60Hz(R22SR-6RMG2-01A
Saudi Arabia
General Wall Mounted
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
2/45
2 GENERAL WALL MOUNTED
GENERAL WALL MOUNTED
Contents
1. Models Line up .............................................................................6
2. Nomenclature ...............................................................................7
3. Features & Benefits......................................................................8
4. Specifications.............................................................................10
5. Dimensional Drawings...............................................................12
6. Wiring Diagrams.........................................................................14
7. Refrigerant Cycle Diagram ........................................................18
8. Capacity Tables ..........................................................................19
9. Capacity Coefficient factor........................................................21
10. Operation Range ......................................................................22
11. Air Velocity and Temperature Distribution
(Reference Data) .......................................................................23
12. Controller ..................................................................................24
13. Installation ................................................................................25
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
3/45
3
SR-6RMG2-01A
GENERAL WALL MOUNTED
Test condition of international standard
KSC ISO ARI AHAM AS SSA
9306 5151 210/240 1861.1 385
Indoor
DBC(F) 27.0 27.0 26.7(80) 26.7(80) 27.0 29.0
Cooling WBC(F) 19.5 19.0 19.4(67) 19.4(67) 19.0 19.0
CapacityOutdoor
DBC(F) 35.0 35.0 35.0(95) 35.0(95) 35.0 46.0
WBC(F) 24.0 24.0 23.9(75) 23.9(75) 24.0 24.0
Indoor
DBC(F) 20.0 20.0 21.1(70) 21.1(70) 21.0 21.0
Heating WBC(F) 15.0 15.0 15.6(60) 15.6(60) 15.0 15.5
CapacityOutdoor
DBC(F) 7.0 7.0 8.3(47) 8.3(47) 7.0 7.0
WBC(F) 6.0 6.0 6.1(43) 6.1(43) 6.0 6.0
Indoor
DBC(F) 32.0 32.0 26.7(80) 32.2(90) 32.0 29.0Maximum
WBC(F) 23.0 23.0 19.4(67) 22.8(73) 23.0 19.0Cooling
Outdoor
DBC(F) 43.0 43.0 46.1(115) 43.3(110) 43.0 54.0Operating
WBC(F) 26.0 26.0 23.9(75) 25.6(78) 26.0 24.0
Indoor
DBC(F) 27.0 27.0 26.7(80) 26.7(80) - -Maximum
WBC(F) 19.0 19.0 19.4(67) 22.8(73) - -Heating
Outdoor
DBC(F) 21.0 24.0 23.9(75) 23.9(75) - -Operating
WBC(F) 15.0 18.0 18.3(65) 18.3(65) - -
EnclosureIndoor
DBC(F) 27.0 27.0 26.7(80) 26.7(80) 27.0 27.0
Sweat / WBC(F) 24.0 24.0 23.9(75) 23.9(75) 24.0 24.0
CondensateOutdoor
DBC(F) 27.0 27.0 26.7(80) 26.7(80) 27.0 27.0
Disposal WBC(F) 24.0 24.0 23.9(75) 23.9(75) 24.0 24.0
Freeze-up/ Indoor DBC(F) 21.0 21.0 19.4(67) 21.1(70) 21.0 21.0
Low WBC(F) 15.0 15.0 13.9(57) 15.6(60) 16.0 16.0
Temperature
Outdoor DBC(F) 21.0 21.0 19.4(67) 21.1(70) 21.0 21.0
WBC(F) 15.0 15.0 13.9(57) 15.6(60) 16.0 16.0
KS : Korea Standard AS : Australia Standard
ISO : International Standard Organization SSA : Saudi Arabian StandardARI : Airconditioning and Refrigeration InstituteAHAM : Association of Home Appliance Manufacturers
CLASSIFICATION
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
4/45
4
SR-6RMG2-01A
GENERAL WALL MOUNTED
General Description
Split type of Air Conditioners are known by the category name of Wall Mounted Type of units.These units can beeasily installed in a small space and have exceptional Cooling capacity.Designed for Low-noise operation,itensures a pleasant air conditioned environment.
LG Offers various types of units to its customers to suit for the best application and requirement.The following are
the important categories offered by LG :1) General Wall Mounted Type Units : Units with Simplicity in design.
2) Art Cool Units : A new concept of cooling introduced by LG in the field of Air Conditioning.
3) New Gas Models : These models uses HCFC free refrigerant to provide a healthy environment to the world.
Some of the Important Features of these units are listed below :
1) Providing Health to the Customers : By having Filters such as Plasma Filter which is capable of removing MicroOrganisms up to 0.1 microns.
2) Long Term Money Saving : By providing Features such as Gold Fin,Plasma Fin, Auto Clean etc. to maintain thesame performance for years.
3) Best Comfort : With Features such as Sleep Mode,Timer,Auto Restart etc.
These Units are available with many standard and optional features which gives our Customers the choice to selectthe unit of their own desire.For details refer to the Detailed specification followed after this description.
LG Electronics Inc.
Air Conditioning & Energy Solution Company
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
5/45
5
SR-6RMG2-01A
GENERAL WALL MOUNTED
Publication history
PDB No. Product Name Notes Publication in
SR-6RMG2-01A SRAC 4Models Dec. 2012
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
6/45
6
Models Line up SR-6RMG2-01A
GENERAL WALL MOUNTED
1. Models Line upGeneral Wall Mounted
Edition Capacity Chassis Type Model
#1
18K SCC/O GS-C182C4B2
H/P GS-H182C4B2
24K SCC/O GS-C242C4B2
H/P GS-H242C4B2
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
7/45
7
NomenclatureSR-6RMG2-01A
GENERAL WALL MOUNTED
2. Nomenclature Identification Rule
Serial Number
Function
B: 4Way
Look/Color
Chassis NameC: SC
Electric Rating
2: 220V, 60Hz
Capacity
EX) '18' 18,000Btu/h Class
Model Type
C: Cooling Only
H: Heat Pump
Product Type
S: Split
Refrigerant Type
G: R22
Supply Method Diving and Type-: SET
G S C- 81 2 C 4 B 1
Chassis Look Classification
SC 4 ICE-E (White)
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
8/45
8
Features & Benefits SR-6RMG2-01A
GENERAL WALL MOUNTED
3. Features & Benefits
SmokeAway GoldFin TropicalCompressor
StylishDesign
Quick & EasyInstallation
Skew Fan DualProtection Filter
Vane &Louver
Extreme Durability
The advanced tropical compressor withstandsextreme weather conditions, enabling theproduct to operate despite high outside tem-perature.
By adopting gold plated fins in the exteriorunit, the heat exchanger is protected from cor-rosion and wear from external conditions.
The combination of tropical compressor,and the gold fin in the exterior unit allcontribute in the improved durability of LG airconditioner.
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
9/45
9
Features & BenefitsSR-6RMG2-01A
GENERAL WALL MOUNTED
Power Cooling
Perfect Health Care
Energy Saving
Stylish Design
Quick & Easy Installation
20m Windblast : Strong and cool windblastcovers the distance of 20m.
Optimized Airflow : The interior of the com-pressor in the outdoor unit has been construct-ed to minimze the sound produced when oper-ating.
The cool airflow reaches thedistance of 15m to all corners ofthe room, keeping the space cooland comfortable regardless ofoutside temperature.
Smoke Away : 3 million ionsspread from diffusion charger and 3M MicroProtection filter remove smoke particle asmuch as air-purifier removes.* Test Results
Size of Area : 30m3, CADR : 135
Dual Protection Filter : Dual Protection Filterinitially captures dust in the air that comes into the air conditioner.
Filter : While being easy to main-tain, the powerful plasma filtration system ofLG air conditioner protects the user from odorand any harmful substances floating in air.
3M Multi Protection Filter : 3M MultiProtection filter captures dust, virus and aller-gen and deactivates the captured virus andallergen by unique technologies of LG and 3M.
Various filtration system protects the userfrom all harmful substances including odor,bacteria, and allergen
Inverter V : The advanced inverter technologyof LG enables the user of the air conditioner touse more and save more.
State of the art heat exchanger, air outlet,compressor, and inverter technology providethe worlds highest energy efficiency
The design of LG air conditioners are stylish ina way that is incomparable to others. Think of
it not just as an air conditioner, but an objetthat will lighten up your living room.
LG air conditioners are not just refreshinglyefficient, but also exceptionally elegant indesign
Perfect finishing / Bigger tubing space / Installationplate improvement / Detachable bottom cover /Elevated service valve / Installation support clip /Compatible with inverter multi system
Installation has never been easier as with thedelicately designed installation elements ofLG air conditioners
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
10/45
10
Specifications SR-6RMG2-01A
GENERAL WALL MOUNTED
4. SpecificationsGeneral Wall Mounted(#1)
Note:O : Applied, - : No relation* For circuit breaker rating, please conform to local standards wherever necessary.
Some of functions are slightly different depending upon models. The specification may be subject to change without notic for purpose of improvement.
Model Name (LG) GS-C182C4B2 GS-H182C4B2Pet Name Gold Plus Gold Plus
Cooling Capacity (T1)W 5,250 5,130
Btu/h. 17,914 17,504
Heating Capacity (H1)W - 5,250
Btu/h. - 17,914
Power Input NormalCooling W 2,050 2,150Heating W - 1,750
Running Current
(Normal)
Cooling A 9.6 10.0
Heating A - 8.0
EERW/W 2.56 2.39
Btu/h.W 8.74 8.14(STAR) 3 2
COP W/W - 3.00
Power FactorCooling % 97% 98%Heating % - 99%
Cooling Capacity (T3)W 4,600 4,450
Btu/h. 15,696 15,184Power Input (T3) W 2,500 2,450Running Current (T3) A 11.5 11.5
EERW/W 1.84 1.82
Btu/h.W 6.28 6.20Power Factor % 98.81 96.84
Power Input (Max)Cooling W 2,900 2,900Heating W - 1,890
Running Current
(Max)Cooling A 13.5 13.5Heating A - 8.9
Power FactorCooling % 97.64 97.64Heating % - 96.53
Power Supply / V / Hz 1/220/60 1/220/60
Air CirculationIndoor m3/min(CFM),Max 13.0 (460) 13.0 (460)Outdoor m3/min(CFM),Max 45 (1,590) 45 (1,590)
Moisture Removal /h. 1.9 1.9
Noise Level(SoundPressure,1m)
IndoordB(A)3,High 43 43dB(A)3,Med 40 40dB(A)3,Low 37 37
Outdoor dB(A)3,Max 56 56
Refrigerant ChargeType R22 R22
g 970 970
Compressor
Type ROTARY ROTARYModel QJ278KCF QJ278KCFMaker LG LGCapacity kcal/h.(Btu/h.) 5,744(19,600) 5,744(19,600)Motor Type PSC PSCMotor Input W 1,867 1,867Oil Type SUNISO 4GSI or NOC NM56 SUNISO 4GSI or NOC NM56Oil Charge cc 500 500O.L.P Name INTERNAL INTERNAL
Blower MotorType Cross Flow Fan Cross Flow FanOutput W 22 22
Fan MotorType Axial fan Axial fanMotor Type AC Induction AC InductionMotor Output W 64 64
Circuit Breaker A 20 20Power Cord AWG#:P*mm2 3x1.5 3x2.0Connecting Cable AWG#:P*mm2 3x1.5 3x2.0+2x0.75
Connecting Tube(. Socket Flare)
Liquid Side mm(in) 6.35(1/4") 6.35(1/4")Gas Side mm(in) 15.88(5/8") 15.88(5/8")Length,std m(in) 5(196) 5(196)
Drain Hose (O.D , I.D) mm(in) 21.5,16 (0.85,0.63) 21.5,16 (0.85,0.63)
Dimension
Indoor
(W*H*D)mm 1030*320*245 1030*320*245inch 40.5*12.6*9.6 40.5*12.6*9.6
Outdoor(W*H*D)
mm 870*655*320 870*655*320inch 34.25*25.79*12.6 34.25*25.79*12.6
Net WeightIndoor kg(lbs) 12.6(27.8) 13(28.7)Outdoor kg(lbs) 40.5(89.3) 42(92.6)
Stuffing Quantity In+Out 20/40ft/HC/Truck 57/124/139/- 57/124/139/-Tool Code In+Out SC+UE SC+UE
Functions
Air flow
Air supply outlet 1 1Airflow direction control(left & right) Auto AutoAirflow direction control(up & down) Auto AutoAuto swing(left & right) Auto AutoAuto swing(up & down) Auto AutoAirflow steps(fan/cool/heat) 3/4/- 3/4/3Chaos swing Yes YesChaos wind(auto wind) Yes YesJet cool(Power wind) Yes Yes
Air purifyingDeodorizing filter (Allergy & H1N1 Filter) - -Plasma air purifier - -
Prefilter(washable / anti-fungus) Yes Yes
ReliabilityHot start - YesSelf diagnosis Yes YesSoft dry operation Yes Yes
Convenience
Setting Temperature, Cooling 18 - 30 18 - 30Setting Temperature, Heating - 16 - 30Auto changeover - YesAuto cleaning Yes YesAuto operation(artificial intelligence) Yes -Auto restart operation Yes YesForced operation Yes YesSleep mode Yes YesSetting Temperature Range (Cooling) 18-30 18-30Setting Temperature Range (Heating) 16-30 16-30Temperature Increment 1 1Timer(Hr) Yes (24h On/Off) Yes (24h On/Off)
Individual
controlWireless remote controller(simple) - -Wireless LCD remote control Yes Yes
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
11/45
11
SpecificationsSR-6RMG2-01A
GENERAL WALL MOUNTED
Note:O : Applied, - : No relation* For circuit breaker rating, please conform to local standards wherever necessary.
Some of functions are slightly different depending upon models. The specification may be subject to change without notic for purpose of improvement.
Model Name (LG) GS-C242C4B2 GS-H242C4B2Pet Name Gold Plus Gold Plus
Cooling Capacity (T1)W 6,600 6,600
Btu/h. 22,520 22,520
Heating Capacity (H1)W - 6,700
Btu/h. - 22,861
Power Input NormalCooling W 2,650 2,650Heating W - 2,500
Running Current
(Normal)
Cooling A 12.6 12.6
Heating A - 12.0
EERW/W 2.49 2.49
Btu/h.W 8.50 8.50(STAR) 3.00 3.00
COP W/W - 2.68
Power FactorCooling % 96% 96%Heating % - 95%
Cooling Capacity (T3)W 5,750 5,750
Btu/h. 19,620 19,620Power Input (T3) W 3,080 3,080Running Current (T3) A 14.5 14.5
EERW/W
Btu/h.W 6.37 6.37Power Factor % 96.55 96.55
Power Input (Max)Cooling W 4,000 4,000Heating W - 2,900
Running Current
(Max)Cooling A 18.5 18.5Heating A - 14.0
Power FactorCooling % 98.28 98.28Heating % - 94.16
Power Supply / V / Hz 1/220/60 1/220/60
Air CirculationIndoor m3/min(CFM),Max 16.0(566) 16.0(566)Outdoor m3/min(CFM),Max 48 (1,695) 48 (1,695)
Moisture Removal /h. 2.5 2.5
Noise Level(SoundPressure,1m)
IndoordB(A)3,High 43 43dB(A)3,Med 40 40dB(A)3,Low 37 37
Outdoor dB(A)3,Max 56 56
Refrigerant ChargeType R22 R22
g 1550 1550
Compressor
Type ROTARY ROTARYModel QP362KBB QP362KBBMaker LG LGCapacity kcal/h.(Btu/h.) 7,911(27,000) 7,911(27,000)Motor Type PSC PSCMotor Input W 2,571 2,571Oil Type NM56 or SUNISO 4GSI NM56 or SUNISO 4GSIOil Charge cc 700 700O.L.P Name INTERNAL INTERNAL
Blower MotorType Cross Flow Fan Cross Flow FanOutput W 25.6 25.6
Fan MotorType Axial fan Axial fanMotor Type AC Induction AC InductionMotor Output W 64 64
Circuit Breaker A 30 30Power Cord AWG#:P*mm2 3x2.5 3x2.5Connecting Cable AWG#:P*mm2 3x2.5 3x2.5+2x0.75
Connecting Tube(. Socket Flare)
Liquid Side mm(in) 9.52(3/8") 9.52(3/8")Gas Side mm(in) 15.88(5/8") 15.88(5/8")Length,std m(in) 5(196) 5(196)
Drain Hose (O.D , I.D) mm(in) 21.5,16 (0.85,0.63) 21.5,16 (0.85,0.63)
Dimension
Indoor
(W*H*D)mm 1030*320*245 1030*320*245inch 40.5*12.6*9.6 40.5*12.6*9.6
Outdoor(W*H*D)
mm 870*655*320 870*655*320inch 34.25*25.79*12.6 34.25*25.79*12.6
Net WeightIndoor kg(lbs) 13.6(30.0) 13.6(30.0)Outdoor kg(lbs) 50,5(111.33) 50,5(111.33)
Stuffing Quantity In+Out 20/40ft/HC/Truck 57/124/139/- 57/124/139/-Tool Code In+Out SC+UE SC+UE
Functions
Air flow
Air supply outlet 1 1Airflow direction control(left & right) Auto AutoAirflow direction control(up & down) Auto AutoAuto swing(left & right) Auto AutoAuto swing(up & down) Auto AutoAirflow steps(fan/cool/heat) 3/4/- 3/4/3Chaos swing Yes YesChaos wind(auto wind) Yes YesJet cool(Power wind) Yes Yes
Air purifyingDeodorizing filter (Allergy & H1N1 Filter) - -Plasma air purifier - -
Prefilter(washable / anti-fungus) Yes Yes
ReliabilityHot start - YesSelf diagnosis Yes YesSoft dry operation Yes Yes
Convenience
Setting Temperature, Cooling 18 - 30 18 - 30Setting Temperature, Heating - 16 - 30Auto changeover - YesAuto cleaning Yes YesAuto operation(artificial intelligence) Yes -Auto restart operation Yes YesForced operation Yes YesSleep mode Yes YesSetting Temperature Range (Cooling) 18-30 18-30Setting Temperature Range (Heating) 16-30 16-30Temperature Increment 1 1Timer(Hr) Yes (24h On/Off) Yes (24h On/Off)
Individual
controlWireless remote controller(simple) - -Wireless LCD remote control Yes Yes
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
12/45
12
Dimensional Drawings SR-6RMG2-01A
GENERAL WALL MOUNTED
250
1030
325210
70
70
69
56
Rightrear
pip
ing
Leftrear
piping
InstallationPlate
MeasuringTape
MeasuringTape
Hanger
Placealevelonraisedtab
UnitOutline
207
105
(Unit:mm)
460
570
LiberoR/E
CHASSISC
ODE:SC
4
5. Dimensional Drawings5.1 Indoor Unit
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
13/45
13
Dimensional DrawingsSR-6RMG2-01A
GENERAL WALL MOUNTED
5.2 Outdoor Unit
1
GasPipeConnectionPort
PartName
AirDichargeGrille
LiquidPipeConnectionPort
ControlBox
No.
2 4
EarthScrew
531
R
emark
Note
1.Theun
itshouldbeinstalledaccordingtoinstallationmanualwhichis
inthep
roductbox.
2.Inana
reaoraapacehavingnoproperaircirculation,anairguide
should
beinstalledintheoutdoorunit.
76,Seongsan-dong,ChangwonCity,Gyeongnam,
641-713,Korea
www.lge.com/aircon
ditioner
CHASSISCOD
E:UE
OutdoorU
nit
Unit:mm
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
14/45
14
Wiring Diagrams SR-6RMG2-01A
GENERAL WALL MOUNTED
6. Wiring Diagrams6.1 Indoor Units
CN-MOTORCN-U/D
CN-L/R
CN-OPTION
CN-DISP3
CN-HVB
CN-12V
CN-TH1
CN-DISP2
CN-SUB
Model : GS-C182C4B2, GS-C242C4B2
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
15/45
15
Wiring DiagramsSR-6RMG2-01A
GENERAL WALL MOUNTED
Model : GS-H182C4B2, GS-H242C4B2
CN-U/D
CN-L/R
CN-DISP3
CN-SUB
CN-OPTION
CN-HVB
CN-12V
CN-TH1
CN-DISP2
CN-4WAY
CN-MOTOR
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
16/45
16
Wiring Diagrams SR-6RMG2-01A
GENERAL WALL MOUNTED
CapacitorTerminal Block
Model : GS-C182C4B2, GS-C242C4B2
6.2 Outdoor Unit
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
17/45
17
Wiring DiagramsSR-6RMG2-01A
GENERAL WALL MOUNTED
TerminalBlock
Capacitor
Model : GS-H182C4B2, GS-H242C4B2
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
18/45
18
Refrigerant Cycle Diagram SR-6RMG2-01A
GENERAL WALL MOUNTED
7. Refrigerant Cycle Diagram
INDOOR UNIT OUTDOOR UNIT
HEATECHANGE(EVAPORATOR)
HEATECHANGE(CONDENSER)
COMPRESSORGAS SIDE
LIQUID SIDE
CAPILLARY TUBE
rotcennoCBCPnoitpircseD.COL
Th1 Thermistor for indoor air temperatureCN-TH1
Th2 Thermistor for evaporating temperature
INDOOR UNIT OUTDOOR UNIT
HEATECHANGE(EVAPORATOR)
HEATECHANGE(CONDENSER)
COMPRESSOR
ACCUMU%LATOR
GAS SIDE
3-WAY VALVE
LIQUID SIDE
3-WAY VALVE
CAPILLARY TUBE
CHECVALVE(Heating Model only)
COOLING
HEATING
REVERSING
VALVE(Heating Model Only)
Model : GS-C182C4B2, GS-C242C4B2
Model : GS-H182C4B2, GS-H242C4B2
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
19/45
19
Capacity TablesSR-6RMG2-01A
GENERAL WALL MOUNTED
8. Capacity Tables
Model : GS-C182C4B2
Model : GS-H182C4B2
Model : GS-C242C4B2
Model : GS-H242C4B2
Cooling capacity
CWB CDB TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI 14 20 4.40 3.41 1.30 4.30 3.37 1.55 4.10 3.28 1.80 3.98 3.21 1.90 3.83 3.14 2.02 3.74 3.10 2.09
16 22 5.13 3.87 1.32 5.02 3.83 1.57 4.79 3.72 1.83 4.64 3.64 1.93 4.47 3.55 2.05 4.37 3.50 2.12
18 25 5.73 4.21 1.34 5.60 4.16 1.59 5.34 4.03 1.86 5.18 3.94 1.96 4.99 3.84 2.08 4.87 3.78 2.15
19 27 5.99 4.35 1.37 5.86 4.30 1.62 5.59 4.16 1.89 5.42 4.07 1.99 5.22 3.96 2.12 5.10 3.90 2.19
22 30 6.58 4.61 1.38 6.44 4.55 1.64 6.13 4.40 1.91 5.95 4.29 2.02 5.73 4.18 2.14 5.60 4.10 2.21
24 32 6.82 4.69 1.40 6.68 4.62 1.66 6.37 4.46 1.94 6.17 4.35 2.04 5.95 4.23 2.17 5.81 4.15 2.25
Indoor Air
Temperature
Outdoor Air Temperature : CDB
20 25 32 35 40 43
CWB CDB TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI
14 20 4.40 3.36 1.30 4.30 3.33 1.55 4.10 3.24 1.80 3.98 3.17 1.90 3.83 3.10 2.02 3.74 3.06 2.09
16 22 5.13 3.82 1.32 5.02 3.78 1.57 4.79 3.67 1.83 4.64 3.59 1.93 4.47 3.50 2.05 4.37 3.45 2.12
18 25 5.73 4.15 1.34 5.60 4.10 1.59 5.34 3.98 1.86 5.18 3.89 1.96 4.99 3.79 2.08 4.87 3.73 2.15
19 27 5.99 4.29 1.37 5.86 4.24 1.62 5.59 4.11 1.89 5.42 4.01 1.99 5.22 3.91 2.12 5.10 3.85 2.19
22 30 6.58 4.55 1.38 6.44 4.49 1.64 6.13 4.34 1.91 5.95 4.24 2.02 5.73 4.12 2.14 5.60 4.05 2.21
24 32 6.82 4.63 1.40 6.68 4.56 1.66 6.37 4.40 1.94 6.17 4.29 2.04 5.95 4.17 2.17 5.81 4.10 2.25
Indoor Air
Temperature
Outdoor Air Temperature : CDB
20 25 32 35 40 43
CWB CDB TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI
14 20 5.70 4.18 1.77 5.58 4.14 2.10 5.32 4.03 2.44 5.16 3.95 2.58 4.97 3.86 2.74 4.86 3.81 2.8316 22 6.66 4.75 1.80 6.52 4.70 2.13 6.21 4.56 2.48 6.02 4.47 2.62 5.80 4.36 2.78 5.66 4.29 2.87
18 25 7.43 5.16 1.82 7.27 5.11 2.16 6.93 4.95 2.52 6.72 4.84 2.66 6.47 4.72 2.82 6.32 4.64 2.92
19 27 7.77 5.34 1.85 7.61 5.28 2.20 7.25 5.11 2.56 7.03 4.99 2.70 6.77 4.87 2.87 6.62 4.79 2.97
22 30 8.53 5.66 1.88 8.35 5.59 2.23 7.96 5.40 2.60 7.72 5.27 2.73 7.43 5.13 2.91 7.26 5.04 3.00
24 32 8.85 5.76 1.91 8.67 5.68 2.26 8.26 5.48 2.63 8.01 5.35 2.77 7.71 5.19 2.95 7.53 5.10 3.05
Indoor Air
Temperature
Outdoor Air Temperature : CDB
20 25 32 35 40 43
SymbolDB : Dry bulb temperature [C]WB : Wet bulb temperature [C]TC : Total capacity [kW]SHC : Sensible capacity [kW]PI : Power Input [kW]
(Comp.+ indoor fan motor+outdoor fan motor)
Notes1. All capacites are net, evaporator fan motor heat is deducted.2. Indicates nominal capacity.3. Direct interpolation is permissible. Do not extrapolate4. Capacities are based on the following conditions:
- Interconnecting Piping Length 7.5m- Level Difference of Zero.
CWB CDB TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI TC SHC PI
14 20 5.70 4.24 1.87 5.58 4.20 2.21 5.32 4.09 2.58 5.16 4.00 2.72 4.97 3.92 2.89 4.86 3.86 2.99
16 22 6.66 4.82 1.90 6.52 4.77 2.25 6.21 4.63 2.62 6.02 4.53 2.76 5.80 4.42 2.94 5.66 4.35 3.03
18 25 7.43 5.24 1.93 7.27 5.18 2.28 6.93 5.02 2.66 6.72 4.91 2.80 6.47 4.78 2.98 6.32 4.71 3.08
19 27 7.77 5.41 1.96 7.61 5.35 2.32 7.25 5.18 2.71 7.03 5.06 2.85 6.77 4.93 3.03 6.62 4.85 3.13
22 30 8.53 5.74 1.98 8.35 5.67 2.35 7.96 5.48 2.74 7.72 5.35 2.89 7.43 5.20 3.07 7.26 5.11 3.17
24 32 8.85 5.84 2.01 8.67 5.76 2.38 8.26 5.56 2.78 8.01 5.42 2.93 7.71 5.27 3.11 7.53 5.17 3.22
Indoor Air
Temperature
Outdoor Air Temperature : CDB
20 25 32 35 40 43
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
20/45
20
Capacity Tables SR-6RMG2-01A
GENERAL WALL MOUNTED
Model : GS-H182C4B2
Model : GS-H242C4B2
CDB TC PI TC PI TC PI TC PI TC PI TC PI TC PI TC PI
16 3.86 1.34 4.55 1.47 5.26 1.60 5.52 1.65 5.79 1.70 6.12 1.72 6.62 1.82 7.31 1.94
18 3.74 1.39 4.40 1.52 5.09 1.65 5.35 1.70 5.60 1.75 5.92 1.78 6.41 1.88 7.08 2.01
20 3.63 1.43 4.27 1.57 4.94 1.71 5.19 1.76 5.44 1.81 5.71 1.84 6.22 1.94 6.86 2.08
22 3.49 1.48 4.12 1.62 4.76 1.76 5.00 1.81 5.24 1.87 5.54 1.90 5.99 2.00 6.62 2.14
24 3.37 1.52 3.98 1.67 4.60 1.81 4.83 1.87 5.06 1.93 5.35 1.96 5.79 2.06 6.39 2.21
Indoor Air
Temperature
Outdoor Air Temperature : CWB
-10 -5 0 2 4 6 10 15
CDB TC PI TC PI TC PI TC PI TC PI TC PI TC PI TC PI
16 5.14 2.02 6.06 2.21 7.01 2.40 7.36 2.48 7.72 2.55 8.15 2.60 8.83 2.73 9.74 2.93
18 4.98 2.09 5.87 2.28 6.79 2.49 7.13 2.56 7.47 2.64 7.90 2.68 8.55 2.83 9.43 3.03
20 4.83 2.16 5.69 2.36 6.59 2.57 6.92 2.65 7.25 2.73 7.62 2.77 8.29 2.92 9.15 3.13
22 4.66 2.23 5.49 2.43 6.35 2.65 6.67 2.73 6.99 2.81 7.38 2.86 7.99 3.01 8.82 3.23
24 4.50 2.29 5.30 2.51 6.13 2.73 6.44 2.81 6.75 2.90 7.13 2.95 7.72 3.10 8.52 3.32
Indoor Air
Temperature
Outdoor Air Temperature : CWB
-10 -5 0 2 4 6 10 15
SymbolDB : Dry bulb temperature [C]WB : Wet bulb temperature [C]
TC : Total capacity [kW]SHC : Sensible capacity [kW]PI : Power Input [kW]
(Comp.+ indoor fan motor+outdoor fan motor)
Notes1. All capacites are net, evaporator fan motor heat is deducted.2. Indicates nominal capacity.
3. Direct interpolation is permissible. Do not extrapolate4. Capacities are based on the following conditions:- Interconnecting Piping Length 7.5m- Level Difference of Zero.
Heating capacity
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
21/45
21
Capacity Coefficient FactorSR-6RMG2-01A
GENERAL WALL MOUNTED
9. Capacity Coefficient Factor
Outdoor unit
Indoor unit
A
B
Outdoor unit
Indoor unit
A
B
Capacity
kW (kBtu/h)
Pipe Size[mm(in)] Standard
Length m(ft)Max.
Elevation m(ft)Max.
Length m(ft)Additional Refrigerant
g/m(oz/ft)GAS LIQUID
5.3(18)12.7(1/2)
6.35(1/4) 5(16) 10(33) 15(49) 20(0.22)15.88(5/8)
7.0(24) 15.88(5/8) 9.52(3/8) 5(16) 10(33) 15(49) 30(0.32)
Model : GS-C182C4B2, GS-H182C4B2, GS-C242C4B2, GS-H242C4B2
Capacity is based on standard length and maximum allowable length is on the basis of reliability.
Additional refrigerant must be charged after 5m.
CAUTION
100
90
80
707.5 10 2015
18K/24K SC Chassis
Capacity(%)
Total Pipe Length(m)
100
90
80
707.5 10 2015
18K/24K SC Chassis
Capacity(%)
Total Pipe Length(m)
Cooling
Heating
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
22/45
22
Operation Range SR-6RMG2-01A
GENERAL WALL MOUNTED
10. Operation Range
Operative: Intermittent operation due to the operationalconditions (indoor/outdoor temperature,humidity, load etc.) can cause the heatingcapacity to decrease
46
43
21
-5
18 32
Indoor Unit [C DB] Indoor Unit [C DB]
Standard operation
Operative
Warmingup
Operation
OutdoorUnit[CDB]
OutdoorUnit[CDB]
24
16 30
-10
-5
Operative
Continuousoperation
Operative
Without Low Ambient Kit
Cooling Heating
If outdoor temperature falls below 0C, the coolingcapacity and operating characteristics could be dif-ferent than rated.
Operative: Intermittent operation due to the operationalconditions (indoor/outdoor temperature,humidity, load etc.) can cause the heatingcapacity to decrease
46
43
21
-5
18 32Indoor Unit [C DB] Indoor Unit [C DB]
Standard operation
Operative
Warmingup
Operation
OutdoorUnit[CDB]
OutdoorUnit[CDB]
24
16 30
-10
-5
Operative
Continuousoperation
With Low Ambient Kit
Cooling Heating
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
23/45
23
Air Velocity and Temperature Distribution(Reference Data)SR-6RMG2-01A
GENERAL WALL MOUNTED
11. Air Velocity and Temperature Distribution(Reference Data)
Model : GS-C182C4B2, GS-H182C4B2
General Wall Mouted 18 kBtu/h
CoolingDischarge angle:45
HeatingDischarge angle:50
Air velocity [m/s]
2.7m
2m
1m
0m1m2m3m4m5m6m7m8m
Temperature [ C]
2.7m
2m
1m
0m1m2m3m4m5m6m7m8m
0.751.25
1.0
1.5
0.5
25 24
23
Air velocity [m/s]
2.7m
2m
1m
0m1m2m3m4m5m6m7m8m
Temperature [C]
2.7m
2m
1m
0m1m2m3m4m5m6m7m8m
0.751.25
1.0
1.5
0.5
28 2930
31
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
24/45
24
Controller SR-6RMG2-01A
GENERAL WALL MOUNTED
12. Controller
Type 1 (Wireless LCD)
Displayscreen
Control
panel
Display
screen
Controlpanel
JET
COOL
JET
COOL
C/F[5SEC]
C/F[5SEC]
Control panel Display screen Description
a F Plasma button*: Purifies the air by removingparticles that enter the indoor unit./ 4 Air circulation button*: Used to circulate theroom air without cooling or heating.l = Sleep mode auto button*: Sets the sleep modeauto operation.e y Temperature adjustment buttons: Adjusts the
room temperature when cooling and heating.
d - On/Off button: Turns the power on/off.g 7 v Indoor fan speed button: Adjusts the fanspeed.f A C
D B E
Operation mode selection button*: Selects theoperation mode.Cooling operation (A) / Auto operation or autochangeover (C) / Dehumidifying operation (D) /Heating operation (B) / Air circulation (E)
JET
COOL NJet cooling/heating button*: Warms up or coolsdown the indoor temperature within a short peri-
od of time.
i j H I Air flow direction button: Adjusts the air flowdirection vertically or horizontally.k S Temperature display button: Displays the roomtemperature.
m n z Timer button: Sets the current time and the start/ end time.
cb
u
J G P
Functions button*: Adjusts the time and setsthe special functions.J: Auto clean / G: Operates energy saving cool-ing / P: Adjusts the brightness of the indoor unit
displayp - Set/clear button: Sets or cancels functions.r - Reset button: Initialize the air conditioner set-tings.
* Some functions may not be supported, depending on the model.
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
25/45
25
InstallationSR-6RMG2-01A
GENERAL WALL MOUNTED
13. Installation
13.1 Installation Map
Vinyl tape (Wide) Apply after carrying out a drainage test. To carry out the drainage
test, remove the air filters and pour water into the heat
exchanger.
Saddle
Gas side pipingLiquid side piping
Additional drain pipe
Vinyl tape (Narrow)
Drain Hose
Base Plate
Air Outlet
Air Inlet
Connecting cable
Tubing Cover
Sleeve
Bushing-Sleeve
Putty(Gum Type Sealant)
Bend the pipe as closelyon the wall as possible,but be careful that itdoesn't break.
Installation plate
* The feature can be changed according to the type of model.
() You should purchase the installation parts.
NOTE
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
26/45
26
Installation SR-6RMG2-01A
GENERAL WALL MOUNTED
13.2 Select the best Location
Indoor unit
1. There should not be any heat or steam near the unit.
2. Select a place where there are no obstacles around the
unit.
3. Make sure that condensation drainage can be conveniently
routed away.
5. Ensure that the gap between a wall and the left (or right) of
the unit is more than 100mm. The unit should be installed
as high as possible on the wall, allowing a minimum of
200mm from ceiling.
6. Use a metal detector to locate studs to prevent unneces-
sary damage to the wall.
* The feature can be changed according to the type of
model.
Outdoor unit
1. If an awning is built over the unit to prevent direct sunlight
or rain exposure, make sure that heat radiation from the
condenser is not restricted.
2. Ensure that the space around the back side and other
sides is more than 300mm. The space in front of the unit
should be more than 700mm.
3. Do not place animals and plants in the path of the warmair.
4. Take the weight of the air conditioner into account and
select a place where noise and vibration are minimum.
5. Select a place where the warm air and noise from the air
conditioner do not disturb neighbors.
More than 200
More than100
More than 2300
More than100
(Unit : mm)
Install the indoor unit on the wall where the height from the floor is more than 2300mm.
CAUTION
Sunroof
Fenceorobstacles
More than300
More than300
More than700
More than600
(Unit : mm)
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
27/45
27
InstallationSR-6RMG2-01A
GENERAL WALL MOUNTED
2. Measure the wall and mark the centerline. It is also important to
use caution concerning the location of the installation plate.
Routing of the wiring to power outlets is through the walls typical-ly. Drilling the hole through the wall for piping connections must be
done safely.
The wall you select should be strong and solid enough to prevent
vibration
1. Mount the installation plate on the wall with type "A" screws. If
mounting the unit on a concrete wall, use anchor bolts.
Mount the installation plate horizontally by aligning the center-
line using Horizontal meter .
6565
69 56
Rightrearpiping
Leftrearpiping
Installation Plate
Measuring Tape
Measuring TapeHanger
Place a level on raised tabUnit Outline
207105
(Unit : mm)
460 570
Installation Plate
ChassisHook
Type "A" Screws
Drill the piping hole with a 65mm hole core drill. Drill thepiping hole at either the right or the left with the hole
slightly slanted to the outdoor side.
5-7mm
(3/16"~5/16")
Indoor
WALL
Outdoor
Bushing
Sleeve
13.3 Fixing Installation Plate
13.4 Drill a Hole in the Wall
Use the sleeve to prevent damage for tube assembly.
CAUTION
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
28/45
28
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
13.5 Flaring Work
Main cause for gas leakage is due to defect of flaring work. Carry out correct flaring work in the following procedure.
Cut the pipes and the cable.
1. Use the piping kit accessory or the pipes purchased locally.
2. Measure the distance between the indoor and the outdoor unit.
3. Cut the pipes a little longer than measured distance.
4. Cut the cable 1.5m longer than the pipe length.
Burrs removal
1. Completely remove all burrs from the cut cross section of pipe/tube.
2. While removing the burrs, hold the end of the pipe in downward direc-
tion in order to avoid dropping burrs into the tubing.
Putting nut on
- Remove flare nuts attached to indoor and outdoor units, then put them
on the pipe/tube which have completed its burr removal.
(not possible to put them on after finishing flare work)
Flaring work1. Firmly hold copper pipe in a bar with the dimension shown in
table below.
2. Carry out flaring work with the flaring tool.
Copperpipe 90 Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar"A"
Outside diameter A Thickness
mm inch mm mm
6.35 1/4" 1.1~1.3 0.7
9.52 3/8" 1.5~1.7 0.812.7 1/2" 1.6~1.8 0.8
15.88 5/8" 1.6~1.8 1.0
19.05 3/4" 1.9~2.1 1.0
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
29/45
29
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
Check
1. Compare the flared work with the figures given below.
2. If a flared section is defective, cut it off and do flaring work
again.
Inclined
Inside is shiny without scratches
Smooth all round
Even lengthall round
Surfacedamaged
Cracked Uneventhickness
= Improper flaring =
13.6 Connecting the pipes
1. Pull the screw caps at the bottom of the indoor unit
2. Remove the chassis cover from the unit by loosing 3 screws
3. Pull back the tubing holder.
4. Remove the pipe port cover and position the piping.
* The feature can be changed according to the type of model.
Chassis cover
Right
Back side view
Tubing holder
Backwards
Left
Pipe Port
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
30/45
30
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
Good case
Press the tubing cover and slowly unfold the tubing to downward. And then bend to the left side slowly.
Bad case Following bending case from right to left directly may cause damage to the tubing.
* The feature can be changed according to the type of model.
Installation Information. For right piping. Follow the instruction above.
CAUTION
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
31/45
31
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
1. Hook the indoor unit onto the upper portion of the installation plate.( engage the three hooks at the top of the indoor unit with
the upper edge of the installation plate) Ensure that the hooks are properly seated on the installation plate by moving it left
and right
2. Unlock the tubing holder from the chassis and mount between the chassis and installation plate in order to separate the bot-
tom side of the indoor unit from the wall.
* The feature can be changed according to the type of model.
Installation plate
1
2
Tubing Holder
13.7 Installation of Indoor Unit
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
32/45
32
Installation SR-6RMG2-01A
GENERAL WALL MOUNTED
3. Insert the connecting cable through the bottom side of
indoor unit and connect the cable
Open the Front Grille
Support the Front Grille with supporter
Open the Control Cover
Connect the connecting cable
Control Cover
Case 1 Case 2 Case 3
4. Tape the tubing pipe, drain hose and the connection cable. Be sure that the drain hose is located at the lowest side of the
bundle. Locating at the upper side can cause overflow from the drain pan through the inside of the unit.
* The feature can be changed according to the type of model.
Connecting pipe
Connectingcable
Tape
Drain hose
Indoor Outdoor
Indoor Unit
Drain hose
Indoor UnitDrain hose
Insulation(More than 100~300mm
length and 7mm thickness)
Extensiondrain hose
Drain hose
Tape
Connecting pipe
Connectingcable
Drain hose
If the extension drain hose is routed inside the room,insulate the hose with an insulation material* so that drip-ping from sweating (condensation) could not damage fur-
niture or floors.
Foamed polyethylene or equivalent is recommended.
CAUTION
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
33/45
33
InstallationSR-6RMG2-01A
GENERAL WALL MOUNTED
Connecting the installation pipe and drain
hose to the indoor unit.
1. Align the center of the pipes and sufficiently tighten the
flare nut by hand
2. Tighten the flare nut with a wrench
3. When needed to extend the drain hose of indoor unit,
assembly the drain pipe as shown on the drawing
Indoor unit tubing Flare nut Pipes
Wrench
Indoor unit tubing
Open-end wrench (fixed)
Connection pipe
Flare nut
Vinyl tape(narrow)Adhesive
Drain pipe
Indoor unit drain hose
Wrap the insulation material around the con-
necting portion.
1. Overlap the connection pipe insulation material and the
indoor unit pipe insulation material. Bind them together with
vinyl tape so that there may be no gap.
2. Wrap the area which accommodates the rear piping hous-
ing section with vinyl tape.
3. Bundle the piping and drain hose together by wrapping
them with vinyl tape sufficient enough to cover where they
fit into the rear piping housing section.
Insulation material
Wrap with vinyl tape
Drain hose
Pipe
Vinyl tape(wide)
Vinyl tape(narrow)
Connection pipe
Connecting cable
Vinyl tape (wide) Wrap with vinyl tape
Indoor unit pipe
Pipe
Outside Diameter Torque
mm inch kgfcm Nm
6.35 1/4 180~250 17.6~24.5
9.52 3/8 340~420 33.3~41.2
12.7 1/2 550~660 53.9~64.7
15.88 5/8 630~820 61.7~80.4
19.05 3/4 990~1210 97~118.6
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
34/45
34
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
Finishing the indoor unit installation
1. Mount the tubing holder in the original positon.
2. Ensure that the hooks are properly seated on the installa-
tion plate by moving it left and right.
3. Press the lower left and right sides of the unit against the
installation plate until the hooks engage into their slots(clicking sound).
4. Finish the assembly by screwing the unit to the installation
plate by using two pieces of type "C" screws. And assemble
a chassis cover.
5. Reconvey the chassis cover in Original place.
Type 'C' screw
Outdoor Unit Installation
1. Remove the tubing cover from the unit by loosening thescrew.
Cover control
Tubing Cover
2. Align the center of the pipings and sufficiently tighten the
flare nut by hand.
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
35/45
35
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
3. Finally, tighten the flare nut with torque wrench until the
wrench clicks.
When tightening the flare nut with torque wrench, ensure
the direction for tightening follows the arrow on the
wrench.
Outdoor unit
Gas side
Liquid side
Cap
3-way or
2-way valve
3-way valveOutside Diameter Torque
mm inch kgfcm Nm
6.35 1/4 180~250 17.6~24.5
9.52 3/8 340~420 33.3~41.2
12.7 1/2 550~660 53.9~64.7
15.88 5/8 630~820 61.7~80.4
19.05 3/4 990~1210 97~118.6
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
36/45
36
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
13.8 Connecting the Cables
Indoor
Connect the cable to the indoor unit by connecting the wires to the terminals on the control board individually according to the
outdoor unit connection. (Ensure that the color of the wires of the outdoor unit and the terminal No. are the same as those of
the indoor unit.)
The circuit diagram is a subject to change without notice.
The earth wire should be longer than the common wires.
When installing, refer to the circuit diagram on the chassis cover.
Connect the wires firmly so that they may not be pulled out easily.
Connect the wires according to color codes, referring to the wiring diagram.
CAUTION
The power cord connected to the unit should be selected according to the following specifications (Cable Type
approved by IEC 60245 or IEC 60227).
CAUTION
The power connecting cable connecting the indoor and outdoor unit should be selected according to the followingspecifications (Cable type approved by IEC 60245 or IEC 60227).
103mm
20mm
GN/YL
103mm
20mm
GN/YL
103mm
20mm
GN/YL
103mm
(mm2)
POWER CORD
Capacity[kW (Btu/h)]
5.3 (18) 7.0 (24)
Nomal Cross-Section Area
1.5 2.5
Unit Indoor Indoor
Cable Type H05VV-F H05VV_F
(mm2)
POWER CONNECTING CABLE
Capacity[kW (Btu/h)]
5.3 (18) 7.0 (24)
Nomal Cross-Section Area
1.5 2.5
Unit Indoor Indoor
Cable Type H07RN-F H07RN-F
(mm2)
COMMUNICATION CONNECTING CABLE
Capacity[kW (Btu/h)]
5.3 (18) 7.0 (24)
Nomal Cross-Section Area
0.75 0.75
Unit Indoor Indoor
Cable Type H05RN-F H05RN-F
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
37/45
37
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
Outdoor
1 Remove the control cover from the unit by loosening the
screw. Connect the wires to the terminals on the control
board individually.
2 Secure the cable onto the control board with the cord
clamp.3 Refix the control cover to the original position with the
screw.
4 Use a recognized circuit breaker between the power source
and the unit.
A disconnecting device to adequately disconnect all supply
lines must be fitted.
* Round Pressure terminal and connecting requirement
Provide the circuit breaker between power source and the
unit as shown by
CAUTION
According to the confirmation of the above conditions, pre-pare the wiring as follows.
1. Never fail to have an individual power circuit specifically for
the air conditioner. As for the method of wiring, be guided
by the circuit diagram posted on the inside of control cover.
2. The screw which fasten the wiring in the casing of electrical
fittings are liable to become loose from vibrations to which
the unit is subjected during the transportation. Check them
and make sure that They all are tightly fastened. (If they
are loose, it could cause burn-out of the wires.)
3. Specification of power source.
4. Confirm that electrical capacity is sufficient.
5. See that the starting voltage is maintained at more than 90
percent of the rated voltage marked on the name plate.
6. Confirm that the cable thickness is as specified in the
power source specification.
(Particularly note the relation between cable length and
thickness.
7. Always install an earth leakage circuit breaker in a wet or
moist area.
8. The following would be caused by voltage drop.
- Vibration of a magnetic switch, which will damage the
contact point, fuse breaking, disturbance of the normalfunction of the overload.
9. The means for disconnection from a power supply shall be
incorporated in the fixed wiring and have an air gap contact
separation of at least 3mm in each active(phase) conduc-
tors.
CAUTION
Cover control
Connecting
cable
1(L) 2(N) 3 4
CASE 1
1(L) 2(N) 3
CASE 3
1(L) 2(N) 3 4
CASE 2
The earth wire shouldhe earth wire should
be longer than thee longer than the
common wires.ommon wires
The earth wire shouldbe longer than thecommon wires.
Over5mm
Round pressureterminal
Power wire
The earth wire should
be longer than the
common wires
AirConditioner
Main power source
Circuit BreakerUse a circuit breakeor time delay fuse.
Circuit
Breaker (A)
Capacity [kW (kBtu/h)]
5.3 (18) 7.0 (24)
20 30
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
38/45
38
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
To check the drainage.
1. Pour a glass of water on the evaporator.
2 Ensure the water flows through the drain hose of the
indoor unit without any leakage and goes out the drain
exit.
Drain piping
1. The drain hose should point downward for easy drain flow.
2. Do not set the drain hose like the following.
* The feature can be changed according to the type of model.
Drain Pan
DrainHose
LeakageChecking
Connecting areadrain hose
Leakagechecking
Downward slope
Do not raiseAccumulateddrain water
Tip of drain hosedipped in water
Air
WavingWaterleakage
Waterleakage Ditch
Less than50mm gap
Waterleakage
13.9 Checking the Drainage
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
39/45
39
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
13.10 Forming the Piping
Form the piping by wrapping the connecting por-tion of the indoor unit with insulation material andsecure it with two kinds of vinyl tapes.
- If you want to connect an additional drain hose, theend of the drain outlet should be routed above theground. Secure the drain hose appropriately.
In cases, where the outdoor unit is installed belowthe Indoor unit, perform the following.
1. Tape the piping, drain hose and connecting cablefrom down to up.
2. Secure the tapped piping along the exterior wallusing saddle or equivalent.
In cases, where the outdoor unit is installed abovethe Indoor unit, perform the following.
1. Tape the piping and connecting cable from down to up.
2. Secure the taped piping along the exterior wall. Form a
trap to prevent water entering the room.
3. Fix the piping onto the wall using saddle or equivalent
Drain hoseVinyl tape(narrow)
Pipe
Wrap withvinyl tape(wide)
Taping
Saddle
Drain hose
PipingsConnecting cable
Seal small openingsaround pipings with agum type sealant.
Trap is required to prevent waterfrom entering into electrical parts.
Seal a small openingaround the pipingswith gum type sealant.
Trap
Trap
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
40/45
40
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
13.11 Air Purging
The air and moisture remaining in the refrigerant system have undesirable effects as indicated below.1. Pressure in the system rises.
2. Operating current rises.
3. Cooling(or heating) efficiency drops.
4. Moisture in the refrigerant circuit may freeze and block capillary tubing.
5. Water may lead to corrosion of parts in the refrigeration system.
Therefore, after evacuating the system, take a leak test for the piping and tubing between the indoor and outdoor unit.
Air purging with vacuum pump
1. Preparation Check that each tube(both liquid and gas side tubes) between the indoor and outdoor units have been properly connected and all
wiring for the test run has been completed. Remove the service valve caps from both the gas and the liquid side on the outdoor unit.
Note that both the liquid and the gas side service valves on the outdoor unit are kept closed at this stage.
2. Leak test Connect the manifold valve(with pressure gauges) and dry nitrogen gas cylinder to this service port with charge hoses.
Be sure to use a manifold valve for air purging. If it is not available, use a stop valve for this purpose. The knob of the 3-way
valve must always be kept close.
- Pressurize the system to maximum 250 P.S.I.G. (R-22 model) or 400 P.S.I.G (R-410A model) with dry Nitrogen gas and
close the cylinder valve when the gauge reading reaches 250 P.S.I.G (R-22 model) or 400 P.S.I.G (R-410A model). Next
step is leak test with liquid soap.
To avoid nitrogen entering the refrigerant system in a liquid state, the top of the cylinder must be higher than its bottom when
you pressurize the system. Usually, the cylinder is used in a vertical standing position.
There is a risk of fire and explosion.
Inert gas (nitrogen) should be used when you check plumbing leaks, cleaning or repairs of pipes etc.
If you are using combustible gases including oxygen, product may have the risk of fires and explosions.
1. Do a leak test of all joints of the tubing(both indoor and out-
door) and both gas and liquid side service valves.
Bubbles indicate a leak. Be sure to wipe off the soap with a
clean cloth.
2. After the system is found to be free of leaks, relieve the nitro-
gen pressure by loosening the charge hose connector at the
nitrogen cylinder. When the system pressure is reduced tonormal, disconnect the hose from the cylinder.
*The feature can be changed according a type of model.
CAUTION
CAUTION
WARNING
Lo Hi
Outdoor unit
Manifold valve
Charge hose
Nitrogen gascylinder(in verticalstanding position)
Pressuregauge
Indoor unit
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
41/45
41
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
Soap water method
1. Remove the caps from the 2-way and 3-way valves.
2. Remove the service-port cap from the 3-way valve.
3. Apply a soap water or a liquid neutral detergent on the
indoor unit connection or outdoor unit connections by a
soft brush to check for leakage of the connecting points of
the piping.4. If bubbles come out, the pipes have leakage
Evacuation
1. Connect the charge hose end described in the preceding
steps to the vacuum pump to evacuate the tubing and indoorunit.
Confirm the "Lo" knob of the pressure Gauge is open. Then,
run the vacuum pump.
The operation time for evacuation varies with tubing length
and capacity of the pump. The following table shows the timerequired for Evacuation.
2. When the desired vacuum is reached, close the knob of the 3-way valve and stop the vacuum pump.
Finishing the Job
1. With a service valve wrench, turn the valve of liquid sidecounter-clockwise to fully open the valve
2. Turn the valve of gas side counter clockwise to fully open the
valve
3. Loosen the charge hose connected to the gas side service
port slightly to release the pressure, then remove the hose.
4. Replace the flare nut and its bonnet on the gas side serviceport and fasten the flare nut securely with an adjustable
wrench. This process is very important to prevent leakage
from the system.
5. Replace the valve caps at both gas and liquid side service
valves and fasten them tight.This completes air purging with a vacuum pump.
6. Replace the pipe cover to the outdoor unit by one screw
Now the air conditioner is ready for test run.
* The feature can be changed according to the type of model.
Outdoor unitGas side
Liquid side
Cap
3-way or2-way valve
3-way valve
Outdoor unit
Lo Hi
Manifold valve
Vacuum pump
Pressuregauge
Open Close
Indoor unit
Required time for Evacuation when 30 gal/h vacuumpump is used
If tubing length is less than10m (33 ft)
If tubing length is longerthan 10m (33 ft)
10 min. or more 15 min. or more
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
42/45
42
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
If the actual pressure is higher than shown, the system is most likely over-charged, and charge should be removed. If the
actual pressure are lower than shown, the system is most likely undercharged, and charge should be added.
NOTE
Pump downThis is performed when the unit is relocated or the refrigerant circuit is serviced.
Pump Down means collecting all refrigerant into the outdoor unit without the loss of refrigerant.
Be sure to perform Pump Down procedure in the cooling mode.
Pump Down Procedure1. Connect a low-pressure gauge manifold hose to the charge port on the gas side service valve.
2. Open the gas side service valve halfway and purge the air in the manifold hose using the refrigerant.
3. Close the liquid side service valve(all the way).
4. Turn on the unit's operating switch and start the cooling operation.
5. When the low-pressure gauge reading becomes 1 to 0.5kg/cm2 G(14.2 to 7.1 P.S.I.G.), fully close the gas side valve and
then quickly turn off the unit. Now Pump Down procedure is completed, and all refrigerant is collected into the outdoor unit.
CAUTION
Settlement of outdoor unit1. Fix the outdoor unit with a bolt and nut(10mm) tightly and
horizontally on a concrete or rigid mount.
2. When installing on the wall, roof or rooftop, anchor the
mounting base securely with a nail or wire assuming the
influence of wind and earthquake.
3. If the vibration of the unit is transmitted to the pipe, securethe unit with an anti-vibration rubber.
Evaluation of the performanceOperate the unit for 15~20 minutes, then check the system
refrigerant charge:
1. Measure the pressure of the gas side service valve.
2. Measure the air temperature from inlet and outlet of air
conditiioner.
3. Ensure the difference between the inlet and outlet temper-
ature is more than 8C.
4. For reference; the gas side pressure at optimum condition
is shown on table (cooling)
The air conditioner is now ready to use.
*The feature can be changed according a type of model.
Bolt
Tubing connection
Dischargetemperature
Discharge air
Intake temperature
Refrigerant
Outside
ambient
TEMP.
The pressure of the
gas side service valve.
R22 35C (95F)4~5kg/cm2G
(56.8~71.0 P.S.I.G.)
R410A 35C(95F)8.5~9.5kg/cm2G
(120~135 P.S.I.G.)
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
43/45
43
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
13.12 Installation of filters
1. Pull out the triple filter and allergy free filter from the separately
packed plastic bag.
2. Insert the triple filter into the left case and insert the allergy free
filter into the right case.
3. Detach two nitto tapes from the plasma filter.
* The feature can be changed according to the type of model.
Virus & Allergy Safe Filter+ Triple Filter
CyclotronPlasma Filter
13.13 Test Running
- Check that all tubing and wiring are properly connected.
- Check that the gas and liquid side service valves are fully open.
Prepare remote controller
Insert batteries before using the remote control. The batterytype used is AAA (1.5 V).
1. Remove the battery cover.
2. Insert the new batteries and make sure that the + and - ter-
minals of the batteries are installed correctly.
3. Reattach the battery cover.
Use 2 AAA(1.5volt) batteries. Do not use rechargeable
batteries.
Remove the batteries from the remote controller if the sys-tem is not used for a long time
NOTE
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
44/45
44
SR-6RMG2-01A
GENERAL WALL MOUNTED
Installation
13.14 Installation Guide at the Seaside
Air conditioners should not be installed in areas where corrosive gases, such as acid or alkaline gas, are produced.
Do not install the product where it could be exposed to sea wind (salty wind) directly. It can result corrosion on the product.
Corrosion, particularly on the condenser and evaporator fins, could cause product malfunction or inefficient performance.
If outdoor unit is installed close to the seaside, it should avoid direct exposure to the sea wind. Otherwise it needs addition-
al anticorrosion treatment on the heat exchanger.
CAUTION
Selecting the location(Outdoor Unit)
1. If the outdoor unit is to be installed close to the seaside, direct exposure to the sea wind should be avoided. Install the out-
door unit on the opposite side of the sea wind direction.
2. In case, to install the outdoor unit on the seaside, set up a windbreak not to be exposed to the sea wind.
It should be strong enough like concrete to prevent the
sea wind from the sea.
The height and width should be more than 150% of theoutdoor unit.
More than 70cm(s) of space should be kept between
outdoor. Unit and windbreak for easy air flow.
Select a well-drained place.
Sea wind Sea wind
Sea wind
Windbreak
1. If you cant meet above guide line in the seaside installation, please contact LG Electronics for the additionalanticorrosion.
2. Periodic ( more than once/year ) cleaning of the dust or salt particles stuck on the heat exchanger by usingwater
-
8/10/2019 PDB Saudi Split (Titan Gold Plus)
45/45
P/No.: MFL67839902
Air Conditioner20 Yeouido-dong, Yeongdeungpo-gu,
Yeouido P.O.Box 335 Seoul,
150-721, Korea.
http://www.lgeaircon.com