OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact Program Pipeline Research Council International, Inc. Nov 4 th , 2003

Upload: mariah-lynch

Post on 11-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Joint Direct Assessment WorkshopJoint Direct Assessment Workshop

High Impact Program

Pipeline Research Council International, Inc.

Nov 4th , 2003

Page 2: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Safety of the Public, Employees and the Environment

Reliability for Customers and Suppliers

Cost Minimization While Maintaining Safety and Reliability

Why Technology?Why Technology?

Safety

ReliabilityCost

CONSUMER NEED

INTEGRITY MANAGEMENT

RISK MANAGEMENT

TechnologyValue

TechnologyValue

Operational ExcellenceOperational Excellence

Page 3: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

MembershipMembership

Over Thirty three oil and gas pipeline companies and, organizations El Paso, SoCal Gas, TransCanada Pipelines, Gas de France, GTI,

Chevron-Texaco Pipeline, Chevron Texaco, SaudiAramco, Centerpoint Energy Gas Transmission, TransGas Ltd, Gastransport Services (GASUNIE), Foothills Pipeline, Gassco AS (Statoil), ENRON Transport Services, Panhandle Energy, Williams Gas Pipeline, Gulf South Pipeline, TEPPCO, Enbridge Pipelines, BP, National Fuel Gas Supply, Transco (UK), Dominion Transmission, Duke Energy, AOPL (12 members), Marathon Ashland Pipeline, Buckeye Pipeline, Shell Pipeline, ExxonMobil Pipeline, Colonial Pipeline, Southern Natural Gas Pipeline, GASUM OY, Consumers Energy, Explorer Pipeline, Columbia Gulf Transmission, ConocoPhillips,

Page 4: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Program MagnitudeProgram Magnitude

Subscriptions approximately $5.0 million FERC Collection (2004 is last year) $7.3 million Cash Co-funding (Members & Federal) $3.5 million In-kind co-funding (not well captured)$5.0 million

Total activity for 2003 > $20 million

Page 5: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

PRCI Committees PRCI Committees

• Compressor and Pump Stations• Flexibility, Life Extension & Reliability, Designs to Maintain Compliance

• Corrosion and Inspection • ILI for Mechanical Damage, Cracks, & Geometry, Direct Assessment,

Coatings & Inspection Tools, SCC, MIC• Design Construction and Operations

• Integrity Management, Reliability Based Design, Preventing 3rd Party Damage, Human Factors, Abnormal External Loads, Wrinkles/Wriples

• Materials • Faster Joining, New X100 Steels, Repair & Assessment Tools,

• Measurement• Reliability and Accuracy, Wet Gas Solutions,

• Underground Storage• Cavern Safety, Productivity, & Deliverability

Page 6: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Congress Demands Integrity & ReliabilityTechnology is the Foundation

Congress Demands Integrity & ReliabilityTechnology is the Foundation

Dec 17/02 Pipeline Safety Act – Clock’s Already Started– Update Regulations & Incorporate ANSI Performance Standards

ASME B31Q : Operator Qualification Standard underway ASME B31.8S 2001: Managing System Integrity of Gas Pipelines

– Language Supported by >20 technical reports Direct Assessment: Support @ > $2.5M over three years

– NACE RP0502-2002 External Corrosion DA Standard & Validations– Internal Corrosion Standards & Validations for Dry & Wet Gases– Inspection Tool Validations: CIS, DCVG, NoPig, etc– SCC Standards & Validations

Inline Inspection Standards –expected soon– API 1163 – ILI Systems Qualification Standard – Umbrella for Systems, – ASNDT ILI-PQ-2003 – for People who provide the Analyses, – NACE RP0102 -2002 Standard Recommended Practice ILI Operations

Page 7: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

ASME Causes of Gas Transmission Incidents

0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0

Vandalism

Stress Corrosion Cracking

Malfunction

Prev. Damgd Pipe

Mfr

Constr/Instal

Other Failures

Unknown

Incorrect Operation

Misc

Natural Forces

Internal Corrosion

External Corrosion

Third Party Damage

Non-Pipe

Pipe

Summary of Incident CausesSummary of Incident Causes

Page 8: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Expanding the Tool Box for System IntegrityExpanding the Tool Box for System Integrity

Data Integration is key to Managing Integrity– Overlay Historical Knowledge, Recent Inspections with Digs– Initiated Standardized Definitions and Suggested Relationships

• Demonstrated in PODS, becoming an ANSI Standard

Direct Assessment – Providing Methodologies for External, Internal, CDA, and SCC– Improved, Alternatives and Innovative Inspections– Understanding Limitations, and – Improving Confidence through Validations

Prevention of Mechanical Damage – Best Practices – aim to support ASME B31P– Innovations to Develop Methods and Tools

Page 9: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Expanding & Applying Technology

Solution = Identify + Understand + Control/Prevent

Expanding & Applying Technology

Solution = Identify + Understand + Control/Prevent

Integrity Must Address all 25 Threats in Seven Groups: – Time Dependent, Stable, & Time Independent

Hydro Test “Intended” Failure Confirms Integrity

Pigging Which Threats; What Technology; How Often

Direct Assessment Knowing Where to Dig & Why & How Often

Page 10: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

2003 & 2004 PRCI High Impact NonPiggable Program2003 & 2004 PRCI High Impact NonPiggable Program

DA Validations PRCI CoFund InKind– ECDA +CDA $968K $390K est $1,000K– ICDA $223K $250K est $ 750K

Developing Standards & Methodologies– SCCDA $50K est $250K– ICDA wet $50K est $250K

Understanding Inspection Tools and Assessment Methodologies– Integrity Protocol $97K– D A Protocols $98K

Magnitude $1,486K $640K $2,250K

Page 11: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

2003 & 2004 PRCI DA High Impact Program2003 & 2004 PRCI DA High Impact Program

Non Piggable Tools PRCI CoFunding est InKind– NoPig $235K @ $390K $360K– Guided Wave 1 $200K est$125K $250K– LongRange UT $150K est$150K $200K– Magnetic Telescope $185K est$185K– Fluidized Sensors $150K est$600K (DOE)– Sensors for Crawlers $150K $273K $352K– Magnitude $1,170K $1,723K $1,162K

– Total @ $8.5M $2,656K est$2,363K est$3,412K

Page 12: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

New DA Inspection Tool Development New DA Inspection Tool Development

Specific Tools to consider for DOE/DOT Research Funding:

Corrosion Mapper (MEIS) ($400K –possibly DOT)

Transwave (EUPEC RMS) ($50K – in ECDA field trials)

NoPig ( additional 2004 Trials possibly )

Magnetic Telescope ($900K possibly DOE)

Long Range Ultrasonic Testing ($300K DOT cofunded)

Fluidized Sensors ($750K – 80% DOE)

Multi-service Tool - DA Meter in field test trials

Innovation or “Outside the Box”

Page 13: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

MEIS – Magnetic Electrochemical Impedance Spectroscopy

Coating Disbondment & Corrosion MapperMEIS – Magnetic Electrochemical Impedance Spectroscopy

Coating Disbondment & Corrosion Mapper

Need to find commercialization partner – SoCal and NGA own intellectual property

Possible partners are NoPig or Dynalog

NoPig (service provider)– Currently makes one of two measurements

• Calibration step• Need to add measurement to ground

– Very interested in MEIS • Want to commercialize metal loss first• Concerned about infringements of MEIS on internal IP

Dynalog (equipment manufacturer) – Maker of C-SCAN– Have capability to make multi-frequency magnetometer measurements

Page 14: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

EUPEC RMS (formerly Transwave)EUPEC RMS (formerly Transwave)

Transwave now EUPEC - Remote Monitoring Systems (RMS)– Survey System ATIS

• Equipment redesigned to be more reliable

Technique similar to GRI developed waveform analyzer– Waveform analyzer places specific waveform on pipeline– ATIS uses natural harmonics of 60Hz from impressed CP

Evaluating ATIS system in ECDA tests– CIS type test - El Paso test near Cleveland, TX– Stray current test - Enbridge test in Toronto

No need for DA development at this time– EUPEC RMS interested in Real Time Monitoring development– Directed toward Mechanical Damage Prevention

Page 15: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

NoPigNoPig

Completed first NA field tests – mid July ’03

DOT cofunding contracted @ $390K

Covered in DOT Presentation

Page 16: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Magnetic TelescopeMagnetic Telescope

– Currently addressing deficiencies identified in previous DOE rejection

– Plan to seek DOE funds in next solicitation– Proposal seeks $900K over 2-3 years

• DOE cofunding needed • NGA cofunding possible• PRCI cofunding ~ $100K-$200K

Page 17: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Long Range Ultrasonic TestingLong Range Ultrasonic Testing

– Proposal - Look for SCC either side of the bell hole– Projects are underway with DOT cofunding.

Page 18: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Fluidized SensorsFluidized Sensors

– SwRI proposal • Nano-particles in pipeline to seek humidity

– DOE interested• Want to see task addressing particle size

– Concerned particle size too large– May drop out and settle on bottom of pipe

– March ’03 Cost @ $640K over 2 years• $200K PRCI share

Page 19: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Integrated Multi-Service ToolIntegrated Multi-Service Tool

– Tool to perform some combination of:

• Close Interval Survey

• Current Mapper (PCM/CSCAN)

• DCVG/ACVG

• Soil Resistivity

– Northeast Gas Association has lead in this area

Page 20: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Protocol Development Protocol Development

Work has started on two protocols to guide the committee members in developing individual company standard operating procedures to meet ASME B31.8S, NACE RP0502 & Expected Reg:

Overall Integrity Management Protocol– Kiefner & Associates

External Corrosion Direct Assessment Protocol– Corrpro lead for transmission– Alternatives in AGA/GTI, NGA plus PG&E

Page 21: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

In SummaryIn Summary

PRCI Technology is Key to Operational Excellence Improves the Means to Identify, Understand, and Control Threats

Enables the Flexible Development and Application of the Best Solution for Each Problem in the Operating Environment in Which it Occurs

Drives More Productive, More Responsive, and More Reliable Operations

Returns Investment Value: Value = Improvement and Innovation

Is the Critical Building Block of Sound, Thorough Risk Management – The Foundation of Integrity Management and a Key Component of Operational Excellence

Page 22: OPS Workshop on Direct Assessment Houston, Nov 4, 2003 OPS Workshop on Direct Assessment Houston, Nov 4, 2003 Joint Direct Assessment Workshop High Impact

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

OPS Workshop on Direct Assessment

Houston, Nov 4, 2003

Contact DetailsContact Details

Keith Leewis

703/387-0190 X103

[email protected]

Pipeline Research Council International Inc.

1401 Wilson Blvd., Suite 1101

Arlington VA 22209