DESCRIPTION
After the criticized response of Hurricane Irene and Super Storm Sandy, Long Island Power Authority developed a plan for a new storm process and supporting Outage Management System. See how Cisco Data Virtualization delivered a high impact result that was critical to the business. Learn more: http://www.cisco.com/c/en/us/products/cloud-systems-management/data-analytics/index.html#~featured-products,TRANSCRIPT
Long Island Power Authority
Lockheed Martin Approved Public Release
Outage Management SystemDeployment
Victor Campbell
Lockheed Martin
Long Island Power Authority
Lockheed Martin Approved Public Release
Timeline
• Hurricane Irene, August 2011• October 2011, PSEG and LM partnership awarded
contract to operate electric grid, effective Jan 2014• Super Storm Sandy, 28-29 Oct 2012• April 2013 – LIPA approved Plan to develop new
Storm Management Process and Outage Management System (OMS)
• October 2013 - LIPA approved LM OMS Offer Design
• August 2014 – LM/PSEG Team delivers new Outage Management System
8/31/12
11/1/12
Long Island Power Authority
Lockheed Martin Approved Public Release
OMS Business Requirements1. Effective Outage Management System ready for 2014 Storm
Season
2. “NEW” Storm Management Process
3. Develop IT/IS infrastructure to support Storm Process
4. Customer / Municipality /State Satisfaction with Storm Management Process and IT system
Long Island Power Authority
Lockheed Martin Approved Public ReleaseData Stores
Legacy Outage Architecture
STORM Center
Outage ManagementCARES
High Volume IVR
IVR
CAS(Customer Information)
ASU
SCADA MWFMCARDS
Call Taker Interface
Mobile Apps
WEIRS(Reporting)
Alerts
PUC/ Municipality
Outage Data Warehouse
Mainframe
Long Island Power Authority
Lockheed Martin Approved Public Release
New OMS DesignDV / ESB
STORM Center
Outage Management System
High Volume IVR
IVR
CAS(Customer Information)
ASU
SCADA
Business Intelligence & Reports
MWFMCAD
System
Call Taker Interface
Mobile Apps
GIS(Electric Network)
Alerts
PUC/ Municipality
GIS OMS CADVSAM Outage Historian
Mainframe
Long Island Power Authority
Lockheed Martin Approved Public Release
Results
• Deployment of Outage Management Applications with Dynamic and continuously updated Restoration Time (ETR) calculations
• Geospatial Information System of electric network with Improvement in Customer count and 150% improvement in location accuracy
• Enterprise level business intelligence system supporting regulatory, compliance, and BI reporting with real-time updates
• Increased outage transaction capacity 5x levels seen in Super Storm Sandy• Data Virtualization provided 2x reduced Data Integration time
The high visibility project ($30M), arguably should have been a 3 year project, was completed in less than 12 months, on schedule, meeting all milestones, and
within project cost.
Long Island Power Authority
Lockheed Martin Approved Public Release
Lessons Learned
• Achievement made possible through a multi-functional agile project team that emphasized management and communication skills with the customer and IT teams to ensure success.
• Used Vendor SME and onsite support early in development to mitigate risks of learning new technology and to gain early wins.
• Migration of legacy architecture into “cloud technologies” has to be re-engineered to reduce complexity, cost, and resulting risks.
“To achieve great things, two things are needed: a plan, and not quite enough time.” Leonard Bernstein
Long Island Power Authority
Lockheed Martin Approved Public Release
Way Ahead
• PSEGLI is continuing to Improve Customer Experience– Transformative CRM– Improve business partner integration
• Smart Meters – work meters into Outage Detection and simplify data collection and analysis
• Improve non-outage dispatch and customer service