    OPTIMIZING ASPHALTMIX DESIGNS

    MIX DEVELOPMENT, AGENCY APPROVAL, MATERIALMANAGEMENT, FIELD ADJUSTMENTS

    Rocky Mountain Asphalt Conference and Equipment ShowFebruary 25, 2010

    1

  • 7/31/2019 Optimizing Asphalt Mix Designs

    2/16

    DEFINE OPTIMIZING

    Whos Perspective

    Producer

    Paving Contractor

    General Contractor

    Owner

    2

  • 7/31/2019 Optimizing Asphalt Mix Designs

    3/16

    MIX DEVELOPMENT

    Project Specifications

    Asphalt Binder Selection

    Recycled Materials Recycled Asphalt Pavement (RAP)

    Recycled Asphalt Shingles (RAS)

    3

  • 7/31/2019 Optimizing Asphalt Mix Designs

    4/16

    MIX DEVELOPMENT

    Aggregate Source / Characteristics

    Aggregate Production Stationary or Mobile Plant

    Hot Mix Asphalt Production Stationary or Mobile Plant

    4

  • 7/31/2019 Optimizing Asphalt Mix Designs

    5/16

    5

    Design Considerations

  • 7/31/2019 Optimizing Asphalt Mix Designs

    6/16

    5

    Design Considerations

    Quality

  • 7/31/2019 Optimizing Asphalt Mix Designs

    7/16

    5

    Design Considerations

    Availability

    Quality

  • 7/31/2019 Optimizing Asphalt Mix Designs

    8/16

    5

    Design Considerations

    Availability

    Quality

    Balance

  • 7/31/2019 Optimizing Asphalt Mix Designs

    9/16

    5

    Design Considerations

    Availability

    Quality

    Balance

  • 7/31/2019 Optimizing Asphalt Mix Designs

    10/16

    5

    Design Considerations

    Availability

    Quality

    Economics

    Balance

  • 7/31/2019 Optimizing Asphalt Mix Designs

    11/16

    AGENCY APPROVAL Conformance to contract requirements

    Selection of JMF Durability considerations

    Appropriate binder content for location

    Strength (stability) considerations

    Avoid fat side of VMA

    6

  • 7/31/2019 Optimizing Asphalt Mix Designs

    12/16

    MATERIAL MANAGEMENT

    Aggregate Quality Control Tests

    Gradation, Specific Gravity, Angularity

    Frequency

    Stockpiling / Handling

    Recycled Product(s) Quality Control Tests

    Asphalt Binder Content, Gradation, Binder Grade

    Frequency

    Stockpiling / Handling

    7

  • 7/31/2019 Optimizing Asphalt Mix Designs

    13/16

    MATERIAL MANAGEMENT

    Asphalt Binder Tests

    Binder Grading AASHTO M320, PG 64-28 add Toughness andTenacity

    Frequency

    Storage and Handling

    Hot Mix Asphalt Production Control Tests

    Gradation, Asphalt Binder Content, Theoretical MaximumSpecific Gravity, % Voids, Calculate % Voids in MineralAggregate

    Frequency

    8

  • 7/31/2019 Optimizing Asphalt Mix Designs

    14/16

    FIELD ADJUSTMENTS

    Typical Production Results versus Laboratory DesignData for the Same Gradation and Asphalt Bindercontent:

    Increased Bulk Specific Gravity of Mixture

    Lower % Voids in Mix

    Lower Calculated % VMA

    9

  • 7/31/2019 Optimizing Asphalt Mix Designs

    15/16

    FIELD ADJUSTMENTS

    Adjusting to Meet Volumetric Targets DuringProduction

    Acceptance Criteria Gradation Acceptance or VoidsAcceptance?

    Analyze Trends

    Binder content in comparison with Rice Binder content in comparison with air voids

    10

  • 7/31/2019 Optimizing Asphalt Mix Designs

    16/16

    FIELD ADJUSTMENTS

    Gradation Acceptance / Voids Acceptance

    Reduce Asphalt Binder Content if %VMA is OK

    Change Gradation For a mix above the Maximum Density Line target the

    Fine Side of the Targets without increasing -#200

    Reject Baghouse Fines if Necessary to Reduce -#200

    Request Target Changes to Asphalt Binder Content andGradation / Request Target Change to Asphalt BinderContent

    11