Electrical Equipment, Troubleshooting & Maintenance Kuala Lumpur –Malaysia 22-26/3/2015 Electrical Engineering Oil, Gas and Petrochemical Mechanical Engineering Electrical Engineering Electronic ICT Instrumentation Automation and Process Control Data Communications & Networking Chemistry & Laboratory Cement Industry Project management Supply chain management www.petratrainingg.com

Upload: qais-alsafasfeh

Post on 20-Dec-2015

24 views

Category:

Documents


6 download

DESCRIPTION

training

TRANSCRIPT

Page 1: Part One Gas

Electrical Equipment, Troubleshooting & Maintenance

Kuala Lumpur –Malaysia 22-26/3/2015

Electrical Engineering

Oil, Gas and

Petrochemical

Mechanical Engineering

Electrical Engineering

Electronic ICT

Instrumentation Automation and Process Control

Data Communications & Networking

Chemistry &

Laboratory

Cement Industry

Project management

Supply chain management

www.petratrainingg.com

Page 2: Part One Gas

Gas Turbine Training Course

Design , Operation & Maintenance

For

WADI AL JIZZI POWER COMPANY

All rights reserved / Omar Zaareer 2015

Petra Training Group

Page 3: Part One Gas

Part #4:

Gas Turbine Auxiliary Systems

4

All rights reserved / Omar Zaareer 2015

Page 4: Part One Gas

5) Auxiliary Systems:

• Gas Turbine Lubricating Oil System

• Hydraulic Supply System and Inlet Guide Vane

• Atomizing Air System

• Fuel Purge.

• Cooling and Sealing Air System.

Gas Turbine Topics to be discussed

All rights reserved / Omar Zaareer 2015

Page 5: Part One Gas

Lube Oil System

All rights reserved / Omar Zaareer 2015

Page 6: Part One Gas

Large gas turbines generally have separate external circulation systems.

Gas turbine parts are made to fit with little clearance.

The shaft must be free to rotate, but not vibrate radially.

Bearings are used to support the weight of the shafts, rotors and prevent them from vibrating radially.

Without a lubricant, the bearing surface would wear out quickly.

Oil is supplied to bearing through machined holes and grooves.

نظام یقوم بتزوید الزیت لكل من:

الضاغط كراسي تحمیل)Compressor bearing(

التوربینة تحمیل راسي ك)Turbine bearing(

المولد تحمیل كراسي)Generator bearing(

Control Oil

Lube Oil System

Introduction

All rights reserved / Omar Zaareer 2015

Page 7: Part One Gas

Lube Oilأھمیــة نظـــام

The oil forms a film between the rotating shaft and the bearing that separates them.

This reduces friction and heat.

Some heat is generated and the lubricant must carry it away.

To re-use this oil, it must be cooled, cleaned and re-pressurized.

Lube Oil System

وظیفة الزیت داخل كراسي التحمیل:

ي ھذا الزیت بعمل طبقة رقیقة داخل كراسیقومالتحمیل تفصل بین

اكالجزء الثابت والجزء الدوار لتقلیل االحتك ى درجة بتبرید كراسي التحمیل والحفاظ علیقوم

.حرارتھا ي بأزالة الملوثات والشوائب من داخل كراسیقوم

.التحمیل

All rights reserved / Omar Zaareer 2015

Page 8: Part One Gas

احتكاك على سطوح جافة

االحتكاك على سطوح مفصولة بالزیت

طبقة زیت

مع المعادن تالمس بمنع الزیت طبقة تقوم ھذه على الحفاظ تم اذا بحیث البعض بعضھا موائع احتكاك ھو االحتكاك یكون الطبقة اضرار من یخفف مما معادن احتكاك ولیس

الفیزیائي التالمس

Lube Oilأھمیــة نظـــام

lube oil System

All rights reserved / Omar Zaareer 2015

Page 9: Part One Gas

Remember: The function of oil lubrication systemTo provide clean, high- grade lubricating oil with suitable pressure and temperature.

Components of the system:

1. Oil tank

2. Oil pumps

3. Oil filters& strainer

4. Oil cooler

5. Oil heater

6. Control valves and protection devices

Major system components

Lube Oil System

All rights reserved / Omar Zaareer 2015

Page 10: Part One Gas

Remember • This lubrication system, complete with

tank, pumps, coolers, filters, valves and various control and protection devices, furnishes normal lubrication and absorption of heat rejection load of the gas turbine.

• Lubricating fluid is circulated to the three main turbine bearings, generator bearings, and to the turbine accessory gear and fuel pump.

• Also, lubricating fluid is supplied to the starting means torque converter for use as hydraulic fluid as well as for lubrication.

• Additionally, a portion of the pressurized fluid is diverted and filtered again for use by hydraulic control devices as control fluid.

Lube Oil System

All rights reserved / Omar Zaareer 2015

Page 11: Part One Gas

A Turbine Oil flow system

Oil lubrication system Components

Lube Oil System

All rights reserved / Omar Zaareer 2015

Page 12: Part One Gas

lubrication system Schematic

Lube Oil System

All rights reserved / Omar Zaareer 2015

Page 13: Part One Gas

ك لبشك الزیت مستوى ارتفع اذا أما•لشاشا تصل )Trip( اشارة فان بیرأب لتقوم الحمایة وانظمة التحكم ت

لسماحا وتمنع الغازیة التوربینة طفاء اعاالرتف ھذا ان حیث تشغیلھا بأعادة لىع یدل الزیت مستوى في الكبیر

المبردات من للماء تسریب ھناك ان یؤثر مما الزیت نظام الى ویدخل

نظاوال والفالتر التحمیلكراسي على.بأكملھ م

ما یعمل كخزان تجمیع وتزوید للزیت وك•

.یعمل كنازع للھواء

:معینةالزیت محدد بمستویات مستوى •

الى قیمة محددة یصل بحیث اذا انخفض •

وكما للتحذیر ) pretrip(تصل اشارة

یت الزتصل ھذه االشارة اذا ارتفع مستوى

.عن المحدد

Lube Oil System

Lube Oil Tank

All rights reserved / Omar Zaareer 2015

Page 14: Part One Gas

یقع ھذا المبرد على خطوط النظام المزودة

. د للزیت وقد یحتوي النظام على اكثر من مبر

یقوم صمام تحكم حراري بتنظیم حرارة جزء

اشرة من زیت التزلیق عن طریق تزویده بزیت مب.من المبرد

Lube Oil System

Lube Oil Cooler

All rights reserved / Omar Zaareer 2015

Page 15: Part One Gas

Lube Oil System

Lube Oil Filters

All rights reserved / Omar Zaareer 2015

Page 16: Part One Gas

��ـــزة ق��اس ومراق��ة احلــرارة والضغط

نع والثانویة األساسیة المضخات اداء مراقبة یتم

غطالض ھذا قراءة یتم حیث الضغط قیاس اجھزة طریق.خةالمض على محلیا المثبت الضغط مقیاس طریق عن

سيلكرا المزود للزیت الضغط مراقبة یتم وكذلك

االشارات بارسال تقوم من ھي االجھزةوھذه التحمیل .المناسبة االجراءاتاتخاذ یتم حیث التحكم لشاشات

حال في تفعیلھا یتم الغازیة التوربینة اطفاء اشارة

من ارسالھا یتم اشارت ثالثة اصل من اشارتین وصول.الضغط قیاس اجھزة

اراش ارسال ویتم الحرارة قیاس اجھزة توجد وكذلك جةدر وصول حال في التحكم لنظام تحذیریھ ات

.المحدده الدرجة الى الزیت حرارة

Lube Oil System

Lube fluid temperatures are indicated on the thermocouples which may be located in the bearing header, bearing drains, and the oil tank.

A thermocouple, LT_OT-1A, prevents turbine start-up if the temperature of the lubricant is lower than the switch setting.

Lubricating fluid for the main, auxiliary and emergency pumps is supplied from the reservoir, while lubricating fluid used for control is supplied from the bearing header.

This lubricant must be regulated to the proper, predetermined pressure to meet the requirements of the main bearings and the accessory lube system, as well as the hydraulic control and trip circuits.

lubricating fluid is filtered and cooled before being piped to the bearing header.

Instrumentations

All rights reserved / Omar Zaareer 2015

Page 17: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 18: Part One Gas

Lube Oil System PID of another unit

All rights reserved / Omar Zaareer 2015

Page 19: Part One Gas

Lube Oil System PID of another unit

All rights reserved / Omar Zaareer 2015

Page 20: Part One Gas

• The system is ventilated through a mist eliminator mounted on top of the lube oil reservoir. slight negative pressure is maintained in the system by the motor driven fan 88 QV-1 or 88QV-2 pulling air through the mist eliminator.

• The separation of oil droplets shall be made by the coalescing filters. In the suction line of the blower a filters with differential pressure transmitters 96 QQ-10 and 96 QQ-20 are fitted. In case of filter contamination the differential pressure transmitter indicates an alarm. This negative pressure draws sealing air through the gas turbine bearing seals.

• A tap and a pressure transmitter 96 QV-1 is provided on the mist eliminator to permit monitoring tank pressure. A diaphragm is upstream of fan for the mist eliminator and is used to regulate tank pressure.

Lube Oil System

Mist eliminator (GE 9E)

All rights reserved / Omar Zaareer 2015

Page 21: Part One Gas

Lube Oil System

Mist eliminator (GE 9E)

All rights reserved / Omar Zaareer 2015

Page 22: Part One Gas

Review

Lube Oil System

All rights reserved / Omar Zaareer 2015

Page 23: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 24: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 25: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 26: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 27: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 28: Part One Gas

Review مراجعة سریعة

Lube Oil System

All rights reserved / Omar Zaareer 2015

Page 29: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 30: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 31: Part One Gas

Lube Oil System

Review

All rights reserved / Omar Zaareer 2015

Page 32: Part One Gas

Hydraulic Supply System and Inlet Guide Vane

All rights reserved / Omar Zaareer 2015

Page 33: Part One Gas

The main hydraulic supply system utilizes turbine lube oil to supplythe high pressure fluid for operating the fuel control valves, or otherdevices.

The hydraulic supply system regulates a supply pressure ofapproximately 1500 psi suitable to modulate oil fuel control valve.

The system filters the oil for servovalve use.

Accumulators to provide transient flow and prevent hydraulicpressure spikes to devices to protect the turbine if hydraulic pressure

becomes inadequate to support essential control functions.

Hydraulic Supply System and Inlet Guide Vane

All rights reserved / Omar Zaareer 2015

Page 34: Part One Gas

Major devices and functional description

• Main pump ,

The primary source of high pressure oil is an accessory gear drivenpressure compensated piston pump. The pump's pressure compensatoris designed VPR 3-1.

• Auxiliary pump

A motor driven 88 HQ-1 fixed displacement pump is provided as a backup to the main pump. While the main pump is at low speed, during thenormal starting sequence, the auxiliary pump runs until the 14 HS speedsensor indicates minimum governing speed is reached. Any time themain pump fails to maintain adequate pressure, as sensed by 63 HQ-1pressure switch, the auxiliary pump is started. When this pump isinitiated by the 63 HQ-1 pressure switch, it will continue to run until shutdown manually.

Hydraulic Supply System and Inlet Guide Vane

All rights reserved / Omar Zaareer 2015

Page 35: Part One Gas

Hydraulic Supply System and Inlet Guide Vane

All rights reserved / Omar Zaareer 2015

Page 36: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 37: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 38: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 39: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 40: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 41: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 42: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 43: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 44: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 45: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 46: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 47: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 48: Part One Gas

Variable Inlet Guide Vane System

All rights reserved / Omar Zaareer 2015

Page 49: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 50: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 51: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 52: Part One Gas

Atomizing Air System

Function The atomizing air system provides

sufficient pressure in the airatomizing chamber of the fuelnozzle body to maintain the properratio of atomizing air pressure tocompressor discharge pressure atapproximately 1.2 or greater overthe full operating range of theturbine.

Since the output of the mainatomizing air compressor, driven bythe accessory gear, is low at turbinefiring speed, a starting atomizing aircompressor provides a similarpressure ratio during the firing andwarm-up period of the startingcycle, and during a portion of theaccelerating cycle.

Major system components:

the main atomizing air compressor

starting atomizing air compressor, atomizing air heat exchanger(s) and an air filter.

All rights reserved / Omar Zaareer 2015

Page 53: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 54: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 55: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 56: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 57: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 58: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 59: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 60: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 61: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 62: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 63: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 64: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 65: Part One Gas

Atomizing Air System

All rights reserved / Omar Zaareer 2015

Page 66: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 67: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 68: Part One Gas

Cooling and Sealing Air System

Introduction

The cooling and sealing air system provides the necessary air flow:

from the gas turbine compressor

TO other parts of the gas Turbine rotor Stator Sealing of the turbine bearings

To prevent excessive temperature buildup in these parts during normal operation and for sealing of the turbine bearings.

Air from two centrifugal type blowers is used to cool the turbine exhaust frame. These two motor fans are part of a cooling system located on a base, near the lower part of the gas turbine exhaust system duct.

All rights reserved / Omar Zaareer 2015

Page 69: Part One Gas

Cooling and sealing functions:

Sealing of the turbine bearings.

Cooling of internal turbine parts subjected to high temperature.

Cooling of the turbine outer shell and exhaust frame.

Providing an operating air supply for air operated valves.

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 70: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 71: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 72: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 73: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 74: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 75: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 76: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 77: Part One Gas

Cool the turbine shell and exhaust frame

Cooling and Sealing Air SystemExhaust Frame Blower

All rights reserved / Omar Zaareer 2015

Page 78: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 79: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 80: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 81: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 82: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 83: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 84: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 85: Part One Gas

لمــاذا نحتــاج التبــریــد؟

.إن كفاءة التوربین تعتمد على ارتفاع حرارة الھواء الداخل إلى التوربین -.النقطة السابقة من الممكن أن تكون مفیدة بناءا على نوع المعدن المستخدم و المتاح-من خالل تأمین تبرید مستمرو كافي فإتھ من الممكن رفع حرارة الھواء من دون المخاطرة بذوبان أجزاء -

.التوربین

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 86: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 87: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 88: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 89: Part One Gas

Cooling and Sealing Air System

All rights reserved / Omar Zaareer 2015

Page 90: Part One Gas

:الغــرض مــن النضــام من أخرى أجزاء و المتحركة و الثابتة الشفرات حرارة خفض على العمل ھو التبرید نظام من الھدف إن

و “Bearing“ال عند عزل تأمین العزل من الھدف أن كما ,الضاغطة ھواء استخدام طریق عن التوربین.التبرید ھواء مجاري

All rights reserved / Omar Zaareer 2015

Page 91: Part One Gas

نقــاش مفتـوح واسئلـــة

All rights reserved / Omar Zaareer 2015

Page 92: Part One Gas

)أعـــداد وتقدیــم (

المھنـدس عمـر الـزعـاریــر / المـدرب

شـركـة جنـوب كـوریـا –مـدیـر التشغیـل والكفـاءة

Eng. Omar Za'areer

1

All rights reserved / Omar Zaareer 2015

Page 93: Part One Gas

Part #1 : Power Plants Primers (مقـــدمـة عـامـة فـي محطــات الطــاقــة)

Part #2: Gas Turbine Major Components

Part #4: Gas Turbine Auxiliary Systems

Part #5: Gas Turbine Maintenance and Troubleshooting

Part #6: Gas Turbine Operation

Part #3: Simple Cycle Improvement

Gas Turbine Training Course

Design , Operation & Maintenance

All rights reserved / Omar Zaareer 2015

Page 94: Part One Gas

Part #1

مقـــدمـة عـامـة فـي محطــات الطــاقــة

Power Plants Primers

1

All rights reserved / Omar Zaareer 2015

Page 95: Part One Gas

Part #1

مقـــدمـة عـامـة فـي محطــات الطــاقــة

Power Plants Primers

1

All rights reserved / Omar Zaareer 2015

Page 96: Part One Gas

مقـــدمـة عـامـة فـي محطــات الطــاقــة

Common Terms & Abbreviationsالمصطلحات و االختصارات -1

Power Plant Historyنشــأة محطــات الطــاقــة -3

Power Plant Formsاشكـال محطــات الطــاقــة -5

Power Plant Conceptionمفھـوم محطــات الطــاقــة -4

-PID )(Symbols مقدمة لـ -2 Piping

All rights reserved / Omar Zaareer 2015

Page 97: Part One Gas

االختصـــارات و المصطلحــات -1 1- COMMON TERMS AND ABBREVIATIONS

GT - Gas Turbine

• CT – Combustion Turbine

• CTG – Combustion Turbine Generator

• GTG – Gas Turbine Generator

ST - Steam Turbine

• STG – Steam Turbine Generator

HRSG – Heat Recovery Steam Generator

CCR – Central Control Room

DCS – Distributed Control System

EWS/OWS – Engineering/Operator Work Station

PLC- Programmable Logic Controller

BMS – Burner Management System

All rights reserved / Omar Zaareer 2015

Page 98: Part One Gas

1- COMMON TERMS AND ABBREVIATIONS BOP – Balance of Plant

HVAC – Heating, Ventilation and Air Conditioning

Simple Cycle – operating CTG only to make electricity and exhausting all CTG exhaust heat to atmosphere.

.الى الجو تشغیل التوربین الغازي لتولید الكھرباء بحیث یتم طرح الغازات العادمة: الدورة البسیطة*

Combined Cycle – capturing exhaust heat from CTG in HRSG to make steam and drive ST. Both CTG and STG make electricity.

وجیھ البخار ثم ت. استخدام الغازات العادمة من التوربین الغازي في تولید البخار في المرجل: دورة المركبة*. الى توربین بخاري لتولید الكھرباء

Cogeneration – producing both electricity and process steam

COD – Commercial Operation Date

All rights reserved / Omar Zaareer 2015

Page 99: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping

1) Letter Symbols

All rights reserved / Omar Zaareer 2015

Page 100: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping

1) Letter Symbols

All rights reserved / Omar Zaareer 2015

Page 101: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols

All rights reserved / Omar Zaareer 2015

Page 102: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols

All rights reserved / Omar Zaareer 2015

Page 103: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols

All rights reserved / Omar Zaareer 2015

Page 104: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols

All rights reserved / Omar Zaareer 2015

Page 105: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols

All rights reserved / Omar Zaareer 2015

Page 106: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols

All rights reserved / Omar Zaareer 2015

Page 107: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols (Valves)

All rights reserved / Omar Zaareer 2015

Page 108: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols (Valves)

All rights reserved / Omar Zaareer 2015

Page 109: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols (Valves)

All rights reserved / Omar Zaareer 2015

Page 110: Part One Gas

-PID )(Symbols مقدمة لـ -2 Piping1) PID Symbols (Examples)

All rights reserved / Omar Zaareer 2015

Page 111: Part One Gas

Gas Turbine History

1939أول استخدام للتوربین الغازي في محطات الطاقة الكھربائیة كان.

2تطور بعد ذللك في مجال الطیران خالل الحرب العالمیة

محطات ( تطور بعد ذلك بشكل ثابت في مجال الطیران و في استخدامات خاصة اخرى كمحرك.... ).محطات ضخ الغاز , الطاقة

Braytonتعمل التوربینات الغازیة على مبداء • Cycle

Rankineمبداء محطات التولید التقلیدیة على تعمل • Cycle

• Brayton cycle less efficient than Rankine Cycle

Power Plant Historyنشــأة محطــات الطــاقــة -3

All rights reserved / Omar Zaareer 2015

Page 112: Part One Gas

Gas Turbine History (cont’d)التقدم في استمر التقدم بتحسین كفاءة التوربین الغازي عن طریق لذلك•

Aerodynamic design, الغازات دینامیكا علم

Combustion control,االحتراق عملیة في التحكم

Compressor and turbine blade design, العنافات تصمیم

Metallurgyعالیة درجات تتحمل مواد ایجاد ( المعادن علم(

Closer tolerances between rotating blades and stationaryparts. كذلك و الضاغط مراحل بین ) الھواء تھریب ( الضیاعات تقلقل .التوربین

نتیجة امكانیة رفع حرارة % 35) اكبر من (كفاءة التوربین الغازي اصبحت تفوق •.مدخل التوربین

Power Plant Historyنشــأة محطــات الطــاقــة -3

All rights reserved / Omar Zaareer 2015

Page 113: Part One Gas

Combined Cycle Power Plant (CCPP) History

عام السابقة 20اصبحت منتشرة وواسعة اآلستخدام خالل.

GTG, STG and HRSG المستخدمة في محطات التولید اكثر كفاءة من محطات التولید. البخاریة

اقل تكلفة Less capital cost

بالمقارنة باالستطاعة ( اقل تكلفة بناء و زمن البناء اقلMW (

بالمقارنة باالستطاعة ( اقل ) أرض(تحتاج الى مساحةMW (

بالمقارنة باالستطاعة ( ) تلوث الھواء ( اقل انبعاثاتMW (

Power Plant Historyنشــأة محطــات الطــاقــة -3

All rights reserved / Omar Zaareer 2015

Page 114: Part One Gas

Power Plant Formsاشكـال محطــات الطــاقــة -5

Power Plant Conceptionمفھـوم محطــات الطــاقــة -4

All rights reserved / Omar Zaareer 2015

Page 115: Part One Gas

الجــزء األول

المحطــــة الحـــراریــــة

Conventional Steam Power Plant

All rights reserved / Omar Zaareer 2015

Page 116: Part One Gas

المكونات األساسیة للمحطات الحراریة

:تتكون المحطات الحراریة بشكل رئیسي ممایلي

Boiler )غالیة(مرجل • (or Reactor)

Steam Turbineتوربین بخاري • and Condenser

Boiler Feed Pumpمضخة تغذیة •

Cooling Systemمكثف •

Balance of Plant Equipment (e.g., fuel system, waterاألنظمة المساعدة •

treatment plant)

Conventional Steam Power Plant

All rights reserved / Omar Zaareer 2015

Page 117: Part One Gas

Rankine Cycle Diagram

Conventional Steam Power Plant

All rights reserved / Omar Zaareer 2015

Page 118: Part One Gas

Rankine Cycle - Basic T-s Diagram

Conventional Steam Power Plant

All rights reserved / Omar Zaareer 2015

Page 119: Part One Gas

Rankine Cycle – T-s Diagram with Superheat

Conventional Steam Power Plant

All rights reserved / Omar Zaareer 2015

Page 120: Part One Gas

الجــزء الثـانـي

الـدورة البسیطـــة

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 121: Part One Gas

المكونات األساسیة لمحطات الدورة البسیطة

Compressorالضــاغــط •

Combustorغـرفــة األحتـراق •

Turbineالتــوربیــن الغـــازي •

Accessory Drive Assemblyاألنظمـــة المســاعـــدة •

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 122: Part One Gas

Gas Turbine SC Schematic

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 123: Part One Gas

Brayton Cycle

COMPRESSOR

AIR

COMBUSTIONCHAMBER

EXHAUST

WORK

FUEL

TURBINE

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 124: Part One Gas

1-2 compression process : یزید الضغط و یقل الحجم

1-2 compression process

Brayton Cycle

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 125: Part One Gas

2-3 Combustion process:

الوقود فترتفع الحرارة مع ثبات الضغط/یحترق مزیج الھواء

2-3 Combustion process

Brayton Cycle

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 126: Part One Gas

3-4 Turbine (Expansion):

3-4 Turbine (Expansion):.تتحول الى طاقة حركیة تحرك التوربین و المولد) عاليضغط حرارة عالیة و (الطاقة المختزنة في الغازات

Brayton Cycle

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 127: Part One Gas

1-2 compression process : pressure increased & volume reduced.

2-3 Combustion process: fuel air mixture burns, temp & volume increase under constant pressure.

3-4 Turbine (Expansion):The hot gas which storing energy is converted to work inside the turbine(rotation, speed and torque).

4-1 Exhaust air rejected & new air is induced. الغازات العادمة تطرح الى الجو.

Brayton CycleSimple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 128: Part One Gas

Brayton Cycle T-s Diagram

Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 129: Part One Gas

الجـــزء الثـالـث

الـــدورة المـــركبــة

COMBINED CYCLE

All rights reserved / Omar Zaareer 2015

Page 130: Part One Gas

Combined

Part #1 with Part #2

الـــدورة المـــركبــة

COMBINED CYCLE

All rights reserved / Omar Zaareer 2015

Page 131: Part One Gas

CO

MP

RE

SS

OR

AIR

CO

MB

US

TIO

NC

HA

MB

ER

EX

HA

US

TWO

RK

FU

EL

TU

RB

INE

+ CC Plant

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 132: Part One Gas

المكونات األساسیة لمحطات الدورة المركبة

تتكون الدورة البسیطة بشكل رئیسي ممایلي:(CTG)توربین غازي مع مولد •

Heat Recovery Steam Generator (HRSG)مرجل •

Steam Turbine Generator (STG)توربین بخاري مع مولد •

cooled)watercooled or airCondenser (eitherمكثف •

Balance of Plant (BOP) equipmentاألنظمة المساعدة •

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 133: Part One Gas

Combined Cycle Components

Gas Turbine (Brayton) CycleCTGتوربین غازي مع مولد •

) الدورة البسیطة(الغازات العادمة تطرح الى الجو •

Steam and Steam Turbine (Rankine) Cycleم توجة الغازات العادمة الى المرجل إلنتاج بخار محمص یستخد•

. النتاج الكھرباء بواسطة التوربین البخاري

. تتطلب مضخات و مكثف و نظام تبرید•

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 134: Part One Gas

Combined Cycle Schematic (Diagram)

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 135: Part One Gas

Combined Cycle Schematic (Diagram)

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 136: Part One Gas

Cycles Comparison

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 137: Part One Gas

Combined Cycle T-h Diagram

This represents theheat recovered fromthe HRSG anddelivered as steam tothe steam turbine.

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 138: Part One Gas

Combined Cycle

Overview the Process

All rights reserved / Omar Zaareer 2015

Page 139: Part One Gas

Schematic Drawing

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 140: Part One Gas

Combined Cycle Overview

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 141: Part One Gas

Combined Cycle Overview

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 142: Part One Gas

Combined Cycle Advantages

Reliability (compared with conventional plants). Higher availability.

Flexibility

Reduced Maintenance

Reduced Environmental Impact.

Reduced Costs

• Less capital equipment than conventional steam power plants

• Significantly reduced construction time

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 143: Part One Gas

Reduced Maintenance

Reduced Environmental Impact

• Low NOx burners used on modern gas turbines

• Further NOx reduction by use of Selective Catalytic Reduction

(SCR) with ammonia injection on HRSG

Combined Cycle Advantages

Combined Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 144: Part One Gas

Part #2:

Gas Turbine Major Components

2

All rights reserved / Omar Zaareer 2015

Page 145: Part One Gas

1) Gas Turbine Overview.

2) Major Components

Air Intake system.• Inlet System• Pulse System • Anti Icing system

Air Compressor• Inlet Guide Vane (IGV)• Blowoff (bleed) Valves.• Surge Protection (Discussion)

3) Combustion Chamber

4) Turbine Section

Gas Turbine Topics to be discussed

All rights reserved / Omar Zaareer 2015

Page 146: Part One Gas

1) Gas Turbine Overview.

Gas Turbine

All rights reserved / Omar Zaareer 2015

Page 147: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 148: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 149: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 150: Part One Gas

GT Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 151: Part One Gas

Gas Turbine SC Schematic

GT Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 152: Part One Gas

Gas Turbine Line Schematic

GT Simple Cycle Power Plant

All rights reserved / Omar Zaareer 2015

Page 153: Part One Gas

Gas Turbine (Typical Industrial GT)

All rights reserved / Omar Zaareer 2015

Page 154: Part One Gas

Gas Turbine (Typical Industrial GT)

All rights reserved / Omar Zaareer 2015

Page 155: Part One Gas

األجــزاء الــرئیسیـــة

Gas Turbine (Typical Industrial GT)

Illustrative Section of a GT

All rights reserved / Omar Zaareer 2015

Page 156: Part One Gas

Gas Turbine (Typical Industrial GT)

Schematic for Major Components

All rights reserved / Omar Zaareer 2015

Page 157: Part One Gas

2) Major Components

Air Intake System

Gas Turbine

All rights reserved / Omar Zaareer 2015

Page 158: Part One Gas

Air intake System

All rights reserved / Omar Zaareer 2015

Page 159: Part One Gas

Air system provide the required air for:

Combustion.

Reduce the temperature of combustion products to certain limit (accepted temp.)

Turbine rotor cooling

Seal lubrication system

Operate the control system

Air intake System

What is the function of air intake system?

All rights reserved / Omar Zaareer 2015

Page 160: Part One Gas

• Air filtration helps prevent internal component deterioration

• Air modification helps increase turbine performance

Air intake System

All rights reserved / Omar Zaareer 2015

Page 161: Part One Gas

Inlet screen: prevents entry of birds, papers,…

Pre-filter: removes medium size particles

High efficiency filter: removes fine particles

Filters are being cleaned by a reverse flow of air through the filters

Air intake System

All rights reserved / Omar Zaareer 2015

Page 162: Part One Gas

Pulse System

Air Puls للتنظیف

الھواء المراد فلترتة

فلتر ھواء

فلتر ھواء

ھواء نظیف

ھواء من ظاغط منفصل

یعمل النظام بشكل اوتوماتیكي على االقل مرة واحدة في الیوم

Air intake System

OperationNormal Self Cleaning is Active

All rights reserved / Omar Zaareer 2015

Page 163: Part One Gas

Evaporative cooler can be installed in the inlet duct to cool the temperature of the incoming air to improve the gas turbine performance.

Through the use of treated water, the incoming air is exposed to a water baffle which cools the air. This makes the air more dense, improving the turbine output power.

Air intake System

Water Injection (Inlet Ducting)

All rights reserved / Omar Zaareer 2015

Page 164: Part One Gas

(Anti Icing system مــانـع تشكـل الجلیـد )

یستخدم لحمایة الفالتر)Filters and Intake Duct ( اثناء التشغیل تحت.ظروف جویة ذات درجات حرترة منخفظة لمنع تشكل الجلید

یتكون نظام مانع تشكل الجلید من:

الساخن انبوب تزوید الھواء)Supply pipe(

رئیسيصمام امان )Shut off Valve (

تحكمصمام )Control Valve (

Air intake System

All rights reserved / Omar Zaareer 2015

Page 165: Part One Gas

مبدا عمل ھذا النظام:

و ذلك في ھذا النظام على التحكم في درجة حراره الھواء الداخلیعملحال تدني درجة حرارة الھواء الداخل یتم إضافة ھواء ساخن

یجلب الھواء الساخن من مخرج الضاغط للوحدة الغازیھ ,الیھلمدخل الھواء من الجانب العلوي للفالتر و من خالل مرشات ھواء

. ساخن یتم خلط الھواء الساخن مع الھواء الداخل

ال یتم التحكم بكمیة الھواءالساخن الداخل من خاللControl valve

Anti Icing system

Air intake System

All rights reserved / Omar Zaareer 2015

Page 166: Part One Gas

م5+م الى 5 -یعمل ھذا النظام مابین

Air intake System

Anti Icing system

All rights reserved / Omar Zaareer 2015

Page 167: Part One Gas

2) Major Components

Compressor Section

Gas Turbine

All rights reserved / Omar Zaareer 2015

Page 168: Part One Gas

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 169: Part One Gas

The role of the air compressor in a gas turbine is basically to provideand compress enough air for

Combustion chamber,

Cooling purposes,

Sealing.

Air CompressorThe Role

All rights reserved / Omar Zaareer 2015

Page 170: Part One Gas

Impeller Diffuser Manifold

Centrifugal CompressorsAxial Compressors

Rotor Blades

Stator Vanes

Air CompressorType of Air Compressors

All rights reserved / Omar Zaareer 2015

Page 171: Part One Gas

• Centrifugal compressor consists of an impeller, a diffuser and a manifold

• Compressor receives air at the center of the impeller in an axial direction

• Air is accelerated outward by centrifugal reaction to its rotational speed

• Air is then allowed to expand into divergent duct, called a diffuser

• According to Bernoulli’s Principle, as the air spreads, its speed slows and static pressure builds

• The manifold distributes the air in a turbulence free condition to the combustion section

Advantages: High pressure rise per stage,Good Efficiency, Simplicity of manufacture,Low cost, Low weight, Low starting powerrequirements

Disadvantages: Large frontal area for agiven flow, More than two stages is notpractical because of energy lossesbetween stages

Air CompressorCentrifugal Compressors (Principles of Operation)

All rights reserved / Omar Zaareer 2015

Page 172: Part One Gas

• Airflow and compression occur parallel to the rotational axis of compressor

• Axial Compressor consists of a series of rotor blades and stator vanes

• A rotor and the following stator make up a stage

• Several stages are combined to make up the complete compressor

• Each rotor consists of a set of blades fitted into a disk

• Kinetic energy of the rotor is transferred to the air

• Stator vanes are placed to the rear of the rotor blades

• Stator vanes receive the air at high velocity and act as a diffuser, changing kinetic to

potential energy (Pressure)

• Stator vanes have a secondary function of directing airflow to the next stage of

compressor at the desired angle

Air CompressorAxial Compressor (Principles of Operation)

All rights reserved / Omar Zaareer 2015

Page 173: Part One Gas

Pressure and Velocity Variation in Axial Compressors

• Velocity increase through rotor blades isequal to velocity decrease through stator vanes

• Pressure, however, increases continuouslythrough rotor blades and stator vanes

• Rotating blades transfer the kineticenergy of the rotor to the airflow.

• Stationary vanes convert the airflowkinetic energy to pressure

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 174: Part One Gas

Pressure and Velocity Variation in Axial Compressors

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 175: Part One Gas

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 176: Part One Gas

The compressor rotor is assembled by vertically stacking the wheels.

First, the forward stub shaft and first wheel are put with tie bolts in place.

Then, each wheel is placed vertically over the tie bolts.

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 177: Part One Gas

All rights reserved / Omar Zaareer 2015

Page 178: Part One Gas

و تنظم كمیة الھواء الالزمة للحتراق وبالتاليتتحكم التحكم بدرجة حرارة االحتراق

1 Pivot pin

2 Airfoil

6 Stationary blade carrier

7 Outer ring

8 Inner ring

Air CompressorVariable inlet guide vanes (IGV)

All rights reserved / Omar Zaareer 2015

Page 179: Part One Gas

Surge phenomenon

&

Surge Protection

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 180: Part One Gas

Surge

Topics to be discussed:

What is the surge?

What is the effect of surge?

Surge control system.

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 181: Part One Gas

What is the surge? Surge is the phenomenon of momentary,

periodic fluctuations in the discharge pressureof compressor air.

It occurs during acceleration, at a point whenthe compressor begins to discharge air fasterthan it can suck air in.

This condition causes low-pressure pockets to form inside the compressor.

Since higher pressures tend to flow toward lower pressures, the discharge air will flow back into the compressor to fill the low-pressure pockets.

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 182: Part One Gas

What is the effect of surge?

As discharge air flows backinto the compressor, it gainsmore heat during the secondpressurization. If thisrepeated, air temperaturewould rise to destructivelevels.

Surge will cause sever axialmovement of the rotor in bothdirections (i.e. axial vibration).This condition will cause rapidfailure in the thrust bearingand all internal seals

Air Compressor

As the discharge air flows backinto the compressor, air is bledfrom an inter-stage location tothe exhaust collector, thuspreventing the back-flowing airfrom re-pressurizing.

Supply compressor suction withextra air so that compressor-inlet pressure keeps pace withcompressor-discharge pressure.This is done by routing a smallamount of compressor-discharge air back to thecompressor inlet.

Surge control

All rights reserved / Omar Zaareer 2015

Page 183: Part One Gas

التحكـــم فـي النظــام..

التشغیل بواسطة الغاز أو الدیزل:%.76الصمامات تفتح خالل بدایة التشغیل و تغلق عند وصول السرعة ل جمیع

اثناء التشغیل المستمر في: .تبقى جمیع الصمامات ھذا النظام مغلقة تماما

السرعةنزول:ق اغالعند (حال ایقاف التوربین عند نزول السرعة عن السرعة المسموحة في تفتح الصمامات

).صمام الوقود

اإلطفاء:Blowoff “خالل اإلطفاء المبرمج تفتح جمیع صمامات .تماما عند إغالق صمامات الوقود “

Trip )االطفاء المفاجىء(ن لسبب ما فإن الصمامات تفتح مباشرة ألن السرعة حتمیا سوف تنزل ع“ Trip “في حال حدوث

. السرع المسموحة

Blowoff (Bleed Valves)

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 184: Part One Gas

..التحكــم فـي النظــام

“Compressor Wash”:الضاغطة اثناء تنظیف -إذا كان Manually “” خالل التنظیف من الممكن فتح الصمامات بشكل یدوي

.تنظیفو في حال الفتح یجب إغالقھم بعد االنتھاء من عملیة ال, ھنالك حاجھ لذلك

:الحمایة -Blowoff “یفشل التشغیل في حال لم یفتح أحد صمامات - “..یحدث للتوربین“ Trip” في حال فتح أحد الصمامات خالل انتاج الطاقة فإن -

Air CompressorBlowoff (Bleed Valves)

All rights reserved / Omar Zaareer 2015

Page 185: Part One Gas

Blowoff (Bleed Valves)

Air Compressor

All rights reserved / Omar Zaareer 2015

Page 186: Part One Gas

Air CompressorBlowoff (Bleed Valves)

All rights reserved / Omar Zaareer 2015

Page 187: Part One Gas

2) Major Components

Combustion Chamber

Gas Turbine

All rights reserved / Omar Zaareer 2015

Page 188: Part One Gas

Principles of Operation The combustion chamber basically consists of an outer casing, an inner perforated liner, a fuel injection system, and a starting ignition system.

The function is to add heat energy to the flowing gases, thereby expanding and accelerating the gases into the turbine section

When the fuel heat is added, the volume of the gas is increased and, with flow area remaining the same, this causes an acceleration of gases to occur.

Interaction of oxygen molecules and molecules of fuel which are heated to ignition temperatures results in combustion

Proper mixing of air and fuel leads to an efficient functioning of combustion chamber

The combustion chamber must cool hot combustion products to a temperature which the turbine section components can withstand

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 189: Part One Gas

Flame Tube is

placed inside the air casing.

consists of

a fuel spray

a combustion zone.

a spark plug if necessary

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 190: Part One Gas

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 191: Part One Gas

Flame detectors indicate the control system whether or not flame exists in the cans they are mounted on.

Combustion Chamber

Spark Plugs are used to initiate combustion.

In some standard combustors, spark plugs are retractable. They are pushed outward to remove the plug from the flame zone. This ensures a longer life for the spark plug.All rights reserved / Omar Zaareer 2015

Page 192: Part One Gas

This older type combustor consists of multiple outer housing, each with its own perforated inner liner. Each of the multiple combustors (cans) is in effect a separate burner unit.

Multi-Can Combustor Can-Annular Combustor Annular Combustor

Combustion Chamber

This is more common in aircraft engines and consists of an outer case containing multiple liners located radially about the axis of the engine. The liners take air in at the front and discharge it at the rear.

This combustor consists of an outer housing, containing only one liner. Multiple fuel spray nozzles protrude into the liner.

All rights reserved / Omar Zaareer 2015

Page 193: Part One Gas

C Bearing

Compressor

TurbineCombustion Chamber

T Bearing

2*8 Hybrid Burners

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 194: Part One Gas

COMBUSTION CHAMBERS FEATURES

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 195: Part One Gas

HYBRID BURNER

HYBRID BURNER

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 196: Part One Gas

HYBRID BURNER

HYBRID BURNER

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 197: Part One Gas

HYBRID BURNER

Combustion Chamber

All rights reserved / Omar Zaareer 2015

Page 198: Part One Gas

HYBRID BURNER

Combustion Chamber

میزات االحتراق باستخدام premix burner

االنبعاثات )Nox and CO ( اقل بكثیر من حالة

Diffusion

التوزیع الحراري اكثر.انتظاما

التعرض الى االجھاداتالحراریة اقل بكثیر من

.Diffusion حالة

All rights reserved / Omar Zaareer 2015

Page 199: Part One Gas

2) Major Components

Turbine Section

Gas Turbine

All rights reserved / Omar Zaareer 2015

Page 200: Part One Gas

The role of the turbine section is to transform a major portion of the kinetic energy and heat energy in the exhaust gases into mechanical work, thereby enabling the turbine to drive the compressor and accessories.

The turbine section is bolted to the combustion chamber and contains the turbine wheels and turbine stators.

Recall that the compressor adds energy to air by increasing its pressure. The turbine extracts energy by reducing pressure of the flowing gases

Turbine The Role

All rights reserved / Omar Zaareer 2015

Page 201: Part One Gas

Pressure of hot gases leaving the combustion chamber is converted to velocity at the nozzles formed at the trailing edge of the turbine stators vanes and rotor blades.

The turbine stator vanes act as nozzles, increasing velocity and decreasing pressure.

The turbine nozzle assembly is also known as the turbine nozzle, nozzle diaphragm, or the turbine nozzle guide vane assembly.

The turbine stator vanes also direct the gases at the optimum angle into the turbine rotor blades.

The velocity referred to is vectored in a tangential direction rather than axial. This slows the gas flow axially, reducing its reactive power, but adds shaft power to the rotor system.

Turbine Gas Flow Through Stator and Rotor

All rights reserved / Omar Zaareer 2015

Page 202: Part One Gas

The turbine wheels are assembled by vertically stacking them. This eliminates sagging. The tie bolts are weighed, numbered and distributed to eliminate imbalance.

The turbine wheels and spacers are slid over the tie bolts and alignments are achieved by rabbet fits between the pieces.

The forward stub shaft is then placed over the tie bolts.

Turbine

All rights reserved / Omar Zaareer 2015

Page 203: Part One Gas

The first stage buckets are installed initially by inserting the first bucket into the dovetail slot made in the wheel.

The remainder of the buckets are installed in this fashion around the wheel.

The second and third stage buckets are installed as a 360 degree ring. The ring is placed into the wheel gradually.

Turbine

All rights reserved / Omar Zaareer 2015

Page 204: Part One Gas

Turbine

All rights reserved / Omar Zaareer 2015

Page 205: Part One Gas

Cooling techniques are employed to maintain the skin of the blades at acceptable temperatures.

Air is the main coolant fluid which can be extracted from the compressor, ducted to the turbine blade and used as a coolant.

Turbine

All rights reserved / Omar Zaareer 2015

Page 206: Part One Gas

Part #3:

Simple Cycle Improvement

3All rights reserved / Omar Zaareer 2015

Page 207: Part One Gas

Improvements to the Simple Cycle

All rights reserved / Omar Zaareer 2015

Page 208: Part One Gas

Regeneration

netoutputwork

9

Regenerator

Inlet

Compressor Turbine Power Turbine

34

4.5

5

5.5

21

3.5

Combustor

All rights reserved / Omar Zaareer 2015

Page 209: Part One Gas

Intercooling

netoutputwork

9

Inlet

Compressor 1 Turbine Power Turbine

4

4.5

521

Combustor

3

Intercooler

Compressor 2

All rights reserved / Omar Zaareer 2015

Page 210: Part One Gas

Reheating

netoutputwork

9

Inlet

Turbine Power Turbine

4

521

Combustor

3

Compressor

Reheater

All rights reserved / Omar Zaareer 2015

Page 211: Part One Gas

Single Shaft

netoutputwork

9

Inlet

Turbine

4

521

Combustor

3

Compressor

All rights reserved / Omar Zaareer 2015

Page 212: Part One Gas

Double Shaft

netoutputwork

9

Inlet

Turbine Power Turbine

4

521

Combustor

3

Compressor

All rights reserved / Omar Zaareer 2015

Page 213: Part One Gas

Double Shaft (Output at Compressor End)

netoutputwork

9

Inlet

Turbine Power Turbine

4

521

Combustor

3

Compressor

All rights reserved / Omar Zaareer 2015

Page 214: Part One Gas

Triple Shaft

netoutputwork

9

Inlet

Turbine 2 Power Turbine

4

521

Combustor

3

Compressor 2 Turbine 1Compressor 1

All rights reserved / Omar Zaareer 2015

Page 215: Part One Gas

نقــاش مفتـوح واسئلـــة

All rights reserved / Omar Zaareer 2015

Page 216: Part One Gas

Part #5:

Gas Turbine Maintenance

5

Omar Zaareer 20153/2/2015

Page 217: Part One Gas

• Recommended Running Hours between Inspections

• Factors that effect Maintenance Cycles

Gas Turbine Maintenance

Omar Zaareer 20153/2/2015

Page 218: Part One Gas

Agenda

• GT Maintenance Considerations

• Typical Inspection Scopes

• Factors That Affect the Maintenance Cycle

• Conclusion

• Questions

Omar Zaareer 20153/2/2015

Page 219: Part One Gas

GT Maintenance Considerations

• All GTs require regular maintenance.

• A typical maintenance regime is given below: -

• Combustion inspection every 8,000 – 12,000 hrs or 800 starts

• Hot gas path inspection every 24,000 hrs or 1200 starts

• Major Inspection every 48,000 hrs or 2400 starts

• Inspections may have other titles such as A,B or C inspections, or Level 1,2 or 3 inspections.

• The intention is the same.

Omar Zaareer 20153/2/2015

Page 220: Part One Gas

GT Maintenance ConsiderationsMajor Inspection

H.G.P.Inspection

CombustionInspection

Omar Zaareer 20153/2/2015

Page 221: Part One Gas

Inspection Scopes

• The combustion inspection

– The most frequent inspection, looks at: -

– Fuel nozzles, combustion liners, transition pieces

• Hot Gas Path Inspection

– Includes a combustion inspection and the following: -

– Turbine stage rotating and stationary parts

• Major Inspection

– Includes all of the above inspections plus a compressor and bearing inspection.

Omar Zaareer 20153/2/2015

Page 222: Part One Gas

Factors That Affect the Maintenance Cycle

• The period between inspections will shorten if: -

• The fuel used is not natural gas• Gas oil will reduce the cycle time by a factor of 1.5

• Heavy fuel oil may do so by a factor of up to 4

• Each peak load operational hr may count as 20 normal hrs.

• The unit is not in base load operation• The number of starts may call for inspection before the hours

limitation is reached.

• An emergency start may count as 2 normal starts.

• Trip from full load may count as 8 normal starts

Omar Zaareer 20153/2/2015

Page 223: Part One Gas

Factors That Affect the Maintenance CycleOperational Duty

• Cyclic operation – peak lopping

• Thermo-mechanical fatigue, TMF, because of simultaneous fluctuations in load and temperature.

• In phase TMF is when max strain and temperature coincide.

• High cycle fatigue – subjected repeatedly to unsteady load and temperature conditions.

• Rubs and wear.

Omar Zaareer 20153/2/2015

Page 224: Part One Gas

Factors That Affect the Maintenance Cycle

Firing Temperature.

– Notionally, one hour of peak firing will have the same effect as six hours at base load firing temperature.

– Peak firing temperature is usually a turbine inlet temperature increase of around 50oc.

– The degradation mechanisms are dependant upon the number of peak hours run and the frequency of peak firing selection.

Omar Zaareer 20153/2/2015

Page 225: Part One Gas

Conclusion

• Gas turbine fatigue and wear mechanisms are highly dependant on: -– Operational duty

– Fuel selection

– The environment.

• The OEM’s guidelines are just that - guidelines!

• Careful review of the condition of each individual GT is required and a programme made based on the behaviour of that individual unit.

Omar Zaareer 20153/2/2015

Page 226: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-1

SPEEDTRONIC Mark V Annunciator Troubleshooting Chart

<I> CRT Display Alarm Message, Logic & No. Cause ActionÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30HRX3ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁL30AC_ALM ÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁL30AF_ALM ÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63CTSL_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

(Not Used)ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63ADLA ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

A.A. Diff. Press Low,Auto Xfer to Dist

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with atomizingair system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate atomizing airsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63ADL_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Atomizing Air Diff. Pressure Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Atomizing air compressornot providing adequatepressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check atomizing air system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26AAH_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Atomizing Air Temp.High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure of atomizingprecooler louvers to openand close.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check water supply to theatomizing air precooler,isolating valve position flowrestrictions.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86S ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auto Synchronizing Lockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auto synchronizingself-checking system hasdetected a synchronizingequipment abnormality.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate synchronizationsystem to determine exactcause of problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L83COMF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auto Xfer to Dist. Communicator Failure

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Communication link withauto transfer to distillatesystem failed.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check auto transfer todistillate components andcommunication system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L52HQ_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auxiliary Hydraulic OilPump Motor Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Accessory gear-drivenhydraulic pump has notsupplied sufficientpressure because of leaksor failure of pump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check hydraulic system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L52QA_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auxiliary Lube Oil PumpMotor Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The main accessory geardriven lube oil pump issupplying insufficient lubeoil pressure due to pumpfailure or leaks

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Examine main lube pump.Check pump output and mainlube filters for leaks orplugging.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L49X_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auxiliary Motor OverloadÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

One of the auxiliarymotors is overloaded.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check auxiliary motors todetermine which motor isoverloaded and the cause ofthe overloading.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L52QS_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auxiliary Seal Oil PumpRunning

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Insufficient pressure frommain seal oil supplypump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check seal oil supply systemcomponents.

Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Page 227: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-2

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Battery 125 VDC GroundÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Insulation failure hasresulted in a ground on the125 VDC system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Isolate and remove groundfrom the system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L27BLN_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Battery Charger ACUndervoltage

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Battery charger ACundervoltage.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check battery charger ACbreaker. Check voltagemagnitude.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Battery DC UndervoltageÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Battery system voltage islow. Battery charger is notfunctioning properly,excessive drain on thebatteries, or bad cells inbattery.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check battery charger forproper operation, correctexcessive drain on battery,check for bad cells. The gasturbine should not be operatedunless DC power is availableto the emergency DC lube oilpump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30LOAÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bearing DrainTemperature High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High bearing draintemperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check lube oil feed and drainpiping.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bearing MetalTemperature High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bearing or lube oilproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check bearings and lube oilsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L27VVN_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Black Start InverterTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The black start inverteroutput voltage has gonelow, ignition power hasbeen transferred to theMCC 12 VAC.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Troubleshoot black startinverter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L27BN_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bus Undervoltage – No Auto Synch

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bus synchronizingpotential not available.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check bus PT fuses andwiring. Do not use autosynchronizing or manualsynchronizing until problemis resolved.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L28FD_SD ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Chamber Flamed OutDuring Shutdown

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Flame loss during firedshutdown period.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate cause and remedybefore restarting turbine.Monitor vibration on the wayup.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30SPA ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Combustion Trouble ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Faulty thermocouples, gaspath hardware or unevendistribution of fuel to thefuel nozzles.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Analyze data for trends. Atearliest shutdown checkthermocouples. Performborescope or combustioninspection. Check flowdivider fuel pressures. Checkfor plugged nozzles.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

LCOM_B_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Common IOCommunication Loss

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

<C> processor is nolonger communicating.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check <C> power supplycard and cabling.

Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Page 228: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-3

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86CB1ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Compressor Bleed ValvePosition Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Compressor bleed valveshave not operatedproperly. They are in thewrong position or requiredan excessive amount oftime to move from oneposition to the other.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate problem. Theproblem should be correctedbefore restarting. The MasterReset switch must be pressedbefore restarting.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86TCIÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Compressor InletThermocouples Disagree

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad thermocouple signal.Thermocouples in theinlet have failed, shortedor open.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check thermocouples andwiring and replace faultythermocouple(s).

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26CTH_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Control Panel Temp HighÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Air conditions notmaintaining propertemperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check air conditioners.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12HFÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Control Speed Signal Loss - HP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Machine tripped due toloss of speed signal.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check wiring to speedpickups.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12HFD_CÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Control Speed SignalTrouble - HP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

HP speed pickup votingmismatch in <C>.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check and recalibrate HPspeed pickups.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12HFD_P ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Control Speed SignalTrouble - HP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

HP speed pickup votingmismatch in <P>.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check and recalibrate HPspeed pickups.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12LF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Control Speed SignalTrouble - LP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

LP speed pickup votingmismatch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check and recalibrate LPspeed pickups.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30CD ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Cooldown Trouble ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Unit failed to go oncooldown, or thecooldown cycle wasaborted prior to cooldowntimer timeout.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check ratchet system.Monitor vibration whencooldown cycle is reinitiated.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L52FC_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Cooling Fan MotorBreaker Open

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Cooling fan motor did notstart.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check cooling fan motormodule in PECC.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L71WL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Cooling Water Level LowÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Cooling water tank levellow.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check cooling water systemfor leaks.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63QQ3H_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Coupling Oil Filter DiffPressure High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged filter. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Replace filter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3CP_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Customer Start InhibitÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Customer contact inputnot enabled.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check customer’s permissive.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L4CT_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Customer TripÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Customer trips input to theL4CT logic have causedan automatic trip of theunit.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine which of thecustomer trip devices causedthe trip and correct.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Customer-Specific Alarms <C>

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Page 229: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-4

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Customer-Specific Alarms <Q>

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L27QEL_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

DC Motor Undervoltage(Lube Oil)

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

DC power not supplied toemergency DC lubepump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check power to DC lubepump (MCC breaker on). Thegas turbine should not beoperated unless DC power isavailable to the emergencyDC lube pump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30DIAG_C ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diagnostic Alarm <C> ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The microprocessor self-checking program hasuncovered a control panelproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Call up diagnostic display.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30DIAG_Q ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diagnostic Alarm <Q>ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The microprocessorself-checking program hasuncovered a control panelproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Call up diagnostic display.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26DWH_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel Engine CoolingWater Temp High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel cooling watertemperature is high.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check diesel cooling watersystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L2DWZ2 ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel Failure to BreakTurbine Away

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel was unable toaccelerate to maximumrpm.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check diesel. Check dieselmaximum torque solenoid.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L48DSX ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel Failure to Start ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel has failure to start.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check diesel fuel tank.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L4DEY_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel Failure to StopÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel should stopautomatically after a 5minute cooldown period.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check diesel stop solenoid20DV.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63QDN_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel Lube Oil Pressure Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel lube oil pressure islow.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check diesel lube oil system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L83DT1ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Diesel Test Mode Selected

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Indication that diesel testpushbutton permissive hasbeen activated.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Test mode should bedeselected once the test iscomplete.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63LF2H_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Distillate Fuel FilterDifferential Pressure High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged filter.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Replace filter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26FD1H_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Distillate FuelTemperature High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Possible cooling systemproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check temperature sensor andcooling system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12HÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Electrical Overspeed Trip - HP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The speed control systemhas not limited HP turbinespeed within the triplimits.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Isolate problem and correct.

Omar Zaareer
Rectangle
Page 230: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-5

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12LÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Electrical Overspeed Trip - LP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The speed control systemhas not limited LP turbinespeed within the triplimits.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Isolate problem and correct.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L72QEZ_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Emergency Lube OilPump Motor Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Loss of AC power to mainlube oil pumps.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine cause of AC powerloss.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L72ES_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Emergency Seal Oil Pump Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator seal oil pressureis low.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check main and auxiliary sealoil supply systemcomponents.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L59E_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exciter OvervoltageÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Excessive field volts havebeen detected.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check exciter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L94EKÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exciter Rect CoolingTrouble - Trip 52G

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Breaker has tripped andmachine is at FSNLbecause of problem withexciter rectifier cooling.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate exciter rectifiercooling system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26SFH_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exciter Rectifier BridgeTemp High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Possible cooling systemproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check exciter rectifier coolingsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86TXT_CÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust OvertemperatureTrip <C>

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine has tripped due tohigh median exhausttemperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86TXTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust OvertemperatureTrip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The temperature controlsystem has not limitedexhaust temperaturewithin the trip limits.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Isolate problem and correct.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63TK_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust Frame CoolingAir Pressure Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust frame blowermotor not operating. Airpassages blocked.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check motor operation.Inspect cooling air flowpassages.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L90TKLÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust Frame CoolingSystem Trouble - Unload

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust frame coolingfans 88TK-1,2 problem orsystem problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate exhaust framecooling system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63EAH_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust Pressure HighAlarm

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust pressure has risenabove recommendedlevels.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Inspect exhaust filter andducting for blockage.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63ETHÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust Pressure HighTrip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust pressure has risenabove the trip level.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Inspect exhaust filter andducting for blockage.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63ETHX_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust Pressure SwitchTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal from exhaustpressure switch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check switches and switchwiring.

Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Page 231: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-6

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30TXAÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust TemperatureHigh

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The exhaust gastemperature is excessive.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check all thermocouples.Replace any badthermocouples. If problem isnot thermocouples, isolateportion of Control Systemcausing the problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30TXA_C ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust TemperatureHigh <C>

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High median exhausttemperature calculated in<C>.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lower load to reduce exhausttemperature. Investigate.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30SPTA ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust ThermocoupleTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Faulty thermocouple. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check thermocouples.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86TFB ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Exhaust ThermocouplesOpen Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Excessive number ofthermocouples notconnected.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check and reconnectthermocouples.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63FLZ_FLT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure to Establish Liquid Fuel Press.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid fuel forwardingsystem problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check that power is beingsupplied to liquid fuelforwarding pump/motor.Troubleshoot per systemcomponents per instructions.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30FD_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure to IgniteÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure to fire within theone minute period.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check that ac power issupplied to the ignitionsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L62TT2_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure to StartÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The master protectivelogic signal “L4” has notbeen set within 30 secondsof the start signal, hastripped the unit twice or, ifthe unit is operating inremote, flame was notestablished after two tries.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check all signals making upthe L4 logic signal todetermine which caused theproblem, or determine causeof lack of flameestablishment.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3ZÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure to SynchronizeÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Unit did not synchronizeand close generatorbreaker within the normalexpected time (15seconds).

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check all signals goingmaking up the L4 logic signalto determine which caused theproblem or determine thecause of lack of flameestablishment.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L45FTX2_ALML45FTX1_ALM

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Fire in Zone #1 or Zone #2 Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Fire in the turbine oraccessory compartment.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Restarting after an operationof the CO2 system requiresthat the CO2 system be reset,including all doors anddampers, and the CO2 releasemechanism.

Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Page 232: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-7

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L45FAX_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Fire Protection SystemInoperative

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

CO2 pressure or controlproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check fire protection system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L28FD_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Flame Detector TroubleÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

One of the detectorsoperating when no flameis present.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check for proper operation ofthe flame detection system.Check that the flame detectorquartz window are clean.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60FSRGÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

FSR Gag Not at MaxLimit

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Manual FSR control hasnot been reset to aposition where it will notinterfere with automaticFSR control.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Raise the manual FSR controlto maximum.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3GCVFLT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Control Valve ServoTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The gas control valvefeedback signal isabnormal.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check LVDT.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63HGL_SENSR ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel HydraulicPressure Switch Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal from hydraulicpressure switch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check switch and switchwiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63HGL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel Hydraulic TripPressure Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low oil pressure in gasfuel hydraulic oil tripcircuit.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check the control oil filterand control oil piping. Thisalarm will actuate if theturbine is tripped with themanual emergency trip valveon the turbine or a large leakwere to occur in the hydraulictrip circuit piping.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3GFIVP ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel IntervalvePressure Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Pressure sensed betweenthe gas control valve andthe speed ratio valve isabnormal.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check GRV control system,intervalve vent, and pressuretransducer.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63PGFT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel Nozzle PurgeSystem Pressure High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with valves. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine cause of incorrectvalve positioning.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L94PGT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel Nozzle PurgeSystem Trouble Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Either VA13-1 or -2 or20VG-2 are stuck openand machine has tripped.Gas may be backingthrough the system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check valves for cause.Correct positioning prior torefire.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L33PGFT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel Nozzle PurgeValve Fail to Close

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

VA13-1 or -2 areobstructed.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check valves to removeobstruction to resume purge.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L33PGO_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel Nozzle PurgeValve Fail to Open

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

No atomizing air flow;VPR44-1 stuck.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check valve.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63FGL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Fuel Pressure Low ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas fuel pressure toturbine has been sensed aslow.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check cause of low supplypressure.

Omar Zaareer
Rectangle
Page 233: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-8

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3GRVFLTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gas Ratio Valve PositionServo Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The gas ratio valvefeedback signal isabnormal.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check LVDT.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63CA3L_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gen Air Filter CleanerPressure Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator air inlet filtercleaning system problems.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check air inlet filter cleaningcomponents.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L43HPA_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gen Purge System onManual Control

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Operator has selectedmanual control.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Change to automatic control.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L52GA_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Gen. Inlet Air DirtSeparator Not Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator inlet air dirtseparator malfunction.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check separator motor forproper operation. Checksupply system wiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63GFH_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator Air Filter HighPressure Drop

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High pressure differentialacross generator air inletfilters.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Inspect and clean/changefilter elements, as required.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63BQL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator BearingVacuum Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator bearings aresealed by vacuum. Thisalarm indicates a potentialproblem with the sealingsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate generator bearingsealing system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L52G_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator BreakerTripped

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator breaker hasbeen tripped by anautomatic protectivedevice or manually.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine device that trippedthe breaker.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63GKL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator CasingHydrogen Press. Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low hydrogen pressure ingenerator.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check hydrogen supplysystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L71WGH_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator Casing LiquidLevel High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquids have accumulatedin bottom of generator.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Remove liquids, check forleaks and take action toprevent recurrence ofproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L33GCC_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator CO2 DoorTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator CO2 door isclosed.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Door must be opened and thelatch reset.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86TGT_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator DifferentialTrip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

A generator panelprotective device hastripped the 86G lockoutrelay.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine which protectivedevice tripped the 86G andcorrect the abnormality thatprecipitated the trip.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L64F_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator Field GroundÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

A ground on the generatorfield has been detected.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Operation of the generatorwith the field grounded is notrecommended as a secondground could result inexcessive damage to thegenerator field.

Page 234: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-9

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L94H_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator HydrogenPurge Shutdown

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Shutdown initiated due toone or more hydrogensystem problems, e.g.,hydrogen purity has fallento shutdown level.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check hydrogen cabinet forundervoltage. Checkhydrogen control switch inmaintenance/auto. Check andrestore hydrogen purity.Check seal unit. If puritycontinues to deteriorate, apossible hazard condition maydevelop.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L49GH_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator Stator TempHigh

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator statortemperature is excessivecaused by lack of coolingor overload.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The generator should not beoperated when the statortemperature is excessive.Check cooling system, reduceoverload on generator.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L94GEN ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Generator VentilationTrouble Shutdown

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Temperature in generatorcompartment exceedslimits. Vent fansinoperable or insufficientto handle ventilationrequirements.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check generator ventilationsystem for proper fan/motoroperation. Check ventilationdampers for properoperation/position.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63FU2LAÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Heavy Fuel Pressure Low,Auto Xfer to Dist

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with heavy fuelsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate heavy fuel system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26FU2LAÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Heavy Fuel Temp Low,Auto Xfer to Dist

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with heavy fuelsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate heavy fuel system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3FUZÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Heavy Fuel TransferPermissive Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine unable to transferto heavy fuel.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check heavy fuel system. Besure fuel is warm andfree-flowing.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30SPTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High Exhaust Temp.Spread Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Faulty thermocouples, gaspath parts or unevendistribution of fuel to thefuel nozzles.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Analyze data for trends.Perform borescope orcombustion inspection. Checkflow divider, fuel pressures.Check for plugged nozzles.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L39VAÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High Vibration AlarmÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High vibration at one ormore bearings.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Monitor vibration readings.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L39VTX_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High Vibration Trip orShutdown

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High vibration due tobowed rotor, mechanicalimbalance, bearing failure,etc.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check that the hydraulicratchet is operating properly.Check for mechanicalfailures, observe vibrationlevel on the next startup.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30TNH_DIFF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

HP Speed SignalDifferential Alarm

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

One of the HP speedsensors is showing adifferent speed than theother two.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check HP speed pickups.

Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Page 235: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-10

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63HF1H_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydraulic FilterDifferential Pressure High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged filter.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Loss of fluid pressure anddeterioration of fluid puritymay result. Change filter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86HDÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydraulic ProtectiveTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

One second after thehydraulic oil trip isinitiated either the liquidfuel stop valve is notclosed or the hydraulictrip pressure (63HG,63HL) has not decreasedsufficiently.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check operation of 20FL and20HD servos.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63HQ1L_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydraulic Supply Pressure Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydraulic supply pressureis low.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check hydraulic supplypressure filter and differentialpressure gauge, regulatingvalve or pump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L27GHN_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydrogen Control PanelUndervoltage

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ac power supply voltagelow.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check power supply forproper operations. Checkwiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63GL_GH_AL ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydrogen Pressure Highor Low (Gen)

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High machine gaspressure or low manifoldgas pressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check generator hydrogensystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63HHL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydrogen Pressure Low(Skid)

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydrogen supply skidpressure low.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check skid components forproper operation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30HPÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Hydrogen Purity TroubleÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad generator hydrogenpurity or purity pressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check generator hydrogensystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

LWLX4MINÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Injection to Fuel RatioLow-Four MinuteAverage

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam (water) injectionflow four minute averagelow.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check steam (water) injectionsystem.

LWLXHR Injection to Fuel RatioLow-Hourly Average

Steam (water) injectionflow one hour averagelow.

Check steam (water) injectionsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86GVAÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Inlet Guide Vane ControlTrouble Alarm

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

IGV control systemproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check IGV control system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L4IGVT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Inlet Guide Vane ControlTrouble Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

IGV control systemproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check IGV control system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3IGVFLT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Inlet Guide Vane PositionServo Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Incorrect servo operation.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check servos.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30TNI_DIFF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

IP Speed SignalDif ferential Alarm

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

One of the IP speedsensors is showing adifferent speed than theothers.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check IP speed pickups.

Omar Zaareer
Rectangle
Page 236: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-1 1

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L71WG_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Detected inGenerator

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Excessive liquid in bottomof generator.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Remove liquid and takecorrective action to preventrecurrence of problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3LFLTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel Control FaultÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid fuel checkingsystem has detected anabnormal servo or LVDTposition or signal.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine abnormalcondition by reading signals(L3LFLT1 to L3LFLT5).

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63LF1H_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel FilterDif ferential Pressure High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged filter. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Loss of fluid pressure anddeterioration of fluid puritymay result. Change filter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30FQL_DIFF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel FlowDifferential Alarm

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Speed pickups on flowdivider disagree.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check and recalibrate speedpickups.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63HL_SENSRÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel HydraulicPressure Switch Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal from hydraulicpressure switch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check switch and switchwiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63HLL_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel HydraulicTrip Pressure Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low oil pressure in liquidfuel hydraulic oil tripcircuit.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check the control oil filterand control oil piping. Thisalarm will actuate if theturbine is tripped with themanual emergency trip valveon the turbine or a large leakwere to occur in the hydraulictrip circuit piping.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63FLZ_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel Pressure LowÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid fuel forwardingsystem problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check fuel forwarding systemcomponents for properoperation. Check liquid fuelforwarding piping for leaks.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3LFP_FLTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel Pump ControlTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with one or morecontrol devices.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Troubleshoot liquid fuelpump control components todetermine problem andcorrect.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L33FL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel Stop ValveFailure to Open

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Valve or control failure. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check operation of VSI andcontrols.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26FL2LAÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Liquid Fuel Temp Low,Auto Xfer to Dist

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Heavy fuel temperature islow. Unit has beenautomatically transferredto distillate fuel operation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check heavy fuel supplyheating equipment.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3TFLT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Loss of CompressorDischarge Pressure Bias

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal fromcompressor dischargepressure transmitter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check transmitter andassociated connections forproper bias signal.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3DWRF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Loss of External SetpointLoad Signal

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Page 237: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-12

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L28FDTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Loss of Flame TripÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure of one of thedetectors to detect flame.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check for following: fuelbeing supplied to thecombustors, flame in allchambers, damaged crossfiretubes, or combustors. Checkfor proper control valveposition and fuel pressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63QTXÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low Lube Oil PressureTrip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube oil pressure hasfallen below the trip level.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine cause and correctbefore restarting unit.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30TNL_DIFF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

LP Speed SignalDifferential Alarm

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

One of the LP speedsensors is showing adifferent speed than theother two.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check HP speed pickups.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26QA_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil Header TempHigh

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube header temperatureabove recommendedlimits.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check for proper operation ofthe lube oil heat exchangers,cooling water fans (properrotation) and temperatureregulating valve.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26QT_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil Header TempHigh Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube header temperatureabove recommendedlimits.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check for proper operation ofthe lube oil heat exchangers,cooling water fans (properrotation) and temperatureregulating valve.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L71QH_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil Level High ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube oil tank level high.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate cause of high levelalarm and restore normallevel.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L71QL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil Level Low ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube oil tank level low.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check for leaks, restorenormal level.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63QA1L_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil Pressure LowÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube system leaks orpump trouble.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Repair leaks or pump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63QT_SENSR ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil Pressure SwitchTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal from lube oilpressure switch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check switches and switchwiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26QN_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil TankTemperature Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube tank temperaturebelow recommendedlimits (see pipingschematic).

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check for proper operation ofthe lube oil tank heaters.Starting is inhibited if the tanktemperature is low.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26QT_SENSR ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Lube Oil TemperatureSwitch Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal from lube oiltemperature switch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check switches and switchwiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63QQ1H_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Main LO Filter DiffPressure High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged filter.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Loss of fluid pressure anddeterioration of fluid puritymay result. Change filter.

Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Page 238: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-13

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L43MAINTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Maintenance - ForcingMode Enable

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Auto calibrate, memorychanging or logic forcingmode of operation hasbeen selected.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

When done with theoperation, deselect theoperation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86MAN_SYNC ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Manual SynchronizingLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Manual synch lockout hasbeen selected on <I> CRT.Breaker will not close.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine why manual synchhas been locked out. Resetusing Master Resetpushbutton on <I> CRT.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L5E_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Manual Trip ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The emergency stoppushbutton has beenpressed.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct abnormality thatcaused the operator to pushthe emergency stoppushbutton.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86MP ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Master Protective StartupLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Within the turbine controlpanel the threemicroprocessor controllersR, S and T are indisagreement for theproper condition of theMaster Protective logic“4X”.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine which controller isin disagreement with the othertwo.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L27MC1N_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

MCC Undervoltage ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Motor control centerundervoltage.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check that power is suppliedto the motor control center.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30LTA ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

No. 3 BearingTemperature High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High number 3 bearingtemperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check lube oil feed and drainpiping.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L33BS_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

No. 3 Drain ValvePosition Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Valve incorrectlypositioned.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check drain valve operations.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3NZFLTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Nozzle Control ServoTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with secondstage nozzle servo.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check servo wiring andhydraulic oil system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L43DIAG_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Off-Line DiagnosticsRunning

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Off-line diagnosticoperation has beenselected.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Do not start unit untildiagnostics are complete.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3WCTIM_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

On Line Water WashInhibited

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ambient temperature isbelow 50 deg F.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Wait to water wash untilambient temperature is higher.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12HBLT_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Overspeed Bolt Trip - HPÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The speed control systemhas not limited turbinespeed within the triplimits.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Isolate problem and correct.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L83HOSTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Overspeed Test ModeSelected - HP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

HP overspeed trip beingtested.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

See “Overspeed Trip Checks”section of text.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L83LOST ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Overspeed Test ModeSelected - LP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

LP overspeed trip beingchecked.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

See “Overspeed Trip Checks”section of text.

Page 239: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-14

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30EKÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Prim Exciter Rect CoolingFan Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with primaryexciter rectifier coolingfan.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine and correctproblem with primary exciterrectifier cooling fan.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L4ETR_FLTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Protective Module ETRRelay Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Trip due to masterprotective relay (4’s)circuit has a problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Isolate <P> ProtectiveModule and correct theproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12H_P_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Protective ModuleOverspeed Trip - HP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

<P> module HPoverspeed trip.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate cause ofoverspeed.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12L_P_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Protective ModuleOverspeed Trip - LP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

<P> module LP overspeedtrip.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate cause ofoverspeed.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L12LF_OS ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Protective Speed SignalTrouble - LP

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

LP speed pickup votingmismatch in <P>.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check and recalibrate LPspeed pickups.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30HRX2 ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ratchet Did Not Start ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ratchet did not initiate aratchet stroke in theprescribed time.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check ratchet permissives.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L49HR1A_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ratchet Motor OverloadÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ratchet motor overload.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check ratchet motor overload(MCC). Check for properoperation of ratchetmechanism.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30HRX1 ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ratchet Trouble ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Ratchet did not complete aprescribed motion innormal time.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check for proper operation ofratchet mechanism.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30RHFLTX ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Relative Humidity SensorFault

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Humidity sensor failure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check sensor and wiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

R5E_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Remote Emergency TripÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Unit was tripped with theremote emergency trippushbutton.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate and correct causeof trip. Manually resetpushbutton.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63SAL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Seal Oil Diff. PressureLow

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low seal oil pressureacross bearings.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check seal oil system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63ST ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Seal Oil Diff. PressureLow Shutdown

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Seal oil pressure acrossbearings has reachedshutdown setpoint.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct seal oil systemproblem before restarting.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L71SDH_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Seal Oil Drain LiquidLevel High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Seal oil drain systemproblem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check generator seal oil drainsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63STX_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Seal Oil Press. ShutdownSwitch Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal from seal oilpressure switch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check switches and switchwiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30WC_LAGÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Standby Cooling WaterPump Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Either low cooling waterpressure, or a problemwith the main coolingwater pump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate problem withcooling water system or maincooling water pump.

Page 240: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-15

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30FD_LAGÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Standby Dist Fuel FwdPump Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low distillate fuelpressure or problem withmain dist fuel fwd pump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate fuel forwardingsystem and main pump.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L4DTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting Device LockoutÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3SMT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting Device Trip ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

The turbine has beentripped because thestarting device has failedto start the turbine.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Note where in the startsequence the turbine trippedto aid in determining cause oftrip. Check the suspectsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting Motor BreakerDid Not Pick Up

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Cranking motor did notstart.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check limitamp forenergizing or overload.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L4CRTÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting Motor BreakerDid Not Pick Up

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting motor did notstart.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Checking starting motormodule in PECC.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L49CR_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting Motor Overload ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting motor is showingan overload.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate starting motorcircuits.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86CRTX ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Starting Motor ProtectiveLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Cranking motor circuitelectrical fault.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clear fault and reset 88CR.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L2SFT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Startup Fuel FlowExcessive Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Excessive fuel for startuphas been detected. For gasfuel the gas control valveis open too far.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check the servo and feedbacksignals for proper operation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30EKR ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Stby Exciter Rect CoolingFan Running

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Problem with primaryexciter rectifier coolingfan.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine and correctproblem with primary exciterrectifier cooling fan.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60APHA_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -High Pressure

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High steam pressure. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Reduce steam pressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60APHT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -High Pressure Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam augmentationsystem tripped due to highpressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct problem beforerestarting steamaugmentation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60ATHT ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -High Temp. Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam augmentationsystem tripped due to hightemperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct problem beforerestarting steamaugmentation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60ATHA_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -High Temperature

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High steam temperature.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Reduce steam temperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60APLA_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -Low Pressure

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low steam pressure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Increase steam pressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60ALPT_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -Low Pressure Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam augmentationsystem tripped due to lowpressure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct problem beforerestarting steamaugmentation.

Page 241: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-16

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60ATLT_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -Low Temp. Trip

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam augmentationsystem tripped due to lowtemperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct problem beforerestarting steamaugmentation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60ATLA_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Augmentation -Low Temperature

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low steam temperature.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Increase steam temperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60WL1_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Flow HighÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Excessive steam flow.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check steam system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60WQPL_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Flow High LockoutÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Excessive steam flow.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct problem beforerestarting.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30SJ ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Injection NotSelected

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

NOx control steaminjection systeminoperative.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Select Steam Injection on <I>CRT.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60SPHA_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Pressure High ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High steam pressure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Reduce steam pressure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60SPHT_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Pressure HighLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High steam pressure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct steam pressure beforerestarting.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60SPLA_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Pressure Low ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low steam pressure. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Increase steam pressure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60SPLT_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Pressure LowLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low steam pressure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct steam pressure beforerestarting.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60STHA_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Temperature HighÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High steam temperature.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Reduce steam temperature.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60STHT_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Temperature HighLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High steam temperature.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct steam temperaturebefore restarting.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60STLA_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Temperature LowÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low steam temperature.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Increase steam temperature.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L60STLT_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam Temperature LowLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low steam temperature.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Correct steam temperaturebefore restarting.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

LWLXHR ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam to Fuel Ratio Low– Hourly Average

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Steam (water) injectionflow one hour averagelow.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check steam (water) injectionsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63QQ2H_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Trip Oil Filter DiffPressure High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged filter. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Replace filter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63TF1H_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine Air InletDif ferential PressureAlarm

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged filter. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Replace filter.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63TFH_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine Air InletDif ferential PressureShut-Down

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Clogged or iced filter. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine cause of blockage.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L63TFH_SENSR ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine Air InletDifferential PressureSwitch Trouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Bad signal fromdifferential pressureswitch.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check switch calibration andswitch wiring.

Omar Zaareer
Rectangle
Omar Zaareer
Rectangle
Page 242: Part One Gas

Gas TurbineOperating Procedures

ATCMKV-17

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30TFXÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine Air Inlet TroubleÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Inlet filter excessivepressure drop or inletfilter motor overloaded orinlet compartment bypassdoor is not in properposition.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check the following:

Inlet filter for blockage.

Inlet filter motor for properoperation.

Inlet house bypass door.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26BT1H_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine CompartmentTemp High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Compartment temperatureexcessive.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check cooling air fan forproper operation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L83KU_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine CompressorAbrasive CleaningSelected

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Compressor beingcleaned.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turn function off whencleaning is complete.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L48 ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine IncompleteSequence

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure of unit to reachcomplete sequence.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check equipment which iscausing the problem in thenormal sequence.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3A ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine Underspeed ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine has bogged down.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Reduce the load that will beapplied to the generatorbefore reclosing the generatorbreaker.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L39VD3_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Vibration – Start Inhibit ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Vibration protectionsystem problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check vibration protectionsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L39VDIFF ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Vibration DifferentialTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Vibration protectionsystem problem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check vibration protectionsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L39VD1 ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Vibration Sensor DisabledÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Signal from vibrationsensor is faulty.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check vibration sensors andwiring.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L39VFÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Vibration TransducerFault

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Vibration detectorimpedance is not withinnormal bounds.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check impedance of eachvibration detector.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3WFD_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Flow FeedbackTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

A disagreement betweenthe water flow sensors hasbeen detected.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Determine failed sensor andreplace.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86WN3ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Flow High LockoutÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water injection systemlocked out due toexcessive water flow.This is dangerous becauseit could extinguish flame.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Investigate water injectionsystem.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3WFLT_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Flow SensorTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water flow sensorsdisagree.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Recalibrate or replace faultyflow sensor.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86WN1 ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Inj Suction PressureHigh Lockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High supply pressure. ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check water supply system.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86WN2ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Injection DischargePressure Low Lockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Low supply pressure.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check water supply system.

Page 243: Part One Gas

Operating ProceduresGas Turbine

ATCMKV-18

<I> CRT Display Alarm Message, Logic & No. ActionCauseÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30WNÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Injection NotSelected

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

NOx control waterinjection systeminoperative.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Select Water Injection on <I>CRT.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26JS2H_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Skid EnclosureTemperature High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure of exhaust fan.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check exhaust fan/motorcomponents for properoperation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L26ALL_ALMÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Skid EnclosureTemperature Low

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Failure of heaters.ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check heater and blower forproper operation.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L86WN4ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water System TroubleLockout

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water injection system notready for use.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check water injection systemcomponents.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L3WSFLT_ALM ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Valve LVDTTrouble

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water valve LVDTsdisagree.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Recalibrate or replace faultyLVDT.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30TWW ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Water Wash InhibitWheelspace Temp High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Turbine not sufficientlycooled before attemptingwater wash.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Allow turbine to cool tospecification prior toselection.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30WSA1 ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Wheelspace TempDif ferential High

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Excessive differentialbetween wheelspacethermocouples.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Check thermocouples forshorts, grounds or opens.Replace failures. If conditionpersists investigate for sealfailure.

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

L30WSA2ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

Wheelspace TemperatureHigh

ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ

High wheelspace temperature.

Check thermocouples, investigate for seal failure.

Page 244: Part One Gas

Questions

Omar Zaareer 20153/2/2015

Page 245: Part One Gas

Part#6

Startup \ Shutdown تشغیل وإیقافالتوربینة الغازیة

6

Omar Zaareer 20153/2/2015

Page 246: Part One Gas

GT precondition for startup & check points: الشروط االولیة ما قبل عملیةالتشغیل

Ensure all permits to work related to GT clear and no any body in the gas turbine and there is no tools in it .( جمیع اذونات العمل على التوربینة مغلقة)

All electrical panels energized & available ) جمیع الكبائن الكھربائیة مشحونة وجاھزة(

Control cabinets energized and operation )جمیع كبائن التحكم في العمل

All fluids system available and normal level and temperature جمیع المنظومات مثل زیت.التزییت والتحكم وغیره جاھزة وضمن المعاییر الطبیعیة بالنسبة للحرارة والضغط .

Fire fighting system healthy & energized جمیع انظمة االطفاء والحریق جاھزة وفعالة

No alarms on alarm list.التأكد من عدم وجود اي تحذیرات على شاشات التحكم للتوربینة الغازیة

Check all doors of the unit in operation position .(filter of air inlet ……) التأكد من جمیعاالبواب للمعدات واالنظمة في الموقع مثل نظام مدخل الھواء وغیرھا

IGV in auto and remote mode. نظام توجیھ الھواء انھ على وضع اتوماتیك والتحكم بھ من من التاكد غرفة المراقبة

Omar Zaareer 20153/2/2015

Page 247: Part One Gas

GT precondition for startup & check points: الشروط االولیة ما قبل عملیةالتشغیل

Auto shut down or trip signal must to be acknowledged اي اشارة سابقة من اطفاء سابق او بسبب توقف مفاجىء یجب عمل لھا قبل عملیة التشغیل reset

SFC not failed .التاكد من نظام بادىء الحركة انھ جاھز

Excitation system not failed .التأكد من نظام التحریض انھ جاھز

Power grid available التاكد من جاھزیة الشبكة الستقبال الطاقة

Ready to start with green color اشارة ان التوریبنة جاھزة للتشغیل تكون باللون االخضر

Omar Zaareer 20153/2/2015

Page 248: Part One Gas

GT START Up تشغیل التوربینة الغازیة

المعدة المةلس وذلك إجراءات عدة اتخاذ یجب الغازیة التوربینة تشغیل بدیة عند الغازیة نةللتوربی المساعدة األنظمة جمیع تشغیل من التأكد یجب حیث والمشغل

في دالعمو تدویر ومنظومة المولد تبرید ومنظومة التزییت زیت منظومة مثل مثل عدةالمسا األنظمة تشغیل من التأكد یتم الغازیة التربینة تشغیل بدایة

تدویر ومةمنظ تشغیل من التأكد ثم المولد تبرید ومنظومة الزیت تبرید منظومة إیقافو تشغیل في التحكم نافذة بواسطة التوربینة تشغیل ثم ومن العمود

یتم إن ىإل بخطوة خطوة التشغیل خطوات تتبع یمكن حیث الغازیة التوربینة.الشبكة على المولد ربط

Omar Zaareer 20153/2/2015

Page 249: Part One Gas

لمنظومات السابقة على تشغیل جمیع ابالتأكید یقوم نظام التحكم تشغیل التوربینة وعند فات وإیقاف منظومة تسخین ملإلى الضاغط الھواء دخول من فتح بوابة التأكد ثم

:التالیةالمولد ثم تتم الخطوات

GT START Up تشغیل التوربینة الغازیة

ر غلق صمام تصریف الوقود الخاص بغرفة االحتراق ثم إیقاف منظومة تدوی10% بالضاغط بنسبة فتح الخاصة العمود وفتح ریش التوجیھ

الحركة للوحدةتشغیل نظام بدءSFC

عندھا یتم فتح صمام اإلیقاف االضطراري لمنظومة لفة بالدقیقة 350أكثر منإلى ربینة والتتصل سرعة عندما

ویتم تشغیل 23% بنسبة فتح Pilot line ثم یتم فتح صمام التحكم لخط حقن الوقودESV الوقود الغازي

.االحتراقنظام القدح للحراقات لیتم االشتعال في غرفة

Omar Zaareer 20153/2/2015

Page 250: Part One Gas

GT START Up تشغیل التوربینة الغازیة

سرعةعند RPM 500یتم إیقاف مضخة رفع العمود

SFC یتم إیقاف منظومة بدء تشغیل الوحدة عندھا RPM 2200 تصل السرعة إلىعندما

.التحریضوتشغیل نظام 2و 1یتم إغالق صمامات نزف الھواء المرحلة عندھا RPM 2900 تصل عندماالسرعة إلى

سرعةوعند RPM 2970 3إغالق صمام نزف الھواء المرحلة یتم

تشغیل نظام التوافق لربط المولد مع الشبكة وتحمیل المولد یتم RPM3000 سرعةوعند

% 100ریشفتح ریش التوجیھ تدریجیا إلى إن تصل نسبة فتح یتم درجة مئویة 526 وعندما تصل حرارة العادم أكثر منإلى

.لعادمعندھا یتم انتقال متحكم التوربینة من وضع التحكم بالحمل الى وضع المتحكم بحرارة ا

Omar Zaareer 20153/2/2015

Page 251: Part One Gas

Start-up (typical sequence with liquid fuel)

(A)

SEQL9ESTD 1

Page 252: Part One Gas

(B)

SEQL9ESTD 2

Start-up (typical sequence with liquid fuel)

Page 253: Part One Gas

SEQL9ESTD 3

Start-up (typical sequence with liquid fuel)

Page 254: Part One Gas

Shutdown (typical sequence with liquid fuel)

(A)

SEQL9ESTD 4

Page 255: Part One Gas

(B)

SEQL9ESTD 5

Shutdown (typical sequence with liquid fuel)

Page 256: Part One Gas

Gas Turbine Start-up Curve - Cold Start-up منحنى تشغیل التوربینة الغازیة من

Omar Zaareer 20153/2/2015

Page 257: Part One Gas

Gas Turbine Start-up Curve – WARM Start-up منحنى تشغیل التوربینة الغازیة من

Omar Zaareer 20153/2/2015

Page 258: Part One Gas

GT START UP

0

10

20

30

40

50

60

70

80

90

100

0 50 100 150 200 250 300 350 400 450 500

TIME [s]

GT

sp

ee

d [

Hz]

, N

G C

V [

%]

0

50

100

150

200

250

300

350

400

450

500

OT

C [

°C]

NG-STOP VALVE

NG CV

GT speed

OTC

SFC OFF

First gradient

Second gradient

NG stop valveSpeed

controller

active

Start up function active

GT START Up تشغیل التوربینة الغازیة

Omar Zaareer 20153/2/2015

Page 259: Part One Gas

GT START Up تشغیل التوربینة الغازیة

Omar Zaareer 20153/2/2015

Page 260: Part One Gas

Omar Zaareer 20153/2/2015

Page 261: Part One Gas

GT START Up تشغیل التوربینة الغازیة

Omar Zaareer 20153/2/2015

Page 262: Part One Gas

GT START Up تشغیل التوربینة الغازیة

Omar Zaareer 20153/2/2015

Page 263: Part One Gas

GT LOADING/UNLOADING GRADIENTS معدلبعد الدمج مع الشبكة MWالتحمیل

NORMAL: الطبیعي 11 MW/min

FAST: السریع 15 MW/min

SLOW: البطيء 4 MW/min (between base and peak load)

Omar Zaareer 20153/2/2015

Page 264: Part One Gas

Shutdownالتوربینة إیقاف إیقاف دعندالمول مفتاح فتح یتم إن إلى تدریجیا المولد أحمال تخفیض یتم

ماتصما جمیع غلق یتم ثم الشبكة من المولد وعزل و وغلق التوربینةdiffusionالوقود لخطي التحكم lineوpilot lineصمام وغلق ESV500 سرعة وعند الھواء نزف صمامات وفتح RPM مضخة تشغیل یتم تشغیل یتم180RPM من اقل الى السرعة تصل وعندما العمود رفع

Turning( العمود تدویر منظومة gear operation(دقیقة130 وبعد ومضخة المساعدة المضخة بتشغیل وذلك تلقائیا الزیت نظام فحص یعمل

.جاھزیتھما من التاكد بعد اطفائھما ثم الطوارىء

GT Shutdown اطفاء التوربینة الغازیة

Omar Zaareer 20153/2/2015

Page 265: Part One Gas

Gas Turbine Shutdown Curve – منحنى ایقاف التوربینة الغازیة

Omar Zaareer 20153/2/2015

Page 266: Part One Gas

GT Shutdown اطفاء التوربینة الغازیة

Omar Zaareer 20153/2/2015

Page 267: Part One Gas

نقــاش مفتـوح واسئلـــة

All rights reserved / Omar Zaareer 2015