pbs gsa national equipment standard guide 2011-03-21

195
GSA National Equipment Standard www.gsa.gov/bim GSA National Equipment Standard

Upload: egglestona

Post on 16-Jul-2016

43 views

Category:

Documents


0 download

DESCRIPTION

PBS GSA National Equipment Standard Guide 2011-03-21

TRANSCRIPT

Page 1: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

GSA National Equipment Standard

Page 2: PBS GSA National Equipment Standard Guide 2011-03-21

Document Revision 03-21-2011

Disclaimer

GSA would prefer not to develop a single organization standard that is

specific only to the agency. GSA would prefer, with review and input from

industry and other agencies, develop a mutually beneficial industry standard

that can be used universally.

With that in mind, this is a draft document developed by GSA and is being

distributed for review process by peers.

This is in no way to be used as a legal or binding document at this time.

This document is in the process of being internally reviewed by GSA.

Note: This is a large document; there is discussion to split out section 4 into

its own document. For review process, this document should be considered

as a whole. Moving section 4 to another sub technical document would not

change its content.

Page 3: PBS GSA National Equipment Standard Guide 2011-03-21

U.S. General Services Administration Public Buildings Service

Office of Design and Construction Facility Management and Services Program

Month XX, 2011 This version of the GSA National Equipment Standard is identified as Version 0.50 to indicate its provisional status. With its publication, this guide becomes available for public review and comment. As its provisional status denotes, however, it will continue to serve as the basis for further development, pilot validation, and professional editing. All readers of this provisional guide are encouraged to submit feedback to the National 3D-4D-BIM Program. Updated versions will continue to be issued to address and incorporate on-going feedback in an open, collaborative process. For further information about GSA’s National 3D-4D-BIM Program, additional BIM Guide Series, or to submit comments or questions, visit the National 3D-4D-BIM webpage at http://www.gsa.gov/bim. The National 3D-4D-BIM Program Office of Design and Construction Public Buildings Service U.S. General Services Administration 1800 F Street NW, Suite 3300 Washington, DC 20405 [ADD FMSP Address]

Page 4: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Version 0.50 – Month, Date 2011 COPYRIGHT © 2011 BY General Services Administration If you would like to contact the authors, please write to: The National 3D-4D-BIM Program Office of Design and Construction Public Buildings Service U.S. General Services Administration 1800 F Street NW, Suite 3300 Washington, DC 20405 [ADD FMSP]

Page 5: PBS GSA National Equipment Standard Guide 2011-03-21

table of contents i

GSA National Equipment Standard

www.gsa.gov/bim

Table of Contents

Equipment Standards Executive Summary: Equipment ................................................................................. iii Introduction .......................................................................................................... iv

About this Guide ....................................................................................................... iv

Objective of this Guide ............................................................................................... iv

How to use this guide – National Equipment Standard ........................................................... iv

Section 1: Equipment and FM ...................................................................................... 7

1.1. Why Equipment Standard .................................................................................... 7

1.2. The Business Need for Equipment Standards .............................................................. 8

1.3. Use cases for equipment data .............................................................................. 10

1.1. The vision for equipment data ............................................................................. 11

Section 2: Equipment Definitions ................................................................................ 14

Section 3: Industry Codes and Standards ....................................................................... 18

3.1. Industry Codes ................................................................................................ 18

3.2. Equipment Type Nomenclature Convention .............................................................. 22

Section 4: Equipment Data Fields ................................................................................ 25

4.1. Complex Data Fields ......................................................................................... 26

4.2. Facility Data Fields ........................................................................................... 32

4.3. Tenant Data Fields ........................................................................................... 40

4.4. Zone Data Fields .............................................................................................. 44

4.5. Space Data Fields ............................................................................................. 47

4.6. Equipment Data Fields ....................................................................................... 53

4.7. Job Task Data Fields ......................................................................................... 96

4.8. Commissioning Data Fields ................................................................................ 108

Page 6: PBS GSA National Equipment Standard Guide 2011-03-21

table of contents ii

GSA National Equipment Standard

www.gsa.gov/bim

4.9. Condition Assessment Data Fields........................................................................ 113

4.10. Audits and Inspection Data Fields ........................................................................ 124

4.11. Warranty ..................................................................................................... 130

4.12. Operation Documents ...................................................................................... 143

4.13. Code and Regulations ...................................................................................... 146

Section 5: Equipment Identification ........................................................................... 159

5.1. Equipment Identification Formats: ...................................................................... 159

Section 6: Equipment Tag ........................................................................................ 163

6.1. Guidelines: .................................................................................................. 163

6.2. Tag Placement: ............................................................................................. 163

6.3. Required Equipment Tag Information: .................................................................. 164

Section 7: Contracts .............................................................................................. 167

7.1. New Construction/Renovation ............................................................................ 167

7.2. Existing Building O&M Contract Renewal ............................................................... 167

7.3. Existing Building Equipment Inventory Contract ....................................................... 168

7.4. Existing Building Project .................................................................................. 169

Section 8: technology ............................................................................................. 171

8.1. Technology Requirements ................................................................................. 171

8.2. Technology Recommendations ........................................................................... 171

Section 9: Implementation Guidance .......................................................................... 173

9.1. Identifying Opportunities.................................................................................. 173

9.2. Developing an Equipment Execution Plan .............................................................. 173

9.3. Pilot Inventory Implementation Studies ................................................................ 173

Section 10: Equipment Data Matrix ............................................................................ 176

References .......................................................................................................... 186

Acknowledgements ................................................................................................ 187

Page 7: PBS GSA National Equipment Standard Guide 2011-03-21

executive summary: equipment iii

GSA National Equipment Standard

www.gsa.gov/bim

Executive Summary: Equipment

In 2003, U.S. General Services Administration (GSA) Public Buildings Service (PBS) Office of the Chief Architect (OCA) established the National 3D-4D-BIM Program. For more information, visit the National 3D-4D-BIM Program webpage at http://www.gsa.gov/bim. As part of this program, OCA has evaluated an array of 3D-4D-BIM applications on a number of capital projects. As one of the largest owners in the U.S., GSA sees great benefits from maintaining lifecycle data for our facilities. Equipment data is one of the key data points critical to the operation and maintenance of facilities. This guide is a result of the work that the GSA team has done to ensure that high-quality data is submitted for equipment in our facilities during design and construction, renovations, projects, and daily operations. The Office of Design and Construction, which houses the BIM Program, and the office of Facility Management and Services Programs has been working with counterparts in all regions to ensure the appropriate equipment deliverables are required. This guide has also been reviewed by the GSA BIM and FM Working Group and several regional GSA associates familiar with BIM and FM. Objective of Using National Equipment Standards (NES)

The overall purpose of utilizing national equipment standards is to enable GSA to leverage equipment data through the facility lifecycle. GSA intends to utilize and update this data throughout the facility lifecycle – through new construction, small projects, building operations, and major renovations. Requirements and Deliverables

At a minimum, contracts or work relating to facility equipment data such as new construction, equipment related projects, equipment repairs/replacements, renovations, etc., are required to have the minimum specified data fields per this guide updated or captured per section 4. These requirements are in addition to all current submission requirements set forth in Appendix A of the Facilities Standards for the Public Buildings Service (PBS P-100 November 2010). A/Es should also follow the PBS CAD Standards for creating 2-D drawings. Conclusions

GSA expects that, in referencing this Guide, GSA will be able to obtain high-quality equipment data for use in Facility Management. While full adoption of this guide within facility management will be incremental, this guide lays the foundation for the vision and technical requirements for facility management. GSA welcomes any constructive comments and recommendations to the guide and the process of creating and maintaining facility lifecycle information.

Page 8: PBS GSA National Equipment Standard Guide 2011-03-21

introduction iv

GSA National Equipment Standard

www.gsa.gov/bim

Introduction

About this Guide

A national equipment standard allows GSA to better utilize and operate facilities through all phases of a facility’s lifecycle. Users of this document should also refer to the GSA BIM Guide Series: 01 – Overview of GSA’s National 3D-4D-BIM Program for program-wide policies on 3D-4D-BIM applications, GSA BIM Guide Series 02 for technical requirements of a spatial program BIM, and the GSA BIM Guide Series 08-facility management to BIM for implementation. This guide will also be of general interest to other members of GSA project teams, including PBS staff, customer agencies, and contracted parties such as construction managers, construction and design-build contractors, and consultants. In addition, construction industry software solution providers will find this Guide useful, in particular those who offer Computerized Maintenance Management Systems (CMMS) and BIM-authoring applications.

Objective of this Guide

The main objective of this guide is to provide a vision, requirements, and technology review for equipment data and its use in CMMS and BIM for facility management.

Disclaimer: This guide is considered a living document that is constantly changing and being updated as the technology matures. While GSA has tried to highlight the major points, GSA cannot take into account all the special cases and changing technology. Therefore, if you have any questions or comments regarding the content of this Series, please contact OCA or FMSP for the most up-to-date information.

How to use this guide – National Equipment Standard This series is divided into 9 major sections:

Section 1: Equipment and FM – This section describes the overall vision and objectives for equipment data within facility management.

Page 9: PBS GSA National Equipment Standard Guide 2011-03-21

introduction v

GSA National Equipment Standard

www.gsa.gov/bim

Section 2: Equipment Definitions – This section defines the definitions of key terms used for equipment inventories and their data.

Section 3: Industry Codes and Standards – This section defines the industry codes, concepts, and standards used for GSA equipment inventories.

Section 4: Equipment Data Fields – This section describes the different equipment data points for GSA, their implementation, requirements, and their data field database name.

Section 5: Equipment Identification – This section describes the requirements and standards for equipment identification in a facility.

Section 6: Equipment Tag – This section describes the requirements and standards for equipment tagging within a facility.

Section 7: Contracts – This section provides lessons learned and information to include in contracts related to equipment inventories.

Section 8: Technology – This section describes the technologies that are affected and possible future technologies available.

Section 9: Implementation Guidance – This section describes the different ways of implementation related to equipment inventories.

Page 10: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 01: Equipment and FM

Page 11: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 1: Equipment and FM This section provides an overview of the origin and motivation behind equipment data and facility management.

1.1. Why Equipment Standard GSA PBS is responsible for over 8300 owned and leased buildings within its 11 regions. The costs and inaccuracy of facilities using incompatible self-generated equipment and systems descriptions has a significant impact on the construction, operations, sustainability, and energy usage of facilities. Using a single common standard that is compatible with industry standards is a significant improvement for GSA and its supporting vendors. Facility operations require the ability to track and located every component of a facility. Those components (equipment) have performance characteristics and costs associated with their operation, installation, replacement, and\or scheduled maintenance. Creating an accurate equipment inventory is essential for achieving optimal performance of the facility. This equipment standard is designed to guide the creation and capture of accurate information for equipment data. Equipment data such as:

Type of equipment.

Equipment physical location in addition to its location within the facility.

Cause and affect (parent/child relationship) each component has on the operations of a building. Example: Transformer ## supplies power to electrical panels xx, yy, zz.

Creation of zones that identify areas that are serviced by common components. (Rooms 1, 2, 3 are on zone 1 of Air Handling Unit 21, or supplied electrical service from circuit panel L-1.)

Development of a unique identifier that can be used to link the software programs files with the CMMS database.

Page 12: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

1.2. The Business Need for Equipment Standards

GSA PBS is responsible for over 8300 owned and leased buildings within its 11 regions. The problems associated with using incompatible self-generated equipment and systems descriptions have significant impact on the construction, operations, sustainability, and energy usage of facilities. “Why are equipment inventories critical? The bottom line: They are the basic requirement for every aspect of facility management. Equipment inventories affect facility safety as well as how the facility is operated, maintained, and forecasted. They also have a direct impact on facility costs. If the equipment inventory is not accurate, the facility and the organization will not be as effective. One adage is “You cannot manage what you do not know.” If the equipment inventory is not accurate, it is costing the organization time, manpower, and money.” Financial Impact and Analysis of Equipment Inventories by Robert Keady, Facility Engineering Journal, Association of Facility Engineering, Nov-Dec, Jan-Feb, 2009-2010. National Institute of Standards and Technology (NIST) estimates the cost of inadequate interoperability in the U.S. capital facilities industry to be $15.8 billion per year. “A building’s performance will decline because of its age, the use it receives, or functional adaptation to new uses, but its performance will decline at an optimized rate with proper maintenance. Without appropriate maintenance, or with the owner’s decision to defer required maintenance, the building’s usefulness will decrease at an accelerated rate. The total cost of ownership is the total of all expenditures an owner will make over a building’s service lifetime. Failure to recognize these costs and to provide adequate maintenance, repair, and renewal results in a shorter service life, more rapid deterioration, higher operating costs, and possible mission degradation over the life cycle of a building. With available data on facility subsystems, an estimate can be made regarding maintenance, repair, and renewal requirements during the remaining asset lifetime. Managing this data is of critical importance to effectively provide optimum services to the facility owner and users.” Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry, Michael P. Gallaher, Alan C. O’Connor, John L. Dettbarn, Jr., and Linda T. Gilday, NIST GCR 04-867, AUGUST 2004. GSA development of a standard and format for equipment inventory will significantly improve the interoperability between design, construction, and operation of its facilities. GSA is committed to maintain interoperability across regions while at the same time being vendor neutral.

Page 13: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

The following are some of the benefits that GSA believes will be realized by having accurate

equipment data:

1. Cost Savings:

Savings in renovations and projects.

Savings to performing equipment condition assessments.

Reduction in the number and costs to perform equipment inventories per each O&M

Contract.

Increased revenue/accuracy of Chargeback’s.

Reduction in peak energy costs.

Reduction of waste water.

Reduction of cost related to inventory collection for new construction.

2. Man-hour Savings:

Reduction in number of contract modifications; reduction of man-hours used affects

multiple departments. (Finance, Contracting Office, Facilities Team, Lessor, etc.)

Reduction of labor-hours needed to recreate maintenance and repair information.

Reduction in hours needed to recreate information to meet regulations.

Reduction in hours caused by miscommunication.

Reduction in hours needed to perform equipment Building Life Cycle Costs.

Reduction in hours needed to determine manpower requirements for O&M costing.

Reduction in hours needed to determine equipment impacted for Chargeback’s.

Reduction of hours to cost projects that require equipment information and quantities.

Reduction of administrative hours spent maintaining current inventory system and

process.

3. Regulations:

Reduce the probability of fines and violations by having the capability of identifying that

all equipment regulations have been met. Increased level of compliance.

Page 14: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Improved ability to meet GREEN and LEED initiatives.

4. Safety:

Increased personnel safety by reducing live electrical work. Reduction in legal exposure.

Reduction in human error.

5. Emergency Response:

Improved emergency response and accident mitigation.

6. Executive Level:

Improved financial budgets and costing information.

Improvement of metrics and data used for equipment, operations, and maintenance

decisions.

Improved tracking of repairs and service calls related to equipment. Improved cost of

expenditure history.

Improved Customer Service.

1.3. Use cases for equipment data

Equipment data affects a significant number of processes and systems used within facility management. The following are only a couple of the major use areas for this data.

1.3.1. Energy and Sustainability

The Department of Energy, Federal Energy Management Program (FEMP) performed a study that found that a 5-20% energy savings could be achieved by simply performing effective O&M (http://www1.eere.energy.gov/femp/operations_maintenance/). One of the major key points of having an effective O&M program is to be able to accurately identify the equipment within the facility. Even though GSA installs highly efficient components within its facilities, if the equipment is not tracked and maintained then the efficiencies will be lost and the savings and sustainability not recognized. Therefore, equipment data has a large impact on energy and sustainability use cases.

Page 15: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

1.3.2. Operation and Maintenance Contracts

A large component of the cost related to operation and maintenance contracts for federal facilities is based on the amount of preventive maintenance required to be performed for the facility. The amount of preventive maintenance is directly related to the accuracy and quality of the equipment data. GSA believes that having a higher quality of data related to equipment inventories will reduce the number of O&M contract modifications, stabilize the known costs and, therefore, the budget of its building O&M program. It will simultaneously reduce the number of repairs related to poor O&M.

1.3.3. Construction to Facility Management Data Transfer At the time of this publication, there is a significant communications gap between the design and construction industry and facility management/owners. One of the major causes of this gap is that the two disciplines use different standards for identification of data. The design and construction industry tends to use established industry standards while the facility management community tends to use self-generated data formats that are not consistent with any standards. Because of this inconsistency in definitions, it is very difficult and costly to transfer data from construction to operations and there is a high level of data loss. The defining of equipment data fields, format, and industry standards used by this publication will reduce, and someday eliminate, the loss of equipment data between construction and operations. GSA believes it will see a significant cost benefit in reducing this data communications gap.

1.1. The vision for equipment data

While it is recognized that it will take time, the vision is to have seamless transfers of equipment data from construction, projects, and operations to the point that all of GSA facilities have completely accurate equipment inventories. The key points in achieving this vision are:

1. To have this guide implemented and the equipment data captured during any activity that

involved equipment. Example: New construction, small project equipment replacement, daily building operations, etc…

Page 16: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

2. When a standard does not meet the requirements needed by GSA, assist the industry and community by proactively becoming involved in fixing the standards, instead of developing self-generated, non-compliant GSA specific standards.

Page 17: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 02: Equipment Definitions

Page 18: PBS GSA National Equipment Standard Guide 2011-03-21

Section 2: Equipment Definitions 14

www.gsa.gov/bim

GSA National Equipment Standard

Section 2: Equipment Definitions This section describes the definitions that relate to equipment. GSA believes that there is a higher clarity of communication when using predefined terms and definitions. Some of these definitions, especially those that relate to equipment inventories, are new.

2.1. Assembly:

An assembly is the putting together of manufactured parts to make a completed product, such as a machine or electronic circuit. A set of parts so assembled. A group of machine parts, especially one forming a self-contained, independently mounted unit. Assemblies are only used to define equipment or building elements.

2.2. Attributes:

A property, quality, or feature belonging to or representative of a person or thing.

2.2.1. Equipment Object Attribute – An equipment object attribute is a property or feature that

defines a particular equipment object and is not related to its design characteristics or operation specifications. Example: Equipment type, equipment sequential number, etc...

2.2.2. Equipment Design Specification Attribute – An equipment design specification attribute is a property or feature of a component based on the design characteristics of particular equipment. Example: Designed for 150% maximum load for 30 minutes at 50 amps, maximum pump head 250 feet, 60HZ, 480 Volts, etc…

2.2.3. Equipment Instance Specification Attribute – An equipment instance specification attribute is a property or feature of a component based on specifications important to that instance of that component. Example: Equipment serial number, equipment model, equipment installation date, etc…

2.3. Element:

An Element is a major component, assembly, or "construction entity part which, in itself or in combination with other parts, fulfills a predominate function of the construction entity" (ISO 12006-2). Predominating functions include, but are not limited to, supporting, enclosing,

Page 19: PBS GSA National Equipment Standard Guide 2011-03-21

Section 2: Equipment Definitions 15

www.gsa.gov/bim

GSA National Equipment Standard

servicing, and equipping a facility. Functional descriptions can also include a process or an activity.

2.4. Equipment Identification:

A short abbreviation of a human understandable word or description defining what instance, category, or classification to which an equipment object belongs. For example: An air handling unit with a sequence number of 001 could be identified as AHU-001 or window 2341 could be identified as WDW-2341

2.5. Equipment Tag: An attached material used to physically mark or label a piece of equipment. For example: A stainless steel tag placed on an air handling unit with an equipment identification of AHU-001.

2.6. Equipment Inventory Types:

Equipment inventories are categorized into five major types. Within a facility there are often varying inventories of different types based on the practice of design discipline or the requirements of the facility owner related to the equipment. For example: A facility could have a mechanical preventive maintenance inventory, lighting non-preventive maintenance inventory, a component level fire safety inventory, and a partial inventory of doors. The five types of inventories are defined as follows:

2.6.1. Partial Inventory – a facility equipment list that is not tied directly to any specific

standard, maintenance schedule, or controlled process. Some common problems related to partial inventories are: Discrepancies between equipment listed and equipment actually installed, and inaccuracies in equipment counts, potentially omitting important pieces of information, such as equipment attributes or physical locations.

2.6.2. Maintenance Inventory – an inventory of all the equipment within a facility that requires maintenance. Types of maintenance would be preventive maintenance (PM), predictive maintenance, etc. Non-maintenance equipment is not included in this inventory.

2.6.3. Non-Maintenance Inventory – an inventory of all the equipment that conveys with the

facility during transfer of ownership or is tracked, serviced, repaired, or maintained by the organization that does not require maintenance. Preventive or predictive maintenance equipment is not included in this inventory.

Page 20: PBS GSA National Equipment Standard Guide 2011-03-21

Section 2: Equipment Definitions 16

www.gsa.gov/bim

GSA National Equipment Standard

2.6.4. Component-Level Inventory – an inventory that includes PM and Non-PM equipment down to the component, or product, level. A component-level inventory normally consists of equipment that conveys with the facility during transfer of ownership or is tracked, serviced, repaired, or maintained by the organization. Component-level inventories are as in-depth as possible for an existing building without actually performing destructive testing to determine what is behind the walls or underground. This type of inventory does not normally include disposable inventories such as supplies. For example: A component-level inventory would contain lighting fixtures but not contain light bulbs, electrical outlets, or mounting hardware.

2.6.5. Complete (Master) Inventory – an inventory that includes all equipment within the building envelope and site boundaries. Complete inventories capture the equipment that a component-level inventory is not able to capture without performing destructive testing: equipment behind walls or in inaccessible and hard to reach areas. Complete inventories are normally obtainable only after new construction. Complete inventories are found in organizations like nuclear power plants, oil rigs, manufacturing companies, and ships, and reflect the understanding within these organizations that equipment inventories are important to the success of overall operations. The complete inventory corresponds to the Bill of Materials for all products purchased in the construction of a facility.

2.7. System: A system is a group of interacting, interrelated, or interdependent elements, equipment, or assemblies, forming a complex whole in order to fulfill a function.

2.8. Subsystem: A sub system is a secondary or subordinate part of a system.

2.9. Equipment System Relationship:

An equipment system relationship is the direct relationship that a piece of equipment has to its system.

Page 21: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 03 Industry Codes and Standard

Page 22: PBS GSA National Equipment Standard Guide 2011-03-21

Section 3: Industry Codes and Standards 18

www.gsa.gov/bim

GSA National Equipment Standard

Section 3: Industry Codes and Standards

This section delineates the concepts and codes to be used for the basis of equipment data. The digital coding of equipment, not to be confused with identification or tagging, is the code used in a database or in software programs to ensure that the equipment types and classifications are consistent throughout the different processes. The proper use of a single consistent code throughout different processes is critical in ensuring the interoperability of the data across platforms, regions, and buildings.

Code Product

23-27 31 00 Valves

23-27 31 11 Backflow Preventors

23-27 31 13 Balancing Valves

23-27 31 13 11 Gate Balancing Valves

3.1. Industry Codes

GSA is committed to the use of open, vendor-neutral, object based oriented industry codes to

minimize the loss of data that is prevalent in self-generated systems of coding.

3.1.1. OmniClass

OmniClass is the coding standard for use by GSA. This standard is an open object based

industry standard used in the construction of facilities. This industry code is the designated

backbone code for Building Information Modeling and Construction Operation Building

Information Exchange (COBie) per the National Institute of Building Sciences (NIBS), Federal

Facility Council (FFC), and buildingSMARTalliance. OmniClass, maintained by the Construction

Specification Institute, a nonprofit organization affiliated with NIBS, is involved in the

Page 23: PBS GSA National Equipment Standard Guide 2011-03-21

Section 3: Industry Codes and Standards 19

www.gsa.gov/bim

GSA National Equipment Standard

International Framework for Dictionaries (IFD) and Industry Foundation Classes (IFC)

standards.

“The OmniClass Construction Classification System (known as OmniClass™ or OCCS) is a classification system for the construction industry. OmniClass is useful for many applications, from organizing library materials, product literature, and project information, to providing a classification structure for electronic databases. It incorporates other extant systems currently in use as the basis of many of its Tables – MasterFormat™ for work results, UniFormat for elements, and EPIC (Electronic Product Information Cooperation) for structuring products.” OmniClass, Construction Specification Institute, http://www.omniclass.org/ “NBIMS V1-P1 includes three candidate reference standards as Appendix documents: IAI Industry Foundation Classes (IFC or ifc), Construction Specifications Institute (CSI) OmniClass™, and CSI IFD Library™,” National Building Information Modeling Exchange Standard, Whole Building Design Guide, National Institute of Building Sciences. www.wbdg.org/pdfs/NBIMSv1_p1.pdf

3.1.1.1. OmniClass Table 23 Products.

OmniClass Table 23 Products shall be used to digitally code and classify GSA equipment types to ensure interoperability between software systems and packages. In the figure 3.2.2, the code is the numerical value embedded within the table. For example: 23-27 21 11 is the digital code for the classified equipment named axial flow compressors.

Page 24: PBS GSA National Equipment Standard Guide 2011-03-21

Section 3: Industry Codes and Standards 20

www.gsa.gov/bim

GSA National Equipment Standard

Figure 3.2.2

3.1.1.2. OmniClass Table 21 Elements.

OmniClass Table 21 Elements shall be used to digitally code and classify GSA equipment

systems to ensure interoperability between software systems and packages. In figure

3.2.3, the code is the numerical value embedded within the table. For example: 21-51

31 11 17 is the digital code for the equipment system named Domestic Water

Distribution.

Page 25: PBS GSA National Equipment Standard Guide 2011-03-21

Section 3: Industry Codes and Standards 21

www.gsa.gov/bim

GSA National Equipment Standard

Figure 3.2.3

3.1.2. National CAD Standard (NCS) and ASME abbreviations.

NCS and ASME standard abbreviations shall be used for the identification of equipment acronyms within the database per the equipment identification and tagging section of this guidance. Construction Specification Institute maintains a reference object based cross to acronym database (ROBCAD) based on NCS and ASME standards.

3.1.3. Specifiers' Properties Information Exchange (SPIE)

SPIE is an emerging industry standard sponsored by the buildingSMARTalliance, National Institute of Building Sciences, Whole Building Design Guide, http://www.wbdg.org/references/pg_spt.php. This code is used to define the specifications or “equipment design attributes” of a product. GSA intention is to ensure all design specifications are captured during equipment data collection using this format.

Page 26: PBS GSA National Equipment Standard Guide 2011-03-21

Section 3: Industry Codes and Standards 22

www.gsa.gov/bim

GSA National Equipment Standard

3.2. Equipment Type Nomenclature Convention

Naming conventions are the descriptive name used to provide the easily identified human interfaces needed to operate, repair, and maintain equipment. It is important to maintain a consistent nomenclature between different organizations and processes. Consistent names provide for ease of use for human interaction with the data in a database. A code 23-75 10 37 11 is meaningless to a user unless cross-referenced to a description of what the code is related to. In order for GSA to have the capability to effectively data mine the information in a database, a standard equipment naming convention is required. 3.2.1. Industry Standard Nomenclature:

GSA equipment type description shall be per the OmniClass Table 23 Products table. Example: 23-27 31 15 is the digital code for the equipment type ball valve. Therefore, the equipment type description used for GSA shall be “Ball Valve.” Using this standard nomenclature allows the data in the equipment database to easily be parsed by personnel and the agency. A search for all ball valves and their sizes could be easily performed on this database.

3.2.2. Equipment Operation Description.

Equipment Operation Descriptions are additional texted based nomenclature that, when added to the industry standard equipment type nomenclature, provides added value to the operation of a facility. The equipment type “Ball Valve” for a piece of equipment in a database side is important, but a single facility can contain thousands of ball valves. The addition of a free text format addition to the equipment type and designated as equipment operation description provides a viable “long description” to the industry standards. For example:

Page 27: PBS GSA National Equipment Standard Guide 2011-03-21

Section 3: Industry Codes and Standards 23

www.gsa.gov/bim

GSA National Equipment Standard

Equipment Type Equipment Operation Description

Ball Valve Main Isolation to Fuel Oil Tank #2

The resulting naming convention becomes: Ball Valve Main Isolation to Fuel Oil Tank #2.

Page 28: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 04 Equipment Data Fields

Page 29: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 25

www.gsa.gov/bim

GSA National Equipment Standard

Section 4: Equipment Data Fields

This section describes and defines the equipment data fields, minimum information, responsibility, and requirements. The term contractor within the scope of these data fields refers to anyone who is under contract to perform said duties, such as the A/E Construction Manager, Commissioning Agent, etc… GSA/Contractor denotes areas in which the data might have to be assigned/developed by GSA, but the contractor is always responsible for the data input based on contract requirements. The equipment data fields are the minimum defined data points needed by GSA for the proper identification of equipment. It is recognized that there are numerous other data points that are needed by facility management for the proper operation of their facilities (for example: square footage of spaces, etc...), but this guide is specifically written for equipment only. Also note that some of the data points are important for other software programs and systems (for example: building number). Whenever possible, data points from multiple systems should be unified under a single standard to reduce integration errors in systems. Section 4 is broken up into the following seven parts for each piece of data: Implementation: How to implement the data in the fields and related examples. Data Capture Requirement: Denotes whether the data is a minimum requirement or if it is a

recommended data point. Data Format Requirement: Standards or format requirements for the data. Database Name: The required database name for the specified data field. Data Instance: Denotes whether the data is expected to be a singular occurrence of

that data point or a many occurrence. Responsibility: Recommended organization responsible for gathering the data.

Page 30: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 26

www.gsa.gov/bim

GSA National Equipment Standard

4.1. Complex Data Fields

The complex data field is the minimum data related to a complex needed to cross reference equipment. A complex is synonymous with the terms site, base, or campus. The term complex was selected due to usage of the term in property management.

4.1.1. Complex Primary Key

The complex primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. The use of a GUID allows all of the data for the complex to be pinned to the GUID as unique database identification. The data for the complex can then be linked to other data using this GUID. Hence, complex data only has to be captured in one location but then can be used in multiple areas throughout the program. Implementation:

Verify with GSA that a GUID does not already exist for the complex. Otherwise, the GUID can be self-developed by the software package or by using a GUID generator. GUID must be approved by GSA.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: COBie

Database Name Facility.ExtFacilityIdentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

Page 31: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 27

www.gsa.gov/bim

GSA National Equipment Standard

4.1.2. Complex Plot

The complex plot was defined to identify the site boundaries or plot for the complex. This plot boundary is very important to facility management to assist in understanding where responsibilities of utilities and equipment start and stop. Example: underground sewage line, facility is responsible until the line crosses the site boundary. The sewage line then becomes the utilities’ responsibility. How to represent this information in a data format has not been determined by GSA at this time. Implementation:

Not used/developed at this time.

Data Capture Requirement New Construction:

Existing Building:

Data Format Requirement No Standard

Database Name

Data Instance

Data Storage

Responsibility

4.1.3. Complex Number

The complex number is the GSA self-generated assigned complex/site number that uniquely identifies the complex in GSA’s portfolio. Example: MD0000WO White Oak Campus. Implementation:

Page 32: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 28

www.gsa.gov/bim

GSA National Equipment Standard

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Alpha-Numeric: Per GSA portfolio standard numbering format: COBie

Database Name Facility.SiteName

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.1.4. Complex Name

The complex name is the GSA/Organization assigned name for the complex or site per portfolio management. Example: Denver Federal Center or White Oak Campus.

Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per GSA portfolio designated name

Database Name Facility.SiteLongName

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.1.5. Complex Address

Page 33: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 29

www.gsa.gov/bim

GSA National Equipment Standard

The complex address is the physical designated postal address for the complex. The complex address consists of the postal number and the street designation. The post box is also to be included in the address. Example: 301 SW 7th Street, P.O. Box 1234 Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per GSA portfolio standard

Database Name Facility.SiteAddress.AddressLine

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.1.6. Complex City

The complex city is the city name that the complex is associated with per the postal codes. When a complex spans more than one city, a main city designated by the agency will be determined. Each building within the complex will still be associated with the city in which it is physically located to ensure they comply with local regulations.

Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per GSA portfolio standard

Database Name Facility.SiteTown

Data Instance One

Page 34: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 30

www.gsa.gov/bim

GSA National Equipment Standard

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.1.7. Complex State

The complex state, for the United States, will use the 2 letter postal state designation. When a complex spans more than one state, a main state designated by the agency will be determined. Buildings within the complex will still be associated with the state in which they are physically located to ensure they comply with local regulations.

Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: 2 capitalized letter designation per United States Postal Standards

Database Name Facility.SiteRegion

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.1.8. Complex Zip

The complex zip is the postal zip code designated for the complex as its main mailing address. When a complex spans multiple zip codes, a main zip code for mailing will be designated for the complex. Buildings within the complex will still be associated with the zip code in which they are physically located.

Page 35: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 31

www.gsa.gov/bim

GSA National Equipment Standard

Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Numeric: Per United States Postal Service

Database Name Facility.SitePostalCode

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

Page 36: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 32

www.gsa.gov/bim

GSA National Equipment Standard

4.2. Facility Data Fields

The facility data field is the minimum data related to the facility needed to cross reference equipment. Facility is synonymous with the terms structure, garage, park, and building. The term facility was selected due to usage of the term in facility management. 4.2.1. Facility Primary Key

The facility primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. The use of a GUID, allows all of the data for the facility to be pinned to the GUID as unique database identification. The data for the facility can then be linked to other data using this GUID. Hence, the data only has to be captured in one location but then can be used in multiple areas throughout the program. Implementation:

Verify with GSA that a GUID does not already exist for the facility. Otherwise, the GUID can be self developed by the software package or by using a GUID generator. GUID must be approved by GSA.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: COBie

Database Name Facility.ExtFacilityIdentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

Page 37: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 33

www.gsa.gov/bim

GSA National Equipment Standard

4.2.2. Facility Owner

The facility owner is a text designation of the organization or agency who owns the facility: GSA, FDA, FAA, DOD, NAVFAC, etc... Example: MD0765 FRC White Oak Life Science Lab is owned by GSA; therefore, GSA would be designated as the owner, even though FDA is the sole tenant agency. Implementation:

Assigned by GSA. The abbreviations and acronyms must be in accordance with approved U.S. government requirements.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per United States standard names and acronyms

Database Name Facility.Owner

Data Instance Many

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.2.3. Facility Designation

The facility designation field is used to denote the disposition of the facility within the organizations’ portfolio. For GSA at this time, the field is used to designate whether the facility is own, leased, or delegated. Implementation:

Facility designation is determined by GSA. The approved designations for GSA are as follows:

Leased

Page 38: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 34

www.gsa.gov/bim

GSA National Equipment Standard

Leased Delegated Owned Owned Delegated

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per 4.2.3 designations

Database Name Facility.Designation

Data Instance One

Data Storage GSA Database

Responsibility New Construction: GSA

Existing Complex: GSA/Contractor

4.2.4. Facility Location Organization Code

The facility location organization code captures the code used to designate the geographical location system used by the organization for the facility. For example: GSA has 11 regions and each building belongs to a specific region. The region number is the location organization code. Implementation:

Enter the region number for the building. GSA has 11 regions, region numbers must be entered with a preceding zero for regional numbers less than 10. GSA Regions: 01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Numeric: Per GSA Region designated numeric value

Database Name Facility.LocationOrgCode

Page 39: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 35

www.gsa.gov/bim

GSA National Equipment Standard

Data Instance One

Data Storage GSA Database

Responsibility New Construction: GSA

Existing Complex: GSA/Contractor

4.2.5. Facility Number

The facility number is the GSA self generated assigned facility number that uniquely identify the facility in GSA’s portfolio. Example: DC0459AF is the facility number for the Reagan Building FOB. There are instances in which tenant agencies assign a number to a GSA facility. Tenant agency numbers are not approved for tracking purposes and should not be used. Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Alpha-Numeric: Per GSA portfolio standard numbering format: COBie

Database Name Facility.Name

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.2.6. Facility Name

The facility name is the name of the building as designated per PBS GSA. Example: Reagan Building FOB. There are instances in which a tenant agency assigns a different name or

Page 40: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 36

www.gsa.gov/bim

GSA National Equipment Standard

number to a GSA facility for their own use. Only the GSA approved portfolio designated name should be used. Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per GSA portfolio designated name

Database Name Facility.LongName1

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.2.7. Organization Facility Name

The organization facility name is the data field used to capture any other name for the facility besides the approved GSA portfolio name. Example: GSA Building MD0821 FRC WHITE OAK CDER OFFICE 2 was designated “Building 51” by tenant agency. Therefore, Building 51 would be entered into this data field. This will allow GSA to streamline cross reference terms and data elements with tenants. Implementation:

Assigned by GSA/Tenant

Data Capture Requirement New Construction: Recommended

Existing Building: Required

Data Format Requirement Text

Database Name Facility.LongName2

Data Instance One

Page 41: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 37

www.gsa.gov/bim

GSA National Equipment Standard

Data Storage GSA Database

Responsibility New Construction: GSA

Existing Complex: GSA/Contractor

4.2.8. Facility Address

The facility address is the physical designated postal address for the building. The facility address consists of the postal number and the street designation. The post box is also to be included in the address. Example: 301 SW 7th Street, P.O. Box 1234 Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per GSA portfolio standards

Database Name Facility.AddressLine

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.2.9. Facility City

The facility city is the city name that the facility is associated with per the postal codes. Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Page 42: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 38

www.gsa.gov/bim

GSA National Equipment Standard

Existing Building: Required

Data Format Requirement Text: Per GSA portfolio standards

Database Name Facility.Town

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.2.10. Facility State

The facility state, for the United States, will use the 2 letter postal state designation. Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: 2 capitalized letter designation per United States Postal Standards

Database Name Facility.State

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

4.2.11. Facility Zip

The facility zip is the postal zip code designated for the facility as its main mailing address. When a complex spans multiple zip codes, an official zip code for mailing will be designated for the building.

Page 43: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 39

www.gsa.gov/bim

GSA National Equipment Standard

Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Numeric: Per United States Postal Service

Database Name Facility.PostalCode

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.2.12. Facility Country

The facility country data field is the field designed to capture the country code for the physical location of the facility. Implementation:

Assigned by GSA

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per GSA portfolio standard

Database Name Facility.Country

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.2.13. Facility Priority

Page 44: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 40

www.gsa.gov/bim

GSA National Equipment Standard

Facility priority field is used to classify the priority of the facility based on its function. The inability to differentiate between the worth of facilities in a portfolio causes ineffective utilization of resources when responding to work in a multiple facility/complex environment. Personnel are sent to the wrong facility to perform work that has a low impact to the organization versus having to reroute those resources to a high priority facility. A mobile repair team/technician when given two work orders of the same order for different facilities needs to know which facility to respond to first. This can create a significant impact on customer service and a drain on funds and resources. GSA has not developed or utilized a facility priority system. This field is for future use. Implementation:

Not used/developed at this time.

Data Capture Requirement New Construction:

Existing Building:

Data Format Requirement No Standard

Database Name Facility.Priority

Data Instance

Data Storage

Responsibility

4.3. Tenant Data Fields

4.3.1. Tenant Primary Key (N)

The tenant primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software

Page 45: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 41

www.gsa.gov/bim

GSA National Equipment Standard

application usage only and is not meant to be a user readable/understandable code. (N) Denotes that there can be multiple tenants within a facility and therefore multiple tenant primary keys. The use of a GUID, allows all of the data for the tenant to be pinned to the GUID as unique database identification. The data for the tenant can then be linked to other data using this GUID. Hence, the data only has to be captured in one location but then can be used in multiple areas throughout the program. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Recommended

Existing Building: Required

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Tenant.Identifier

Data Instance Many

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.3.2. Tenant Name

The tenant name field is used to capture the official full name of the organization, agency, or company of the tenant. Example: Department of Energy Implementation:

Assigned by GSA, the tenant name should only be the full descriptive legal name of the tenant. Abbreviations or acronyms should not be used to reduce confusion.

Data Capture Requirement New Construction: Recommended

Page 46: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 42

www.gsa.gov/bim

GSA National Equipment Standard

Existing Building: Required

Data Format Requirement Text: Per company or government approved full official name.

Database Name Tenant.Name

Data Instance One: Per Tenant.Identifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.3.3. Tenant Organization Name

The tenant organization name field is used to capture the tenant sub organizational name. For example: Nuclear Regulatory Commission, which is part of the Department of Energy. Implementation:

Assigned by GSA, the tenant organization name should only be the full descriptive legal name of the tenant. Abbreviations or acronyms should not be used to reduce confusion. If there is no tenant organization name, leave this field blank.

Data Capture Requirement New Construction: Recommended

Existing Building: Required

Data Format Requirement Text: Per company or government approved full official name.

Database Name Tenant.OrgName

Data Instance One: Per Tenant.Identifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.3.4. Tenant Department Name

Page 47: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 43

www.gsa.gov/bim

GSA National Equipment Standard

The tenant department name is used to capture the department name of the tenant agency. For example: Energy Branch. Implementation:

Assigned by GSA, the tenant department name should only be the full descriptive legal name of the tenant. Abbreviations or acronyms should not be used to reduce confusion. If there is no tenant department name, leave this field blank.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Per company or government approved full official name.

Database Name Tenant.DeptName

Data Instance One: Per Tenant.Identifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.3.5. Tenant Code

The tenant code field is used to capture designated codes related to the tenant. GSA codes tenants differently depending on which database is used. This field allows a cross referencing field to capture the different codes relating directly with this tenant. Example: A0181974 GSA budget line code for FEMP DOE in GSA financial software (code string made up for example purpose only). Implementation:

Assigned by GSA, the tenant agency code per GSA standards should be entered in this field.

Data Capture Requirement New Construction: Recommended

Page 48: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 44

www.gsa.gov/bim

GSA National Equipment Standard

Existing Building: Recommended

Data Format Requirement Text: Per GSA budget office standards

Database Name Tenant.Code

Data Instance One: Per Tenant.Identifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.4. Zone Data Fields

Within a facility there are two designated types of zone data; facility zones and equipment zones. Facility zones are design or construction features that are specific to the building. A facility might be designed with different wings, sections, slices, rings, etc... These types of designations make up facility zones. Equipment zones are designated mechanical, electrical, plumbing (MEP), or equipment areas within a facility that serve a specific purpose based on building design. An equipment zone would be the heating zones, cooling zones, etc. that are based off of the orientation and design of the facility.

4.4.1. Facility Zone Primary Key (N)

The facility zone primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. (N) Denotes that there can be multiple facility zones within a facility and therefore multiple primary keys. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Page 49: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 45

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Facility.ZoneIdentifier

Data Instance One

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.4.2. Facility Zone Description (N)

The facility zone description data field is used to capture the name of the facility zone related to the primary key. Example: Facility Zone Primary Key ABCD1234… = Wing 2F Implementation:

The facility zone descriptions are typically assigned by A/E based on design of the facility. Example: Facility Zone Primary Key Facility Zone Description AbT67Yge…. East Wing 89Gv21lP4…. Sector A Abbreviations and acronyms should be avoided and full text descriptions should be used. Do not abbreviate East, West, North, South, and Southwest…

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name Facility.ZoneName

Data Instance One: Per Facility.ZoneIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Page 50: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 46

www.gsa.gov/bim

GSA National Equipment Standard

Existing Complex: GSA/Contractor

4.4.3. Equipment Zone Primary Key (N)

The equipment zone primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. (N) Denotes that there can be multiple equipment zones within a facility and therefore multiple primary keys. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Compoment.ZoneIdentifier

Data Instance One

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.4.4. Equipment Zone Description (N)

The equipment zone description data field is used to capture the name of the zone related to the primary key. Example: Equipment Zone Primary Key AbCd1234…. = HVAC North Implementation:

The equipment zone descriptions are typically assigned by A/E based on operational design of the facility.

Page 51: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 47

www.gsa.gov/bim

GSA National Equipment Standard

Example: Equipment Zone Primary Key Equipment Zone Description Ghy7eha0….North Heating Zone 4A Mh49f37r….Zone B18 Plumbing Vent Stack K89fTyy7….Fire Zone 52-17 Abbreviations and acronyms should be avoided and full text descriptions should be used. Do not abbreviate East, West, North, South, and Southwest…

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name Comonent.ZoneName

Data Instance One: Per Compoment.ZoneIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.5. Space Data Fields

This section covers the minimum space/room/location data fields needed to designate where a piece of equipment is located within the facility. Note: Not all of the required data for spaces for facility management is developed in this section. Example sq-ft/m-sq is not captured but is extremely important for facility management. Only the minimum data for space that relates to equipment per this guide has been included. 4.5.1. Space Primary Key

Page 52: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 48

www.gsa.gov/bim

GSA National Equipment Standard

The space primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. The use of a GUID allows all of the data for the space to be pinned to the GUID as unique database identification. The data for the space can then be linked to other data using this GUID. Hence, the data only has to be captured in one location but then can be used in multiple areas throughout the program. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: COBie

Database Name Space.ExtFacilityIdentifier

Data Instance One

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.5.2. Floor Number

The floor number is the ANSI/BOMI designation for the floor that the space is located on. Example: 01. Implementation:

Enter the floor designation based on ANSI/BOMI standards.

Data Capture Requirement New Construction: Required

Existing Building: Required

Page 53: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 49

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement Alpha-Numeric: ANSI/BOMI Standards: COBie

Database Name Space.FloorName

Data Instance One: Per Space.ExtFacilityIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.5.3. Blueprint Room Number

The blueprint room number is the designated room/space identification per the architect/engineer that would be found on the blueprints or on the model. Implementation:

Enter the designated blueprint or model room number as designated by the A/E. In the case of existing buildings, if a room number based on blueprints cannot be determined, leave this data field blank. If the room is numbered, but not per blueprint, then enter the number in the organization room number.

Data Capture Requirement New Construction: Required

Existing Building: Required if available

Data Format Requirement Alpha-Numeric: National CAD Standards: COBie

Database Name Space.Name

Data Instance One: Per Space.ExtFacilityIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.5.4. Organization Room Number

The organization room number is the room/space identification number designated by the organization occupying the facility. These numbers are typically different than the

Page 54: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 50

www.gsa.gov/bim

GSA National Equipment Standard

blueprint room numbers or a variation of them. For example: Blueprint Room Number 1019 might be split up by an organization into 3 separate rooms: 1019A, 1019B, 1019C. Implementation:

Enter the organization’s room number designation. If the room does not have an organization room number, leave this data field blank. The blueprint room number should not be entered in this field.

Data Capture Requirement New Construction: Recommended

Existing Building: Required is available

Data Format Requirement Text: Per Tenant agency standards: COBie

Database Name Space.RoomTag

Data Instance One: Per Space.ExtFacilityIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.5.5. Space Description

The room description data field is the long name description of the room/space as designated by architect/engineer or tenant organization. Example: Theodore Roosevelt Room. Implementation:

Enter the descriptive name of the space. Acronyms and abbreviations should not be used to avoid confusion. Do not abbreviate East, West, South, and North.

Data Capture Requirement New Construction: Recommended

Existing Building: Required if available

Data Format Requirement Text: COBie

Page 55: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 51

www.gsa.gov/bim

GSA National Equipment Standard

Database Name Space.Description

Data Instance One: Per Space.ExtFacilityIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.5.6. Space Identification Composite

The space identification composite field is used by GSA to define the identification schema of the room/space for physical labels based on the organization/agency definition. GSA uses a composite of Space.Name + Space.RoomTag + Space.Description data fields. Example: 1019:1019A: Theodore Roosevelt Room. This field can be automatically generated to be filled when the other data fields are completed. Implementation:

Enter the information in this data field based on input from the following fields: Space.Name, Space.RoomTag, Space.Description using colons to separate the data. If there is no data for field, leave the field in the identification blank. Example: Space.Name:Space.RoomTag:Space.Description 1019:1019A:Conference Room 4010::Washington Room :2020:Office

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per NES 4.5.6:

Database Name Space.IdentificationDescription

Data Instance One: Per Space.ExtFacilityIdentifier

Data Storage GSA Database

Page 56: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 52

www.gsa.gov/bim

GSA National Equipment Standard

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.5.7. Space Priority

Space priority field is used to classify the priority of the room/space based on its function. The inability to differentiate between the importances of work based on location in a facility causes ineffective utilization of resources. A technician when given two work orders of the same type for different spaces needs to know which to respond to first. This can create a significant impact on customer service and a drain on funds and resources. Example: The atrium to a corporate headquarters that has high public traffic will most likely have a higher work priority than an atrium to a furniture warehouse that has no public traffic. Both spaces are atriums but one has a higher business impact. GSA has not developed or utilized a space priority system. This field is for future use. Implementation:

Not used/developed at this time.

Data Capture Requirement New Construction:

Existing Building:

Data Format Requirement No Standard

Database Name Space.Priority

Data Instance

Data Storage

Responsibility

Page 57: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 53

www.gsa.gov/bim

GSA National Equipment Standard

4.6. Equipment Data Fields

Equipment data fields represent the information that GSA believes is important to the operation of a facility. The developed points are considered a work in progress, and while extensive, it is understood that they are not all inclusive and future development is expected and welcome.

4.6.1. BIM Equipment Object Primary Key

The Building Information Model (BIM) equipment object primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. The BIM equipment object is the graphic representation of the equipment within a model. It is possible to have a single BIM equipment object with multiple pieces of associated equipment. Example: An air handler in a model is a single BIM equipment object, but associated with that BIM object is a damper, motor, cooling coils, fans, filters, etc. A door in the model is a single BIM equipment object, but associated with the door are the lockset, door closer, etc. Implementation:

The GUID can be self developed by the software package or by using a GUID generator. The BIM equipment object primary key is stored in the BIM model attached to its graphical object. In relation to the equipment database, that piece of equipment will have a BIM equipment object primary key. It is possible to have multiple pieces of equipment using the same BIM equipment object primary key and thus relating those pieces of equipment to the BIM object.

BIM:BIM equipment object primary key

Air Handler Unit-001 = AbCdEe12346…

Page 58: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 54

www.gsa.gov/bim

GSA National Equipment Standard

Equipment Database: Equipment Type Equipment primary key BIM equipment primary key Motor ACDF3256… AbCdEe12346… Damper DHYF3256… AbCdEe12346… Coil K123Dfg3… AbCdEe12346… Filter r3Tgh789Y… AbCdEe12346…

BIM:BIM equipment object primary key Door 263 = GgHhJj12346…

Equipment Database: Equipment Type Equipment primary key BIM equipment primary key Door Closer 3256ACDF … GgHhJj12346… Door Lockset 3256DHYF … GgHhJj12346… Door Micro Switch Dfg3 K123… GgHhJj12346…

Data Capture Requirement New Construction: Required

Existing Building: Recommended if available

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Component.ModelObjectIdentifier

Data Instance One

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.2. Equipment Primary Key

The equipment primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. Implementation:

Page 59: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 55

www.gsa.gov/bim

GSA National Equipment Standard

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: COBie

Database Name Component.ExtIdentifier

Data Instance One: Per Equipment Instance

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.3. OmniClass Table 23 Number

The OmniClass Table 23 Number is the digital code used to identify the type classification of a piece of equipment per the OmniClass standards. Example: 23-27 17 13 (Centrifugal Pump), 23-13 39 31 (Roof Membrane), 23-17 11 13 23 (Revolving Metal Door), 23-21 45 11 13 11 (Fine Art Sculpture), 23-25 63 13 13 45 (Computed Tomography CAT Radiotherapy Simulator)… Implementation:

The OmniClass number is a selected parameter by the person developing the equipment object in the model. For instances in which there is no model, the contractor shall determine and input the appropriate numbers. The latest version of table 23 shall be used. If a type of object is not found within the table, the responsible person/organization/contractor shall contact Construction Specification Institute and get a provisional number and nomenclature. Enter the number in the exact same format as within the specification. 23-XX YY ZZ …

Data Capture Requirement New Construction: Required

Existing Building: Required

Page 60: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 56

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement OmniClass Table 23. Numbers shall remain in CSI specified number format: 23-XX YY ZZ.

Database Name Component.Category: COBie

Data Instance One: Per Component.ExtIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.4. OmniClass Table 23 Description (Type)

The OmniClass Table 23 Description is the OmniClass designated nomenclature related to the selected OmniClass Table 23 Number. Example: (23-27 17 13) Centrifugal Pump, (23-13 39 31) Roof Membrane, (23-17 11 13 23) Revolving Metal Door, (23-21 45 11 13 11) Fine Art Sculpture, (23-25 63 13 13 45) Computed Tomography CAT Radiotherapy Simulator… Implementation:

The OmniClass description is the standard name of the equipment/product based on the selected OmniClass Table 23 Number. The description should be automatically generated when the number is selected within a model or it will have to be manually added by the designated personnel/contractor. Example: OmniClass Table 23 Number: Description: 23-27 17 13Centrifugal Pump 23-13 39 31Roof Membrane 23-17 11 13 23 Revolving Metal Door 23-21 45 11 13 11 Fine Art Sculpture 23-25 63 13 13 45 Computed Tomography CAT Radiotherapy Simulator In these instances, the description would be entered in the database. The nomenclature should be entered exactly as it appears in the table, no abbreviations or alterations should be made.

Page 61: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 57

www.gsa.gov/bim

GSA National Equipment Standard

If a type of equipment found does not exist in the table, the responsible party shall contact Construction Specification Institute for additions/clarifications.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement OmniClass Table 23: Exact nomenclature and format: COBie

Database Name Component.Type.Name

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.5. Equipment Operation Nomenclature

The equipment operation nomenclature field is used for additional text to further identify equipment within a facility by allowing the addition of a text description that describes the operational function of the component. Example: Fuel Oil Tank T-01 Isolation Ball Valve. In the example the “Ball Valve” is from the OmniClass Table 23 Description of the product and the Fuel Oil Tank T-01 Isolation is the equipment operation nomenclature. The importance of this data field is simple; for example, a facility could literally have hundreds of ball valves in the facility. The ability to include the function of the component in order to distinguish the purpose of all of the valves, “Fuel Oil Tank T-01 Isolation”, is vitally important to facility operation. Example: Mona Lisa Fine Arts Painting, Main Entrance Revolving Door… Implementation:

The equipment operation nomenclature is normally determined during design and construction of a facility. A valve, pump, or motor is placed in the facility to perform a specific function by the A/E and CM. This is the most opportune time to capture this information.

Page 62: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 58

www.gsa.gov/bim

GSA National Equipment Standard

The equipment operation nomenclature should describe its function and what component it is associated with, if necessary. Example: Note: equipment type in parenthesis ( ) does not need to be added, it is shown for clarification of example only.

Fuel Oil Tank T-01 Isolation (Ball Valve) Chill Water Supply AHU-01 (Ball Valve) Boiler BLR-01A Draft (Centrifugal Fan) Lighting Room 4130, 4132, 4015A, 4155 (Circuit Breaker EPB-001-CB-04) Mona Lisa (Fine Arts Painting FAPTG-01A) Main Entrance (Plastic Revolving Door DRRVLV-005) The following special characters are the only ones approved for use in this field:

Semi Colon ;

Colon :

Comma ,

Hyphen -

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Alphanumeric Text: Avoid abbreviations because they tend to lead to confusion; the only special characters allowed are semi colon (;), colon (:), comma (,), and hyphen. (-): COBie

Database Name Component.Type.Description

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.6. Equipment Acronym

Page 63: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 59

www.gsa.gov/bim

GSA National Equipment Standard

The equipment acronym field is used to capture the approved abbreviation/acronym for the equipment based off of National CAD Standards (NCS) and/or American Society of Mechanical Engineers (ASME). The purpose of the acronym is for use in equipment identification and is a short hand for the equipment type. Example: AHU-019A for air handler unit with a sequence number of 019A. The AHU designation is a common designation found on blueprints and is usually assigned during design and construction. Implementation:

NCS abbreviations take precedence over ASME. Construction Specification Institute (CSI) is developing an NCS/ASME abbreviation to OmniClass Table 23 Products cross reference. This cross reference should be used to determine the correct abbreviation/acronym to use. When an acronym does not exist, CSI, the National Institute of Building Science (NIBS), and GSA should be consulted. Only enter approved abbreviations per Construction Specification Institute cross reference (ROBCAD).

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: National CAD Standard, ASME, CSI-ROBCAD

Database Name Component.Acronym

Data Instance One: Per Component.ExtIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.7. Equipment Sequence

The equipment sequence is the sequential number assigned to the equipment based on the design and construction of a facility. Because there are multiple instances of the same type of equipment; for example, ball valves that exists within a facility - the need to

Page 64: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 60

www.gsa.gov/bim

GSA National Equipment Standard

sequentially number this equipment is required. Example: AHU-019A. The 019A indicates that the air handler unit is number 019A and that other air handlers exist within a facility. Implementation:

The equipment sequence number is based off the rules defined by NCS. The sequential number is normally assigned during design and construction and this is the best time to capture this information. For existing buildings, the number should be the same as the one listed on blueprints and other construction documentation. Ad hoc self-numbering should be avoided.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Alpha-Numeric: COBie

Database Name Component.AssetIdentifier

Data Instance One: Per Component.ExtIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.8. Equipment Identification Composite

The equipment identification composite field is used to define the identification schema of the equipment for physical labels based on the organization/agency definition. GSA uses a composite of Facility.Name + Component.Acronym + Component.AssetIdentifier data fields. Example: DC0000-AHU-019A. This field can be automatically generated to be filled when the other data fields are completed. Implementation:

GSA has two standards: Normal and Enhanced for equipment identification per section 5 of this guide. Ensure the proper standard is used per contract requirements.

Page 65: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 61

www.gsa.gov/bim

GSA National Equipment Standard

If this field is not automatically generated, manually enter the Facility.Name (Building Number) + Component.Acronym + Component.AssetIdentifier (Equipment Sequence Number) using hyphens to separate the data. Example: DC0000-AHU-019A CA0123-VLV-0145 TX8972-BLR-01C LA1122-DR-1912 VA1719-MRI-19

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Per NES 4.6.8 and Section 5.

Database Name Component.CompositeID

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.9. Previous Equipment Identification

The previous equipment identification data field is used to capture the identification of previous existing equipment. This information is used to cross reference existing data and history of component to new equipment. Example: A11-001-DC0000 which is the old self generation standard used by GSA would be entering in this field and thereby associates it with the new equipment identification DC0000-AHU-001. Implementation:

Page 66: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 62

www.gsa.gov/bim

GSA National Equipment Standard

Enter previous equipment identification if it is determined that the facility requires the capture of historical data. Life safety systems and equipment like elevators should always be cross referenced with the older previous equipment identification to allow for the recreation of maintenance because regulations require that all records be kept for these types of equipment.

Data Capture Requirement New Construction: Recommended - Renovations

Existing Building: Recommended

Data Format Requirement Text

Database Name Component.PreviousID

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.10. Previous Equipment Primary Key

The previous equipment primary key is used to capture the primary key of pre-existing equipment. This information is used to cross reference existing data and history of component to new equipment. Implementation:

If available, enter the previous equipment primary key codes from other software platforms.

Data Capture Requirement New Construction: Recommended - Renovations

Existing Building: Recommended

Data Format Requirement None

Database Name Component.Previous.ExtIdentifier

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Page 67: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 63

www.gsa.gov/bim

GSA National Equipment Standard

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.11. Equipment Organization Asset Number

The equipment organization asset number is an organization specific self generated asset number used to uniquely identify a piece of equipment for purchasing and financial. Example: GSA10001258967. This number is also useful when inventorying the equipment in a large existing facility using a large team. It allows personnel to independently capture equipment information in the field, attach a unique self-generated asset label, and then continue on without having conflicting equipment sequence numbers (no blueprints for reference). This data field can also be used to capture tenant equipment identifications for cross referencing. Implementation:

If available, enter the organization asset number.

Data Capture Requirement New Construction: N/A

Existing Building: N/A

Data Format Requirement None

Database Name Component.OrgExtIdentifier

Data Instance Many

Data Storage GSA Database

Responsibility New Construction: N/A

Existing Complex: GSA/Contractor

4.6.12. Equipment Power Supply

The equipment power supply data field is the link in the database that identifies the equipment that supplies power to the product being identified.

Page 68: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 64

www.gsa.gov/bim

GSA National Equipment Standard

Implementation:

It is recommended that the electrical distribution equipment be identified and inventoried prior to other MEP. This allows the development of the necessary electrical power supply information. Enter the equipment primary key (GUID) associated with the electrical distribution component that supplies power directly to the equipment. Example: Given:

DC000-MOT-019 o Motor for AHU-019

DC000-EPB-002-CB-018: o Circuit Breaker o Supplies power to DC0000-MOT-019 o Equipment Primary Key DfG2345Yg7….

The equipment primary key of the circuit breaker DfG2345Yg7…. would be entered into this field. Some computer systems can be configured to automatically allow this field to be populated; otherwise this field will have to be entered manually.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: Component.ExtIdentifier of related electrical component

Database Name Component.ElectricPower

Data Instance Many:

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.13. Equipment System Relationship

Page 69: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 65

www.gsa.gov/bim

GSA National Equipment Standard

The identification of the system that a piece of equipment is related to is very important to the operation of a facility. System performance and cost roll ups are typically performed to determine the overall health of the facility. Equipment systems are typically designated during design and construction. GSA uses OmniClass Table 21 (UniFormat) for system coding and nomenclature as selected defined by the architect/engineer. Example: 21-51 31 11 17 Domestic Water Distribution. Implementation:

Using OmniClass Table 21, select the lowest applicable level that represents the primary system that the equipment is associated with. Example:

Given: (Table 21) 21-51 51 00 Heating, Ventilating and Air Conditioning (HVAC)

21-51 51 16 Air Distribution 21-51 51 16 11 Ventilation

An HVAC Terminal Box would be associated with 21-51 51 16 11 Ventilation because, within the equipment database and Table 21, the link from ventilation to air distribution to HVAC is already established.

While it is possible for a piece of equipment to belong to multiple systems, the system that the equipment was designed to support should be the one selected. Example: 21-51 31 11 17 Domestic Water Distribution. The Domestic Water Distribution should be entered in this field. Enter the description exactly as it appears in the standard, do not use abbreviations. If the system does not exist in the OmniClass Table 21 standard, contact Construction Specification Institute for clarification and preliminary number.

Page 70: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 66

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement OmniClass Table21: Exact description as formatted: COBie

Database Name System.Name

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.14. Equipment System Category

The equipment system category is the OmniClass Table 21 Number for the system designated in the equipment system relationship field. Example: 21-51 31 11 17 (Domestic Water Distribution). Implementation:

Using OmniClass Table 21, select the lowest applicable level that represents the primary system with which the equipment is associated. Example:

Given: (Table 21) 21-51 51 00 Heating, Ventilating and Air Conditioning (HVAC)

21-51 51 16 Air Distribution 21-51 51 16 11 Ventilation

An HVAC Terminal Box would be associated with 21-51 51 16 11 Ventilation because, within the equipment database and Table 21, the link from ventilation to air distribution to HVAC is already established.

While it is possible for a piece of equipment to belong to multiple systems, the system that the equipment was designed to support should be the one selected. Example: 21-51 31 11 17 Domestic Water Distribution. The 21-51 31 11 17 should be entered in this field.

Page 71: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 67

www.gsa.gov/bim

GSA National Equipment Standard

Enter the number from standard exactly in the format as it appears. If the system does not exist in the OmniClass Table 21 standard, contact Construction Specification Institute for clarification and preliminary number.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement OmniClass Table 21: Table Number Format: COBie

Database Name System.Category

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.15. Equipment Assembly/Sub Assembly

The equipment assembly/sub assembly field is used to capture the relationship that a component/equipment has with another component. Another commonly used name for this relationship is a parent-child relationship. Example: An air handler unit typically contains a motor. The motor is said to have an assembly/sub assembly relationship with the air handling unit. Because there are multiple types of relationships within a facility, some addressed later in this guide, the equipment assembly/sub assembly data field is used to capture the design/installation relationship for the equipment. Industry standard practice is to relate a component with the equipment it is designed to support, based on the installed purpose for that component. Example: A tamper switch on a fire control valve is installed to monitor the position of the valve. Because the installed purpose of the tamper switch is to monitor the position of the valve, the assembly subassembly relationship for the tamper switch is the fire control valve. The tamper

Page 72: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 68

www.gsa.gov/bim

GSA National Equipment Standard

switch will also have a relationship with a fire control panel. The relationship between the switch and panel are covered under control, alarm, or indication relationships. Implementation:

Enter the assembly equipment primary key for the equipment being identified. Typically a piece of equipment belongs to one assembly (parent). But an assembly can have multiple pieces of equipment as sub assemblies (child). Because of this, the assembly (parent) equipment is used to establish this relationship and is what is entered into this data field. Example:

Given: Equipment: Equipment Primary Key: AHU-019C Gyh67Tk… COIL-019C (Cooling) Bbq789F… BV-019C-CWR K0lPmH6… BV-019C-CWS Ps34TfG… The cooling coil (COIL-019C) is a sub assembly of air handling unit 19C. The chill water supply valves (BV-019C-CWR/CWS) are sub assemblies of the cooling coil.

Page 73: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 69

www.gsa.gov/bim

GSA National Equipment Standard

In this example when identifying the equipment for this facility, the AHU has no assembly (parent). While the air handling unit is associated with the facility HVAC distribution system, that relationship is a system relationship, not an assembly/sub assembly relationship. Equipment: Equipment Assembly/Sub (Component.SubAssembly.ExtIdentifier) Air Handling Unit 091C None COIL-019C (Cooling) Gyh67Tk… BV-019C-CWR Bbq789F… BV-019C-CWS Bbq789F… In the example above, the relationship, one level up, between the coil and air handling unit is captured and the relationships, one level up, with the chill water valves and the cooling coil are captured. Enter the equipment primary key for the associated assembly.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: Component.ExtIdentifier of related component

Database Name Component.SubAssembly.ExtIdentifier

Data Instance One: Per Component.ExtIdentifier

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.16. Equipment Control Relationship

The equipment control relationship is the relationship that a component has with another piece of equipment based on a control function. For example: A level switch is installed to monitor the level of a tank and send a control signal to open a level control valve when the level in the tank gets low. The level switch has a control relationship with the level

Page 74: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 70

www.gsa.gov/bim

GSA National Equipment Standard

control valve. Note: The level switch, due to installed purpose, has an assembly subassembly relationship with the tank. It was installed to monitor or control the level in the tank. Control relationships are vitally important for impact analysis and risk assessments.

The level switch can have a direct relationship with another component, such as the level control valve or an indirect relationship with a level control module. The level control module would then control the level control valve. Implementation:

Enter the equipment primary key for the equipment being controlled. Equipment can have a many-to-many relationship in relation to control. A component can control multiple pieces of equipment (Control Module) or be controlled by multiple pieces of equipment (Alarm Module). Because of this possibility, only the control relationship is captured. Note: The inverse of the control relationship would be the controlled relationship. When multiple control relationships exist, a data field has to be populated for each instance. Example:

Page 75: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 71

www.gsa.gov/bim

GSA National Equipment Standard

Given: Level Switch SW-018 directly controls Control Valve BV-018

Equipment: Equipment Primary Key: SW-018 Gyh7wky0… BV-018 J7afw52r… In this example: Equipment: Equipment Control SW-018 J7afw52r… BV-018 None

Given: Level Switch SW-020 indirectly controls Control Valve BV-020 through LCAM-020.

Equipment: Equipment Primary Key:

Page 76: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 72

www.gsa.gov/bim

GSA National Equipment Standard

SW-020 6y99ky0… BV-020 KTafw52r… LCAM-20 ypY5an1o… In this example: Equipment: Equipment Control SW-020 ypY5an1o… BV-020 None LCAM-20 KTafw52r…

Given: Level Switch SW-020 indirectly controls Control Valve BV-020 and 018 through LCAM-020. (Not shown on drawing)

Equipment: Equipment Primary Key: SW-020 6y99ky0… BV-020 KTafw52r… BV-018 J7afw52r… LCAM-20 ypY5an1o… In this example: Equipment: Equipment Control SW-020 ypY5an1o… BV-020 None BV-018 None LCAM-20 KTafw52r… and J7afw52r…

In the examples above, the captured relationship is one level down between the switch and the valve or the switch and the control module etc… Enter the equipment primary key for the equipment being controlled.

Page 77: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 73

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: Component.ExtIdentifier of related component

Database Name Component.Control.ExtIdentifier

Data Instance Many

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.17. Equipment Alarm Relationship

The equipment control relationship is the relationship that a component has with another piece of equipment based on a control function. For example: A level switch is installed to monitor the level of a tank and send a control signal to open a level control valve when the level in the tank gets low. The level switch has a control relationship with the level control valve. Note: The level switch, due to its installed purpose, has an assembly subassembly relationship with the tank. It was installed to monitor or control the level in the tank. Control relationships are vitally important for impact analysis and risk assessments.

Page 78: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 74

www.gsa.gov/bim

GSA National Equipment Standard

The level switch can have a direct relationship with another component, such as the level control valve or an indirect relationship with a level control module. The level control module would then control the level control valve.

Implementation:

Enter the equipment primary key for the equipment being alarmed. Equipment can have a many-to-many relationship in relation to alarms. A component can send an alarm signal to multiple pieces of equipment (proactive) or alarm based on inputs from multiple pieces of equipment (reactive). Because of this possibility, only the proactive alarm relationship is captured. Note: The inverse of the proactive alarm relationship would be the reactive alarm relationship. When multiple proactive alarm relationships exist, a data field has to be populated for each instance. Example:

Page 79: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 75

www.gsa.gov/bim

GSA National Equipment Standard

Given: Level Switch SW-018 directly sends an alarm signal to BAS-001

Equipment: Equipment Primary Key: SW-018 Gyh7wky0… BAS-001 Lp099fV5… In this example: Equipment: Equipment Alarm SW-018 Lp099fV5… BAS-001 None

Given: Level Switch SW-020 indirectly sends an alarm to BAS-001 through LCAM-020.

Equipment: Equipment Primary Key:

Page 80: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 76

www.gsa.gov/bim

GSA National Equipment Standard

SW-020 6y99ky0… BAS-001 Lp099fV5… LCAM-20 ypY5an1o… In this example: Equipment: Equipment Alarm SW-020 ypY5an1o… BAS-001 None LCAM-20 Lp099fV5…

Given: Level Switch SW-020 indirectly sends an alarm to BAS-001 and fire control panel (FACP-MAIN) through LCAM-020.

Equipment: Equipment Primary Key: SW-020 6y99ky0… BAS-001 Lp099fV5… FACP-MAIN Sm87T4u… LCAM-20 ypY5an1o… In this example: Equipment: Equipment Alarm SW-020 ypY5an1o… BAS-001 None FACP-MAIN None LCAM-20 Lp099fV5… and Sm87T4u…

In the examples above, the captured relationship is one level down between the switch and the BAS or the switch and the control module, etc… Enter the equipment primary key for the equipment receiving the alarm signal.

Page 81: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 77

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: Component.ExtIdentifier of related component

Database Name Component.Alarm.ExtIdentifier

Data Instance Many

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.18. Equipment Indication Relationship

The equipment indication relationship is the relationship that a component has with another piece of equipment based on an indication function. For example: A level switch that is installed to monitor the level of a tank, sends a signal to open a level control valve, and sends a signal to the building monitoring system indicating level in the tank. The level switch has an indication relationship with the building monitoring system.

Implementation:

Enter the equipment primary key for the equipment receiving the indication signal.

Page 82: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 78

www.gsa.gov/bim

GSA National Equipment Standard

Equipment can have a many-to-many relationship in relation to indications. A component can send an indication signal to multiple pieces of equipment (proactive) or have multiple indications from multiple pieces of equipment (reactive) like a building monitoring system. Because of this possibility, only the proactive indication relationship is captured. Note: The inverse of the proactive indication relationship would be the reactive indication relationship. When multiple proactive indication relationships exist, a data field has to be populated for each instance. Example:

Given: Level Switch SW-018 directly sends an indication signal to BAS-001.

Equipment: Equipment Primary Key: SW-018 Gyh7wky0… BAS-001 Lp099fV5…

Page 83: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 79

www.gsa.gov/bim

GSA National Equipment Standard

In this example: Equipment: Equipment Indication SW-018 Lp099fV5… BAS-001 None

Given: Level Switch SW-020 indirectly sends an indication signal to BAS-001 through LCAM-020.

Equipment: Equipment Primary Key: SW-020 6y99ky0… BAS-001 Lp099fV5… LCAM-20 ypY5an1o… In this example: Equipment: Equipment Indication SW-020 ypY5an1o… BAS-001 None LCAM-20 Lp099fV5…

Given: Level Switch SW-020 indirectly sends an indication signal to BAS-001 and fire control panel (FACP-MAIN) through LCAM-020.

Equipment: Equipment Primary Key: SW-020 6y99ky0… BAS-001 Lp099fV5… FACP-MAIN Sm87T4u… LCAM-20 ypY5an1o… In this example: Equipment: Equipment Indication

Page 84: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 80

www.gsa.gov/bim

GSA National Equipment Standard

SW-020 ypY5an1o… BAS-001 None FACP-MAIN None LCAM-20 Lp099fV5… and Sm87T4u…

In the examples above, the captured relationship is one level down between the switch and the BAS or the switch and the control module, etc… Enter the equipment primary key for the equipment receiving the indication signal.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: Component.ExtIdentifier of related component

Database Name Component.Indication.ExtIdentifier

Data Instance Many

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.6.19. Equipment Failure Impact Relationship (N)

The equipment failure impact relationship is used to capture the physical impact of an equipment failure on other components. This relationship is very similar to the control relationship and can be the same information. This data field is used to capture the direct component-to-component relationship of a failure.

Page 85: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 81

www.gsa.gov/bim

GSA National Equipment Standard

Given that the level switch controls the control valve, failure of the level switch impacts the control valve; therefore, the information is similar to the control relationship data. Failure of the control valve, however, which has no control function, impacts the tank. This information is very important to facility in order to determine the impact of equipment failure on facility operations. Implementation:

Enter the equipment primary key for the equipment that is impacted by equipment failure. Equipment can have a many-to-many relationship in relation to what they impact. A component can impact multiple pieces of equipment or can be impacted by multiple pieces of equipment. Because of this possibility, only what a component impacts is captured. Note: The inverse of the impact relationship would be the impacted relationship. When multiple impact relationships exist, a data field has to be populated for each instance. Control, alarm, and indication relationships should not be replicated within the equipment impact data field. If control, alarm, and/or indication relationships have been previous captured in the database, the system will have already denoted the

Page 86: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 82

www.gsa.gov/bim

GSA National Equipment Standard

impact. Capture only the impact relationship not related to control, alarm, and/or indication. Electrical power is also assumed to impact equipment and is not to be included in the equipment impact. Example:

Given: Level control valve BV-018 supplies fuel oil to tank T-118, level switch SW-018 sends a control signal to BV-018 and alarm and indication signals to BAS-001.

Equipment: Equipment Primary Key: SW-018 Gyh7wky0… BV-018 J7afw52r… BAS-001 Lp099fV5… T-1180917Grwe…

Page 87: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 83

www.gsa.gov/bim

GSA National Equipment Standard

In this example: Equipment: Equipment Impact SW-018 None (Already captured) BV-018 0917Grwe… BAS-001 None T-118None

Enter the equipment primary key for the equipment impacted.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: Component.ExtIdentifier of related component

Database Name Component.Failure.ExtIdentifier

Data Instance Many

Data Storage BIM (Related Layer) and GSA Database

Responsibility New Construction: A/E, Contractor

4.6.20. Equipment Priority

Equipment prioritization is an important aspect in developing an asset management system. The proper identification of assets within a facility is only half of the equation when it comes to managing assets. When a piece of equipment is used for metrics or work processes the computer system has to know the different priorities of the equipment in order to be able to operate efficiently. When scheduling work for equipment, an equipment priority is used to schedule the work and denote to facility staff the importance of that equipment. Both the staff and the system need to know whether the equipment is for emergency use, mission critical use, or affects public safety, etc... The only way to accomplish this is to prioritize the equipment properly. For Example: A technician receives two similar work orders to fix two similar pieces of equipment at different locations. In this scenario, the only way in which the technician knows that one of the

Page 88: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 84

www.gsa.gov/bim

GSA National Equipment Standard

pieces of equipment is actually mission critical is if the equipment has been properly prioritized. Implementation:

GSA has not developed an equipment priority system. Until a GSA standard is completed, use the following table to identify equipment priorities. This allows the development of a place holder for the database and in doing so captures projects in progress. When GSA develops a standard for priorities, a cross reference will be developed to convert earlier usage and this guide will be updated. Enter the 3-letter code for the priority designation related to the equipment.

Equipment Priorities

Code Priorities Description ELS Emergency/Life Safety

Equipment Equipment whose purpose is for emergency or life safety. For Example: Emergency Generator that supports Life Safety Systems, or Emergency Lighting. Another example would be an elevator that is used for building evacuation that is powered off of emergency power.

FSE Fire Safety Equipment Equipment that supports fire safety and suppression

PHS Public Health and Safety Equipment

Equipment that is used to protect the health and safety of the public. For example: A biohazard containment door.

PSE Personnel Safety Equipment Equipment that is used directly for personnel safety. For example: Harness hooks on a roof used by maintenance personnel.

MCE Mission Critical Equipment Equipment that is essential to operate in order to support the mission of an agency. For example: Air conditioning unit that supplies a critical data center.

Page 89: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 85

www.gsa.gov/bim

GSA National Equipment Standard

SCE Security Equipment Equipment used for the physical security of a facility. For example: Cameras, key cards, etc.

ENE Environmental Safety Equipment

Equipment that is used to protect the environment. For example: a berm around a tank that prevents the release of the tank contents to the environment in the event of a tank failure.

BOE Building Operations Equipment Equipment that is essential to the operation of a building. For example: The normal power system that is required for the normal operation of a building.

ESE Essential Support Equipment Equipment that is deemed essential by GSA or an Agency to support building operation. For Example: An air dryer for a compressed air system. While the compressed air system would be coded Building Operations Equipment, the dryer for the compressor is not as essential. The system could operate without the dryer for a short period of time.

NEE Non Essential Equipment Any equipment that is not categorized as above. For Example: A water fountain.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement No Standard Text: Per NES 4.6.20

Database Name Component.Priority

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.21. Equipment COOP

The equipment COOP field is unique to government organizations. COOP stands for continuity of operations. Federal regulations requires that COOP related equipment be

Page 90: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 86

www.gsa.gov/bim

GSA National Equipment Standard

tracked and maintained. COOP equipment is a separate field than priorities because equipment can have an installed purpose or priority and also be COOP equipment. Example: A fire damper that is used to isolate a building during a chemical attack for COOP. The damper’s equipment priority is fire life safety due to its installed purpose but it is also related to COOP. Note: Historical fine arts like paintings and sculptures are required to be tracked per COOP regulations. Implementation:

Enter Yes or No based on whether equipment is COOP related.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Yes or No, Per NES 4.6.21

Database Name Component.COOP

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.22. Equipment Owner

The equipment owner field is used to capture the tenant name, company, organization, or agency who owns the installed equipment. It is very important for budgeting and strategic planning to determine who owns and is responsible for maintaining and tracking equipment within a facility. Implementation:

Enter the full legal name of the organization, company, or agency that owns the equipment. Abbreviations and acronyms should be avoided to prevent confusion.

Page 91: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 87

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Recommended

Existing Building: Required

Data Format Requirement Text: Company or organization legal name

Database Name Component.Owner

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.23. Equipment Curtailment

This data field is used by facility management to determine the equipment that can be safely secured based on differing curtailment levels. The most opportune time to determine the different levels at which equipment can be secured and still meet the function of the facility is during commissioning. Commissioning is also the best time to determine the facility operational baselines. Example: Some regions have 4 curtailment levels that allow them to efficiently shutdown predetermined equipment in a fast manner to meet electrical demands. This significantly helps them reduce peak loads and costs. Implementation:

GSA has not developed and defined a consistent curtailment level for each region. This field is for future use.

Data Capture Requirement New Construction:

Existing Building:

Data Format Requirement No Standard

Database Name Component.Curtailment

Data Instance

Data Storage

Page 92: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 88

www.gsa.gov/bim

GSA National Equipment Standard

Responsibility

4.6.24. Equipment Operation Level

This field is used to designate the equipment required for building operation plans. Building operation plans are used to determine when equipment is required to be running to maintain normal weekday, weekend, night, freeze protection, startup, and shutdown operations of a building. Implementation:

GSA has not developed a consistent building operations plan designation and definitions for database usage. This field is for future use.

Data Capture Requirement New Construction:

Existing Building:

Data Format Requirement No Standard

Database Name Component.OpsCode

Data Instance

Data Storage

Responsibility

4.6.25. Equipment Status

The equipment status is used to capture the normal position that the equipment is required to be in (open/closed/on/off) for normal building operations based on commissioning, design, or operations. It is vital to facility management to understand the normal position of the equipment in order to be able to determine deviations or changes in status. Example: Normally Open, Abandoned In Place, Normally Closed. Implementation:

Page 93: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 89

www.gsa.gov/bim

GSA National Equipment Standard

GSA has not developed an equipment status standard for database usage. This field is for future use.

Data Capture Requirement New Construction:

Existing Building:

Data Format Requirement No Standard

Database Name Component.Status

Data Instance

Data Storage

Responsibility

4.6.26. Equipment Failure Status

Equipment failure status is the field used to capture the failure position of equipment when a loss of power or motive force occurs. The failure status is based on the design, construction, and commissioning of the facility. Example: A pneumatic limit switch fails to the open position when it loses air pressure. Typical failure statuses are FO = Fail Open, FC = Fail Closed, FAS=Fail As-Is, etc… Implementation:

GSA has not developed an equipment failure status standard for database usage. This field is for future use.

Data Capture Requirement New Construction:

Existing Building:

Data Format Requirement No Standard

Database Name Component.FailureStatus

Data Instance

Data Storage

Page 94: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 90

www.gsa.gov/bim

GSA National Equipment Standard

Responsibility

4.6.27. Minimum Required Equipment Specifications

The following are minimum required specifications. These are specifications that are universal for all equipment and make up the core information about the component.

4.6.27.1. Equipment Manufacturer

This data field captures the product manufacturer name of the installed equipment. Implementation:

Enter the legal name of the product manufacturer.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Legal Manufacturers name: COBie

Database Name Type.Manufacturer

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.27.2. Equipment Manufactured Date

This field is used to capture the date that the equipment was manufactured. This field is very important to determine the applicability of the manufacturer’s warranty and the useful life of the equipment. Implementation:

Page 95: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 91

www.gsa.gov/bim

GSA National Equipment Standard

Enter the date that the equipment was manufactured. This information is usually stamped on the equipment or on its label plate. The format for entering the date is 2 digits for month, 2 digits for day, and 4 digits for year separated by a slash (MM/DD/YYYY). In the event that a manufactured date does not contain all of the information, leave the information blank. This is only acceptable if month or day information is missing. Year information is always required. Example: 08—2000 -31-2001

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Type.ManufacturerDate

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.27.3. Equipment Manufacturer Shelf Life

This field is used to capture the maximum shelf life of a manufactured item that still allows the warranty to be valid. The equation Equipment Manufacturer Date (minus) the Equipment Manufacturer Shelf Life will determine validity and ownership of warranties. Implementation:

Enter the maximum allowed shelf life based on the manufacturer recommendations. The maximum shelf life is typically given in months or years.

Page 96: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 92

www.gsa.gov/bim

GSA National Equipment Standard

The format for entering the data is 2 digits for month, 2 digits for day, and 4 digits for year separated by a slash (MM/DD/YYYY).

This information is determined by taking the manufactured date and adding the maximum allowed shelf life to get a shelf life date.

MM/DD/YYYY Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Type.ManufacturerShelfLife

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.27.4. Equipment Model Name

This data field is used to capture the product model name of the installed equipment. Implementation:

Enter the product model name.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: COBie

Database Name Type.ModelName

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Page 97: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 93

www.gsa.gov/bim

GSA National Equipment Standard

Existing Complex: GSA/Contractor

4.6.27.5. Equipment Model Number

This data field is used to capture the product model number of the installed equipment. Implementation:

Enter the product model number.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: COBie

Database Name Type.ModelNumber

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

4.6.27.6. Equipment Serial Number

This data field is used to capture the manufacturer’s serial number of the installed equipment. Implementation:

Enter the equipment serial number.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement None

Page 98: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 94

www.gsa.gov/bim

GSA National Equipment Standard

Requi

4.6.27.7. Equipment Installation Cost

The equipment installation cost is used to capture the actual cost of the piece of equipment at the time of installation. This data field does not capture the labor and other related installation costs of the equipment. The equipment installation cost is important for capital depreciation, taxes, strategic planning, etc... Implementation:

Enter the equipment serial number.

Required

4.6.28. Product Specific Required Specifications

Equipment Specifications (N) (Spie Defined)

Database Name Type.SerialNumber: COBie

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement None

Database Name Type.EquipmentInstallationCost

Data Instance One: Per Component.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

Page 99: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 95

www.gsa.gov/bim

GSA National Equipment Standard

Every product has unique specifications that are based on the type of equipment. For example, the product specific specifications for a pump are different than for a valve. Because there are literally thousands of different types of products, these fields are to be determined and filled out per the Specifiers' Properties information exchange (SPIE) in COBie2 format. This is the product specific specification, like Horse Power, GPM, CFM, Tons, etc., related to specific piece of equipment. Note: (N) denotes that the equipment could have multiple required SPIE specification data points. Implementation:

Determine product specifications data points based on the SPIE product pages listed on the Whole Building Design Guide, National Institute of Buildings Sciences (NIBS) related pages. The product guides are organized by type of equipment based on OmniClass Table 23.

Enter required data.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement OmniClass Table 49 and SPie NIBS WBDG

Database Name Type.Parameter (N)

Data Instance Many

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, GSA

Existing Complex: GSA/Contractor

Page 100: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 96

www.gsa.gov/bim

GSA National Equipment Standard

4.7. Job Task Data Fields

Job tasks are any prescribed work that is required to be performed on equipment that is required to be performed and tracked. Preventive maintenance is one of the most common job tasks associated with equipment. Other types of tasks that could also be captured are required inspections, historical prevention, environmental, fire safety, etc… tasks.

4.7.1. Job Task Primary Key

The job task primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. Having a unique GUID for a job task allows that task to be associated with multiple pieces of equipment. Example: Air handling unit preventive maintenance task (A11) could be associated with all of the air handling units in the facility. This reduces the replication of data (tasks) within the database. Implementation:

The GUID can be self-developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Job.ExtIdentifier: COBie

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.2. Job Task Type

Page 101: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 97

www.gsa.gov/bim

GSA National Equipment Standard

The job task type is used to capture the classification of the type of job task. Types break the job tasks into recognizable groups such as; preventive maintenance, environmental, historical preservation inspection, etc… Implementation:

Enter the type of job task that is being captured per the following classification: PM = Preventive Maintenance. GSA has not defined the different types of tasks with the exception of preventive maintenance.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement No Standard: PM only approved: COBie

Database Name Job.Category

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.3. Job Task Name

The job task name is used to capture the descriptive name of the job task. Example: Air Handling Unit Annual Preventive Maintenance. Implementation:

Enter the job task descriptive name. Names are required to be per manufacturers’ required titles or GSA-specified title for the type of job task. Example: GSA PM Guide Cards

Page 102: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 98

www.gsa.gov/bim

GSA National Equipment Standard

Example: GSA Guide Description A03 HUMIDIFICATION SYSTEMS A04 AIR COMPRESSOR A05 A/C COMFORT COOLING 10 TON AND UNDER In this example, job task A04 name would be Air Compressor.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: COBie

Database Name Job.Name

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.4. Job Task Status

The job task status field is used to capture the designated status of the job task on the assigned equipment. Example of job task statuses are: perform and deferred.

Implementation:

GSA does not have a standard for job status with the exception of industry standards or tasks that have to be “perform” or those that are “deferred” Enter the required status for the equipment either perform or deferred.

Data Capture Requirement New Construction: Recommended

Page 103: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 99

www.gsa.gov/bim

GSA National Equipment Standard

Existing Building: Recommended

Data Format Requirement No Standard: Deferred and Perform allowed

Database Name Job.Status

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.5. Job Task Status Related Cause

The job task status related-cause data field is used to denote the cause of the deviations from normal job status. Example: Deferred Due to Pending Renovation, Deferred Due to Insufficient Funds, and Deferred to Inaccessibility to Equipment, etc… Implementation:

Enter a descriptive text describing the cause of the deviation of the job task from its normal status.

Data Capture Requirement New Construction: Not Required

Existing Building: Recommended

Data Format Requirement No Standard: Text

Database Name Job.StatusDescription

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.6. Job Task Guide

This field is used to allow the parsing of job tasks based on the equipment they are associated with. The Task Guide Identification would be the GSA Predetermined Guide

Page 104: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 100

www.gsa.gov/bim

GSA National Equipment Standard

Card (A11) or NCAD Abbreviation (AHU) depending on whether GSA Guide Card Maintenance (A11) or Manufacturer maintenance/another job task like environmental (AHU) is performed on the equipment. Implementation:

Enter the guide identification based on GSA or manufacturer standards. Manufacturer standards would be the manual number or name used for the job task. Example: Guide ID Description A11 Air Handling Unit (GSA Guide Region 11) A11C Air Handling Unit (GSA Guide Region 3) HVAC-AHU Air Handling Unit (GSA Guide PBS Draft) HT134 Humidifier technical Manual (Honeywell – example not real) The A11, A11C, HVAC-AHU, HT134 would be entered into this field.

Data Capture Requirement New Construction: Recommended

Existing Building: Required

Data Format Requirement GSA Guide Card Standard

Database Name Job.Guide

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.7. Job Task Sequence Number

Job task sequence number used to delineate in a database the different reoccurrences of a job task in a database. The same job task can be repetitively used on similar equipment and requires a way to differentiate the usage. For example:

Page 105: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 101

www.gsa.gov/bim

GSA National Equipment Standard

Equipment ID Job Task ID DC1234-AHU-001 A11-001 DC1234-AHU-002 A11-002 In the example, A11 guide is used twice but is associated with different equipment. There are two instances of A11. Because some databases are setup using this type of design, it is important to capture the sequence number. The best database design is the ability to have all of the equipment associated with a specific guide link to that guide without having to use sequence numbers. Implementation:

The sequential number should be the same as the one listed on blueprints and other construction documentation.

Data Capture Requirement New Construction: Recommended

Existing Building: Required

Data Format Requirement Numeric: COBie

Database Name Job.TaskNumber

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.8. Job Task Identification Composite

Composite of PM Guide, PM Sequence Number, Building Number: DC1234-A11-001, DC1234-A11-002, etc. Implementation:

Page 106: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 102

www.gsa.gov/bim

GSA National Equipment Standard

If this field is not automatically generated, manually enter the Facility.Name (Building Number) + Job.Guide + Job.TaskNumber (Job Task Sequence Number) using hyphens to separate the data. Example: DC1234-A11-001 DC1234-V05-111 DC1234-HVAC-AHU-009

Data Capture Requirement New Construction: Recommended

Existing Building: Required

Data Format Requirement Text: Per NES 4.7.8

Database Name Job.CompositeID

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.9. Job Task Performer

This data field is used to designate the organization or agency that is required to perform/pay for the cost of the job task on the installed equipment. Example: GSA, FDA, FAA, DOD, USNAVY, etc... Designations per Government Standards. Implementation:

Enter the legal name or descriptor for the agency or organization responsible for performance of the job task. Example: An elevator in a DOE delegated building might be owned by GSA but the organization responsible for insuring the job task is performed might be DOE.

Data Capture Requirement New Construction: Recommended

Page 107: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 103

www.gsa.gov/bim

GSA National Equipment Standard

Existing Building: Required

Data Format Requirement Text: Designations per Government Standards

Database Name Job.ResponsiblePerformer

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.10. Job Task Frequency

Job task frequency is the frequency that the job task is required to be performed based on the job frequency units. Example: 2 years, 1 month, etc… Implementation:

Enter the numerical value of the job task frequency based on the job task frequency units. Do not enter a text value for the number.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Numeric Value: COBie

Database Name Job.Frequency

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.11. Job Task Frequency Units

The job task frequency unit is the unit of measurement that the job task frequency is based on. Example: Day, Month, Year.

Page 108: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 104

www.gsa.gov/bim

GSA National Equipment Standard

Implementation: Enter the job task frequency unit related to the job task frequency for the task. Use proper standard time units.

Data Capture Requirement New Construction: Required

Existing Building: Required

Data Format Requirement Text: Unit of time: COBie

Database Name Job.FrequencyUnit

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.12. Job Task Inspection Percentage

The job task inspection frequency designates, based on a percentage of the times a job task is performed, a third party inspection to ensure the correct performance of job task is required. The normal default for this data field is 10%. Example: 10% of all air handling unit job tasks is required to be inspected. Implementation:

Enter the percentage for inspection of the job task that is required. GSA does not have a standard for inspection percentages and the current default is 10%. Job tasks that are critical or infrequent should be set at a higher percentage. Example: For a condenser tube cleaning preventive maintenance job task, the facility might want to perform inspections on the completion of this task 100% of the times this task is performed (always). The percentage is to be entered in a 2-dgit number, 3-digit for 100 only, with no decimals or % symbol. Example: 25, 50, 10, 100.

Page 109: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 105

www.gsa.gov/bim

GSA National Equipment Standard

Inspection percentages are defined by GSA.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Numeric: 2-3 Digit Percentage

Database Name Job.InspectionPercent

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: GSA/Contractor

Existing Complex: GSA/Contractor

4.7.13. Job Task Season

The job task season is used to define the weather season in which job task is to be performed: Summer, fall, winter, spring… Example: Chiller maintenance job task would be performed in cold weather seasons to ensure it is operational within the summer season. Implementation:

Enter the season(s) in which the job task is recommended to be performed. When the job task can be performed in multiple seasons, then separate the seasons by a hyphen. When a job task is not dependent upon a season, then enter not applicable in this field. Example: Winter Fall-Winter Summer-Fall-Winter Not Applicable

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Season proper name, no abbreviations: COBie

Page 110: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 106

www.gsa.gov/bim

GSA National Equipment Standard

Database Name Job.TaskSeason

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: GSA/Contractor

Existing Complex: GSA/Contractor

4.7.14. Job Task Start Date

The job task start date is the date in which the first instance of the job task should be started. Implementation:

Enter the date (MM/DD/YYYY) that the task is required to be performed. For new construction, during commissioning is the perfect time to start loading start dates for preloading manpower maintenance.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY: COBie

Database Name Job.Start

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: GSA/Contractor

Existing Complex: GSA/Contractor

4.7.15. Job Task Time Standard

The job task time standard is the estimated time that it takes to complete a job task. This time standard can be from the GSA designated time standard, RS Means, or manufacturer

Page 111: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 107

www.gsa.gov/bim

GSA National Equipment Standard

recommended for the length of time it takes to perform job task. GSA time standard takes precedence over other standards. Implementation:

Enter the estimated time as a numerical value based on job task time standard units. The maximum decimal places allowed are 2 digits. GSA time standard shall be used if available, otherwise use a standard approved by GSA on the project. Example: 1.25 25.02 115.50

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Numeric: Maximum decimal place 2 digits: COBie

Database Name Job.Duration

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.7.16. Job Task Time Standard Units

The job task standard units are the units of measure related to the job task time standard. Example: Hour or Day. Implementation:

Enter the standard unit that is related to the job task time standard.

Page 112: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 108

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended: COBie

Data Format Requirement Text: Units

Database Name Job.DurationUnits

Data Instance One: Per Job.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.8. Commissioning Data Fields

Commissioning data fields are those data points required to be captured during the commissioning of equipment.

4.8.1. Commissioning Primary Key The commissioning primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. A unique GUID is used because commissioning is typically done on multiple pieces of equipment and therefore allows the database to link multiple equipment objects to a single commissioning project/document. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Required

Page 113: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 109

www.gsa.gov/bim

GSA National Equipment Standard

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Commission.ExtIdentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

4.8.2. Commission Provider The commission provider is the data field used to capture the name of company or organization performing the commissioning. Implementation:

Enter the legal name of the person, company, or organization performing the commissioning. Do not use abbreviations or acronyms if possible because it can lead to confusion.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text: Legal name of company or organization

Database Name Commission.Provider

Data Instance One

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

4.8.3. Commission Date Data field used to capture the date that commissioning was completed. Implementation:

Page 114: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 110

www.gsa.gov/bim

GSA National Equipment Standard

Enter the date that the commissioning was completed. The date format for use is to be 2-digit month/2-digit day/4-digit year (MM/DD/YYYY).

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Commission.Date

Data Instance One

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

4.8.4. Commission Observation Commissioning observation data field is used to capture the detailed text of the information about the commissioning of that piece of equipment. Implementation:

Enter the detail observation noted per the commissioning for this specific instance of equipment.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Commission.Observation

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Commission.ExtIdentifier (Commission)

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

Page 115: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 111

www.gsa.gov/bim

GSA National Equipment Standard

4.8.5. Commission Recommendation The commission recommendation field is used to capture the detailed text of any recommendations determined by commissioning of the equipment. Implementation:

Enter the recommendation noted per the commissioning for this specific instance of equipment. Example: Replace equipment.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Commission.Recommendation

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Commission.ExtIdentifier (Commission)

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

4.8.6. Commissioning Document GUID A unique GUID is used because commissioning is typically done on multiple pieces of equipment and therefore allows the database to link multiple equipment objects to a single commissioning project/document. Implementation:

Otherwise, the GUID can be self-developed by the software package or by using a GUID generator. GUID must be approved by GSA.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Page 116: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 112

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Commission.DocumentExtIdentifier

Data Instance One: Per Commission.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

4.8.7. Commissioning Short Description

The short description data field allows the provider to submit a short description of the document for improved operational reference and usage. Implementation:

Enter a short description of the document. For Example: DC1234 Cooling Tower Commissioning

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name Commission.DocumentName

Data Instance One: Per Commission.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

4.8.8. Commissioning Document This data field is used to capture the actual document or a link to the document. Implementation:

Page 117: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 113

www.gsa.gov/bim

GSA National Equipment Standard

The document must be submitted in DOC, DOCX, or PDF format. The document file name should be in an easy to understand format: DC1234 Fire Safety Inspection.docx, DC1234 Trane AHU Warranty 2010-12-12.pdf, or D1234 Commissioning 2011-01-15.docx.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement DOC, DOCX, PDF Format.

Database Name Commission.Document

Data Instance One: Per Commission.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: Commissioning Contractor

Existing Complex: GSA/Commissioning Contractor

4.9. Condition Assessment Data Fields

The condition assessment data fields are those fields used to capture the information from the last condition assessment for the related equipment.

4.9.1. Condition Assessment Primary Key GUID automatically generated. The GUID is used to link a condition assessment to equipment in a facility. The condition assessment primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Page 118: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 114

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Condition.ExtIdentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.2. Equipment Installed Date The equipment installed date field is used to capture the actual date that the equipment was installed. This is vital information for determining expected life of equipment and warranty items. Implementation:

Enter the exact date that the equipment was installed. The format for capturing the date is 2-digit month/2-digit day/ 4-digit year (MM/DD/YYYY).

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Component.InstallDate

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.3. Equipment Life Expectancy

Page 119: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 115

www.gsa.gov/bim

GSA National Equipment Standard

The equipment life expectancy field captures (in years) the manufacturer’s or industry’s projected expected life span of this type of equipment This information, when compared to installed date, is vital for the proper strategic planning and budgeting of the facility. Implementation:

Enter the expected life expectancy in years for the equipment based on manufacturer documentation. If manufacturer information does not exist, use industry findings. The data should be a number, the unit years will be assumed.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Numeric: Unit Years

Database Name Component.LifeExpectance

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.4. Equipment Age The equipment age data field is used to capture the length of time equipment has been installed and display this age of the equipment in years. The age is calculated by the formula: Current Date - Installed Date. Implementation:

Using the formula Current Date – Installed Date, personnel will determine and enter the age of the equipment in years.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Page 120: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 116

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement Numeric: Unit Years

Database Name Component.Age

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.5. Equipment Life Remaining The equipment life remaining data field is used to display the amount of life remaining based on the calculated formula: Life expectancy - Age. Implementation:

Using the formula life expectancy – age, personnel will determine and enter the expected life remaining of the equipment in years.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Numeric: Unit Years

Database Name Component.LifeRemaining

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.6. Equipment Purchased Condition The equipment purchased condition field is used to designate what the condition of the equipment was when it was installed.

Page 121: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 117

www.gsa.gov/bim

GSA National Equipment Standard

Implementation:

Enter one of the following into this data field based off of purchased condition.

New Rebuilt Used Refurbished Used

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text: Per NES 4.9.6

Database Name Component.PurchaseCondition

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.7. Equipment Condition The equipment condition data field is used to designate what the current condition of the equipment was found to be during installation and audits. Implementation:

Enter one of the following into this data field based off of the equipment condition.

Unknown Inoperable Failure Possible Poor

Page 122: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 118

www.gsa.gov/bim

GSA National Equipment Standard

Fair Good Excellent

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Per NES 4.9.7

Database Name Component.Condition

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.8. Equipment Condition Related Cause The equipment condition related cause data field is used to categorize the findings of the equipment condition based on possible related causes. This categorization of related causes is used to predefine data for analysis. Implementation:

Enter one of the following into this data field based off of the equipment condition findings.

Component Exceeded Useful Life Design or Production Problem Does Not Meet Facility Requirements Insufficient Preventive Maintenance Insufficient Utility or Environment

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Page 123: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 119

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement Text: Per NES 4.9.7

Database Name Component.ConditionCause

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.9. Equipment Life Used The equipment life used data field is used to determine the percentage of calculated life used based on the condition assessment of the equipment. A piece of equipment might have a higher life used than projected life expectancy remaining because the equipment is in poor condition or is constantly run at maximum tolerances. There are calculations in the industry when equipment is run above standards for periods of time that can be used to determine premature aging of equipment. Implementation:

Enter the percentage of equipment life used based off of industry standards and experience.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Numeric: 2-3 Digits, Unit Percentage

Database Name Component.LifeUsed

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.10. Condition Observation

Page 124: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 120

www.gsa.gov/bim

GSA National Equipment Standard

The condition observation field is used to contain the detailed written notes about the condition of the equipment. Example: Equipment found in poor condition due to a wet environment in which it was installed. This is in violation of the manufacturer’s recommendations of install environment. Implementation:

Enter any notes about the condition of the equipment found during the assessment.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Condition.Observation

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.11. Condition Recommendation This data field is used to capture the detailed text of the recommendation based off of the assessment for the piece of equipment. Example: Recommend replacement. Implementation:

Enter any recommendations about the condition of the equipment found during the assessment.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Page 125: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 121

www.gsa.gov/bim

GSA National Equipment Standard

Database Name Condition.Recommendation

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.12. Condition Assessment Provider This data field is used to capture the name of company or organization performing the assessment. Implementation:

Enter the legal name of the company or organization that performed the condition assessment. Avoid using abbreviations and acronyms since they can lead to confusion.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Legal name of company or organization

Database Name Condition.Provider

Data Instance One: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.13. Condition Assessment Date

This data field is used to capture the date that the condition assessment was performed. Implementation:

Page 126: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 122

www.gsa.gov/bim

GSA National Equipment Standard

Enter the date that the condition assessment was performed in the format of MM/DD/YYYYY.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Condition.Date

Data Instance One: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.14. Condition Assessment Document GUID A unique GUID is used because condition assessment is typically done on multiple pieces of equipment and therefore allows the database to link multiple equipment objects to a single condition assessment project/document. Implementation:

Otherwise, the GUID can be self-developed by the software package or by using a GUID generator. GUID must be approved by GSA.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Condition.DocumentExtIdentifier

Data Instance One: Per Condition.ExtIdentifier (Condition Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.15. Condition Assessment Short Description

Page 127: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 123

www.gsa.gov/bim

GSA National Equipment Standard

The short description data field allows the provider to submit a short description of the document for improved operational reference and usage. Implementation:

Enter a short description of the document. For Example: DC1234 Condition Assessment Mechanical

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Condition.DocumentName

Data Instance One: Per Condition.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.9.16. Condition Assessment Document This data field is used to capture the actual document or a link to the document. Implementation:

The document must be submitted in DOC, DOCX, or PDF format. The document file name should be in an easy to understand format: DC1234 Fire Safety Inspection.docx, DC1234 Trane AHU Warranty 2010-12-12.pdf, or D1234 Commissioning 2011-01-15.docx.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement DOC, DOCX, PDF Format.

Database Name Condition.Document

Data Instance One: Per Condition.DocumentExtIdentifier

Page 128: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 124

www.gsa.gov/bim

GSA National Equipment Standard

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Condition Auditor

Existing Complex: GSA/ Condition assessment contractor

4.10. Audits and Inspection Data Fields

Audits data fields allow facility management to capture the information about the equipment during quality control and inspection audits.

4.10.1. Audit Primary Key The audit primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Audit.ExtIndentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.2. Audit Type

Page 129: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 125

www.gsa.gov/bim

GSA National Equipment Standard

This field is used to capture the type of audit that was performed: Inspection, Energy Audit, Environmental, Fire Life Safety, Maintenance Compliance Audit, O&M Audit, etc. Implementation:

Enter the type of audit performed.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Audit.Type

Data Instance One: Per Audit.ExtIndentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.3. Equipment Compliance (N) The equipment compliance data field is used to capture if equipment meets compliance during an audit. A component can be audited to ensure it meets multiple compliance regulations. Therefore this field can be duplicated multiple times based on the regulation that is being audited. Implementation:

Enter either yes or no if equipment meets compliance per the audit guidelines.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Yes or No

Database Name Audit.ComponentCompliance

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Audit.ExtIdentifier (Audit)

Page 130: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 126

www.gsa.gov/bim

GSA National Equipment Standard

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor 4.10.4. Compliance Regulations (N)

This data field is used to capture the GUID cross reference to the code and regulations section for the regulations being audited (Section 4.13). Implementation: Enter the GUID for the regulation or code that is related to the audit.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Component.ComplianceRegulation

Data Instance Many: Per Component.ExtIdentifier (Equipment) Many: Per Audit.ExtIdentifier (Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.5. Audit Observation The audit observation is used to capture the detailed observation about the audit of the equipment. Example: Equipment has not been inspected per NFPA requirements and therefore is in violation of fire codes. Implementation:

Enter the detailed information about observations noted.

Page 131: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 127

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Audit.Observation

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Audit.ExtIdentifier (Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.6. Audit Recommendation The audit recommendation data field is used to document recommendations determined by the auditor. Example: Have equipment pressure tested to meet code. Implementation:

Enter the audit recommendations for the equipment.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Audit.Recommendation

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Audit.ExtIdentifier (Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor 4.10.7. Audit Provider

The audit provider field is used to capture the name of company or organization performing the audit.

Page 132: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 128

www.gsa.gov/bim

GSA National Equipment Standard

Implementation:

Enter name of the company, person, or organization legally responsible for the audit. Do not use abbreviations or acronyms since they can cause confusion.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Legal company or organization name.

Database Name Audit.Provider

Data Instance One: Per Audit.ExtIdentifier (Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.8. Audit Date The audit date data field is used to capture the date that the audit was completed. Implementation:

Enter date that the audit was completed. The format for the date is MM/DD/YYYY.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Audit.Date

Data Instance One: Per Audit.ExtIdentifier (Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.9. Audit Document GUID

Page 133: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 129

www.gsa.gov/bim

GSA National Equipment Standard

A unique GUID is used because condition assessment is typically done on multiple pieces of equipment and therefore allows the database to link multiple equipment objects to a single audit project/document. Implementation:

Otherwise, the GUID can be self-developed by the software package or by using a GUID generator. GUID must be approved by GSA.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Audit.DocumentExtIdentifier

Data Instance One: Per Audit.ExtIdentifier (Audit)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.10. Audit Short Description

The short description data field allows the provider to submit a short description of the document for improved operational reference and usage. Implementation:

Enter a short description of the document. For Example: DC1234 Condition Assessment Mechanical

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name Audit.DocumentName

Page 134: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 130

www.gsa.gov/bim

GSA National Equipment Standard

Data Instance One: Per Audit.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.10.11. Audit Document This data field is used to capture the actual document or a link to the document. Implementation:

The document must be submitted in DOC, DOCX, or PDF format. The document file name should be in an easy to understand format: DC1234 Fire Safety Inspection.docx, DC1234 Trane AHU Warranty 2010-12-12.pdf, or D1234 Commissioning 2011-01-15.docx.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement DOC, DOCX, PDF Format.

Database Name Audit.Document

Data Instance One: Per Audit.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor, Auditor

Existing Complex: GSA/Auditor

4.11. Warranty

4.11.1. Warranty Primary Key

The warranty primary key is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for

Page 135: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 131

www.gsa.gov/bim

GSA National Equipment Standard

software application usage only and is not meant to be a user readable/understandable code. Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive: COBie

Database Name Warranty.ExtIdentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.2. Warranty Number The warranty number is the number provided by the warranty provider for the policy. Implementation:

Enter the number or identification related to the policy for the warranty. Some manufacturers for basic manufacturer warranties do not have a specific policy number but base the date on policy registration and installation date. In these instances, the equipment must be registered with the manufacturer, a confirmation number, and date obtained from the manufacturer.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name Warranty.Number

Data Instance One: Per Warranty.ExtIdentifier

Page 136: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 132

www.gsa.gov/bim

GSA National Equipment Standard

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.3. Warranty Provider Name The warranty provider name data field is used to capture the name of the warranty provider. Implementation:

Enter the legal name of the actual company or organization that provides the equipment warranty. Do not use abbreviations or acronyms since that can cause confusion. Also do not use the name of a sales person or person of contact for the company since they can change.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text: Legal company or organization name

Database Name Warranty.ProviderName

Data Instance One: Per Warranty.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.4. Warranty Provider Contact Information This data field is used to capture the contact information for the warranty provider. Implementation:

Enter the contact information for the warranty provider. The address and main phone number for the company should be entered in this field. Do not enter personal sales or

Page 137: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 133

www.gsa.gov/bim

GSA National Equipment Standard

contact personnel contact information since their position or information is more likely to change within the warranty period.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text: Legal company or organization name

Database Name Warranty.ProviderContact

Data Instance One: Per Warranty.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.5. Warranty Installer Name The warranty installer name is actually a data field that is designed to capture the company or organization responsible for installation of the equipment. Part of warranty usage is ensuring that the component is installed correctly per manufacturer recommendations. Implementation:

Enter the legal name of the company or organization that installed the equipment. Do not use abbreviations or acronym since it can lead to confusion.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text: Legal company or organization name

Database Name Component.Installer

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Warranty.ExtIdentifier (Warranty)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

Page 138: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 134

www.gsa.gov/bim

GSA National Equipment Standard

4.11.6. Warranty Installer Contact Information

This data field captures and documents the contact information of the company legally responsible for the installation of the equipment. The address and main phone number for the company should be entered in this field. Do not enter personal sales or contact personnel contact information since their position or information is more likely to change. Implementation:

Enter the warranty installer company contact information. The address and main phone number for the company should be entered in this field. Do not enter personal sales or contact personnel contact information since their position or information is more likely to change within the warranty period.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name Component.InstallerContact

Data Instance One: Per Component.ExtIdentifier (Equipment) Many: Per Warranty.ExtIdentifier (Warranty)

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.7. Warranty Start Date This data field is used to capture the warranty start date. Implementation:

Enter the exact date on which the warranty starts in the following format: MM/DD/YYYY.

Page 139: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 135

www.gsa.gov/bim

GSA National Equipment Standard

Format: MM/DD/YYYY

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Warranty.StartDate

Data Instance One: Per Warranty.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.8. Warranty End Date This data field is used to calculate or capture the end date of coverage for the warranty. Implementation:

Enter the warranty end date in the following format: MM/DD/YYYY.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Warranty.EndDate

Data Instance One: Per Warranty.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor 4.11.9. Extended Warranty Available

The extended warranty available is used to determine if an extended warranty is available and if it was purchased. There are a significant number of times in which an extended warranty can be purchased that extends the manufacturer warranty.

Page 140: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 136

www.gsa.gov/bim

GSA National Equipment Standard

Implementation:

Enter whether or not an extended warranty is available and if it was purchased for the equipment per the following field entries: Yes Purchased Yes Not Purchased Not Available

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text: Per NES 4.11.9

Database Name Warranty.ExtendStatus

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

4.11.10. Extended Warranty Number The extended warranty number is the number provided by the warranty provider for the extended policy. Implementation:

Enter the number or identification related to the policy for the extended warranty.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name Warranty.ExtendNumber

Data Instance One

Data Storage GSA Database

Page 141: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 137

www.gsa.gov/bim

GSA National Equipment Standard

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor 4.11.11. Extended Warranty Provider Name

The extended warranty provider name data field is used to capture the name of the warranty provider. Implementation:

Enter the legal name of the actual company or organization that provides the equipment extended warranty. Do not use abbreviations or acronyms since that can cause confusion.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text: Legal name of company or organization

Database Name Warranty.ExtendProvider

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor 4.11.12. Extended Warranty Start Date

This data field is used to capture the extended warranty start date. Implementation:

Enter the extended warranty start date in the following format: MM/DD/YYYY.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Page 142: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 138

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement Date: MM/DD/YYYY

Database Name Warranty.ExtendStartDate

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor 4.11.13. Extended Warranty End Date

This data field is used to calculate or capture the end date of coverage for the extended warranty. Implementation:

Enter the extended warranty end date in the following format: MM/DD/YYYY.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name WarrantyExtendEndDate

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.14. Substantial Completion Date Per Federal Acquisition Regulations (FAR) contractors are required to provide a 1-year contractor warranty that starts at the substantial completion date. Therefore, it is very important to ensure the substantial completion date is captured to determine warranty applicability. Implementation:

Page 143: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 139

www.gsa.gov/bim

GSA National Equipment Standard

Enter the substantial completion date in the following format: MM/DD/YYYY.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Date: MM/DD/YYYY

Database Name Warranty.SubstantialCompletion.Date

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.15. Warranty Document GUID A unique GUID is used because condition assessment is typically done on multiple pieces of equipment and therefore allows the database to link multiple equipment objects to a single warranty document. Implementation:

Otherwise, the GUID can be self-developed by the software package or by using a GUID generator. GUID must be approved by GSA.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name Warranty.DocumentExtIdentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.16. Warranty Short Description

Page 144: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 140

www.gsa.gov/bim

GSA National Equipment Standard

The short description data field allows the provider to submit a short description of the document for improved operational reference and usage. Implementation:

Enter a short description of the document. For Example: DC1234 Condition Assessment Mechanical

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name Warranty.DocumentName

Data Instance One: Per Warranty.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.17. Warranty Document This data field is used to capture the actual document or a link to the document. Implementation:

The document must be submitted in DOC, DOCX, or PDF format. The document file name should be in an easy to understand format: DC1234 Fire Safety Inspection.docx, DC1234 Trane AHU Warranty 2010-12-12.pdf, or D1234 Commissioning 2011-01-15.docx.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement DOC, DOCX, PDF Format.

Database Name Warranty.Document

Data Instance One: Per Warranty.DocumentExtIdentifier

Page 145: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 141

www.gsa.gov/bim

GSA National Equipment Standard

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.18. Extended Warranty Document GUID A unique GUID is used because condition assessment is typically done on multiple pieces of equipment and therefore allows the database to link multiple equipment objects to a single extended warranty document. Implementation:

Otherwise, the GUID can be self-developed by the software package or by using a GUID generator. GUID must be approved by GSA.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name ExtWarranty.DocumentExtIdentifier

Data Instance One

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.19. Extended Warranty Short Description

The short description data field allows the provider to submit a short description of the document for improved operational reference and usage. Implementation:

Enter a short description of the document. For Example: DC1234 Condition Assessment Mechanical

Page 146: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 142

www.gsa.gov/bim

GSA National Equipment Standard

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement Text

Database Name ExtWarranty.DocumentName

Data Instance One: Per ExtWarranty.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.11.20. Extended Warranty Document This data field is used to capture the actual document or a link to the document. Implementation:

The document must be submitted in DOC, DOCX, or PDF format. The document file name should be in an easy to understand format: DC1234 Fire Safety Inspection.docx, DC1234 Trane AHU Warranty 2010-12-12.pdf, or D1234 Commissioning 2011-01-15.docx.

Data Capture Requirement New Construction: Required

Existing Building: Recommended

Data Format Requirement DOC, DOCX, PDF Format.

Database Name ExtWarranty.Document

Data Instance One: Per Warranty.DocumentExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

Page 147: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 143

www.gsa.gov/bim

GSA National Equipment Standard

4.12. Operation Documents

The following operation documents have similar data fields:

A GUID field that is the primary key globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code. An operation manual for a Company XYZ Air Handler can be linked to the multiple air handlers in the facility.

A short description data field that allows the provider to submit short description of the document for improved operational usage.

The document itself in DOC, DOCX, or PDF format. The document file name should be in an easy to understand format: DC1234 Fire Safety Inspection.docx, DC1234 Trane AHU Warranty 2010-12-12.pdf, D1234 Commissioning 2011-01-15.docx…

A video data field that allows the database to link or capture a video file. The operation documents should be compiled on a file server.

Normal Operation GUID

Normal Operation Short Description

Normal Operation Document

Normal Operation Video

Operator Prestart Procedure GUID

Operator Prestart Procedure Short Description

Operator Prestart Procedure Document

Operator Prestart Procedure Video

Operator Startup Procedure GUID

Operator Startup Procedure Short Description

Operator Startup Procedure Document

Operator Startup Procedure Video

Operator Shutdown Procedure GUID

Operator Shutdown Procedure Short Description

Page 148: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 144

www.gsa.gov/bim

GSA National Equipment Standard

Operator Shutdown Procedure Document

Operator Shutdown Procedure Video

Operator Post Shutdown Procedure GUID

Operator Post Shutdown Procedure Short Description

Operator Post Shutdown Procedure Document

Operator Post Shutdown Procedure Video

Emergency Operations GUID

Emergency Operations Short Description

Emergency Operations Document

Emergency Operations Video

Maintenance and Troubleshooting Documents

Wiring Control Diagrams GUID

Wiring Control Diagrams Short Description

Wiring Control Diagrams Document

Wiring Control Diagrams Video

Removal and replacement instructions GUID

Removal and Replacement Instructions Short Description

Removal and Replacement Instructions Document

Removal and Replacement Instructions Video

Cleaning Requirements GUID

Cleaning Requirements Short Description

Cleaning Requirements Document

Cleaning Requirements Video

Lubrication Data GUID

Lubrication Data Short Description

Lubrication Data Document

Lubrication Data Video

Spare Parts List GUID

Spare Parts List Short Description

Spare Parts List Document

Spare Parts List Video

Page 149: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 145

www.gsa.gov/bim

GSA National Equipment Standard

Special Tools List GUID

Special Tools List Short Description

Special Tools List Document

Special Tools List Video

Troubleshooting Guide GUID

Troubleshooting Guide Short Description

Troubleshooting Guide Document

Troubleshooting Guide Video

Product Cut Sheet GUID

Product Cut Sheet Document

Certificate GUID

Certificate Date

Certificate Short Description

Certificate Document

Training Documents

Training Materials GUID

Training Materials Short Description

Training Materials Document

Training Materials Video

Condition Documents

Environmental Conditions GUID

Environmental Conditions Short Description

Environmental Conditions Document

Environmental Conditions Video

Hazardous Material GUID

Hazardous Material Short Description

MSDS Data Sheet Document

Safety Precautions GUID

Safety Precautions Short Description

Safety Precaution Document

Page 150: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 146

www.gsa.gov/bim

GSA National Equipment Standard

4.13. Code and Regulations

The code and regulation data fields are used to capture the related codes and regulations required to be enforced for each piece of equipment. The codes and regulations can be maintained in a separate database and, because a GUID is used, they can be linked to the equipment while reducing the repetition of data. Example: NFPA standard linked to each fire extinguisher, Energy Independence and Security Act of 2007 linked to each advanced remote utility meter, or ASHRAE standard linked to a restroom exhaust fan ductwork. This data is vital to ensuring that facility managers have immediate access to all of the codes and regulations related to installed equipment. A significant amount of this information is predetermined during design construction to ensure the facility meets federal, state, and local standards. This is the optimum point to capture this data. Note: At some point GSA will have a large portion of the federal, state, and local codes links in their database and will start replicating data. At the point that the code and regulation standards are substantially complete, GSA should provide the reference library that the contractor would use versus regeneration per project. 4.13.1. Federal Code

4.13.1.1. Federal Code GUID

The Federal Code GUID is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code.

Implementation:

Page 151: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 147

www.gsa.gov/bim

GSA National Equipment Standard

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name FederalCode.ExtIdentifier

Data Instance One: Per Regulation

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.1.2. Federal Code Title The federal code title data field is used to capture the legal title of the code or regulation. Example: Clean Water Act, Energy Independence and Security Act of 2007, etc… Implementation:

Enter the legal full title of the code. Abbreviations and acronyms should be avoided to prevent confusion.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text: Legal title

Database Name FederalCode.Title

Data Instance One: Per FederalCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.1.3. Federal Code Identification

Page 152: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 148

www.gsa.gov/bim

GSA National Equipment Standard

The federal code identification data field is used to capture the direct code designation or section. Example: EISA 2007 434(b), 10CFR50.65. Implementation:

Enter the legal designation for section or area of code per the regulation. Format of the information should be in accordance with the regulation or code being stated.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name FederalCode.ID

Data Instance Many: Per FederalCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.1.4. Federal Code Description This data field is used to capture a brief description of the section or portion of the related code being identified. For example: Advanced Metering or Maintenance Rule. Implementation:

Enter a brief description of the section or code for the related section identified.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name FederalCode.Description

Data Instance One: Per FederalCode.ID

Data Storage GSA Database

Page 153: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 149

www.gsa.gov/bim

GSA National Equipment Standard

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.1.5. Federal Code Governing Entity This data field is use to capture the name of the agency or organization that is responsible for the interpretation and governance of the related code. Example: DOE, NRC. Implementation:

Enter the name or approved government acronym of the agency or organization responsible for the governance of the regulation.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name FederalCode.Governance

Data Instance Many: Per FederalCode.ID

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.1.6. Federal Code Document Implementation:

Attach a copy of the code or regulation in DOC, DOCX, or PDF format.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement DOC, DOCX, or PDF

Database Name FederalCode.Document

Page 154: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 150

www.gsa.gov/bim

GSA National Equipment Standard

Data Instance One: Per FederalCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.2. State and Local Code and Regulation

4.13.2.1. State Code GUID The State Code GUID is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code.

Implementation:

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name StateCode.ExtIdentifier

Data Instance One: Per Code

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.2.2. State Code Title The state code title data field is used to capture the legal title of the code or regulation. Example: Virginia Maintenance Code Part III of the Virginia Uniform Statewide Building Code.

Page 155: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 151

www.gsa.gov/bim

GSA National Equipment Standard

Implementation:

Enter the legal full title of the code. Abbreviations and acronyms should be avoided to prevent confusion.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name StateCode.Title

Data Instance One: Per StateCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.2.3. State Code Identification The state code identification data field is used to capture the direct code designation or section. Example: Section 402.1, Section 404.4.4. Implementation:

Enter the legal designation for section or area of code per the regulation. Format of the information should be in accordance with the regulation or code being stated.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name StateCode.ID

Data Instance Many: Per StateCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

Page 156: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 152

www.gsa.gov/bim

GSA National Equipment Standard

4.13.2.4. State Code Description

This data field is used to capture a brief description of the section or portion of the related code being identified. For example: Light Habitable Space, Prohibited Occupancy. Implementation:

Enter a brief description of the section or code for the related section identified.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name StateCode.Description

Data Instance One: Per StateCode.ID

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.2.5. State Code Governing Entity This data field is use to capture the name of the agency or organization that is responsible for the interpretation and governance of the related code. Example: Virginia Local Governing Body. Implementation:

Enter the name or approved government acronym of the agency or organization responsible for the governance of the regulation.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Page 157: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 153

www.gsa.gov/bim

GSA National Equipment Standard

Data Format Requirement Text

Database Name StateCode.Governance

Data Instance Many: Per StateCode.ID

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.2.6. State Code Document Implementation:

Attach a copy of the code or regulation in DOC, DOCX, or PDF format.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement DOC, DOCX, or PDF

Database Name StateCode.Document

Data Instance One: Per StateCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.3. Industry Code and Regulation

4.13.3.1. Industry Code GUID The Industry Code GUID is a globally unique identifier (GUID) used in software applications to provide a unique reference number. This software identification is for software application usage only and is not meant to be a user readable/understandable code.

Implementation:

Page 158: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 154

www.gsa.gov/bim

GSA National Equipment Standard

The GUID can be self developed by the software package or by using a GUID generator.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Time Based 128 Bit Alpha-Numeric Case-Sensitive.

Database Name IndustryCode.ExtIdentifier

Data Instance One: Per Code

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.3.2. Industry Code Title The industry code title data field is used to capture the legal title of the code or regulation. Example: National Fire Protection Association Code. Implementation:

Enter the legal full title of the code. Abbreviations and acronyms should be avoided to prevent confusion.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name IndustryCode.Title

Data Instance One: Per IndustryCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.3.3. Industry Code Identification

Page 159: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 155

www.gsa.gov/bim

GSA National Equipment Standard

The industry code identification data field is used to capture the direct code designation or section. Example: NFPA 71 § 1.1.1, or ASHRAE STD 55. Implementation:

Enter the legal designation for section or area of code per the regulation. Format of the information should be in accordance with the regulation or code being stated.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name IndustryCode.ID

Data Instance Many: Per IndustryCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.3.4. Industry Code Description This data field is used to capture a brief description of the section or portion of the related code being identified. For example: Fire Electrical Testing or Environmental Temperature. Implementation:

Enter a brief description of the section or code for the related section identified.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name IndustryCode.Description

Data Instance One: Per IndustryCode.ID

Data Storage GSA Database

Page 160: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 156

www.gsa.gov/bim

GSA National Equipment Standard

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.3.5. Industry Code Governing Entity This data field is use to capture the name of the agency or organization that is responsible for the interpretation and governance of the related code. Example: NFPA, ASHRAE. Implementation:

Enter the name or approved government acronym of the agency or organization responsible for the governance of the regulation.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement Text

Database Name IndustryCode.Governance

Data Instance Many: Per IndustryCode.ID

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

4.13.3.6. Industry Code Document Implementation:

Attach a copy of the code or regulation in DOC, DOCX, or PDF format.

Data Capture Requirement New Construction: Recommended

Existing Building: Recommended

Data Format Requirement DOC, DOCX, or PDF

Database Name StateCode.Document

Page 161: PBS GSA National Equipment Standard Guide 2011-03-21

Section 4: Equipment Data Fields 157

www.gsa.gov/bim

GSA National Equipment Standard

Data Instance One: Per StateCode.ExtIdentifier

Data Storage GSA Database

Responsibility New Construction: A/E, Contractor

Existing Complex: GSA/Contractor

Page 162: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard www.gsa.gov/bim

Section 05 Equipment Identification

Page 163: PBS GSA National Equipment Standard Guide 2011-03-21

Section 5: Equipment Identification 159

www.gsa.gov/bim

GSA National Equipment Standard

Section 5: Equipment Identification

Equipment identification conventions are the abbreviated identification standards used on blueprints, equipment tags, lock-out tag-outs, and the short hand used to identify specific instances of equipment. It is very important to properly identify equipment to ensure continuity of operations during emergency operations, power outages, and when unable to connect to computer-based inventory systems. A technician, when tasked with shutting off equipment in the field, needs to be able to ensure they are working in the right building and on the correct equipment. For example: Shutting off pump tagged DC0000-P-001 versus the pump next to it tagged DC0000-P-002. GSA shall use the following equipment data fields per section 4 for equipment identification:

Facility Number (4.2.5)

Equipment Acronym (4.6.6)

Equipment Sequence Number (4.6.7)

The designation of data fields and their usage and order in this section are used to define the equipment identification composite (4.6.8) standard.

5.1. Equipment Identification Formats:

5.1.1. Standard Equipment Identification

Equipment identification is to be a composite of three equipment database fields. The database fields are: Facility number, equipment acronym, and equipment sequence number. All equipment is to be identified via this method with the exception of electrical distribution components that require enhanced identification.

Facility Number-Equipment Acronym-Equipment Sequence Number

DC0000-AHU-001 5.1.2. Enhanced Equipment Identification

Page 164: PBS GSA National Equipment Standard Guide 2011-03-21

Section 5: Equipment Identification 160

www.gsa.gov/bim

GSA National Equipment Standard

The enhanced equipment identification standard is developed using the assembly/sub-assembly relationship based on record drawings. Equipment assembly/sub assembly relationship (4.6.15) data field is defined per section 4. The identification for each component contains the identification of the immediate preceding assembly/sub-assembly or system component in-line. The enhanced equipment identification is to be used for all electrical distribution components. The preceding component identification used is the major component that supplies electrical power to the equipment being identified.

Facility Number-Equipment Acronym (Parent)-Equipment Sequence Number (Parent)-

Equipment Acronym-Equipment Sequence Number DC0000-FDR-52A1-SWGR-B2

The advantage to this method is the ability for the technician to troubleshoot in the field without having to refer back to a database.

Example: A technician has lost lighting in room 4131. Dispatch has radioed to him that the room is powered from DC0000-EPB-001-CB-01. Due to the identification schema, the technician understands that circuit breaker (CB-01) is on electrical panel EPB-001. Because the electrical panel is labeled DC0000-XFMR-23-EPB-001, if the technician finds that the breaker is closed with no faults, the technician knows to go to the supplying transformer (XFMR-23) to check for power. When the technician gets to the transformer, it is determined that the transformer DC0000-MCC-003-XFMR-23 has no power. The technician then has the information to go to motor control center (MCC-003). Upon arriving at the motor control center, the technician observes that circuit breaker (DC0000-MCC-003-CB-03) is trip free. This example shows that the technician could literally follow the labeling

Page 165: PBS GSA National Equipment Standard Guide 2011-03-21

Section 5: Equipment Identification 161

www.gsa.gov/bim

GSA National Equipment Standard

schema back to the feeder that supplies power to that electrical panel. Conversely, if a facility lost a feeder, they could determine all of the electrical components affected. This ability provides significant positive impact and cost savings to facility operations.

Page 166: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 06 Equipment Tag

Page 167: PBS GSA National Equipment Standard Guide 2011-03-21

Section 6: Equipment Tag 163

www.gsa.gov/bim

GSA National Equipment Standard

Section 6: Equipment Tag

Equipment identification conventions are the abbreviated identification standards used on blueprint and equipment

6.1. Guidelines:

Equipment tags shall be made of a durable material that corresponds with the conditions and

environment in which the tag will be placed.

All tag information will conform to the standards applicable to this GSA National Equipment

Standard.

Tag information has to be approved by GSA.

Personnel are responsible for identifying lost, incorrectly labeled, unreadable, or damaged tags

and notifying the proper personnel for replacement tags.

6.2. Tag Placement:

Tags should be place on or near the component being identified in a manner that clearly

associates the tag with the respective component.

Tags should be permanently attached to the component in a way that will not interfere with

the normal operational use or testing of the component (e.g., attached to the yoke of the

valve, not to a removable part of the valve such as the hand wheel).

Valves operated by reach rods or chains, or other remotely operated components, should have

an additional tag installed at the operating device.

Tags for chain operators should be attached to a small piece of tubing (PVC) through which the

chain passes to ensure the label always remains at the bottom of the chain loop.

Tags that cover a group of equipment, for example 01-50 fire detectors in a room, the tag

should be place in an area that conforms to the following:

Page 168: PBS GSA National Equipment Standard Guide 2011-03-21

Section 6: Equipment Tag 164

www.gsa.gov/bim

GSA National Equipment Standard

Tag shall be placed in an area that reduces the chance of tampering.

Tag shall be placed in a common location, such as beside the main door to the area.

Tags should be readable from the normal operating location or position (i.e., an operator

should have to manipulate the tag to read it, label should be facing out).

If a new tag cannot be immediately provided, a temporary label should be installed until a

correct permanent label can be obtained.

6.3. Required Equipment Tag Information:

Equipment tags shall, at a minimum, include the following information, if it exists, from the

national equipment standard database data fields (See Figure):

GSA Logo

Space Identification Composite (4.5.6)

Equipment Identification Composite (1) (4.6.8) for the electrical power supply

component based off of Equipment Power Supply (4.6.12)

Equipment Zone Description (4.4.4)

Page 169: PBS GSA National Equipment Standard Guide 2011-03-21

Section 6: Equipment Tag 165

www.gsa.gov/bim

GSA National Equipment Standard

Equipment Identification Composite (4.6.8)

Equipment Operation Nomenclature (4.6.5)

OmniClass Table 23 Description (4.6.4)

Equipment System Relationship (4.6.13)

Equipment Status (4.6.25)/Equipment Failure Status (4.6.26)

Dot Matrix barcode (ISO/IEC 16022) and/or RFID: Encoded using the data field

Equipment Primary Key (4.6.2)

Equipment Tag Examples:

Page 170: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 07 Contracts

Page 171: PBS GSA National Equipment Standard Guide 2011-03-21

Section 7: Contract Language 167

www.gsa.gov/bim

GSA National Equipment Standard

Section 7: Contracts

This section was developed to provide a checklist of information to remember to include when specifying contracts for equipment inventories in multiple types of projects. As with any contract, other sections of this guide should be included in the contract, such as definition and data fields. Refer to the GSA website for samples of contracts. Including the actual contract language in this document would have made this document significantly larger than it already is.

7.1. New Construction/Renovation

7.1.1. Contract language and usage shall be in accordance with the Office of Design

Construction and the BIM Guide Series.

7.2. Existing Building O&M Contract Renewal

O&M contract renewal period is the most opportune time to capture equipment inventories for existing buildings. Component-level is the preferred level because of the impact that an accurate inventory has on the facility. Include the following in the contract: 7.2.1. Use the National Approved O&M Boilerplate. 7.2.2. Ensure definitions per section 2 of this guide are included. 7.2.3. Select the data fields and points required per attachment-01, ensure that they are

specified in the solicitation. 7.2.4. Specify use of this guide and GSA-developed software or guidance on capturing

equipment inventories in the correct format. It is important to ensure that the product is delivered in a correct format that allows the data to be transferred to the software packages that need the information.

7.2.5. Important to ensure all required disciplines are specified in contracts. For example: mechanical, electrical, historical preservation, food services inventories. This is because O&M contractors have a tendency to assume that their bid is on only that equipment for which they are responsible: mechanical, electrical, etc…

Page 172: PBS GSA National Equipment Standard Guide 2011-03-21

Section 7: Contract Language 168

www.gsa.gov/bim

GSA National Equipment Standard

7.2.6. Level of effort and expectation is important: Will they be going above ceiling tile and investigating interstitial space, etc.

7.2.7. Level of detail is important: Some of the data or all of the data fields. 7.2.8. Type of inventory is important: preventive maintenance inventory, non preventive

maintenance inventory, component-level inventory, etc.

7.3. Existing Building Equipment Inventory Contract

Third party equipment inventory contracts can be anything from having an independent company inventory the facility to including the inventory in a commissioning project or maintenance review audit. Third party inventories are very important to include in contracts for the performance of 3-D BIM Scan of an existing facility. The scan will not identify the equipment or its information and it is typically less expensive to have professionals trained in equipment capture to tag the information to the scan versus having to train A/E and BIM experts. Equipment inventories captured by third party, non-invested contractors are highly recommended versus using existing O&M contractors because it provides an extra set of independent information on the facility. For example: An O&M contractor might be hesitant in reporting that the condition of a piece of equipment is poor, considering they have been maintaining that equipment for years. 7.3.1. Ensure definitions per section 2 of this guide are included. 7.3.2. Select the data fields and points required per attachment-01, ensure that they are

specified in the solicitation. 7.3.3. Specify use of this guide and GSA-developed software or guidance on capturing

equipment inventories in the correct format. It is important to ensure that the product is delivered in a correct format that allows the data to be transferred to the software packages that need the information.

Page 173: PBS GSA National Equipment Standard Guide 2011-03-21

Section 7: Contract Language 169

www.gsa.gov/bim

GSA National Equipment Standard

7.3.4. Important to ensure all required disciplines are specified in contracts. For example: mechanical, electrical, historical preservation, and food services inventories.

7.3.5. Level of effort and expectation is important: Will they be going above ceiling tile and investigating interstitial space, etc.

7.3.6. Level of detail is important: Some of the data or all of the data fields. 7.3.7. Type of inventory is important: preventive maintenance inventory, non preventive

maintenance inventory, component-level inventory, etc.

7.4. Existing Building Project

The NES Guide should be included and followed for all projects that include equipment. Projects and O&M are the critical functions in facility management that will ensure that equipment inventories are updated and maintained accurately. Accurate and up-to-date equipment inventories are vital to the proper operation and future renovation of facilities.

Page 174: PBS GSA National Equipment Standard Guide 2011-03-21

GSA National Equipment Standard

www.gsa.gov/bim

Section 08: Technology

Page 175: PBS GSA National Equipment Standard Guide 2011-03-21

Section 8: Technology 171

www.gsa.gov/bim

GSA National Equipment Standard

Section 8: technology Because equipment data has a significant impact on a vast number of software programs and there are multiple methods to capture equipment data, this section is reserved for describing the various technologies.

8.1. Technology Requirements

8.1.1. COBie files per Whole Building Design Requirements. 8.1.2. Database files to be compatible with the GSA database designated in the contract.

8.2. Technology Recommendations

8.2.1. Equipment Inventory Capture:

Currently there is not a software program designed to capture equipment inventory per this guidance. Most inventories for existing buildings are done in excel and with paper and pen. If a software program is developed, it is recommended that the software meet some fundamental requirements:

Web-based application.

Able to import and export COBie/SPie and other IFC formats.

Database fields match this guidance field names.

Reference tables in software confirm as closely to industry standard formats such that updates to standards can be easily incorporated.

Method to track equipment and information not found in current standards to enable GSA to assist in improving the standards.

Approval process for equipment submission and editing of data.

Page 176: PBS GSA National Equipment Standard Guide 2011-03-21

09: MatrixImplementation guidance

StandardGSA National Equipment Standard gsa.gov/bim

Page 177: PBS GSA National Equipment Standard Guide 2011-03-21

Section 9: Implementation Guidance 173

www.gsa.gov/bim

GSA National Equipment Standard

Section 9: Implementation Guidance This section provides implementation guidance to GSA facility management and inventory teams. Teams are also encouraged to read the GSA BIM Guide Series 01 – Overview which further provides guidance on implementing 3D-4D-BIM technologies.

9.1. Identifying Opportunities

Meet with Regional Facility Managers to discuss the level of use of equipment inventories that currently exists within the facility, establish data requirements and process, establish data capture method for the facility, and determine roles and responsibilities.

9.2. Developing an Equipment Execution Plan Once the project team members have been established, GSA should require an equipment execution plan. Equipment execution plan should highlight the following: What level of equipment inventory will be captured? What data fields will be required? Who will be responsible for capturing the data? Who will be responsible for review? Are there software packages available for automatic review? What information will be transferred to downstream applications? What information will reside

only in the database model? How will updates be handled?

9.3. Pilot Inventory Implementation Studies

Pilot inventory projects are important aspect of refining implementation, improvement of guidance, and data points. Some important data points to consider are: Capture cost of operations and maintenance for a facility with no accurate or digital equipment

inventory to compare to projected cost of O&M with an updated data. Capture actual cost of a 3rd party contractor performance of facility inventory using this guidance

per gross square footage and type of facility.

Page 178: PBS GSA National Equipment Standard Guide 2011-03-21

Section 9: Implementation Guidance 174

www.gsa.gov/bim

GSA National Equipment Standard

Capture curtailment plans for a facility with no accurate inventory versus the level of curtailment change with a completed inventory to project energy savings.

Cost of and lessons learned for implementation on small projects. Recently commissioned facilities: equipment inventory tracking and maintenance prior to capture

of accurate inventory versus an accurate inventory. Is equipment missing pre- versus post-inventory and what is projected failure of equipment missed?

Sustainability or energy project pre- and post- inventory using guidance and what equipment was missed?

O&M contract pre- and post- inventories per this guidance and what is the delta of cost changes versus missed maintenance?

Page 179: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10:Section Equipment Data

GSA National Equipment

www.gsa.gov/bimwww.

Page 180: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Section 10: Equipment Data Matrix This section provides a matrix of all of the equipment data points per this standard. Included in the matrix are the marked (X) data fields required per new construction (NC) or existing building (EB). This matrix allows the user to include a comprehensive listing of data fields in their contract or to be used during negotiations.

Complex Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Comment

Database Links

Complex Primary Key 4.1.1 Facility.ExtFacilityIdentifier X X

Complex Data Fields

Complex Plot 4.1.2

Complex Number 4.1.3 Facility.SiteName X X

Complex Name 4.1.4 Facility.SiteLongName X X

Complex Address 4.1.5 Facility.SiteAddress.AddressLine X X

Complex City 4.1.6 Facility.SiteTown X X

Complex State 4.1.7 Facility.SiteRegion X X

Complex Zip 4.1.8 Facility.SitePostalCode X X

Facility Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Facility Primary Key 4.2.1 Facility.ExtFacilityIdentifier X X

Facility Data Fields

Facility Owner 4.2.2 Facility.Owner

Facility Designation 4.2.3 Facility.Designation X X

Facility Location Organization Code 4.2.4 Facility.LocationOrgCode

Facility Number 4.2.5 Facility.Name X X

Facility Name 4.2.6 Facility.LongName1 X X

Organization Facility Name 4.2.7 Facility.LongName2 X

Facility Address 4.2.8 Facility.AddressLine X X

Facility City 4.2.9 Facility.Town X X

Facility State 4.2.10 Facility.State X X

Facility Zip 4.2.11 Facility.PostalCode X X

Country 4.2.12 Facility.Country X X

Page 181: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Facility Priority 4.2.13 Facility.Priority

Tenant Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Tenant Primary Key 4.3.1 Tenant.Identifier X

Tenant Data Fields

Tenant Name 4.3.2 Tenant.Name X

Tenant Organization Name 4.3.3 Tenant.OrgName X

Tenant Department Name 4.3.4 Tenant.DeptName

Tenant Code 4.3.5 Tenant.Code

Zone Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Facility Zone Primary Key 4.4.1 Facility.ZoneIdentifier X

Facility Zone Description 4.4.2 Facility.ZoneName X

Equipment Zone Primary Key 4.4.3 Compoment.ZoneIdentifier X

Equipment Zone Description 4.4.4 Comonent.ZoneName X

Space Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Space Primary Key 4.5.1 Space.ExtFacilityIdentifier X X

Space Data Fields

Floor Number 4.5.2 Space.FloorName X X

Blueprint Room Number 4.5.3 Space.Name X X

Organization Room Number 4.5.4 Space.RoomTag X

Space Description 4.5.5 Space.Description X

Space Identification Composite 4.5.6 Space.Name + Space.RoomTag +

Space.Description

X X

Space Priority 4.5.7 Space.Priority

Page 182: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Equipment Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

BIM Equipment Object Primary Key 4.6.1 Component.ModelObjectIdentifier X

Equipment Primary Key 4.6.2 Component.ExtIdentifier X X

Equipment Attributes

OmniClass Table 23 Number 4.6.3 Component.Category X X

OmniClass Table 23 Description 4.6.4 Component.Type.Name X X

Equipment Operation Nomenclature 4.6.5 Component.Type.Description

Equipment Acronym 4.6.6 Component.Acronym X X

Equipment Sequence 4.6.7 Component.AssetIdentifier X X

Equipment Identification Composite 4.6.8 Component.CompositeID X X

Previous Equipment Identification 4.6.9 Component.PreviousID

Previous Equipment Primary Key 4.6.10 Component.Previous.ExtIdentifier

Equipment Organization Asset

Number

4.6.11 Component.OrgExtIdentifier

Equipment Power Supply 4.6.12 Component.ElectricPower X

Equipment System Relationship 4.6.13 System.Name X

Equipment System Category 4.6.14 System.Category X

Equipment Assembly/Sub Assembly 4.6.15 Component.SubAssembly.ExtIdentifier X

Equipment Control relationship 4.6.16 Component.Control.ExtIdentifier

Equipment Alarm Relationship 4.6.17 Component.Alarm.ExtIdentifier

Equipment Indication Relationship 4.6.18 Component.Indication.ExtIdentifier

Equipment Failure Impact

Relationship

4.6.19 Component.Failure.ExtIdentifier

Equipment Priority 4.6.20 Component.Priority X X

Equipment COOP 4.6.21 Component.COOP X X

Equipment Owner 4.6.22 Component.Owner

Equipment Curtailment 4.6.23 Component.Curtailment

Equipment Operation Level 4.6.24 Component.OpsCode

Equipment Status 4.6.25 Component.Status

Equipment Failure Status 4.6.26 Component.FailureStatus

Equipment Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Minimum Required Equipment

Specifications

Page 183: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Equipment Manufacturer 4.6.27.1 Type.Manufacturer X X

Equipment Manufactured Date 4.6.27.2 Type.ManufacturerDate

Equipment Manufacturer Shelf Life 4.6.27.3 Type.ManufacturerShelfLife

Equipment Model Name 4.6.27.4 Type.ModelName X X

Equipment Model Number 4.6.27.5 Type.ModelNumber X X

Equipment Serial Number 4.6.27.6 Type.SerialNumber X X

Equipment Installation Cost 4.6.27.7 Type.EquipmentInstallationCost

Product Specific Required

Specifications

Equipment Specifications

(Spie Defined)

4.6.28 Type.Parameter Various X X Classification Parameters

Design Parameters

Complete SPie Data

Package

Job Tasks Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Job Task Primary Key 4.7.1 Job.ExtIdentifier X X

Job Task Data Fields

Job Task Type 4.7.2 Job.Category X X

Job Task Name 4.7.3 Job.Name X X

Job Task Status 4.7.4 Job.Status

Job Task Status Related Cause 4.7.5 Job.StatusDescription

Job Task Guide 4.7.6 Job.Guide X

Job Task Sequence Number 4.7.7 Job.TaskNumber X

Job Task Identification Composite 4.7.8 Job.CompositeID X

Job Task Performer 4.7.9 Job.ResponsiblePerformer X

Job Task Frequency 4.7.10 Job.Frequency X X

Job Task Frequency Units 4.7.11 Job.FrequencyUnit X X

Job Task Inspection Percentage 4.7.12 Job.InspectionPercent

Job Task Season 4.7.13 Job.TaskSeason

Job Task Start Date 4.7.14 Job.Start

Job Task Time Standard 4.7.15 Job.Duration

Job Task Time Standard Units 4.7.16 Job.DurationUnits

Commissioning Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Page 184: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Database Links

Commissioning Primary Key 4.8.1 Commission.ExtIdentifier X

Condition Assessment Data

Commission Provider 4.8.2 Commission.Provider X

Commission Date 4.8.3 Commission.Date X

Commission Observation 4.8.4 Commission.Observation

Commission Recommendation 4.8.5 Commission.Recommendation

Commissioning Document GUID 4.8.6 Commission.DocumentExtIdentifier X

Commissioning Short Description 4.8.7 Commission.DocumentName X

Commissioning Document 4.8.8 Commission.Document X

Condition Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Condition Assessment Primary Key 4.9.1 Condition.ExtIdentifier X

Condition Assessment Data

Equipment Installed Date 4.9.2 Component.InstallDate X

Equipment Life Expectancy 4.9.3 Component.LifeExpectance

Equipment Age 4.9.4 Component.Age

Equipment Life Remaining 4.9.5 Component.LifeRemaining

Equipment Purchased Condition 4.9.6 Component.PurchaseCondition X

Equipment Condition 4.9.7 Component.Condition

Equipment Condition Related Cause 4.9.8 Component.ConditionCause

Equipment Life Used 4.9.9 Component.LifeUsed

Condition Observation 4.9.10 Condition.Observation

Condition Recommendation 4.9.11 Condition.Recommendation

Condition Assessment Provider 4.9.12 Condition.Provider

Condition Assessment Date 4.9.13 Condition.Date

Condition Assessment Document

GUID

4.9.14 Condition.DocumentExtIdentifier X

Condition Assessment Short

Description

4.9.15 Condition.DocumentName X

Condition Assessment Document 4.9.16 Condition.Document X

Audit and Inspection Data Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Page 185: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Audit Primary Key 4.10.1 Audit.ExtIndentifier

Audit and Inspection Data

Audit Type 4.10.2 Audit.Type

Equipment Compliance 4.10.3 Audit.ComponentCompliance

Compliance Regulations 4.10.4 Component.ComplianceRegulation

Audit Observation 4.10.5 Audit.Observation

Audit Recommendation 4.10.6 Audit.Recommendation

Audit Provider 4.10.7 Audit.Provider

Audit Date 4.10.8 Audit.Date

Audit Document GUID 4.10.9 Audit.DocumentExtIdentifier

Audit Short Description 4.10.10 Audit.DocumentExtIdentifier

Audit Document 4.10.11 Audit.Document

Warranty Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Database Links

Warranty Primary Key 4.11.1 Warranty.ExtIdentifier X

Warranty Data Fields

Warranty Number 4.11.2 Warranty.Number X

Warranty Provider Name 4.11.3 Warranty.ProviderName X

Warranty Provider Contact

Information

4.11.4 Warranty.ProviderContact X

Warranty Installer Name 4.11.5 Component.Installer X

Warranty Installer Contact

Information

4.11.6 Component.InstallerContact X

Warranty Start Date 4.11.7 Warranty.StartDate X

Warranty End Date 4.11.8 Warranty.EndDate X

Extended Warranty Available 4.11.9 Warranty.ExtendStatus X

Extended Warranty Number 4.11.10 Warranty.ExtendNumber X

Extended Warranty Provider Name 4.11.11 Warranty.ExtendProvider X

Extended Warranty Start Date 4.11.12 Warranty.ExtendStartDate X

Extended Warranty End Date 4.11.13 WarrantyExtendEndDate X

Substantial Completion Date 4.11.14 Warranty.SubstantialCompletion.Date X

Warranty Document GUID 4.11.15 Warranty.DocumentExtIdentifier X

Warranty Short Description 4.11.16 Warranty.DocumentName X

Warranty Document 4.11.17 Warranty.Document X UFGS Data Packages

1,2,3,4,5

Page 186: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Extended Warranty Document

GUID

4.11.18 ExtWarranty.DocumentExtIdentifier X

Extended Warranty Short

Description

4.11.19 ExtWarranty.DocumentName X

Extended Warranty Document 4.11.20 ExtWarranty.Document X UFGS Data Packages

1,2,3,4,5

Code and Regulations Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Federal Code and Regulation

Documents

4.13.1

Federal Code GUID 4.13.1.1 FederalCode.ExtIdentifier

Federal Code Title 4.13.1.2 FederalCode.Title

Federal Code Identification 4.13.1.3 FederalCode.ID

Federal Code Description 4.13.1.4 FederalCode.Description

Federal Code Governing Entity 4.13.1.5 FederalCode.Governance

Federal Code Document 4.13.1.6 FederalCode.Document

State and Local Code and

Regulation Documents

4.13.2

State Code GUID 4.13.2.1 StateCode.ExtIdentifier

State Code Title 4.13.2.2 StateCode.Title

State Code Identification 4.13.2.3 StateCode.ID

State Code Description 4.13.2.4 StateCode.Description

State Code Governing Entity 4.13.2.5 StateCode.Governance

State Code Document 4.13.2.6 StateCode.Document

Industry Code and Regulation

Documents

4.13.3

Industry Code GUID 4.13.3.1 IndustryCode.ExtIdentifier

Industry Code Title 4.13.3.2 IndustryCode.Title

Industry Code Identification 4.13.3.3 IndustryCode.ID

Industry Code Description 4.13.3.4 IndustryCode.Description

Industry Code Governing Entity 4.13.3.5 IndustryCode.Governance

Industry Code Document 4.13.3.6 IndustryCode.Document

Operations Documents Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Operating Documents

Normal Operation GUID 4.12 Operation.DocumentExtIdentifier UFGS Data Packages

Page 187: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

2,3,4,5

Normal Operation Short Description 4.12 Operation.DocumentName

Normal Operation Document 4.12 Operation.Document

Normal Operation Video 4.12 Operation.Video

Operator Prestart Procedure GUID 4.12 Prestart.DocumentExtIdentifier UFGS Data Packages 3,4,5

Operator Prestart Procedure Short

Description

4.12 Prestart.DocumentName

Operator Prestart Procedure

Document

4.12 Prestart.Document

Operator Prestart Procedure Video 4.12 Prestart.Video

Operator Startup Procedure GUID 4.12 Startup.DocumentExtIdentifier UFGS Data Packages 3,4,5

Operator Startup Procedure Short

Description

4.12 Startup.DocumentName

Operator Startup Procedure

Document

4.12 Startup.Document

Operator Startup Procedure Video 4.12 Startup.Video

Operator Shutdown Procedure GUID 4.12 Shutdown.DocumentExtIdentifier UFGS Data Packages 3,4,5

Operator Shutdown Procedure Short

Description

4.12 Shutdown.DocumentName

Operator Shutdown Procedure

Document

4.12 Shutdown.Document

Operator Shutdown Procedure Video 4.12 Shutdown.Video

Operator Post Shutdown Procedure

GUID

4.12 PostSD.DocumentExtIdentifier UFGS Data Packages 3,4,5

Operator Post Shutdown Procedure

Short Description

4.12 PostSD.DocumentName

Operator Post Shutdown Procedure

Document

4.12 PostSD.Document

Operator Post Shutdown Procedure

Video

4.12 PostSD.Video

Emergency Operations GUID 4.12 EmergOps.DocumentExtIdentifier UFGS Data Packages 3,4

Emergency Operations Short

Description

4.12 EmergOps.DocumentName

Emergency Operations Document 4.12 EmergOps.Document

Emergency Operations Video 4.12 EmergOps.Video

Operations Documents Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Page 188: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

Maintenance and Troubleshooting

Documents

Wiring Control Diagrams GUID 4.12 Wiring.DocumentExtIdentifier UFGS Data Packages 3,4,5

Wiring Control Diagrams Short

Description

4.12 Wiring.DocumentName

Wiring Control Diagrams Document 4.12 Wiring.Document

Wiring Control Diagrams Video 4.12 Wiring.Video

Removal and replacement instructions

GUID

4.12 Replacement.DocumentExtIdentifier UFGS Data Packages

2,3,4,5

Removal and Replacement

Instructions Short Description

4.12 Replacment.DocumentName

Removal and Replacement

Instructions Document

4.12 Replacment.Document

Removal and Replacement

Instructions Video

4.12 Replacment.Video

Cleaning Requirements GUID 4.12 Cleaning.DocumentExtIdentifier UFGS Data Packages

1,2,3,4

Cleaning Requirements Short

Description

4.12 Cleaning.DocumentName

Cleaning Requirements Document 4.12 Cleaning.Document

Cleaning Requirements Video 4.12 Cleaning.Video

Lubrication Data GUID 4.12 Lubrication.DocumentExtIdentifier UFGS Data Packages 2,3,4

Lubrication Data Short Description 4.12 Lubrication.DocumentName

Lubrication Data Document 4.12 Lubrication.Document

Lubrication Data Video 4.12 Lubrication.Video

Spare Parts List GUID 4.12 Parts.DocumentExtIdentifier X UFGS Data Packages

1,2,3,4,5

Spare Parts List Short Description 4.12 Parts.DocumentName X

Spare Parts List Document 4.12 Parts.Document X

Spare Parts List Video 4.12 Parts.Video

Special Tools List GUID 4.12 Tools.DocumentExtIdentifier

Special Tools List Short Description 4.12 Operation.DocumentName

Special Tools List Document 4.12 Operation.Document

Special Tools List Video 4.12 Operation.Video

Operations Documents Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Troubleshooting Guide GUID 4.12 Troubleshoot.DocumentExtIdentifier UFGS Data Packages

Page 189: PBS GSA National Equipment Standard Guide 2011-03-21

Section 10: Equipment Data Matrix

www.gsa.gov/bim

GSA National Equipment Standard

3,4,5

Troubleshooting Guide Short

Description

4.12 Tools.DocumentName

Troubleshooting Guide Document 4.12 Tools.Document

Troubleshooting Guide Video 4.12 Tools.Video

Product Cut Sheet GUID 4.12 Product.DocumentExtIdentifier X UFGS Data Packages

3,4,5

Product Cut Sheet Short Description 4.12 Product.DocumentName X

Product Cut Sheet Document 4.12 Product.Document X

Certificate GUID 4.12 Certificate.DocumentExtIdentifier

Certificate Date 4.12 Certificate.DocumentName

Certificate Short Description 4.12 Certificate.Document

Certificate Document 4.12 Certificate.Video

Training Documents

Training Materials GUID 4.12 Training.DocumentExtIdentifier

Training Materials Short Description 4.12 Training.DocumentName

Training Materials Document 4.12 Training.Document

Training Materials Video 4.12 Training.Video

Operations Documents Required

Synonym Name NES Database Field Name: Responsibility NC EB Format Format

Condition Documents

Environmental Conditions GUID 4.12 Environment.DocumentExtIdentifier UFGS Data Packages

2,3,4,5

Environmental Conditions Short

Description

4.12 Environment.DocumentName

Environmental Conditions Document 4.12 Environment.Document

Environmental Conditions Video 4.12 Environment.Video

Hazardous Material GUID 4.12 Hazard.DocumentExtIdentifier

Hazardous Material Short Description 4.12 Hazard.DocumentName

MSDS Data Sheet Document 4.12 Hazard.Document

Safety Precautions GUID 4.12 Safety.DocumentExtIdentifier X UFGS Data Packages

1,2,3,4,5

Safety Precautions Short Description 4.12 Safety.DocumentName X

Safety Precaution Document 4.12 Safety.Document X

Page 190: PBS GSA National Equipment Standard Guide 2011-03-21

References 186

www.gsa.gov/bim

GSA National Equipment Standard

References

OmniClassTM (http://www.omniclass.org/) National CAD Standards (http://www.buildingsmartalliance.org/index.php/ncs/) National BIM Standard TM (http://www.buildingsmartalliance.org/index.php/nbims/) Construction Operations Building Information ExchangeTM

(http://www.wbdg.org/resources/cobie.php) Whole Building Design Guide (http://www.wbdg.org/) Operations & Maintenance, Energy Efficiency and Renewable Energy, Federal Energy Management

Program, Department of Energy (http://www1.eere.energy.gov/femp/operations_maintenance/) Financial Impact and Analysis of Equipment Inventories, Robert Keady, Facilities Engineering

Journal by the Association for Facilities Engineering, Part 1, Nov/Dec 2009 (http://digital.bnpmedia.com/publication/?i=24865), Part 2, Jan/Feb 2010 (http://digitaladmin.bnpmedia.com/publication/?i=29138)

Page 191: PBS GSA National Equipment Standard Guide 2011-03-21

acknowledgements 187

www.gsa.gov/bim

GSA National Equipment Standard

Acknowledgements The development of this guidance has been a collaborative effort among a cadre of very knowledgeable consultants, working with a number of PBS associates in the Office of Design and Construction, Office of Facility Management and Services Programs, and GSA regional associates. Contributors are listed below: GSA PBS Central Office:

Charles Matta, FAIA

Director, Strategic Program Resources

Office of Design and Construction

Peggy Yee, Ph.D.

Program Expert, Strategic Program Resources

Office of Design and Construction

Jim Mullins

Lead Building Management Specialist

Office of Facility Management and Services Programs

David L. Gray, CFM

Office of Facility Management and Services Program

Smart Buildings Specialist

Cameron Schow

Building Management Specialist

Office of Facility Management and Services Programs

Carolyn Adelsten

Business Process Improvement Division(PGB)

Program Analyst

GSA PBS Regional Associates

Michael J. Stec

Building Operations and Tenant Services

Branch Chief

Region 01

John P. McDonald

Building Operations & Tenant Services Branch

Building Management Specialist

Region 01

Joel M. Dunbar, QCxP

Building Operations Tenant Services Branch

Building Management Specialist

Region 01

Robert A. Granato

Design and Construction Division

Branch Chief

Region 02

Ilana Hellmann, LEED

Design and Construction Division

Engineer

Region 02

Terrence L. Rollins, MBA, CEM, CPMM, CSDP

Newark Field Office

Building Management Specialist

Region 02

Matthew J. Waychoff

Operations Support Staff

Computer Integrated Facilities Manager

Region 03

Page 192: PBS GSA National Equipment Standard Guide 2011-03-21

acknowledgements 188

www.gsa.gov/bim

GSA National Equipment Standard

Stephen Devito

Project Management Division

Project Technology Specilaist

Region 03

Brandon J. Bolstad

Design & Construction Division

Project Technology Specialist

Region 03

Kenric Lanier

Operations and Maintenance Branch

Branch Chief

Region 04

Kenneth R. Burrell, RPA

Lead Building Management Specialist

Region 04

Jason P. Evanco

Architectural Section

Civil Engineer

Region 04

Mandy N. Yeomans

Architectural Section

Program Manager

Region 04

Richard Gee

Professional Services Division

Architect

Region 05

Francisco J. Torres

Facilities Management Services & Programs

Program Analyst

Region 05

Amanda M. Zansitis

Energy and Sustainability Branch

Engineer

Region 05

Kevin W. Santee

Tenant Services Branch

Branch Chief

Region 06

John L. Brumley

Planning and Support Branch

Program Specialist BIM

Region 06

William Reger

Tenant Services Branch

Buildings Management Specialist

Region 06

Keith G. Jorgensen

Tenant Services Branch

Equipment Specialist

Region 06

Gene E. Ramirez

Building Operations & Security Branch

Facility Engineer

Region 06

Guy T. Lunay

Building Operations Support Branch

Branch Chief

Region 07

Dan Lewis, CEM

Building Operations Support Branch

CMMS Coordinator

Region 07

Page 193: PBS GSA National Equipment Standard Guide 2011-03-21

acknowledgements 189

www.gsa.gov/bim

GSA National Equipment Standard

Jana A. Faris

Denver Federal Center Service Center Division

Lead Building Management Specialist

Region 08

Charles E. Turman

Colorado Property Management Center

Buildings Management Specialist

Region 08

Arlene R. Graham

Office of the Chief Architect

Program Manager

Region 08

Mark Levi

Energy & Sustainability Branch

Energy Manager

Region 09 Pacific Rim Region

Earle Murphy

Document and Web Management Branch

Regional SDM Coordinator (Contractor)

Region 09

Story Swett

Property Development Division

Regional Chief Architect

Region 10

Donna L. Twinam

Facilities Management Services & Programs Division

Deputy Director

Region 11

Roger D. Mason

Operations and Maintenance

Branch Chief

Region 11

Jeff Garrett

Operations Branch

Branch Chief

Region 11

Terry B. Forline, PMP

Business Solutions Branch

Program Manager

Region 11

Kevin Luk

Organizational Resources Division

Senior Information Technology Specialist

Region 11

Sam Wu

Principle Software Architect (Contractor)

Qinetiq North America

Region 11

Christie-Anne Edie

White House Service Center

Program Analyst

Region 11

Robert A. Keady Jr. CEM, FMP

Operations Branch

Building Management Specialist

Chairman and Author, National Equipment Standard

Region 11

Page 194: PBS GSA National Equipment Standard Guide 2011-03-21

acknowledgements 190

www.gsa.gov/bim

GSA National Equipment Standard

GSA Consultants

Calvin Kam, Ph.D.

Senior Program Expert, Strategic Program Resources

Office of Design and Construction

William Brodt

Chair, Facility Maintenance and Operations Committee

National Institute of Building Sciences

Kristine K. Fallon, FAIA

President

Kristine Fallon Associates, Inc.

Naila L. Crawford Consultant Kristine Fallon Associates, Inc.

Roger Grant

Senior Consultant

Construction Specification Institute

Page 195: PBS GSA National Equipment Standard Guide 2011-03-21

191

www.gsa.gov/bim

GSA National Equipment Standard

For further information about this GSA BIM Guide Series: 08 – BIM Guide for Facility Management or to submit comments or

questions, please visit the National 3D-4D-BIM webpage at http://www.gsa.gov/bim or contact:

The National 3D-4D-BIM Program

Office of Design and Construction

Public Buildings Service

U.S. General Services Administration

1800 F Street NW Suite 3300

Washington, DC 20405