perhitungan hcs

Upload: hendragt

Post on 16-Feb-2018

252 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/23/2019 Perhitungan HCS

    1/11

    1. DATA STRUKTUR

    Panjang bentang, L 8mTinggi kolom, H 3mDimensi kolom, Bk 40cm

    Hk 40cmDimensi ba lok, Bb 30cm

    Hb 75cm

    2. MATERIAL PROPERTIES

    Beton PC Hollow Core Slab Topping

    - Mutu Beton,K K450 450kg

    cm2

    K225 225kg

    cm2

    - Kuat tekan beton, fc f'c1 K450 0.83 g f'c2 K225 0.83 g

    =f'c1 36.628MPa =f'c2 18.314MPa

    - Modulus elastisitas,Ec Ec1 4700 f'c1 MPa Ec2 4700 f'c2 MPa

    =Ec1 28444.84MPa =Ec2 20113.539MPa

    - Berat jenis beton,c c1 25kN

    m3

    c2 24kN

    m3

    - Faktor reduksi, n Ec2

    Ec1=n 0.707

    Reinforcement

    - Diameter > 13mm U-39

    Kuat leleh ba ja, fy fy 390MPa- Diameter < 13mm U-24

    Kuat leleh baja, fys fys 240MPaModulus Elastisitas, Es Es 200000MPa

    Prestress

    Uncoated stress-relieved seven wire strand, Grade 270-ASTM A416-90a Low Relaxation

    Diameter, dp dp 6mmLuas area strand, Ap Ap =0.25 dp

    228.274mm

    2

    Modulus Elastisitas, Ep Ep 198000MPaUltimate Tensile Strength, fpu fpu 1625MPaUTS = fpu/Ap UTS =fpu Ap 45.946kNBanyaknya tendon, np (Dari Brosur) np 5

    Tegangan Ijin Beton PC HCS

    Pada saat transfer

    Kekuatan beton transfer, fci fci =0.8 f'c1 29.302 MPa

    Eci =4700 fci MPa 25441.839MPa

    - Tegangan ijin tekan f'ct =0.6 fci 17.581 MPa

  • 7/23/2019 Perhitungan HCS

    2/11

    - Tegangan ijin tarik f'tt =0.8 fci MPa 4.331MPa

    Pada saat beban layan

    Kekuatan beton layan, f'ci f'ci =1.0 f'c1 36.628 MPa

    E'ci =4700 f'ci MPa 28444.84 MPa

    - Tegangan ijin tekan f'cs =0.4 f'ci 14.651MPa

    - Tegangan ijin tarik f'ts =0.498 f'ci MPa 3.014 MPa

    3. PERATURAN

    1.

    2.

    3.

    ACI 318-11 (Building Code Requirements for Structural Conc rete

    PCI Design Handbook 6th Edition

    SNI 2847-2013 (Persyaratan Beton Struktural Untuk Bangunan Gedung

    4. HCS SECTION PROPERTIES

    Lebar penampang bHC 1200 mmTinggi penampang HCS h 200 mmPelat Hollow b1 190mmTebal flens atas t1 30mmTeba l flens bawah t2 30mmTebal badan t3 35mmTebal badan ke tepi t4 50mm

    a =t3

    b1h t1 t2 25.789mm

  • 7/23/2019 Perhitungan HCS

    3/11

    Ax =++t1 t2 a 85.789mm 'Per satuan panjang sb-YAcx =Ax bHC 102947.368 mm

    2'Untuk lebar 1200 mm

    Sx =++1

    2t1

    2

    1

    2a +h t1 t2 t2

    h

    1

    2t2

    8578.947 mm

    2

    zx =Sx

    Ax100mm

    Ix +++++

    1

    12 t13

    t1

    zx

    1

    2 t1

    2

    1

    12 t23

    t2

    h zx

    1

    2 t2

    2

    1

    12 a h t1 t2

    2

    a

    zx

    1

    2 +h t1 t2

    2

    =Ix 480122.807 mm3

    Icx =Ix bHC 5.761 104

    m4

    Ay =+t1 t2 60mm 'Per satuan panjang sb-XAcy =Ay L 480000mm

    2'Untuk lebar 8000 mm

    Sy =+1

    2t1

    2t2

    h

    1

    2t2

    6000mm

    2

    zy =Sy

    Ay100 mm

    Iy =+++1

    12t1

    3t1

    zy

    1

    2t1

    2

    1

    12t2

    3t2

    h zy

    1

    2t2

    2

    438000 mm3

    Icy =Iy L 3.504 109

    mm4

    PENAMPANG HCS PER 1 METER LEBAR

    Luas Penampang Ac Acx =Ac 1029.474cm2

    Momen Inersia, Ic Icx =Ic 576147368.421 mm4

    Garis serat bawah, Cbh

    2

    =Cb 100mm

    Garis serat atas, Ct h Cb =Ct 100mm

    Modulus penampang atas, StIc

    Ct=St 5761473.684 mm

    3

    Modulus penampang bawah, Sb Ic

    Cb=Sb 5761473.684 mm

    3

    5. COMPOSITE SECTION PROPERTIES

    Panjang bentang HCS, Lsl Lsl =L 8mTinggi topping, htop htop 50mmTinggi pelat komposit, hsl hsl +htop h =hsl 250mmFaktor reduksi, n =n 0.707Lebar plat transformasi, be n bHC =be 848.528mmLuas penampang tranformasi,Ack Ack =+Ac htop be 145373.775 mm

    2

    Garis serat bawah, Cbk Cbk =

    +be htop

    +h

    htop

    2

    Ac Cb

    Ack136.48mm

    Garis serat atas, Ctk Ctk =hsl Cbk 113.52mm

    Momen Inersia, Ick +++Ic Ac Cbk Cb2

    be htop3

    12 be htop

    Ctk

    htop

    2

    2

    =Ick 1.054 109

    mm

    4

    =Stk 9288549.963 mm3

    Modulus penampang atas, Stk Ick

    Ctk

  • 7/23/2019 Perhitungan HCS

    4/11

    Modulus penampang bawah, Sbk Ick

    Cbk=Sbk 7725883.071 mm

    3

    6. PEMBEBANAN DAN ANALISA GAYA DALAM

    A. LOADING

    - Beban sendiri HCS, qslb Ac c1 =qslb 2.574

    kN

    m

    - Beban Topping, qtop htop bHC c2 =qtop 1.44kN

    m

    - Beban mati tambahan, qsdl 1.2kN

    m2

    bHC =qsdl 1.44kN

    m

    - Beban titik akibat penambahan dak baru, Rmax

    (ETABS ANALYSIS)

    Pdk 192.2374kN

    - Beban Hidup, qL 4.903kN

    m2

    bHC=qL 5.884kN

    m

    A. ANALISA MOMEN DAN GESER

    1. Berat Sendiri =qslb 2.574kN

    m

    Solution: x , 0 1 8 L 8

    Fx 0; qslb L

    2qslb x V 0 Vslb x

    qslb

    2L 2 x m

    M 0; ++qslb L

    2qslb x

    x

    2

    M x 0 Mslb x

    qslb

    2L x x

    2m

    2

    -8-6-4-2

    02468

    10

    -12-10

    12

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    0

    8

    x

    Vslb x kN

    Shear (kN)

    J arak (m)

  • 7/23/2019 Perhitungan HCS

    5/11

    468

    101214161820

    02

    22

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    x

    Mslb x kN m

    Momen (kNm)

    J arak (m)

    2. Topping

    =qtop 1.44kN

    m

    Solution: x , 0 1 8 L 8

    Fx 0; qtop L

    2qtop x V 0 Vtop x

    qtop

    2L 2 x m

    M 0; ++qtop L

    2qtop x

    x

    2

    M x 0 Mtop x

    qtop

    2L x x

    2m

    2

    -4-3-2-1

    012345

    -6-5

    6

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    0

    8

    x

    Vtop x kN

    Shear (kN)

    J arak (m)

    23456789

    1011

    01

    12

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    x

    Mtop x kN m

    Momen (kNm)

    J arak (m)

  • 7/23/2019 Perhitungan HCS

    6/11

    3. Beban mati tambahan

    qsdl 1.44kN

    m

    Solution: x , 0 1 8 L 8

    Fx 0; qsdl L

    2qsdl x V 0 Vsdl x

    qsdl

    2L 2 x m

    M 0; ++qsdl L

    2qsdl x

    x

    2

    M x 0 Msdl x

    qsdl

    2L x x

    2m

    2

    -4-3-2-1

    01234

    5

    -6-5

    6

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    0

    8

    x

    Vsdl x kN

    Shear (kN)

    J arak (m)

    23456789

    1011

    01

    12

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    x

    Msdl x kN m

    Momen (kNm)

    J arak (m)

  • 7/23/2019 Perhitungan HCS

    7/11

    4. Beban titik penambahan dak baru

    Pdk 19.226kN

    a 4 L 8Solution:

    Pdk L a Ay L 0 Ay =Pdk

    1

    a

    L

    9.613kN

    x1 , 0 0.5 a aAy V1 x 0 V1 x Ay

    M1 x Ay x 0 M1 x Ay x m

    x2 , a 1.5 a LAy Pdk V2 x 0 V2 x Ay Pdk

    +M2 x Ay x Pdk x a 0 M2 x Ay x Pdk x a m

    -6-4-2

    02468

    -10-8

    10

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    840

    x1

    x2

    V1 x1 kN

    V2 x2 kN

    812162024283236

    04

    40

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    840

    x1

    x2

    M1 x1 kN m

    M2 x2 kN m

  • 7/23/2019 Perhitungan HCS

    8/11

    5. Beban Hidup

    qL 5.884kN

    m

    Solution: x , 0 1 8 L 8

    Fx 0; qL L

    2qL x V 0 VL x

    qL

    2L 2 x m

    M 0; ++qL L

    2qL x

    x

    2

    M x 0 ML x

    qL

    2L x x

    2m

    2

    -18-13.5

    -9-4.5

    04.5

    913.5

    1822.5

    -27-22.5

    27

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    0

    8

    x

    VL x kN

    Shear (kN)

    J arak (m)

    913.5

    1822.5

    2731.5

    3640.5

    45

    04.5

    49.5

    1.6 2.4 3.2 4 4.8 5.6 6.4 7.20 0.8 8

    x

    ML x kN m

    Momen (kNm)

    J arak (m)

  • 7/23/2019 Perhitungan HCS

    9/11

    6. CEK TEGANGAN

    Summary :

    fpu 1625 MPafpy 0.9 fpu =fpy 1462.5MPa

    fpi 0.6fpu =fpi 975 MPafpeff 0.8 fpi =fpeff 780MPa

    Diameter, dp dp 6mm

    Banyaknya tendon, np (Dari Brosur) np 7Luas area strand, Ap Ap =0.25 dp

    228.274mm

    2

    UTS = fpu/Ap UTS =fpu Ap 45.946kNJ acking Force, Jf %70 =Jf 0.7Tinggi penampang HCS h 200 mmEksentritas kabel, e 0.5 h 20 mm =e 80mm

    1. Pemerikasaan Tegangan Pada Saat Transfe

    =qslb 2.574kN

    m

    x 0 8 Ac 98842.105mm2

    Cb 100mm

    Mslb x qslb

    2L x x

    2m

    2Ic 535328947.368 mm

    4

    J arak (m) Momen (kNm)

    =x

    0

    1

    2

    3

    45

    6

    7

    8

    =Mslb x

    0

    9.008

    15.442

    19.303

    20.58919.303

    15.442

    9.008

    0

    kN m

    P transfer, Po np UTS Jf

    Mmax_transfer Mslb 4

    =Po 225134.384 N

    =Mmax_transfer 20.589 kN m

    Syarat : ;top f'tt bot x f'ct

    top =+Po

    Ac

    Po e Cb

    Ic

    Mmax_transfer Cb

    Ic2.759MPa

    bot =+Po

    Ac

    Po e Cb

    Ic

    Mmax_transfer Cb

    Ic1.796MPa

    CheckStress1

    if

    else

    top f'tt bot f'ct

    Pass

    Fail

    =CheckStress1 Pass

  • 7/23/2019 Perhitungan HCS

    10/11

    2. Pemerikasaan Tegangan Pada Saat Masa Konstruksi

    Pada tahap ini gaya prategang telah mengalami kehilangan yang bersifat seketika, beban

    yang bekerja adalah Beban Berat Sendiri dan Berat Konstruksi dan kekuatan beton telah

    termobilisasi penuh.

    =qslb 2.574kN

    mqkons 1

    kN

    m=L 8 Mkons x

    qkons

    2L x x

    2m

    2

    Mmax_kons +Mslb 4 Mkons 4

    =x

    01

    2

    3

    4

    5

    6

    7

    8

    =Mslb x

    09.008

    15.442

    19.303

    20.589

    19.303

    15.442

    9.008

    0

    kN m =Mkons x

    03.5

    6

    7.5

    8

    7.5

    6

    3.5

    0

    kN m =Mmax_kons 28.589 kN m

    P transfer, Po np UTS Jf =Po 225134.384 NPada saat konstruksi loss of prestress yang terjadi 5% loss %5P konstruksi, Pi Po %100 loss =Pi 213877.664 NSyarat : ;top x f'ts bot x f'cs

    top =+Pi

    Ac

    Pi e

    StkMmax_kons

    Stk3.4MPa

    bot =+Pi

    Ac

    Pi e

    StkMmax_kons

    Stk0.928MPa

    CheckStress2

    if

    else

    top f'tt bot f'ct

    Pass

    Fail

    =CheckStress2 Pass

    2. Pemerikasaan Tegangan Pada Saat Masa Layan

    Pada tahap ini beton telah mengalami seluruh komponen kehilangannya, beban yang

    bekerja adalah beban mati, beban hidup dan beban tambahan, kekuatan beton telah

    termobilisasi penuh, pada tahap ini terjadi loos sebesar 25%.

    MD +++Mslb 4 Mtop 4 Msdl 4 M1 4

    =MD 82.081 kN m

    ML =ML 4 47.072 kN m

    Mmax_layan +MD ML

    =x

    0

    1

    2

    3

    4

    5

    6

    7

    8

    =Mslb x

    0

    9.008

    15.442

    19.303

    20.589

    19.303

    15.442

    9.008

    0

    kN m

    =Mmax_layan 129.153 kN m

    P transfer, Po np UTS Jf =Po 225134.384 NPada saat layanloss of prestress yang terjadi 25% loss %25P layan, Peff Po %100 loss =Pi 213877.664 NSyarat : ;top x f'ts bot x f'cs

  • 7/23/2019 Perhitungan HCS

    11/11

    top =+Peff

    Ac

    Peff e

    StkMmax_layan

    Stk14.159MPa

    bot =+Pi

    Ac

    Peff e

    StkMmax_layan

    Stk10.286MPa

    CheckStress3

    if

    else

    top f'cs bot f'ts

    Pass

    Fail

    =CheckStress3 Pass

    SUMMARY

    Penambahan struktur berupa kolom yang membebani plat Hollow Core Slab existing tidak

    ada masalah.