In Refer Toi RP^2~1 Sohio ft fettles* C . wy Attention. NT. Car, V. Kftrtf- Post Off Btw Lafayette. Ua1s1an* 70505 G«itleesnt Reference to n«t< to your Initial Plan of Exploration received June 19* IM* for Lease OCS-6 6209, Block 544* East Breaks Area. Tills plan Includes the activities proposed for Wells A through D. In accordance vftti 30 CFR 250*34* revised Deeeaeer 13* 1979* and et r letter dated January 29* 1979* tills Dies fees been determined to be conplete es ef July 3t 1986* and 1s nee being considered for approval. T w plan control nneber Is 8-249X end should be referenced t» your DOMJnfftstfen and correspondence concerning tnls plan* Sincerely yours* (Orig. Sgd.) A. Donald Giroir A* Donald ftlrelr Deputy Regional Supervisor Rules and Production bect /Lease OCS-G 8209 (OPS-3-2) (FILE FOQM) ^flPS-q-4 w/Publlc Info* Copy of ttie plan (PUBL.REC.) DO-3 AtSobertiansf'7/2/86 SOHX8209 Disk la 0 Office of Program Services JUL 0 ? 1936 information Service*

Upload: trinhcong

Post on 13-May-2018

234 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

In Refer Toi RP 2̂~1

Sohio ft fettles* C. wy Attention. NT. Car, V. Kftrtf-Post Off Btw Lafayette. Ua1s1an* 70505

G«itleesnt

Reference to n«t< to your In i t ia l Plan of Exploration received June 19* I M * for Lease OCS-6 6209, Block 544* East Breaks Area. Tills plan Includes the activities proposed for Wells A through D.

In accordance vftti 30 CFR 250*34* revised Deeeaeer 13* 1979* and et r letter dated January 29* 1979* t i l ls Dies fees been determined to be conplete es ef July 3t 1986* and 1s nee being considered for approval.

T w plan control nneber Is 8-249X end should be referenced t» your DOMJnfftstfen and correspondence concerning tnls plan*

Sincerely yours*

(Orig. Sgd.) A. Donald Giroir

A* Donald ftlrelr Deputy Regional Supervisor Rules and Production

bect /Lease OCS-G 8209 (OPS-3-2) (FILE FOQM) ^flPS-q-4 w/Publlc Info* Copy of ttie plan (PUBL.REC.)

DO-3

AtSobertiansf'7/2/86 SOHX8209 Disk la

0 Office of Program Services

JUL 0 ? 1936

information Service*

Page 2: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

SOHIO PETROLEUM COMPANY LAFAYETTE. LOUISIANA fOBOS

PO BOX 91466

OIL CENTER STATION

June 18, 1986 '

Mr D. W. Solanas Regional Supervisor Offshore Operations Support U.S. Department of the Interior Minerals Management Service P. 0. Box 7944 Metairie, LA 70010-7944

I

PUBLIC INFORMATION

Re: Plan of Exploration East Breaks Block 564 0CS-G-8209, Wells A, B, C & D Offshore Texas

Dear Mr. Solanas:

Please find enclosed f ive (5) Confidential and six (6) Public Information copies of the Plan of Exploration (POE) for the above referenced project . Accompanying th i s POE are one (1) set of processed seismic l ine data o f fse t ­t ing each well locat ion. Two (2) copies of the Hazard Study by John Chance & Associates, Inc. for East Breaks Blocks 563, 564 and 607 have been submitted with the POE for East Breaks Block 563.

I f you have questions or require addit ional information, please ca l l me at (318) 989-4200.

Sincerely,

Cary M. ke r l i n Regulatory Supervisor Lafayette D i s t r i c t

SFB/brg Attachments

C: Mr. W. D. Harris

Page 3: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

PLAN OF EXPLORATION

OCS-G-8209

EAST BREAKS BLOCK 564

OFFSHORE TEXAS

June 18. 1986

Page 4: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

\

LIST OF ATTACHMENTS

A. Description of Drilling Rig

B. Letters from Sohio Petroleum Company's Regional Geophysicist

C. Vicinity & Well Location Plats

D. Geologic Cross Section & Structure Maps

E. Drilling Mud Components

F. Projected Air Emissions Schedule

G. Magnetometer and Side-Scan Sonar Waiver

Page 5: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

SOHIO PETROLEUM COMPANY EAST BREAKS BLOCK 564

, OCS-G-8209 j OFFSHORE TEXAS

Ipujrsuant to the requirements of 30 CFR 250.23 .1 , Sohio Petroleum Company sub­

m i t s the fo l lowlbg^Plan of Exp lora t ion (POE) fo r !Eas t Breaks Block 564.

( i ) EXPLORATION ACTIVITY

The proposed e x p l o r a t i o n a c t i v i t y f o r East Breaks Block 564 cons is ts of d r i l ­

l i n g Wells "A, 8 , C & 0" from four (4 ) d i f f e r e n t l oca t i ons . A l l four locat ions

w i l l be d r i l l e d as s t r a i g h t ho les . The estimated t ime to d r i l l these four (4)

exp lo ra to ry we l ls i s about f i v e hundred s i x t y f i v e (565) days, w i th a January 1 ,

1988 ant ic ipated spudding date f o r the "A" l oca t i on .

(11) PROPOSED DRILLING RIG

Sohio present ly does not have a r i g under cont rac t f o r l oca t ion "A, B. C or

D" ; however, these w e l l s w i l l be d r i l l e d w i th a d r i l l i n g u n i t , s i m i l a r t o the

"Ben Ocean Lancer" owned by Ben Odeco L imi ted . This r i g Is capable of d r i l l i n g

i n water depths o f 4000 ' . The r i g ' s s p e c i f i c a t i o n s , BOP and D ive r te r systems

a r e shown In Attachment A.

(111) GEOPHYSICAL WORK

A l l of the geophysica l work prepara tory to I n i t i a t i o n of exp lo ra to ry opera­

t i o n s has been completed. A v e l o c i t y survey may be run on these we l l s when

t o t a l depth has been eached. No o ther geophysical work i s planned unless data

ob ta ined from d r i l l i n g operations necess i ta tes add i t i ona l d e f i n i t i o n d e t a i l from

convent ional r e f l e c t i o n seismic methods.

Magnetometer and side-scan sonar requirements f o r the shal low hazard surveys

were walvered f o r t h i s block as shown In Attachment G.

Page 6: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

Plan of Exploration East Breaks Block 564 Page 2 '

Two (2 l copies of the shal low hazard report e n t i t l e d , "Hazard Study Blocks

563, 564 & '607, East Breaks Area" , prepared by John Chance fc Associates, Inc.

were submitted w i t h the POE fo r East Breaks Block 563.

The East Breaks Hazard Study has been reviewed by Mr. Jack Golden, Sohio's

Regional Geophys ic is t . Let ters from Mr. Golden in which he agrees w i th John

Chance's conclusions and addresses shal low hazards at each we l l s i t e , are i n c l u ­

ded as Attachment B.

Attachment C-l i s a v i c i n i t y map dep ic t ing the subject t r a c t ' s pos i t i on r e l a ­

t i v e to the Texas shore l i ne . No new onshore f a c i l i t i e s w i l l be required f o r

d r i l l i n g these proposed exp lo ra to ry w e l l s . Ex is t i ng serv ice company f a c i l i t i e s

i n the Sabine Pass Area have s u f f i c i e n t capaci ty to accommodate t h i s p ro jec t

wi thout m o d i f i c a t i o n or expansion.

Attachment C-2 shows the proposed surface loca t ions f o r Wells "A, B, C & D".

The t o t a l depth , water depth and surface locat ions f o r each of these wel ls is as

fo l lows :

(1v) VICINITY AND LOCATION MAPS

Well "A" TO: Water Depth: Surface Location:

10,000' 2,970' 8,500' FNL 14,650' FEL

Well "B" TD: Water Depth: Surface Location:

10,800' 2,900' 7,500' FNL 11,750' FEL

Page 7: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

Plan of Exploration East Breaks Block 564 Page Q

i

11,600' 2,980'

12,550';FNL 8,150' FEL

Surface Location:

Well "D" TD: 13,600'

3,010' 15,000' FNL 5,550' FEL

Water Depth: Surface Location:

(v) STRUCTURE MAPS AND CROSS SECTIONS

Structure maps and cross-sections are Included in the f ive (5) confidential

copies of th is Plan as Attachment D. Depths shown on cross-sections and struc­

ture maps are sub-sea measurements.

(A) 011 Sp i l l Contingency Plan

Sohio Petroleum Company 1s a member of Clean Gulf Associates (CGA) and

would u t i l i z e that organization's equipment to clean up an o i l s p i l l .

The closest CGA bases are at Galveston, Texas Ci ty , Texas and Cameron,

Louisiana, respectively. Response times for CGA Fast Response Units from

these three (3) locations would be 15, 16 and 19 tours, respectively.

Manpower to operate the CGA's equipment would be provided by Peterson

Maritime Services, Inc. , whose personnel are trained for o i l s p i l l clean­

up operations. Sohlo's supervisory personnel would direct the clean-up

operations u n t i l successfully completed. Additional detai ls can be found

1n Sohlo's 1985 Oil Sp i l l Contingency Plan, which has been approved by

the Minerals Management Service.

( v i ) OTHER RELEVANT DATA

Page 8: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

Plan of Exploration East Breaks Block 564 Page 4 '

(B) l)lsjt of Mud Components , "

Attachment E is a l i s t of the proposed d r i l l i n g mud components and addi-fca j

tives, including the common and chemical trade name of each additive.

(C) Gaseous Emissions

Exploratory d r i l l i n g operations wil l be conducted from the surface sites

described in section (iv) using the mobile dr i l l i n g unit described in

Section ( i i ) . Operations w i l l be of a maximum duration of five hundred

sixty five (565) days.

At the d r i l l site, gaseous emissions w i l l be generated by the rig en­

gines, the attendant work boat, stand-by boat, crew boat, and helicopter,

and the production testing of possible prospective reservoirs. Gaseous

emissions at the dock site in Sabine Pass, Texas, w i l l be generated by

the work boat, crew boat and helicopter. Onshore staging for this opera­

tion w i l l be from existing f a c i l i t i e s , so there w i l l be no significant

Increase In emissions for this activity. Projected emissions from this

activity have beer, calculated and are presented in the Projected Air

Emission Schedule as Attachment F.

(D) Coastal Zone Management (CZM) Consistency Certification

A Coastal Zone Management Consistency Certification for activities des­

cribed in this plan is not required.

Page 9: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

A.

BEN OCEAN LANCER

GENERAL DESCRIPTION AND EQUIPMENT LIST

11/84

iEWERAL

owners:

DESCRIPTION

Regi s t r y :

C lass i f i ca t i on :

Ce r t i f i ca tes :

Ben Odeco Limited 17 Grosvenor H i l l London W1X 9HG England

U. K. F lag/Lei th, Scotland O f f i c i a l No. 366477 Signal Le t te rs : GUUU

Lloyd's Register, Maltese Cross 100A1, Ice Class 2, L.M.C. U.M.S.

The 8en Ocean Lancer complies with the ce r t i f y i ng requirements of the U.K. Department of Transport, U.K. Factories Act (regarding safe workinn condit ions of machinery) and S0LAS/MO0U Codes including the IMO Internat ional Oi l Pol lut ion and Prevention Regulations.

PRINCIPAL CHARACTERISTICS AND DIMENSIONS

Length:

Breadth:

Depth:

Design Draft (a l l seasons):

Gross Tonnage:

Load Displacement:

Net Tonnage:

Deadweight:

.41.37 m./463.80 f t

23.50 m./ 77.10 f t

11.78 m./ 38.55 f t

8.03 m.V 26.03 f t

10,823.22 tons

17,793 tons

5,289.82 tons

9,193 tons

Nominal minimum/maximum Operating water depth capab i l i t y : 400 f t / 4,000 f t

-1-

ATTACHMENT A

Page 10: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

CAPACITIES:

Bal laf t Water: Potable Water: Active Mud: Reserve Mud: Bulk Mud: Bulk Cement: Sack Storage:

Fuel O i l : Drill/Dome st1c Water:

2,160 m. tons/lc ,500 bbls 675 m. tons/ 4 250 bbls

(1,950 m. tons of d r i l l water can also be stored in bal last system)

4,010 m. tons/25,200 bbls 246 m. tons/ 1,549 bbls

153.7 cu. metres/ 967 bbls 232.77 cu. metres/1,464 bbls

9,900 cu f t 9,900 cu. . t 6,000 sacks

QUARTERS: Quarters area to accommodate 98 men.

HELIPORT: Heliport sky S-61

designed to accommodate Skior-he l icopter .

B. GRILLING EQUIPMENT

1. One (1) Pyramid dynamic derrick 44' x 36' x 160' with double V-doors. Derrick is rated for 1,000,000 lbs . s ta t i c hook load capa-

2. One (1) Pyramid 500-ton capacity crown block assembly with seven (7) 60" sheaves grooved fo r 1-3/8" d r i l l l i ne complete with 9/16" sandiine sheave and 1-1/4" cat l ine sheave.

3. One (1) Koomey Model TCB Crown-o-matic.

4. One (1) NL Shaffer d r i l l s t r ing motion compensator rated at 400,000 lbs. w i th a 18-foot stroke.

5. One (1) Gardner-Denver Model 55-T-660 t rave l ing block, 550-ton capacity with six (6) 60" sheaves grooved fo r 1-3/8" wire.

6. One (1) Byron Jackson Model 5500 dynaplex hook, 500 ton capacity.

7. One National Model P-650 650 ton capacity d r i l l i n g swivel with 6-5/8" API Reg. LH box down.

8. One (1) Internat ional Model A63-2 ke l l y spinner with 6-5/8" AP! Reg. connections.

9. One (1) OHwell A 49-1/2" rotary driven by one (1) 800 hp LSE DC motor. Rotary equipped wi th Varco hinged pin drive master bushings complete with extended API insert bowl No. 3, l i f t i n g s l ing and b i t breaker adapter.

c i t y .

2-

Page 11: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

10. One (1) Ol lwel l Model RT-2010-D two speed rotary table transmis­sion.

11 . One (i> ro tary table support s t ruc ture . •

12. One (1> Gardner-Denver Model 3000-E e l e t t r i c drawworks with a drum grooved for and including 1-3/8" wire and a coring reel sized for and including 20,000' of 9/16" wire, a l l driven by two (2) 800 hp LSE Dt* motors.

13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake.

14. One (1) Byron Jackson 3-arm pipe racking system with block re t rac t .

15. One (1) adjustable casing stabbing board.

16. One (1) BJ Hughes Spintorc hydraulic d r i l l pipe spinner and torque wrench.

17. One (1) Mathey wire l ine measuring device with 15,000- of 0.092 wire.

18. One (1) National Type E-3 deadline anO \

19. D r i l l f loor instrumentation consisting of:

a) Martin Decker Type "£" weight indicator . b) Martin Decker pump pressure gauge. c) Martin Decker tong torque indicator . d) Martin Decker rotary table rpm. e) Martin Decker rotary table amp meter. f ) Martin Decker pump stroke tachometer. g) Martin Decker 5-channel recorder. h) A-l Rig Services p i t volume to ta l i ze r and gain/loss indicator

(motion compensated) wi th monitoring cor:oles located on d r i l l f loor and 1n toolpusher's o f f i c e . Doth stat ions equipped with chart recorder giving 7 hour view of to ta l volume and f low. Flow sensors in flow l i ne and at shale shaker. Dual p i t volume sensors in each activ? mud p i t .

SUBSEA AMD WELL COMTROL EQUIPICnT

I . Two (2) 16-3/4" 10 000 ps1 Cameron BOP stacks ( l -ac t ive/ l -s tandby) each consisting of :

a) One (1) hydraul ic CIW c o l l e t connector, 16-3/4" 10,000 psi WP. b) One (1) guidance funnel. c) Two (2) Cameron doub'.a ram type U preventers -.iith two (2) 3"

outlets below each ram. Ram bodies f i t t e d from top to bottom as fo l lows:

-3-

Page 12: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

Blind/shear ram (SBR) 5" pipe ram 5" pipe ram 5" pipe ram

(Two (2) sets of 3-1/2" pipe rams also*avail able)

d) One (1) 5,000 psi Hydri l GL bag type preventer. e) One (1) 5,000 psi s**vel/adaptor f i t t e d with mandrel for

mating BOP to LRP Col let connector. f ) Three (3) 3" 10,000 psi double cavi ty Type "OF" fa i l sa fe

valves. g) One (1) k i l l l ine spool - k i l l ine entry point below ram No.

4. h) One (1) choke l ine spool - c^oke l ine entry points be^w rams

No. 1 and No. 3. i ) One (1) hydraulic receiver plate for use with guidelineless

system. j ) One (1) acoustic control package (four f u n c t i o n complete with

accumulators. k) One (1) frame for stack. 1) One (1) 16-3/4" BOP stack tes t stump.

2. Two (2) 15-3/4" CIW lower marine r iser packages (1-act ive/ 1-standby) each consist ing of:

\) One (1) hydraul ic CIW co l l e t connector, oj One (1) guidance funnel. c) One (1) 5,000 psi Hydri l GL bag type preventer ( for p-imary

uni t on ly ) . d) One (1) 10° ba l l j o i n t . e) One (1) hydraul ic face plate with two (2) Payne multiplex

e lectro-hydraul ic pods. f ) Two (2) 3" f lex hoses fo r k i l l and choke l ines. g) One (1) frame fo r r i se r package. h) One (1) emergency BOP recovery system. i ) Ont (1) 16-3/4- LRP test stump.

3. One (1) 18-5/8" OD Integral r i se r system with Cameron Style 'RD' connectors and consist ing of : (Total footage - 4,100 f t . plus s l i p j o in t s )

a) Forty-six (46) 50' r i ser j o i n t s with 5/8" wall of which (30) have Grade FG 36T steel tube and (16) have Grade X-65 steel tube.

b) Twenty-nine (29) 50' r i se r j o i n t s with 1/2" wa l l . c) One (1) 43.75' r i se r j o i n t with 5/8" wa l l . d) Two (2) 25' r i s e r j o i n t w i th 1/2" wa l l . e) Two (2) 37.5' r i se r j o i n t with 1/2" wal l . f ) Two (2) 43.75' r i se r j o i n t wi th 1/2" w a l l . g) Two (2) 46.8' r i se r j o i n t wi th 1/2" wa l l . h) Two (2) 55' stroke te^scoping j o i n t s complete with Pensioner

cl-jmp, in tegra l k i l l and choke l ines, and hydraulic conduit supply l i ne complete with terminating goosenecks.

-4-

Page 13: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

. 1

i ) One (1) l o t buoyancy modules for 18-5/8" r i se r manufactured by Emerson & Cunnings tc provide 95X buoyancy, service rated for 3,000' - 4,000' water depth.

j ) Ona (1) set BOP/riser running and handling tools complete with spider and t r o l l e y . , '

4 . Two (2) sets Cameron wellhead running and test ing tools - weight set / r ight hand release - 3 hanger system. Cach set consisting of : K*

a) One (1) J -s lo t temporary d r i l l i n g template running too*. b) One (1) 30" conductor housing hydraul ical ly operated running

too l . c) One (1) 16-3/4" wellhead housing hydraul ical ly operated

running t o o l . d) One (1) wear bushing running tool with 4-1/2" IF box by 4-1/2"

IF box connections. e) One (1) d r i l l pipe hang-off t o o l . f ) One (1) 16-3/4" - 10M weight set test t o o l . g) One (1) 16-3/4" - 10M BOP plug test tool - lands in 16-3/4"

housing; 13-3/8" seal assy; 9-5/8" seal assy; and 7" seal assy.

h) One (1) casing hanger running tool for 13-3/8"; 9-5/8"; and 7".

i ) One (1) seal assembly running/test ing tool for 13-3/8"; 9-5/8"; and 7".

5. One (1) set Vetco wellhead running and handling tools as fol lows:

a) Running Tool - 30" wellhead housing: Cam-actuated tool with 6-5/8" reg. box up x 6-5/8" reg. box down.

b) Running Tool - 16-3/4" wellhead housing: cam-actuated tool with 6-5/8" reg. box up x 6-5/8" reg. box down.

c) Running and re t r i ev ing tool - 16-3/4" seat protector and w«ar bushing: 4 1/2" IF box up and down.

d) Running Tool - Type SG-5 16-3/4" casing hanger: direct drive tool for a l l torque type 16-3/4" SG-5 casing hangers. 4-1/2" API IF box up x 4-1/2" non-upset 8rd tubing box down. In­cludes thread protector.

e) Test Tool - 16-3/4" Type Su-5 casing hanger/wellhead housing: 4-1/2" API IF box up and box down. Includes seal protector.

6. Mult iplex e lectro-hydraul ic BOP contro l system consisting of:

a) One (1) power skid containing 630 gal lon 3,000 psi accumulator capacity, two (2) 30 hp e lec t r i c pumps, two (2) 50:1 ra t io a i r driven pumps, 400 gal lon f l u i d reservoi r , 100 gal lon soluble o i l reservoir wi th automatic metering and alarm system.

b) One (1) d r i l l f l o o r and remote panels with controls for opera­t ion of:

One (1) r i s e r connector. Two (2) annular preventers.

-5-

Page 14: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

c)

d)

8,

9.

10.

Four (4) rams with wedge locks. One J ) BOP connector. Four (4) k m and choke valves. One (1) selector -alve for blue/bellow pods.

e r L ( V a K U W ^ c e m u l I 1 p l W control'system having two (2) pow-X d e p t V 6 6 1 5 W U h e l , e C t M c c o n t ' 0 1 c i l e f o r V K i

S t n ! ' ° f 1 / 2 " a U X 1 1 1 ^ h * d r * u l i c rated water

One (1) Regan KFDS diverter for AQ I ID diverter lines and F * ^ 1 2 " actuated valves 1 5 ( 2 7 5 P S 1 w p ) denote

l l U l V n e u T e ^ " 1 ° ° - 0 0 0 , b ' r , s e r t e " s , ° ^ - U s each „ith 45'

& . t l U l f M P / t S ! " * 7 7 U S e d 1 n s 1 d e riser for reentry

One (1) Sub Sea Systems external TV systan with spare camera.

WILL STRine m moLim rm <

1. Drill pipe consisting of:

d) "f f iw'U ,EU dr<„ pipe tool Joints w i t h 5 " X-hole b) . W ^ ^ ^ ? ' 5 " x"h01e

tool joints. tapered shoulders, 5" X-hole

5 Hrs- w'-r art- CJ? g? EK

2. Drill collars consisting of:

aaas.» - »• «»»« •«*• ' A ^ r f e . ' ^ o ^ s 3 " 1 0 * 3 1' ' 0 n 0 *'» " » « "1th 6-5/8..

o

d)

e)

Page 15: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

c) Twenty-four (24) 6 - l / 2 H 00 x 2-3/4" ID x 31* long spiral d r i l l col lars wi th 4-1/2" IF connections.

d) Fifteen (15) 4-3/4" 00 x 2-1/4" ID x 3 1 ' long spiral d r i l l col lars wi th 3-1/2" IF connections.

3. D H l i ; col lar 11ft nipples consisting d f :

a) Four (4) 8" 00 x 6-5/8" API regula. pin d r i l l co l lar l i f t nipples.

b) Four (4) 6-1/2" OD x 4-1/2" IF pin d r i l l co l lar l i f t nipples. c) rhree (3) 4-3/4" 0D x 3-1/2" IF pin d r i l l co l la r l i f t nipples.

4 . One (1) lot of cross-over and b i t subs for Contractor furnished equipment including:

a) Four (4) 8" OD x 3" ID b i t subs bored for f l oa t 6-5/8" API Reg. connections.

b) Two (2) 8" OD x 3" ID double pin subs with 6-5/8" API Reg. connections.

c) Four (4) 6-1/2" 00 x 2-3/4" ID b i t subs with 4-1/2" IF box up, and 4-1/2" API Reg. box down, bored fo r f l o a t .

d) Four (4) 6-5/8" API Reg. pin x 4-1 /2" IF box X-over subs. e) Five (5) saver subs for 5-1/4" hex ke l l y , 6-3/8" OD x 3" ID

with 4-1/2" IF double pin. f ) Two (2) 8" OD x 3" 10 subs wi th 6-5/8" API Reg. box x 4-1/2"

IF pin. g) One (1) 4-1/2" x 4-1/2" IF double pin subs. h) Three (3) 4-3 /4" OD x 2-1/4" ID b i t subs with 3-1/2" API Reg.

box down x ? - l / 2 " IF box up, bored fo r f l o a t . i ) Two (2) 4-1/2" IF box x 3-1/2" IF pin crossover subs, j ) One (1) 7-5/8" API Reg. pin x 6-5/8" API Reg. box sub. k) Two (2) 7-5/8" API Reg. box x 6-5/8" API Reg. box b i t sub

bored for f l o a t , 10" OD x 8" OD.

5. Two (2) square ke l l ys 6" across f l a t s x 3" ID x 54' long with 6-5/8" APT Reg. 7-3/4" 00 l e f t hand box on top and a 4-1/2" IF 6-3/8" OD r igh t hand box on bottom.

6. One (1) test sub fo r the kel ly and ke l l y cocks.

7. One (1) c i rcu la t ing head 5,000 psi WP with 5" XH pin down and connection for hose (Chiksan).

8. Two (2) Hydril upper ke l l y cock 7-3/4" OD x 2-1/2" ID x 10,000 psi WP wi th 6-5/8" API Reg. l e f t hand pin and box connections.

9. Two (2) Hydril lower ke l l y cock 7-1/2" 00 x 2-1/2" ID x 10,000 psi WP wi th 4-1/2" IF pin and box connections.

10. One (1) Hydril lower ke l l y cock 5-1/8" OD x 1-3/4" ID x 10,000 psi WP wi th 3-1/2" API IF connections.

-7 -

Page 16: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

11 . Two (2) Gray inside BOP 6-3/4" 00 with 4-1/2" IF pin and box connections.

: 12. One (1) Gray inside BOP with 3-1/2" API IF connections.

13. One (1) each Hydril drop-in check valve' for 5" and 3-'*/2" d r i l l pipe complete with check valve and landing sub.

14. Two (2fTIW safety j o i n t s 6-3/8" 00 x 3-1/2" ID wi th 4-1/2" IF pin and box connections.

15. Bumper subs consisting of :

a) Two (2) d r i l l i n g bumper subs 9-1/2" OD. b) Three (3) Baash-Ross type 6SI-PM bumper subs 8" 00 x 3" ID x

60" stroke with 6-5/8" API Reg. connections. c) Three (3) Baash-Ross type 6SI-PM bumper subs 6-1/2" 00 x 2" ID

x 60" stroke with 4-1/2" API IF connections.

Note: Servicing and repair of a l l bumper subs for Operator's account.

16. Hole openers and reamers consisting of :

a) One (1) Security 36" hole opener body, j e t type with 6-5/8" API Reg. box down and pin up and 20" 0D body.

b) One (1) Security 26" hole opener body, regular c i r cu la t ion type with 6-5/8" API Reg. box down and pin up and 6-3/4" 0D body.

c) Two (2) Dr i lco Model 60 three point s t r i ng reamer bodies fo r 12-1/4" hole with 6-5/8" API Reg. connections.

d) Two (2) Dr i lco Model 60 three point s t r i ng reamer bodies for 8-1/2" hole with 4-1/2" API IF connections.

e) One (1) three point b i t reamer body fo r 12-1/4" hole with 6-5/8" API Reg. connections.

f ) One (1) three point b i t reamer body fo r 8-1/2" hole with 4 -1/2" API Reg. connections.

g) Two (2) 18-1/2" A-Z jnder-reamer Model U13M for 12-1/4" p i l o t hole.

Note: Cutter 's and cut ter arms furnished by Operator.

17. Stabi l izers consisting of :

a) Eight (8) blade s tab i l i ze rs 8" 0D x 6-5/8" API Reg. connec­t ions wi th 7-1/2" mandrel fo r 12-1/4" hole.

b) Eight (8) blade s tab i l i ze rs 6-1/2" 00 x 4-1/2" API IF connec­t ions wi th 5-1/2" mandrel f o r 8-1/2" hole.

c) One (1) near b i t s t ab i l i ze r , sleeve type fo r 12-1/4" hole, 8" 00 body with 6-5/8" API reg. connections, bored for f l o a t .

d) One (1) near b i t s t ab i l i ze r , sleeve type fo r 8-1/2" hole, 6-1/2" 0D body with 4-1/2" API reg. box x 4-1/2" API IF box, bored for f l o a t .

- 8 -

Page 17: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

I

Not'e- Repair, redressing and inspection of a l l hole openers, reamers, and s tab i l i zers fo r Operator's account.

18 . Core barrels consist ing of :

a) One (1) Chrlstensen Marine core bar re l , 6-1/4" 00 x 3" ID ) 60» long, wi th 4-1/2" API IF connectipns.

b) One (1) Chrlstensen Marine type core bar re l . 4-1/2" OD : 2-r /8" ID x 60' long with 3-1/2"!API reg. box connection.

Note; Core b i ts and repair and inspection of core barrels fo Operator's account.

19. Necessary 5" x 7-1/4" snap-on d r i l l pipe rubbers fo r Contractor' d r i l l pipe in surface casing.

20. Fou- (4) Wooley rotary tongs for d r i l l pipe.

2 1 . Two (2) Web Wilson rotary tongs for d r i l l co l l a r s .

22. One (1) d r i l l pipe spinning wrench for 5" d r i l l pipe.

23. One (1) lo t manual elevators for Contractor's d r i l l pipe and d r i ' co l lars .

24. One (1) lot a i r operated center latch elevators fo r 5" and 3 -1 / : d r i l l pipe.

25. 0ns (1) l o t a i r operated center latch elevators for 8 " , 6-1/2" a 4-3/4" d r i l 1 co l l a rs .

26. One (1) lo t manual operated side door elevator for 9-1/2" d r i co l lars .

27. One (1) l o t s l i ps for the Contractor's d r i l l pipe and d r i l l co la rs .

28. One (1) lo t safety clamps fo r 9 -1 /2" , 8 " , 6-1/2" and 4-3/4" d r i co l lars .

29. One (1) set each of elevator l inks sizes 2-3/4" x 132" long and 1/2" x 144" long.

30. Two (2) Eastman 6° d r i f t Indicators. One (1) Eastman 12° indi t o r . (Non-d1rect1onal.)

3 1 . Bit breakers fo r fol lowing standard three cone b i t s izes:

1 - 26" b i t breaker 1 - 18-1/2" b i t breaker 1 - 15" b i t breaker

-9-

Page 18: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

1 - 11-3/4" to 12-1/2" b i t breaker 1 - 8-3/8" to 9" b i t breaker 1 - 6" to 6-1/4" b i t breaker

3 - Christensen diamond b i t breakers' for 6-1/4" shank b i t

32. Casing and tubing handling tools consisting of : a) One (1) Lamb Model 20,000 power casing tongs complete with

""heads for 20" , 13-3/8", 9 -5 /8" , 7" casing and hydraulic power uni t .

b) One (1) BJ Hughes power tubing tongs with heads for 3-1/2" tubing.

c) Two (2) Web Wilson rotary tongs for 20" casing.

d) Three (3) each Byron Jackson 500-ton capacity s l i p elevator spiders with s l ip assemblies for 13-3/8", 9-5/8" and 7" casing.

e) Two (2) each manual operated side door elevators for 30" anc 20" casing.

f ) One (1) each Byron Jackson single j o i n t elevators for 13-3/8", 9-5/8" and 7" casing.

g) One (1) set 20" casing s l ips to f i t 49-1/2" rotary.

h) Four (4) each Klampon thread protectors fo r 13-3/8", 9-5/8' and 7" casing.

FISHING TOOLS

1 . One (1) each 11-3/4" , 9-5/8", 8-1/8" and 5-3/4" 00 f u l l strength Series 150 Bowen overshots complete with necessary pack-offs, grap­ples and accessories to catch Contractor furnished d r i l l pipe and co l la rs .

2. One (1) each 11" and 7-7/8" Bowen reverse c i rcu la t ion junk baske with accessories.

3. One (1) each 10-1/2" 00 and 7" 00 Bowen K & 6 f ish ing magnet fo use in 12-1/2" and 8-1/2" 00 hole sizes.

4 . One (1) each 8" 00 and 6-1/2" 00 Bowen, Type "Z" or equivalent oi ja rs with 6-5/8" API Reg. and 4-1/2" IF connections.

5. One (1) each boot basket for 12-1/4" , 8-1/2" and 6" hole.

-10-

Page 19: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

o. One (1) each 8" OD x 20" stroke and 6-1/2" OD x 20" stroke Bowen f i sh ing bumper subs.

7. One (1) taper tap with 4-1/2" IF box connection. One (1) taper tap w i th 3-1/2" IF box connection.

» * Note: Repair and maintenance of Contractor's f ish ing tools for

Operator's account.

F. MUD ANO CEMENTING SYSTEM

1. Two (2) Gardner Denver Model PZ-l l-C t r i p lex mud pumps each driven by two (2) 800 hp LSE DC motors.

2. Two (2) Hydril K-20 5,000 psi discharge dampeners for the mud

3. Two (2) i oomey suction dampeners for the mud pumps.

4. Three (3) Mission Magnum 6 x 8 centr i fugal pumps for mud mixing and mud transferr ing service, each pump driven by an LSE 100 hp AC

5. Two (2) rotary hoses 3" x 75' x 5,000 psi WP ( test ra t ing of 10,000 p s i ) .

6. One (1) mud/gas separator, 36" OD x 12' t a l l with 10-3/4" discharge.

7. One (1) Swaco degasser.

8. One (1) Pioneer S3-12 desander serviced with a 6 x 8 Mission Magnum centr i fugal pump driven by a 100 hp LSE AC motor.

9. One (1) Pioneer T16-4 des i l te r serviced with a 6 x 8 Mission Magnum centr i fugal pump driven by a 100 hp LSE AC motor.

10. One (1) t r i p l e basket Hutchinson-Hayes hinh speed shale shaker. Each basket has two (2) t i e r screening systems each driven by a 3 hp AC motor.

11 . Act ive mud p i t s wi th to ta l capacity of 153.7 cu. metres (967 falls) consist ing of :

pumps.

motor.

No. 1 No. 2 No. 3 No. 4

- 16.89 cu. metres/106 bbls - 21.91 cu. metres/138 bbls - 56.00 cu. metres/352 bbls - 58.90 cu. metres/371 bbls

-11-

Page 20: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

I 1

12. Reserve mud p i t s with to ta l capacity of 232.77 cu. metres (1,464 bbls) consisting of:

; No. 1 - 65.60 cu. metres/412 bbls No. 2 - 75.63 cu. metres/476 bbls

I No. 3; - 56.85 cu. metres/358 bbls, " / Mud mixing - 25.52 cu. metres/160 bbls 1 Chemical - 9.17 cu. metres/58 bbls

tea I

13. One (1) 20 barrel measuring t r i p tank.

14. One (1) set basic mud checking equipment consist ing of mud balance, f i l t e r press, f i l t r a t i o n equipment, and sand content equipment.

15. One (1) choke manifold 10,000 psi WP including two (2) Flocon Products, Inc. manual adjustable chokes and two (2) Cameron remote adjustable chokes.

16. Dual standpipes and standpipe manifo 1^ 5,000 psi WP.

17. One (1) cementing standpipe complete with separate cementing kel ly and Brown Oil Tool Type 1 Combination Plug Dropping Head and Swivel with Flag Sub. (Cementing pump down plugs to be furnished by Operator.)

18. Nine (9) Philadelphia mud p i t ag i ta tors , each driven by 15 hp LSE AC motors.

19. One (1) Phi ladelphia chemical mixer.

20. Four (4) Demco low pressure mud hoppers Model 612-B, three (3) of which are fed by surge tanks.

21 . Storage room for sack chem1cal/mud materials - 6,000 sacks/nominal capacity, 5,000 sacks/unable capacity.

22. One (1) Gantry crane for handling sack materials in mud storage room.

23. Bulk storage (pneumatic) for ba r i t e , bentonite and cement with to ta l capacity of 19,800 cu. f t . and consisting of six (6) 1,650 cu. f t . bulk mud tanks and six (6) 1,650 cu. f t . bulk cement tanks. Two (2) 90 cu. f t . surge tanks for mud mixing and one (1) 220 cu. f t . pressurized cement surge tank.

-12-

Page 21: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

AUXILIARY EQUIPMENT

l i Dynamic posi t ioning and propulsion equipment as fo l lows:

One (1) Honeywell automatic s tc t ion Keeping system for 4,000' j I water. ,

a) Dual RS5 acoustic pos i t ion measurement system. b) ARA-*-acoustic r i ser «ngle ind icator . c) Dual H-316 real time computers. d) Taut wire posit ion measurement system. e) Required Honeywell Marir.o Systems subsea beacons, two (2)

mounted on BOP stack, one (1) mounted on LRP, one (1) expenda­ble beacon to be tethered to sea f l oo r . (Replacement and repair of beacons for Operator's account.)

Five (5) transversely mounted thrusters with 8 feet diameter varia­ble pitch IHC/LIPS propellers driven by constant speed 1750 hp Laurence Scott AC motors.

Two (2) longi tudinal variable p i tch LIPS main propulsion propellers driven by two (2) tandem 1750 hp constant speed Laurence Scott motors.

2. Five (5) SACM Mulhouse engines Type AGO-16 rated 3,400 hp at 1,200 rpm dr iv ing Laurence Scott 2,600 kw 6,600 V a l ternators.

3. Three (3) Laurence Scott 3,000 kw 6,600 V/440 V ship service trans-formers.

4 . Seven (7) L.S.E. thyr is to r panels rated at 1,100 amps. 520 V, X converting AC to DC for d r i l l i n g funct ions.

5. One (1) Harbor generator, 750 kw, 440 V to supply power when main engines are Id le .

6. One (1) emergency generator 150 KVA, 440 V, 1,800 rpm.

7. Deck cranes consist ing of :

a) One (1) Clark Chapman electro-hydraul ic pedestal crane with 100 f t . boom. Rated capacity at 10 meter min radius - 25 tons/at 28 meter max radius - 5 tons.

b) One (1) Clark Chapman 40 ton e lectro-hydraul ic pedestal crane with 100 f t . boom. Rated capacity at 8.3 meter min radius - 40 tons/at 28 meter max radius - 7 tons.

Whip l ine capacity for both cranes - 3 tons up to 30 meter radius.

8. I n i t i a l set of supply boat mooring l ines and cargo transfer hoses (Operator to provide replacements as requi red) . Four (4) Yokohama type boat bumpers.

-13-

Page 22: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

I

9. One (1) lot sl ings fo r onloading and of f loading the d r i l iship.

10. One (1) lo t personnel t ransfer nets and baskets.

11. One (1) well tes t boom, complete wi th piping from burner end of boom to manifold at well test area to connect Operator's furnished burner and well tes t equipment.

12. Four (47 welding machines and equipment.

13. Three (3) 535 SCFM each Ingerso1-Rand LLE3 a i r compressors for 125 psi bulk air system driven by 120 hp LSE motors.

14. One (1) 426 SCFM Atlas Copco BE63 a i r compressor for 40 psi bulk a i r system driven by 75 hp LSE motors,

15. Two (2) Weir MXH d i s t i l l a t i o n units wi th 495 gph capacity used for making potable water only.

16. Normal ships radio and navigation gear to sa t i s f y B r i t i sh OTI regu­la t ions for U.K. f lag vessels including:

a) Marconi Conqueror "SO" 1800 watt main SSB transmit ter with Nebula receiver in long range telephone and telegraph.

b) Harris 100 watt SSB transceiver Type RF-230M with remote uni t in r ig superintendent o f f i ce .

c) Marconi Salvor I I I - emergency t ransmit ter with Nebular receiver - telegraph only - medium range.

d) Sailor T122/R105 medium SSB radio telephone.

e) Marconi Argonaut short range VHF radio telephone with remote uni ts in radio room, bridge and D.P. room.

f ) Pye F30 AM radio fo r hel icopter voice communications.

g) Texas Instruments T12100 Marine FM VHF transceiver.

h) Appelco Clipper marine FM VHF (on br idge) .

i ) Southern Avionics non direct ional hel icopter radio beacon,

j ) Marconi/Koden weather facsimile receiver.

k) Magnivox Model MX 4102 s a t e l l i t e navigation system (SATNAV).

1) Decca Radar, two (2) un i ts .

m) Marisat s a t e l l i t e communication system ( te lex /vo ice) , Sc ient i f i c At lanta Type 3941. (A l l usage/time charges for Operator's account.)

-14-

Page 23: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

17. Necessary l i f e boat, l i f e r a f t s and safety gear to meet USCG and DTI regulations for a d r i l l s h i p including:

1 - enclosed l i feboats located forward (port and starboard) • capable of accommodating 49 persons each.

2 - each open l i feboats located a f t (port and starboard) capa-I ble of accommodating 49 persons each.

8 -W*25 man l i f e ra* ts capable of accommodating 200 persons.

14 - l i febuoys, with l igh ts and smoke f l a re .

98 - l i f e jackets d is t r ibuted throughout accommodation cabins, ( f i t t e d with survival l i g h t s ) .

98 - l i f e jackets d is t r ibuted in four boxes at embarkation posi t ions, ( f i t t e d with survival l i g h t s ) .

98 - survival sui ts d is t r ibuted throughout accommodation cabins.

18. One (1) hel icopter refuel ing system consist ing of one (1) Hamworthy pumping un i t , one (1) main storage tank of approximately 2,000 ga l ­lons and two (2) portable slave tanks of approximately 500 gallons each.

19. Two (2) sewage disposal un i t s .

20. Oil-water co l lec t ion and separating system to meet USCG and IOPP requirements which includes primary and secondary o i l water sepa­ra to rs , required dr ip pans, piping and o i l sluge inc inerator .

2 1 . HjjS and hydrocarbon gas detection and protect ion equipment consis­t ing of :

a) One (1) 8acharach Instrument Co. Model XD500W H2S gas detection and alarm system with readouts at D r i l l e r ' s console and with sensors located at the ce l la r deck, active mud tanks and mud pump room. A central control system is mounts in the Superin­tendent's o f f i c e to i n i t i a t e contingency alarms which are s i t u ­ated throughout the accommodation and various working areas of the vessel.

b) One (1) hydrocarbon gas detection and alarm system with main control uni t in wheel Muse and remote units at the D r i l l e r ' s console and in the engine control room.

c) Various heat, smoke and flame detectors located throughout ves­se l ' s accommodation and working areas.

-15-

Page 24: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

d1) Thirteen (13) , t h i r t y minute self contained breathing appara­tus.

a) Eighteen (18) , f i ve minute breathing escape packs.

f ) Two (2) portable hand held HgS gas detectors and two (2) porta­ble hydrocarbon gas detectors.

(Note: Operator to provide a l l other required H2S detection and protect ion equipment and services as may be required for the d r i l l i n g operation.

H. THIRD PARTY EQUIPMENT

1. One (1) Hal l ibur ton twin skid HT-400 diesel powered cementing unit with rec i rcu la t ing mixer and low pressure mixer (monthly ren ta l ) . Should Operator u t i l i z e a company other than Hal l iburton to operate the Hal l iburton equipment, then the monthly rental shall be for Operator's account. A l l repair costs, parts, e t c . , are for the Operator's account.

-16-

Page 25: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

BEN OCEAN LANCER

Environmental Design

Page 26: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

BEN OCEAN LANCER

ENVIRONMENTAL PES I GfJ

The "Ben Ocean Lancer" has been designed to operate under the fol lowing tem­perature condit ions:

Air:

Gener al: Machinery:

Electrical

DP System:

-15°C to 350C 50°C in machinery spaces -150C to 40°C elsewhere 50°C in machinery spaces 45°C elsewhere •10°C to 26°C in D.P. room (humidity 0 to 90*) -150C to +50°C outside D.P. room

Water:

General: Mach inery: E l e c t r i c a l : O.P. System:

Up to 340C OOC to 340C Up to 32°C

-50C to 5OOC

DP System:

The Dynamic Posit ioning System w i l l c i r c l e of radius 6% of water depth

Surface current: Constant wind speed: Wind gusts: S ign i f icant wave height: S ign i f i can t wave period:

keep the vessel on location within a in the fol lowing condi t ion:

2 knots 45 knots 65 knots 4.9 m. (16 f t . )

12 seconds

During survival condi t ions, the hydrophone s t ru ts should be l i f t e d by one pipe length and set on the handling t o l . The same should be done fo r f i e l d moves at speeds less than 7 knots. Higher speeds require f u l l re t rac t ion of the s t ru t s .

BOP Handling:

Maximum conditions fo r handling the B.O.P. are:

5o single amplitude r o l l : 10 sec. period 2° single amplitude p i t c h : 10 sec. period

Page 27: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

I

Derrick:

Derrick loads were calculated and applied in accordance with the A . P . I , speci f icat ion for steel derr icks.

)pe|-at1ng:

60 m.p.h.: 20:

Wind L i s t 'Roll

(ha l f amplitude) 5° , 10 sec. period: Pitch

(ha l f amplitude) 2 ° , 10 sec. period;

100 m.p.h.

3,° 10°,10 sec. per ,od

4° , 10 sec. period Heave Hook Load Setback

6 f t . 8 sec. period: 12 f t . 8 sec. period 227 tonnes: None 181 tonnes: 181 tonnes

Survival:

Wind Roll (ha l f amplitude) Pi tch (hal f amplitude) Heave Setback

100 m.p.h. 30°, 10 sec. period 3° , 8 sec. period 15 f t . 10 sec. period 181 tonnes.

Substructure:

Substructure is bu i l t to Lloyd's Register "Rules for the Construction and Class i f icat ion of Mobile Offshore Uni ts" .

Operating:

Wind Hee~» Roll Heave Casing Pul1 Setback Riser tensioners

50 m.p.h. 1° 6°, 8 sec. period 3 m. , 8 See. p?riod 400 *onnes 235 tonnes U at 171 tonnes (1 at 103 tonnes (4 at 27 tonnes

Survival:

Wind Heel Roll Pitch Casing Pull Setback Riser tensioners

100 m.p.h. 5-30°, 18 sec. period 70 None 235 tonnes None

Page 28: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

burner Boom:

The burner boon should be retracted to I t s stowed posi t ion when environmental condit ions exceed the fo l lowing:

Wind speed R|olft (half amplitude) Pltfch (half amplitude)

50 m.p.h. 50, 10 sec. period 2° , 10 sec. period

Page 29: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

STANDARD OIL PRODUCTION

SITE CLEARANCE EAST BREAKS 564 (QCS-C-8209), PROPOSED "A" LOCATION

Gulf Coast Division geophysicists conclude that no significant shallow d r i l l i n g hazards exist within 500' of the East Breaks !>64 "A" location (8,500' FNL; 14,650' FLL; W.D.-2,970').

The results and report of a shallow hazard survey conducted by John E. Chance and Associates for Standard Oil Production Company over tract 564 have been reviewed. We are in agreement with their findings and conclude that:

1. No obstructions are observed on the sea floor within 500' of the proposed location.

2. At least the upper 200' of sediment consist of strata that dip to the southwest.

3. Sediments at the sea floor consist of s i l t y clay.

4. No faults or high pressure gas accumulations are observed within the upper 1000' below mud lin e or within 500' of the proposed d r i l l s i t e .

Attachments consist of annotated copies of the pinger and water gun records for lines 18 and 47 of the hazard survey.

Prepared by:

cc: B. Boyce (w/o) J . Golden (w/o) Unit Leader (w/o)

0. Warren (w/attachments) M. Karas (3-w/attachments)

(0012W)

ATTACHMENT B

Page 30: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

STANDARD OIL PRODUCTION

SITE CLEARANCE EAST BREAKS 564 (OCS-C-8209), PROPOSED "B" LOCATION

G u l f Coast D i v i s i o n geophysicists conclude . that no ' i g n i f l e a n t shallow d r i l l i n g hazards e x i s t w i t h i n 500' of the East Breaks 564 "B" l o c a t i o n (7,500' FNL; 11,750' FEL; W.D.-2 ,900 ' ) .

The results and r e p o r t of a shallow hazard survey conducted by John E. Chance and Associates f o r Standard O i l Production Company over t r a c t 564 have been reviewed. We are I n agreement w i t h t h e i r f i nd ings and conclude t h a t :

1. No o b s t r u c t i o n s are observed on the sea f l o o r w i t h i n 500' of the proposed l o c a t i o n .

2. At least the upper 200' of iltnent consist of ho r i zon t a l s t r a t a .

3. Sediments a t the sea f l o o r consis t of s i l t y c l a y .

4. No f a u l t s or high pressure gas accumulations are observed w i t h i n the upper 1000* below mud l i n e or w i t h i n 500' of the proposed d r i l l s i t e .

Attachments cons i s t o f annotated copies of the pinger and water gun records f o r l ines 46 and 48 o f the hazard survey.

Approval

M. Karas

Date

cc : B. Boyce (w/o ) J . Goldet) (w/o ) Unit Leader (w/o )

C. VTarr«*n (w/attachments) A» Karas (3-w/attachments)

(O012W)

ATTACHMENT B

Page 31: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

• 1 • \ I

STANDARD OIL PRODUCTION

d r i l l i n g i hazards exist within 500' of the East Breaks 564 "C" loca len (12,550' FNL; 8,150' FEL; W.D. -2,980*).

The results and report of a shallow hazard survey conducted by John E. Chance and Associates for Standard Oil Production Company over tract 564 have been reviewed. We are In agreement with their findings and conclude that:

1. No obstructions are observed on the sea floor within 500' oi the proposed location.

2. At least the upper 200' of sediment consist of horizontal strata.

3. Sediments at the sea floor consist of s i l t y clay.

4. No faults or high pressure gas accumulations are observed within the upper 1000* below mud l i e n or within 500' of the proposed d r i l l s i t e .

Attachments consist of annotated copies of the pinger and water gun records for lines 25 and 38 of the hazard survey.

Prepared by: M. Karas

Approval: Proj. Mgr.

Date Div. Gecph

E. Golden

cc: B. Boyce (w/o) J. Golden (w/o) Unit Leader (w/o)

C. War.en ^^/attachments) M. isaras -v/attachmen»-.8)

0012W

ATTACHMENT B

Page 32: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

STANDARD OIL PRODUCTION

SITE CLEARANCE EAST BREAKS 564 (OCS-C-8-209), PROPOSED "D" LOCATION

Gulf Coast Division geophysicists conclude that no | s i g n i f i c a n t shallow d r i l l i n g hazards exist within 500* of the East Breads 564 "D" location (15,000' FNL; 5,550' FEL; W.D.-3.010').

The results and report of a shallow hazard survey conducted by John E. Chance and Associates for Standard Oil Production Company over tract 564 have been reviewed. We are in agreement with their findings and conclude that:

1. No obstructions are observed on the sea floor within 500' of the proposed location.

2. At least the upper 200' of sediment consist of horizontal strata.

3. Sedim ts at the sea floor consist of s i l t y clay.

4. No faults or high pressure gas accumulations are observed within the upper 1000' below mud l i n e or within 500' of the proposed d r i l l s i t e .

Attachments consist of annotated copies of the pinger and water gun records for lines 27 and 39 of the hazard survey.

Prepared by:

JL2£ M. Karas

Date

Approval -Proj . Mgr. ( ' C X ^ O A A ^

C. A. Warren

Div. Geoph . ML J\\E. Golden

cc: B. Boyce (w/o) J. Golden (w/o) Unit Leader (w/o)

C. Warren (w/attachments) M. Karas (3-w/attachment3)

(0012^)

ATTACHMENT B

Page 33: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract
Page 34: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

cV— P.T.O.-10.800'

P.T4^-10J00'

S0HJ0-CXX0N OCS-G-8209

i i

P.T-O-ll^OO'

564

1L750' FfL

M A

•.oo* rn.

6F— P.T.O.- 13*00'

5 J S C ro.

XNU! raooo* ATTACHMENT C-2

S TO NO PRO OIL PRODUCTION CO-

I BLOCK 564

— T l

PH0P03CO HELL LOCATIONS

nr. -r. v 4 TT

wnpn jwaft »*aan • wa­ff- trii-anwani E» "^artitBirflapn

Page 35: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

• 1 SOHIO PETROLEUM COMPANY

DRILLING MUD COMPONENTS

Products of- IMCO Services and Sun D r i l l i n g Products are l i s ted in th is program fo i l l us t ra t i on purposes. Equivalent or comparable products are available from other service coftp^nles such as ML Baroid, Magcobar, and Mllchem. •

Composition Purpose Trade Name

IMCO GEL

IMCO SURLIFT

IMCO GELEX

IMCO LOYD

IMCO PLUG

irico ;iENT0R-28

IMCO RD-111

IMCO C-COR

IMCO XO2

IMCO BAR

CAUSTIC SODA

IMCO LIG

SODA ASH

SUN LUBRA-GLIDE

SUN LUBRA-SEAL

Western Bentonite; A natural occuring element containing plates of Si l ica 4 alumina ( Iner t )

Preshaped, wet processed, high density chrysot i le asbestos (a native calcium magnesium s i l i ­cate)

Co-polymer of polyvinyl acetate & maleic anhydride

Pr̂ gelantlnized Starch

Crushed walnut hulls

Mineral 011

r^opr1etary blend containing * d l f led 1ignosulfonates, n id i f i ed l i gn i t e and chroma te

An organic f i lming amine

An Inorganic compound of the b i s u l f i t e family

Mined bar i te (Ground barium sul fate)

Sodium hydroxide

L ign i te , ground & refined

Sodium carbonate

Stirene, dlvlnalbenzene copolymer spheral beads

Mlcronized callulose Fiber cotton seed hairs

Primary wall bu i lJ ing, f i l ­t rate contro l , 4 suspending agent for water based d r i l l i r f l u i d

Viscosi f ier for upperhole f lu ids

Bentonite extender

Fluid loss control

Lost c i rcu la t ion & b i t ba l l i r

Lubricant/Fluid loss control

Thinner and f i l t r a t e control for water base d r i l l i n g f lui<

corrosion inh ib i to r and oxyg< scavenger

Oxygen scavenger

Weighting agent

A lka l in i t y control

Thinner & water loss control

Removing hardness (calcium) from d r i l l i n g f l u i d

Reduces torque v -ag

Improve wall cake

ATTACHMENT E

Page 36: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

Ai r Quality Review For

East Breaks Area ?lock 564 OCS-G-8209 i

Standard 011 Droduct1on Company 3630 Ambassador Caffery Parkway

Lafayette, Louisiana 70503

Submitted To Cary Kerl in

Regulatory Supervisor

June 4, 1986

Prepareu by: John E. Chance S Associates, Inc.

Regulatory and Environmental Division Lafayette, Louisiana Project No. 86-8104

John E. Chance £ Assoc mm i n C m *

ATTACHMENT F

Page 37: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

c Projected Air Emission Schedule for Exploration Project

I . General Information

j Location of Fac i l i t y - East Breaks Area Block 564 Name of Rig/Platform - D r i l l Ship

U / Owner/Operator - Standard 011 Production Company

3639 Ambassador Caffery Parkway »- Lafayette, Louisiana i 70503

Contact Person - Cary Ker l in Regulatory Supervisor

Project Start Date - January 1, 1988 Project End Date - December 20, 1989

46,000 feet to be d r i l l e d 124 miles Offshore

I I . Total Emissions at R1g/Platform, D r i l l i n g (years 1 - 2 )

Allowable Projected Emission Emitted Emissions Emissions Status Substance ( tons/yr) ( tons/yr) (OK/NG)

CO 84546.06 34.77 OK

S0 2 4129.20 1.40 OK

NO 4129.20 222.46 OK

VOC 4129.20 11.85 OK

TSP 4129.20 .13 OK

A. Transportation Emissions, D r i l l i n g

Emitted Crew Supply Substance Boat Boat Helicopter

( tons/yr ) ( tons/yr) ( tons/yr)

CO 15.57 13.34 2.96

S02 * * .09

N0¥ 109.22 93.62 .30

VOC 5.88 5.04 .27

TSP * * .13

John E. Chance & Assoc., Inc.

Page 38: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

Crew boat horsepower of 2500 Port of Sabine Pass, Texas

' Waiting Time 4 hour(s) per trip f 14 Tr1p(s) per Week

| I Supply boat horsepower of 3000 / Port of Sabine Pass, Texas

Waiting Time 10 hour(s) per trip 4 Trfpte) per Week !

Helicopters Port of Sabine Pass, Texas 10 Trip(s) per Week

I I I , Findings of Air Quality Review

As per D0I-MMS regulations this facility is exempt from further air quality review as 1t has been determined that Its operation will not have a significant adverse environmental Impact on air quality.

IV. Factors Used 1n Calculations

A. Emission Factors for Power Generation

Emitted Substance(s)

Drilling (lb/hp-hr)

Production (lb/hp-hr)

CO .004200 .00084

so2 .001900 .00013

N0X .028000 .0031

VOC .000950 .00031

TSP * .00011

Emission Factors for Transportation

Emitted Substance(s)

Helicopters (lb/eng1ne-LT0)

Boats (lb/gal)

CO 5.7000 .0598

so2 .1800

N0X .5700 .4196

VOC .5200 .0226

TSP .250G

— John £ Chance £ Assoc., Inc.

Page 39: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

D r i l l i n g Power Generation 60 hp-hr / f t

! Fuel Consumption .0959 hp-hr / f t by Boats

t . V. Methodology I I

I R1g/Platform - horsepower-hour method Boats - horsepower-hour method* Hallco'pters - landing/takeoff (LT0) ! cycle method

VI. References i

"Atmospheric Emissions from Offshore Oil Development and Production" D r i l l i n g - EPA-450/3-77-026 (June 1977) pp. 81-92.

"Compilation of A1r Pollutant Emission Factors", Boats and Helicopters - EPA Report AP-42 - (August 1977), 3rd e d i t i o n , pp. 116, 125, 1287.

* The EPA does not provide SO^ and TSP emission factors

for boats, nor does 1t provide TSP enrfssloh factors for

d r i l l i n g .

John £ Chance & Assoc*, Inc.

Page 40: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

(SOHIO] SOHIO PETROLEUM COMPANY

October U , 19S5

Mr. Sandridge Texas Distric:

\ - T u j i ' r c r o w '

115 Circle Way Lake Jackson. TX 77566

Dear Mr. Sandndge:

.. ' v -> v " RtCElVcD v \

3 OCT lo 1335 j

I am wr i t ing to request a waiver of side-scan sonar and magnetometer requirements as stated in NTL-83-3 on our deep-water contiguous blocks. East Breaks 563, 564, 607. The water depths across these blocks are 2800-/1200 feet.

The problem with acquiring side-scan sonar and magnetometer data in very deep water is getting the sensor near the ocean f iocr . Although good results can be obtained with the towfish anywhere from 10 percent to 50 percent of the range scale above the seafloor. optimum results occur when the towfish is 10 percent of the range scale above the ocean f loor .

As with any towed submerged device, the depth of the sensor is a function of cable length and speed through the water. ^ n e r a l l y , a cable length-to-depch rat io of 3-4:1 can be expected at tow speeds adequate for successful gathering other high-resolution data required bv N'TL-83-'5. namely seismic and bathymetric data. Our hiph-resoiution contractor has proven electr ical cables of 16,000 feet in lengtn. This would indicate that acquir ing side-scan sonar data in depths of £000-5000 feet is possible under ideai conditions but only at great expense to the operator. I f ocean currents were very mi ld , a 4.000-foot towfish depth could be obtained with 16,000 feet of cable deployed. The line extensions to get f u l l side-scan sonar coverage immediately becomes three miles and boat turns absorb an enormous amount of time. We have to survey f ive blocks to get co -erage in one. If conditions exist that prevent one from getting required depth at conventional speeds, one must then run the survey twice: once at manageable speeds to acquire seismic and bathymetric data, and once at slower speeds to get side-scan sonar data.

Knowledge of the position of the towfish , i . e . , where is data being gathered, is another important question. Ultrashort baseline acoustic tools can be employed, but generally experience ranges no g r e a t e r than 10,000 feet, equalling a f isn depth of 2.500 feet maximum.

ATTACHMENT G

Page 41: (Orig. Sgd.) A. Donald Giroir - data.bsee.gov · 13. One (1) Baylor Elmagco Model PWf4-CL 7838 Eddy current brake. 14. One (1) Byron Jackson 3-arm pipe racking system with block retract

Mr. Sandridge M.MS TE^AS DISTRICT October; U , 1985 Page 2 :

Long I b l s e l i n e acoustic p o s i t i o n i n g systems can be employed where transponders are deployed on the ocean f l o o r . These aevices usua l ' experience ranges equal to or shorter than the u l t r a sho r t baseline posit ioning systems /" therefore numerous transponders would have to be deployed :o survey 3 s i ng l e b lock . These devises are very expensive since an acoustic release must accompany each transponde: Also, surface in t e r roga t ion equipment is expensive and recovery of the t ransponders is less than 100 percent.

A l l in a l l . i t would seem that the p r a c t i c a l depth l i m i t for a c q u i r i n g . i i c k i : 11 •' I l i i i D i KJ <r — SC a : l p 0 i"i u I w j i d i b J J O U i _ . j J i tf v t « ' . i". 4 I • i tf >.. i tf

of expensive a n d exc:ic tools and /o r procedures.

Very t r u l y y o u r s ,

SOHIC PETROLEUM COMPANY

Tim Al lmend inger Acquis i t ion Coord ina tor Gulf Coast D i v i s i o n

TA: sea

APP8QVED BY:̂ ACK c. sAnwih

DISTRICT SUPERVISOR TEXAS DISTRICT rUlf OF MEXICO OCS RE6SGH ftATE: OCT lgjgj

N