paving, grading and drainage notesdnhiggins.com/docs/arden pud sr80.pdfall costs associated with...
TRANSCRIPT
INDEX
JOB NO: 1627 SHEET 1 OF 7R
ROADWAY ALTERATION PLANS
ARDEN P.U.D.
STATE ROAD 80
POSTED SPEED 55 MPH
DESIGN SPEED 65 MPH
SEC. 33 & 34 TWP. 43 RNG. 40
LOCATION MAP
NORTH
STATE ROAD 80
SE
MIN
OLE
P
RA
TT
WH
IT
NE
Y R
OA
D
SA
FA
RI R
OA
D
LIO
N C
OU
NT
RY
LE
VE
E L-8
TWENTY
MILE BEND
SITE
N.T.S.
MICHAEL B. SCHORAH& ASSOCIATES, INC.
EB# 2438
ENGINEERS SURVEYORS DEVELOPMENT CONSULTANTS
LB# 2438
1 COVER SHEET
2 DRAINAGE MAP
3 TYPICAL ROADWAY SECTIONS
4 SIGNING AND MARKING PLAN
5 PAVING AND DRAINAGE PLAN
6-7 PAVING AND DRAINAGE DETAILS
AS-BUILT NOTES:
1. RECORD DRAWINGS SHALL BE PREPARED IN
STATE PLANE COORDINATE SYSTEM.
2. UTILITY FACILITIES ARE TO BE SHOWN IN
AS-BUILT LOCATION.
3. STATE PLANE COORDINATES ARE REQUIRED
FOR UTILITY FACILITIES.
PAVING, GRADING AND DRAINAGE NOTES:
1. THE CONTRACTOR MUST COMPLY WITH F.D.O.T. INDEX 600 FOR MAINTENANCE OF
TRAFFIC.
2. EROSION AND TURBIDITY BARRIERS ARE TO BE INSTALLED AND MAINTAINED PRIOR
TO AND DURING CONSTRUCTION TO PREVENT VIOLATION OF STATE WATER
QUALITY STANDARDS FOR OFFSITE DISCHARGES (29 NTU ABOVE BACKGROUND
FOR TURBIDITY). THESE BARRIERS SHALL REMAIN IN PLACE UNTIL CONSTRUCTION
IS COMPLETED, SOILS ARE STABILIZED, AND VEGETATION HAS BEEN ESTABLISHED.
REFERENCE FLORIDA DEPT. OF TRANSPORTATION ROADWAY AND TRAFFIC DESIGN
STANDARDS INDEXES 102 AND 103 FOR TYPICAL INSTALLATION DETAILS.
3. FILTER FABRIC SHALL BE INSTALLED ON ALL CATCH BASIN GRATES AND
MAINTAINED UNTIL CONSTRUCTION IS COMPLETE.
4. THE CONTRACTOR SHALL MAKE HIMSELF FAMILIAR WITH THE STORM WATER
POLLUTION PREVENTION PLAN REQUIRED BY THE NATIONAL POLLUTANT
DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT. CONTRACTOR'S
RESPONSIBILITIES SHALL INCLUDE, BUT BE NOT LIMITED TO, THE FOLLOWING:
EROSION AND SEDIMENT CONTROLS
MAINTENANCE AND INSPECTION
GOOD HOUSEKEEPING
SPILL CONTROL
WEEKLY REPORTS AND AFTER EVERY RAINFALL EVENT GREATER THAN 0.5"
MAINTENANCE OF SUCH REPORTS ON-SITE
RETENTION OF RECORDS FOR THREE (3) YEARS AFTER COMPLETION OF FINAL
SITE STABILIZATION
5. ALL ACCESSIBLE ROUTES CANNOT EXCEED A SLOPE OF 1:20 (5%) AND CURB CUT
RAMPS CANNOT EXCEED A SLOPE OF 1:12 (8.33 %). RAMPS THAT EXCEED 6' IN
LENGTH REQUIRE HANDRAILS. ALL CROSS SLOPES CANNOT EXCEED A SLOPE OF
1:50 (2%). ALL CURB CUT RAMPS REQUIRE DETECTABLE WARNING (TRUNCATED
DOMES).
SUPPLEMENTAL CONDITIONS:
(APPLICABLE TO PAVING, DRAINAGE, WATER, SANITARY AND UTILITY CROSSING
PLANS)
1. ALL FITTINGS ARE TO BE INCLUDED IN THE PIPE UNIT PRICES.
2. ALL REQUIRED TESTING IS TO BE INCLUDED IN THE UNIT PRICES.
3. FINAL GRADING IS TO BE INCLUDED IN THE UNIT PRICES. GRADING IS TO BE IN
ACCORDANCE WITH THE DETAILS ON THE PLANS. ANY EXCESS MATERIAL IS TO
BE REMOVED FROM THE SITE. ANY DEFICIT MATERIAL IS TO BE PROVIDED BY
THE CONTRACTOR AND IS INCLUDED IN THE UNIT PRICES.
4. OVERBURDEN, OUTSIZE MATERIALS, TRASH AND ANY DELETERIOUS MATERIALS
THAT DO NOT MEET THE SPECIFICATIONS ON THE PLANS, ARE TO BE REMOVED
TO A LEGAL DISPOSAL SITE AT NO ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR IS REQUIRED TO ADHERE TO THE CURB SURFACE
REQUIREMENTS AS OUTLINED IN THE FLORIDA DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION, SECTION 520-10.
6. UTILITY CROSSINGS ARE TO BE MARKED WITH A PVC PIPE EACH END INDICATING
THE CROSSING TYPE AND SIZE(S) ON THE PVC PIPE WITH A PERMANENT WATER
PROOF MARKER.
7. WATER AND SEWER SERVICE LOCATIONS ARE TO BE MARKED WITH A NAIL AND
TIN TAB IN THE PAVEMENT 18 FEET FROM THE SERVICE AND PERPENDICULAR
TO THE ROAD RIGHT-OF-WAY LINE.
8. THE CONTRACTOR WILL BE REQUIRED, AS PART OF THE UNIT PRICES, TO
STREET SWEEP/VACUUM THE CURB AND ROADWAY SURFACE UPON NOTICE TO
PROCEED FROM OWNER.
9. THE CONTRACTOR WILL BE REQUIRED, AS PART OF THE UNIT PRICES, TO CLEAN
THE DRAINAGE SYSTEM BY VACUUMING AS NECESSARY UPON NOTICE TO
PROCEED BY OWNER.
10. THE CONTRACTOR WILL BE REQUIRED, AS PART OF THE UNIT PRICES, TO
REGRADE AS NECESSARY AFTER FPL, BELLSOUTH AND CABLE SERVICE
INSTALLATION UPON NOTICE TO PROCEED BY OWNER.
11. TWO FEET OF SOD, MINIMUM, SHALL BE REQUIRED BEHIND ALL CURB AND
AROUND EACH DRAINAGE INLET.
12. THE CONTRACTOR SHALL INSTALL TEMPORARY ASPHALT TRANSITIONS AFTER
INSTALLATION OF THE FIRST LIFT OF ASPHALT AROUND ALL MANHOLE LIDS AND
VALVE BOXES WITHIN THE PAVEMENT AREA. ALSO, TRANSITIONS SHALL BE
PROVIDED AT ALL INTERSECTIONS OF SIDEWALKS AND ROADWAYS. THE
CONTRACTOR SHALL REMOVE ASPHALT TRANSITIONS PRIOR TO INSTALLATION
OF THE FINAL LIFT OF ASPHALT.
13. MAINTENANCE OF TRAFFIC AND CONSTRUCTION LAYOUT ARE TO BE INCLUDED
IN THE CONTRACTOR'S UNIT PRICES.
14. CONTRACTOR SHALL PROVIDE TEMPORARY PAVEMENT MARKINGS (TRAFFIC
PAINT) AFTER PLACEMENT OF FIRST ASPHALT LIFT.
15. CONTRACTOR SHALL PROVIDE BI-DIRECTIONAL BLUE REFLECTIVE PAVEMENT
MARKERS (RPM'S) AT TRAFFIC LANE CENTER ADJACENT TO FIRE HYDRANT
LOCATIONS. RPM'S SHALL BE PLACED AFTER EACH ASPHALT LIFT. RPM'S SHALL
BE REMOVED FROM FIRST LIFT PRIOR TO PLACEMENT OF FINAL LIFT.
GENERAL NOTES
1. INCORPORATED AS A PART OF THE GENERAL SPECIFICATIONS AND REQUIREMENTS FOR THIS PROJECT
ARE THE RELEVANT CRITERIA INCLUDED IN THE LATEST REVISION OF THE FOLLOWING ITEMS:
1.1. FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION
1.2. FLORIDA DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS
1.3. PALM BEACH COUNTY UNIFIED LAND DEVELOPMENT CODE
1.4. PALM BEACH COUNTY WATER UTILITIES DEPARTMENT MINIMUM ENGINEERING AND
CONSTRUCTION STANDARDS
1.5. ALL CONDITIONS AND/OR REQUIREMENTS RELATED TO THE CONSTRUCTION ACTIVITIES AS SET IN
THE SITE DEVELOPMENT PERMITS. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THESE
ITEMS. ANY COSTS ASSOCIATED WITH COMPLIANCE IS INCLUDED IN THE UNIT PRICES.
2. AT NO ADDITIONAL COST TO THE OWNER, THE CONTRACTOR SHALL PROVIDE ACCESS AND ALLOW FOR
COORDINATION SERVICES TO ACCOMMODATE UTILITIES, CONDUIT AND/OR SLEEVE CONSTRUCTION BY
OTHERS. ANY UTILITIES, CONDUITS AND/OR SLEEVES INSTALLED BY OTHERS AND DAMAGED BY THE
CONTRACTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
3. IF REQUIRED BY OWNER OR GOVERNMENTAL AGENCY HAVING JURISDICTION OVER AFFECTED
ROADWAYS, THE CONTRACTOR WILL PROVIDE, AS PART OF HIS BASE BID FOR PAVEMENT SYSTEMS, A
MAINTENANCE OF TRAFFIC PLAN. ALSO INCLUDED WILL BE THE LABOR, EQUIPMENT AND MATERIALS
REQUIRED TO IMPLEMENT THAT PLAN. ALL WORK MUST BE DONE IN ACCORDANCE WITH AGENCY
REQUIREMENTS AND ANY REQUIRED PERMITS OR APPROVALS MUST BE APPLIED FOR AND OBTAINED
BY THE CONTRACTOR.
4. TESTING OF CONSTRUCTION MATERIALS AND/OR CONSTRUCTED FACILITIES WILL BE REQUIRED AS
OUTLINED IN THE GOVERNING SPECIFICATIONS AS NECESSARY TO MEET THE REQUIREMENTS OF THE
PERMITTING/APPROVING AGENCIES. ALL TESTING IS TO BE DONE BY A FLORIDA LICENSED TESTING
LABORATORY AND THE COST OF THESE TESTS IS INCLUDED IN THE CONTRACTOR'S UNIT PRICES.
5. FIELD REVIEWS OF CONSTRUCTED FACILITIES WILL BE REQUIRED DURING THE CONSTRUCTION
PROCESS. THE CONTRACTOR IS TO NOTIFY THE ENGINEER A MINIMUM OF 24 HOURS PRIOR TO THE
REQUESTED TIME FOR REVIEW OF THE COMPLETED ITEMS. CONTRACTOR TO PROVIDE ALL LABOR,
EQUIPMENT AND MATERIALS NEEDED TO ACCOMMODATE THE FIELD REVIEW. THESE REVIEWS
INCLUDE BUT ARE NOT LIMITED TO:
5.0.1. DRAINAGE PIPE AND STRUCTURE REVIEW
5.0.2. SUB-GRADE REVIEW
5.0.3. CURB REVIEWS
5.0.4. BASE REVIEWS
5.0.5. PUMP OUT AND LAMPING OF DRAINAGE SYSTEM
5.0.6. ASPHALT REVIEWS
5.0.7. SEMI-FINAL AND FINAL REVIEWS
5.0.8. PRESSURE AND LEAKAGE TESTING OF WATER SYSTEMS
5.0.9. LAMPING AND TELESPECTION OF SANITARY SEWER SYSTEM
FACILITIES MUST BE COMPLETED PRIOR TO SCHEDULING FIELD REVIEW. IF A FIELD REVIEW FAILS
TO MEET THE AGENCY REQUIREMENTS AND AN ADDITIONAL REVIEW IS REQUIRED THE CONTRACTOR
WILL BE RESPONSIBLE TO PAY ANY FEES ASSOCIATED WITH THE ADDITIONAL REVIEW.
6. NO SEPARATE PAYMENT SHALL BE PROVIDED TO THE CONTRACTOR FOR EARTHWORK ASSOCIATED
WITH THIS CONTRACT. ALL COSTS ASSOCIATED WITH SITE PREPARATION NECESSARY TO EXECUTE
THE WORK SET FORTH IN THE CONTRACT SHALL BE INCLUDED IN THE ITEMS PROVIDED FOR IN THE
UNIT PRICE BID SCHEDULE. ANY EXCESS MATERIAL REMAINING UPON COMPLETION OF CONSTRUCTION
SHALL BE REMOVED TO AN ACCEPTABLE LOCATION AT THE EXPENSE OF THE CONTRACTOR. AT THE
OWNER'S OPTION HE MAY IDENTIFY A LOCATION FOR THIS MATERIAL TO BE STOCK PILED OR INSTRUCT
THE CONTRACTOR TO REMOVE THE EXCESS TO A LEGAL DISPOSAL SITE. THE SITE HAS BEEN
PREVIOUSLY FILLED BY OTHERS TO ELEVATION 23.0 NGVD. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR FINAL GRADING OF THE SITE TO WITHIN 0.2 ± FOOT OF ALL THE PROPOSED FINISHED GRADE
ELEVATIONS THROUGHOUT THE PROJECT SITE AS DEPICTED ON THE PLANS PREPARED BY THE
ENGINEER. ELEVATIONS OF CONSTRUCTED FACILITIES, IE ROADWAYS, DRAINAGE, ETC. ARE TO BE AS
INDICATED ON THE PLANS.
7. EXISTING UTILITIES, ROADWAY AND DRAINAGE FACILITIES ARE LOCATED AND IDENTIFIED BASED ON
THE AVAILABLE INFORMATION. THE CONTRACTOR IS TO VERIFY THIS INFORMATION WHERE
NECESSARY FOR PROPOSED CONSTRUCTION. ALL COSTS ASSOCIATED WITH VERIFICATION,
PROTECTION OF EXISTING SYSTEMS OR CONNECTION TO THOSE ITEMS AS CALLED FOR ON THE PLANS
IS INCLUDED IN THE UNIT PRICES.
8. CONTRACTOR SHALL EMPLOY A REGISTERED SURVEYOR TO LAY OUT LINE, GRADES, STRUCTURES,
LOT CORNERS, ETC. AS NECESSARY TO CONSTRUCT THE PROPOSED FACILITIES IN ACCORDANCE WITH
THE PLANS AND SPECIFICATION. BENCH MARKS SHALL BE ESTABLISHED BY A REGISTERED SURVEYOR.
BENCH MARKS SHALL BE PERMANENT AND EASILY ACCESSIBLE AND MAINTAINED AND REPLACED IF
DISTURBED OR DESTROYED.
9. ANY UNSTABLE SOIL AND/OR SOIL CONTAINING ORGANIC MATERIAL ENCOUNTERED DURING
CONSTRUCTION, INCLUDING BUT NOT LIMITED TO MUCK, SILT, SLUDGE AND MARL, SHALL BE REMOVED
AND SHALL BE REPLACED BY MATERIAL ACCEPTABLE TO THE ENGINEER. NO ADDITIONAL PAYMENT
SHALL BE PROVIDED FOR REMOVAL, REPLACEMENT, AND DISPOSAL OF SUCH UNSTABLE SOIL AND/OR
ORGANIC CONTENT SOIL. THE REMOVAL, REPLACEMENT AND DISPOSAL OF SUCH UNSTABLE SOIL
AND/OR ORGANIC CONTENT SOIL SHALL BE CONSIDERED TO BE PART OF THE CONTRACT PRICE AS
PROVIDED IN THE UNIT PRICE BID SCHEDULE. IF ANY ROCK, HARDPAN, ETC. IS ENCOUNTERED DURING
CONSTRUCTION OF ANY ITEMS, THE REMOVAL AND BACKFILL REQUIRED SHALL BE CONSIDERED
INCIDENTAL TO CONSTRUCTION OF THAT ITEM AND NO SEPARATE PAYMENT WILL BE MADE.
10. THE CONTRACTOR SHALL VISIT THE SITE AND ACQUAINT HIMSELF WITH ALL EXISTING CONDITIONS.
MAKE HIS OWN SUBSURFACE INVESTIGATION TO SATISFY HIMSELF AS TO THE SITE AND SUBSURFACE
CONDITIONS, BUT SUCH SUBSURFACE INVESTIGATIONS SHALL BE PERFORMED ONLY UNDER TIME
SCHEDULES AND ARRANGEMENTS APPROVED IN ADVANCE BY THE OWNER'S REPRESENTATIVE AND
ENGINEER. THE EXISTING GRADES SHOWN ON THE DRAWINGS ARE APPROXIMATE ONLY AND NO
REPRESENTATION IS MADE AS TO THEIR ACCURACY OR CONSISTENCY. THE CONTRACTOR SHALL
VERIFY ALL EXISTING GRADES TO THE EXTENT NECESSARY TO INSURE COMPLETION OF THE JOB TO
THE PROPOSED GRADES INDICATED ON THE DRAWINGS
11. THE CONTRACTOR SHALL PROVIDE ADEQUATE BARRIERS AND PROTECTION FOR THOSE EXISTING
FACILITIES AND VEGETATION (NATURAL AND LANDSCAPING) THAT ARE TO REMAIN IN THE EXISTING
CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY COST ASSOCIATED WITH REPAIR OR
REPLACEMENT OF THESE ITEMS IF THEY ARE DAMAGED OR DESTROYED BY THE CONTRACTOR
(INCLUDING HIS WORKERS, SUBCONTRACTORS, LABORERS, SUPPLIERS, DELIVERY VEHICLES.)
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ANY DEWATERING
PERMITS AND/OR APPROVALS NECESSARY FOR THE CONSTRUCTION OF THE PROPOSED
FACILITIES/SYSTEMS.
13. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF SEVEN (7) COPIES FOR SHOP DRAWINGS, PRODUCT
DATA, MATERIAL SPECIFICATION OF OTHER INFORMATION REGARDING CONSTRUCTION MATERIALS
AND STRUCTURES AS REQUESTED BY THE OWNER, ENGINEER OR PERMITTING/APPROVAL AGENCY.
SHOP DRAWINGS MUST BE NEWLY PREPARED INFORMATION, DRAWN TO ACCURATE SCALE. DO NOT
REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD INFORMATION AS THE BASIS OF SHOP
DRAWINGS. STANDARD INFORMATION PREPARED WITHOUT SPECIFIC REFERENCE TO THE PROJECT IS
NOT CONSIDERED SHOP DRAWINGS. ALL COSTS ASSOCIATED WITH THIS ITEM IS INCLUDED IN THE UNIT
PRICES.
Plot D
ate: A
ug. 12, 2015
File: W
:\1627 H
IG
HLA
ND
D
UN
ES
F
CM
\E
NG
IN
EE
RIN
G\A
PR
IL D
RA
WIN
GS
\1627S
R80 - C
opy.dw
g
FDOT PERMIT # 15A-496-0035-93120 ARDEN P.U.D. (HIGHLAND DUNES)
8/12/15: REV. PER F.D.O.T.
1
133
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
PC
: 101+
69.59
Mid: 101+
69.73
PT
: 101+
69.87
EP
: 133+
52.44
6
10
20
6
10
20
20 20
105+09.19
310.72' LT
S - 133
INVERT
6.00 S
CONC. COLLAR
99
100
101
102
103
104
105
106
107
108
PC
: 101+
69.59
Mid: 101+
69.73
PT
: 101+
69.87
105+09.19
310.72' LT
S - 133
INVERT
6.00 S
CONC. COLLAR
72
73
74
75
76
77
78
79
80
81
82
83
1" = 200'
1" = 100'
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
200
100 200 400 600
1627
2
DE
SC
RIP
TIO
N:
PR
OJE
CT
:
MIC
HA
EL
B. S
CH
OR
AH
& A
SS
OC
IAT
ES
, IN
C.
EB
# 2438
EN
GIN
EE
RS
S
UR
VE
YO
RS
D
EV
EL
OP
ME
NT
C
ON
SU
LT
AN
TS
DR
AW
N/C
HE
CK
ED
:
DA
TE
:
RE
VIS
IO
NS
SC
ALE
:
MD
V / F
R
DA
TE
:
OC
T 2
01
4
7R
DR
AIN
AG
E M
AP
Plot D
ate: A
ug. 12, 2015
File: W
:\1627 H
IG
HLA
ND
D
UN
ES
F
CM
\E
NG
IN
EE
RIN
G\A
PR
IL D
RA
WIN
GS
\1627S
R80 - C
opy.dw
g
LB
# 2
43
8
PLAN
DRAINAGE CONNECTION DETAIL 'B'
EXISTING 24" PIPES
EXISTING 48" PIPES
EXISTING 18" PIPES
SEE DETAIL 'B'
CONSTRUCT 18"
PIPE AND M.E.S.'S
REMOVE EXISTING
PIPE AND M.E.S.
EXISTING 72" PIPES
CONTROL
STRUCTURE
REMOVE EXISTING
PIPE AND M.E.S.
REMOVE EXISTING
PIPE AND M.E.S.
EXISTING 24" PIPE
EXISTING 30" PIPE
EXISTING 72" OUTFALL
TO S.F.W.M. C-51 CANAL
ARDEN P.U.D. PLAT 1
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
100
50 100 200 300
EXISTING 30" PIPE
CONTROL
STRUCTURE
LAKE TRACT 4
STATE ROAD 80
REMOVE EXISTING HEADWALL
AND CONSTRUCT TYPE 'P'
MANHOLE ON EXISTING 72" RCP
ARDEN LAKE WAY
PROJECT ENTRANCE
CANE FIELD TRACE
PROJECT ENTRANCE
1" = 100'
DRAINAGE CONNECTION DETAIL "A'
EXISTING 48" RCP
DRAINAGE
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
100
50 100 200 300
L-8
C
AN
AL
STATE ROAD 80
REMOVE EXISTING HEADWALL
AND CONSTRUCT TYPE 'P'
MANHOLE ON EXISTING 48" RCP
C-51 CANAL
SEE DETAIL 'A'
C-51 CANAL
C-51 CANAL
LAKE TRACT
BOUNDARY
20' LME
DEMOLITION NOTE:
OWNERSHIP OF ALL SUITABLE EXCAVATED MATERIALS WITHIN THE FDOT R/W, AS DETERMINED BY
THE F.D.O.T., SHALL REMAIN IN THE DEPARTMENT UNTIL A FINAL ACCEPTANCE OF THE PERMITTED
PROJECT IS FULFILLED. EXCAVATED MATERIALS SHALL BE HAULED BY THE CONTRACTOR, AT THEIR
COST & EXPENSE FROM THE SITE TO THE PALM BEACH OPERATIONS CENTER, 7900 W FOREST HILL
BLVD OR STOCKPILED IN THOSE AREAS AS DIRECTED BY THE DOT, INCLUDING ASPHALT MILLINGS.
PERMITTEE SHALL RETURN ALL SALVAGEABLE SIGNS, INCLUDING APPURTENANCES AND DRAINAGE
PIPES TO THE PALM BEACH OPERATIONS CENTER AT THE OWNERS EXPENSE.
DRAINAGE AND NPDES NOTES:
OUTFALL PIPES TO BE CONSTRUCTED THROUGH EXISTING BERM AREA. CONTRACTOR TO REMOVE
AND REPLACE BERM TO INSTALL NEW PIPES. BERM TO BE RECONSTRUCTED TO MATCH EXISTING.
CONTRACTOR TO INSTALL SILT FENCE AND EROSION CONTROL MEASURES TO CONFORM TO
CURRENT NPDES CRITERIA.
CONTRACTOR TO PROVIDE NPDES PLAN AND OBTAIN ALL REQUIRED NPDES PERMITS PRIOR TO
CONSTRUCTION.
2
0
' E
M
B
A
N
K
M
E
N
T
E
A
S
E
M
E
N
T
30'
ACCESS
EASEMENT
20'
EMBANKMENT
EASEMENT
20'
EMBANKMENT
EASEMENT
LIMIT OF SR-80
CONSTRUCTION
NOT INCLUDED
(F.D.O.T. INDEX 280)
(F.D.O.T. INDEX 280)
8/1
2/1
5: R
EV
. P
ER
F
.D
.O
.T
.
1
1
1
1
REMOVE GRATE
CONSTRUCT MANHOLE TOP
ON EXISTING STRUCTURE
TOP EL. = 18.00
1
1
1
CAUTION - NOTICE TO CONTRACTOR
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS FROM THE VARIOUS UTILITY COMPANIES AND,
WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS
BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST
48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE
PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
NOTES:
ALL EXISTING INFORMATION ON STATE ROAD 80 EDGE OF PAVEMENT, R/W LINES, ETC., WERE OBTAINED FROM
FIELD INFORMATION PROVIDED BY LANDMARK SURVEYING AND MAPPING, INC.
ALL CONSTRUCTION WITHIN STATE, COUNTY OR CITY RIGHT-OF-WAY SHALL COMPLY WITH THE MANUAL OF
TRAFFIC CONTROL AND SAFE PRACTICES FOR STREET AND HIGHWAY CONSTRUCTION, MAINTENANCE AND
UTILITY OPERATIONS, FLORIDA DEPARTMENT OF TRANSPORTATION.
ALL PAVEMENT MARKINGS SHALL CONFORM TO THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES FOR STREETS AND HIGHWAYS, PLACEMENT AND MATERIALS REQUIREMENTS OF FLORIDA
DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, D.O.T. STANDARD INDEX 17346.
ALL REFLECTIVE PAVEMENT MARKERS SHALL BE PLACED ACCORDING TO D.O.T. ROADWAY AND TRAFFIC 2015
DESIGN STANDARDS (INDEX NO. 17352)
ALL CONFLICTING MARKINGS SHALL BE REMOVED BY SCARIFYING WATER AND /OR SAND BLASTING AND
AND/OR OTHER METHOD APPROVED BY THE ENGINEER-OF-RECORD AND THE DEPT. OF TRANSPORTATION
TRAFFIC ENGINEER.
ALL WORK WITHIN STATE ROAD 80 RIGHT-OF-WAY MUST COMPLY WITH F.D.OT. PERMIT CONDITIONS,
STANDARD SPECIFICATIONS (LATEST EDITION), AND CURRENT POLICIES OF THE DEPARTMENT.
CONTRACTOR TO PREPARE MAINTENANCE OF TRAFFIC PLAN AND SUBMIT TO ENGINEER FOR APPROVAL. ALL
SIGNS, BARRICADES, ETC., MUST BE MAINTAINED UNTIL ALL WORK WITHIN THE RIGHT-OF-WAY IS
COMPLETED.
ALL ELEVATIONS ARE IN NAVD.
1.
2.
3.
4.
5.
6.
7.
232' ROADWAY
114' 89'
4' 6'
12'
LANE
12'
LANE2'
32'
1
4
B/L
12'
LANE
12'
LANE
28'
1
4
12'
TURN
LANE5'
7'
220' ROADWAY
114'
89'
4' 6'
12'
LANE
12'
LANE2'32'
1
4
B/L
4'
12'
LANE
12'
LANE 2' 28'
1
4
VARIES 4'
EXISTING
TURN LANE
(VARIES)
VARIES4'
EXISTING
TURN LANE
(VARIES)
4' 24' 28' 4'
3-1/2" TYPE SP STRUCTURAL COURSE
(TRAFFIC D)
1-1/2" TYPE SP STRUCTURAL COURSE
(TRAFFIC D)
3/4" FRICTION COURSE FC-5
BASE GROUP 912" THICK COMPACTED TO 98%
MAXIMUM DRY DENSITY
A.A.S.H.T.O. T-180 STABILIZED TO
L.B.R. 40
WEARING SURFACETYPE
PAVING SPECIFICATIONS
BASE SUB-GRADE
PAVEMENT
WITHIN
F.D.O.T. R.O.W
29'
17'
6'
10'
U.E.
5'±8'± 4' ± 10'±
1
4
10'
U.E.
5'±8'± 4' ± 10'±
12" THICK COMPACTED TO 98%
MAXIMUM DRY DENSITY
A.A.S.H.T.O. T-180 STABILIZED TO
L.B.R. 40
12" THICK COMPACTED TO 98%
MAXIMUM DRY DENSITY
A.A.S.H.T.O. T-180 STABILIZED TO
L.B.R. 40
STABILIZED
SHOULDER
WITHIN F.D.O.T.
R.OW.
SHOULDER
PAVEMENT
WITHIN
F.D.O.T. R.O.W.
1-1/2" TYPE SP STRUCTURAL COURSE
(TRAFFIC D)
3/4" FRICTION COURSE FC-5
NONE
BASE GROUP 4
NONE
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
10
5 10 20 30
TY
PIC
AL R
OA
DW
AY
S
EC
TIO
NS
Plot D
ate: A
ug. 12, 2015
File: W
:\1627 H
IG
HLA
ND
D
UN
ES
F
CM
\E
NG
IN
EE
RIN
G\A
PR
IL D
RA
WIN
GS
\1627S
R80 - C
opy.dw
g
15'
3%
EXISTING
12" GAS MAIN
T.O.P. EL. 15.0±
EXISTING
F.O.C.
EXISTING18" F.M.
T.O.P. EL. 15.3±
EXISTING 24" W.M.
T.O.P. EL. 13.3±
EXISTING
12" GAS MAIN
T.O.P. EL. 15.0±
EXISTING
F.O.C.
EXISTING18" F.M.
T.O.P. EL. 15.3±
EXISTING 24" W.M.
T.O.P. EL. 13.3±
0.00
+0.5(±)
0.00
0.00
-0.50
6%
0.00
+0.5(±)
0.00
+0.5(±)+0.5(±)
+0.5(±)+0.5(±)
0.00
VARIES
8' - 12'
VARIES
8' - 12'
PAVED SHOULDER
STABILIZED SHOULDER
PAVED SHOULDER
STABILIZED SHOULDER
PAVED SHOULDER
STABILIZED SHOULDER
PAVED SHOULDER
STABILIZED SHOULDER
SAWCUT AND REMOVE
EXCESS PAVEMENT
CONSTRUCT 4'
STABILIZED
SHOULDER
SAWCUT AND REMOVE
EXCESS PAVEMENT
CONSTRUCT 4'
STABILIZED
SHOULDER
ELEVATION
18.0 (TYP)
137 S.F. CUT
CANAL WATERLINE
CANAL WATERLINE
UL
TIM
AT
E
R.O
.W
.
R.O
.W
.
EX
IS
T. R
.O
.W
.
SECTION A-A
PROPOSED TYPICAL SECTION AT WESTBOUND TURN LANES
UL
TIM
AT
E
R.O
.W
.
EX
IS
T. R
.O
.W
.
R.O
.W
.
SECTION B-B
PROPOSED TYPICAL SECTION IN AREAS OF PAVEMENT REMOVAL
DESIGN SPEED 65 MPH
DESIGN SPEED 65 MPH
EXISTING LANDSCAPE
BUFFER BERM
1
4
-0.50
EXISTING LANDSCAPE
BUFFER BERM
7'
BIKE
LANE
1627
3
DE
SC
RIP
TIO
N:
PR
OJE
CT
:
MIC
HA
EL
B. S
CH
OR
AH
& A
SS
OC
IAT
ES
, IN
C.
EB
# 2438
EN
GIN
EE
RS
S
UR
VE
YO
RS
D
EV
EL
OP
ME
NT
C
ON
SU
LT
AN
TS
DR
AW
N/C
HE
CK
ED
:
DA
TE
:
RE
VIS
IO
NS
SC
ALE
:
LB
# 2
43
8
VARIES
-1.00 TO -2.00
MD
V / F
R
24'
DA
TE
:
OC
T 2
01
4
24'
7R
14'
5'
5'14'
12'
SHLDR.
5'5'
1
:6
8.
1
:
3
12'
TURN
LANE
1
:6
10' 5' 11'
12'
SHLDR.
2' PAVED SHLDR.
12" SUBGRADE
12" SUBGRADE
-1.29
-2.12-2.12
-0.45-0.17
EARTHWORK NOTES:
CONTRACTOR TO CLEAN AND GRUB SR-80 R/W (EXISTING AND PROPOSED) ADJACENT TO SUBJECT PROPERTY
FOR THE ENTIRE LENGTH OF THE SUBJECT PARCEL.
CONTRACTOR TO FILL AND GRADE SR-80 R/W (EXISTING AND PROPOSED) ADJACENT TO SUBJECT PROPERTY
FOR THE ENTIRE LENGTH OF THE SUBJECT PARCEL. FILL MATERIAL TO BE OBTAINED FROM ON-SITE SOURCE
ADJACENT TO R/W. LOCATION OF ON-SITE MATERIAL TO BE IDENTIFIED BY OWNER PRIOR TO FILL OPERATION.
(WITHIN 1000 FT OF R/W). SEE SECTION B-B FOR DETAIL.
CONTRACTOR TO FULLY SOD ALL NON-PAVED AREAS OF R/W ADJACENT TO ENTIRE LENGTH OF PROPERTY.
1.
2.
3.
TYPICAL EARTHWORK SECTION
2%
-0.57
2%
5
%
89'
12'
LANE 2'
28'
1
4
B/L
12'
LANE
12'
LANE
32'
1
4
+0.5(±)+0.5(±)
12'
SHLDR.
12'
TURN
LANE
1
:6
10'5'11'
12'
SHLDR.
2' PAVED SHLDR.
12" SUBGRADE
2%
5
%
4' 6'
0.00
PAVED SHOULDER
STABILIZED SHOULDER
R.O
.W
.
SECTION E-E
PROPOSED TYPICAL SECTION AT EASTBOUND TURN LANE
DESIGN SPEED 65 MPHCANAL WATERLINE
8/1
2/1
5: R
EV
. P
ER
F
.D
.O
.T
.
1
1
1
88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103
PC
: 101+
69.59
Mid: 101+
69.73
PT
: 101+
69.87
73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88
18.00
20.00
103 104 105106
107108 109
110 111112 113
114 115 116117 118
118119 120
121 122 123124 125
126127 128 129 130
131132
133
MA
TC
H L
IN
E A
MA
TC
H L
IN
E B
MA
TC
H L
IN
E C
MA
TC
H L
IN
E A
MA
TC
H L
IN
E B
MA
TC
H L
IN
E C
50'
78'
89
'1
14
'
89
'1
14
'
17
'
22
0'
22
0'
A
A
B
B
N88° 24' 56" W
N88° 24' 56" W
N88° 29' 50" W
22
0'
13
1'
89
'
22
0'
13
1'
89
'
22
0'
13
1'
89
'
N 88° 29' 50" WN 88° 24' 56" W
PI 101+69.73
N 01° 30' 10" E
162'-18" RCP @ 0.00%
D
D
C
C
95
+8
0.7
5
L
C
12
'
21
'
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
50
25 50 100 150
1627
5
DE
SC
RIP
TIO
N:
PR
OJE
CT
:
MIC
HA
EL
B. S
CH
OR
AH
& A
SS
OC
IAT
ES
, IN
C.
EB
# 2438
EN
GIN
EE
RS
S
UR
VE
YO
RS
D
EV
EL
OP
ME
NT
C
ON
SU
LT
AN
TS
DR
AW
N/C
HE
CK
ED
:
DA
TE
:
RE
VIS
IO
NS
SC
ALE
:
MD
V / F
R
DA
TE
:
OC
T 2
01
4
7R
PA
VIN
G A
ND
D
RA
IN
AG
E P
LA
N
Plot D
ate: A
ug. 12, 2015
File: W
:\1627 H
IG
HLA
ND
D
UN
ES
F
CM
\E
NG
IN
EE
RIN
G\A
PR
IL D
RA
WIN
GS
\1627S
R80 - C
opy.dw
g
LB
# 2
43
8
REMOVE EXISTING HEADWALL AND
CONSTRUCT AN 9' DIAMETER
TYPE P MANHOLE ON THE EXISTING
72" RCP PER F.D.O.T.
INDEXES 200 AND 201
INV. EL. 6.00 N & S
EXISTING GUARDRAIL TO BE REMOVED
SAWCUT AND REMOVE
EXISTING PAVEMENT
46'- 72" RCP @ 0.1%
SEE SHEET 2 FOR
CONTINUATION
EXIST. 72" RCP
REMOVE EXISTING DIRT
ROAD, 24" PIPE AND M.E.S.'S
SAWCUT AND MATCH EXISTING PAVEMENT
(SEE ASPHALT JOINT DETAIL)
CONSTRUCT TURN LANE W/7' BIKE PATH
AND 4' PAVED SHOULDER (SEE SHEET 3)
SECTION LINE
EXIST. 24" W.M.
EXIST. 16" F.M.
S.R.80 PROPOSED RIGHT-OF-WAY LINE
S.R.80 EXISTING RIGHT-OF-WAY LINE
SFWMD C-51 CANAL NORTH RIGHT-OF-WAY
SOUTHERN BOULEVARD (SR 80)
S.R.80 PROPOSED RIGHT-OF-WAY LINE
S.R.80 EXISTING RIGHT-OF-WAY LINE
S.R.80 PROPOSED RIGHT-OF-WAY LINE
S.R.80 EXISTING RIGHT-OF-WAY LINE
SFWMD C-51 CANAL NORTH RIGHT-OF-WAY
S.R.80 PROPOSED RIGHT-OF-WAY LINE
S.R.80 EXISTING RIGHT-OF-WAY LINE
SFWMD C-51 CANAL NORTH RIGHT-OF-WAY
SOUTHERN BOULEVARD (SR 80)
SOUTHERN BOULEVARD (SR 80)
SOUTHERN BOULEVARD (SR 80)
EXIST. 24" W.M.
EXIST. 16" F.M.
EXIST. 24" W.M.
EXIST. 18" F.M.
EXIST. 24" W.M.
EXIST. 18" F.M.
NEW PAVEMENT EXISTING PAVEMENT NEW MEDIAN SWALE
EXISTING 24" PIPE
SECTION LINE
SAWCUT AND REMOVE
EXISTING PAVEMENT
REMOVE EXISTING 15"
PIPE AND M.E.S.'S
REMOVE EXISTING DIRT
ROAD, PIPE AND M.E.S.'S
SAWCUT AND REMOVE
EXISTING PAVEMENT
REMOVE EXIST.
PIPE AND M.E.S.'S
PROPOSED RIGHT TURN LANE (1350')
EXIST. 36" PIPE
EXIST. 24" PIPE
SAWCUT AND MATCH EXISTING PAVEMENT
(SEE ASPHALT JOINT DETAIL)
SAWCUT AND MATCH EXISTING PAVEMENT
(SEE ASPHALT JOINT DETAIL)
M.E.S. PER F.D.O.T. INDEX 273
INV. EL. 17.00
M.E.S. PER F.D.O.T. INDEX 273
INV. EL. 17.00
EXIST 72" PIPES
ARDEN LAKE WAY
PROJECT ENTRANCE
CANE FIELD TRACE
PROJECT ENTRANCE
10
' U
.E
.
REMOVE EXIST.
PIPE AND M.E.S.'S
23
2'
14
3'
89
'
49
'
49
'
36
.0
2'
49
'
45
.2
7'
R
2
3
.
5
'
R
5
0
'
30
.3
7'
61
'
61
'
49
'
49
'
R
5
0
'
EXISTING DITCH WITHIN SR80 RIGHT-OF-WAY
TO BE FILLED TO EDGE OF PAVEMENT GRADE
AT PROPOSED RIGHT-OF-WAY LINE
EXIST. CATCH BASIN
RIM ELEV. 16.23
0.50% SWALE
0.40% SW
ALE
0.40% SW
ALE
0.40% SWALE
0.40% SWALE0.80% SWALE0.80% SWALE
NOTE: ALL ELEVATIONS ARE IN NAVD.
R
2
4
.
1
1
'
INSTALL 3-6" PVC (SCH 40)
CONDUIT SLEEVES
INSTALL 2-6" PVC (SCH 40)
CONDUIT SLEEVES
R
5
0
'
R
5
0
'
E
E
510'
8/1
2/1
5: R
EV
. P
ER
F
.D
.O
.T
.
1
1
1
1
1
1
1 1
1
REMOVE GRATE
CONSTRUCT MANHOLE TOP
ON EXISTING STRUCTURE
TOP EL. = 18.00
1
1
1
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
20
10 20 40 60
1627
7
DE
SC
RIP
TIO
N:
PR
OJE
CT
:
MIC
HA
EL
B. S
CH
OR
AH
& A
SS
OC
IAT
ES
, IN
C.
EB
# 2
43
8
EN
GIN
EE
RS
S
UR
VE
YO
RS
D
EV
ELO
PM
EN
T C
ON
SU
LT
AN
TS
DR
AW
N/C
HE
CK
ED
:
DA
TE
:
RE
VIS
IO
NS
SC
AL
E:
MD
V / F
R
DA
TE
:
OC
T 2014
7R
PA
VIN
G A
ND
D
RA
IN
AG
E D
ET
AIL
S
Plo
t D
ate
: A
ug
. 1
3, 2
01
5
File
: W
:\1
62
7 H
IG
HL
AN
D D
UN
ES
F
CM
\E
NG
IN
EE
RIN
G\A
PR
IL
D
RA
WIN
GS
\1
62
7S
R8
0.d
wg
LB
# 2438
F.D.O.T. GENERAL NOTES:
1. ALL MATERIALS AND CONSTRUCTION WITHIN THE FLORIDA DEPARTMENT OF
TRANSPORTATION DESIGN (F.D.O.T.) RIGHT-OF-WAY SHALL CONFORM TO THE
(LATEST EDITION) F.D.O.T. DESIGN STANDARDS AND (LATEST EDITION) STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
2. MAINTENANCE OF TRAFFIC M.O.T. FOR THIS PROJECT WILL COMPLY WITH THE
F.D.O.T. STANDARD INDEX (600 SERIES) AND THE LATEST EDITION OF THE MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).” SPECIAL ATTENTION WILL BE
GIVEN TO FDOT DESIGN STANDARD INDEX 611, 612, 613, AND 660.
3. ALL THERMOPLASTIC TRAFFIC STRIPES, MARKINGS AND SIGNAGE WILL BE
INSTALLED PER THE FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS.
4. PERMITTEE WILL MATCH ABUTTING PAVEMENT SECTION ADJACENT TO PERMITTED
WORK WHICH INCLUDES THICKNESS AND TYPE OF ASPHALT & BASE & SUBGRADE
MATERIAL OR AS DIRECTED BY THE LOCAL RESIDENT OPERATIONS ENGINEER OR
DESIGNEE.
5. IT IS THE PERMITTEE'S RESPONSIBILITY TO OBTAIN FINAL ACCEPTANCE OF
PERMITTED WORK (COMPLETED) AND THE RESTORATION OF THE RIGHT-OF-WAY
FROM THE F.D.O.T. PRIOR TO USAGE.
6. PERMITTEE WILL PROVIDE THE NECESSARY DENSITIES IN ACCORDANCE WITH
SECTION 125-8 OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD & BRIDGE
CONSTRUCTION (LATEST EDITION) PRIOR TO FINAL ACCEPTANCE BY THE F.D.O.T.
7. PERMITTEE WILL RESTORE THE RIGHT OF WAY AS A MINIMUM, TO ITS ORIGINAL
CONDITION OR BETTER IN ACCORDANCE W/F.D.O.T.'S LATEST STANDARD
SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION OR AS DIRECTED BY THE
RESIDENT OPERATIONS ENGINEER.
8. PERMITTEE SHALL PROVIDE THE PRODUCER'S CERTIFICATION (DELIVERY TICKET)
FOR THE NS CONCRETE-2500 PSI (USED FOR SIDEWALK, CURB & GUTTER, DITCH
PAVEMENT AND TRAFFIC SEPARATOR) PRIOR TO FINAL ACCEPTANCE BY THE
DEPARTMENT. THE DELIVERY TICKET SHALL CERTIFY THE CONCRETE WAS
BATCHED, DELIVERED AND PLACED IN ACCORDANCE WITH SECTION 347 OF THE
F.D.O.T.'S STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
(CURRENT EDITION).
9. SODDED AREAS WILL BE IN ACCORDANCE WITH STANDARD INDEX 105 AND
SECTIONS 162, 981, 982, 983, 987 OF THE F.D.O.T.'S STANDARD SPECIFICATIONS
FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION. ALL DISTURBED AREAS
WILL BE SODDED WITHIN ONE (1) WEEK OF INSTALLATION OF SAID PERMITTED
WORK.
10. OWNERSHIP OF ALL SUITABLE EXCAVATED MATERIALS WITHIN THE FDOT R/W, AS
DETERMINED BY THE F.D.O.T., SHALL REMAIN IN THE DEPARTMENT UNTIL A FINAL
ACCEPTANCE OF THE PERMITTED PROJECT IS FULFILLED. EXCAVATED
MATERIALS SHALL BE HAULED BY THE CONTRACTOR, AT THEIR COST & EXPENSE
FROM THE SITE TO THE PALM BEACH OPERATIONS CENTER, 7900 W FOREST HILL
BLVD OR STOCKPILED IN THOSE AREAS AS DIRECTED BY THE DOT, INCLUDING
ASPHALT MILLINGS.
11. PERMITTEE SHALL RETURN ALL SALVAGEABLE SIGNS, INCLUDING
APPURTENANCES AND DRAINAGE PIPES TO THE PALM BEACH OPERATIONS
CENTER AT THE OWNERS EXPENSE.
12. RESTRICTED HOURS OF OPERATION WILL BE FROM 9:00AM TO 3:30 PM,
(MONDAY-FRIDAY), UNLESS OTHERWISE APPROVED BY THE OPERATIONS
ENGINEER, OR DESIGNEE.
13. PERMITTEE WILL COORDINATE (PRE-CONSTRUCTION MEETING, INSPECTIONS,
FINAL ACCEPTANCE OF WORK, ETC) ALL PERMITTED WORK WITH DBI, INC, ATTN:
ANTHONY GATTONE @ 561-992-1318, FAX 561-993-9000, CELL 561-662-2437
14. PERMITTEE: PLEASE NOTE: PERMITTEE'S CONTRACTORS THAT ARE PERFORMING
PERMITTED WORK ACTIVITIES SHALL PROVIDE THE F.D.O.T. (PERMIT OFFICE)
PROOF OF A PROPER STATE CONTRACTOR'S LICENSE AND CERTIFICATE OF
LIABILITY INSURANCE PRIOR TO ANY COMMENCEMENT OF PERMITTED WORK.
15. PERMIT IS VALID FOR ONE YEAR FROM DATE OF ISSUE.
16. PERMITTEE WILL PROVIDE THE F.D.O.T. WITH CERTIFIED “AS-BUILT” PLANS PRIOR
TO FINAL ACCEPTANCE OF THE PERMITTED WORK.
CROSS END MITERED END SECTION (PER FDOT INDEX 272)
NO SCALE
TYPE G INLET DETAIL (PER FDOT INDEX 233)
NO SCALE
TYPE E DITCH BOTTOM INLET (PER FDOT INDEX 232)
NO SCALE
BACKFILL NOTES
EXISTING GROUND
1. BEDDING SHALL CONSIST OF IN-SITU GRANULAR MATERIAL
OR WASHED AND GRADED LIMEROCK (3/8"-7/8" SIZING).
UNSUITABLE IN-SITU MATERIALS SUCH AS MUCK, DEBRIS
2. THE PIPE SHALL BE FULLY SUPPORTED FOR ITS ENTIRE
LENGTH WITH APPROPRIATE COMPACTION UNDER THE
AND LARGER ROCK SHALL BE REMOVED.
5. EXCAVATION, SIDE SLOPES, SHORING, ETC., SHALL
4. BACKFILL SHALL BE FREE OF UNSUITABLE MATERIAL
3. THE PIPE SHALL BE PLACED IN A DRY TRENCH.
TRENCH DETAIL
LARGER ROCK, MUCK AND DEBRIS.
CONFORM TO O.S.H.A. STANDARDS.
PIPE HAUNCHES.
NO SCALE
12"
MAX.MAX.
NOTES:
4"
12"
MIN
.
12"
MIN
.
18"
BEDDING MATERIAL
REMAINING BACKFILL PLACED AND
COMPACTED PER APPROPRIATE
SPECIFICATIONS (6" MAX. SIZE)
GRANULAR BACKFILL PLACED AND
COMPACTED TO MINIMUM 98% OF
MAXIMUM DENSITY (2" MAX. SIZE)
BACKFILLING EXCAVATION
1. ALL STRUCTURES, PIPE LINES AND JOINTS AND OTHER CONSTRUCTION SHALL BE
SUBJECT TO FIELD OBSERVATION BY THE ENGINEER (OR HIS REPRESENTATIVE) PRIOR
TO BACKFILLING.
2. BACKFILLING SHALL BE DONE WITH APPROVED MATERIAL, FREE FROM LARGE CLODS,
ROCKS, ORGANIC MATERIALS OR OTHER EXTRANEOUS MATERIAL.
3. BACKFILLING OF STRUCTURE (MANHOLES, ETC) EXCAVATIONS AND REQUIRED FILL
UNDER STRUCTURE SLABS SHALL BE DONE IN HORIZONTAL LIFTS NOT EXCEEDING
TWELVE (12) INCHES IN DEPTH, AND SHALL BE COMPACTED TO A DENSITY OF NOT
LESS THAN 98% OF THE MAXIMUM DENSITY AS DETERMINED BY A.A.S.H.T.O. T-180.
4. BACKFILL MATERIAL FOR PIPE EXCAVATION SHALL BE SELECTED, DEPOSITED AND
COMPACTED SO AS TO ELIMINATE THE POSSIBILITY OF HORIZONTAL OR LATERAL
DISPLACEMENT OF THE PIPE. BACKFILL MATERIAL SHALL BE SOLIDLY TAMPED
AROUND THE PIPES IN SIX (6) INCH LIFTS UP TO A LEVEL AT LEAST SIX (6) INCHES
ABOVE THE TOP OF THE PIPE. BACKFILLING SHALL BE CARRIED OUT SIMULTANEOUSLY
ON BOTH SIDES OF THE PIPE. THE REMAINDER OF THE BACKFILL SHALL BE PLACED IN
SIX (6) INCH LIFTS (COMPACTED THICKNESS), MOISTENED AND MECHANICALLY
COMPACTED TO A DENSITY OF NOT LESS THAN 95% OF THE MAXIMUM DENSITY AS
DETERMINED BY A.A.S.H.T.O. T-180. WATER SETTLING MAY BE UTILIZED AT THE OPTION
OF THE CONTRACTOR, PROVIDED THE REQUIRED DENSITY IS ACHIEVED. IN AREAS
WHERE PAVING IS TO BE PLACED OVER THE BACKFILLED TRENCH, COMPACTION SHALL
BE CARRIED OUT TO ACHIEVE A DENSITY OF AT LEAST 98% OF THE MAXIMUM DENSITY
AS DETERMINED BY A.A.S.H.T.O. T-180 FOR A MINIMUM OF THE TOP THREE (3) FEET OF
THE BACKFILLED TRENCH (THE REMAINING DEPTH AS NOTED ABOVE) AND EXTENDING
TO THE TRENCH WIDTH + TWO (2) FEET - SEE DETAIL.
5. DENSITY TESTS FOR DETERMINATION OF THE SPECIFIED COMPACTION SHALL BE MADE
BY AN APPROVED ENGINEERING TESTING LABORATORY. TESTS SHALL BE TAKEN IN
ALL COMPACTED LIFTS (1 FOOT MINIMUM) AND SPACED ONE (1) FOR EVERY 150 FEET
OF TRENCH (MAXIMUM) WITH AT LEAST ONE (1) TEST IN EACH PIPE RUN (STRUCTURE
TO STRUCTURE). WHERE TRENCH CROSSES AREAS TO BE PAVED, A MINIMUM OF ONE
(1) OF THE REQUIRED DENSITY TESTS MUST BE TAKEN IN THAT AREA.
6. EXCAVATION, SIDE SLOPES, SHORING, ETC., SHALL CONFORM TO O.S.H.A. STANDARDS.
PRE-CAST CONCRETE
EACH WAY
NO.6 @ 6" O.C.
PRE-CAST CONCRETE
NO.4 HOOPS
@ 12" O.C.
NO.4 @ 12" O.C.
(U.S.FOUNDRY NO.170-F)
MANHOLE RING AND COVER
VA
RIE
S 2' M
IN
.
UNLESS OTHERWISE SHOWN
TYPE 'P'
MANHOLE DETAIL
8"
8"
4"
NO SCALE
NO.5 @ 12" O.C.
EACH WAY
4'-0" DIA.
ON PLAN
4"
8"
INSIDE INLET
GROUT BRICK
GROUT JOINTS
ALL AROUND
INSIDE AND OUTSIDE
ALL AROUND
SO
LID
B
RIC
K
2 C
OU
RS
ES
M
AX
.
VA
RIE
S
3" CL.
TYP.
8"
6"
8"
2'-0"
OPENING
GROUT FRAME
TO BRICK
ALL AROUND
8"
BASE
TOP SLAB
8/12/15: R
EV
. P
ER
F
.D
.O
.T
.
1
1