  • How Low Should You Go? A Method to Calibrate Estimates

    of P99 Prospect Reserves

    Robert Otis

    Paul Haryott

    www.roseassoc.com

  • Acknowledgement

    Thanks to Chevron Corporation for use of data in the development

    of this presentation

  • Background Prospect reserve and many reserve

    parameter distributions are lognormal

    Data from a lognormal distribution plot as a straight line on log-probability graph paper

    Probit scale

    Log scale

  • Background Prospect reserve and many reserve

    parameter distributions are lognormalMid-point is the P50;slope is proportional to standard deviation

    Probability scale is greater than convention P10 is a large number; P90 is a small number

  • Background Prospect reserve and many reserve

    parameter distributions are lognormalVolatility or uncertainty is another term from standard deviation (or variance) and can be expressed most easily as the P10/P90 ratio

    Volatility or uncertainty is another term for variance (or standard deviation) but is most easily quantified by the P10/P90 ratio

    The larger the P10/P90, the more uncertainty or the higher the variance (standard deviation) of the distribution

  • Background Prospect reserve and many reserve

    parameter distributions are lognormal

    A straight line is defined by two points thus, any lognormal distribution can be completely defined with two independent pieces of information, e.g., mean and variance, P10 and P90, P01 and P10/P90, etc.

  • Pre-Post Drill Discovery Sizes

    Norwegian Petroleum Directorate, 1997

    1

    10

    100

    1,000

    10,000

    1 10 100 1,000 10,0001

    10

    100

    1,000

    10,000

    1 10 100 1,000 10,000

    8th To 14th Licensing RoundsNorwegian North Sea

    Expected Size before Licensing, MMBOE

    S

    i

    z

    e

    o

    f

    D

    i

    s

    c

    o

    v

    e

    r

    y

    ,

    M

    M

    B

    O

    E

  • Observations The P01 (high side) of most distributions is

    fairly well constrained Field size distributions can use the largest

    field which is usually found early in the exploration phase

    Area distributions can use the closing contour on structures and reservoir extent on stratigraphic traps

    Average net pay distributions can use a high N/G and the thickest reservoir with an appropriate geometric correction or averaging

  • Observations Given a constrained upside or P01, we

    can acknowledge a significant downside by several approaches Consider the smallest field in the trend and

    force the distribution to honor both the extreme upside (P01) and the extreme downside (P99) connect with straight line

    Assume an appropriate P10/P90 and pivot from the P01 do a credibility check on the estimated P99 and adjust as needed

  • Appropriate P10/P90? One guideline (from the mid 1980s)

    suggests a range of values based on type of prospect and typical field size distributions Development 2 to 7 Extension 5 to 25 Trend 10 to 120 Rank 55 to 250 Frontier 120 to 650

    Unfortunately, these values are not, for the most part, supported with published data

  • What We Want To Do And Why?

    What Describe a method or process to calibrate

    P10/P90 to appropriately represent the uncertainty of a distribution

    Why Differing opinions are abundant, but are

    mostly based on a wide variety of experience; few, if any, are validated with data

    We would like to see a data supportedprocess that allows a company to develop their own rule(s) of thumb

  • Finding An Appropriate P10/P90

    Because each company has a different portfolio, there are no hard rules each company will need to determine it independently

    To do this, each company needs a history of consistent estimates of pre-drill distributions and post-drill actual results to use for calibration

    If you have a history, apply the following process

  • The Process Compile your history wells require two

    independent values to define the pre-drill distribution and the post drill mean

    Estimate the P01 from each pre-drill distribution Assign a common P10/P90 to all wells and see

    where the actual prospect result falls on each distribution

    Evaluate results using a percentile histogram method from Otis and Schneidermann (1997)

    Do this for several P10/90 ratios and see which one is most appropriate

  • Percentile Histograms

    Each percentile interval has a 10% probability If the post-drill result from each pre-drill distribution

    is random, the result is a uniform distribution

    P05

    P20P30P40

    P60P70P80

    P95

    P01

    P10

    P50

    P90

    P991 10 100 1000

    P05

    P20P30P40

    P60P70P80

    P95

    P01

    P10

    P50

    P90

    P991 10 100 1000

    P05

    P20P30P40

    P60P70P80

    P95

    P01

    P10

    P50

    P90

    P991 10 100 1000

    P05

    P20P30P40

    P60P70P80

    P95

    P01

    P10

    P50

    P90

    P991 10 100 1000

    0

    1

    2

    3

    90-100 80-90 70-80 60-70 50-60 40-50 30-40 20-30 10-20 0-10

    52 MMBOE in 50-60 Interval

    193 MMBOE in 0-10 Interval

    76 MMBOE in 10-20 Interval

    25 MMBOE in 90-100 Interval

  • 0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-100%

    10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-100%

    10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    Diagnostics

    Heavy on the downside too optimistic

    Heavy on the upside too pessimistic

    Heavy on both up - and downsides need to widen ranges Uniform distribution - acceptable

  • Lets Look at Some Data Chevron international exploration wells

    from 1989-1993 (total of 50 discovery wells)

    Prospects include trend, rank and frontier wells

    No appraisal wells

  • P10/P90 For Years 1989 - 1993

    02468

    101214161820

    Wells

    P

    1

    0

    /

    P

    9

    0

    R

    a

    t

    i

    o

    1989 1990 1992 1993

    Look Back

    1991

  • Actual Post Drills - Pre-Lookback

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    Actual Post Drills - Post-Lookback

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    02468

    101214161820

    Wells

    P

    1

    0

    /

    P

    9

    0

    R

    a

    t

    i

    o

    1989 1990 1991 1992 1993

    Look Back

    02468

    101214161820

    Wells

    P

    1

    0

    /

    P

    9

    0

    R

    a

    t

    i

    o

    1989 1990 1991 1992 1993

    Look Back

    Percentile Histograms(1989-91) (1992-93)

    Average P10/P90 = 3.7 Average P10/P90 = 7.8

    Too many results below P90

    Essentially balanced

    About right on upside (P10)

  • Observations 1989-91 wells had average P10/P90 of ~4

    but needed to include more downside 1992-93 wells had P10/P90 of ~8 and had

    reasonably balanced results What would the histograms have looked

    like if we used a variety of P10/P90s?

  • Range of P10/P90 ValuesWhat would these wells look like with a

    P10/P90 = 7?P10/P90 = 10?P10/P90 = 20?P10/P90 = 50?P10/P90 = 100?P10/P90 = 250?

  • Post Drills w/7 P10/P90

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    Actual Post Drills

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    All WellsAverage P10/P90 Ratio = 7

    Not bad - a nice balanced distribution Pre-drill, 31% of the wells were above P50 With P10/P90 = 7, 56% of the wells were

    above P50

  • Post Drills w/10 P10/P90

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    All WellsAverage P10/P90 Ratio = 10

    Although not bad, indications are that we are becoming pessimistic on the downside (P99 too low)

    With P10/P90 = 10, 73% of the wells were above P50

    Actual Post Drills

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

  • Post Drills w/20 P10/P90

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    Worse than the original, and way too pessimistic of the downside (P99 way too low)

    With P10/P90 = 20, 84% of the wells were above P50

    All WellsAverage P10/P90 Ratio = 20

    Actual Post Drills

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

  • Point made . . . With P10/P90 = 50, 93% of the wells were

    above P50

    All WellsAverage P10/P90 Ratio = 50

    Actual Post Drills

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

    Post Drills w/50 P10/P90

    0%10%20%30%40%50%

    90-100

    80-90

    70-80

    60-70

    50-60

    40-50

    30-40

    20-30

    10-20

    0-10

  • Observations For this data set, the process indicated

    P10/P90 ratios for reserves vary between 5 and 10 Less than 5 too many results fall below P90 Greater than 10 too many results fall above P10

    Quick Look process Check number of results above and below pre-drill

    P50 Rule of Thumb: Greater than ~70% in either bin

    check your process Let the process determine the appropriate

    P10/P90 ratio for your company each portfolio is different and needs to be examined.

  • Observations The process should be applied to reserve

    parameters as well (e.g., area, average net pay) to determine appropriate P10/P90 ratios For this data set, appropriate P10/P90 for area

    ranged between 3 and 4 For this data set, appropriate P10/P90 for average

    gross pay ranged between 6 and 8 however, a balanced histogram was reached only by allowing to P01 to be twice the original P01

  • Take-Aways Reserves and key, high variance reserve

    parameters have consistent P10/P90 ratios capitalize on this observation

    The high side is usually well constrained, and, together with an appropriate P10/P90 ratio, can define a very reasonable distribution as a credibility check

    Use your P10/P90 ratios as QC and if aberrations are observed ask Why?

    Appropriate P10/P90 ratios can only be determined by examining your company history and the basins explored of pre and post drill results maintain these religiously

  • So, How Low Should You Go? Low enough to have ~10% of your post

    drill outcomes in the P100-P90 range of your pre-drill distributions

    When data are available, high enough so that the distribution honors values in the 80% confidence interval (P90-P10)

    This can be done by developing and using your companys appropriate P10/P90 as a calibration check