  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    1.0 Pre Fabrication

    1.1

    1.2 Test plate welding-Check the test coupon preparation

    1.3 Visual Inspection- To do the completed weldment visual inspection

    1.4

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISION

    Approved WPS &

    ASME SEC IXWelder Qualification List Before Start Work H, R, V

    AKRA MMCES CLIENT

    ASME SEC IX WPS Before Start Work R

    Non Destructive Examination - Radiographic testingASME SEC IX

    Radiography Test report & After Visual I, V

    Approved WPS &

    ASME SEC IXVisual Inspection Report

    After test coupon

    weldedH, R, V

    To review all Welding Procedure Specification (WPS) and Procedure

    Qualification Records (PQR)

    1.4

    -To check the internal defect of weldment

    2.0 Material Control

    2.1

    2.2

    3.0 Tank Fabrication Works

    3.1 Bottom Plate & Annular Plate

    3.2 Shell Plate

    3.3 Roof Plate

    3.4 Nozzle, Manhole, Reinforcement Pad and Sump

    3.5 Roof Structure & Truss

    4.0 Foundation Inspection

    4.1 Levelness and Flatness

    Non Destructive Examination - Radiographic testingASME SEC IX

    Radiography Test report &

    Qualified Welder List

    After Visual

    InspectionI, V

    - Visual Inspection to ensure the material are in good condition as per

    Welding Consumables

    Approved WPS Material Inspection Report &

    Electrode issue formsBefore welding I, R, V

    Material Receiving Inspection of Bottom Plates, Annular Plate,Shell

    Plate, Roof Plate & Stural MaterialAFC Drawing, Mill Certificate

    & Delivery Order (DO)

    Material Inspection Report&

    Mill Certificates

    Upon receiving

    materialI, R, V

    - To perform dimensional check after marking

    AFC Drawing & Approved

    Fabrication ProcedureDimensional Report

    Before cutting

    workI, R, V

    - To check the electrode as per specification

    - To Maintain the electrode backing register

    AFC Drawing & Approved

    Fabrication ProcedureDimensional Report

    Before cutting

    workI, R, V

    - To perform dimensional check after marking

    AFC Drawing & Approved

    Fabrication Procedure

    Dimensional Report, Fit up,

    Visual & NDT

    Before cutting

    workI, R, V

    - To perform dimensional check after marking

    AFC Drawing & Approved

    Fabrication ProcedureDimensional Report

    Before cutting

    workI, R, V

    - To perform dimensional check after marking and welding

    AFC Drawing, API 650 Foundation Levelness Report Before laying

    annular plateI, R, V

    - To perform dimensional check after marking

    AFC Drawing & Approved

    Fabrication Procedure

    Dimensional Report, Fit up,

    Visual & NDT

    Before cutting

    work and after

    welding

    I, R, V

    - To check levelness and flatness on final surface of tank foundation

    Page 1 of 8

    amirrul.bakhariRectangle

    amirrul.bakhariCalloutPengerang power sdn bhd

    amirrul.bakhariTypewritten TextR

    amirrul.bakhariTypewritten TextR

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextW,R

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextW,R

    amirrul.bakhariTypewritten TextW,R

    amirrul.bakhariTypewritten Text,R

    amirrul.bakhariRectangle

    amirrul.bakhariCalloutAs per?

    amirrul.bakhariTypewritten TextR

    amirrul.bakhariTypewritten TextR

    amirrul.bakhariTypewritten TextR,S

    amirrul.bakhariTypewritten TextR

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextR,S

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextW

    amirrul.bakhariTypewritten TextR,S

    amirrul.bakhariTypewritten TextR,S

    amirrul.bakhariTypewritten TextR

    amirrul.bakhariTypewritten TextR,S

    amirrul.bakhariTypewritten Text,S

  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISIONAKRA MMCES CLIENT

    4.2 Orientataion Marking

    5.0 Tank Erection Works

    5.1 Material

    - Material Identification

    52 Annular Plate

    5.2.1

    - To check tank centre, 0, 90,180, 270 orientations

    Fit-up InspectionWelding Summary Sheet

    Before/After

    plate layingI, R, V

    AFC Drawing, API 650Checking at site and Survey

    Record

    Before tank

    erectionI, R, V

    MVR & Material Identification

    Record

    5.2.2

    5.2.3

    5.2.4

    5.2.5

    5.3 Bottom Plate & Centre Sump

    5.3.1

    5.3.2

    5.3.3

    Welding Summary Sheetplate laying

    I, R, V

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    - To check start point for annular plate laying & fit-up inspection

    Weld MonitoringMonitoring at site

    During welding

    worksS

    - To do the daily monitoring of welding work at site

    Visual InspectionWelding Summary Sheet

    After completion

    of weldingI, R, V

    After Visual

    InspectionH, W, R, V

    - To do the completed weldment visual inspection

    Non Destructive Examination - Ultrasonic testingAFC Drawing, Approved

    WPS, Approved NDT

    Procedure & API 650

    Ultrasonic Test reportAfter Visual

    InspectionH, I, R, V

    - To do the leak test on all annular plate weld joints

    Before/After

    plate layingI, R, V

    - To do the daily monitoring of welding work at site

    Visual InspectionVisual Report

    After completion

    of weldingI, R, V

    Weld MonitoringMonitoring at site

    During welding

    worksS

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    - To check orientation of 1st bottom plate laying- To check lapping of bottom plate to bottom plate & annular plate

    - To do the completed weldment visual inspection

    - To check the Internal Shell plate to head lapping - To check the Centre sump installation as per AFC drawings

    Fit-up Inspection

    Fit up Report

    - To do the 50% of total radial annular plate weld joints

    Vacuum Box testing AFC Drawing, Approved

    Erection Procedure & API 650 Vacuum Box Test report

    Page 2 of 8

  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISIONAKRA MMCES CLIENT

    5.3.4

    5.4 Shell Plate

    5.4.1

    5.4.2

    Vacuum Box testing AFC Drawing, Approved

    Erection Procedure & API 650 Vacuum Box Test report

    After Visual

    InspectionH, W, R, V

    S

    - To check orientation of 1st shell plate installation

    - To check the joint preparations

    - To check the joint misalignment

    - To do the leak test on all bottom plate weld joints

    Fit-up Inspection

    Fit up Report

    After complete

    installation of

    shell plate course

    by course

    H, I, R, V

    AFC Drawing, Approved Weld MonitoringMonitoring at site

    During welding 5.4.2

    5.4.3

    5.4.4

    5.4.5

    5.4.6

    5.4.7

    5.4.8

    S

    Before & After

    weldingH, I, R, V

    - To do the completed weldment visual inspection

    Oil Penetrant testingOil Penetrant Test Report

    1st layer weld on

    annular plate to

    shell plate

    H, I, R, V

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650 - To do the daily monitoring of welding work at siteVisual Inspection

    Visual ReportAfter completion

    of weldingI, R, V

    Weld MonitoringMonitoring at site

    During welding

    works

    - To check the shell plate joint curvature

    Non Destructive Examination - Dye Penetrant TestingAFC Drawing, Approved

    WPS, Approved NDT

    Procedure & API 650

    DPT ReportAfter Visual

    InspectionW, V

    Local deviation check - Peaking & BandingPeaking & Banding Report

    Before & After

    weldingH, I, R, V

    AFC Drawing, Approved

    Erection Procedure & API 650

    - To check levelness after 1st course erection- To check the roundness after 1st course erection- To check the plumbness before and after every course erection

    Levelness , Plumbness & RoundnessLevelness , Plumbness

    & Roundness Report

    -To check the surface defect of shell to annular plate external weldment

    Non Destructive Examination - Radiography testingAFC Drawing, Approved

    WPS, Approved NDT

    Procedure & API 650

    Radiography Test reportAfter Visual

    InspectionV

    -To check the internal defect of weldment on shell plate weld joints

    - To detect leakage on internal weldment of annular plate to shell plate

    Page 3 of 8

  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISIONAKRA MMCES CLIENT

    5.5 Top Angle

    5.5.1

    5.5.2

    5.5.3

    During welding

    worksS

    - To do the daily monitoring of welding work at site

    Visual Inspection

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    Fit-up InspectionFit up Report Before welding I, R, V

    - To check fitup of inspection of top angle to 8th course shell plate

    Weld MonitoringMonitoring at site

    5.5.3

    5.5.4

    5.6 Shell Nozzle, Manhole, Reinforcement Pad & Repad to Shell

    5.6.1

    5.6.2

    5.6.3

    5.6.4

    5.6.5

    Visual Inspection

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    After completion

    of weldingI, R, V

    - To check surrface defect of weld top angle To shell plate & top angle to

    top angle.

    Orientation Check Fit up Nozzle & Manhole

    ReportBefore welding I, R, V

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    During welding

    worksS

    - To do the daily monitoring of welding work at site

    - To check the orientation of nozzle installation as per AFC drawingFit-up Inspection

    Fit up Nozzle & Manhole

    ReportBefore welding I, R, V- To check the nozzle installation as per AFC drawings

    - To check the joint preparations

    Visual Inspection Approved WPS, Approved

    Erection Procedure & API 650

    Visual Nozzle & manhole

    Report

    After completion

    of weldingI, R, V

    - To do the completed weldment visual inspection

    -To check the surface defect of shell to annular plate external weldment

    Non Destructive Examination - Magnetic Particle / Dye Penetrant Testing After Visual

    InspectionW, V

    - To do the completed weldment visual inspection

    NDT -MT/DPT

    Visual Report

    NDT Report

    - To check the surface defect of weld nozzle neck To shell plate &

    manhole neck To shell plate & reinforcement pad To shell

    AFC Drawing, Approved

    WPS, Approved NDT

    Procedure & API 650

    DPT Report

    Weld MonitoringApproved WPS Monitoring at site

    Page 4 of 8

  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISIONAKRA MMCES CLIENT

    5.6.6 API 650

    5.7 Roof Structure & Truss

    5.7.1

    5.7.2

    - To do the daily monitoring of welding work at site

    Air leak test- Reinforcement PadAir Leak Test report

    After Visual

    InspectionH, W, R, V

    - To detect leakage on weldment using soap solution

    Fit-up InspectionFit up Report Before welding I, R, V

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    - To check the truss bracket attached to shell installation

    Weld MonitoringMonitoring at site

    During welding

    worksS

    5.7.3

    5.7.4

    5.8 Roof Plate

    5.8.1

    5.8.2

    5.8.3

    5.8.4

    - To do the daily monitoring of welding work at site

    - To do the completed weldment visual inspection

    Bolt tightening check AFC Drawing, Approved

    Erection Procedure & API 650 Bolt Tightening Report

    Before laying

    Roof PlateW, R, V

    Procedure & API 650

    Visual InspectionVisual Report

    After completion

    of weldingI, R, V

    -To check all the bolt joint have been fully tightened

    works

    - To check lapping of roof plate to roof plate & crown plate

    Weld MonitoringMonitoring at site

    During welding

    worksS

    - To do the daily monitoring of welding work at site

    Fit-up InspectionFit up Report Before welding I, R, V

    - To do the completed weldment visual inspection

    Vacuum Box testing AFC Drawing, Approved

    Erection Procedure & API 650 Vacuum Box Test report

    After Visual

    InspectionH, 'W, V

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    Visual InspectionVisual Report

    After completion

    of weldingI, R, V

    - To do the leak test on all roof plate weld joints

    Page 5 of 8

  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISIONAKRA MMCES CLIENT

    5.9 Roof Nozzle & Manhole

    5.9.1

    5.9.2

    5.9.3

    Orientation Check Nozzle & Manhole Fit up

    ReportBefore welding I, R, V

    Fit-up InspectionNozzle & Manhole Fit up

    ReportBefore welding I, R, V- To check the nozzle installation as per AFC drawings

    - To check the joint preparations

    Weld MonitoringMonitoring at site

    During welding

    worksS

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    - To check the orientation of nozzle installation as per AFC drawing

    5.9.4

    5.9.5

    5.10 Permanent Bracket to Shell

    5.10.1

    5.10.2

    5.10.3

    5.10.4

    5.10.5

    - To check the orientation as per AFC drawing

    Monitoring at siteworks

    S

    - To do the daily monitoring of welding work at site

    Visual InspectionVisual Report

    After completion

    of weldingI, R, V

    - To do the completed weldment visual inspection

    Orientation Check AFC Drawing, Approved

    Erection Procedure & API 650 Fit up Report Before welding I, R, V

    Non Destructive Examination - Dye Penetrant TestingAFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    DPT ReportAfter Visual

    InspectionW, V

    - To do the daily monitoring of welding work at site

    Visual InspectionVisual Inspection Report

    After completion

    of weldingI, R, V

    - To check the installation as per AFC drawings- To check the joint preparations

    Weld MonitoringMonitoring at site

    During welding

    worksS

    - To do the completed weldment visual inspection

    AFC Drawing, Approved

    WPS, Approved Erection

    Procedure & API 650

    Fit-up InspectionFit up Report Before welding I, R, V

    -To check the surface defect of shell attachment external weldmentNon Destructive Examination - Dye Penetrant Testing AFC Drawing, Approved NDT

    Procedure & API 650 DPT Report

    After Visual

    InspectionW, V

    Page 6 of 8

  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISIONAKRA MMCES CLIENT

    6.0 Tank Hydrotesting

    6.1 Pretest check list

    6.2 Internal Bottom Plate Settlement

    6.3 Water Filling & Discharging

    6.4

    - To measure at max.3m interval on diametrical line across the tank

    Pre Test Check List Before water

    fillingI, R, V

    - To ensure all the tank attachment welds are completed

    Monitoring at site During

    hydrostatic testW

    Tank Bottom settlement

    Report

    Before

    hydrostatic testH, I, R, V

    AFC Drawing, Approved

    - To check filling & discharging rate as per API 650

    - To ensure roof nozzle & manhole in open positionVisual Inspection & observation

    Visual Check at site During

    H6.4

    6.5

    7.0 Tank Painting Works

    7.1 Paint Material

    7.2 Surface preparation

    - After the tank has been emptied

    Material Inspection Report &

    Paint Batch Certificate

    Upon receiving

    materialI, R, V

    AFC Drawing, Approved

    Erection Procedure & API 650

    Settlement reading shall be taken as below mentioned intervals- Before start hydostatic test- With tank filled with 25% test height- With tank filled with 50% test height- With tank filled with 75% test height- With tank filled with 100% test height

    - To do the visual check & observation on weldments for any leaksTank settlement Monitoring - Before, during & after hydrostatic test

    Tank settlement Report &

    Hydrostatic test report

    Before , During &

    After hydrostatic

    test

    Visual Inspection & observationVisual Check at site

    During

    hydrostatic test

    - To ensure the surface cleanliness of plate & weld profile as per

    Manufacturer data or specification

    - To ensure approved paint material used as per specification

    Blasting & Painting Report Before start

    paintingI, R, V

    H, I, R, V

    H

    Page 7 of 8

  • PROJECT STORAGE TANK'S FOR PENGERANG COGEN POWER PLANT DOC. NO AK/QA/FQP/015C/009-001

    OWNER PETRONAS RAPID REV. NO 1

    DISCIPLINE DATE 27 AUG 2015

    AKRA ENGINEERING SDN BHD

    FIELD QUALITY PLAN

    TANK FABRICATION & ERECTION

    ITEM

    NO.ACTIVITY

    REFERENCE /

    ACCEPTANCE CRITERIAVERIFYING DOCUMENTS

    STAGE/

    FREQUENCY

    INSPECTION POINTS

    REVISIONAKRA MMCES CLIENT

    7.3 Steel Temperature & Relative Humidity

    7.4

    7.5

    Blasting & Painting Report Before start

    paintingI, R, V

    - To do the visual check of blasted surface & DFT checking

    Visual Inspection & DFT check

    Petronas Technical

    Standard,

    Manufacturer data and

    specification & Approved

    Blasting Painting Procedure

    - To check Steel Temperature as per Manufacturer data or specification

    - To check Relative Humidity as per Manufacturer data or specification

    Blasted SurfaceBlasting & Painting Report

    After blasting

    workI, R, V

    7.5

    Remarks

    I - Inspection R - Generate Record V - Verification of Record W - Witness of Inspection/Test H - Hold on Inspection/Test S - Surveilance/Spot Check

    Prepared by : AKRA Reviewed by : AKRA Reviewed & Approved by : MMCES

    Name : Khairul Anuar Name : Rosnizam Name :

    QA/QC Engineer Project Manager

    - To do the visual check of painted surface as per Manufacturer data or

    specification

    - To carry out the DFT check of painted surface as per Manufacturer data

    or specification

    Visual Inspection & DFT check

    Blasting & Painting Report After painting

    worksI, R, V

    Page 8 of 8