PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
1.0 Pre Fabrication
1.1
1.2 Test plate welding-Check the test coupon preparation
1.3 Visual Inspection- To do the completed weldment visual inspection
1.4
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISION
Approved WPS &
ASME SEC IXWelder Qualification List Before Start Work H, R, V
AKRA MMCES CLIENT
ASME SEC IX WPS Before Start Work R
Non Destructive Examination - Radiographic testingASME SEC IX
Radiography Test report & After Visual I, V
Approved WPS &
ASME SEC IXVisual Inspection Report
After test coupon
weldedH, R, V
To review all Welding Procedure Specification (WPS) and Procedure
Qualification Records (PQR)
1.4
-To check the internal defect of weldment
2.0 Material Control
2.1
2.2
3.0 Tank Fabrication Works
3.1 Bottom Plate & Annular Plate
3.2 Shell Plate
3.3 Roof Plate
3.4 Nozzle, Manhole, Reinforcement Pad and Sump
3.5 Roof Structure & Truss
4.0 Foundation Inspection
4.1 Levelness and Flatness
Non Destructive Examination - Radiographic testingASME SEC IX
Radiography Test report &
Qualified Welder List
After Visual
InspectionI, V
- Visual Inspection to ensure the material are in good condition as per
Welding Consumables
Approved WPS Material Inspection Report &
Electrode issue formsBefore welding I, R, V
Material Receiving Inspection of Bottom Plates, Annular Plate,Shell
Plate, Roof Plate & Stural MaterialAFC Drawing, Mill Certificate
& Delivery Order (DO)
Material Inspection Report&
Mill Certificates
Upon receiving
materialI, R, V
- To perform dimensional check after marking
AFC Drawing & Approved
Fabrication ProcedureDimensional Report
Before cutting
workI, R, V
- To check the electrode as per specification
- To Maintain the electrode backing register
AFC Drawing & Approved
Fabrication ProcedureDimensional Report
Before cutting
workI, R, V
- To perform dimensional check after marking
AFC Drawing & Approved
Fabrication Procedure
Dimensional Report, Fit up,
Visual & NDT
Before cutting
workI, R, V
- To perform dimensional check after marking
AFC Drawing & Approved
Fabrication ProcedureDimensional Report
Before cutting
workI, R, V
- To perform dimensional check after marking and welding
AFC Drawing, API 650 Foundation Levelness Report Before laying
annular plateI, R, V
- To perform dimensional check after marking
AFC Drawing & Approved
Fabrication Procedure
Dimensional Report, Fit up,
Visual & NDT
Before cutting
work and after
welding
I, R, V
- To check levelness and flatness on final surface of tank foundation
Page 1 of 8
amirrul.bakhariRectangle
amirrul.bakhariCalloutPengerang power sdn bhd
amirrul.bakhariTypewritten TextR
amirrul.bakhariTypewritten TextR
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextW,R
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextW,R
amirrul.bakhariTypewritten TextW,R
amirrul.bakhariTypewritten Text,R
amirrul.bakhariRectangle
amirrul.bakhariCalloutAs per?
amirrul.bakhariTypewritten TextR
amirrul.bakhariTypewritten TextR
amirrul.bakhariTypewritten TextR,S
amirrul.bakhariTypewritten TextR
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextR,S
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextW
amirrul.bakhariTypewritten TextR,S
amirrul.bakhariTypewritten TextR,S
amirrul.bakhariTypewritten TextR
amirrul.bakhariTypewritten TextR,S
amirrul.bakhariTypewritten Text,S
-
PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISIONAKRA MMCES CLIENT
4.2 Orientataion Marking
5.0 Tank Erection Works
5.1 Material
- Material Identification
52 Annular Plate
5.2.1
- To check tank centre, 0, 90,180, 270 orientations
Fit-up InspectionWelding Summary Sheet
Before/After
plate layingI, R, V
AFC Drawing, API 650Checking at site and Survey
Record
Before tank
erectionI, R, V
MVR & Material Identification
Record
5.2.2
5.2.3
5.2.4
5.2.5
5.3 Bottom Plate & Centre Sump
5.3.1
5.3.2
5.3.3
Welding Summary Sheetplate laying
I, R, V
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
- To check start point for annular plate laying & fit-up inspection
Weld MonitoringMonitoring at site
During welding
worksS
- To do the daily monitoring of welding work at site
Visual InspectionWelding Summary Sheet
After completion
of weldingI, R, V
After Visual
InspectionH, W, R, V
- To do the completed weldment visual inspection
Non Destructive Examination - Ultrasonic testingAFC Drawing, Approved
WPS, Approved NDT
Procedure & API 650
Ultrasonic Test reportAfter Visual
InspectionH, I, R, V
- To do the leak test on all annular plate weld joints
Before/After
plate layingI, R, V
- To do the daily monitoring of welding work at site
Visual InspectionVisual Report
After completion
of weldingI, R, V
Weld MonitoringMonitoring at site
During welding
worksS
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
- To check orientation of 1st bottom plate laying- To check lapping of bottom plate to bottom plate & annular plate
- To do the completed weldment visual inspection
- To check the Internal Shell plate to head lapping - To check the Centre sump installation as per AFC drawings
Fit-up Inspection
Fit up Report
- To do the 50% of total radial annular plate weld joints
Vacuum Box testing AFC Drawing, Approved
Erection Procedure & API 650 Vacuum Box Test report
Page 2 of 8
-
PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISIONAKRA MMCES CLIENT
5.3.4
5.4 Shell Plate
5.4.1
5.4.2
Vacuum Box testing AFC Drawing, Approved
Erection Procedure & API 650 Vacuum Box Test report
After Visual
InspectionH, W, R, V
S
- To check orientation of 1st shell plate installation
- To check the joint preparations
- To check the joint misalignment
- To do the leak test on all bottom plate weld joints
Fit-up Inspection
Fit up Report
After complete
installation of
shell plate course
by course
H, I, R, V
AFC Drawing, Approved Weld MonitoringMonitoring at site
During welding 5.4.2
5.4.3
5.4.4
5.4.5
5.4.6
5.4.7
5.4.8
S
Before & After
weldingH, I, R, V
- To do the completed weldment visual inspection
Oil Penetrant testingOil Penetrant Test Report
1st layer weld on
annular plate to
shell plate
H, I, R, V
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650 - To do the daily monitoring of welding work at siteVisual Inspection
Visual ReportAfter completion
of weldingI, R, V
Weld MonitoringMonitoring at site
During welding
works
- To check the shell plate joint curvature
Non Destructive Examination - Dye Penetrant TestingAFC Drawing, Approved
WPS, Approved NDT
Procedure & API 650
DPT ReportAfter Visual
InspectionW, V
Local deviation check - Peaking & BandingPeaking & Banding Report
Before & After
weldingH, I, R, V
AFC Drawing, Approved
Erection Procedure & API 650
- To check levelness after 1st course erection- To check the roundness after 1st course erection- To check the plumbness before and after every course erection
Levelness , Plumbness & RoundnessLevelness , Plumbness
& Roundness Report
-To check the surface defect of shell to annular plate external weldment
Non Destructive Examination - Radiography testingAFC Drawing, Approved
WPS, Approved NDT
Procedure & API 650
Radiography Test reportAfter Visual
InspectionV
-To check the internal defect of weldment on shell plate weld joints
- To detect leakage on internal weldment of annular plate to shell plate
Page 3 of 8
-
PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISIONAKRA MMCES CLIENT
5.5 Top Angle
5.5.1
5.5.2
5.5.3
During welding
worksS
- To do the daily monitoring of welding work at site
Visual Inspection
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
Fit-up InspectionFit up Report Before welding I, R, V
- To check fitup of inspection of top angle to 8th course shell plate
Weld MonitoringMonitoring at site
5.5.3
5.5.4
5.6 Shell Nozzle, Manhole, Reinforcement Pad & Repad to Shell
5.6.1
5.6.2
5.6.3
5.6.4
5.6.5
Visual Inspection
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
After completion
of weldingI, R, V
- To check surrface defect of weld top angle To shell plate & top angle to
top angle.
Orientation Check Fit up Nozzle & Manhole
ReportBefore welding I, R, V
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
During welding
worksS
- To do the daily monitoring of welding work at site
- To check the orientation of nozzle installation as per AFC drawingFit-up Inspection
Fit up Nozzle & Manhole
ReportBefore welding I, R, V- To check the nozzle installation as per AFC drawings
- To check the joint preparations
Visual Inspection Approved WPS, Approved
Erection Procedure & API 650
Visual Nozzle & manhole
Report
After completion
of weldingI, R, V
- To do the completed weldment visual inspection
-To check the surface defect of shell to annular plate external weldment
Non Destructive Examination - Magnetic Particle / Dye Penetrant Testing After Visual
InspectionW, V
- To do the completed weldment visual inspection
NDT -MT/DPT
Visual Report
NDT Report
- To check the surface defect of weld nozzle neck To shell plate &
manhole neck To shell plate & reinforcement pad To shell
AFC Drawing, Approved
WPS, Approved NDT
Procedure & API 650
DPT Report
Weld MonitoringApproved WPS Monitoring at site
Page 4 of 8
-
PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISIONAKRA MMCES CLIENT
5.6.6 API 650
5.7 Roof Structure & Truss
5.7.1
5.7.2
- To do the daily monitoring of welding work at site
Air leak test- Reinforcement PadAir Leak Test report
After Visual
InspectionH, W, R, V
- To detect leakage on weldment using soap solution
Fit-up InspectionFit up Report Before welding I, R, V
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
- To check the truss bracket attached to shell installation
Weld MonitoringMonitoring at site
During welding
worksS
5.7.3
5.7.4
5.8 Roof Plate
5.8.1
5.8.2
5.8.3
5.8.4
- To do the daily monitoring of welding work at site
- To do the completed weldment visual inspection
Bolt tightening check AFC Drawing, Approved
Erection Procedure & API 650 Bolt Tightening Report
Before laying
Roof PlateW, R, V
Procedure & API 650
Visual InspectionVisual Report
After completion
of weldingI, R, V
-To check all the bolt joint have been fully tightened
works
- To check lapping of roof plate to roof plate & crown plate
Weld MonitoringMonitoring at site
During welding
worksS
- To do the daily monitoring of welding work at site
Fit-up InspectionFit up Report Before welding I, R, V
- To do the completed weldment visual inspection
Vacuum Box testing AFC Drawing, Approved
Erection Procedure & API 650 Vacuum Box Test report
After Visual
InspectionH, 'W, V
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
Visual InspectionVisual Report
After completion
of weldingI, R, V
- To do the leak test on all roof plate weld joints
Page 5 of 8
-
PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISIONAKRA MMCES CLIENT
5.9 Roof Nozzle & Manhole
5.9.1
5.9.2
5.9.3
Orientation Check Nozzle & Manhole Fit up
ReportBefore welding I, R, V
Fit-up InspectionNozzle & Manhole Fit up
ReportBefore welding I, R, V- To check the nozzle installation as per AFC drawings
- To check the joint preparations
Weld MonitoringMonitoring at site
During welding
worksS
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
- To check the orientation of nozzle installation as per AFC drawing
5.9.4
5.9.5
5.10 Permanent Bracket to Shell
5.10.1
5.10.2
5.10.3
5.10.4
5.10.5
- To check the orientation as per AFC drawing
Monitoring at siteworks
S
- To do the daily monitoring of welding work at site
Visual InspectionVisual Report
After completion
of weldingI, R, V
- To do the completed weldment visual inspection
Orientation Check AFC Drawing, Approved
Erection Procedure & API 650 Fit up Report Before welding I, R, V
Non Destructive Examination - Dye Penetrant TestingAFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
DPT ReportAfter Visual
InspectionW, V
- To do the daily monitoring of welding work at site
Visual InspectionVisual Inspection Report
After completion
of weldingI, R, V
- To check the installation as per AFC drawings- To check the joint preparations
Weld MonitoringMonitoring at site
During welding
worksS
- To do the completed weldment visual inspection
AFC Drawing, Approved
WPS, Approved Erection
Procedure & API 650
Fit-up InspectionFit up Report Before welding I, R, V
-To check the surface defect of shell attachment external weldmentNon Destructive Examination - Dye Penetrant Testing AFC Drawing, Approved NDT
Procedure & API 650 DPT Report
After Visual
InspectionW, V
Page 6 of 8
-
PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISIONAKRA MMCES CLIENT
6.0 Tank Hydrotesting
6.1 Pretest check list
6.2 Internal Bottom Plate Settlement
6.3 Water Filling & Discharging
6.4
- To measure at max.3m interval on diametrical line across the tank
Pre Test Check List Before water
fillingI, R, V
- To ensure all the tank attachment welds are completed
Monitoring at site During
hydrostatic testW
Tank Bottom settlement
Report
Before
hydrostatic testH, I, R, V
AFC Drawing, Approved
- To check filling & discharging rate as per API 650
- To ensure roof nozzle & manhole in open positionVisual Inspection & observation
Visual Check at site During
H6.4
6.5
7.0 Tank Painting Works
7.1 Paint Material
7.2 Surface preparation
- After the tank has been emptied
Material Inspection Report &
Paint Batch Certificate
Upon receiving
materialI, R, V
AFC Drawing, Approved
Erection Procedure & API 650
Settlement reading shall be taken as below mentioned intervals- Before start hydostatic test- With tank filled with 25% test height- With tank filled with 50% test height- With tank filled with 75% test height- With tank filled with 100% test height
- To do the visual check & observation on weldments for any leaksTank settlement Monitoring - Before, during & after hydrostatic test
Tank settlement Report &
Hydrostatic test report
Before , During &
After hydrostatic
test
Visual Inspection & observationVisual Check at site
During
hydrostatic test
- To ensure the surface cleanliness of plate & weld profile as per
Manufacturer data or specification
- To ensure approved paint material used as per specification
Blasting & Painting Report Before start
paintingI, R, V
H, I, R, V
H
Page 7 of 8
-
PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001
OWNER PETRONAS RAPID REV. NO 1
DISCIPLINE DATE 27 AUG 2015
AKRA ENGINEERING SDN BHD
FIELD QUALITY PLAN
TANK FABRICATION & ERECTION
ITEM
NO.ACTIVITY
REFERENCE /
ACCEPTANCE CRITERIAVERIFYING DOCUMENTS
STAGE/
FREQUENCY
INSPECTION POINTS
REVISIONAKRA MMCES CLIENT
7.3 Steel Temperature & Relative Humidity
7.4
7.5
Blasting & Painting Report Before start
paintingI, R, V
- To do the visual check of blasted surface & DFT checking
Visual Inspection & DFT check
Petronas Technical
Standard,
Manufacturer data and
specification & Approved
Blasting Painting Procedure
- To check Steel Temperature as per Manufacturer data or specification
- To check Relative Humidity as per Manufacturer data or specification
Blasted SurfaceBlasting & Painting Report
After blasting
workI, R, V
7.5
Remarks
I - Inspection R - Generate Record V - Verification of Record W - Witness of Inspection/Test H - Hold on Inspection/Test S - Surveilance/Spot Check
Prepared by : AKRA Reviewed by : AKRA Reviewed & Approved by : MMCES
Name : Khairul Anuar Name : Rosnizam Name :
QA/QC Engineer Project Manager
- To do the visual check of painted surface as per Manufacturer data or
specification
- To carry out the DFT check of painted surface as per Manufacturer data
or specification
Visual Inspection & DFT check
Blasting & Painting Report After painting
worksI, R, V
Page 8 of 8
DOC110915-11092015155145FQP rev.1