11 th Annual Pennsylvania Concrete Conference. PennDOT’s 2010 Program. Rebecca S. Burns, P.E. Acting Director Bureau of Construction and Materials. January 26 th -27 th , 2010 - Grantville, PA. 2009/2010 Construction Program. 2010 Program Asset Management Things to Come. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PennDOT’s 2010 Program

www.dot.state.pa.us

PennDOT’s 2010 Program

Rebecca S. Burns, P.E.Acting Director

Bureau of Construction and Materials

1111thth Annual Pennsylvania Concrete Conference Annual Pennsylvania Concrete Conference

January 26th-27th, 2010 - Grantville, PA

Page 2: PennDOT’s 2010 Program

www.dot.state.pa.us

2009/2010 Construction Program

• Letting Trends

• ARRA Status

• Design Build

• Material Trends

• 2010 Program

• Asset Management

• Things to Come

Page 3: PennDOT’s 2010 Program

www.dot.state.pa.us

Historic Letting Trends

* Includes Base Program + $62 Million in ARRA Funding for 23 Projects

Page 4: PennDOT’s 2010 Program

www.dot.state.pa.us

Project Type Breakdown

Year % Bridge % Highway % Other Amount

2005 21% 79% $ 1.41 B

2006 31% 69% $ 1.70 B

2007 35% 58% 7% $ 2.02 B

2008 36% 56% 8% $ 1.97 B

2009 Base 40% 55% 6% $ 1.86 B

2009 ARRA 40% 44% 16% $ 0.86 B

2009 Total 39% 52% 9% $ 2.72 B

2010* 38% 47% 15% $ 1.80 B* Projected

Page 5: PennDOT’s 2010 Program

www.dot.state.pa.us

ARRA

• $1.026 Billion* in ARRA funding

• 282 contracts bid for 326 projects

• 91% let on original scheduled date

• 2009 - $863M• 2010 - $ 61M

* includes construction oversight

Page 6: PennDOT’s 2010 Program

www.dot.state.pa.us

2009 Design Build Trends

Data Source: ECMS contracts bid in calendar year 2009, by cost [excludes municipal contracts]

Page 7: PennDOT’s 2010 Program

www.dot.state.pa.us

2009 Average Number of Bidders

Page 8: PennDOT’s 2010 Program

www.dot.state.pa.us

Inflation Indices

FHWA/PENNDOT Highway Admin Bid Index for PA (BPI)Engineering News Records Construction Cost Index (CCI)Bureau of Labor and Statistics Consumer Price Index (CPI)3% Trend Line

Page 9: PennDOT’s 2010 Program

www.dot.state.pa.us

Producer Price Indices – Competitive Building Materials

Data Source: Portland Cement Association Market Research December 15th, 2009

Page 10: PennDOT’s 2010 Program

www.dot.state.pa.us

Materials Usage Totals

2007 2008 2009 2010

Asphalt (Tons) 9.8 M 8.5 M 8.2 M 8.0 M

Aggregate (Tons) 13.9 M 11.8 M 13.5 M 11.5 M

Concrete Paving (SY)

0.5 M 0.8 M 1.0 M 0.8 M

Data Source = Projected Material Usage from Annual District Surveys

Page 11: PennDOT’s 2010 Program

www.dot.state.pa.us

2010 Construction Program

*Unknowns: Act 44 Funds, Reauthorization of Highway Trust Fund, Motor License Funds, Economic Stimulus

$1.8 Billion$1.8 Billion**

Page 12: PennDOT’s 2010 Program

www.dot.state.pa.us

2010 Letting Schedule

• 675 Projects Projected for 2010*

• 209 projects populated in ECMS

•11% have Concrete Paving

•6% with Concrete Pavement

Rehabilitation (CPR) Operations

Page 13: PennDOT’s 2010 Program

www.dot.state.pa.us

Concrete Pavements

Item of WorkQuantities Paid

in 2009

Quantities to be

Completed

Section 501 Reinforced or Plain Cement

Concrete Pavements 164,465.42 SY 302,295.83 SY

Section 506 Reinforced or Plain Cement

Concrete Pavements, RPS

117,708.54 SY 356,175.52 SY

Page 14: PennDOT’s 2010 Program

www.dot.state.pa.us

Concrete Pavement Rehabilitation (CPR)

Item of WorkQuantities Paid in

2009

Quantities to be Completed

Section 514 Diamond Grinding of Concrete

Pavement490,138.50 SY 655,923.59 SY

Section 516 Concrete Pavement Patching 481,920.52 SY 301,246.86 SY

Section 525 Concrete Pavement Spall Repair 24,447.54 SF 9,050.77 SF

Section 527 Dowel Retrofit472.00 EA 739.00 EA

Sections 512 & 521 Longitudinal & Transverse Joint Cleaning and Sealing

1,261,969.19 LF 2,443,578.50 LF

Section 590 Crack Cleaning and Sealing 14,201.50 LF 17,563.76 LF

Page 15: PennDOT’s 2010 Program

www.dot.state.pa.us

Asset Management

Page 16: PennDOT’s 2010 Program

www.dot.state.pa.us

What’s Next

• A second Federal Stimulus package, known as Job Creation, is in development in the US Congress.– Passed the House of Representatives awaiting action by the Senate

• PennDOT can respond as needed with up to 300 additional highway and bridge projects.

Page 17: PennDOT’s 2010 Program

www.dot.state.pa.us

We Look Forward to Working with ACPA in 2010!

Thank-You!