PBN and the Cockpit Workshop
Regulatory and Certification Forum
EASA Guidance Material
Bryan Jolly ATM Rulemaking Officer/PBN Project manager,
18th October 2012
Currently Applicable Regulations
• Annex III to Council Regulation (EEC) No 3922/91 (EU-OPS)
3
http://eur-lex.europa.eu/en/index.htm
Operational Approval
• An operator shall ensure that an aeroplane operated in areas, or through portions of airspace, or on routes where navigation performance requirements have been specified, is certified according to these requirements, and, if required, that the Authority has granted the relevant operational approval.
4
EU-OPS 1.243(a)
Operational Approvals Required from NAA !
EASA requirements
PBN operations
EASA / JAA
RNAV 10 AMC 20-12
RNAV 5 (B-RNAV)
AMC 20-4
RNAV 1 (P-RNAV)
JAA TGL 10
RNP APCH (LNAV) AMC 20-27
RNP APCH (LNAV/VNAV) AMC 20-27
RNP APCH (LPV) AMC 20-28
RNP AR AMC 20-26
http://easa.europa.eu/agency-measures/certification-specifications.php
AMC 20- material
6
1. Purpose
2. Background
3. Scope
4. Reference Documents
5. Assumptions
6. RNP-APCH Airworthiness Criteria
7. Functional Criteria
8. Airworthiness Compliance
9. AFM/POH
10. RNP-APCH Operational Criteria incl. appendices 2, 3, 4 and 5
11. Availability of Documents
• Contents of AMC 20-27:
General information.
General information.
Airworthiness Criteria.
Operational Criteria.
Issues
•Note the number of PBN applications is increasing, •Requesting and obtaining a SPA constitutes an additional administrative task, especially for non-commercial operators
What are the Safety gains?
7
Future PBN Operational Approvals
PBN Approvals
Objectives
Transpose the operational criteria
from AMC 20-4, AMC 20-5, AMC 20-12,
AMC 20-27 AMC 20-28 into Part-SPA;
8
9
• interoperability requirements, resulting from the SES implementing rules
• Safety requirements deemed necessary to ensure the safe operation of the aircraft in the given volume of airspace.
• Will replace the AMC 20 series • Developed to included required Nav
Spec’s for worldwide operations
Develop applicable
Certification Specifications
(CS-ACNS)
What Next - Airworthiness