oscarde la peña (2)

6
Page1 Oscar Marcos De La Peña Rodriguez [email protected] [email protected] Married, 2 children 44 Years. Office: +52 844 2883250 @252 Direct: +52 8442883252 Mobile: +52 844 4551281 Mex. Passport: G01673127 English: 100% written and spoken Spanish: Mother language BS: Electric Engineering (1991-1996). MS: Administration and higher direction (2011- 2013) Summary 20 year proven experience in the Engineering segment of the industry: Process Design & Implementation, Product Design & Implementation, Machinery acquisition, Budget planning, Strategic Planning, Team design and Training, Manpower Development. Extensive development within the Engineering area: Process, Manufacturing (tactic and strategic), Product, Plant, Supply chain and Project Management. I am a professional, dedicated, honest, trustable, focused, and lean oriented, with extensive experience in managing in multi-cultural environments. Goals - Successful implementation of the projects in which I take part of, - Generate a fair profit to the executives, through the use of the best methods available to increase product quality, safety, and manufacturability. - Surpass expectations on product and process implementation - Generate the necessary environmental policies that create the nest for a future socially responsible enterprise. - Work every day with enthusiasm and positive mind set, so I can contribute with ideas, and plans, at any moment. Blessed be the Lord, my strength, which teaches my hands to fight, and my fingers to war…psalm 144

Upload: oscar-de-la-pena

Post on 14-Feb-2017

105 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: OscarDe La Peña (2)

Page1

Oscar Marcos De La Peña Rodriguez

[email protected] [email protected] Married, 2 children 44 Years. Office: +52 844 2883250 @252 Direct: +52 8442883252 Mobile: +52 844 4551281 Mex. Passport: G01673127 English: 100% written and spoken Spanish: Mother language BS: Electric Engineering (1991-1996). MS: Administration and higher direction (2011- 2013)

Summary

20 year proven experience in the Engineering segment of the industry:

Process Design & Implementation,

Product Design & Implementation,

Machinery acquisition,

Budget planning,

Strategic Planning,

Team design and Training,

Manpower Development.

Extensive development within the Engineering area: Process, Manufacturing (tactic and strategic),

Product, Plant, Supply chain and Project Management.

I am a professional, dedicated, honest, trustable, focused, and lean oriented, with extensive experience

in managing in multi-cultural environments.

Goals

- Successful implementation of the projects in which I take part of,

- Generate a fair profit to the executives, through the use of the best methods available to increase

product quality, safety, and manufacturability.

- Surpass expectations on product and process implementation

- Generate the necessary environmental policies that create the nest for a future socially responsible enterprise.

- Work every day with enthusiasm and positive mind set, so I can contribute with ideas, and plans, at

any moment.

Blessed be the Lord, my strength, which teaches my

hands to fight, and my fingers to war…psalm 144

Page 2: OscarDe La Peña (2)

Page2

Specialties

LEAN PHILOSOPHY

PROJECT MANAGEMENT

TEAM BUILDING

STRATEGIC PLANNING

COACHING

MANUFACTURING

TRAINING

WELDING

Experience

Director of Operations. Miner Enterprises, Powerbrace RPD Division. Oct 2016 – To date (3 months) Structured a Business Unit Model in the Facility, dividing the entire plant into 3 units, each one with its own structure and metrics. No extra personnel were required for this project. Looking for future expansions and future business out of our actual core ones. Plant Manager. Miner Enterprises, Powerbrace RPD Division. May 2014 – To date (2.5 years) Structured a Strategic Planning for Powerbrace RPD Division, creating a Vision, Mission, Policies, Strategic goals and measures for monitoring and improving. Created the Social Responsibility program. Justified a Powder coating line for RPD (4million USD total Investment), with proven success after 10 months of operation. Coordinate a team that has achieved world class manufacturing metrics in 2015 Structured a plan for a Human Work Environment. Participate in the corporate teams for the strategic goals of: Best railcar manufacturer in the world. Best and first to market.

Lean Manufacturing Implementation.

Manufacturing Technologies Manager. Miner Enterprises, Powerbrace RPD division.

June 2004 – June 2015 (11 years)

Acting Plant Manager

Plant Startup (June 2004- January 2005)

Plant coordination, from Aug 04 until Jan 05

From Aug 04 to Date, in charge of the Manufacturing Technologies Department: Maintenance,

Manufacturing (process), and Tooling.

Teamed with the USA to close Kenosha WI. Operations and re locate them at Saltillo Mexico.

In charge of the machinery installation at Saltillo Plant.

Product Engineering Support: We have introduced more than 30 different Products in 10 years.

Page 3: OscarDe La Peña (2)

Page3

New building construction coordination and support: Concrete, Structure, overhead crane system.

Machinery installation: Welding machines (Miller, and Fronius TPS4000), Bystronic Press brakes,

and Trumpf Co2 Laser cutting cell: Trulaser 3030.

Process start up: Design and layout of 5 production lines: 2 lines according to the old school of massive

production, few change overs, and the three remaining lines were conceived using lean manufacturing

concepts, of high flexibility, SMED (1 hour changeover, for welding fixtures)

Team development: Engineers and Technicians.

Team coaching: developed a Strategic Training together with a local coaching office, using horses.

Budget analysis: 4 accounts that summarizes 750 000 usd per year

Machinery and Infrastructure Justification: Justified a CO2 Laser cutting cell with a ROI of 1.5 years that paid in less than 1.

Training to new Crew members, in topics such as Fixture design, Leadership, Self-direction, decision making, 5’s, Kaizen, Kan Ban, OEE, LoTo.

Development of Process documentation: Formats, Procedures, Instructive, and Policies.

During my 9.5 years I have achieved the following:

100% implementation of the POWERBRACE RPD operation.

Achieved in 2 years a best in sector Uptime index, rising it from a 82%, to a 92%

Achieved in 6 years a BEST IN CLASS uptime Index, rising from 92% to a 95% overall, with a consistent 98% in the welding areas.

Achieved in 2006 the M1003 (ISO9000 rail equivalent) Certification as part of the implementation team.

Implemented a Patented system for insertion that saved 1 usd per unit produced, totalizing up to 220,000 usd per year in cost reduction.

3 recommendations available upon request FAN at LEGO Group

1980 – to date (36 years)

Build and build, imagine, project, envision

Field Service Engineer at TRUMPF North America

2003 - 2004 (1 year) LASER Field Engineer

Installation of LASER equipment

Troubleshooting to Installed machines

Maintenance to installed machines

Machine construction (Solid State Laser)

Training

Customer care

Manufacturing Engineer at Shiloh Industries

September 2000 - July 2003 (2 years 11 months)

Manufacturing Engineer for the tailored welded blank lines: Laser welding lines, equipped with TRUMPF

Page 4: OscarDe La Peña (2)

Page4

YAG Lasers (THL4006).

In charge of the Laser performance, support to production, machinery troubleshooting

Responsible for the process development, implementation and documentation.

ABB robots programing, and troubleshooting.

General support to Production department.

Project Engineer at ZF Friedrichshafen

1998 - 2000 (2 years)

Mannesmann Sachs Start up project.

Plant Startup. New Machinery release and install: ABB Robot cells, Hessap, and Frontor Weiser

Lathes and Machining centers, TRUMPF laser.

Welding wire, substitution project (from German to Mexican wire)

Welding Engineer

Process Engineer

Production Support

1 recommendation available upon request

Design and Implementation Engineer at John Deere

June 1996 - September 1998 (2 years 4 months)

Hydraulic Excavator Project Team member.

Teamed in the Assembly Line Project. Method design, Assembly line layout, design and deployment.

Process documentation. Assembly Fixtures design and implementation. Excavator test instructive. Finish

product packaging and loading instructive. ISO9000 Implementation team member.

1 recommendation available upon request

Skills & Expertise

Program Management Strategic Planning Problem Solving Lean Manufacturing philosophy Tooling Design Supply Chain management Team Building Coaching Plant start ups Plant Layout Budget Management ROI development

Page 5: OscarDe La Peña (2)

Page5

Laser Welding / cutting Multicultural Environments OEE APQP GMAW (S, P, ad C) Welding Wine enthusiast Grill cooking

Training Manufacturing Engineer

Shiloh Industries Core Tools (AIAG) OEE TRUMPF basic, intermediate and advanced training Tailored Weld line Administration

Design and Implementation Engineer

John Deere

GMAW ISO 9000 DFT LEAN tools

Lean Manufacturing Field Service Engineer

TRUMPF North America Laser Design, build, and operation Laser theory Laser Welding TRUMPF advanced training

Laser cutting

Manufacturing Technologies Manager. Miner Enterprises, Powerbrace RPD Division.

Project Management Lean Manufacturing (Shingo prize training) GMAW Diploma (Steel, and Aluminum) MBA CWE

Certifications

Certified Welding Educator

AWS License 0905027E May 2009 to May 2017.

Education

Page 6: OscarDe La Peña (2)

Page6

Universidad Iberoamericana, Ciudad de México

MBA, Administration and High Direction, 2011 – 2013

Instituto Tecnológico de Saltillo

BS, Electric Engineering, 1991 - 1996

Activities and Societies: Member of the Students Committee (1995-1996) Member of the Football Team (1992-1996)

Interests

My family, The Outdoors, Music listening, LEGO building blocks, Camping, Puzzle solving, to calculate, Sudoku solving, sport shotgun, airsoft, grill cooking, and wine tasting (Mexican wine enthusiast).