
2.1
1.8
2.3
4.1
PM
2.5
24-h
r35
2.1
1.8
2.3
4.1
SO
2 1-
hr19
641
.936
.047
.583
.5N
O2
1-hr
*18
869
.159
.378
.213
7.6
CO
1-h
r35
,000
151.
813
0.3
171.
930
2.2
CO
8-h
r10
,000
106.
291
.212
0.3
211.
6
*The
am
bien
t air
impa
ct fo
r NO
2is
repo
rted
as 2
0% le
ss th
an th
e to
tal N
Ox
conc
entra
tion.
Targ
et�L
evel
s
Scen
ario
�2
Tota
l
723 K with no engine diversion 2-14-12.txtScenario 1 - All flow through Engine Stack SV001
02/14/12 09:52:12 *** SCREEN3 MODEL RUN *** *** VERSION DATED 96043 ***
Scenario 1 - All Flow through Engine Stack SV001
SIMPLE TERRAIN INPUTS: SOURCE TYPE = POINT EMISSION RATE (G/S) = 1.00000 STACK HEIGHT (M) = 15.2000 STK INSIDE DIAM (M) = .9000 STK EXIT VELOCITY (M/S)= 43.7000 STK GAS EXIT TEMP (K) = 723.7000 AMBIENT AIR TEMP (K) = 293.0000 RECEPTOR HEIGHT (M) = .0000 URBAN/RURAL OPTION = RURAL BUILDING HEIGHT (M) = 12.3000 MIN HORIZ BLDG DIM (M) = 17.7000 MAX HORIZ BLDG DIM (M) = 30.5000
THE REGULATORY (DEFAULT) MIXING HEIGHT OPTION WAS SELECTED. THE REGULATORY (DEFAULT) ANEMOMETER HEIGHT OF 10.0 METERS WAS ENTERED.
BUOY. FLUX = 51.644 M**4/S**3; MOM. FLUX = 156.566 M**4/S**2.
*** FULL METEOROLOGY ***
********************************** *** SCREEN AUTOMATED DISTANCES *** **********************************
*** TERRAIN HEIGHT OF 0. M ABOVE STACK BASE USED FOR FOLLOWING DISTANCES ***
DIST CONC U10M USTK MIX HT PLUME SIGMA SIGMA (M) (UG/M**3) STAB (M/S) (M/S) (M) HT (M) Y (M) Z (M) DWASH ------- ---------- ---- ----- ----- ------ ------ ------ ------ ----- 61. 50.66 4 15.0 16.0 4800.0 15.52 5.19 7.14 SS 100. 54.79 4 15.0 16.0 4800.0 16.03 8.20 8.96 SS 200. 37.02 4 15.0 16.0 4800.0 18.08 15.56 12.85 SS 300. 23.86 4 15.0 16.0 4800.0 20.69 22.61 15.98 SS 400. 16.60 4 15.0 16.0 4800.0 23.47 29.45 18.98 SS 500. 12.26 4 15.0 16.0 4800.0 26.26 36.15 21.87 SS 600. 9.770 4 15.0 16.0 4800.0 28.36 42.72 24.68 SS 700. 8.656 4 15.0 16.0 4800.0 28.36 49.19 27.41 SS 800. 7.645 4 15.0 16.0 4800.0 28.36 55.57 30.08 SS 900. 6.846 4 15.0 16.0 4800.0 28.36 61.88 30.74 SS 1000. 6.124 4 15.0 16.0 4800.0 28.36 68.13 33.08 SS
MAXIMUM 1-HR CONCENTRATION AT OR BEYOND 61. M: 92. 55.00 4 15.0 16.0 4800.0 15.92 7.67 8.63 SS
Page 1
723 K with engine diversion 2-14-12.txtScenario 2 - 66% of engine flow through Engine Stack SV001
02/14/12 09:56:24 *** SCREEN3 MODEL RUN *** *** VERSION DATED 96043 ***
Scenario 2 - 66% of engine flow through Engine Stack SV001
SIMPLE TERRAIN INPUTS: SOURCE TYPE = POINT EMISSION RATE (G/S) = 1.00000 STACK HEIGHT (M) = 15.2000 STK INSIDE DIAM (M) = .9000 STK EXIT VELOCITY (M/S)= 28.9000 STK GAS EXIT TEMP (K) = 723.7000 AMBIENT AIR TEMP (K) = 293.0000 RECEPTOR HEIGHT (M) = .0000 URBAN/RURAL OPTION = RURAL BUILDING HEIGHT (M) = 12.3000 MIN HORIZ BLDG DIM (M) = 17.7000 MAX HORIZ BLDG DIM (M) = 30.5000
THE REGULATORY (DEFAULT) MIXING HEIGHT OPTION WAS SELECTED. THE REGULATORY (DEFAULT) ANEMOMETER HEIGHT OF 10.0 METERS WAS ENTERED.
BUOY. FLUX = 34.154 M**4/S**3; MOM. FLUX = 68.475 M**4/S**2.
*** FULL METEOROLOGY ***
********************************** *** SCREEN AUTOMATED DISTANCES *** **********************************
*** TERRAIN HEIGHT OF 0. M ABOVE STACK BASE USED FOR FOLLOWING DISTANCES ***
DIST CONC U10M USTK MIX HT PLUME SIGMA SIGMA (M) (UG/M**3) STAB (M/S) (M/S) (M) HT (M) Y (M) Z (M) DWASH ------- ---------- ---- ----- ----- ------ ------ ------ ------ ----- 61. 70.55 4 15.0 16.0 4800.0 15.38 5.19 7.80 SS 100. 68.97 4 15.0 16.0 4800.0 15.67 8.20 9.79 SS 200. 43.61 4 15.0 16.0 4800.0 16.94 15.56 13.76 SS 300. 28.23 4 15.0 16.0 4800.0 18.71 22.61 16.85 SS 400. 19.74 4 15.0 16.0 4800.0 20.75 29.45 19.82 SS 500. 15.38 4 15.0 16.0 4800.0 21.71 36.15 22.68 SS 600. 13.08 4 10.0 10.6 3200.0 30.71 42.72 24.70 SS 700. 11.84 4 10.0 10.6 3200.0 30.71 49.19 27.43 SS 800. 10.62 4 10.0 10.6 3200.0 30.71 55.57 30.10 SS 900. 9.539 4 10.0 10.6 3200.0 30.71 61.88 30.76 SS 1000. 8.619 4 10.0 10.6 3200.0 30.71 68.13 33.10 SS
MAXIMUM 1-HR CONCENTRATION AT OR BEYOND 61. M: 74. 71.57 4 15.0 16.0 4800.0 15.47 6.30 8.53 SS
Page 1
338 K with engine diversion to dryer stack 2-14-12.txtScenario 2 - 34% of the Engine Flow through Dryer Stack SV003
02/14/12 09:59:49 *** SCREEN3 MODEL RUN *** *** VERSION DATED 96043 ***
Scenario 2 - 34% of the Engine Flow through Dryer Stack SV003
SIMPLE TERRAIN INPUTS: SOURCE TYPE = POINT EMISSION RATE (G/S) = 1.00000 STACK HEIGHT (M) = 15.2000 STK INSIDE DIAM (M) = .9000 STK EXIT VELOCITY (M/S)= 14.9000 STK GAS EXIT TEMP (K) = 338.2000 AMBIENT AIR TEMP (K) = 293.0000 RECEPTOR HEIGHT (M) = .0000 URBAN/RURAL OPTION = RURAL BUILDING HEIGHT (M) = 12.3000 MIN HORIZ BLDG DIM (M) = 17.7000 MAX HORIZ BLDG DIM (M) = 30.5000
THE REGULATORY (DEFAULT) MIXING HEIGHT OPTION WAS SELECTED. THE REGULATORY (DEFAULT) ANEMOMETER HEIGHT OF 10.0 METERS WAS ENTERED.
BUOY. FLUX = 3.954 M**4/S**3; MOM. FLUX = 38.949 M**4/S**2.
*** FULL METEOROLOGY ***
********************************** *** SCREEN AUTOMATED DISTANCES *** **********************************
*** TERRAIN HEIGHT OF 0. M ABOVE STACK BASE USED FOR FOLLOWING DISTANCES ***
DIST CONC U10M USTK MIX HT PLUME SIGMA SIGMA (M) (UG/M**3) STAB (M/S) (M/S) (M) HT (M) Y (M) Z (M) DWASH ------- ---------- ---- ----- ----- ------ ------ ------ ------ ----- 43. 105.8 6 4.0 5.0 10000.0 16.03 1.85 5.63 SS 100. 183.1 6 4.0 5.0 10000.0 17.45 4.07 8.04 SS 200. 109.2 4 5.0 5.3 1600.0 17.62 15.56 12.02 SS 300. 90.71 4 4.5 4.8 1440.0 18.55 22.61 14.85 SS 400. 75.79 4 4.0 4.3 1280.0 19.93 29.45 17.48 SS 500. 64.45 4 3.5 3.7 1120.0 22.00 36.15 19.93 SS 600. 55.33 4 3.0 3.2 960.0 25.14 42.72 22.17 SS 700. 48.88 4 3.0 3.2 960.0 25.14 49.19 24.97 SS 800. 43.12 4 2.5 2.7 800.0 29.91 55.57 26.93 SS 900. 39.18 4 2.5 2.7 800.0 29.91 61.88 29.61 SS 1000. 35.42 4 2.5 2.7 800.0 29.91 68.13 32.09 SS
MAXIMUM 1-HR CONCENTRATION AT OR BEYOND 43. M: 98. 183.2 6 4.0 5.0 10000.0 17.41 4.03 7.99 SS
Page 1
C:\Documents and Settings\alenshe\Local Settings\Temporary Internet Files\Content.Outlook\498MES1I\Hometown BioEnergy - Biofilter OM Plan.docx
Hometown BioEnergy Biofilter O&M Plan
(January 2012)
1. Maintain manual of biofilter system design plans and recommended operation parameters
2. Perform and record monthly biofilter inspection results for:
a. biofilter containment integrity
b. gas stream connection to biofilter
c. biofilter temperature and moisture level
d. pressure drop across the media bed; replace media if pressure drop exceeds recommended range
e. presence of rodents/pests and possible short-circuiting of the media via tunnels in the media; treat for infestations and work the media to eliminate any channeling of the gas stream
f. presence of weeds
3. Conduct ongoing checks for excessive odor on a weekly basis. If excessive odor is detected, conduct a biofilter inspection. Record remedial actions taken to reestablish effective odor control.
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 1 of 12
Subject Item: Total Facility
NC/CA
Type Citation Requirement
CD hdr SOURCE-SPECIFIC REQUIREMENTS1.0
CD Minn. R. 7007.0800, subp. 2 Permit Appendices: This permit contains two appendices as listed in the permitTable of Contents. The Permittee shall comply with all requirements contained inthe appendices.
2.0
CD Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200
Application for a major permit amendment: If any GP 001 CO emission factorverification test measures at 0.88 g/hp-hr or greater, the Permittee shall submit anapplication for a major amendment. The application shall propose a reduction of the31,000 hr/yr GP 001 operating limit to a level that will limit GP 001 CO emissions tono greater than 85.0 tons per year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
This requirement is repeated under Subject Item GP 001.
3.0
CD Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200
Application for a major permit amendment: If any GP 001 formaldehyde emissionfactor verification test measures at 0.60 lb/hr or greater, the Permittee shall submitan application for a major amendment. The application shall propose a reduction ofthe 31,000 hr/yr GP 001 operating limit to a level that will limit GP 001formaldehyde to less than 9.0 tons/year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
This requirement is repeated under Subject Item GP 001.
4.0
CD hdr OPERATIONAL REQUIREMENTS5.0
CD Minn. R. 7011.0020 Circumvention: Do not install or use a device or means that conceals or dilutesemissions, which would otherwise violate a federal or state air pollution control rule,without reducing the total amount of pollutant emitted.
6.0
CD Minn. R. 7007.0800, subp. 2;Minn. R. 7007.0800, subp. 16(J)
Air Pollution Control Equipment: Operate all pollution control equipment wheneverthe corresponding process equipment and emission units are operated.
7.0
CD Minn. R. 7007.0800, subps. 14and 16(J)
Operation and Maintenance Plan: Retain at the stationary source an operation andmaintenance plan for all air pollution control equipment. At a minimum, the O & Mplan shall identify all air pollution control equipment and control practices and shallinclude a preventative maintenance program for the equipment and practices, adescription of (the minimum but not necessarily the only) corrective actions to betaken to restore the equipment and practices to proper operation to meet applicablepermit conditions, a description of the employee training program for properoperation and maintenance of the control equipment and practices, and the recordskept to demonstrate plan implementation.
8.0
CD Minn. R. 7019.1000, subp. 4 Operation Changes: In any shutdown, breakdown, or deviation the Permittee shallimmediately take all practical steps to modify operations to reduce the emission ofany regulated air pollutant. The Commissioner may require feasible and practicalmodifications in the operation to reduce emissions of air pollutants. No emissionsunits that have an unreasonable shutdown or breakdown frequency of process orcontrol equipment shall be permitted to operate.
9.0
CD Minn. R. 7011.0150 Fugitive Emissions: Do not cause or permit the handling, use, transporting, orstorage of any material in a manner which may allow avoidable amounts ofparticulate matter to become airborne. Comply with all other requirements listed inMinn. R. 7011.0150.
10.0
CD Minn. R. 7030.0010 - 7030.0080 Noise: The Permittee shall comply with the noise standards set forth in Minn. R.7030.0010 to 7030.0080 at all times during the operation of any emission units.This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.
11.0
CD Minn. R. 7007.0800, subp. 9(A) Inspections: The Permittee shall comply with the inspection procedures andrequirements as found in Minn. R. 7007.0800, subp. 9(A).
12.0
CD Minn. R. 7007.0800, subp. 16 The Permittee shall comply with the General Conditions listed in Minn. R.7007.0800, subp. 16.
13.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 2 of 12
CD hdr PERFORMANCE TESTING14.0
CD Minn. R. ch. 7017 Performance Testing: Conduct all performance tests in accordance with Minn. R.ch. 7017 unless otherwise noted in Tables A, B, and/or C.
15.0
CD Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7017.2035, subps. 1-2
Performance Test Notifications and Submittals:
Performance Tests are due as outlined in Table A of the permit.See Table B for additional testing requirements.
Performance Test Notification (written): due 30 days before each Performance TestPerformance Test Plan: due 30 days before each Performance TestPerformance Test Pre-test Meeting: due 7 days before each Performance TestPerformance Test Report: due 45 days after each Performance TestPerformance Test Report - Microfiche Copy: due 105 days after each PerformanceTest
The Notification, Test Plan, and Test Report may be submitted in an alternativeformat as allowed by Minn. R. 7017.2018.
16.0
CD Minn. R. 7017.2025, subp. 3 Limits set as a result of a performance test (conducted before or after permitissuance) apply until superseded as stated in the MPCA's Notice of Complianceletter granting preliminary approval. Preliminary approval is based on formal reviewof a subsequent performance test on the same unit as specified by Minn. R.7017.2025, subp. 3. The limit is final upon issuance of a permit amendmentincorporating the change.
17.0
CD hdr MONITORING REQUIREMENTS18.0
CD Minn. R. 7007.0800, subp. 4(D) Monitoring Equipment Calibration: The Permittee shall calibrate all requiredmonitoring equipment at least once every 12 months (any requirements applying tocontinuous emission monitors are listed separately in this permit).
19.0
CD Minn. R. 7007.0800, subp. 4(D) Operation of Monitoring Equipment: Unless otherwise noted in Tables A, B, and/orC, monitoring a process or control equipment connected to that process is notnecessary during periods when the process is shutdown, or during checks of themonitoring systems, such as calibration checks and zero and span adjustments. Ifmonitoring records are required, they should reflect any such periods of processshutdown or checks of the monitoring system.
20.0
CD hdr RECORDKEEPING21.0
CD Minn. R. 7007.0800, subp. 5(C) Recordkeeping: Retain all records at the stationary source, unless otherwisespecified within this permit, for a period of five (5) years from the date of monitoring,sample, measurement, or report. Records which must be retained at this locationinclude all calibration and maintenance records, all original recordings forcontinuous monitoring instrumentation, and copies of all reports required by thepermit. Records must conform to the requirements listed in Minn. R. 7007.0800,subp. 5(A).
22.0
CD Minn. R. 7007.0800, subp. 5(B) Recordkeeping: Maintain records describing any insignificant modifications (asrequired by Minn. R. 7007.1250, subp. 3) or changes contravening permit terms (asrequired by Minn. R. 7007.1350, subp. 2), including records of the emissionsresulting from those changes.
23.0
CD Minn. R. 7007.1200, subp. 4 If the Permittee determines that no permit amendment or notification is requiredprior to making a change, the Permittee must retain records of all calculationsrequired under Minn. R. 7007.1200. For nonexpiring permits, these records shall bekept for a period of five years from the date that the change was made. The recordsshall be kept at the stationary source for the current calendar year of operation andmay be kept at the stationary source or office of the stationary source for all otheryears. The records may be maintained in either electronic or paper format.
24.0
CD hdr REPORTING/SUBMITTALS25.0
CD Minn. R. 7019.1000, subp. 3 Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of aplanned shutdown of any control equipment or process equipment if the shutdownwould cause any increase in the emissions of any regulated air pollutant. If theowner or operator does not have advance knowledge of the shutdown, notificationshall be made to the Commissioner as soon as possible after the shutdown.However, notification is not required in the circumstances outlined in Items A, Band C of Minn. R. 7019.1000, subp. 3.
At the time of notification, the owner or operator shall inform the Commissioner ofthe cause of the shutdown and the estimated duration. The owner or operator shallnotify the Commissioner when the shutdown is over.
26.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 3 of 12
CD Minn. R. 7019.1000, subp. 2 Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdownof more than one hour duration of any control equipment or process equipment ifthe breakdown causes any increase in the emissions of any regulated air pollutant.The 24-hour time period starts when the breakdown was discovered or reasonablyshould have been discovered by the owner or operator. However, notification is notrequired in the circumstances outlined in Items A, B and C of Minn. R. 7019.1000,subp. 2.
At the time of notification or as soon as possible thereafter, the owner or operatorshall inform the Commissioner of the cause of the breakdown and the estimatedduration. The owner or operator shall notify the Commissioner when the breakdownis over.
27.0
CD Minn. R. 7019.1000, subp. 1 Notification of Deviations Endangering Human Health or the Environment: As soonas possible after discovery, notify the Commissioner or the state duty officer, eitherorally or by facsimile, of any deviation from permit conditions which could endangerhuman health or the environment.
28.0
CD Minn. R. 7019.1000, subp. 1 Notification of Deviations Endangering Human Health or the Environment Report:Within 2 working days of discovery, notify the Commissioner in writing of anydeviation from permit conditions which could endanger human health or theenvironment. Include the following information in this written description:1. the cause of the deviation;2. the exact dates of the period of the deviation, if the deviation has been corrected;3. whether or not the deviation has been corrected;4. the anticipated time by which the deviation is expected to be corrected, if not yetcorrected; and5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of thedeviation.
29.0
S/A Minn. R. 7007.0800, subp. 6(A)(2) Semiannual Deviations Report: due 30 days after end of each calendar half-yearfollowing Permit Issuance. The first semiannual report submitted by the Permitteeshall cover the calendar half-year in which the permit is issued. The first report ofeach calendar year covers January 1 - June 30. The second report of eachcalendar year covers July 1 - December 31. If no deviations have occurred, thePermittee shall submit the report stating no deviations.
30.0
CD Minn. R. 7007.1150 - 7007.1500 Application for Permit Amendment: If a permit amendment is needed, submit anapplication in accordance with the requirements of Minn. R. 7007.1150 throughMinn. R. 7007.1500. Submittal dates vary, depending on the type of amendmentneeded.
31.0
CD Minn. R. 7007.1400, subp. 1(H) Extension Requests: The Permittee may apply for an Administrative Amendment toextend a deadline in a permit by no more than 120 days, provided the proposeddeadline extension meets the requirements of Minn. R. 7007.1400, subp. 1(H).Performance testing deadlines from the General Provisions of 40 CFR pt. 60 andpt. 63 are examples of deadlines for which the MPCA does not have authority togrant extensions and therefore do not meet the requirements of Minn. R.7007.1400, subp. 1(H).
32.0
S/A Minn. R. 7007.0800, subp. 6(C) Compliance Certification: due 31 days after end of each calendar year followingPermit Issuance (for the previous calendar year). The Permittee shall submit this tothe Commissioner on a form approved by the Commissioner. This report covers alldeviations experienced during the calendar year.
33.0
CD Minn. R. 7019.3000 - 7019.3100 Emission Inventory Report: due on or before April 1 of each calendar year followingpermit issuance, to be submitted on a form approved by the Commissioner.
34.0
CD Minn. R. 7002.0005 - 7002.0095 Emission Fees: due 60 days after receipt of an MPCA bill.35.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 4 of 12
Subject Item: GP 001 Generator Engines
Associated Items: EU 001 Generator Engine
EU 002 Generator Engine
EU 003 Generator Engine
EU 004 Generator Engine
NC/CA
Type Citation Requirement
CD hdr EMISSION LIMITS1.0
LIMIT Minn. R. 7011.2300, subp. 1 Opacity: less than or equal to 20 percent once operating temperatures have beenattained.
2.0
LIMIT Minn. R. 7011.2300, subp. 2 Sulfur Dioxide: less than or equal to 0.50 lbs/million Btu heat input . The potentialto emit from the unit is 0.21 lb/MMBtu due to equipment design and allowable fuels.
3.0
LIMIT Minn. R. 7005.0100, subp. 35a; 40CFR 241.3; Minn. R. 7011.2300,subp. 2; Minn. Stat. Section116.07, subds. 4a & 9; Minn. R.7007.0100, subp. 7(A), 7(L), &7(M); Minn. R. 7007.0800, subps.1, 2 & 4; Minn. R.7009.0010-7009.0080
Hydrogen Sulfide: less than or equal to 300 parts per million in conditioned biogas.4.0
LIMIT Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200
Operating Hours: less than or equal to 31,000 hours/year total for the fourgenerator engines (EU 001, EU 002, EU 003, EU 004), calculated monthly by thelast day of each month. This limit may be revised through a major amendmentbased on results from CO emission factor testing required by this permit.
During the initial 12 months of operation, the applicable operating hours limit as ofmonth 'n' shall be the following:
month 1 = 2,976 hrsmonth 2 = 5,856 hrsmonth 3 = 8,832 hrsmonth 4 = 11,712 hrsmonth 5 = 14,688 hrsmonth 6 = 17,568 hrsmonth 7 = 20,544 hrsmonth 8 = 23,424 hrsmonth 9 = 26,400 hrsmonth 10 = 29,280 hrsmonth 11 = 30,140 hrsmonth 12 = 31,000 hrs
5.0
CD hdr OPERATING CONDITIONS6.0
CD Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200
Application for a major permit amendment: If any GP 001 CO emission factorverification test measures at 0.88 g/hp-hr or greater, the Permittee shall submit anapplication for a major amendment. The application shall propose a reduction of the31,000 hr/yr GP 001 operating limit to a level that will limit GP 001 CO emissions tono greater than 85.0 tons per year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
7.0
CD Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200
Application for a major permit amendment: If any GP 001 formaldehyde emissionfactor verification test measures at 0.60 lb/hr or greater, the Permittee shall submitan application for a major amendment. The application shall propose a reduction ofthe 31,000 hr/yr GP 001 operating limit to a level that will limit GP 001formaldehyde to less than 9.0 tons/year.
The application shall be submitted no later than 30 days after the Permittee'sreceipt of the MPCA letter approving the performance test results (i.e. a Notice ofVerification).
8.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 5 of 12
CD Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200; Minn. R. 7005.0100,subp. 35a
Fuel Usage: limited to biogas produced onsite through anaerobic digestion ofapproved feedstock material defined below.
9.0
CD 40 CFR Section 241 Materials authorized in this permit as feedstock:Agricultural material including: vegetable processing residuals, silage, manure,grasses, hays, snack foods, cereals, and cellulosic biomass.
10.0
CD Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the catalysts (CE 001-004) any time thatany process equipment controlled by the engine catalyst is in operation. ThePermittee shall document periods of non-operation of the control equipment.See GP 002 for control equipment requirements.
11.0
CD Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200; 40 CFR Section60.4243(a)(2)(iii)
The engines in this group (EU 001, EU 002, EU 003, EU 004) separately must beequipped with non-resettable hour meters.
12.0
CD hdr FUEL TESTING REQUIREMENTS13.0
S/A Minn. R. 7007.0800, subp. 4 Initial Fuel Analysis: due 30 days after Initial Startup. Analysis of conditionedbiogas for hydrogen sulfide (H2S) following ASTM Method D-5504 and EPAMethod 18.
Fuel sample must be obtained from the fuel feed pipe to the engines. For the initialfuel analysis only: laboratory sample analysis shall performed to confirm onsitesample analysis.
14.0
S/A Minn. R. 7007.0800, subp. 4 Fuel Analysis: due 30 days after Initial Fuel Analysis for H2S following ASTMMethod D-5504 and EPA Method 18. Fuel sample must be obtained from the fuelfeed pipe to the engines.
After a total of 12 sampling events, fuel sampling and analysis may be changed toquarterly sampling if the monthly data results are below 150 ppm.
15.0
CD Minn. R. 7007.0800, subp. 4 Additional Fuel Analysis for H2S when the digester feedstock makeup changes by30% or more on a dry weight basis following ASTM Method D-5504 and EPAMethod 18.
16.0
CD hdr PERFORMANCE TESTING17.0
S/A Minn. R. 7017.2020, subp. 1 Initial Performance Test: due 90 days after Initial Startup for formaldehyde.18.0
S/A Minn. R. 7017.2020, subp. 1 Performance Test: due 180 days after Initial Performance Test to test formaldehydeemissions, not to exceed 6 months between test dates. After a total of three tests,if the average of the results are below 0.40 lb/hr, the Permittee shall notify theMPCA in writing that testing for formaldehyde will be discontinued. If the average ofthe results are above 0.40 lb/hr, the Permittee shall submit a test frequency plan tothe MPCA.
If any results are over 0.60 lb/hr the Permittee shall submit an application for amajor amendment. The application shall propose a reduction of the 31,000 hr/yr GP001 operating limit to a level that will limit GP 001 formaldehyde emissions to nogreater than 9.0 tons per year.
19.0
S/A Minn. R. 7017.2020, subp. 1 Initial Performance Test: due 90 days after Initial Startup for arsenic20.0
S/A Minn. R. 7017.2020, subp. 1 Performance Test: due 180 days after Initial Performance Test for arsenicemissions, not to exceed 6 months between test dates. After a total of three tests, ifthe results are negligible, the Permittee shall notify the MPCA in writing that testingfor arsenic will be discontinued.
21.0
S/A Minn. R. 7017.2020, subp. 1 Initial Performance Test: due 90 days after Initial Startup for hydrochloric acid22.0
S/A Minn. R. 7017.2020, subp. 1 Performance Test: due 180 days after Initial Performance Test for HCl emissions,not to exceed 6 months between test dates. After a total of three tests, if theresults are negligible, the Permittee shall notify the MPCA in writing that testing forHCl will be discontinued.
23.0
CD hdr RECORDKEEPING REQUIREMENTS24.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 6 of 12
CD Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200; Minn. R. 7007.0800,subp. 4 and 5
Monthly Calculations:By the last day of the month, the Permittee shall calculate and record the following:1) Total hours of operation for the month for all emission units in GP 001.2) The 12 month rolling sum of operating hours for the previous 12 month period bysumming the monthly operating hours for the previous 12 months.
25.0
CD hdr NSPS JJJJ REQUIREMENTS26.0
LIMIT 40 CFR Section 60.4233(e) Nitrogen Oxides: less than or equal to 1.0 grams/horsepower-hour or 82 ppmvd at15% oxygen.
27.0
LIMIT 40 CFR Section 60.4233(e) Carbon Monoxide: less than or equal to 2.0 grams/horsepower-hour or 270 ppmvdat 15% oxygen.
28.0
LIMIT 40 CFR Section 60.4233(e) Volatile Organic Compounds: less than or equal to 0.70 grams/horsepower-hour29.0
CD 40 CFR Section 60.4243(g) Air-to-fuel ratio controllers shall be used with the operation of three-waycatalysts/non-selective catalytic reduction. The AFR controller must be maintainedand operated appropriately in order to ensure proper operation of the engine andcontrol device to minimize emissions at all times.
30.0
CD 40 CFR Section 60.4243(a)(2), 40CFR Section 60.4243(a)(2)(iii)
A non-certified stationary SI internal combustion engine shall demonstratecompliance by:- keeping a maintenance plan and records of conducted maintenance- maintaining and operate the engine in a manner consistent with good air pollutioncontrol practice for minimizing emissions, to the extent practicable- conducting an initial performance test within 1 year of engine startup andconducting subsequent performance testing every 8,760 hours or 3 years,whichever comes first, thereafter.
31.0
S/A 40 CFR Section 60.4243(a)(2), 40CFR Section 60.4243(a)(2)(iii)
Initial Performance Test: due 365 days after Startup of each engine for NOx. Thisrequirement applies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 1.0g/hp-hr.
32.0
S/A 40 CFR Section 60.4243(a)(2), 40CFR Section 60.4243(a)(2)(iii)
Initial Performance Test: due 365 days after Startup of each engine for CO. Thisrequirement applies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 2.0g/hp-hr. If results are at or greater than 0.88 g/hp-hr see operating condition aboveregarding submitting a major permit amendment.
33.0
S/A 40 CFR Section 60.4243(a)(2), 40CFR Section 60.4243(a)(2)(iii)
Initial Performance Test: due 365 days after Initial Startup of each engine forVOCs. This requirement applies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 0.70g/hp-hr.
34.0
S/A 40 CFR Section 60.4243(a)(2), 40CFR Section 60.4243(a)(2)(iii)
Performance Test: due before end of each 36 months following Initial PerformanceTest or 8,760 hours of operation, whichever comes first for NOx. This requirementapplies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 1.0g/hp-hr.
35.0
S/A 40 CFR Section 60.4243(a)(2), 40CFR Section 60.4243(a)(2)(iii)
Performance Test: due before end of each 36 months following Initial PerformanceTest or 8,760 hours of operation, whichever comes first for CO. This requirementapplies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 2.0g/hp-hr. If results are at or greater than 0.88 g/hp-hr see operating condition aboveregarding submitting a major permit amendment.
36.0
S/A 40 CFR Section 60.4243(a)(2), 40CFR Section 60.4243(a)(2)(iii)
Performance Test: due before end of each 36 months following Initial PerformanceTest or 8,760 hours of operation, whichever comes first for VOCs. This requirementapplies separately to each engine.
Compliance with NSPS Subpart JJJJ is demonstrated if results are less than 0.70g/hp-hr.
37.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 7 of 12
CD 40 CFR Section 60.4245(a) The Permittee shall keep records of the following:(1) All notifications submitted to comply with Subpart JJJJ and all documentationsupporting any notification;(2) Maintenance conducted on the engine;(3) If the engine is certified, documentation from the manufacturer that the engine iscertified to meet the emission standards and information as required in 40 CFRParts 90 and 1048; and(4) If the engine is non-certified or is certified but operating in a non-certifiedmanner and subject to 40 CFR Section 60.4243(a), documentation that the enginemeets the emission standards.
38.0
CD 40 CFR Section 60.4244 The Permittee shall follow the procedures in 40 CFR Section 60.4244(a) through (f)when conducting performance tests.
39.0
CD 40 CFR Section 60.4245(c) The Permittee must submit an initial notification as required in 40 CFR Section60.7(a)(1). The notification must include the following information:1) Name and address of the Permittee;2) The address of the affected source;3) Engine information including make, model, engine family, serial number, modelyear, maximum engine power, and engine displacement;4) Emission control equipment; and5) Fuel used.
40.0
CD 40 CFR Section 60.4245(d) The Permittee must submit a copy of each performance test as conducted in 40CFR Section 60.4244 within 60 days after the test has been completed.
41.0
CD hdr NESHAP ZZZZ REQUIREMENTS42.0
CD 40 CFR Section 63.6590(c); Minn.R. 7011.8150
EU 001, EU 002, EU 003, EU 004 are new affected sources as defined under 40CFR pt. 63, subp. ZZZZ, and the facility is an area source as defined at 40 CFRSection 63.2. The Permittee shall meet the requirements of 40 CFR pt. 63, subp.ZZZZ by meeting the requirements of 40 CFR pt. 60, subp. JJJJ. No furtherrequirements of 40 CFR pt. 63, subp. ZZZZ apply to EU 001, EU 002, EU 003, EU004.
43.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 8 of 12
Subject Item: GP 002 CO Catalysts
Associated Items: CE 001 Catalytic Oxidizer
CE 002 Catalytic Oxidizer
CE 003 Catalytic Oxidizer
CE 004 Catalytic Oxidizer
NC/CA
Type Citation Requirement
CD hdr EMISSION AND OPERATIONAL LIMITS1.0
CD Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the engine catalyst any time that anyprocess equipment controlled by the engine catalyst is in operation. The Permitteeshall document periods of non-operation of the control equipment.
2.0
LIMIT Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for Volatile Organic Compounds: greater thanor equal to 60 percent control efficiency
3.0
LIMIT Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for Carbon Monoxide: greater than or equal to60 percent control efficiency
4.0
LIMIT Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for HAPs - Total: greater than or equal to 60percent control efficiency
5.0
LIMIT Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
The Permittee shall operate and maintain the control equipment such that itachieves an overall control efficiency for Formaldehyde: greater than or equal to 60percent control efficiency
6.0
LIMIT Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
Temperature: greater than or equal to 550 degrees F and less than or equal to1250 degrees F using 3-hour Rolling Average unless a new limit is set pursuant toMinn. R. 7017.2025, subp. 3 based on the values recorded during the most recentMPCA-approved performance test where compliance was demonstrated. The newlimit shall be implemented upon receipt of the Notice of Compliance letter grantingpreliminary approval. The limit is final upon issuance of a permit amendmentincorporating the change. If the temperature is below the minimum inlettemperature limit, the CO, VOC and HAPs used during that time shall beconsidered uncontrolled until the inlet temperature is above the minimumtemperature limit. This shall be reported as a deviation.
7.0
CD hdr MONITORING AND RECORDKEEPING8.0
S/A Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
Sample Analysis: due before end of each 24 months following Startup. ThePermittee shall send a representative sample of the catalyst to a laboratory to testthe catalyst's activity. If test results show a activity of less than 60%, the Permitteeshall follow the corrective actions contained in the Operation and MaintenancePlan.
9.0
CD Minn. R. 7007.0800, subps. 4 and5
Daily Monitoring: The Permittee shall physically verify the operation of thetemperature recording device at least once each operating day to verify that it isworking and recording properly. The Permittee shall maintain a written record of thedaily verifications.
10.0
CD Minn. R. 7007.0800, subp. 4 Monitoring Equipment: The Permittee shall install and maintain thermocouples formeasuring the temperatures as required by this permit. The monitoring equipmentmust be installed, in use, and properly maintained whenever the monitored controlequipment is required to be operated.
11.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 9 of 12
CD Minn. R. 7007.0800, subps. 4 and5
The Permittee shall maintain and operate a thermocouple monitoring device thatcontinuously indicates and records both the inlet and outlet temperatures of thecatalytic oxidizer. The monitoring device shall have a margin of error less than thegreater of +/- 0.75 percent of the temperature being measured or +/- 2.5 degreesCelsius. The recording device shall also calculate the three-hour rolling averageinlet temperature.
12.0
CD Title I Condition: To avoidclassification as a major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200; Minn. R.7007.0800, subps. 4 and 5
The Permittee shall maintain a continuous hard copy readout or computer disk fileof the inlet and outlet temperatures and the calculated three-hour rolling averageinlet temperature.
13.0
CD Minn. R. 7007.0800, subps. 4, 5,and 14
Monthly Monitoring: At least once each month during normal operation, thePermittee shall record the temperature rise across the catalyst (outlet temp. - inlettemp.) while the process is running. If it is determined that the catalyst reactivityhas been impaired, by comparison of the observed temperature rise to the pasttemperature rise records, the Permittee shall follow the corrective actions in theOperation and Maintenance Plan. The Permittee shall maintain written records ofthe monitoring and any corrective actions taken.
14.0
CD Minn. R. 7007.0800, subps. 4, 5,and 14
Quarterly Inspections: At least once per calendar quarter, or more frequently ifrequired by the manufacturer specifications, the Permittee shall inspect the controlequipment internal and external system components, including but not limited to therefractory, heat exchanger, and electrical systems. The Permittee shall maintain awritten record of the inspection and any corrective actions taken resulting from theinspection.
15.0
CD Minn. R. 7007.0800, subps. 4, 5,and 14
Annual Calibration: The Permittee shall calibrate the temperature monitor at leastannually and shall maintain a written record of the calibration and any actionresulting from the calibration.
16.0
CD Title I Condition: To avoidclassification as major sourceunder 40 CFR Section 70.2 andMinn. R. 7007.0200, Minn. R.7007.0800, subps. 2 and 14
For periods when the catalytic oxidizer is operated above the minimum inlettemperature, the Permittee shall use either one of the following when completingcalculations as required elsewhere in this permit:a. The overall control efficiency limit specified in this permit for this equipment(60%); orb. The overall control efficiency determined during the most recent MPCA approvedperformance test. If the tested efficiency is less than the efficiency limit in thispermit, the Permittee must use the tested value in all calculations until theefficiency is demonstrated to be above the permit limit through a new test
17.0
CD Minn. R. 7007.0800, subps. 4, 5,and 14
Corrective Actions: If the temperature is below the minimum specified by this permitor if the catalytic oxidizer or any of its components are found during the inspectionsto need repair, the Permittee shall take corrective action as soon as possible.Corrective actions shall return the temperature to at least the permitted minimumand/or include completion of necessary repairs identified during the inspection, asapplicable. Corrective actions include, but are not limited to, those outlined in the O& M Plan for the catalytic oxidizer. The Permittee shall keep a record of the typeand date of any corrective action taken.
18.0
CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain the CO Catalyst in accordance with theOperation and Maintenance (O & M) Plan. The Permittee shall keep copies of theO & M Plan available onsite for use by staff and MPCA staff.
19.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 10 of 12
Subject Item: EU 005 Boiler
Associated Items: SV 002 Hot Water Boiler
NC/CA
Type Citation Requirement
CD Minn. R. 7005.0100, subp. 35a Fuels allowed: propane, by equipment design.1.0
LIMIT Minn. R. 7011.0515, subp. 1 Total Particulate Matter: less than or equal to 0.40 lbs/million Btu heat input . Thepotential to emit from the unit is 0.008 lb/MMBtu due to equipment design andallowable fuels.
2.0
LIMIT Minn. R. 7011.0515, subp. 2 Opacity: less than or equal to 20 percent except for one six-minute period per hourof not more than 60 percent opacity.
3.0
CD 40 CFR Section 60.48c(g); Minn.R. 7011.0570
Recordkeeping: By the last day of each calendar month, the Permittee shall recordthe amount of propane combusted in the boiler during the previous calendar month.These records shall consist of purchase records, receipts, or fuel meter readings.
4.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 11 of 12
Subject Item: EU 006 Solid Fuel Drying and Prep
Associated Items: SV 003 Solid fuel drying and prep
NC/CA
Type Citation Requirement
LIMIT Minn. R. 7011.0715, subp. 1(A) Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011.0735.
1.0
LIMIT Minn. R. 7011.0715, subp. 1(B) Opacity: less than or equal to 20 percent2.0
S/A Minn. R. 7017.2020, subp. 1 Initial Performance Test: due 365 days after Initial Startup of EU 006 to verify theVOC emission factor (this is not a test for compliance determination).
The VOC emission factor for this unit is 2.90 lbs/hr.
3.0
S/A Minn. R. 7017.2020, subp. 1 Initial Performance Test: due 365 days after Initial Startup of EU 006 to verify thePM, PM10 and PM2.5 emission factor (this is not a test for compliancedetermination).
The PM, PM10 and PM2.5 emission factor for this unit is 0.00 lbs/hr.
4.0
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01
Facility Name: Hometown BioEnergy
Permit Number: 07900050 - 001
3 May, 2012 10:14Page 12 of 12
Subject Item: EU 007 Flare
Associated Items: SV 004 Flare
NC/CA
Type Citation Requirement
LIMIT Title I Condition: To avoid majorsource classification under 40CFR Section 70.2 and Minn. R.7007.0200
Operating Hours: less than or equal to 200 hours/year using 12-month Rolling Sum. Calculated by the 15th of the month for the preceding month.
1.0
LIMIT Minn. R. 7011.0610, subp. 1(A)(1)and Minn. R. 7011.0735
Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011.0735.
2.0
LIMIT Minn. R. 7011.0610, subp. 1(A)(2) Opacity: less than or equal to 20 percent except for one six-minute period per hourof not more than 60 percent opacity.
3.0
CD Minn. R. 7007.0800, subp. 5 The Permittee shall keep records of hours of operation on a daily basis.4.0
ST. P
AU
L, M
N 5
5155
-419
4
Sho
w:
Act
ive
and
Pen
ding
Rec
ords
Act
ion:
PE
R 0
01A
QD
Fac
ility
ID:
0790
0050
Faci
lity
Nam
e:MIN
NES
OTA
PO
LLU
TIO
N C
ON
TRO
L A
GEN
CY
AIR
QU
ALI
TY52
0 LA
FAY
ETTE
RO
AD
21 F
ebru
ary,
201
2 1
6:08
FAC
ILIT
Y D
ESC
RIP
TIO
N: E
MIS
SIO
N U
NIT
(EU
)
Max
Fuel
Inpu
t(m
il B
tu)
Hom
etow
n B
ioE
nerg
y
Ret
ired
By
(Act
ion)
Ope
rato
r Des
crip
tion
ID N
o.E
mis
sion
Uni
tS
tatu
s
Add
edB
y(A
ctio
n)
Con
trol
Equ
ip.
ID N
o(s)
.
Sta
ck/
Ven
tID
No(
s).
Ope
rato
rID
for I
tem
Insi
gnif-
ican
tA
ctiv
ity
SIC
Man
ufac
ture
rM
odel
Num
ber
Max
.D
esig
nC
apac
ity
Max
imum
Des
ign
Cap
acity
Mat
eria
lsU
nits
nU
nits
d
18.4
41
Gen
erat
or E
ngin
eE
U 0
01A
ctiv
eP
ER
001
CE
001
CE
005
SV
001
(M)
Hr
Ele
ct E
nerg
y49
31C
umm
ins
QS
V91
5398
Kw
18.4
42
Gen
erat
or E
ngin
eE
U 0
02A
ctiv
eP
ER
001
CE
002
CE
005
SV
001
(M)
Hr
Ele
ct E
nerg
y49
31C
umm
ins
QS
V91
5398
Kw
18.4
43
Gen
erat
or E
ngin
eE
U 0
03A
ctiv
eP
ER
001
CE
003
CE
005
SV
001
(M)
Hr
Ele
ct E
nerg
y49
31C
umm
ins
QS
V91
5398
Kw
18.4
44
Gen
erat
or E
ngin
eE
U 0
04A
ctiv
eP
ER
001
CE
004
CE
005
SV
001
(M)
Hr
Ele
ct E
nerg
y49
31C
umm
ins
QS
V91
5398
Kw
105
Boi
ler
EU
005
Act
ive
PE
R 0
01S
V 0
02 (M
)H
rFu
el49
31TB
D11
0.5
Gal
6S
olid
Fue
l Dry
ing
and
Pre
pE
U 0
06A
ctiv
eP
ER
001
SV
003
(M)
Hr
Wat
er49
31TB
D13
15L
7Fl
are
EU
007
Act
ive
PE
R 0
01S
V 0
0449
31TB
D
Page
1 o
f 1 (
a)
21 F
ebru
ary,
201
2 1
6:08
FAC
ILIT
Y D
ESC
RIP
TIO
N: E
MIS
SIO
N U
NIT
(EU
)
ID N
o.E
leva
tor
Type
Bot
tlene
ckP
ct.
Fuel
/S
pace
Hea
t
Firin
g M
etho
dA
dded
By
(Act
ion)
Rem
oval
Dat
eIn
itial
Sta
rtup
Dat
e
Com
m-
ence
Con
st.
Dat
e
Em
issi
onU
nit
Sta
tus
1E
U 0
010
PE
R 0
01A
ctiv
e
2E
U 0
020
PE
R 0
01A
ctiv
e
3E
U 0
030
PE
R 0
01A
ctiv
e
4E
U 0
040
PE
R 0
01A
ctiv
e
5E
U 0
05P
ER
001
Act
ive
6E
U 0
06P
ER
001
Act
ive
7E
U 0
07P
ER
001
Act
ive
Page
1 o
f 1 (
b)
MIN
NES
OTA
PO
LLU
TIO
N C
ON
TRO
L A
GEN
CY
AIR
QU
ALI
TY52
0 LA
FAY
ETTE
RO
AD
ST. P
AU
L, M
N 5
5155
-419
4
Sho
w:
Act
ion:
AQ
D F
acili
ty ID
:Fa
cilit
y N
ame:
Act
ive
and
Pen
ding
Rec
ords
PE
R 0
0107
9000
50H
omet
own
Bio
Ene
rgy
FAC
ILIT
Y D
ESC
RIP
TIO
N: G
RO
UPS
(GP)
21 F
ebru
ary,
201
2 1
6:08
ID N
o.A
dded
By
(Act
ion)
Ret
ired
By
(Act
ion)
Incl
ude
in E
IO
pera
tor
IDfo
r Ite
m
Gro
up D
escr
iptio
nG
roup
Item
sG
roup
Sta
tus
1G
P 0
01P
ER
001
Gen
erat
or E
ngin
esE
U 0
01, E
U 0
02, E
U 0
03, E
U 0
04A
ctiv
e
2G
P 0
02P
ER
001
CO
Cat
alys
tsC
E 0
01, C
E 0
02, C
E 0
03, C
E 0
04A
ctiv
e
Page
1 o
f 1
MIN
NES
OTA
PO
LLU
TIO
N C
ON
TRO
L A
GEN
CY
AIR
QU
ALI
TY52
0 LA
FAY
ETTE
RO
AD
ST. P
AU
L, M
N 5
5155
-419
4
Sho
w:
Act
ive
and
Pen
ding
Rec
ords
Act
ion:
PE
R 0
01A
QD
Fac
ility
ID:
0790
0050
Faci
lity
Nam
e:H
omet
own
Bio
Ene
rgy
21 F
ebru
ary,
201
2 1
6:08
FAC
ILIT
Y D
ESC
RIP
TIO
N: C
ON
TR
OL
EQ
UIP
ME
NT
(CE
)
ID N
o.A
dded
By
(Act
ion)
Ret
ired
By
(Act
ion)
Ope
rato
rID
for I
tem
Con
trol
Equ
ip.
Type
Con
trol E
quip
men
t Des
crip
tion
Mod
elC
ontro
lE
quip
.S
tatu
s
Man
ufac
ture
rP
ollu
tant
sC
ontro
lled
Afte
rbur
ner
Com
bust
ion
Par
amet
ers
Cap
ture
Effi
cien
cy(%
)
Des
truct
ion/
Col
lect
ion
Effi
cien
cy(%
)
1C
E 0
01P
ER
001
109
Cat
alyt
ic O
xidi
zer
ZCS
-54x
61-2
0/24
Act
ive
Mira
tech
CO
HA
Ps
VO
C
100
100
100
60 60 60
2C
E 0
02P
ER
001
109
Cat
alyt
ic O
xidi
zer
ZCS
-54x
61-2
0/24
Act
ive
Mira
tech
CO
HA
Ps
VO
C
100
100
100
60 60 60
3C
E 0
03P
ER
001
109
Cat
alyt
ic O
xidi
zer
ZCS
-54x
61-2
0/24
Act
ive
Mira
tech
CO
HA
Ps
VO
C
100
100
100
60 60 60
4C
E 0
04P
ER
001
109
Cat
alyt
ic O
xidi
zer
ZCS
-54x
61-2
0/24
Act
ive
Mira
tech
CO
HA
Ps
VO
C
100
100
100
60 60 60
Page
1 o
f 1
MIN
NES
OTA
PO
LLU
TIO
N C
ON
TRO
L A
GEN
CY
AIR
QU
ALI
TY52
0 LA
FAY
ETTE
RO
AD
ST. P
AU
L, M
N 5
5155
-419
4
Sho
w:
Act
ive
and
Pen
ding
Rec
ords
Act
ion:
PE
R 0
01A
QD
Fac
ility
ID:
0790
0050
Faci
lity
Nam
e:H
omet
own
Bio
Ene
rgy
21 F
ebru
ary,
201
2 1
6:08
FAC
ILIT
Y D
ESC
RIP
TIO
N: S
TA
CK
/VE
NT
S (S
V)
ID N
o.D
isch
arge
Dire
ctio
nFl
ow R
ate/
Tem
pera
ture
Info
rmat
ion
Sou
rce
Exi
t Gas
Tem
pera
ture
at T
op(º
F)
Des
ign
Flow
Rat
eat
Top
(AC
FM)
Wid
th(fe
et)
Dia
met
eror
Len
gth
(feet
)
Insi
de D
imen
sion
sH
eigh
t of
Ope
ning
From
Gro
und
(feet
)
Add
edB
y(A
ctio
n)
Ret
ired
By
(Act
ion)
Ope
rato
rID
for I
tem
Ope
rato
rs D
escr
iptio
nS
tack
/V
ent
Sta
tus
1S
V 0
01U
p, N
o C
apM
anuf
actu
rer
843
6084
83
50P
ER
001
Gen
erat
or E
ngin
es -
4A
ctiv
e
2S
V 0
02U
p, N
o C
apE
stim
ate
300
1000
02.
548
PE
R 0
01H
ot W
ater
Boi
ler
Act
ive
3S
V 0
03U
p, N
o C
apE
stim
ate
149
9100
350
PE
R 0
01S
olid
fuel
dry
ing
and
prep
Act
ive
4S
V 0
04U
p, N
o C
apE
stim
ate
10P
ER
001
Flar
eA
ctiv
e
Page
1 o
f 1
MIN
NES
OTA
PO
LLU
TIO
N C
ON
TRO
L A
GEN
CY
AIR
QU
ALI
TY52
0 LA
FAY
ETTE
RO
AD
ST. P
AU
L, M
N 5
5155
-419
4
Sho
w:
Act
ive
and
Pen
ding
Rec
ords
Act
ion:
PE
R 0
01A
QD
Fac
ility
ID:
0790
0050
Faci
lity
Nam
e:H
omet
own
Bio
Ene
rgy
21 F
ebru
ary,
201
2 1
6:08
FAC
ILIT
Y D
ESC
RIP
TIO
N: F
UG
ITIV
E S
OU
RC
ES
(FS)
ID N
o.Fu
gitiv
e S
ourc
e D
escr
iptio
nY
ear
Inst
alle
dY
ear
Rem
oved
Add
edB
y(A
ctio
n)
Ret
ired
By
(Act
ion)
Insi
gnif-
ican
tA
ctiv
ity
Ope
rato
rID
for I
tem
Pol
luta
nt(s
)E
mitt
edC
ontro
lE
quip
.ID
No(
s).
Fugi
tive
Sou
rce
Sta
tus
1FS
001
PE
R 0
01P
MP
M10
PM
2.5
Truc
k Tr
affic
Act
ive
2FS
002
PE
R 0
01C
O2e
Met
hane
Liqu
id F
ertil
izer
Sto
rage
Lag
oon
Act
ive
Page
1 o
f 1
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194
21 February, 2012 16:08
FACILITY DESCRIPTION: Potential-to-emit (by item)
Show: Active and Pending RecordsAQD Facility ID:Facility Name:
07900050Hometown BioEnergy
Item UnrestrictedPotential
(tons per yr)
LimitedPotential
(tons per yr)
ActualEmissions
(tons per yr)
Pollutant AddedBy
(Action)
RetiredBy
(Action)
HourlyPotential
(lbs per hr)
EU 001
Acetaldehyde PER 001 2.39E-011.54E-01 6.75E-01Acrolein PER 001 1.47E-019.48E-02 4.15E-01Benzene PER 001 1.26E-028.11E-03 3.55E-02Biphenyl PER 001 6.06E-033.91E-03 1.71E-021,3-Butadiene PER 001 7.63E-034.92E-03 2.16E-02Carbon tetrachloride PER 001 1.05E-036.77E-04 2.96E-03Carbon Dioxide Equivalent PER 001 9.52E+031.23E+03 1.08E+04Chlorobenzene PER 001 8.69E-045.61E-04 2.46E-03Chloroethane PER 001 5.34E-053.45E-05 1.51E-04Chloroform PER 001 8.15E-045.26E-04 2.30E-03Carbon Monoxide PER 001 2.12E+011.37E+01 6.00E+011,1-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloropropane PER 001 7.69E-044.96E-04 2.17E-031,3-Dichloropropene PER 001 7.55E-044.87E-04 2.13E-03Ethylbenzene PER 001 1.13E-037.32E-04 3.21E-03Formaldehyde PER 001 1.51E+009.74E-01 4.26E+00Hexane PER 001 3.17E-022.05E-02 8.97E-02Methanol PER 001 7.15E-024.61E-02 2.02E-01Naphthalene PER 001 2.13E-031.37E-03 6.01E-03HAPs - Total PER 001 8.26E+005.33E+00 2.33E+01Phenol PER 001 6.86E-044.43E-04 1.94E-03Styrene PER 001 6.75E-044.35E-04 1.91E-031,1,2,2-Tetrachloroethane PER 001 1.14E-037.38E-04 3.23E-03Tetrachloroethylene PER 001 7.09E-054.57E-05 2.00E-04Toluene PER 001 1.17E-027.52E-03 3.30E-021,1,2-Trichloroethane PER 001 9.09E-045.86E-04 2.57E-03Vinyl chloride PER 001 4.26E-042.75E-04 1.20E-03Xylenes (mixed isomers) PER 001 5.26E-033.39E-03 1.49E-022,2,4-trimethylpentane PER 001 7.15E-034.61E-03 2.02E-02Acenaphthene PER 001 3.57E-052.31E-05 1.01E-04Acenaphthylene PER 001 1.58E-041.02E-04 4.47E-04Benzo(a)pyrene PER 001 1.19E-057.65E-06 3.35E-05Benzo(b)fluoranthene PER 001 4.74E-063.06E-06 1.34E-05Benzo(ghi)perylene PER 001 1.18E-057.63E-06 3.34E-05Chrysene PER 001 1.98E-051.28E-05 5.60E-05Ethylene dibromide (dibromoeth PER 001 1.27E-038.17E-04 3.58E-03Fluoranthene PER 001 3.17E-052.05E-05 8.97E-05Fluorene PER 001 1.62E-041.05E-04 4.58E-04Methylene chloride (dichlorome PER 001 5.72E-043.69E-04 1.62E-03Phenanthrene PER 001 2.97E-041.92E-04 8.40E-04Pyrene PER 001 3.89E-052.51E-05 1.10E-04Nitrogen Oxides PER 001 1.21E+013.12E+00 1.36E+01PM < 2.5 micron PER 001 7.24E-011.87E-01 8.19E-01PM < 10 micron PER 001 7.24E-011.87E-01 8.19E-01Polycyclic organic matter PER 001 7.69E-044.96E-04 2.17E-03
Page 1 of 6
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194
21 February, 2012 16:08
FACILITY DESCRIPTION: Potential-to-emit (by item)
Show: Active and Pending RecordsAQD Facility ID:Facility Name:
07900050Hometown BioEnergy
Item UnrestrictedPotential
(tons per yr)
LimitedPotential
(tons per yr)
ActualEmissions
(tons per yr)
Pollutant AddedBy
(Action)
RetiredBy
(Action)
HourlyPotential
(lbs per hr)
EU 001
Total Particulate Matter PER 001 7.24E-011.87E-01 8.19E-01Sulfur Dioxide PER 001 1.95E+005.04E+00 2.21E+01Volatile Organic Compounds PER 001 2.22E+001.43E+00 6.28E+00
EU 002
Acetaldehyde PER 001 2.39E-011.54E-01 6.75E-01Acrolein PER 001 1.47E-019.48E-02 4.15E-01Benzene PER 001 1.26E-028.11E-03 3.55E-02Biphenyl PER 001 6.06E-033.91E-03 1.71E-021,3-Butadiene PER 001 7.63E-034.92E-03 2.16E-02Carbon tetrachloride PER 001 1.05E-036.77E-04 2.96E-03Carbon Dioxide Equivalent PER 001 9.52E+031.23E+03 1.08E+04Chlorobenzene PER 001 8.69E-045.61E-04 2.46E-03Chloroethane PER 001 5.34E-053.45E-05 1.51E-04Chloroform PER 001 8.15E-045.26E-04 2.30E-03Carbon Monoxide PER 001 2.12E+011.37E+01 6.00E+011,1-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloropropane PER 001 7.69E-044.96E-04 2.17E-031,3-Dichloropropene PER 001 7.55E-044.87E-04 2.13E-03Ethylbenzene PER 001 1.13E-037.32E-04 3.21E-03Formaldehyde PER 001 1.51E+009.74E-01 4.26E+00Hexane PER 001 3.17E-022.05E-02 8.97E-02Methanol PER 001 7.15E-024.61E-02 2.02E-01Naphthalene PER 001 2.13E-031.37E-03 6.01E-03HAPs - Total PER 001 8.26E+005.33E+00 2.33E+01Phenol PER 001 6.86E-044.43E-04 1.94E-03Styrene PER 001 6.75E-044.35E-04 1.91E-031,1,2,2-Tetrachloroethane PER 001 1.14E-037.38E-04 3.23E-03Tetrachloroethylene PER 001 7.09E-054.57E-05 2.00E-04Toluene PER 001 1.17E-027.52E-03 3.30E-021,1,2-Trichloroethane PER 001 9.09E-045.86E-04 2.57E-03Vinyl acetate PER 001 4.26E-042.75E-04 1.20E-03Xylenes (mixed isomers) PER 001 5.26E-033.39E-03 1.49E-022,2,4-trimethylpentane PER 001 7.15E-034.61E-03 2.02E-02Acenaphthene PER 001 3.57E-052.31E-05 1.01E-04Acenaphthylene PER 001 1.58E-041.02E-04 4.47E-04Benzo(a)pyrene PER 001 1.19E-057.65E-06 3.35E-05Benzo(b)fluoranthene PER 001 4.74E-063.06E-06 1.34E-05Benzo(ghi)perylene PER 001 1.18E-057.63E-06 3.34E-05Chrysene PER 001 1.98E-051.28E-05 5.60E-05Ethylene dibromide (dibromoeth PER 001 1.27E-038.17E-04 3.58E-03Fluoranthene PER 001 3.17E-052.05E-05 8.97E-05Fluorene PER 001 1.62E-041.05E-04 4.58E-04Methylene chloride (dichlorome PER 001 5.72E-043.69E-04 1.62E-03Phenanthrene PER 001 2.97E-041.92E-04 8.40E-04Pyrene PER 001 3.89E-052.51E-05 1.10E-04
Page 2 of 6
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194
21 February, 2012 16:08
FACILITY DESCRIPTION: Potential-to-emit (by item)
Show: Active and Pending RecordsAQD Facility ID:Facility Name:
07900050Hometown BioEnergy
Item UnrestrictedPotential
(tons per yr)
LimitedPotential
(tons per yr)
ActualEmissions
(tons per yr)
Pollutant AddedBy
(Action)
RetiredBy
(Action)
HourlyPotential
(lbs per hr)
EU 002
Nitrogen Oxides PER 001 1.21E+013.12E+00 1.36E+01PM < 2.5 micron PER 001 7.24E-011.87E-01 8.19E-01PM < 10 micron PER 001 7.24E-011.87E-01 8.19E-01Polycyclic organic matter PER 001 7.69E-044.96E-04 2.17E-03Total Particulate Matter PER 001 7.24E-011.87E-01 8.19E-01Sulfur Dioxide PER 001 1.95E+005.04E+00 2.21E+01Volatile Organic Compounds PER 001 2.22E+001.43E+00 6.28E+00
EU 003
Acetaldehyde PER 001 2.39E-011.54E-01 6.75E-01Acrolein PER 001 1.47E-019.48E-02 4.15E-01Benzene PER 001 1.26E-028.11E-03 3.55E-02Biphenyl PER 001 6.06E-033.91E-03 1.71E-021,3-Butadiene PER 001 7.63E-034.92E-03 2.16E-02Carbon tetrachloride PER 001 1.05E-036.77E-04 2.96E-03Carbon Dioxide Equivalent PER 001 9.52E+031.23E+03 1.08E+04Chlorobenzene PER 001 8.69E-045.61E-04 2.46E-03Chloroethane PER 001 5.34E-053.45E-05 1.51E-04Chloroform PER 001 8.15E-045.26E-04 2.30E-03Carbon Monoxide PER 001 2.12E+011.37E+01 6.00E+011,1-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloropropane PER 001 7.69E-044.96E-04 2.17E-031,3-Dichloropropene PER 001 7.55E-044.87E-04 2.13E-03Ethylbenzene PER 001 1.13E-037.32E-04 3.21E-03Formaldehyde PER 001 1.51E+009.74E-01 4.26E+00Hexane PER 001 3.17E-022.05E-02 8.97E-02Methanol PER 001 7.15E-024.61E-02 2.02E-01Naphthalene PER 001 2.13E-031.37E-03 6.01E-03HAPs - Total PER 001 8.26E+005.33E+00 2.33E+01Phenol PER 001 6.86E-044.43E-04 1.94E-03Styrene PER 001 6.75E-044.35E-04 1.91E-031,1,2,2-Tetrachloroethane PER 001 1.14E-037.38E-04 3.23E-03Tetrachloroethylene PER 001 7.09E-054.57E-05 2.00E-04Toluene PER 001 1.17E-027.52E-03 3.30E-021,1,2-Trichloroethane PER 001 9.09E-045.86E-04 2.57E-03Vinyl acetate PER 001 4.26E-042.75E-04 1.20E-03Xylenes (mixed isomers) PER 001 5.26E-033.39E-03 1.49E-022,2,4-trimethylpentane PER 001 7.15E-034.61E-03 2.02E-02Acenaphthene PER 001 3.57E-052.31E-05 1.01E-04Acenaphthylene PER 001 1.58E-041.02E-04 4.47E-04Benzo(a)pyrene PER 001 1.19E-057.65E-06 3.35E-05Benzo(b)fluoranthene PER 001 4.74E-063.06E-06 1.34E-05Benzo(ghi)perylene PER 001 1.18E-057.63E-06 3.34E-05Chrysene PER 001 1.98E-051.28E-05 5.60E-05Ethylene dibromide (dibromoeth PER 001 1.27E-038.17E-04 3.58E-03Fluoranthene PER 001 3.17E-052.05E-05 8.97E-05
Page 3 of 6
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194
21 February, 2012 16:08
FACILITY DESCRIPTION: Potential-to-emit (by item)
Show: Active and Pending RecordsAQD Facility ID:Facility Name:
07900050Hometown BioEnergy
Item UnrestrictedPotential
(tons per yr)
LimitedPotential
(tons per yr)
ActualEmissions
(tons per yr)
Pollutant AddedBy
(Action)
RetiredBy
(Action)
HourlyPotential
(lbs per hr)
EU 003
Fluorene PER 001 1.62E-041.05E-04 4.58E-04Methylene chloride (dichlorome PER 001 5.72E-043.69E-04 1.62E-03Phenanthrene PER 001 2.97E-041.92E-04 8.40E-04Pyrene PER 001 3.89E-052.51E-05 1.10E-04Nitrogen Oxides PER 001 1.21E+013.12E+00 1.36E+01PM < 2.5 micron PER 001 7.24E-011.87E-01 8.19E-01PM < 10 micron PER 001 7.24E-011.87E-01 8.19E-01Polycyclic organic matter PER 001 7.69E-044.96E-04 2.17E-03Total Particulate Matter PER 001 7.24E-011.87E-01 8.19E-01Sulfur Dioxide PER 001 1.95E+005.04E+00 2.21E+01Volatile Organic Compounds PER 001 2.22E+001.43E+00 6.28E+00
EU 004
Acetaldehyde PER 001 2.39E-011.54E-01 6.75E-01Acrolein PER 001 1.47E-019.48E-02 4.15E-01Benzene PER 001 1.26E-028.11E-03 3.55E-02Biphenyl PER 001 6.06E-033.91E-03 1.71E-021,3-Butadiene PER 001 7.63E-034.92E-03 2.16E-02Carbon tetrachloride PER 001 1.05E-036.77E-04 2.96E-03Carbon Dioxide Equivalent PER 001 9.52E+031.23E+03 1.08E+04Chlorobenzene PER 001 8.69E-045.61E-04 2.46E-03Chloroethane PER 001 5.34E-053.45E-05 1.51E-04Chloroform PER 001 8.15E-045.26E-04 2.30E-03Carbon Monoxide PER 001 2.12E+011.37E+01 6.00E+011,1-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloroethane PER 001 6.75E-044.35E-04 1.91E-031,2-Dichloropropane PER 001 7.69E-044.96E-04 2.17E-031,3-Dichloropropene PER 001 7.55E-044.87E-04 2.13E-03Ethylbenzene PER 001 1.13E-037.32E-04 3.21E-03Formaldehyde PER 001 1.51E+009.74E-01 4.26E+00Hexane PER 001 3.17E-022.05E-02 8.97E-02Methanol PER 001 7.15E-024.61E-02 2.02E-01Naphthalene PER 001 2.13E-031.37E-03 6.01E-03HAPs - Total PER 001 8.26E+005.33E+00 2.33E+01Phenol PER 001 6.86E-044.43E-04 1.94E-03Styrene PER 001 6.75E-044.35E-04 1.91E-031,1,2,2-Tetrachloroethane PER 001 1.14E-037.38E-04 3.23E-03Tetrachloroethylene PER 001 7.09E-054.57E-05 2.00E-04Toluene PER 001 1.17E-027.52E-03 3.30E-021,1,2-Trichloroethane PER 001 9.09E-045.86E-04 2.57E-03Vinyl acetate PER 001 4.26E-042.75E-04 1.20E-03Xylenes (mixed isomers) PER 001 5.26E-033.39E-03 1.49E-022,2,4-trimethylpentane PER 001 7.15E-034.61E-03 2.02E-02Acenaphthene PER 001 3.57E-052.31E-05 1.01E-04Acenaphthylene PER 001 1.58E-041.02E-04 4.47E-04Benzo(a)pyrene PER 001 1.19E-057.65E-06 3.35E-05Benzo(b)fluoranthene PER 001 4.74E-063.06E-06 1.34E-05
Page 4 of 6
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194
21 February, 2012 16:08
FACILITY DESCRIPTION: Potential-to-emit (by item)
Show: Active and Pending RecordsAQD Facility ID:Facility Name:
07900050Hometown BioEnergy
Item UnrestrictedPotential
(tons per yr)
LimitedPotential
(tons per yr)
ActualEmissions
(tons per yr)
Pollutant AddedBy
(Action)
RetiredBy
(Action)
HourlyPotential
(lbs per hr)
EU 004
Benzo(ghi)perylene PER 001 1.18E-057.63E-06 3.34E-05Chrysene PER 001 1.98E-051.28E-05 5.60E-05Ethylene dibromide (dibromoeth PER 001 1.27E-038.17E-04 3.58E-03Fluoranthene PER 001 3.17E-052.05E-05 8.97E-05Fluorene PER 001 1.62E-041.05E-04 4.58E-04Methylene chloride (dichlorome PER 001 5.72E-043.69E-04 1.62E-03Phenanthrene PER 001 2.97E-041.92E-04 8.40E-04Pyrene PER 001 3.89E-052.51E-05 1.10E-04Nitrogen Oxides PER 001 1.21E+013.12E+00 1.36E+01PM < 2.5 micron PER 001 7.24E-011.87E-01 8.19E-01PM < 10 micron PER 001 7.24E-011.87E-01 8.19E-01Polycyclic organic matter PER 001 7.69E-044.96E-04 2.17E-03Total Particulate Matter PER 001 7.24E-011.87E-01 8.19E-01Sulfur Dioxide PER 001 1.95E+005.04E+00 2.21E+01Volatile Organic Compounds PER 001 2.22E+001.43E+00 6.28E+00
EU 005
Carbon Dioxide Equivalent PER 001 5.41E+036.17E+02 5.41E+03Carbon Monoxide PER 001 3.59E+008.20E-01 3.59E+00Nitrogen Oxides PER 001 6.22E+001.42E+00 6.22E+00PM < 2.5 micron PER 001 3.40E-018.00E-02 3.40E-01PM < 10 micron PER 001 3.40E-018.00E-02 3.40E-01Total Particulate Matter PER 001 3.40E-018.00E-02 3.40E-01Sulfur Dioxide PER 001 7.20E-011.60E-01 7.20E-01Volatile Organic Compounds PER 001 4.80E-011.10E-01 4.80E-01
EU 006
Volatile Organic Compounds PER 001 1.12E+012.90E+00 1.27E+01
EU 007
Benzene PER 001 1.52E-051.52E-04 6.65E-04Arsenic compounds PER 001 1.45E-061.45E-05 6.33E+05Beryllium Compounds PER 001 8.68E-088.68E-07 3.80E-06Carbon Dioxide Equivalent PER 001 4.11E+024.11E+03 3.60E+04Cadmium compounds PER 001 7.95E-067.95E-05 3.48E-04Carbon Monoxide PER 001 6.39E-014.10E-04 1.80E-03Cobalt compounds PER 001 6.07E-076.07E-06 2.66E-05Chromium compounds PER 001 1.01E-051.01E-04 4.43E-041,4-Dichlorobenzene PER 001 8.68E-068.68E-05 3.80E-04Formaldehyde PER 001 5.42E-045.42E-03 2.38E-02Hexane PER 001 1.30E-021.30E-01 5.70E-01Naphthalene PER 001 4.41E-064.41E-05 1.93E-04HAPs - Total PER 001 1.37E-021.37E-01 5.98E-01Mercury Compounds PER 001 1.88E-061.88E-05 8.24E-05Toluene PER 001 2.46E-052.46E-04 1.08E-03Manganese compounds PER 001 2.75E-062.75E-05 1.20E-04Benz(a)anthracene PER 001 1.30E-081.30E-07 5.70E-07Benzo(a)pyrene PER 001 8.70E-098.68E-08 3.80E-07Benzo(b)fluoranthene PER 001 1.30E-081.30E-07 5.70E-07
Page 5 of 6
MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194
21 February, 2012 16:08
FACILITY DESCRIPTION: Potential-to-emit (by item)
Show: Active and Pending RecordsAQD Facility ID:Facility Name:
07900050Hometown BioEnergy
Item UnrestrictedPotential
(tons per yr)
LimitedPotential
(tons per yr)
ActualEmissions
(tons per yr)
Pollutant AddedBy
(Action)
RetiredBy
(Action)
HourlyPotential
(lbs per hr)
EU 007
Benzo(k)fluoranthene PER 001 1.30E-081.30E-07 5.70E-07Chrysene PER 001 1.30E-081.30E-07 5.70E-07Dibenz(a,h)anthracene PER 001 8.70E-098.68E-08 3.80E-07Indeno(1,2,3-cd)pyrene PER 001 1.30E-081.30E-07 5.70E-07Nickel compounds PER 001 1.52E-051.52E-04 6.65E-04Nitrogen Oxides PER 001 7.53E-017.11E-04 3.11E-03PM < 2.5 micron PER 001 5.72E-023.83E-05 1.68E-04PM < 10 micron PER 001 5.72E-023.83E-05 1.68E-04Polycyclic organic matter PER 001 6.38E-076.38E-06 2.79E-05Total Particulate Matter PER 001 5.72E-023.83E-05 1.68E-04Selenium compounds PER 001 1.74E-071.74E-06 7.60E-06Sulfur Dioxide PER 001 4.86E-038.20E-05 3.59E-04Volatile Organic Compounds PER 001 4.15E-025.46E-05 2.39E-04
FS 001
PM < 2.5 micron PER 001 6.00E-016.00E-01PM < 10 micron PER 001 2.80E+002.80E+00Total Particulate Matter PER 001 1.38E+011.38E+01
FS 002
Carbon Dioxide Equivalent PER 001 5.00E+025.00E+02Methane PER 001 2.24E+012.24E+01
Page 6 of 6
Points Calculator
1) AQ Facility ID No.: 07900050 Total Points 1602) Facility Name: Hometown BioEnergy3) Small business? y/n? n ����4) DQ Numbers (including all rolled) : 3698 ����5) Date of each Application Received: 10/12/20116) Final Permit No. '07900050-0017) Permit Staff Adriane Lenshek8) "Work completed" in which .xls file (i.e. unit 2bNA
TotalApplication Type DQ No. Qty. Points Points DetailsAdministrative Amendment 1 0Minor Amendment 4 0Applicability Request 10 0Moderate Amendment 15 0Major Amendment 25 0Individual State Permit (not reissuance) 3698 1 50 50Individual Part 70 Permit (not reissuance) 75 0
Additional PointsModeling Review 15 0
BACT Review 15 0LAER Review 15 0CAIR/Part 75 CEM analysis 10 0NSPS Review 3698 2 10 20 NSPS JJJJ, NSPS DcNESHAP Review 3698 1 10 10 NESHAP ZZZZCase-by-case MACT Review 20 0Netting 10 0Limits to remain below threshold 3698 1 10 10 Part 70Plantwide Applicability Limit (PAL) 20 0AERA review 15 0Variance request under 7000.7000 35 0Confidentiality request under 7000.1300 2 0EAW reviewPart 4410.4300, subparts 18, item A; and 29 15 0Part 4410.4300, subparts 8, items A & B; 10, items A to C; 16, items A & D; 17, items A to C & E to G; and 18, items B & C
35 0
Part 4410.4300, subparts 4; 5 items A & B; 13; 15; 16, items B & C; and 17 item D
3698 1 70 70
Add'l Points 110
NOTES:Revised 3/21/2012 to include EAW review required by Minn. R. 4410.4300 Subp. 5A
(DQ 3698)
1
Lenshek, Adriane (MPCA)
From: Frank Ebert [[email protected]]Sent: Friday, March 09, 2012 11:01 PMTo: Lenshek, Adriane (MPCA)Cc: Bruce McKay Subject: Question about Home Town Bioenergy Air Permit VTM calculations
Hello Adriane,
I am analyzing the Home town Bioenergy support document emissions section Table A.1.
A quick question if I may on the VTM calculations related to calculating PM’s.
The document states 0.5 miles for both their feed stock and effluent in calculating the total VTM.
My question is, is the miles distance traveled based on only the site location, or does it include the total traffic distances? That is all I need to know.
When I use total traffic distances the PM’s are off of the roof. Therefore I need to know if I am missing something regarding VTMand miles traveled in the proper regulatory requriments.
No rush on this. Take your time. I would highly appreciate a response if this is part of the formal permit summary communicationprocess. Thank you.
� �
������������ ������� ������������������ � �������������������������� �!�"�#������������������������������� ����$��%��������$����� &��������������'(�)(���������������������� ���$����&��"���*��+������,��!����������#������������������������� � �#��,�-��./�**�'��.��������������������������������������������������������������������������� �'0�� ,��1�����2.3#0�� ��0����$��1��,�40�5��6������������ ��&����$������������
���������0��2�'!���7�� ����00���7���!�!��! ��������#��2&����������8�����!����������#��&��%#��� 5�������0��5������������0����9��5���!��00�����%#�����00�����������0��!�5�#���#��2�'!�����9��5���!��00���7���!�7��������#���:6��� ������%#���������0��!�����77���������7������!���� �9� �#��0�������!������ ���9� ��������!���0����7������������0����#�������� � ������&���!�0������#�����������5�����!!�����!����#����;����#���7�1�������#���������0����#�������0��������!��0���!�5�#���0����9��5�#��<���� ��#� !�������5���!������������������ ���7�������� �7��0���9� ��������������� �!�!���%#��7��0�����5� �5�������!!������������������0����=����0�����45�9��&�#����77 �0���!��0���5���!������ ����!������������#��!��0��>���� �&��������&���!�!������ ��5�#� ����� �����!���0� �7���&������7��&�������?��0� ���0� ������@������� �!���0�#����!������� ������� �����!����#������ �'7������0��7������!����7�� ����9� ��������9�!����#��!������0� �'7������0��5�#� �����������@��5� !��07�9��� ����������9� �����������7��0������#����������<�5� !� ������?7�����0���77���������#��������������#��!�5�����!�0����#������9���!��7�9�!��#��������!�0������������!���������� ����#���7�1������ �������� ������������0���������0������������#��������7�!������������=����!���$������ ������&�������������������2A�)A���������
� �
40�5��6���������������0���9� �������!� ��7���,��������2A�)A����%#��� 5����������0�%��#�$�77��8����8��0�����!���;�����0���,��$����4���#���!�� �0��,����
� $����4���#,�$�9��� ��07 �?�0!� �����0���������!��!���0���������#���#������#� ��������#��9� �!������?�����������#���#���!����#����;���!�������5������#���#�� ���!����(�������!����������%#�������������!������������ ���!���.���������#���#��?���!����#�������#���#����6���������#���!������<�=������#��������9��������!��������������#������!��7������0!� �����#��0��&�<��������#�����0� �&�5#���,�4�B�����C�4��4��B��!�������������7������������#���#&�0������!���0�#������!' �9� �� �9������#���������#������D���!�4�B�#���#�����������������-�/�0������!���0�#������!' �9� �� �9������#���������#������D�-�/����� �#��������&�#�������#���#��� �� ��!����#��� 5������0� �,�4�B�4�E��������;#���,�4��B��!�������������7������������#���#&�0������!���0�#������!' �9� �� �9������#���������#������D�4�B�#���#�����������������-�/�0������!���0�#������!' �9� �� �9������#���������#������D���!���B�#���#���7�1���!�5�!#&�5#��#�9������ ���&�����������������-�/D�<��#����0��$����4���#� ��� ����7���0���������������������������&������0��7���� ��#��#��.����!��������5� !����� �������#��#������������� ��������?�.��B��+.����������#���#&����#��#��F��������F�� �������0��#�������0����0��#���=�������0���0�0������#���#��7����2�������
� ������� �����0������� ���������7 �0�����0�#������� ������� �����������#���77�?�0���!������������������#��7 �0�����0�#������ ����#� !���������� ������!��<���=��������0� ����� ����-�����0������� ������� ����/�����07 ��!�������������!����������!�#������ �!�!���������<�$��
�
�77��!�?�<<<��$������2�0!� ����<�7����!�G�7��,���
� �?7 ����#5��G������ �9� ������0�������#���-2�&������A����0���/�#�����+�#���H�-��&������A����0���/��<��#�����07 ����� ������!��7������9���7���!�����0�H��
� %#���������2��!� �����$�����������!���������� ��%#��7�7��!� �������#����������I������%#�����������#� !����������!�����!���#������ ����
� "�����#��$������2�0!� ��#��� �9������#��������!��������������#��#���#���#��� �9������#���������#������������������0������
� 6���!���#�����������������$������2�0!� �����7���#���������������0�����������!�����!���!��?7 ����!��6��������� ������� �������!���#������ �� ������������=����!�����0� ������-���� ���/������0������ ������� ����������!���!��
�
� 2
���� ���8�����7���������9��������,��� ������0�?�!���0���������0��������5������=����!����#����;���!����#���
�������#������7��0��<�!�������#�0��<��#�������=����0��H�� %�� �����������0�������<�9������%#����0�������������7����� ���5�#����
��� ������7���9� ������#����;��%#�������������#�������9���0����������#��J�%���������!��#� !�������#����9� ���!���!������0�!�������#�������������������������0�������� �� �����������
�
6��� ��,��
� %#��9��� �7����0�������#�������0�7����������������<��#����������7�� �������7�����H�4���#����7��������0���������!����#���9�������77 ���������������� �H�;#�����#�� ���9�����7����0�������#��������H�;� �#���9����0������0� ���0����� ��#��0��������������!��!!�9���������0��������#������!�5�������� H�G9����0�&�5� �#������ ���0����� �#�9��������7 ���!�!��������� �!��07����H��
� ����!����#������ ���-�I��+/,�%#��!��0�����������K�����7���5�#�����?7���!�!���������������������.���)�K��%#���!���������������� �����������!����� �����
� %#��7�7��!�����7��0������ ����!����������K�� 5�������!���!����#��!��������#���!�9�����%#������������7�� �����7�7�����!�������!�!����� ����.�K�!�������&�!���� �����5� ����2�K&��?���!����#����K�� 5�������%#������!��0�#����������
�
6���������,��
� �� �������������0�������7�9�!�!���#��6������������ �7��������0����7�9�!�!�������!�� ����7�� ����������#������#���7��������������#��5� �������!&�#5���5� �7����!&������#����������77�9�!��������������0���%#������!��0������!�7#���!���
� %#�������������������� ���� �������� �7�������6�����������#��# ��!�7��!�!����07������&�74&���!���������� �������45�����#���7���������������!�����������9����!��� ��� �H�;#��7�9��������������7���!��0�������7�7����07��������#��0��#�������#��7����0�������#���!�9���H�� ����������0���
� <������#�������#������7��0��#��#������07 ������7 ����8'������#���7�������<����#��# �����00��!�!�#��������!!�����!���!��!!�!��#������7��0���
� %#��G7�������L���������������#����������������!��!��� #��#�����=������!�����7��������!�������� �!��7�7���� ������&����7�������#�� ��#���������=����!��� 5�7�7���7����0����&��07�������0���������������7�7���7����0����&�7���� ��74�0������&����������#������!��������� ���!��%#���0��������� �!�!���!��!!�����!����#���������0����
� (
� 45������!������!���0����� ���� �7���7���9�����������7������� �����������!������5�#�#�!������� ��!�����H�
� <������!��0��������� ���5#�5� �� ������#������������!�5� �������������!��#�� �=��!���7�!���������7�!���%#������������!!���7���� ��������� ���� ������������#����� ����# !����7�!�&�����������#��7���� ����0���!����!�#�!������� ��!���������
� ;� �#���0����� ���������!���!���0����#�!������� ��!�����#������ ���&���5� ���������?�!�@�!���0�����#������ ����H���#���5��&��7��#���0����� ���������#����� ����# !����7�!�&���#�����#��#�7���� ���!!�9�������#�0��� ��07�����#��0��#�����������������0���#�!������� ��!��������%#�����=�������!!���� ��9� �������������������9��7����0����������� ����!�����
�
��������?�!����� ��,��
� 8���#���!�9������=����������#�0��� �0����� ����������������#�@��!���5�����7������� ����!��� � �H�
� �����!�����!�������#�����7�����G?�!��9����� ������9���������!������!��������!����� �����������0���������������;� �#���!�9����7����0�7�7�� ��5�#�����7������������� ��0�������������H�<�����7���������=����0������!!�����#������#������7��0���45�9��&�#������������#��7����0�������#�������5�#�����7������������� ��0����������������
� ������0�?�!����� �����!�$� ?����,�$� ������!��#������0������#�9������������� �9� ������ ?������$� ?�����������5����� �?�!��9����� ������9�������4���#������������!�7���� ��07���������9� ���!����#����77 �����H��
�
�?#����8������$���0�-$J��2/,��
� <���0���������!���0�#����;���!�#���������?#���������5�� �����I��*�������!������� �!��������!�7��7�������<��77������#�9������� ��0����������-��/���!�����?7� �!�#���#�$J��2��<�������� ��� ����#5�#�������0����!������!���!�7�������<��#��!�������!������7��������� ��!�����0���7������� ��9���#���?#������ ����!����#�������7���0����������#����������!�!������ 5�#���#�#��!�������0����� H���
� <��#��#���!��?#��������0����������5�#�#��!�������9�7��&�5#���������5� !�#��#�9����� �������?����9��0��������!��0���������������0�#��!��������������#�������7����0����H��<���������� ��!�����0�#���=������!������77 ���
� ��������0�����#� !����7�9�!�!��!���0��������I��*��#� !��������!�5�#������ ��0������8�9�����������?#���������#���#�$J��2�!�7��!������0��=���������9���
� �
8�������JG����!������ �� ���������������������0���� �� ����,��
� ���������&�������7���!����&���!�����0������JG�>���������!���0�#��!�������!������7������������������� ���9�� �� ����!�0��������� �!�!��%#��7�7�������� ��7�9�!����������0���5�#���������������
� 45����#��7�7�����!���������JG�>�H�JG�>������������� ��*������!��77 ���������6�� �!&�<�!����� �;������!��&���!�� ����6�������;�����2�.�<������*��'�'*�,�9 �� ��� �!��0�����#���0�����7������� �� �!�� ��5#���#��0����� �����0����!�����9��#��!��!�!��������� ��������#��7����������?������%�!���0����JG�>����0�#���7�����A����<��0���=�����������0� �JG����������!���!���������0����� ��� ��JG��9� ���&��7������� �����#��!��������%#������0�����#� !�#������7�7�� ���77 ��!����#���JG��!����%#��7�7��������9��� �7�� ���0��������������!�#���5������!������9������7� ���!�������#���#��0����� ���!���������0���0� ���7��������#� !���������!���!�JG����������!���!�����0� ���7�!���0����� ���
� %#���!�������#���������������!��������� ����77 �������������� �����%#��!�������0�������������!���� �� �9� ������ �������������7�!������!�#���0����� ��#��0������!���0��� ��#���� ���7��������������������?������ ������ !��7�!�������0������#��0��#����� ����0�1�����������4���#���7���� �������������9� ���!���!�����!���!H�
� %#����!��������7������������ ���(�#���A!����45�9��&���������!�#�������� �7�!�����#�������������*�#�����;#��7���!�������!���������#��0����� �������� ���0��������#��!������������7�9�!�!���!!�����#��9�����#�����0� ������#���0����� ���� �!���������������!��H��
� ��������������� ��������,��I��*&�$ �!���� �!����������������M�� ��� ��#�����!����5� ��?���!���2��������A!����N�%#���� ��0�����������������!������9� �!��!�5�#��� �� ���������!���!���!����������7�#������0�����
�
��� �9� ���,��
�6���!���#��������6%I�������&�#����� �0���#�9��#������9� �����07���� ����!���� ���� ���8���#������������!�������6%IA�����0���#������=����0���H�
�
%������� ����!�����0������,��
� <����������������#��#���07��������������0�������#���7��0������������!��#� !�������#�����!��!���<�������00��!�!�����������07�����!�������!���!��
� %�������� 5�5� ���� ��������4��#5���������!������ !��������������$����&�������?7���!�0��#��������5� �#�9���7����#���#�#��5�������$�������������������#��#5���������%#���5� !����������������&�������������&���!�7���� �!����������
� *
� %����������#��#�� ������!�������#������������� �!�!����#�������7��0����!���;#�����#��!������������ �!�!�5#������ ������!� �5����!����0����� �����H�<��#��7�9�!���������#����5����������!�!��9�������#����5����!������!���� ��������7�H�;#�����!������������ �!�!�������������� �������!��� ��!��0������H�
� <���!!����#���5� ��!!��#���������������������������!����������������� <�5�����=����!����#����;�#��������0�?�!���0������������� �!�!����
��������<�!�������#������5#�������#���������0��!����� �� ������� ����9�#�� ��-%�������!�����/��0���������=����!�#���#�����H��?�07 ���G&�
"G?&�JG�>���<����5#������#�������� �!�!����#���0��������7�H�<��#�������#�����#� !������� �!�!�������#��7��0������77�9�!��
�
%��������0��������� �� �������#����!���%�� ��������
� %#��J�%�9� ���� ���!����%�� �������!����77��������������!���� ����5�#�0���� �� ������%#����0��������7��������!������� �� ���#��J�%�����#��#�������!��������'!�7#���!����!���7�9�!�!����#����;��G���!�����!�������.&������0�����7��7�������&����(*����0�����7��7���0�#&�������9��������(+���0�����7��7���!����%#����#� !������'�9� ���!���!�������!��
� 8���������7����������� �!�!����#��J%����!�<��?7����#� !������� %#���0������9� �������#����������&�#���0����������������AI��&���!�
��A��������!������ ��!���7#������������� ����� ������������!�!������ ���!���������!���0� �7�����%#���������#��������07�9�!�����������&��� �&���!�� ��������0�����9�� �� ������� ������������ �� �������
� ;#������#����0��������������%�� ���������#�����������������������0������H��%#�������������!�����!��<����07��������� ���#���9� ����5�#�#����������0������!������#���0������%�� �������#�������!������ ���07������!�!���7#����4�9��#��7�7�����07�9��#���!�������0������������7�7�� ���9� ���!��
���0�#���������0��$7������� ����77��!�?�<<��6���������0������������� �����G!�����9����,���
� G!����!��������!�����!�����!����#���7�1���#���#�#��9������������!� �� �7��0�����;� '!�����!�7���0�������!�0���������=����0�������!�������� �!�!�#���� �@���07 ������!���0�������������&�����������������&��0�����!����������-#���# !����������/&��0�����!������������-0�������������/&��7��!��!�����'���=�������������&��������0��������������-#���# !���0�������������/���!������9�� �� ����� ���#� �����������-�������!��������!��!�/���
� �����!��!�7����������!���0������!������������0� �����%���*.)')�&��$%����(('.�&++�����7����0��� �@����������0��������0� ���7����0��#� !�������������!���;#���9��������!��5� ����� ��&���� !��07 ����&���!�
� .
��������07 ���������#���7�1��H��� �����!��� �#���07 ��������������!�0�#!���� ���07 ������
� �������������0�� ����9������!�� ��������J��� ����G!���0����������0����%�� ���'+��-I�����9����� ���07�/�8�������� �!������ �����!��������������
� G!���07������#� !����0���������� ����!��!���������#���?���!���7�������
�
G!�����!���!�8������%����7��-%������'�� ��!�!��/���
� ����!�������������!�����7����������!������!���� ���&��7����!5������!�#���#�#�����������$����&�5#��!����� �0������0����5� �����77 ��!����#����9�#�� �����������0������#���������0����� ���=����0���H��
�
��� ����$�������!����!�G!��,��
� %#��7�������������� ����!�����0�#����� ����# !����7�!������� ���� �����%#���������00������#��7���� ����������� ����������0��<�!���������� ����������0�� �����!����5#������ �����7�9�!��#�������0���������� ����������0�5� ���������!��<���&�#��� �������0��������#� !�����!!�!��#������7��0���
� %�7�7�� ����� ���� ����7�!�!���<��0���=�������#�����!�����5�������������#���0������������!�����0���!�9�������#��������� ������������
� %#���������9���!�����0&�#������������� ����������&���!���77��! ����# ����� �!��7��9���!���$�!���5� �������!���!���� !�����7�����!��#��# !����7�!� �������� �����9���� ��#������#�������0�5#�����;����5� �#����H��
� %#���9�������0�������?7 ����!����!��� ���#5���5� �7����0��%#����;���!�#����������������0����!���������#��������� ������9��������!��� �!�����0���������=����!���?7 ����#���?7���!��������������#�������0��45�5� ��������� �!��7��9�������7�����0��������������!�!�����������������H��
� 45�5� �#����!����������!����� �#��!����;#�����#��!����������!�5� ��������#���#���� ����������0H���7�7�� ��!������!�!�������5�#�7�7���# !�����0���#� !�����������������&�7�7��������!��������#��������#��# ��!������ ��0����� �������!�������7��������������#�����!�!�������������07��!������#��9����'�0����� �����!����!�7���� ��� �� �����5�����
� O�������!�!����� ���0�#����� ����# !����7�!������ ���������!�#�9���������#����!!�����!���!��������!������0���������!��$�����#��!����� �0�������07 ��!�5�#����#���������0��������#���&����7���������������������!����� �����0����#��7�7���������#���������� �������������������������������������������������� ����������������������������� ��� ����������� �������������������� �������������� ��������������������������������� � ������������������
� +
� 4�$���!��00�������������������� �!�������������������!����#����� ����7�!��45�5� �#�����������������!H�
� � ������0�����������������9����� �7����������0������!������������������#��#�����#�������������� ���������#����������0����� ���� ������0�����������������9��!����� ����7�����������������07��!�����#����������0����� �������#���������������������������#�0����#��� ������7�������45������ ������������������9��������������� �!�����!���#��7���� ���!����H��
� ;#��5� �0�#��������������!����#����� ���H�;#����!�!�#�������0������!��� �� ������0����0H��<��#�����!��������������� ��!�����!�<�5� !��?7�������� ������������0�#�������#����� ����# !����7�!��$����#�������7�#��7�7�������������#����!������������������������7��������� ������?7 ������!������0�#�������!������
� ;#���7�����JG�>����!�#���������#��0���7��������#�� #�#�@��!�5� �����������!���0�#����� ����7�!�H�45���!�5#����!����5������!���!���#��0��#����0���������!�#����JG�>����!���!������#�0H�<��#���#�9���� ���&�#5�5� �#��7����������07 �0���!H�$�����<�������!���������#���9����������!�5�#���� �����6���������!����!���� ��������0�0��#�������!��<��#���5�!�&�����#���������������� ������#����� ����# !����7�!�H�P������H�<�����&�#���!������0��������� �!�!����#��7��0���<���&�#5�5� �#����JG�>��������!����!�#����0�������������H�
� ���9��� �����!&�!�7��!������#��7����0�������!��� �������#��!������&���!�#����� �����07�����5#��#������77��!��#�9���07 ������������� �@���0����� &�#��#� �9� �����00���������� !�����������!����#����� ����# !����7�!���45�5� �!����� �����77 ��!����#�������!����!�'�����������07��!�H�
� <����0�����!�#���0���� ����1�������!������������!�����0������!�9���!��#����7�!���������7�!����$� ����1�����#�����6G8� �9� ����77�?�0�� ����&���������<���� ����1��������!�9���!��#��# !����7�!����5� ���������������0����9���0������9������!���07������
� <�������!�#��#�������������#����09���#�!������� ��!����0�#��������5� ����� ����!���!�7����!���!�#��0����� �5� ���������#����� ����# !����7�!���;#��������5� �#���#�9�����#��7���� �������������!��H�;� �#���0����� ���������!���!���0����#�!������� ��!�����#������ ���&���5� ���������?�!�@�!���0�����#������ ����H���#���5��&��7��#���0����� ���������#����� ����# !����7�!��5� ����!!�9�������#�0��� ��07�����#��0��#�����������������0���#�!������� ��!�����H������������������������������������� ����� ������������� ��������������������� ����� ���� �������
� $�����#��7�7������#���7�1���#������!���!������ �������7� ���!���&���!�������������5�#�C����&�#������� �����������#� !������ �������0��5#����7 ����!���!�!���#������������!���!�������������!� �������������O�A�����$7����77 ��������%#��7��0���#� !�������77�9�!���� �#�������0��������9�� �� �����������!���9��5�7��������
�
� )
$� ���������������,��
� %���� �!�����#���� �����������&�#����������!�5�#��9������9����� ������!���09�!�������������H�%#��5� ���7��9���!����
� �6��������������#� !������ ����� ��!��������� !������!�#�9��#����5������ ������������ ��!����� �����0��I������9����5#��#�������7���! ����09�!�������������������������� ��&�������#���5� �������������������!������ ����!��07������
� �8������������ ����1��������������#�!�����������!��<��#������ ��!���7�������0H��$� ����1�����#����������7������!����!����#������#�!����������!������!�7�7�� ��������9����!���5� ������ ����!���
� %#������#�!�����0�������� ����� ��!��7��9���!��������������0�5�����������#�������������0�#��9��������� ����07 �����0�����������������!������5�����0���
� <����0�����!�#���0���� ����1�������!������������!�����0������!�9���!��#����7�!���������7�!����$� ����1�����#�����6G8� �9� ����77�?�0�� ����&���������<���� ����1��������!�9���!��#��# !����7�!����5� ���������������0����9���0������9������!���07������
� �� �������� ��������������&���!�����������09� ���#���9�����������!�����������?����9��!����������������������������� �����������������
�
8�������G!����� ,�G!���9� ������#�9�����������!���!����#��!�������!������7������������
� ��7���JG����!����� �����#������������!���!���#��!��������%#����#� !������!���!��
� %#�� 7�7���� �� #��� 7�1��� ���!� ��� 7�� ��� �0�� 7� � ��� ��!���� 5������!���!��� �&� #������!� #�������������C����� ��� #��!�������7�1����$�����C����� ��� ��77��!� � ��� �0�� 5#�� ��7 ������� #��� 7������ �� ��� ��=����!� �7�9�!����07 ������������!�!�����#��JG���������0�!������!���������!�#��!���07�������
� 45����#�������0�!������!�5�#�#���� �!�������!����0����#�������?#���H�<��#��������� ��!�����0�������������9����!�#����0������H�<��#�����0�#���?#�������������!������9������#��!�������� H�G#��5���&���� ������!��� �!�!�����0�����77�����!���0��������������!����#��!�������!������7�������77��������!���� ������������9���5#��#�0�����#����!���5� ���07 �����!���#����!�!���� �����#��������4���#������������ ��7������#�������0�����7�7�� ���9� ���!����#������H����
� ��
G#���G!���<��O����� ,��
� <��#��!�������7�������������������&�����07 ��!����#��7�7���&���9�&�#����5� ������!�����!�9 �� ���������!����0������������#��0�#����������7���#��!�������7��������%#������>��5� ��������������!�����
� %#��7�7��!����� ������� ��.���)�K�����������%#���!�������������!�=����!����� ���!�������������7�� ��7�������
�
���!�����������������������"�������#��
��1���������5�#��%���0�������� �� ������%�� ������
� %#���� ������?��0� ��!������ ������7���#��5���#��!������!��7 ���!������!�������0��������������� ��!���0����#��������%#��������7���� ���������#����������%#���� ��#���������'!����� 5���9��5������!��������������� ���� ���07�����������#����5���� �� ������������������
� %#��!������������9�������0��������!�#����� �� ���������������������!��������@�!�0�����������!������ ���9� ����5#��������������!�5#������#5��
� <��77�����#����� ���������?���!�7 �������0�#���77 ����>��7��9������;������!��������7�1���-���$����������������&�!��!�"9�0��������/���
�
%�� ������������6� �������!��I��*�$ �!���� �8�������JG���� �� ����,��
� <��#��7�7����������JG�����JG�������0�������������#����?7��������#��!������JG��$ �!�H�<��77�����#��������� ����#����� �!�JG���0���������$#� !�#������������@�!����JG�>���������� ���H�
�
%�� ����*������ ���0��O�����4����O����� �� ����,�;#������#�����������������������!����#��-�����/������ ����������7�!H�%#������� ����!����������������������07 ���!�������7�������45�9��&�������#������!��0���!�#������#���0���������#�����!������ ������#��7�!��9����
� <���!!���&�#5�5� �!��������� �!����#��!��������5� ����0�����5�#�#��0�#�������&���#���G������#��#����77���0�����&������#��!��������������� �00�� ��������#��!���07����������0�5#��5����� �� ���07��!����!�� ��!����0�����%#������&���������00��!�!����!���� ��&�������������&���#������������!�9�������� �!�������� �!�!���#�������0��
� ��
%�� ��'+�� ����9������!�7 ��������9��� ����!�����0�����M:����������!���0���������0��07����N,�
� %#���!������������7�� ���J�����9�����!��������9�������#������ ���5� ���#�9�����������!�#���#����07�����7�������G!���07��������� ��������5� �!��0���!����#�� ���������%#���� ��� ����!��������������������#���!�����<����5� '���� ��#�!�#�������#��#��#����07�����7�!���!�!�������� ����!��07�����������������!��
� <���!!���&��� ������!�#��#������!����0����� �������������!��������!���7�7���!�������<���=����!�#�����#��������������!���!�������������!� ���������!�#������ ���#���!�������#���7��0������77�9�!�����
�
����!�����0�������������,�
� <�5� ���� �!�����7����0���?�� ��7���!��#���#�������5����!�!5��������0�������#5�<��� �� ��!���!������!������0�������5#� ����O����� ��� ���� ������9� ����#�����!����7�!��0�����������!����������0���� �� ������7�9�!������������#���7�1����
� %#��� ����������#���7���!�#������#�9�������������#��M�0������N��������"���A#7��?��� ��A(�(����?��+�*�-#7/�?�+.*��#��A���?����A���������#���� �� ����0�#!�<��0������������ �� ������%���
� %#���0�������<�7������������ �����!������ �@��#��!�����!���������#�������77 ��������
� %#����������#��������� ����77 ����������������� ��0���������!�#��������������!��%#��%������������������������� �� �����J�%�Q���������!�!��������%#���#����0���������������!�#����������� ��������#���0��������
� ���� ��0�����������������#���0�����������?�#7��?���������?�#������7������#���#�#������������������������7���0�#��
�
G9��� &�#���������0����� ������?�� �������������������������07 �������%#���������������#��������!��!����������������#������� ��������������#���7�1���������9� ����!�#�9��#����� ����#�0����#������0�7�������������� ����!���07 ���#���������0����=����0�����<�#����#�������������#�����0��!����������!����!����� �7�!������
�
�
�
��
���
�
$�� ����������� ������� ������������������������������������ ��������������������
���� ���������������������������� ����������� �������� �� �������� ������� �������� ������ ����� �������!������#�
��� $ ����������������&���� ������� ��'��<<?�QY������� ����������������� ������������������<�ZZ��^��_�������������������������������� ����������������� ������������������<�`<�q^����������������������������������q����� ��������� ��������{����� ��� ���������������� �������������������� �������|?�<<<���^���'��<<?������� ����������������������������'��<<?�QY������� ���� ������������ �Z}�<�� ����������������������������������� �~�<�� �^������
���� $ ����������������&���� ��� ��� �����!������&���� ���� �������� ����� ��q�� ������ ����������������������� ��� ������ ��������q� ������ ���������������� ����q�� ��������������� �������������������� �������� �� �������� ���$��� ����������� �������� ��������� �� ��� �� ���$������!������ �� ���������������������������������������� ���
����� $ �����!������&���� �����q���������������������q���������������������� ������������� ����������������Z�`<�������� ����������� ����������������|}�<�<���^�������������� ������������� ������������������}<�������� ����������� ����������������|?�<<<���^����������� ����� ������ ������������� ����������������}Z�<�������� ����������� �����������������|�|`<���^���������� ���������� �� ���������������� ������� ���� ����������� ���������� ����������������������� �������� � ��������� ��q������������������ ��q�����
�9�� $ �����!������&���� ����������������q����������������q����������� ����� ��� ������������������������������������������� ��������q������������������ ����
9�� $ �����!������&���� ������������������������������������� ��� ���� ��������� ����� �Y��������� �����q���_Z���q������������� ��� �� ������������������������������ ������������������������� ������� �������������� ��� �������������������������������q���������� ���� ��������������������� ��� ��� �������� ��� ����� �� � ������������������ ���� ��������q������������
%�� ������ �������� ���� <��#��� 5����5�������&������������������q����� �������� ��#�
��������#��$�$�!���&�Y���������$������!�
!�q{����$���#��������������
!Y��Q�_!��Q$�$Q�����$������!�
��
|��
$��� ��'��<<?�QY������� ����������������� ������������������<�ZZ��^��_�������������������������������� ����������������� ������������������<�`<�q^����������������������������������q����� ��������� ��������{����� ��� ���������������� �������������������� �������|?�<<<���^���'��<<?������� ����������������������������'��<<?�QY������� ���� ������������ �Z}�<�� �������������� ���������������������� �~�<�� �^������
�������#��$�$�!���&�Y���������$������!�
!�q{����$���#��'��<<?�'� ������� �� ���
Y�����$�'�QY�&$�$Y�!�
$��� ��'��<<?�QY������� ����������������� ������������������<�ZZ��^��_�������������������������������� ����������������� ������������������<�`<�q^����������������������������������q����� ��������� ��������{����� ��� ���������������� �������������������� �������|?�<<<���^���'��<<?������� ����������������������������'��<<?�QY������� ���� ������������ �Z}�<�� �������������� ���������������������� �~�<�� �^������
��� <��#��� 5���������&����q� �Y��� �������q�������������������� �������Y��� �����������������q�� ������������������������������������ ������������������!������������������������ ������ ������ ���q���������}�����&���������� ���� ������� �� �������� ����������q���|<�������������� �����q����������������#�
������&$��$$$�
� �����������������
� � !Q�����|����� ��$ ����
&�� ������ ������� �������� ���� <��#��� 5���������&���q���������q����� �������������q���q��#�
�
___��������������___�
?������������������ �#�
� ��q��������������������� �����������!�������
� ���������� ����� �� �� �������������������������������� ���������� ���������������q�������������������� �������������q���������� ������q���_?������������������ ��q������ �#�������� ��������������������� � ����������� ����������������Z�`<�������� ����������� ����������������|}�<�<���^�����������Q ����������� ������������������}<�������� ����������� ����������������|?�<<<���^����������� �����������Q ����������� ����������������}Z�<�������� ����������� �����������������|�|`<���^�������������q����������� ������������ ��q�������������������� �����������
��
���
�����������!����������������� ������� ��������������q��� �������������������� ��������������������������� ���������� ��q�����
��� � Y ������ ������������������$����������� ����������������� ��������� ����������������� ������������������������������ ������ ���������� ��������� ������� ������q���������������� �q���� �������� ���������������� ���������������������������������������������������������� ��#��
___�������|������___�
� ��� �� �����������������
����������������� ������� ����� ��� ����� ������� ��� �� ����������� ������������������
��� <��#��� 5���������&������������������������ ����� �q��������q����{������������������ ���q��#�
�___��������������___�
����������������������� ��
���������� ���� ��������������������������q�������������� ������������������������ ������������ ��������
!�� <��#��� 5���������&����q� �Y��� �������q�������������������� �������Y��� �����������������q�� ������������������������������������ ������������������!������������������������ ������ ������ ���q���������}�����&���������� ���� ������� �� �������� ����������q���|<�������������� �����q����������������#�
������ ���� �����!Q�����|����� ��$ ���������!�� ������
��
MinnesotaPollutionControlAgency
Hometown BioEnergy ProposalAir Quality Permit Comments
\
Your CommentsPlease take this opportunity to provide comments on the air quality permit for the proposed HometownBioEnergy facility in Le Sueur. The MPCA will consider public comments when establishing final permitconditions.
o In order to assure that we receive and understand your comments, please submit them in writing.o When you comment on the permit, you will be most clear and will best help us understand your
concerns if you can give us the permit section and page number that contain the issue you areaddressing in your comment.
o Plan your comment so you can make the points you want to make as briefly and effectively as possible.Long and rambling comments run the risk of your key points getting lost and diluting the effectivenessof your comments.
o The MPCA responds by letter to all written comments.
Written comments should be addressed to: Adrianc LenshekMinnesota Pollution Control Agency520 Lafayette Road NorthSt. Paul, Minnesota 55 I55651-757-2526 (voice); 651-297-8683 (fax)[email protected]
Written comments on the draft permit must be received at the MPCA Office by 4:30 p.m. on March 27,2012.
Name (Required, please print)Street Address (Required, please print)City, State, Zip (Required, please print)PhoneEmail
@.'\ (Make comments on the back of this sheet):.J ? W t-/A"- T '1'P '" (>F 1"",-14 ,J "L-c~'( !-JUt... ex V;:'t<D ~
- • _l-IyP~"" S\J~I"",{ lZ€t-<'A•..•••L- I\N\)-'5\ LoX ,p>lG ~"""A L-
ltV"";';;: w,os1"" 1>' IZ- .s~A •....1 .-., -r~ G~,..d 5';-.,-..s /J.oJP W\l..L- -r1ol€lZ-G8~ t;::>i3Ac-1(. LIP AIR. Cot-K~u;: ~~"H-(155l6r-!.s ~()r1. =rl-k!;"," 0>~-WONi:....rr$ ,
Minnesota Pollution Control Agency, 520 Lafayette Road North, Sl. Paul, Minnesota 55155-4194(651) 296-6300, toll-free (800) 657-3864, TTY (651) 282.5332 or (800) 657-3864
This material can be made available in allernative formats for people with disabilities. c:>V~@ Printed on recycled paper containing at least 30 percent fibers from paper recycled by consumers.
Section Permit page # __
<1.'2.-) tAl \ LL.. -11;} \31<': L-IH 11"'5 "Sf:: 'F'U'\u<D nJ .L~
"'ft. \" '> 't1~AN,~IN ~ -l-\'t'D~,.j 5VWtDtf, 5 \\..0 I/'tLN ~ 7
Minnesota Pollution Control Agency, 520 Lafayette Road North, Sl. Paul, Minnesota 55155-4194(651) 296-6300, toll-free (800) 657-3864, TTY (651) 282-5332 or (800) 657-3864
This material can be made available in alternative formats for people with disabilities.
@ Printed on recycled paper containing at least 30 percent fibers from paper recycled by consumers.
MinnesotaPollutionControlAgency
BV: _
Hometown BioEnergy ProposalAir Quality Permit Comments
Your CommentsPlease take this opportunity to provide comments on the air quality permit for the proposed HometownBioEnergy facility in Le Sueur. The MPCA will consider public comments when establishing final pennitconditions.
o In order to assure that we receive and understand your comments, please submit them in writing.o When you comment on the permit, you will be most clear and will best help us understand your
concerns if you can give us the permit section and page number that contain the issue you areaddressing in your comment.
o Plan your comment so you can make the points you want to make as briefly and effectively as possible.Long and rambling comments run the risk of your key points getting lost and diluting the effectivenessof your comments.
o The MPCA responds by letter to all written comments.
Written comments should be addressed to: Adriane LenshekMinnesota Pollution Control Agency520 Lafayette Road NorthSt. Paul, Milmesota 55155651-757-2526 (voice); 651-297-8683 (fax)adriane.l [email protected]
Written comments on the draft permit must be received at the MI'CA Office by 4:30 p.m. on March 27,2012. -
Name (Required, please print)Street Address (Required, please print)City, State, Zip (Required, please print)PhoneEmail
(Make comments on the back of this sheet) atlMn07tAr {{f(!JTt,.{ cl)J 4/.,'ftu!/'fcf fDWttkrr;flatil&/ t(i1(jJ\£rJS/
Minnesota Pollution Control Agency, 520 Lafayette Road North, 51. Paul, Minnesota 55155-4194(651) 296-6300, toll-free (800) 657-3864, TTY (651) 282.5332 or (800) 657.3864
This material can be made available in alternative formats for people with disabilities.
@ Printed on recyded paper containing at least 30 percent fibers from paper recyded by consumers.
Section Permit page # __
Minnesota Pollution Control Agency, 520 Lafayette Road North, 51. Paul, Minnesota 55155-4194(651) 296-6300, toll-free (800) 657-3864, TTY (651) 282-5332 or (800) 657-3864
This material can be made available in alternative formats for people with disabilities.
Printed on recycled paper containing at least 30 percent fibers from paper recycled by consumers.
March 22, 2012
Thank you so much for taking the time and so kindly conducting this meeting in ourcommunity. You did a great job in professionally managing a session where there is a lot ofemotion and strong feelings. I think it all boils down to the fact that people are fearful that ourquality of life will be negatively impacted by this project. Your objective and fact basedanalysis can aid us in better understanding the impact of the project on our land, water andnoise. It is disappointing to know that you do not regulate odor as I think your objectiveassessment would be valuable, however, you did a good job of providing an overview ofintended material handling. The following are my questions remaining or resulting fromattendance of the Minnesota Pollution Control Agency meeting conducted in Le Sueur, March20,2012.
1. Community resident Frank Ebert has invested a significant amount of his time andenergy researching the impact of this project on our community. He has significantlymore scientific knowledge, training and experience then most community members. Itappears that he has pointed out concerns based on his research, yet we do not know ifhis calculations have received review and consideration. This increases the fear anddistrust in the project by those without the scientific knowledge and training. Who willrespond to his research?
2. What would the Department of Agriculture requirements for storing and handling ofthe liquid by product be if it was called fertilizer versus the requirements for handlingand storage when termed soil amendment? Does one agencies handling of "a rose byany other name" result in more or less protection for the environment and thecommunity? Are there requirements to define the by-product based on its intendeduse or its chemical makeup? We don't want a play of words to result in less protectionfor the precious gift of our states water.
3. Why is the well located on Karen Voss's property (32066 360th Street, Le Sueur, MN56058) not being commented on in terms of the impact of this project? There wouldbe more confidence in the project if there was assurance specifically and scientificallythat her well would not be negatively impacted.
~ Alul&2~.KlL- --__7~tSO&%4th
LeSueur, MN 56058
little
drea
ms,
and
the
less
onth
at"Y
ou're
Nev
erTo
oO
ldto
Dre
am".
Thei
rup
com
ing
Apr
ilco
ncer
tw
illfe
atur
e,sin
ging
tribu
tes
toRa
inbo
w,
Dre
ams,
and
eter
nal
Hop
es.
Dre
amth
eIm
poss
ible
Dre
am",
"Whe
elsof
aDr
eam
t!an
dno
stalg
icre
nditi
ons
like
"Som
ewhe
reOv
erth
eR
ainb
ow"
and
"Arn
eric
ana4 .
afo
lk.so
ngm
edie
y".
The
conc
ert
Craw
dad
Song
".Th
eN
otab
les
are
the
area
'sco
mm
unity
singi
nggr
oup.
Form
edin
2006
,th
eyha
vegr
own
from
15,m
embe
rsto
near
ly50
and
and
St.P
eter
.G
ordo
nG
rege
rsen
,fo
rnle
rLS
Hvo
cal
mus
icte
ache
r,di
rect
sth
egr
oup
.Th
eco
ncer
tw
illbe
Sund
ay,
Apr
il22
,at
4p.
m.
inth
eLS
H
'conc
ert
isfre
ebu
tdo
natio
nsar
,ap
prec
iate
d.Re
fresh
men
tsw
illbe
serv
e,af
ter
the
conc
ert.
",
Lette
rs--
----
----
----
----
----
----
----
----
----
----
----
----
----
----
-,
,j
are
strip
ped
ofth
eirri
ghts
cons
cien
ceo
whe
npa
rent
alco
nsen
ti
nece
ssar
yto
disp
ense
aspi
ri:.i
nsc
hool
butn
otfo
rabm
.tio!
arra
ngem
ents
••\~
hen
apr
ovisi
on0
,Oba
mac
are
finan
cial
'pe
naliz
esco
uple
sfo
r'be
in,
mar
ried
ow
hen
relig
ious
liber
tyi
bein
gde
stroy
edby
thgo
vem
men
t•
whe
na
mem
oria
ler
osw
hich
hono
rsfa
llen
w.
hero
esis
rule
dill
egal
anto
mdo
wn
ow
hen
the
Sena
teh.
refu
sed
for
1,05
7da
yst
pass
abud
get
foro
urco
untr
whi
chsp
ends
$3.
TRIL
LIO
Na
year
and
iov
er$1
5tri
llion
inde
bin
crea
sing
by$2
.3m
illio
each
min
nte?
????
Mar
yLy
nnSC
01Le
Sueu
Ag
Ser
vice
Cen
ter,
Lafa
yette
507-
228-
8224
or80
0-64
2-41
04w
ww
.ufc
mn.
com
YOllr
'}\re
ar'i
reSe
rVic
eC
ente
r!
soth
eyco
uld
have
abor
ted
her o
whe
nsu
ppor
tfo
rou
rm
ilita
ryis
cut,
butw
ebu
ilda
$750
,000
socc
erfie
ld(th
eth
irdon
e)fo
rsu
spec
ted
terro
rists
atG
uant
anam
oo
whe
nfa
mili
esar
elo
sing
thei
rho
mes
ina
rotte
nec
onom
yan
dso
me
ofth
ehi
ghes
t-pai
dM
inne
sota
nsde
man
dth
atta
xpay
ers
fund
alu
xury
faci
lity
fort
hem
ow
hen
kids
are
killi
ngea
chot
her
insc
hool
sw
here
they
'reno
tallo
wed
topr
ayo
whe
nw
eco
ntin
ueto
fill
the
treas
urie
sof
the
enem
ies
who
wou
ldde
stroy
usbe
caus
eth
epr
esid
ent
won
'tal
low
apip
elin
efro
mCa
nada
orm
ore
drill
ing
inth
eG
ulf
orin
Ala
ska
'whe
nba
bies
who
surv
ive
abor
tions
are
put
inth
etra
shto
die
ow
hen
heal
thca
rew
orke
rs
Fran
kEb
ert,
.Bi
oche
mist
Righ
ts...
orw
rong
s?.
Isn't
ther
eso
met
hing
wro
ng..,
ow
hen
apr
esid
entia
lca
ndid
ate
is,vi
ciou
slyat
tack
edfo
rsta
ndin
gup
for
t~e
teac
hing
sof
his
chur
chw
hile
the
Pres
iden
tap
plau
dsa
youn
gw
oman
for
cpar
npio
ning
sexu
alpr
omisc
uity
onco
llege
cam
puse
s'
•whe
na
coup
lefin
dlif
ew
ithth
eir
four
-yea
r-old
daug
hter
with
.dow
n'ssy
ndro
me
soun
bear
able
that
they
seek
and
are
awar
ded
$3m
illio
nin
ala
wsu
itag
ains
ta
doct
orw
hode
liver
edhe
rbe
caus
eth
em
issed
the
gene
ticm
arke
rs
Spin
Ier,
and
TellI
joH
n.Y
ouw
illbe
resp
onsib
lefo
rth
ese
heal
than
dEn
viro
lll!le
ntal
ef-
fect
son
the
popu
latio
nof
LeSu
eur,
Shar
on,
and
Otta
wa
Tow
nshi
psba
sed
onyo
urde
:ci
sions
.
Obe
rle,
Wic
ks.
Alm
ich,
Broe
der,
carb
ondi
oxid
e.In
addi
tion,
whe
nni
tric
diox
ide,
sulfu
rdi
oxid
e,an
dca
rbon
diox
ide
com
ein
cont
act
with
water
they
trans
fonn
into
nitri
c,su
l-fu
ric,a
ndca
rbon
icac
ids
that
fonn
acid
rain
,cha
nge
the
pHof
wat
eran
d.so
il,an
dha
rmw
ildlif
e,fa
nnla
nd,a
ndw
ater
-w
ays.
.A
nnua
lly,
thes
eem
issio
nsca
use
billi
ons
ofdo
llars
ofda
mag
ean
dre
sult
inm
any
heal
thim
pact
sia
elud
ing
pul-
mona
rydi
seas
es,
canc
er,a
ndde
ath. How
man
yci
gare
ttes
wou
ldyo
uha
veto
smok
ea
year
tobe
equi
vale
ntto
thes
eem
issio
nle
vels?
NO
x:16
3,67
3,81
9,74
3(5
190
ciga
rette
sPE
RSE
C-O
ND
fora
full
year
)CO
:5,
069,
666,
667
(160
ciga
rette
sper
seco
ndfo
rafu
llye
ar) I'M
:658
,300
,000
(20
ciga
-re
ttes
per.
seco
ndfo
ra
full
.ye
ar) Mr.
Kerk
ow,
(Voe
's)
16.6
Sulfu
rDio
xide
(SO
X's)
6.4
TOTA
L:16
0to
ns/y
r.A
t16
hrs.
ofop
erat
ion
per
day
the
faci
lity
will
gene
rate
n,02
6m
etric
ton's
ofca
rpon
diox
ide.
And
they
call
this
gree
nen
ergy
.In
fonn
atio
nga
ther
edfro
mEP
Aw
ebsit
eH
YPE
RUN
K''h
ttp://
ww
w.
epa.
govI
triex
-pl
orer
r'ht
tp://
wv.
w.ep
a.gov
/tri
expl
orer
lin
dica
tes
that
ona
per
capi
ta.ba
sis,
LeSu
eur's
EPA
-'mon
itore
dre
leas
esex
-ce
edth
ose
ofSh
akop
ee,C
has-
ka,N
ewPr
ague
and
St.P
eter
.O
nly
Man
kato
has
grea
terp
erca
pita
rele
ases
than
LeSu
eur.
This
indi
cate
sLe
Sueu
ral
-re
ady
has
ahi
gher
pollu
tion
quot
ient
than
near
byco
mm
u-ni
ties.
Even
thou
ghLe
Sueu
rin
noti
nan
attain
men
tc1
assi.
fieal
ion,
the
pOle
ntia
leffe
cts
ofth
eai
rem
issio
nsar
eah
igh
conc
ern
toth
eci
tizen
sof
LeSu
eur.
Nitr
ogen
Dio
xide
sar
eab
out
250
times
aspo
tent
asca
rbon
diox
ide
(acc
ordi
ngto
HY
PERU
NK
''http
://en
vim
-pa
ct.o
rglg
loss
ary
Iterm
l26"
IPCC
),an
dar
eha
rmfu
lto
hu-
man
heal
th.
On
aver
age,
the
liSgo
vern
men
tpu
tthe
irto
x-ic
ityas
300-
1000
times
that
of
Air
emis
sion
leve
lsan
dim
pact
sof
the
Hom
eTo
wn
.Bi
oEne
rgy
Proj
ect.
The
follo
win
gar
eth
eam
ount
ofac
tual
crite
rea
air'
emiss
ions
into
nsly
r.I
calc
u-la
ted
that
will
beem
itted
byth
eH
ome
Tow
nBi
oEne
rgy
Proj
ect. Cr
itere
aPo
lluta
ntA
ctua
lEm
issio
nsat
16hr
sJda
yTo
nsN
r,I'M
(par
ticul
ate
mat
ter)
20PM
-IO6
PM-2
.53.
5Ca
rbon
mon
oxid
e(C
O)6
7N
itrog
enD
ioxi
de(N
OX
's)41
Vol
atile
Org
anic
Com
poun
ds
From
Page
4A
the
river
.Ju
ston
epo
und
ofph
osph
orus
,fo
r'ex
ampl
e,w
illsu
ppor
t1,
000
poun
dsof
alga
egr
owth
inou
rw
ater
s.H
omeo
wne
rsca
nal
sohe
lppr
otec
t'ou
rw
ater
reso
urce
.s,Pl
ease
'dono
tra
kele
aves
orgr
ass
clip
ping
sin
toth
estr
eet.
Ifyo
use
ear
eas
whe
rede
bris
has
accu
mul
ated
near
stann
drain
s,tak
ea
few
min
utes
tore
mov
eit.
Wea
llca
ndo
our
part
toim
prov
ew
ater
qual
ity.
Todd
Redm
ann,
Frie
nds
ofth
eM
inne
sota
Val
ley
Boar
dM
embe
r
.,
1
Lenshek, Adriane (MPCA)
From: Dave Graff [[email protected]]Sent: Tuesday, March 27, 2012 3:08 PMTo: Lenshek, Adriane (MPCA)Cc: Lynott, William (MPCA)Subject: Proposed Le Sueur Hometown BioEnergy Proposal
I am writing in regard to air quality concerns due to stored sweet corn silage. I am from Springfield, MN, and won’t have to deal with the air quality concerns that the residents of Le Sueur will. I have worked with sweet corn silage for many years – stacking it in a commercial silage company bunker during the harvest season as well as removing it during the off season. If Ilived any where near a proposed project such as the one at Le Sueur, I would oppose it with the most vigorous efforts. In spiteof the planned filtering and reverse ventilation THERE IS NO GUARANTEE that there won’t be any unpleasant odors or smell from the facility, especially the outside silage storage area or the lagoons. I have experienced the extremely unpleasant and Ibelieve harmful odors and smells when temperatures are 90 degree’s plus with strong winds – particularly in August and September but also at any other unpredicted time as well. The smell permeates clothing, buildings and vehicles and the stench stays with them.
I was at the March 20th meeting and when the question was asked “what if the facility smells”, the answer was that they (BioEnergy) would have to build an enclosed storage facility for the silage to contain the smell. My response, knowing what I do - for the benefit of the residents in the area as well as being a good will gesture to them – is then include the cost for andbuild the storage structure now as a preventative measure. Covered bunkers will not contain the smell and there are no other storage facilities of this type available to compare it with. The same is true of the potential smell from the ponds or lagoons in having no other ones to compare it to.
Would the mayor and other supporters of the project build it next to their homes, or the golf course, or hospital or church? I’llbet they wouldn’t – for the same or similar reasons Mr. Lynott is opposed to a mining company operating near his lake home.
Its evident that the MPCA staff has put significant time into the EAW, to the point that those of us that attended the meeting from Springfield felt Mr. Lynott’s presentation bordered on promoting the project rather than being unbiased. The good sized crowd that attended the meeting plus the presence of on duty law enforcement are indications of more than minor opposition to the project. It isn’t fair to area residents to have their children’s birthday party, graduation party, wedding, funeral or other event ruined because of this project. Again, THERE IS NO GUARANTEE that the outlined preventative measures will work. The lights will not go out in Le Sueur without this project. Due to the many concerns, I would request an EIS before the project isapproved. Thank you.
David Graff 17349 420th Ave Springfield, MN 56087 [email protected]
Minnesota Pollution Control Agency Hometown BioEnergy LLC
and Minnesota Municipal Power Agency
Air Emission Permit NO. 07900050-001
RESPONSES TOCOMMENTS ON THE DRAFT PERMIT
1. Comment by Frank Ebert. Email received March 9, 2012
Comment 1-1: Concerning the vehicle miles traveled, is the miles distance traveled based on only the site location, or does it include the total traffic distances?
Response: Emissions from truck traffic are calculated by the distance the vehicle is driven onsite. Air quality permits do not regulate the truck emissions when the trucks are offsite. Each truck is estimated to drive 0.5 miles on the property during each trip to the facility.
2. Comment by Frank Ebert. Email received March 19, 2012 letter received March 21, 2012. The electronic version contained calculations by Frank Ebert that are referenced in his comments.
Comment 2-1: Stack Height: Several complex model systems are used to determine stack height. My challenge is the validity of existing stack height noted in the EAW indicating two stack heights listed at 54 feet and 50 feet. Three anaerobic digesters are listed at 75 feet in height exceeding the stack heights. Because of this design I question the effectiveness and efficiency of the air dispersion model. Furthermore, I refer to this formula, where: Hg= 2.5 X H. Hg = good engineering practice stack height, measured from the ground-level elevation at the base of the stack; and H = height of nearby structure(s) measured from the ground-level elevation at the base of the stack; (b) For all other stacks, the stack height calculated by the following formula: Hg= H + 1.5 L. Where: Hg = good engineering practice stack height, measured from the ground-level elevation at the base of the stack; H = height of nearby structure(s) measured from the ground-level elevation at the base of the stack; and L = height or projected width, whichever is less, of nearby structure(s); If the same Stack Height Regulation parameters are in force in Minnesota, it seems probable that the 75 ft digesters would be close enough to the stacks to result in 2.5 x 75 = 187.5 ft stack height, but that the "greater of" clause from this information might require a minimum stack height up to 213.25 ft.
Response: The commenter is likely referring to part of Section 123 of the Clean Air Act that describes good engineering practice (GEP) of stack height to “not exceed two and one-half times the height of the source unless a demonstration is performed justifying a higher stack.” Note that GEP applies to maximum height, not minimum height. One purpose of this GEP is to discourage a source from simply building a taller stack to achieve satisfactory air dispersion modeling. This GEP would encourage a source to install controls or to take measures to reduce the amount of pollutant emitted. This information can be found in EPA document titled Guideline for Determination of Good Engineering Practice Stack Height (Technical Support Document For the Stack Height Regulations) (Revised) dated June 1985. Because the Facility has demonstrated modeled compliance with the National Ambient Air
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 2 of 18
Quality Standards (NAAQS) by completing SCREEN3 modeling, the MPCA has assurance that the stack height, as proposed, is sufficient.
Comment 2-2: Stack Height and Plumes: Essential information is lacking on plumes from this facility. Analysis stating the approximate distance of 200 ft. of the plumes from the facility should be better clarified. I request a formal A.E.R.A. (Air Emissions Risk Analysis) be completed by a certified Agency and this included in an E.I.S.
Response: The commenter is likely referring to the following statement from the EAW, “Under certain atmospheric conditions, there will be a visible water vapor plume from the exhaust stacks. These plumes will be relatively small and will dissipate within approximately 200 feet from the facility.” The visible vapor plumes from the Hometown BioEnergy facility would be the result of condensation of water that is generated in the combustion of the biogas or driven off during solids drying. The Hometown BioEnergy plumes are expected to behave similar to the exhaust from a car or truck during the winter where a small plume is visible but dissipates within a short distance.
Comment 2-3: Appendix III. Screen 3 modeling Input and Outputs: Explain how CO target levels are more at 1 hour (35,000 ug/cu. meter) than at 8 hours? (10,000 ug/cu. meter). Is this simply reflecting dispersion over periods of time?
Response: The CO target levels are the NAAQS for one-hour exposure and for eight-hour exposure. The target for the one-hour exposure is higher because the exposure time is shorter. A higher level of pollution is acceptable for a shorter amount of time, and over a longer period of time, the acceptable level is lower.
Comment 2-4: Appendix III. Screen 3 modeling Input and Outputs: The screen 3 Model run Scenario 1 indicates rural. The proposed location of this site is Urban. The scenario should be corrected based on this conflict.
Response: The SCREEN3 model requires an input of urban or rural; the following text is excerpted from EPA’s SCREEN3 Model User’s Guide. “Determination of the applicability of urban or rural dispersion is based upon land use or population density. In general, if 50 percent or more of an area 3 km around the source satisfies the urban criteria (Auer, 1978), the site is deemed in an urban setting. Of the two methods, the land use procedure is considered more definitive.” The land use procedure is summarized as follows: if 50 percent or more of the land use within 3 kilometers of the source is heavy industrial, light-moderate industrial, commercial, or compact residential, then the area is classified urban.
Comment 2-5: Appendix III. Screen 3 modeling Input and Outputs: Note in the Screen 3 models the elevation of the surrounding terrain is higher than the elevation of the base of the stacks by about 10 meters.
Response: The SCREEN3 model does not take elevation changes into account, but because SCREEN3 is a conservative model, the MPCA has assurance that the emissions from the facility would be in compliance with the NAAQS.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 3 of 18
Comment 2-6: Appendix III. Screen 3 modeling Input and Outputs: Based on this entire section on Screen 3 modeling outputs this entire section must be better defined and explained. Because of lack of clarity and of these calculations it be requested a formal MPCA (A.E.R.A.) Air Emission Risk Analysis be conducted.
Response: The SCREEN3 model was completed properly, and the MPCA has reasonably assurance that the facility would comply with NAAQS.
Comment 2-7: Facility Description. Fugitive sources: Carbon monoxide emissions from traffic were requested in the EAW and if they are in the air permit I do not see them. Is this a requirement?
Response: CO emissions from traffic are not required in the air permit. The emissions created by mobile sources, such as truck engines, are not regulated by the air permit. The air permit addresses stationary sources.
Comment 2-8: Facility Description. Fugitive sources: Table A.1 Air Emissions Inventory. The number of truck trips conflict with our analysis upon evaluating the EAW. This increases the Fugitive emissions in the VMT section and should be further evaluated and confirmed since these inconsistencies affect emission calculations.
Response: The spreadsheet submitted by the commenter calculates a total of 13,800 trucks, which is consistent with the information provided by the facility. While the bulk of the particulate emissions at the facility would be fugitive emissions caused by truck traffic, the calculated emissions are less than a quarter of the allowable particulate emissions.
Comment 2-9: Biofilter: The overall performance of this system presents concerns. Is this an acceptable MPCA process? Has this type of system been used in other various applications successfully? What is the longevity of performance of these units? Will they over time accumulate materials that may concentrate and add various contaminations to the ground water or soil? Over time, will the biofilter material have to be replaced due to natural decomposition?
Response: The biofilter is not in the air permit because none of the emission calculations depend on the performance of the biofilter. However, the MPCA is familiar with the technology of biofilters. Biofilters have been used in similar and other applications successfully. The maintenance of the biofilter would be the facility’s responsibility. The filter media may need replacement or addition, just as any pollutioncontrol equipment would need maintenance.
Comment 2-10: Biofilter: Regarding the biofilter (EU008): The document states 100% absorption with an expected destruction efficiency of 70 to 90%. This does not guarantee fully efficient odor control.
Response: The commenter is possibly referencing this statement from the EAW, “The biofilter will have a capture efficiency of 100 % and an expected destruction efficiency of 70-90%.” The commenter might also be citing a previous version of the permit or the EAW because the biofilter was incorrectly included as an emission unit by the project proposer describing it as EU 008; however, the biofilter is not an
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 4 of 18
emission unit. The facility does not guarantee full odor control; however, the use of the biofilter will decrease the odorous emissions.
Comment 2-11: Biofilter: The proposed air permit actually indicates a 10% allowance of odors due to the design of this device. This is not acceptable for proper and ensured odor control. At 70% destruction, odor release will be 30%, exceeding the 10% allowance. They need something better.
Response: The air permit does not have a 10% allowance for odor; odor is not a regulated pollutant.
Comment 2-12: Bioscrubber: Little if any information is provided on the Bioscrubber. All prior information provided contained only a publication but nothing of the type of bioscubber that will be used, how it will operated, or if this is an approved efficient system. This needs more in depth study.
Response: Bioscrubber and biofilter are synonymous, however in this application the bioscrubber does not vent to the atmosphere as the biofilter does. Instead, the bioscrubber prepares the biogas for combustion in the engines. The operating details of the bioscrubber are not included in the permit because that information is not necessary to assure compliance with air quality standards.
Comment 2-13: Bioscrubber: The bioscrubber is a biological bacterial process. Bacteria are highly depended on temperature, pH, and nutrient balances. How can this process be ensured to be effective and reliable? What provisions are incorporated to maintain proper temperatures that might affect the performance of this device? Please confirm.
Response: The air quality permit contains conditions to ensure compliance with air quality standards; the operating details of the bioscrubber are not necessary to ensure compliance with air quality standards.
Comment 2-14: Bioscrubber: I see nothing in the Air permit that has a compliance plan CD-01 for this process. It is highly recommended these be addressed and added to the air permit.
Response: See Response to Comment 2-13.
Comment 2-15: Bioscrubber: The Operations & Maintenance for this unit is substandard. Although it requires odor inspections it does not include proper cleaning, inspection of the light source required to allow proper performance, temperature monitoring to ensure proper performance, possible pH monitoring, ensuring the unit does not get clogged. This must be included and addressed in the Air Permit.
Response: See Response to Comment 2-13.
Comment 2-16: Bioscrubber: How is it designed from a biological perspective to function specifically to absorb and react with hydrogen sulfide gas?
Response: See Response to Comment 2-13.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 5 of 18
Comment 2-17: Bioscrubber: It is noted some bacterial growth will collect in the bioreactor and will be transferred to the liquid byproduct storage ponds. This transfer adds to potential ongoing biological reactions in the effluent holding ponds, generating the potential for more odor and hydrogen sulfide gas.
Response: There is potential for the ponds to produce gas; the ponds will be covered control odor.
Comment 2-18: Bioscrubber: Will this material contain reduced forms of hydrogen sulfide such as sulfur, or will it be in oxidized forms such as sulfates? Either way, upon this material entering the effluent holding ponds, it has a high potential to add various chemical components that might continue to generate more hydrogen sulfide gas. This requires additional evaluation to ensure effective performance for controlling odors.
Response: The gas bioscrubber will remove moisture and hydrogen sulfide from the biogas. The bioscrubber will use autotrophic, sulfur-oxidizing bacteria to convert sulfide to either sulfate or elemental sulfur. The discharge stream from the bioscrubber would flow to the liquid industrial byproduct ponds. The small amount of sulfur, relative to the expected volume of the liquid industrial byproduct, is desirable for land application as some farmers apply supplemental sulfur as part of their fertilizer application program. Also see Response to Comment 2-13.
Comment 2-19: Carbon Monoxide Catalyst: Does this device require any chemical materials or generate any hazardous waste specifically under RCRA?
Response: The air permit does not regulate RCRA materials.
Comment 2-20: Carbon Monoxide Catalyst: My understanding is these types of Oxidative catalytic converter are designed to be used in only stationary combustion turbines. Will this device perform properly with reciprocating internal combustion engines? I note specific requirements to address this in the air permit. However, the concern is the performance of this unit with reciprocating internal combustion engines.
Response: Carbon monoxide catalysts are used in many applications, including reciprocating internal combustion engines. As stated in the comment, the air quality permit has requirements to assure compliance with air quality standards.
Comment 2-21: Carbon Monoxide Catalyst: Carbon monoxide catalyst and Siloxanes: Silage and chicken manure have significant levels of siloxanes. Siloxanes are known to foul oxidative catalytic converters. Has this concern and potential impact been evaluated for this application?
Response: Silage and chicken manure are not expected to have significant levels of siloxanes; therefore, the biogas created at this facility is not expected to contain siloxanes. Siloxanes are an additive in cosmetics and used in other applications. Siloxanes are common in biogas created at wastewater treatment plants because the wastewater contains soap, shampoo, and other cosmetics. When combusted, siloxanes turn into silicon dioxide which has the potential to foul pollution control
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 6 of 18
equipment. The air quality permit has requirements to monitor the catalyst and periodically test its activity.
Comment 2-22: Exhaust Drying System (SV003): Information obtained from the EAW noted that genset exhaust uses two outlets. EU006 is used for fuel drying and preparation. It appears to have no control emission unit (CE) and is expelled through SV003. It is not fully clear how this system is designed and operates. Is the digestate drying process a closed system to specifically vent the exhaust released into the air upon emission out of this stack and does not flow through the digestate material?
Response: The exhaust from the gensets can be discharged from two stacks: directly to the atmosphere or first passing through the digestate solids then to the atmosphere.
Comment 2-23: Exhaust Drying System (SV003): If the heated exhaust gas makes contact with the digestate vapors, what effects would that have on collecting extensive moisture and emission sources from the digestate to affect the stack performance? If it is a closed system this question does not apply.
Response: This is not a closed system; see the response to 2-22. Dispersion from the stack has been modeled satisfactorily.
Comment 2-24: Exhaust Drying System (SV003): More information should be provided to determine if EU006 should be treated with a Control Emission Device before exhausting out through SV003 depending on my questions above.
Response: Requirements to conduct a performance tests on EU 006 have been added to the permit to confirm the emission factor used in calculations. The method used to calculate emissions from this source appear to be reasonable. However, because this is not a common emission source, it is pertinent to test.
Comment 2-25: Digestate VOC and PM calculations affecting Air Permit calculations: References, testing procedures, and information on VOC’s generated from the digestate drying process are not accurately available and must be included. The proposer is only providing an estimate with no references.
Response: See Response to Comment 2-24.
Comment 2-26: Digestate VOC and PM calculations affecting Air Permit calculations: How is the proposer identifying VOC’s? VOC’s in EPA Article 61. Land Applications of Biosolid, Industrial Waste Product, and Pollutant Bearing Water. 327 I.A.C. 6.1-2-60: volatile solids means the amount of percent total solids lost when the material is combusted at five hundred degrees Celsius in the presence of oxygen. To determine VOC’s from this process/unit I am requesting a formal VOC test be conducted to ensure more reliable VOC values, specifically for the digestate. The information should then be properly applied in this VOC data. The proposer at several public meetings announced they were conducting various pilot studies. Either that material or digestate from similar operations should be obtained and VOC testing conducted on similar product materials.
Response: See Response to Comment 2-24.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 7 of 18
Comment 2-27: Digestate VOC and PM calculations affecting Air Permit calculations: This digestate has been suggested as a fuel to supply energy for boilers. The digestate may contain considerable levels of silica containing products and other minerals that may be detrimental to the boiler process by generating excess slag build up during combustion that might result in major issues. Has this potential issue been evaluated and considered?
Response: The user of the dried digestate solid is responsible for complying with applicable regulations. Also see Response to Comment 2-21.
Comment 2-28: Digestate VOC and PM calculations affecting Air Permit calculations: The biodigesters operate continuously 24 hours/day. However, it is stated the general production hours consist of 16 hours. What procedures and storage of the material consistently coming out of the digesters are provided to address the overnight accumulation of this material including generation of odors?
Response: The digestion process will continuously create biogas which will be directed through the bioscrubber to the storage tanks. The liquid industrial byproduct digester residuals will be removed from the digestion process in batches, not continuously.
Comment 2-29: Digestate VOC and PM calculations affecting Air Permit calculations: Monitoring. Particulate Matter: EU006, Solid fuel drying states it is “unlikely the stated PM will exceed 0.30 grains/dscf.” This claim of unlikeliness needs to be validated with calculations or conducted studies to backup this statement.
Response: See Response to Comment 2-24.
Comment 2-30: Fuel values: Based on the biogas BTU ratings, the fuel must have heating value to comparable traditional fuels. Does this biogas stated at 500 BTU/scf. meet these requirements?
Response: Biogas typically has a heating value greater than 500 Btu/scf.
Comment 2-31: Traffic Regarding emissions: It is our consensus that the impact of traffic remains another primary issue and should be further studied. It is recommended a traffic impact study be conducted.
Response: The air permit does not regulate emissions from mobile sources, such as truck traffic. However, fugitive emissions from paved roads are addressed in the air permit at FS 001.
Comment 2-32: Traffic Regarding emissions: Traffic flow will not only affect Highway 112 and County Rd. 115 near Le Sueur, it is expected much traffic will have to pass through the town of Le Sueur to gain access to highway 112. This would cause annoyances, safety issues, and potential odor issues.
Response: See Response to Comment 2-31.
Comment 2-33: Traffic Regarding emissions: Traffic for the hauling of digestate has not been included in this air permit study. Why is the digestate not included when Effluent and Raw feedstock materials are?
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 8 of 18
Is the provider using their own trucks and drivers for the raw feedstock and effluent transport? Why is digestate not included in traffic analysis and related emissions?
Response: The vehicle miles traveled onsite for removing liquid industrial byproduct are included in the emission calculations; the effluent truck traffic is synonymous with liquid industrial byproduct or digestate removal. See also Response 2-32.
Comment 2-34: Traffic Regarding emissions: In addition this will add to the concern of noise generation and safety concerns.
Response: See Response to Comment 2-31.
Comment 2-35: Traffic Regarding emissions: It was requested in the EAW that carbon monoxide emissions be included for traffic. I do not see this anywhere in the Air Permit data calculations.
Response: See Response to Comment 2-7.
Comment 2-36: Traffic Regarding emissions: Are vehicle (Truck and tractor) emissions required other than PM? Example CO, NOx, VOC’s. If so why are they not included in the emission report? If they are these should be included before the permit is approved.
Response: See Response to Comment 2-7 and 2-31.
Comment 2-37: Traffic Emissions calculations at the end of Table A.1. The VMT values listed in Table A.1. do not appear accurate and conflicts with my calculations. The number of trips for feedstock to calculate the VMT are higher based on an in-depth study of data provided in the EAW. Our data indicates 17,520 or more trips per year, or 1460 or more trips per month, or an average of 48 or more trips per day. This should be re-evaluated and corrected.
Response: The calculations submitted by the commenter uses the same number of trucks in the calculations the facility submitted. However, the facility is still well below permit limits using the truck numbers used in this comment.
Comment 2-38: Traffic Emissions calculations at the end of Table A.1. Digestate trips are not included in the VTM and I expect should be.
Response: See Response to Comment 2-33.
Comment 2-39: Traffic Emissions calculations at the end of Table A.1. The emission values in the note section, the emission units in Lb/Unit, and tons/yr. are difficult to decipher because of legibility issues and difficulty identifying decimal points. This section has to be improved in structure, style, and clear information available to enable accurate calculations.
Response: The commenter has been provided with the full emissions calculation excel file with calculation to address legibility issue and the spreadsheet as been reformatted for easier reading in the final permit.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 9 of 18
Comment 2-40: Traffic Emissions calculations at the end of Table A.1. What are those emission units in Table A.1. on the notes section for traffic emissions? The units are not defined. In attempting to correlate those values with the traffic emission data in the Emission Table. A.1 they are difficult to compare and decipher. Have the proposer improve this data system so it can be properly evaluated.
Response: See Response to Comment 2-39.
Comment 2-41: From the Air Permit Specifically. Appendix II. Best Management Practices Plan. Odor Prevention: Odor conditions need to be defined for this project through the various state and local permits. Well-defined parameters and monitoring requirements need to be included that utilize compliance determining criteria, annoyance criteria, ambient odor criteria (threshold or intensity), ambient odorant criteria (mass concentration), episode duration-frequency criteria, source emission criteria (threshold or mass concentration) and best available control technology criteria (i.e. industry standards).
Response: The type of odor emitted is helpful to know for certain circumstances related to exposure; however, for control purposes, the specific odorant is not a requirement as the control technology is considered to be effective for all pollutants, whether regulated or not.
Comment 2-42: From the Air Permit Specifically. Appendix II. Best Management Practices Plan. Odor Prevention: A standard practice for determining odor intensity similar to ATM E679-91, ASTM E544-75,88 or a program utilizing a scentometer or similar program should be referenced. What governing body will regulate, field complaints, and ensure compliance for this project? Please detail the complaint criteria and method to file complaints.
Response: If a citizen has observed an incident that may either negatively impact the environment or be in violation of environmental regulations, they may contact the MPCA by calling 651-296-6300 or 1-800-657-3864 in Greater Minnesota or by filling out an online form at this web address: http://www.pca.state.mn.us/index.php/view-document.html?gid=17383
Comment 2-43: From the Air Permit Specifically. Appendix II. Best Management Practices Plan. Odor Prevention: Refer to Air Permit Receiving and Plant Area Ventilation Odor Emissions Estimate. Table A-8. (Using vegetable compost) Does not include biofilter or digestate areas.
Response: The biofilter would be at the facility to reduce odor from the receiving building, and the liquid industrial byproduct ponds would be covered to prevent odors. The pond covers are part of SDS permit.
Comment 2-44: From the Air Permit Specifically. Appendix II. Best Management Practices Plan. Odor Prevention: Odor components should be more accurately studied to ensure the exact odor species.
Response: See Response to Comment 2-41.
Comment 2-45: Odors Produced During Transport (Traffic-related odors). Regarding traffic and transportation of feedstock and effluent, upon roadways and through the city of Le Sueur, what odor
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 10 of 18
control measurements will be applied for these vehicles to ensure meeting the Air Permit Control requirements?
Response: See Response to Comment 1-1.
Comment 2-46: Effluent Storage Ponds and Odors: The processes for controlling odors from the effluent holding pond are still not clear. There are comments on the possible use of a flaring system. I do not see a flaring system illustrated anywhere. Please provide this information if a flaring system will be used. If so, the flaring emissions should be added to the air permit.
Response: The liquid industrial byproduct ponds will be covered to reduce odor. The flare (EU 007) at the site is planned to be located to the west of the tanks. Emissions from the flare have been accounted for in the calculations the facility submitted. The Odor Management Plan submitted by the facility states that gas generation in the ponds is not expected from normal operation, but if it does occur, the gas may be routed to the flare or bioscrubber.
Comment 2-47: Effluent Storage Ponds and Odors: To properly control effluent pond odors I am requesting the need of a wet scrubber or other more efficient odor treatment device such as a catalytic burner.
Response: The odor from the ponds will be controlled with a cover.
Comment 2-48: Effluent Storage Ponds and Odors: This is a covered system, therefore basically anaerobic, and supposedly tightly sealed to prevent odor. So odors will be stored and building up inside that holding pond like a balloon. Eventually that gas has to go somewhere. Were will this go?
Response: The gas will be released as necessary. The facility has stated, though not expected, if a significant amount of gas is created it will be routed to the engines or the flare.
Comment 2-49: Effluent Storage Ponds and Odors: The cover system is not explained in detail of how it will perform. The EAW and other sources of information describes this as a floating cover. More detailed information is required to explain the expected efficiency of this system. How will it be sealed to prevent escape of emission gases and odor generating gases?
Response: The covers would be anchored in place around the perimeter of the ponds; a trench would be dug around the crests of the ponds’ berms and the edges of the cover are set into the trenches to cover the entire pond. The trenches are backfilled to secure the cover in place and prevent it from pulling free.
Comment 2-50: Effluent Storage Ponds and Odors: How will these odors be treated to control the odors. What if the odors generated will not burn through a flaring system? A properly designed digester with proper holding time should not generate butyric, propionic acids since these are highly digestible materials for a digester process. Many of the acid odor generating compounds are heavy non-combustible acids and partially soluble in water.
Response: See Response to Comment 2-47 and 2-48.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 11 of 18
Comment 2-51: Effluent Storage Ponds and Odors: Guaranteed odor control from the effluent holding ponds are lacking and have to be further addressed and a better odor system guaranteed. Stating that odor control must be complied with in the Air Permit is one thing, but presenting an efficient odor control system by the proposer is another. Since odor is a primary concern in this project it is requested this process be better explained and further studies to ensure proper odor control based upon the inferior information and design of this system.
Response: See Response to Comment 2-47 and 2-48.
Comment 2-52: Effluent Storage Ponds and Odors: H2S and ammonia gases cannot be ruled out as being generated in the effluent pond. How will these gases be treated?
Response: See Response to Comment 2-47 and 2-48.
Comment 2-53: Effluent Storage Ponds and Odors: Flaring may not be an effective control process if emission odorous gases are not at high enough concentrations to flare or if they are not combustible. Flaring may not be an effective odor controlling process for certain compounds if they are not combustible or if there is no carrier gas to enter them into the flaring process. How can flaring be an effective guarantee to control odors under the potential conditions?
Response: The draft permit does not require a flare to control odors. The facility has submitted an Odor Management Plan that describes how odors would be controlled and managed which includes an option to route gas from the pond to the flare.
Comment 2-54: Effluent Storage Ponds and Odors: Why will methane be generated in the effluent? Where did this information and calculations come from? If the feedstock is efficiently digested I would expect no analogs to generate methane in the effluent holding pond. So by this concept the proposer is stating the biodigester is an inefficient process. Please explain and confirm this contradiction.
Response: The purpose of the anaerobic digestion process is to create biogas, which is primarily methane. It is in the facility’s best interests to create as much biogas as possible from the feedstock; however, some methane forming components may remain in very small quantities in the liquid industrial byproduct that is stored in the ponds onsite.
Comment 2-55: Effluent Storage Ponds and Odors: What types of VOC’s and other gases that may present a health hazard will be generated from the effluent ponds? How and what studies were conducted on the mechanism to generated these VOC’s and to identify them? If they have to flare, how will that process be implemented? So far I see no design for the cover to be fitted with a flare. But it is indicated a flare system might be used. In other words, are they going to use a flare at the effluent holding ponds? Yes or no? If yes, this design must be included in the permit. If no, how will these VOC’s affect odor and other emission concerns?
Response: See Response to Comment 2-47 and 2-48.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 12 of 18
Comment 2-56: Effluent Storage Ponds and Odors: Previously stated, depending on the performance and balance of the digester, and the effluent composition which is supposed to have ample nitrogen fertilizer material, high levels of ammonia gas could be generated in the effluent holding ponds. How will odor control be applied for these kinds of odor-generating compounds?
Response: See Response to Comment 2-47 and 2-48.
Comment 2-57: Effluent Storage Ponds and Odors: It is mentioned that some silage juice under certain conditions may be diverted to the byproduct storage ponds. Silage juice has a BOD level of approximately 20,000 PPM. If silage juice is diverted to the holding ponds it will continue to create massive amounts of various odor components.
Response: See Response to Comment 2-47 and 2-48.
Comment 2-58: Effluent Storage Ponds and Odors: It is stated that the bioscrubber that removes hydrogen sulfide from the biogas will be cleaned and purged and that material will be sent to the effluent holding ponds. What effect will this have for the potential of generating odors? Will this material contain reduced forms of hydrogen sulfide such as sulfur, or will it be in oxidized forms such as sulfates? Either way, upon this material entering the effluent holding ponds will it add various chemical components that might continue to generate more hydrogen sulfide gas? This is a very important question regarding odor control and possible health issues under OSHA guidelines.
Response: See Response to Comment 2-13 and 2-18.
Comment 2-59: Effluent Storage Ponds and Odors: Since the proposer of this project has stated conducting laboratory pilot studies, and is contracting with Xergi, these effluent gases should be able to be some what replicated and odors therefore be conducted by a certified laboratory using GC/Mass Spec applications. The permit should not be approved until this information is available for a second review process.
Response: The MPCA has reasonable assurance that the proposed facility will not violate air quality standards.
Comment 2-60: Silage storage areas: To control odor in the silage bunkers, they are fitted with covers to cover silage and removed to gain access? That will not prevent odors.
Response: The covers would help control odor but would not eliminate it.
Comment 2-61: Silage storage areas: Bunkers storage should be fully enclosed in a building and have their own biofilter or reasonable odor control system. Using covers which are repeatedly removed is notgoing to control odor, since they will continue to be generated by silage decomposition.
Response: See Response to Comment 2-60.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 13 of 18
Comment 2-62: Silage storage areas: Drainage of silage juice by a trench drain is stated. Is this a closed or open system? Silage juice has a strong pungent odor and if the trench drain is not designed properly it is obvious odors will be released.
Response: The trenches would only be covered by a grate; the trenches flow to the sump where they will be pumped to the process or, in the case of high flows, will be pumped to the liquid industrial byproduct ponds. The trenches would be collection devices, not storage devices, they would not contain standing pools of liquid industrial byproduct.
Comment 2-63: Silage storage areas: The trench drain must be fully enclosed to prevent odors or access form water sources that can occur from heavy rain fall or complicate maintenance issues during wintertime.
Response: See Response to Comment 2-62.
Comment 2-64: Silage storage areas: It is mentioned that some silage juice under certain conditions may be diverted to the byproduct storage ponds. Silage juice has a BOD level of approximately 20,000 PPM. If silage juice is diverted to the holding ponds it will continue to create massive amounts of various odor components.
Response: See Response to Comment 2-47 and 2-48.
Comment 2-66: Silage storage areas: Filling of silage storage bins, and continuous removal of the covers are bound to generate extensive odors. This is not an acceptable odor control system.
Response: Comment noted.
Comment 2-67: Digestate Odor Control: Odor evaluations have not been conducted for the digestate drying process area.
Response: The Odor Management Plan submitted by the facility addresses this issue. Dryer velocity and solid retention time in the anaerobic digester are two areas that will be monitored to manage odor from the drying process.
Comment 2-68: Digestate Odor Control: Proper VOC or odor analysis has not been conducted on the digestate. This should be conducted.
Response: Requirements to conduct a VOC performance tests on EU 006 (the digester solids dryer) have been added to the permit to confirm the emission factor used in calculations.
Comment 2-69: Digestate Odor Control: The proposer of this project stated in public some pilot lab studies were conducted. Also, they stated they are using Xergi for the digester project. Since Xergi is supposed to be some what replicating this process it is requested to provide samples or certified data on the VOC content from drying digestate and the odor components.
Response: See Response to Comment 2-68.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 14 of 18
Comment 2-70: Digestate Odor Control: How is this system designed with the belt dryer and incoming heating exhaust? Is this an enclosed system to contain fugitive and other emissions? Is heat from the exhaust transferred by convection to the drying belt? Otherwise, by lack of detailed diagrams it appears odor emissions generated by the digestate drying process appears to go directly into a stack vent which means these odors will simply be discharged directly into the air. Has there been a blueprint of this system to be properly evaluated by the MPCA?
Response: The digester solids will be dried on a belt drier with the exhaust from the engines. The emissions from drying the digestate solids will be discharged directly to the atmosphere. Also see Response to Comment 2-68.
Comment 2-71: Other Odors In General: If the digestion process is inefficient, as implied by the proposer, above, there will be undigested volatile fatty acids remaining after the methanogenic step of the digestion process. These FA’s will be a source of odors.
Response: The MPCA does not have reason to believe that the proposer believes that the process is inefficient. The majority of volatile fatty acids will be consumed by anaerobic digestion to create biogas.
Comment 2-72: Other Odors In General: The proposed biofilter is only 70 to 90% efficient. This does not ensure adequate odor control and is not an acceptable process.
Response: See Response to Comment 2-9, 2-10 and 2-11.
Comment 2-73: Air Permit Technical Support Document: Major issues with PTE Emission calculations. Table A1. The table is extremely difficult to interpret the way the data is displayed. Periods are missing to accurately determine the units. This is especially true for the gensets. That table has to be re-done to allow reviewers and engineers to intelligently compare against their own calculations for accuracy.
Response: See Response to Comment 2-39. The calculation spreadsheet will be reformatted to improve readability.
Comment 2-74: Air Permit Technical Support Document: Major issues with PTE Emission calculations. Table A1. The data for using various emission and other calculations are inconsistent and unorganized making it is difficult to evaluate what is being used where or how.
Response: See Response to Comment 2-73.
Comment 2-75: Air Permit Technical Support Document: Major issues with PTE Emission calculations. Table A1. It appears this table is an exact duplicate from the applicant’s previous EAW for a different project (Le Sueur Energy Park, dated November 2010).
Response: Comment noted.
Comment 2-76: Air Permit Technical Support Document: Table A.5. Mass Balance and EU006 Solid Fuel Drying. VOC Calculations: Is the proposer stating VOC as VOC gas emissions or are they expressing the
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 15 of 18
data as VOC Solids? It appears they are calling these solid VOC emissions. Should this be categorized as VOC’s or Particulates?
Response: As a conservative estimate, the proposer is assuming all solid VOCs are emitted to the atmosphere as VOC emissions. The proposer has calculated the emissions in a conservative manner. See also Response 2-24.
Comment 2-77: Air Permit Technical Support Document: Table A.6 Potential to Emit Green House Gas Calculations: Why are these gases being generated in the (basin) or effluent storage pond? This usually indicates an inferior or incomplete digestion process. However, since this is documented this further magnifies the need of a flare on the pond cover.
Response: The facility has submitted worst-case calculations. While significant gas production is not expected from the liquid industrial byproduct storage pond, it is possible and must be taken into consideration.
Comment 2-78: Air Permit Technical Support Document: Table A.6 Potential to Emit Green House Gas Calculations: In addition, how will odors be controlled if the odor gases will not combine with the methane gas, or the CO2 is too high to support combustion, or if the odor gases are not flammable. Most of the odor components are somewhat water soluble compounds and also do not combust. Therefore, it is recommended an odor filter, gas scrubber, or other efficient device to control odor be included on this system.
Response: See Response to Comment 2-48 and 2-54.
Comment 2-79: Air Permit Technical Support Document: TableA-8. Receiving and plant area ventilation odor estimates. “Quantifying odor Emissions from Composting”: This data is not acceptable. Vegetative feedstock arriving in the facility will not have been treated through a composting process. Odor components of silage are well documented in the literature. This clearly indicates inaccuracy in this data. It is well-established that one of the highest components produced during silage decomposition is acetic acid.
Response: The feedstock arriving daily by truck is food processing residuals, not corn silage. Composting odors from uncomposted material are a reasonable comparison to the feedstock odors.
Comment 2-80: Air Permit Technical Support Document: TableA-8. Receiving and plant area ventilation odor estimates. “Quantifying odor Emissions from Composting”: In addition, silage and the other feedstock materials are in abundance to conduct proper odor tests. I requested that further testing be conducted by a certified laboratory and the results shared before this permit is approved.
Response: The MPCA has reasonable assurance that the proposed facility will not violate air permit standards.
Comment 2-81: Air Permit Technical Support Document: Regarding Emission concerns: I will include a copy of my excel spread sheet that is a watered down basic means of how I calculated and tracked air
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 16 of 18
emissions while at General Mills. Please evaluate this and respond to me if you find errors in my calculations to provide fairness to this project. The only section of the spreadsheet you have to focus on is the “emissions” section. Note g/hp. x 1 lb./454 g. x 2826 (hp) x 8760 hr./yr x 1 ton/2000 are the calculation method I am using in calculating PTE. The Emissions Input section is only used to finalize the data and use for charting applications. The tracking hours are only to apply for tracking actual emissions and that can be ignored. The Traffic section are notes on calculating VMT # trucks and distance. The charts may interest you and these are reflections of the emissions. Actual emissions are using the emission units x hp. x CE units x hrs. of operation through the tracking section in units per month.
Response: Commenter has been provided with the excel spreadsheet used to draft the in order to compare his calculations.
Comment 2-82: Overall, the Air Permit itself is excellent in assuring actions for compliance. The big issue is the substandard issues to ensure this facility can construct this project effectively and have the skills to both make the system operate successfully and to comply to the Air Permit requirements. I thank the MPCA for such a tremendous effort and a good final product.
Response: Comment noted.
3. Comment by Bruce McKay. Email received March 21, 2012. Letter received March 21, 2012.
Comment 3-1: In the Air Permit Document, if any GP 001 CO emission factor verification test measures at 0.88 g/hp-hr or greater or formaldehyde emission factor verification test measures at 0.60 lb/hr or greater, the Permittee shall submit an application for a major amendment. The application shall propose a reduction of the 31,000 hr/yr GP 001 operating limit to a level that will limit GP 001 CO emissions to no greater than 85.0 tons per year and formaldehyde to less than 9.0 tons/year.
Response: This requirement will be split into two separate requirements for clarity.
Comment 3-2: In the Air Permit Document and in the Support Document, stack height has not been fully and properly addressed taking into account the urban setting, the height of neighboring structures, and the relative elevation of surrounding terrain. Is an Air Emissions Risk Analysis or an Environmental Impact Statement needed to complete the stack height assessment?
Response: Please see comment 2-1.
Comment 3-3: In the Support Document, Table 2 should clearly describe the categories “Uncontrolled PTE (Entire Facility)” (8760 hours runtime per generator per year (35,040 hr/yr total)), “Controlled PTE (Entire Facility)” (7750 hours runtime per generator per year (31,000 hr/yr total)), and “LimitedControlled PTE (Entire Facility)” (5840 hours runtime per generator per year (23,360 hr/yr total)) and the role and necessity of the control elements in the emissions mitigation process that allow reduction of the Uncontrolled PTE numbers to the lower PTE numbers.
Response: The “uncontrolled PTE” is based on 8,760 hours of operation annually with no control equipment; the “controlled PTE” is based on 8,760 hours operation with control equipment (catalytic oxidizers); and the “limited controlled PTE” is based on 7,750 hours of operation with control
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 17 of 18
equipment. The calculations that were submitted based on 5,840 hours annually are necessary for the MPCA emissions inventory. The facility has estimated the actual operating hours will be 5,840 hours.
Comment 3-4: In the Support Document, the EAW should be correctly described as mandatory and any related topics, such as Permit Fee Assessment, should be dealt with accordingly.
Response: This has been corrected.
Comment 3-5: In the Support Document, there are estimates for the Receiving and Plant Area Ventilation Odor Emissions (Table A-8), but there are no estimates for odor from digestate drying, silage storage area, trench drain system, or holding ponds. These other odor sources should be fully defined and more complete mitigation plans and operating and maintenance procedures designed and described for them.
Response: The odor estimates are not necessary to draft the air permit because the air permit does not regulate odor that is not a health issue. The MPCA has reasonable assurance that the facility will not violate air standards.
4. Comment by Kevin Skelly. Comments received in writing at public meeting March 20, 2012
Comment 4-1: What type of technology will be used for hydrogen sulfide removal and siloxane removal? In the waste air stream to the gensets and will there be back up air controls emissions fro these components?
Response: Hydrogen sulfide will be removed with a bioscrubber. Siloxanes are not expected to be present in significant amounts. Siloxanes are typically present in gas created at wastewater treatment plants and landfills because the feedstock at those sources contain cosmetic products which contain siloxanes. Cosmetic products are not part of the feedstock at this facility.
Comment 4-2: Will there be limits placed on hydrogen sulfide and siloxanes?
Response: The draft permit contains a limit of 300 ppm of hydrogen sulfide in the gas combusted in the gensets in order to limit SO2 emissions. There is no limit on siloxanes because it is not a regulated pollutant. There are requirements to test the catalysts’ activity periodically; if the catalyst is fouled the facility would be required to replace or recondition the catalyst.
5. Comment by Mary Scott Riviere. Received by mail March 26, 2012
Comment 5-1: Community resident Frank Ebert has invested a significant amount of his time and energy researching the impact of this project on our community. He has significantly more scientific knowledge, training and experience then most community members. It appears that he has pointed out concerns based on his research, yet we do not know if his calculations have received review and consideration. This increases the fear and distrust in the project by those without the scientific knowledge and training. Who will respond to his research?
Response: The air permit engineer will respond to his comments. Please see the responses to Frank Ebert’s letter previously in this document.
Attachment 8
Responses to Comments on Draft Air Emission Permit No. 07900050-001 18 of 18
7. Comment by Dave Graff. Email received March 27, 2012
Comment 7-1: Due to the many concerns, I would request an EIS before the project is approved.