Bits&Bytes and….

…..Paprika’s

SLIDE 1SLIDE 1

Pieter Duijves

Parthenon Data Centres

Managing Director

Datacenter DynamicsAmsterdam, November 24th, 2009

Page 2: Parthenon Dc Dynamics Conferentie24nov2009[1]

• Data centre market trends• Symbiosis• Parthenon One• Benefits

CONTENT

SLIDE 2SLIDE 2

• Benefits

2

Page 3: Parthenon Dc Dynamics Conferentie24nov2009[1]

Market trends

SLIDE 3SLIDE 3

Page 4: Parthenon Dc Dynamics Conferentie24nov2009[1]

� Steep growth in the demand for data centre space and power– Increasing demand for data traffic and storage

• Growing IP network traffic (IPTV, on-demand video traffic, VoIP, e-commerce, household broadband penetration)

• Increasing number of companies outsource their server farm to data centres

• Increased central hosting of enterprise applications

Demand

� Increasing technical requirements (power, cooling)

MARKET TRENDS

SLIDE 4SLIDE 4

Technology

requirements

Environmental

requirements

� Increasing technical requirements (power, cooling)� High density equipment, blade servers

� Server virtualisation

� Required power density approaching 5 kW/m2

� Previous generation (1999/2000) engineered at ~ 500 W/m2

� Increasing environmental requirements

Page 5: Parthenon Dc Dynamics Conferentie24nov2009[1]

ICT has become one of the most energy consuming industries with around 7.5 % of the electricity consumption in the Netherlands

ICT carbon footprint comparable with aviation industry

ENVIRONMENTAL REQUIREMENTS

SLIDE 5SLIDE 5SLIDE 5

5

ICT carbon footprint comparable with aviation industry

ICT energy consumption doubles every 5 -6 years

Strong environmental pressure to design with maximum energy efficiency (e.g. use of free air cooling)

Page 6: Parthenon Dc Dynamics Conferentie24nov2009[1]

SYMBIOSIS

SLIDE 6SLIDE 6

Page 7: Parthenon Dc Dynamics Conferentie24nov2009[1]

Heat/coldParthenon Data Centre

SYMBIOSIS

SLIDE 7SLIDE 7

Heat

CO2

Heat

CO2

Trafo

150 kV TennetOnderstation

20 kV

20 kV

20 kV

Ground storage

Page 8: Parthenon Dc Dynamics Conferentie24nov2009[1]

Datacentre

HEAT AND COLD STORAGE

SLIDE 8SLIDE 8SLIDE 8

Koude vraag

Page 9: Parthenon Dc Dynamics Conferentie24nov2009[1]

• Ultimate green operation

– Residual heat harvested for greenhouse growing

– CO2 fully used to grow the greenhouse plants

– Heat/cold storage in the ground to decouple heat

supply and usage

• Data centre can also operate stand-alone (not

Electrical PowerCO2Heat

Electrical PowerCO2Heat

Electrical PowerCO2Heat

SYMBIOSIS

SLIDE 9SLIDE 9

• Data centre can also operate stand-alone (not

depending on the greenhouse farming)

• 12200 Ton annual carbon savings (Royal Haskoning)

• Growers have their own electricity company ECW;

electrical infrastructure is ready and available

• Electricity purchasing under agreement with electricity

management company for farmers

– Purchasing on OTC

– No supplier lock-in

• Second substation connected to Tennet high voltage

network in 2011

Greenhouses Data Centre

Electrical PowerCO Heat

Page 10: Parthenon Dc Dynamics Conferentie24nov2009[1]

PARTHENON ONE

Kwekerij

40 ha (55ha) paprikaWKK 3+3 MWe WKK 3+3 MWe

SLIDE 10SLIDE 10

1000meter

Datacenter

10 ha

Onbelicht

10 ha

Onbelicht

10 ha

Onbelicht

10 ha

Belicht

Nieuw

10 haNieuw

5 ha

WKK 3+3 MWe WKK 3+3 MWe

WKK 3+3 MWe

WKK 3+4 MWe

Geen WKK Geen WKK

Page 11: Parthenon Dc Dynamics Conferentie24nov2009[1]

� Amsterdam is one of the largest internet connectivity-concentration points in the world (AMS-IX)

� Site in Wieringermeer less than 45 km distance from Amsterdam AMS-IX

� An area of new economic activity hosting an ambitious greenhouse expansion project

PARTHENON ONE

SLIDE 11SLIDE 11

� Three diversely routed optical networks to AMS-IX.

� Design contract with Royal Haskoning

� Permits by Royal Haskoning and Grontmij

� Supported by:

� Municipality mayor

� Province deputy

� Minister of agriculture

� Green-IT Amsterdam

Page 12: Parthenon Dc Dynamics Conferentie24nov2009[1]

PARTHENON ONE

SLIDE 12SLIDE 12

Page 13: Parthenon Dc Dynamics Conferentie24nov2009[1]

• 10,000 m2 net customer space with

4,200 racks

• Total max site power: 60 MW

• Average 5,000 Watt/m2

• Eight data floors / phases

• 24x7 security & support

PARTHENON ONE

SLIDE 13SLIDE 13SLIDE 13

• 24x7 security & support

• Tier 3+ design

• 3 redundant optical networks to AMS-IX

• State of the art SLAs

• Carbon neutral operation by means of

Symbiosis

• EUE of better than 1.2

• European Code of Conduct compliant

• Construction starts 1st quarter 2010

Page 14: Parthenon Dc Dynamics Conferentie24nov2009[1]

AVERAGE PUE - RESULTING EUE of 1.19

SLIDE 14SLIDE 14SLIDE 14

Page 15: Parthenon Dc Dynamics Conferentie24nov2009[1]

Ultimate green implementation, “Green by design”Symbiosis, energy optimisation across ICT and greenhouse growingNear 100% data centre energy reuseTotal of 12200 ton annual carbon savingsExcellent power efficiency, EUE < 1.2, excluding SymbiosisLarge power density

BENEFITS PARTHENON ONE

SLIDE 15SLIDE 15

Large power densityReady for high density blade serversReady for virtualised servers

Ample power supply by existing transformersShort time to market due to existing electrical infrastructureUnique electricity procurementInherent low opex cost structureCHP (WKK) units as additional electrical power source3 redundant optical networks to AMS-IX

Page 16: Parthenon Dc Dynamics Conferentie24nov2009[1]

Initiative started in January 2008Established as a company in October 2008Investment by a real estate giantManagement team

Pieter DuijvesKevin Burton

PARTHENON DATA CENTRES BV

SLIDE 16SLIDE 16

Kevin BurtonAdvisory board

Anwar OsseyranMarc van der HeijdenPeter Oei

Financial advise – Royal Bank of ScotlandLegal advise – SBHR advocatenDesign contract Parthenon One – Royal Haskoning