Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT PROGRAM

Upload: maegan-merriam

Post on 01-Apr-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

Paula J. Trigg, County Engineer

Public Works and Transportation Committee

April 2, 2014

OVERVIEW | SOURCE OF PROJECTS2014-2019 PROPOSED HIGHWAY IMPROVEMENT PROGRAM

Page 2: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

PRESENTATION SCHEDULE:2014-2019 5-YEAR HIGHWAY IMPROVEMENT PROGRAM

PWTC 2014 Meeting Date Presentation Topic

February 26 • Preview 2014 Construction

April 2 • Overview/Source of Projects

April 30 • Preservation Projects

May 7 • Modernization and Expansion Projects

May 28 • Funding and Revenue

June 4 • Project Listings

June 25 • Draft Program Document

Page 3: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

• Presented at Feb 26 PWTC meeting

• Transportation corridors

• Meeting long-term traffic growth demands

PREVIEW: 2014-15 MAJOR PROJECTS

Project continued from 2013

New project (construction in 2014)

Late-2014 project award (construction in 2015)

Page 4: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

• 2014-2019 5-year Highway Improvement Program effective 7/1/14, but project additions generally made for years 2015-2019

• Q: Where do ideas for the recommended projects come from to create a list of funded projects for the next 5 years?

• A: from the LCDOT’s comprehensive technical, objective highway asset management tools

POTENTIAL PROJECT SOURCES

Page 5: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

WORK TYPES• Bike Path

• Bonds

• Bridges

• Culverts

• Drainage

• Engineering Support

• Enhancements

• Facilities

• Guardrail

• Intersection

• Maintenance

• Paratransit

• Patch

• Patrol 1

• Plan

• Railroad

• Reconstruction

• Resurface

• Resurfacing, Rehabilitation & Restoration (3R)

• Road Districts

• Roadway

• Signals

Page 6: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

DEVELOPING THE PROGRAM

Page 7: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

SYSTEM PRESERVATION PROJECTS• First Priority

• Keep county highway pavements, bridges bikeways, signals and related items in good condition

• Project set is developed using:

• ARGUS

• NBIS

Page 8: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

RECURRING ANNUAL PROJECTS:2019 MAINTENANCE

• Basin Management

• Bike Path Repaving

• Bituminous Markings

• Bituminous Patching

• Bituminous Shoulder Maintenance

• Bond Payments

• CMAP Assessment

• Concrete Markings

• Concrete Patching

• Crack Sealing

• Detention Right of Way

• Guardrail Maintenance

• ITS-PASSAGE Elements

• ITS-PASSAGE Integration

• ITS-PASSAGE Network

• JULIE locates

• Material Inspection

• Microsurfacing

• Miscellaneous Engineering – MT

• Miscellaneous Engineering – ST

• Miscellaneous Maintenance – CB

• Miscellaneous Maintenance – MT

• Non-motorized Travel

• NPDES Phase 2

• Paratransit Dispatch Mobility Operations

• Pavement Management

• Pavement Markers

• Retaining Wall Maintenance

• Road Districts

• Road Enhancements

• Road Maintenance

• 2012 Revised Sales Tax Plan – Engineering and ROW Support

• Signal Coordination

• Signal Equipment

• Signal Maintenance

• Tree Maintenance

Page 9: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

SYSTEM MODERNIZATION PROJECTS• Second Priority

• Reduce delays and increase safety by accommodating short-term traffic growth and the needs of non-motorists

• Project set is developed using:

• TCAS

• 2040 Bicycle Priorities

• Non-motorized Policy guidelines

• Inter/Intra County Paratransit Transportation Plan

Page 10: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

• Third Priority

• Provide highway capacity to meet long-term traffic growth needs and provide for economic development

• Project set is developed using:

• Consensus Priority List

• Plan for Using the new Collar County Transportation Empowerment Funds

• 2040 Roadway Plan

• Average Daily Traffic data

• 2040 Transit Plan

SYSTEM EXPANSION PROJECTS

Page 11: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

LAKE COUNTY’S2040 TRANSPORTATION PLAN• Long range plan to identify

deficiencies and recommend improvements to address future transportation needs

• In development since 2010

• Network modeled from CMAP regional model with local characteristics

• Includes 2040 population and employment projections and corresponding traffic impacts

• Proposed improvements prioritized based on forecasted deficiency, prior study, cost and people-jobs potential

Page 12: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

2040 ROADWAY PRIORITIES• Peak period trips estimated

to increase by 36% between 2010 and 2040

• 212 miles of roadway Improvements recommended

• 7 interchange

• 9 intersection

• 65 corridor

Page 13: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

• Plan recommends an

additional 300 miles of non-motorized facilities

• Primarily off-street multi-use path for cyclist, pedestrian and other non-motorized use

• Many projects connect to Metra and bus routes for improved viability of non-motorized travel

• Provide essential non-motorized connections to communities, jobs, parks, schools, forest preserves

• Jurisdiction over non-motorized facilities by Lake County DOT, Lake County Forest Preserves, townships, municipalities and institutions

2040 NON-MOTORIZED PRIORITIES

Page 14: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

• Variety of transit services are needed to address county needs:

• Demand response

• Fixed route bus

• Commuter rail• Recommendations based on

assessed needs with regard to:

• Connectivity

• Existing facilities and services

• Jurisdictional issues

• Considered previous plan results (CMAP GOTO2040, Lake County 2020 Transportation Priority Plan)

2040 TRANSIT PRIORITIES

Page 15: Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT

PRESENTATION SCHEDULE:2014-2019 5-YEAR HIGHWAY IMPROVEMENT PROGRAM

PWTC 2014 Meeting Date Presentation Topic

February 26 • Preview 2014 Construction

April 2 • Overview/Source of Projects

April 30 • Preservation Projects

May 7 • Modernization and Expansion Projects

May 28 • Funding and Revenue

June 4 • Project Listings

June 25 • Draft Program Document