paul e. chiodo deployment director, lean six sigma certified lean six sigma master black belt us...
TRANSCRIPT
Paul E. Chiodo
Deployment Director, Lean Six Sigma
Certified Lean Six Sigma Master Black Belt
US Army Armament Research, Development & Engineering Center
4 March 2008
PANEL DISCUSSION:
Probabilistic Technology Challenges
&
Applications for Defense and Aerospace
Success
Conference on Quality in
Space and Defense
Industries CQSDI 2008
“PT Challenges & Applications for Defense & Aerospace Success”
• PURPOSE: Bring together Defense and Aerospace Leaders in the field of Nondeterministic Analysis & Probabilistic Technology (Techniques and Methods) to discuss the emerging Requirements, Strategies, Key issues and Challenges, and their Path Forward in the area of Probabilistic Technology.
• OBJECTIVES:– Provide an Introduction to Probabilistic Technology– Identify Needs, Challenges, and New efforts – Discuss Collaborative efforts between NASA, Army/DOD, Industry &
Academia.– Introduce the Path Forward– Discuss what is being done to develop and deploy the technology– Discuss the integrated competency approach– Introduce the Role of ASQ – Encourage involvement and Show how to get involved in this
Culture change process
“PT Challenges & Applications for Defense & Aerospace Success”
• Moderator: Mr. Paul E. Chiodo
• Panel members: Representing: NASA, Army, Industry, ASQ
– Dr. Shiver, Deputy Director, Safety & Mission Assurance at NASA(MSFC)
– Dr. M. Khalessi; CEO/President PredictionProbe, Inc.– Mr. Brian LeHouillier, ASQ Managing Director– Ms. Pam Caruso, Assistant to the Director, NASA -
Marshall Space Flight Center – Mr. Bob Kuper, Competency Dean for Reliability
Engineering, & the Program Manager, Reliability for Future Force Technology Program
Panel Participants
Challenges & Direction Needed To Develop & Deploy a Culture based on Probabilistic Design &
Analysis Principles
• Focus: – Drive Culture Change for Army, NASA and on National Scale – Use Probabilistic Methods to enhance National competitiveness.
• Bottom-line: – Make US Government Agencies and Industry more competitive,
effective, efficient using Probabilistic methods/technology• Basic Problems/Challenges:
– Lacked the National talent pool for broad and timely applications of highly advanced Probabilistic Technology & Computational Probabilistic Methods.
– University Curriculum void: not preparing & promoting applications for S&T, Engineers, Economists, Business/Finance for exceptional value of advanced Probabilistic Methods
– Lack the leadership, program management and practitioner knowledge of these advanced methods and their potential
– Lack the Processes, Tools, and Methods and a Framework for deployment/integration, accountability, measurement and continuous improvement
Integration of Probabilistic Technology with DFLSS
Critical Role for Probabilistic Technology: “Enhancing Decision-making structures across the LC– Integration with DFLSS, Program Mgt & System Engineering– DFLSS build into Product Development Process (PDP)– PT Becomes a Key Component of LSS – LC Process Focus
• PT- Enhanced DFLSS: Innovation and Conceptual Design – “Rapid Innovation”
• PT- Enhanced DFLSS: Robust Design, Reliability-Based Design Optimization, Axiomatic Design
• PT- Enhanced DMAIC/DMALC: Process and Product Improvement
Customer Customer RequirementsRequirements
Customer Customer ExpectationExpectation
Design for Lean Six SigmaDesign for Lean Six Sigma
Customer Customer RequirementsRequirements
Customer Customer ExpectationExpectation
Design for Lean Six SigmaDesign for Lean Six Sigma
Army Plan
PT
for
Challenges & Direction Needed To Develop & Deploy a Culture based on Probabilistic Design &
Analysis Principles
SO WHAT WE NEED MOST:
• A Strong, Multi-tiered Education & Integration Framework
Are we Moving in the Proper Direction?
• In the Army we are using Our Business Transformation Framework (Lean Six Sigma) as our PT Integration Platform
• Primary Emphasis: Education and Integration– Then Measurement and Continuous Improvement
• Working Closely with National Experts– Probabilistic Technology – Tools, Methods, Best Practices– Design for Lean Six Sigma – Better Process and Tools– Axiomatic Design – Additional Tools for Design simplicity, and
improved reliability• Developed the Probabilistic Technology Community (PTC) with ASQ• Developing a “Government Only” variant to enhance Integration• Developing Body’s of Knowledge(BOK), Standards & Guidelines.