Bits&Bytes and….
…..Paprika’s
SLIDE 1SLIDE 1
Pieter Duijves
Parthenon Data Centres
Managing Director
Datacenter DynamicsAmsterdam, November 24th, 2009
• Data centre market trends• Symbiosis• Parthenon One• Benefits
CONTENT
SLIDE 2SLIDE 2
• Benefits
2
Market trends
SLIDE 3SLIDE 3
� Steep growth in the demand for data centre space and power– Increasing demand for data traffic and storage
• Growing IP network traffic (IPTV, on-demand video traffic, VoIP, e-commerce, household broadband penetration)
• Increasing number of companies outsource their server farm to data centres
• Increased central hosting of enterprise applications
Demand
� Increasing technical requirements (power, cooling)
MARKET TRENDS
SLIDE 4SLIDE 4
Technology
requirements
Environmental
requirements
� Increasing technical requirements (power, cooling)� High density equipment, blade servers
� Server virtualisation
� Required power density approaching 5 kW/m2
� Previous generation (1999/2000) engineered at ~ 500 W/m2
� Increasing environmental requirements
ICT has become one of the most energy consuming industries with around 7.5 % of the electricity consumption in the Netherlands
ICT carbon footprint comparable with aviation industry
ENVIRONMENTAL REQUIREMENTS
SLIDE 5SLIDE 5SLIDE 5
5
ICT carbon footprint comparable with aviation industry
ICT energy consumption doubles every 5 -6 years
Strong environmental pressure to design with maximum energy efficiency (e.g. use of free air cooling)
SYMBIOSIS
SLIDE 6SLIDE 6
Heat/coldParthenon Data Centre
SYMBIOSIS
SLIDE 7SLIDE 7
Heat
CO2
Heat
CO2
Trafo
150 kV TennetOnderstation
20 kV
20 kV
20 kV
Ground storage
Datacentre
HEAT AND COLD STORAGE
SLIDE 8SLIDE 8SLIDE 8
Koude vraag
• Ultimate green operation
– Residual heat harvested for greenhouse growing
– CO2 fully used to grow the greenhouse plants
– Heat/cold storage in the ground to decouple heat
supply and usage
• Data centre can also operate stand-alone (not
Electrical PowerCO2Heat
Electrical PowerCO2Heat
Electrical PowerCO2Heat
SYMBIOSIS
SLIDE 9SLIDE 9
• Data centre can also operate stand-alone (not
depending on the greenhouse farming)
• 12200 Ton annual carbon savings (Royal Haskoning)
• Growers have their own electricity company ECW;
electrical infrastructure is ready and available
• Electricity purchasing under agreement with electricity
management company for farmers
– Purchasing on OTC
– No supplier lock-in
• Second substation connected to Tennet high voltage
network in 2011
Greenhouses Data Centre
Electrical PowerCO Heat
PARTHENON ONE
Kwekerij
40 ha (55ha) paprikaWKK 3+3 MWe WKK 3+3 MWe
SLIDE 10SLIDE 10
1000meter
Datacenter
10 ha
Onbelicht
10 ha
Onbelicht
10 ha
Onbelicht
10 ha
Belicht
Nieuw
10 haNieuw
5 ha
WKK 3+3 MWe WKK 3+3 MWe
WKK 3+3 MWe
WKK 3+4 MWe
Geen WKK Geen WKK
� Amsterdam is one of the largest internet connectivity-concentration points in the world (AMS-IX)
� Site in Wieringermeer less than 45 km distance from Amsterdam AMS-IX
� An area of new economic activity hosting an ambitious greenhouse expansion project
PARTHENON ONE
SLIDE 11SLIDE 11
� Three diversely routed optical networks to AMS-IX.
� Design contract with Royal Haskoning
� Permits by Royal Haskoning and Grontmij
� Supported by:
� Municipality mayor
� Province deputy
� Minister of agriculture
� Green-IT Amsterdam
PARTHENON ONE
SLIDE 12SLIDE 12
• 10,000 m2 net customer space with
4,200 racks
• Total max site power: 60 MW
• Average 5,000 Watt/m2
• Eight data floors / phases
• 24x7 security & support
PARTHENON ONE
SLIDE 13SLIDE 13SLIDE 13
• 24x7 security & support
• Tier 3+ design
• 3 redundant optical networks to AMS-IX
• State of the art SLAs
• Carbon neutral operation by means of
Symbiosis
• EUE of better than 1.2
• European Code of Conduct compliant
• Construction starts 1st quarter 2010
AVERAGE PUE - RESULTING EUE of 1.19
SLIDE 14SLIDE 14SLIDE 14
Ultimate green implementation, “Green by design”Symbiosis, energy optimisation across ICT and greenhouse growingNear 100% data centre energy reuseTotal of 12200 ton annual carbon savingsExcellent power efficiency, EUE < 1.2, excluding SymbiosisLarge power density
BENEFITS PARTHENON ONE
SLIDE 15SLIDE 15
Large power densityReady for high density blade serversReady for virtualised servers
Ample power supply by existing transformersShort time to market due to existing electrical infrastructureUnique electricity procurementInherent low opex cost structureCHP (WKK) units as additional electrical power source3 redundant optical networks to AMS-IX
Initiative started in January 2008Established as a company in October 2008Investment by a real estate giantManagement team
Pieter DuijvesKevin Burton
PARTHENON DATA CENTRES BV
SLIDE 16SLIDE 16
Kevin BurtonAdvisory board
Anwar OsseyranMarc van der HeijdenPeter Oei
Financial advise – Royal Bank of ScotlandLegal advise – SBHR advocatenDesign contract Parthenon One – Royal Haskoning