From: Victor Wallace [mailto:[email protected]]Sent: Wednesday, June 27, 2012 7:58 AMTo: Steve DanaCc: Rene West; Michael Baerresen; Derrick Payne; Mike Horton;[email protected];
[email protected]; Edward Spears;[email protected]; Vic Wallace; Al Garza;[email protected]: Re: Stadium water
This is unacceptable, the system has not operated for a period of 7 days at any point without afailure. Tuesday morning the controller showed 10 different "faults". Was anyone there to fix it?
NO. There is no as built, there are components of the system that have not been completelyinstalled. This project was advertised to be the show piece of Pensacola, the follow thou and
attention to detail by the groups that had a hand in building the project is a joke. Day after dayafter day with no one on site to fix / finish. Last nights issue is just another in a long line of
problems. So if there is debris in the valves where did it come from??? Did it come from the
Ghost? What is the plan, to spend more money to add master valves and air relief valves, to tryto fix installation problems? If there is debris in valves, hold someone ACCOUNTABLE. Thislooks so pathetic blaming the installation problems on the budget. Shame on those who had part
in the design and installation, Irrigation is the backbone to any landscape. So let me get thisstraight vital parts of the system (that where in the original plan) ie. shut off valves before
electrical operated valves, where removed to save money. Then in turn that money could be usedto buy more plant material. If the irrigation system has problems now and they are not properly
corrected the landscape will suffer from day 1 to the end. What is it going to take to finish?
Victor Wallace
On Tue, Jun 26, 2012 at 9:00 PM, Steve Dana wrote:
What the hell is going on?? Get all these ghosts fixed now! I am tired of this.
Sent from my HTC Inspire 4G on AT&T
----- Forwarded message -----From: "Jonathan Griffith"
To: "[email protected]" , "Steve Dana"
Cc: "Bruce Baldwin" , "Ray Sayre" ,
"Quint Studer" Subject: Stadium waterDate: Tue, Jun 26, 2012 8:48 pm
Hi Ed,
We have a major problem that needs to be fixed ASAP and we need guidance. The sprinkler
system has not worked correctly for the last two months. We now have sprinkler heads that rise
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected] -
7/27/2019 Pate and Wallace.pdf
2/2
up and down during the game. The game was delayed tonight with player safety concerns. Canwe please have someone here first thing to figure out what we can do? We not only want to have
green grass but we cannot have safety issues with our field. Please let me know what we can do?
Thanks,
Jonathan Griffith
Executive Vice President
Pensacola Blue Wahoos
(o)(850) 934-8444 Ext.113
(c)(850) 356-3898
http://www.facebook.com/pages/Pensacola-Blue-Wahoos/189165001131567http://www.milb.com/promotions/index.jsp?sid=t4124http://twitter.com/bluewahoosbballhttp://bw1.glitnirticketing.com/bwticket/web/ev_list.phphttp://www.bluewahoos.com/