OMV Petrom S.A. Regulation
TABLE OF CONTENTS
1 Introduction ................................................................................................................................ 3
2 Range of Applicability ..................................................................... ........... ........... ..................... 4
3 Objectives ................................................................................................................................... 5
4 Content Procedure .......................................................... ........... ........... ..................................... 54.1 Step 1: Qualifications of Personnel ................................................. ........... ....................... 5
4.2 Step 2: Identification of Flammable Substances .............................. ........... ..................... 5
4.3 Step 3: Properties of Flammable Substances ................................................. ........... ....... 5
4.4 Step 4: Source of Release and Ventilation .......................................................... .............. 6
4.5 Step 5: Hazardous Areas Classification .................... ........... .............................................. 6
4.6 Step 6: Hazardous Areas Drawing ........... ........... .............................................................. 7
4.7 Step 7: Equipment Selection ............................................................................................ 7
4.8 Step 8: Installation of Equipment .................................................................................... 10
4.9 Step 9: Assessment of Equiment / Installation Initial Inspection ................... ........... ... 10
4.10 Step 10: Documentation for Permitting .......................................................................... 11
4.11 Step 11: Availability of Documents .......... ........... ............................................................ 12
5 Definitions and Abbreviations ................................................................................................. 13
6 References Documents ............................................................................................................ 15
7 Obsolete Documents ................................................. .............................................................. 16
8 Annexes .................................................................................................................................... 16
8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP ..................................................... 17
8.2 Annex 2 Types of Protection for Electric Equipment ............................ ........... ................... 18
8.3 Annex 3 Types of Protection NonElectrical Equipment ..................................................... 19
8.4 Annex 4 Conformity Assessment Procedure ....................................................................... 20
8.5 Annex 5 Conformity assessment procedure .................................................................... ... 21
8.6 Annex 6 Deliverables List ..................................................................................................... 22
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
3/29
OMV Petrom S.A. Regulation
1 Introduction
Hazardous area classification is an important part of processes safety and integrity.
The term hazardous area, in the meaning of this document, refers to an area created by the
presence of an explosive atmosphere.
The term is also known as Electrical Area Classification, in the older references, or as "zoning".
In Europe and beyond, ATEX (ATmospheres EXplosive) became an accepted standard for themanagement of the activity in the hazardous areas in order to protect staff and assets, and isbased on the same principles, regardless of the country where the facility is located.
There are, however, differences between national laws governing these activities.
This document outlines legislation, regulations and standards applicable in Romania in order to
guide their own engineering staff or contractors due to differences from other countries.
ATEX is governed by Directive 94/9/EC, Directive for equipment and by Directive 1999/92/EC,Directive for personnel. Both Directives have been transposed into the Romanian legislation.
Consequently, ATEX regulations and reference standards, e.g. series of standards EN 60079, EN
/ ISO 80079, EN 1127 and EN 13463 are mandatory.List of reference standards are periodically updated and published in the Official Journal of the
European Union, available on the website:
http://ec.europa.eu/enterprise/policies/european-standards/harmonised-standards/equipment-explosive-atmosphere/index_en.htm
ATEX regulations refer to all equipment, electrical and non-electrical.
The latest edition of standard EN 60079-0, divides the explosive atmospheres into 3 groups:
group I mines susceptible to firedamp
group II gases, vapours or mist, other than those from the mines susceptible tofiredamp
group III explosive dusts, other than those from the mines susceptible to firedamp
Subdivision of group II
IIA, typical gas: propane
IIB, typical gas: ethylene
IIC, typical gas: hydrogen
Subgroup of group II are divided considering the maximum experimental safe gap MESG orminimum ignition current or MIC( minimum ignition current ) of explosive gaseousatmosphere in which the equipment may be installed (EN 60079-20-1).
In oil and gas installations of OMV Petrom, EP Division, were identified explosive substances
from group II (gases) and its subgroups, IIA (propane), respectively, IIB (ethylene).
No substances from subgroup IIC (Hydrogen) or group III (dusts) were identified.
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
4/29
OMV Petrom S.A. Regulation
Relation with other standards
Standard Status Applicable
Projects, including extensions, modernizations or changes
PE-D-HA-PRO-001-01-R_ ATEX Procedure for Projects In force Projects
EP FA HA 01 ST PETROM Standard for Areas Classification In forceProjects
Operation
RO-EP-SR-GDL-001-01-E _Process Safety and IntegrityEngineering and Design 29112011
In force Projects
TO-HQ-02-019 Rev 00 Philosophy for Hazardous Area Classification
and HVAC OnshoreIn force NO*
Operation-Maintenance-Procurement-Inspection-Attestations (Permits)
RO-EP-DMSS-STD-046-01-R _Standardization of types of explosionproof for low voltage electric motors ( in Romanian version)
In forceMaintenanceProcurement
PE-D-HA-GDL-001-01- R_ATEX_Attestation_of_Plants_06.03.2012 In force
Operation
Attestations
EP HA 10 PR R1 Equipment Inspection in Hazardous AreasUnderreview
Inspection
EP -MNT-RO-06-POL-16-01.00R_ Maintenance And InspectionStrategy Of Ex Equipment( in Romanian version)
In forceMaintenance
Inspection
Withdrawn
RO-EP-SR-SOW-001-01-R _Scope of Work for ATEX certification of
plants ( in Romanian version) Withdrawn NO
RO-EP-SR-PRO-001-01-R_Ex Certification Procedure (in Romanianversion)
Withdrawn NO
RO-EP-SR-STD-001-01-E Company Standard for Selection of Ex
EquipmentWithdrawn NO
RI EX 9.2006 Procedure for Self-Certification for Three-Phase,
Squirrel Cage Induction Motors in Normal Construction Used InZone 2
Withdrawn NO
Note * OMV philosophy contains conflicting standards with present procedure.
2 Range of Applicability
This procedure applies for the following:
Projects, including extensions, modernization/upgrades or changes, starting fromconcept phase until commissioning and operation readiness, including permits system,
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
5/29
OMV Petrom S.A. Regulation
Project and engineering team members of OMV Petrom E&P
Ex Responsible
Maintenance personnel involved in extension, modernization or changes of existentplant.
3 Objectives
This document presents the applicable regulations and standards, the steps to be followed indifferent phases of a project, and the documents to be prepared in order to conform to national
legal requirements.
In order to achieve the same outcome for all installations, documentation must meet both therequirements of authorities and the requirements of OMV Petrom.
4 Content Procedure
The next chapters mentions briefly the minimum requirements and actions to be taken inengineering, design, construction and operation readiness of plants where explosive
atmospheres are present or where they are expected to occur.Where, for those actions, there is an applicable standard it was preferred to refer to the
appropriate standards, without going into details.
4.1 Step 1: Qualifications of Personnel
The area classification should be carried out by those who understand the relevance and
significance of properties of flammable materials and by those who are familiar with theprocess and the equipment. Such personnel should consult with safety, electrical, mechanicaland other qualified engineering personnel as required.
The design of the installation, the selection of equipment and the installation covered by this
standard shall be carried out only by persons whose training has included instruction on thevarious types of protection and installation practices, relevant rules and regulations and on thegeneral principles of area classification. The competency of the person shall be relevant to the
type of work to be undertaken.
Note 1: Requirements for qualification of personnel are described in the 5th
edition of standard EN 60079-14
Nota 2: According to NEx 01-06 the companies that design, construct, maintain or repair equipment inexplosive atmospheres or prepare documentation for obtaining attestation of facilities shall have
certified staff and specific procedures.
4.2 Step 2: Identification of Flammable Substances
The identification of flammable substances is made using analysis reports of crude oil, gases orwater injection. These documents are usually available to the Assets.If such reports are not available or dont contain enough data, the contractor shall order them,at his own expenses, from an authorized laboratory.
4 3 Step 3: Properties of Flammable Substances
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
6/29
OMV Petrom S.A. Regulation
Hexane / Octane (IIA T3) Rich gas or crude oil, H2S not present
Hydrogen Sulphide (IIB T3)
Annex 1 lists the relevant properties, for this document, of crude oil, and gas. The Data hasbeen obtained from the examination of over than 40 analysis reports and Material Safety Data
Sheets (MSDS) of flammable petroleum used in E&P.Consequently the subgroup IIB and temperature class T3cover the usual requirements for oiland gas installations from E&P.
In case more hazardous substances are identified than those above mentioned they will belisted by CAS number (Chemical Abstract System).
Unclassified liquids:
Petroleum products having a Flash Point higher than 100 C will not be classified in theconditions specified in the Company Standard for Areas Classification.
Water Injection circuits, e.g. pumps or manifolds, where fluids contain less than 200 ppm ofhydrocarbons, is not classified. Exceptions:
o Tanks for untreated reservoir water or which may be occasionally used for oil storage
o
Pumps that may be used for conveying oil or because the location of those pumps fits inthe zone produced by neighbouring equipment.
Deliverable: Hazardous area classification data sheet Part I: Flammable material list andcharacteristics according to EN 60079-10-1
4.4 Step 4: Source of Release and Ventilation
The basic elements for establishing the hazardous zones types are the identification of thesources of release and the determination of the grades of release.
4.4.1 Identification of Source of Release
The sources of release may be classified as continuous, primary or secondary grade.
4.4.2 Characteristics of Ventilation
Type of ventilation: natural or artificial ventilation (general or local)
Degree of ventilation (dilution): high, medium, low
Availability of ventilation: good, fair, poor
Combining the concepts of degree of ventilation and level of availability depending on thegrade of release results in a quantitative method for the evaluation of zone type (see Annexes B
and C of EN 60079-10-1).4.5 Step 5: Hazardous Areas Classification
Area classification is a method of analysing and classifying the environment where explosivegas atmospheres may be present so as to facilitate the proper selection and installation ofequipment to be used in that environment. The classification also takes into account the
ignition characteristics of the gas or vapour such as ignition energy (equipment group) and
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
7/29
OMV Petrom S.A. Regulation
Where necessary, the design, operation and location of process equipment should ensure that,even when it is operating abnormally, the amount of flammable material released into theatmosphere is minimised, so as to reduce the extent of the hazardous area.
Hazardous areas are classified in zones based on the frequency and duration of explosiveatmospheres. Areas (0,1, 2 or unclassified) are defined in Art. 5, Definitions.
Hazardous area classification is considered for normal operation.Hazardous area classification shall be in compliance with EN 60079-10-1 and Company
Standards for Areas Classification.Deliverable: Hazardous area classification data sheet Part I: List of sources of releaseaccording to EN 60079-10-1.
4.6 Step 6: Hazardous Areas Drawing
After classifying areas, a risk assessment shall be performed in order to determine if the
consequences of ignition of an explosive atmosphere requires the use of equipment with alevel of explosion protection (EPL) higher than what would normally be required, or if you canuse a device with a lower EPL than normally required.
Requirements for EPL / ATEX category will be listed in the ATEX documents, includingHazardous plan to allow the correct choice of equipment.
Hazardous area plan will include the following:
Plans and elevations of three-dimensional model, if any, showing the type and extent of
zones (quotas) and the requirements listed below
Classification of gases or vapours in relation to equipment group or subgroup
Temperature class or ignition temperature of the gas or vapours existing in thehazardous area
External influences and ambient temperature
Requirements for the protection level of equipment (EPL). This requirement applies even
if the consequences were not subject to a risk assessment
Calculus criteria, including the source and grade of release and the type, degree andavailability of ventilation (EN 60079-10-1).
Hazardous area drawings will be delivered both in a signed form, on paper, and in nativeformat (e.g. AutoCAD), non-secured. Recommended format: A2/A3. Areas will be highlightedby patterns, according to EN 60079-10-1, so that black and white print does not createconfusion. Paper format will be presented and laminated for posting in site.
Deliverable: Area classification drawings.
4.7 Step 7: Equipment Selection
For new installations the selected equipment must have been tested and certified inaccordance with directive 94/9/EC and current editions of the standards series EN 60079, EN
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
8/29
OMV Petrom S.A. Regulation
Table no. 1 - Relationship between Zones, EPLs and ATEX categories
Zone Permitted explosion protection levels (EPLs) Permitted ATEX Category
0 Ga 1G
1 Gb 2G
2 Gc 3G
The use of equipment with a lower or higher EPL than was specified in the Table no. 1 shall bedemonstrated.
To allow access to the bidding of different manufacturers and, taking into consideration theprogress of technology, references to Ex equipment will be made quoting the following:
The area where the equipment will be used (zone 0,1 or 2) and,
o The required EPL, or
o The required ATEX equipment category and
Equipment Group and Temperature Class (usually IIB T3)
Justified: type of explosion protection.
Note 1: Mentioning the type of protection may be necessary in Detailed Design Phase, case in which e.g.for Ex i equipment (safety intrinsically), it is necessary to design appropriate circuits.Note 2: The use of a higher EPL than requirement is allowed in procurement phases as a result of abetter offer. Example: the requirement is for an EPL Gc. 1
stoffer: intrinsically ic (EPL Gc), price A. 2
nd
offer: intrinsically ia (EPL Ga) or ib (EPL GB), both of them at price B < A. 2nd
offer is preferred and thereason is: it presents the best price with respect of technical criteria.
Note 3: Since July 2012 mentioning EPL on the marking for each Ex equipment is mandatory.
4.7.1 Conformity Assessment ProcedureDepending on the intended ATEX category, the manufacturer or his authorized representative
established in the EU may choose one of the procedures described in Directive 94/9/EC thatensures and declares the compliance of product with the requirements of the directive.The conformity assessment procedures allowed by the Directive are presented in Annex 5.
4.7.2 Preferred Types of Protection
Table no. 2 presents the types of protection currently used in OMV Petrom EP and givesrecommendations on their use. This table serves as a guide only and is not intended to
influence the choice of technology.The contractor must provide justification for the use of another type of protection than the ones
mentioned below (e.g. a better price for another protection typemay be a reason buttraditionally manufacturers offer only this type of protectionis not acceptable).
Types of protection unchecked in the table are not commonly used in OMV Petrom EP.
Table no. 2 Types of protection currently used in OMV Petrom E&P
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
9/29
OMV Petrom S.A. Regulation
Recommended for:Type of protection Code According to:
I1) A2) Boxes3) Motors4)
Protection by oil immersion o EN 60079-6
Protection by pressurizedenclosures
p EN 60079-2
Protection by powder filling q EN 60079-5
Protection by using opticalradiation
EN 60079-28
Non-sparking equipment n EN 60079-15 Yes
Fieldbus non-incendive concept
(FNICO)EN 60079-27
Note 1: Field instruments, e.g. sensors, transmitters, measuring equipment
Note 2: Command or control devices, e.g. command buttons, solenoids
Note 3: Connection or junction boxes
Note 4: Three phases squirrel cage induction motor
4.7.3 Motors Supplied by Converter
It is normally expected that motors and converters will be evaluated as a system.
Motors intended to be driven by converters will have the following additional markings (in
accordance with standard EN 60079-0, edition 6):
"For Converter Supply"
Frequency / minimum speed / maximum speed allowed
Type of converter acceptedNote 1: The term converter (used for driving of electric motors) is also known as a frequency converter,inverter or variable speed drive - VSD.
Additionally, regardless of the zone (1 or 2), there are additional requirements that the
following types of motors must meet:
Exe with EPL Gb or Gc
o thermal protection requirements
o motor and a converter shall be tested as a complete unit
Exd with EPL Gb or EPL Gc
o thermal protection requirements
o embedded temperature detectors, for direct controlling of temperature,
o it is not mandatory for the motor and converter to be tested as a complete unit.
Ex nA with EPL Gc
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
10/29
OMV Petrom S.A. Regulation
4.7.4 Gas Detectors
Gas detectors, to be used as a protective measure (e.g. de-energise equipment if gas is
detected), shall be used in accordance with relevant requirements of IEC 60079-29-1 and IEC60079-29-4.
Gas detection may be used as a method of protection enabling the use of electrical equipmentin hazardous areas where that equipment might not have otherwise been allowed.
Reference: IEC 60079-14, ed.5, Annex N.
4.7.5 Light Metals as Construction Materials
Installation materials (e.g. cable trays, mounting plates, weather protection) shall not containmore light metals than required by IEC 60079-0 for equipment.
4.8 Step 8: Installation of Equipment
The equipment shall be installed in accordance with its documentation.
Reference standard: EN 60079-14.
4.9 Step 9: Assessment of Equiment / Installation - Initial Inspection
After the installation of the equipment is complete, an initial inspection must be carried out inaccordance with IEC 60079-14 Explosive atmospheres, Edition 5 - Part 14: Design, selection and
construction of electrical installations.
Note: Development of this standard is ongoing. Until the next edition is in force, the initial inspectionshall be performed in accordance with the current edition of standard EN 60079-17 Explosiveatmospheres - Part 17: Maintenance and inspection of electrical installations.
The following aspects will be considered for initial inspection:
That the initial checking of electrical installation was performed according to SR HD
60364-6 and that the verification report has been prepared and is available. That equipment is properly marked with CE marking and Ex, in accordance with
Directive 94/9/EC, with referenced standard and EC certificate / declaration ofconformity.
That the classification of the installed equipment is appropriate for the installation area.
That the Ex Certificate / declaration of conformity are available and contain the minimuminformation specified in Directive 94/9/EC and relevant standards. The content ofDeclaration of Conformity is described in Annex 4.
Declaration of manufacturer for equipment without its own source of ignition and areconsidered out of scope of Directive 94/9/EC
Declaration of manufacturer for equipment considered as "simple apparatus" accordingto Directive 94/9
That documents for equipment with special conditions of operation (e.g. equipmenthaving certificate number with the suffix "_X") have been provided, and that the
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
11/29
OMV Petrom S.A. Regulation
Table no. 3 Equipment list
Denumire echipamentsau instalaie
ZonaFabricant /
An fabricaie
Datetehnice(Un, In,
Nn)
Tipprotecie
(Ex)Grupa
Clasa detemperatura
CertificatEx
Grad deprotecie(Codul IP)
CategoriaATEX /
EPL
ConditiiSpeciale
Name ofequipment/installation
ZoneManufacturer
/ YearTechnical
data
Exprotection
typeGroup
TemperatureClass
Excertificate
Ingressprotection(IP code)
ATEXcategory
/ EPL
SpecialConditions
4.10 Step 10: Documentation for Permitting
This section presents the documentation to be produced/reviewed and attestations to be
obtained, for installations in explosive atmospheres, namely:
Explosion protection document as a requirement of the Directive 1999/92/EC, alsoknown as ATEX 137 or the directive for staff, transposed by HG 1058/2006
Attestation of plant, based on documentation and an inspection on site, by NationalAuthority, as a provision of normative NEx 01-06.
According to the normative and regulations mentioned above the responsibility for preparingdocumentation and obtaining the attestation is the responsibility of the user.
Considering that, for new and modernized plants and for the various phases of the project, themajority of these documents are prepared by the Contractor the responsibility fordocumentation preparation and for obtaining of attestations will be transferred, by clearprovisions of contract, to the Contractor.
4.10.1 Explosion Protection Documentation
The documentation shall contain, as minimum:
Presentation memo Area classification drawings
Classification of Ex equipment and Ex certificates
Guidelines for maintenance of equipment, as per SR EN 60079-17
Qualification and training of personnel referring to protection against explosion
Nomination of Ex responsible person
Specifications for PPE
Explosion risk assessment.4.10.2 Document for Attestation of Plants by INSEMEX
The documentation shall contain, as minimum:
General plant description
Process flow diagrams
Th li t f i t ( l t i l d h i l) l d i l ifi d ( t
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
12/29
OMV Petrom S.A. Regulation
4.10.3 Document Presentation
The above mentioned documents will be approved by User before they are submitted to the
Authority.
After receipt of the attestation, the Contractor will send to user the documentation togetherwith the attestation.
The Documentation will be delivered with respect of the following requirements:
Both in hardcopy and in softcopy
Original/native documents in editable format (MS Office, Adobe 6, AutoCAD 6)
Romanian and English languages
Separate file (from other technical documents)
Contractor may combine both sets of documents in a single file
Taxes and other expenses required for attestation will be Contractor's responsibility.
Note: Some requirements e.g. "Nomination of Ex responsible person" will be fulfilled with user's support.
4.10.4 Delivery Time
The initial inspection shall be carried out after the mounting of equipment and before it is put infunction (energised). The attestation shall be obtained before the equipment is deemed to be
ready for operation. It is the Contractor's responsibility for the timely submission of documentsand coordination with Authority.
4.11 Step 11: Availability of Documents
In order to ensure correct installation or extension of plants, the following information,additional to the requirements for non-hazardous areas, is required, where applicable.
Reference: EN 60079-14 standard, ed. 5
4.11.1 Site
Area classification drawing, as indicated in [4.6]
Optional assessment of consequences of ignition
Material characteristics including electrical resistivity
4.11.2 Equipment
Instructions for installation and initial inspection
Documents for electrical equipment with conditions of use, e.g. for equipment withcertificate numbers which have the suffix _X
Descriptive system document for the intrinsically safe system
Details of any relevant calculation, e.g. for purging rates, for instruments or analyserhouses
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
13/29
OMV Petrom S.A. Regulation
Documentation relating to the suitability of the equipment for the area and environmentto which it will be exposed, e.g. temperature ratings, type of protection, IP rating,corrosion resistance
Details of the type of wiring system
Record of selection criteria for cable entry system, for compliance with therequirements for particular types of protection
Drawings and schedules relating to identification of circuits.
4.11.4 Personnel
Evidence of personnel competency (Annex A of EN 60079-14, ed.5).
4.11.5 Approval of Documents
Documents will be approved by competent persons and who own a valid attestation, accordingto [4.1], and who meet the required approval level given in the Discipline Authority Framework
(DAF) and specified in Annex 6.
4.11.6 Documents Keeping
After commissioning of plant, the documents mentioned in this chapter, together with thosementioned in 4.9 and 4.10, including documentation for obtaining certificates, will be posted on
SharePoint, by care of Responsible Ex, with support of Technical Compliance Office FacilityEngineering Department.
4.11.7 Deliverable
Deliverables by project phases, maturity and level of approval are presented in Annex 6
5 Definitions and Abbreviations
For the purpose of this procedure the following definitions are given:
AssetOperating and Production Area (subunits) of Division OMV
Petrom E&P
E&P OMV Exploration & Production Division of Petrom
Ex Responsible(ATEX expert)
The person appointed by Asset Manager, part of the FacilityEngineering, included in PE Asset Department, in order tocomply with the requirements of the Explosion Protection
Document. This person must be attested by INSEMEX.
FE Facility Engineering PE Asset Project and Engineering Department from Asset
ATEX ATmosfere EXplosive (Directive 94/9/CE)
Attestation Document issued by the Authority
AuthorityNational Authority for Explosion Protection, INCD INSEMEX
Petroani
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
14/29
OMV Petrom S.A. Regulation
ATEX CategoryDefined by directive 94/9/EC. Similarly definitions withEPLATEX categories are, for Group II - gases and vapours: 1G, 2G
and 3G
Ex Certificate Certificate of conformity , as defined in Directive 94/9/EC
CAS numberChemical Abstract System. Unique numerical identifier assigned
to each substance described in scientific literature
Temperature Class
Classification of equipment for explosive atmospheres in terms
of maximum surface temperature (IEV426).
DocumentationSet of documents prepared in accordance with and in order toaccomplish legal requirements
Declaration of
Conformity
Document prepared by manufacturer or his authorized
representative in accordance with Directive 94/9/CE
ExplosionProtectionDocument
Documentation elaborated as a requirements and in conformitywhit Directive 1999/92/EC respectively GD 1058/2006
Equipment
protection level(EPL)
The level of protection assigned to equipment based on its risk
of becoming a source of ignition and distinguishing thedifferences between explosive gas atmospheres, explosive dustatmospheres and coal mines.
EPL Ga
ATEX II 1GCategory
Equipment for explosive gas atmospheres, having a "very high"level of protection, which is not a source of ignition in normaloperation, expected malfunction or when subject to rare
malfunction. Such equipment will have a form of protection,
which will remain effective even in the presence of two potentialfaults (for example, intrinsic safety, level of protection ia), orwill have two independent means of protection (for example, Ex
e and Ex d acting independently of each other).
EPLGb
ATEX II 2G
Category
Equipment for explosive gas atmospheres, having a "high" levelof protection, which is not a source of ignition in normal
operation or when subject to faults that may be expected,though not necessarily on a regular basis. (The majority of the
standard protection concepts bring equipment within thisequipment protection level).
EPL Gc
ATEX II 3G
Equipment for explosive gas atmospheres, having a "normal"level of protection, which is not a source of ignition in normaloperation and which may have some additional protection toensure that it remains inactive as an ignition source in the case
f l d (f l f il f l )
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
15/29
OMV Petrom S.A. Regulation
Normal operation
Situation when the equipment is operating within its designedparametersNOTE 1: Minor releases of flammable material may be part of normaloperation. For example, releases from seals, which rely on wetting bythe fluid that is being pumped, are considered to be minor releases.
NOTE 2: Failures (such as the breakdown of pump seals, flange gasketsor spillages caused by accidents), which involve urgent repairs orshutdown, are not considered to be part of normal operation nor are
they considered to be catastrophic.NOTE 3: Normal operation includes start-up and shutdown conditions.
(Equipment) Group
Classification of electrical equipment related to the explosiveatmosphere for which it is to be used (IEV 426)
NOTE: EN 60079-0 standard, ed. 5, defines 3 groups: group I(mines
susceptible to firedamp) group II (vapours and gases) group III(dusts)
LEL - lower
explosive limit
Concentration of flammable gas, vapour or mist in air below
which an explosive gas atmosphere will not be formed ( IEV 426)
Protection level
Subdivision of the type of protection, correlated with theexplosion protection level (EPL) that differentiates the probabilityfor an equipment to become a source of ignition (EN 60079-0)
Explanatory note: Type of intrinsically protection (i) is divided in levelsof protection "ia", "ib" and ic, and that they are correlated with EPL'sGa, Gb and Gc (for explosive gas atmospheres)
Type of protectionSpecific measures for equipment applied to prevent ignition of
explosive atmospheres surrounding ( IEV 426)
Maximum surfacetemperature
Highest temperature which is attained in service under the mostadverse conditions (but within the specified tolerances) by any
part or surface of equipment
NOTE: This temperature may occur on an internal component or on theexternal surface of the enclosure, depending upon the type ofprotection employed
Flash point
Lowest liquid temperature at which, under certain standardized
conditions, a liquid gives off vapours in a quantity such as to becapable of forming an ignitable vapour/air mixture( IEV 426)
UEL- upper
explosive limit
Concentration of flammable gas, vapour or mist in air, above
which an explosive gas atmosphere will not be formed ( IEV 426)
User
For the purpose of Directive 99/99/EC and NEx 01-06: Companywho operate the plant. The user may not be the same with the
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
16/29
OMV Petrom S.A. Regulation
Non-hazardousarea (on account of
explosive gasatmospheres)
An area in which an explosive gas atmosphere is not expected to
be present in such as quantities to require special precautionsfor the construction, installation and use of equipment
6 References Documents
Directive 94/9/EC transposed by HG 752/2004, modified
Directive 99/92/EC, transposed by HG 1058/2006
Normative NEx 01-06
ATEX Guideline 3rdEdition July 2009
EN 1127-1 Explosive atmospheres - Explosion prevention and protection - Part 1: Basicconcepts and methodology
Series standards SR EN 60079 Explosive atmospheres
Series standards SR EN 13463 Non-electrical equipment for use in potentially explosive
atmospheres Series standards ISO/IEC 80079 Explosive atmospheres. Non-electrical equipment for
use in potentially explosive atmospheres
International Electrotechnical Vocabulary. Part 426 Electrical apparatus for explosiveatmospheres (IEV 426)
SR HD 60364-6 Low voltage installations. Part 6: Verification
EP FA HA 01 ST PETROM Standard for Areas Classification
RO-EP-QA-MAN-002-01-R Quality manual of Facility Engineering Department ( in
Romanian version)
7 Obsolete Documents
RO-EP-SR-PRO-001-01-R_Ex Certification Procedure (in Romanian version)
RO-EP-SR-STD-001-01-E Company Standard for Selection of Ex Equipment
RO-EP-SR-STD-001-01-R Company Standard for Selection of Ex Equipment
RO-EP-SR-SOW-001-01-R _Scope of Work for ATEX certification of plants ( in Romanianversion)
RI EX 9.2006 Procedure for Self-Certification for Three-Phase, Squirrel Cage InductionMotors in Normal Construction Used In Zone 2
Note: EP HA 10 PR R1 Equipment Hazardous Areas 2007-10-10 procedure remains in force, it will bereviewed
8 Annexes
8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
17/29
OMV Petrom S.A. Regulation
PE-D-HA-PRO-001-01-E
Valid from: 31.03.2012ATEX Procedure for Projects Page 17of 22
Edition: 01
8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP
CASNumber
Material/ CompositionEquipment
GroupTemperature
Class(Auto) Ignition
Temperature (C)Formula LEL (%) UEL(%)
74-82-8 Methane* IIA T1 600 CH4 5,0 15,4
74-84-0 Ethan IIA T1 515 CH3CH3 3,0 15,5
74-98-6 Propane IIA T2 450 CH3CH2CH3 2,1 9,6
106-97-8 n-Butane IIA T2 372 CH3(CH2)2CH2 1,5 8,5
109-66-0 n Pentane IIA T3 243 CH3(CH2)3CH3 1,3 7,6
110-54-3 Hexane (n-hexane) IIA T3 225 CH3(CH2)4CH3 1,1 7,5
142-82-5 Heptane (n-heptane) IIA T3 204 C7H16 1,1 6,7
111-65-9 n-Octane IIA T3 206 CH3(CH2)6CH3 1,0 6,5111-84-2 Nonane IIA T3 205 CH3(CH2)7CH2 0,74 5,6
124-18-5 n-Decane IIA T3 235 C10H22 0,7 5,6
7783-06-4 Hydrogen Sulphide IIB T3 260 H2S 4,0 45,5
8008-20-6 Diesel fuel No. 2)) IIA T3 254 C15 C21 0,6 6,5
8006-61-9 Gasoline (benzine) IIA T3 280 1,4 7,6
Condensate - Asset II - INCERP T2 >300 0,6 6,0
Rich gas- Asset VII INCPDM 537 5,0 15,0
Gasoline - Asset VII >250 0,6 6,0
Note*: Content< 25% (V/V) of Hydrogen (see EN 60079-20-1)
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
18/29
OMV Petrom S.A. Regulation
8.2 Annex 2 Types of Protection for Electric Equipment
EPL ATEX Category Type of protection Code According to:
Protection by Intrinsically safe ia EN 60079-11
Protection by Encapsulation ma EN 60079-18
Two independent types of protection, each
satisfying the conditions imposed by theGb level
EN 60079-26Ga 1G
Protection of equipment and transmissionsystems using optical radiation
EN 60079-28
Protection by Flameproof enclosures d EN 60079-1
Protection by Increased safety e EN 60079-7
Protection by Intrinsically safe ib EN 60079-11
Protection by Encapsulationm sau
mb EN 60079-18
Protection by Oil immersion o EN 60079-6
Protection by Pressurized enclosuresp, px or
pyEN 60079-2
Protection by Powder filling q EN 60079-5
Fieldbus intrinsically safe concept (FISCO) EN 60079-27
Gb 2G
Protection using optic radiation EN 60079-28
Protection by Intrinsically safe ic EN 60079-11
Protection by Encapsulation mc EN 60079-18
Non-sparking equipment n or nA EN 60079-15
Restricted breathing equipment nR EN 60079-15
Energy limitation equipment nL EN 60079-15
Sparking equipment nC EN 60079-15
Protection by Pressurized enclosures pz EN 60079-2
Fieldbus non-incendive concept (FNICO) EN 60079-27
'Gc' 3G
Protection by using optical radiation EN 60079-28
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
19/29
OMV Petrom S.A. Regulation
8.3 Annex 3 Types of Protection Non-Electrical Equipment
EPL ATEX Category Type of protection Code According to:
Constructional safety "c" EN 13463-5
Control of ignition source "b" EN 13463-6Ga 1G
Liquid immersion "k" EN 13463-8Flameproof "d" EN 13463-3
Constructional safety "c" EN 13463-5
Control of ignition source "b" EN 13463-6
Pressurization "p" EN 13463-7
Gb 2G
Liquid immersion "k" EN 13463-8
Flow restricting enclosure "fr" EN 13463-2
Flameproof "d" EN 13463-3Constructional safety "c" EN 13463-5
Control of ignition source "b" EN 13463-6
Pressurization "p" EN 13463-7
Gc 3G
Liquid immersion "k" EN 13463-8
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
20/29
OMV Petrom S.A. Regulation
8.4 Annex 4 Content of EC declaration
The EC declaration of conformity must contain the following elements [Directive 94/9/EC,Annex X, B]:
the name or identification mark and the address of the manufacturer or his authorized
representative established within the Community
a description of the equipment, protective system, or device referred to in Article 1 .(2) ofdirective
all relevant provisions fulfilled by the equipment, protective system, or device referred toin Article 1. (2) of directive
where appropriate, the name, identification number and address of the notified body and
the number of the EC-type-examination certificate
where appropriate, reference to the harmonized standards
where appropriate, the standards and technical specifications which have been used
where appropriate, references to other Community Directives which have been applied identification of the signatory who has been empowered to enter into commitments on
behalf of the manufacturer or his authorized representative established within the
Community.
The manufacturer or his authorized representative must keep a copy of the declaration of
conformity for a period of at least 10 years from the date of manufacture the last equipment. If incase when neither the manufacturer nor his authorized representative not domiciled or have
registered in Romania or in an EU Member State, obligation to keep available the technical
documentation shall be the responsibility of the person who places the equipment or protectivesystem on the market.
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
21/29
OMV Petrom S.A. Regulation
8.5 Annex 5 Conformity Assessment Procedure
Equipment of Groups I and II
Categories M1 and 1* and
Autonomous Protective
Systems
Equipment of group II
Category 3*
Equipment of Groups I and II
Categories M2 and 2*
Internal combustion
engine or electrical
equipment
Internal control of
production Annex VIII
EC type Examination
Annex III
YES NO
and
Production
QA
Annex IVor
Product
verification
Annex V
EC type
Examination
Annex III
Internal control
of production
Annex VIII
and
and
Conformity to
type
Annex VI
orProduct QA
Annex VII
Communicate atechnical
documentation to
a Notified Body
Equipment of Groups I and II
and Autonomous Protective
Systems
OR
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
22/29
OMV Petrom S.A. Regulation
8.6 Annex 6 Deliverables List
ProjectPhase
Document Maturity Approval
Select Evidence of personnel competency Final DA2
SelectSpecification for hazardous areas classification - Part I Listof flammable materials and their characteristics
FinalDA2
Define Explosion risk assessment Optionally DA2Define Hazardous Areas Drawing Baseline DA2
Define Equipment Ex specifications Preliminary DA2
Execute Evidence of personnel competency Final DA3
ExecuteSpecification for hazardous areas classification - Part IIList of sources of release
FinalDA3
Execute Hazardous Areas Drawings Final DA2
Execute Equipment Ex specifications Final* DA3
Execute Materials characteristics, including electrical resistivity Final* DA3
Execute Ex certificate of conformity Final DA3
Execute Declaration of conformity EC Final DA3
Execute
Equipment manufacturer's Declaration which have not
own source of ignition and are considered outside thescope of Directive 94/9/EC
Final
DA3
ExecuteDocuments for electrical equipment with conditions ofuse, e.g. for equipment with certificate numbers whichhave the suffix _X
FinalDA3
Execute Descriptive Declaration of the intrinsically safety system Final* DA3
ExecuteRisks assessment for assemblies, issued by the
manufacturer, as defined in ATEX Guide Edition 3-a/2009.Final
DA3
ExecuteDetails of any relevant calculation, e.g. for purging rates,for instruments or analyser houses
FinalDA3
Execute Plans showing and details of type of wiring system Final DA3
Execute
Record of selection criteria for cables entry system, for
compliance with the requirements for particular types ofprotection
Final*
DA3
Execute Drawings and schedules relating to circuits identification Final DA3
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
23/29
PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects
IS 2014
Aceasta Foaie de Interpretare a fost creat ca urmare si pentru a evita in viitor confuziile in
utilizarea listei de livrabile din Anexa 6.
In principiu doar documentele marcate cu verde ar trebui sa fie considerate livrabile.
Celelalte documente sau informaii trebuie sa fie de asemenea disponibile, in faza de proiectmenionat, chiar daca sunt incluse in documente aparinnd diferitelor discipline sau sunt
livrate de productorii de echipamente.
In orice caz, toate documentele trebuie analizate si aprobate de autoritile pe disciplina, inconformitate cu DAF si faza de proiect
This Interpretation Sheet (IS) has been developed as result of and in order to avoid in thefuture any confusion in use of Deliverable List from Annex 6.
In principle only the documents in green should be considered as deliverable.
The other documents shall be also available in the mentioned project phase, even if they are
included in documents which belong to other disciplines or are delivered by manufacturers.
In every case, all documents shall be reviewed and approved by discipline authority,
according to DAF for Project Phase.
AuthorJugravu Nicolae
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
24/29
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
25/29
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
26/29
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
27/29
ATEX Procedure for Projects Interpretation Sheet 2014 Page 5of 7 Valid from: 2014
Nr. Crt. Fazeleproiectului
Document Observaii Livrabile Maturitate
11. Execute
Declaraia productorului pentruechipamente care nu dein surse deaprindere proprii i sunt considerate a fin afara scopului Directivei 94/9/EC.
Equipment manufacturer's Declarationwhich have not own source of ignition
and are considered outside the scope of
Directive 94/9/EC
Sunt livrate de ctre furnizor. Vor fi parte din EPD.
Delivered by vendor. Will be part of EPDNu Final
12. Execute
Documente pentru echipamentele
electrice nsoite de condiiile deutilizare, de ex. pentru echipamente cunumere de certificate care au sufixul_X .
Documents for electrical equipment with
conditions of use, e.g. for equipment
with certificate numbers which have the
suffix _X
Sunt livrate de ctre furnizor. Vor fi parte din EPD.
Delivered by vendor. Will be part of EPDNu Final
13. Execute
Descriptive Declaration of theintrinsically safety system
Declaraie descriptiv a sistemelor de
securitate intrinsec.
Faza de construcie. A se vedea i EN 60079-25.Modelul Petrom este n curs de elaborare. Trebuie sa fie disponibilecaracteristicile aparatelor ex. U,L,C,I.Va fi parte din EPD.
Construction phase. See also EN 60079-25.
PETROM template under development.
It requires the availability of apparatus characteristics e.g. U,L,C,I
Will be part of EPD.
Nu Final
14. Execute
Evaluarea de risc pentru ansamble, emisde productor, conform definirii dinGhidul ATEX ediia 3/2009.
Risks assessment for assemblies, issuedby the manufacturer, as defined in ATEX
Guide 3rd Edition /2009.
Sunt livrate de ctre furnizor. Vor fi parte din EPD.
Delivered by vendor. Will be part of EPDNu Final
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
28/29
ATEX Procedure for Projects Interpretation Sheet 2014 Page 6of 7 Valid from: 2014
Nr. Crt. Fazeleproiectului
Document Observaii Livrabile Maturitate
15. Execute
Detalii ale oricrei calculaii relevante,ex. rata de purjare pentru instrumentesau lcaurile analizoarelor.
Details of any relevant calculation, e.g.
for purging rates, for instruments or
analyser houses
Dac este necesar, trebuie s faca parte din planul de zonare
If case, it shall be part of hazardous areas drawing.
Nu Final
16. Execute
Planuri care arat i detaliaz tipurile deconexiuni n sistem.
Plans showing and details of type of
wiring system
Nu este solicitat ca document separat.
Not required as separate document
Nu Final
17. Execute
nregistrarea criteriilor de selecie asistemului de intrare a cablurilor, pentruconformarea cu cerinele pentru tipurileparticulare de protecie.
Record of selection criteria for cables
entry system, for compliance with the
requirements for particular types of
protection
Nu este solicitat ca document separat. Va fi parte din EPD.
Not required as separate document. Will be part of EPD
Nu Final
18. Execute
Scheme i grafice pentru identificareacircuitelor.
Drawings and schedules relating to
circuits identification
Nu este solicitat ca document separat.
Not required as separate document
Nu
Final
19.Execute
Instruciuni pentru inspecia iniial iinstalare.Instructions for initial inspection and
Installation
Sunt livrate de ctre furnizor. Vor fi parte din EPD.Delivered by vendor. Will be part of EPD Nu
Final
20. ExecuteLista de echipamente i caracteristicilelorList of equipment and their
characteristics
Inclus n EPD ca parte din inspecia iniial.Included in EPD as part of initial inspection
Nu
Final
21. Execute
Report privind inspecia iniial (ATEX iElectric)Report regarding initial inspection (ATEXand Electric)
Inclus n EPD, a se vedea EN 60079-14 i HD 60364-6
Included in EPD, see EN 60079-14 and HD 60364-6
Nu Final
22. ExecuteInformaii pentru mentenan i revizie.
Information for Maintenance and repairs
Inclus n EPD
Included in EPD
Nu Final
-
7/25/2019 PE D HA PRO 001 01 E_ ATEX Procedure for Projects
29/29
ATEX Procedure for Projects Interpretation Sheet 2014 Page 7of 7 Valid from: 2014
Nr. Crt. Fazeleproiectului
Document Observaii Livrabile Maturitate
23. Execute
Documentul de protecie la explozie(EPD)
Explosion Protection Document (EPD)
Ref: Directiva 1999/92, HG 1058/2006
Se va furniza n format nativ, nu doar raportul, n cazul n care raportul afost obinut de la Autoritate (INSEMEX).
Ref: Directive 1999/92, HG 1058/2006
To be provided in native format, not only the report, in case a report have
been obtained from Authority (INSEMEX)
Da
Final
24. Execute
Atestare(certificate, permis) de laINSEMEX, conform solicitriinormativului NEX 01/062
Attestation (certificate, permit) from
INSEMEX, as a requirement of normative
NEX 01/063
Documentaia depus pentru atestare trebuie furnizat n format nativnsoit de atestare
Documentation submitted for attestation shall be provided in native
format together with attestation itself
Da
Final
2Atestarea de la INSEMEX poate s nu fie solicitat n cazul n care proiectul afecteaz doar parial instalaia care deja posed o atestare valabil, considernd c atestarea ar trebuiemis pentru ntreaga instalaie. Modificri/ mriri de capacitate/ modernizri,vor fi considerate, atunci cnd se solicit o nou atestare/ re-atestare.
Attestation from INSEMEX may not be required in case if the project affects only partially the plant which already owns a valid attestation, considering that the attestation shall be
issued for whole plant. Plant modification / upgrade/ revamp will be considered when it will apply for a new attestation/re-attestation.