overcoming challenging narrow mud weight window of 8-9 april 2014 nh eurobuilding ... malaysia map...

15
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition 8-9 April 2014 NH Eurobuilding Hotel, Madrid Overcoming Challenging Narrow Mud Weight Window of 0.35 ppg: Successful MPD & MPC Application in Offshore Malaysia - A Case History 1 Lee Jin Ming, Drilling Engineer / PETRONAS (Presenter) Mizuar Omar, Senior Drilling Fluid Engineer / PETRONAS Freddy Rojas, MPD Engineering Manager / MISWACO

Upload: truongdan

Post on 24-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

Overcoming Challenging Narrow Mud Weight

Window of 0.35 ppg: Successful MPD & MPC

Application in Offshore Malaysia

- A Case History

1

• Lee Jin Ming, Drilling Engineer / PETRONAS (Presenter)

• Mizuar Omar, Senior Drilling Fluid Engineer / PETRONAS

• Freddy Rojas, MPD Engineering Manager / MISWACO

Page 2: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

2

Malaysia Map

TA WELL

Field Location

Page 3: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

3

TA Well Background

6” hole

7” liner

9-5/8” csg

While drilling 6” hole:

Fracture: 18.3 ppg

Pore Pressure: 16.7ppg TA Well revisit planned

with MPD applications

2010 m-MD

2090 m-MD

Cementing deemed

impossible, suspended

Planned well TD: 2350 m-MD

Page 4: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

4

6” Hole MPD Plan

Shoe DLOT = 18.6 ppg

0.35 ppg!! TD DFIT = 18.17 ppg

PP = 17.82 ppg

Actual Well Results

Worst case

Top kill well

Page 5: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

5

16.72

16.72

17.51

17.61

17.7517.76

2,134

2,195

Top F10

Top H01

Top H02

18.60

18.60

7'' liner @2010 m-MDDF2010

2060

2110

2160

2210

2260

2310

2360

16.5 17.0 17.5 18.0 18.5 19.0 19.5

Measu

red D

epth

(m

-MD

DF

)

Equivalent Mud Weight (ppg)

EST. PORE PRESSURE GRADIENT(NOOP) ECD+SBP Surface MW FRACTURE GRAD (ppg) EWM CONN.(ESD+SBP)

TA WELL MPD BASIS OF DESIGN

7" Liner Shoe

Well TD

Top F10 S

Top F10

Top H01

Top H02

2010

2060

2110

2160

2210

2260

2310

2360

16.0 16.5 17.0 17.5 18.0 18.5 19.0 19.5

Measu

red D

epth

(m

-MD

DF

)

Equivalent Mud Weight (ppg)

prognosed PP (ppg) Prognosed FG (ppg) (ppg) ACTUAL FG BASED ON DFIT

Actual PP (ppg) Drilling MW (ppg) ECD + SBP (ppg)

TA WELLMPD PLOT SUMMARY - AFTER TD

PLANNED ACTUAL

Plan Versus Actual of Drilling Phase

0.35ppg

Page 6: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

6

6” BHA Tripping Out

• Well was top-killed with

18.3ppg mud at 1200m,

18 ppg EMW @ TD

(50psi overbalance).

TD @ 2350m-MDDF

7" Shoe @ 2010m-MDDF

7" Top of Liner @ 1890m-MDDF

18.3

PPG

16.3

ppg

MW

16.3

ppg

MW

17.9

ppg

16.3

ppg

MW

16.3

ppg

17.9

ppg

TRIP MUD DISPLACEMENT

18

.3 p

pg

17

.9 p

pg

Page 7: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

7

4-1/2” Liner Running

7" Shoe @ 2010m-MDDF

TD @ 2350m-MDDF

7" Top of Liner @ 1890m-MDDF

18.3

PPG

17.9

ppg

16.3

ppg

MW

16.3

PPG

16.3

PPG

16.3

ppg

MW

16.3

ppg

MW

16.3

ppg

MW

16.3

ppg

MW

16.3

ppg

MW

17.9

ppg

16.3

ppg

MW

17.9

ppg

1\\\

18.3

ppg

16.3

ppg

MW

16.3

PPG

16.3

PPG

16.3

ppg

MW

16.3

ppg

16.3

ppg

16.3

ppg

17.9

ppg

17.9

ppg

17.9

ppg

16.3

ppg

RUNNING LINER AND UNDERBLANCED FLUID DISPLACEMENTS

17.9

ppg

17.9

ppg

16.3

ppg

RIH Liner to 600m, displace 18.3ppg to 16.3ppg.

RIH SBP = 15psiEnd of Disp. SBP = 112psi

RIH Liner to 1200m, displace 18.3ppg to 16.3ppg.

RIH SBP = 112psiEnd of Disp. SBP = 240psi

RIH Liner to 1700m, displace 18.3ppg to 16.3ppg.

RIH SBP=240psiEnd of Disp. = 450psi

RIH Liner to 2334m, displace 18.3ppg to 16.3ppg.

RIH SBP= 450psi End of Disp. = 650psi

Page 8: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

8

4-1/2” Liner Displacement

Page 9: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

9

4-1/2” Liner Managed Pressure Cementing (MPC)

Challenges

• Well loss & gain

• Constant bottom hole pressure

• 0.35 ppg pressure window

• Zero human error – communication

• High static underbalance – 640psi

Page 10: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

10

Managed Pressure Cementing Plan (without SBP)

FG = 18.5 ppg (as per cementing company simulation,

calibrated to equivalent of 18.17ppg) to the actual

PP = 17.82 ppg.

Page 11: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

11

Managed Pressure Cementing Plan (with SBP)

Operating window

Page 12: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

12

Actual Managed Pressure Cementing Graph

weighted

spacer Displacement Cement

slurry Wash

spacer

Page 13: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

13

• Liner cementing without

gains / losses.

• USIT log result below

previous shoe

Cement Quality

Page 14: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

14

Conclusion

• Cementing possible in marginal pressure window.

• MPC success depends on:

◦ Valid hydraulic simulations.

◦ Reliable MPD system.

◦ personnel training, communication protocols & clear

procedures

• Successful MPC set new standard for operator.

• Exploring full MPD utilization:

Page 15: Overcoming Challenging Narrow Mud Weight Window of 8-9 April 2014 NH Eurobuilding ... Malaysia Map TA WELL Field Location . ... Top F10 S Top F10 Top H01 Top H02 2010 2060 2110 2160

SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition

8-9 April 2014 NH Eurobuilding Hotel, Madrid

15

Co-Authors:

Trigunadi Setiawan, Warjanto Saikam, Mohammed Mousa, Sagi V. R Raju,

Ahmad Zahir, W Nor Afiqah, M Abshar B M Noor, Mizuar Omar, PETRONAS;

Freddy Rojas, Andi Eka Prasetia, Dylan Richards, MISWACO

Acknowledgement

PETRONAS

MISWACO

Appreciation