SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
Overcoming Challenging Narrow Mud Weight
Window of 0.35 ppg: Successful MPD & MPC
Application in Offshore Malaysia
- A Case History
1
• Lee Jin Ming, Drilling Engineer / PETRONAS (Presenter)
• Mizuar Omar, Senior Drilling Fluid Engineer / PETRONAS
• Freddy Rojas, MPD Engineering Manager / MISWACO
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
2
Malaysia Map
TA WELL
Field Location
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
3
TA Well Background
6” hole
7” liner
9-5/8” csg
While drilling 6” hole:
Fracture: 18.3 ppg
Pore Pressure: 16.7ppg TA Well revisit planned
with MPD applications
2010 m-MD
2090 m-MD
Cementing deemed
impossible, suspended
Planned well TD: 2350 m-MD
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
4
6” Hole MPD Plan
Shoe DLOT = 18.6 ppg
0.35 ppg!! TD DFIT = 18.17 ppg
PP = 17.82 ppg
Actual Well Results
Worst case
Top kill well
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
5
16.72
16.72
17.51
17.61
17.7517.76
2,134
2,195
Top F10
Top H01
Top H02
18.60
18.60
7'' liner @2010 m-MDDF2010
2060
2110
2160
2210
2260
2310
2360
16.5 17.0 17.5 18.0 18.5 19.0 19.5
Measu
red D
epth
(m
-MD
DF
)
Equivalent Mud Weight (ppg)
EST. PORE PRESSURE GRADIENT(NOOP) ECD+SBP Surface MW FRACTURE GRAD (ppg) EWM CONN.(ESD+SBP)
TA WELL MPD BASIS OF DESIGN
7" Liner Shoe
Well TD
Top F10 S
Top F10
Top H01
Top H02
2010
2060
2110
2160
2210
2260
2310
2360
16.0 16.5 17.0 17.5 18.0 18.5 19.0 19.5
Measu
red D
epth
(m
-MD
DF
)
Equivalent Mud Weight (ppg)
prognosed PP (ppg) Prognosed FG (ppg) (ppg) ACTUAL FG BASED ON DFIT
Actual PP (ppg) Drilling MW (ppg) ECD + SBP (ppg)
TA WELLMPD PLOT SUMMARY - AFTER TD
PLANNED ACTUAL
Plan Versus Actual of Drilling Phase
0.35ppg
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
6
6” BHA Tripping Out
• Well was top-killed with
18.3ppg mud at 1200m,
18 ppg EMW @ TD
(50psi overbalance).
TD @ 2350m-MDDF
7" Shoe @ 2010m-MDDF
7" Top of Liner @ 1890m-MDDF
18.3
PPG
16.3
ppg
MW
16.3
ppg
MW
17.9
ppg
16.3
ppg
MW
16.3
ppg
17.9
ppg
TRIP MUD DISPLACEMENT
18
.3 p
pg
17
.9 p
pg
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
7
4-1/2” Liner Running
7" Shoe @ 2010m-MDDF
TD @ 2350m-MDDF
7" Top of Liner @ 1890m-MDDF
18.3
PPG
17.9
ppg
16.3
ppg
MW
16.3
PPG
16.3
PPG
16.3
ppg
MW
16.3
ppg
MW
16.3
ppg
MW
16.3
ppg
MW
16.3
ppg
MW
17.9
ppg
16.3
ppg
MW
17.9
ppg
1\\\
18.3
ppg
16.3
ppg
MW
16.3
PPG
16.3
PPG
16.3
ppg
MW
16.3
ppg
16.3
ppg
16.3
ppg
17.9
ppg
17.9
ppg
17.9
ppg
16.3
ppg
RUNNING LINER AND UNDERBLANCED FLUID DISPLACEMENTS
17.9
ppg
17.9
ppg
16.3
ppg
RIH Liner to 600m, displace 18.3ppg to 16.3ppg.
RIH SBP = 15psiEnd of Disp. SBP = 112psi
RIH Liner to 1200m, displace 18.3ppg to 16.3ppg.
RIH SBP = 112psiEnd of Disp. SBP = 240psi
RIH Liner to 1700m, displace 18.3ppg to 16.3ppg.
RIH SBP=240psiEnd of Disp. = 450psi
RIH Liner to 2334m, displace 18.3ppg to 16.3ppg.
RIH SBP= 450psi End of Disp. = 650psi
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
8
4-1/2” Liner Displacement
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
9
4-1/2” Liner Managed Pressure Cementing (MPC)
Challenges
• Well loss & gain
• Constant bottom hole pressure
• 0.35 ppg pressure window
• Zero human error – communication
• High static underbalance – 640psi
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
10
Managed Pressure Cementing Plan (without SBP)
FG = 18.5 ppg (as per cementing company simulation,
calibrated to equivalent of 18.17ppg) to the actual
PP = 17.82 ppg.
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
11
Managed Pressure Cementing Plan (with SBP)
Operating window
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
12
Actual Managed Pressure Cementing Graph
weighted
spacer Displacement Cement
slurry Wash
spacer
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
13
• Liner cementing without
gains / losses.
• USIT log result below
previous shoe
Cement Quality
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
14
Conclusion
• Cementing possible in marginal pressure window.
• MPC success depends on:
◦ Valid hydraulic simulations.
◦ Reliable MPD system.
◦ personnel training, communication protocols & clear
procedures
• Successful MPC set new standard for operator.
• Exploring full MPD utilization:
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
8-9 April 2014 NH Eurobuilding Hotel, Madrid
15
Co-Authors:
Trigunadi Setiawan, Warjanto Saikam, Mohammed Mousa, Sagi V. R Raju,
Ahmad Zahir, W Nor Afiqah, M Abshar B M Noor, Mizuar Omar, PETRONAS;
Freddy Rojas, Andi Eka Prasetia, Dylan Richards, MISWACO
Acknowledgement
PETRONAS
MISWACO
Appreciation