OTJIKOTO MINE, NAMIBIA REALIZING FUEL AND CARBON SAVINGS WITH
AN AUTONOMOUS HYBRID SOLUTION 1
2
7 MWdc Installed capacity
20 Hectare Solar Farm Area
62,400 x CAT Thin-film Panels
7 x 1MW Transformers
260 SMA String Inverters
105k Injury-free hours worked during construction
42.3 Million kWh’s generated since commissioning (41.9 Million
kWh’s projected)
Consumption of HFO reduced by 9,1 Million liters
YTD June 2021
Actual performance exceeds feasibility
study projections
OTJIKOTO SOLAR PLANT
POST-CONSTRUCTION INFORMATION
3OTJIKOTO SOLAR PLANT
GLOBAL, AFRICA AND NAMIBIAN IRRADIANCE LEVELS
Namibia ranks as one of the best locations globally to generate solar energy.
4
The graph above indicates the maximum irradiance levels in W/m2 measured per month over a 5 year period at the Otjikoto Mine. The trendline indicates an
average irradiance of +/- 1,000 W/m2 which translates to an annual index of 2,591 kW/m2 per annum (assuming an average 7.31 hours sunlight per day). Actual
irradiance data logged at the Solar Plant compare well to the overall recorded numbers in Northern Namibia (see map on previous page).
OTJIKOTO SOLAR PLANT
HISTORICAL IRRADIANCE FIGURES – PAST 5 YEARS
-
200
400
600
800
1 000
1 200
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Max W/m2 Linear (Max W/m2)
5OTJIKOTO SOLAR PLANT
CUMULATIVE HFO CONSUMPTION – PROJECTED VS ACTUAL
-
50,0
100,0
150,0
200,0
20182019
20202021
20222023
20242025
2026
19,2 38,0 57,5 76,5
21,6 42,4 63,2 84,1 104,9
125,8 146,7
167,6 188,5
Cumulative HFO Consumption in Millions of liters: Phase 1 - Solar + HFO:
2018 – 2020 Actual; 2021 Forecast: 76.5M litres vs Feasibility of 84.1M litres
Phase 1: Cumulative Consumption HFO + Solar Plant (Millions of HFO litres) 2018 - 2020 Actual; 2021 Forecast
Phase 1: Cumulative Consumption HFO + Solar Plant (Millions of HFO litres) Per Feasibility
As of end June 2021:
• 42.3 Million kWh’s
generated post
commissioning vs 41.9
Million kWh’s projected.
• Consumption of HFO
reduced by 9.1 Million
litres post commissioning
– in line with projections.
• 13% overall reduction in
fuel consumption since
commissioning – in line
with projections.
6OTJIKOTO SOLAR PLANT
CUMULATIVE SAVINGS EXPECTED FROM THE OTJIKOTO SOLAR PLANT - MUSD
2018 2019 2020 2021 2022 2023 2024 2025 2026
-
50,0
100,0
150,0
200,0
250,0
19,2
39,1
59,8
81,4
103,8
127,0
151,2
176,2
202,3
17,6
35,5
54,1
73,4
93,5
114,4
136,0
158,6
182,0
1,64 3,77 5,43 7,28 10,3 12,7 15,1 17,7
20,3
Year
Savi
ngs
in U
SD M
illio
ns
Cumulative Operating Costs - HFO Plant and HFO + Solar per Feasibility vs Actual Performance
Cumulative HFO Plant Operating Cost - Feasibility Cumulative Solar Hybrid Operating Cost - Feasibility Cumulate Actual Saving due to Solar Energy - Actual (2021 Forecast)
Payback to be achieved Q1 2022, in line with Feasibility (4.3 Years)
7THE GRID CONNECTION OPTION
Eldorado Substation: 220Kv –
66kV step down
20km 66kV Overhead Line
B2Gold Substation: 66Kv – 6.6kV
step down
Metering Station
NamPower Project Background
• Construction of a 21-kilometer overhead powerline to link the
Otjikoto Mine to the Nampower Grid
• 13M USD Capital investment
• Reduction in running hours on HFO Gensets, resulting in:
• Reduced carbon emissions
• Significantly reduced HFO consumption
The NamPower Grid Link Project is on schedule to be fully
commissioned and online by August 2022.
8
Golden Opportunities to make a real difference
and leave a Lasting Legacy
9OTJIKOTO SOLAR PLANT
THE FUTURE – ENERGY STORAGE SOLUTION
GREATER WATERBERG PARTNERSHIP PARK
Creation of a 400 000 Ha Park
in partnership with farmers,
local communities and the
government.
Proposal under consideration –
to include the Otjikoto Nature
Reserve into the GWPP and
generate continuous income
for ongoing CSI activities from
the sale of PV power to the
local grid
Comprehensive Master Plan
completed 2018
10
11