opportunities for investment in hydro power
TRANSCRIPT
-
8/7/2019 Opportunities for Investment in Hydro Power
1/31
Anup Kumar Upadhyay
Joint Secretary,
Ministry of Water Resources
Opportunitiesin
Hydropower Investmentin Nepal
NRNs for Socio-Economic Transformation of Nepal- InvestmentOpportunities in Infrastruvture,16th Oct,2007 ,Kathmandu.
To generate electricity at low cost byutilizing the water resources available inthe country.
Tie up electrification with the economic
activities
To develop hydro power as an exportable
commodity.
Objectives:
-
8/7/2019 Opportunities for Investment in Hydro Power
2/31
2017:
2100 MW for Domestic consumption.
50 % Electrification from National Power Grid,
12 % Small Hydro,
3 % Alternative Energy Resources.
Target:
2027:
4000 MW for Domestic consumption.
75% electrification from National Power Grid,
20 % Small Hydro,
5% Alternative Energy Resources.
Target:
-
8/7/2019 Opportunities for Investment in Hydro Power
3/31
Policy:
Implementation of hydropower based on theconcept of Build, Operate, Own andTransfer (BOOT) shall be encouraged.
In view of the concept of bilateral and regional
cooperation and taking into consideration theabundant hydropower generation capacity inthe country, Export of Electricity shall beencouraged.
Policy:
Environmental Provision: Environmentalimpact; Land acquisition, rehabilitation, etc.
Water right: Legal provisions shall be made toprevent adverse effects on the availability of
water or Water right of the projects forwhich license is not required or beingoperated after obtaining the license.
-
8/7/2019 Opportunities for Investment in Hydro Power
4/31
Provision for Investment:
In cases where irrigation benefits may alsobe availed form any storage project, GONmay be a joint venture partner with the privatesector in such project.
Provision relating to Visa:
Non-tourist visa and Work Permit shall beprovided to the investor of hydropowerproject, his/ her authorized representative andnecessary foreign experts, skilled manpowerand their families as provided for in theagreement until the construction andoperation of the project.
-
8/7/2019 Opportunities for Investment in Hydro Power
5/31
Management of investment risk: Hydropower projects, transmission system anddistribution system established by the private sectorshall not be nationalized during the term of thelicense
Exchange facility shall be provided to the foreignperson, firm or company making investment for thepower project to be constructed by the private sectorto repatriatethe amount form Nepal in foreigncurrency at prevailing exchange rate:
a) Amount necessary for repayment of the principal
and interest of the approved loan borrowed in foreigncurrency for the hydropower project.
Management of investment risk:
b) If the electricity has been sold within thecountry, the amount earned as profit or dividendin lieu of the foreign investment,
c) In the case of an export- oriented power
project, all of the payment of principal and theinterest on the loan, profit and dividend may berepatriated in the currency in which the incomehas been received in the Nepal by selling theelectricity.
-
8/7/2019 Opportunities for Investment in Hydro Power
6/31
Management of investment risk:d) The amount received from the sale of the
share of foreign investment as a whole or partthereof may be repatriated in the samecurrency in which the share has been sold.Provided, however, that if the share has beensold in Nepalese currency, foreign currency
exchange facility shall be available only for75% thereof.
Provision on internal electricity market:
Provision on internal electricity market:
For the private sector operated hydropowerprojects with capacity up to one MW and notlinked to the Grid, the IPP may sell anddistribute the electricity by determining thetariff rate of the electricity on its own.
-
8/7/2019 Opportunities for Investment in Hydro Power
7/31
Legal Provisions
Hydropower Development Policy 2001,1992
Electricity Act - 1992 (Regulations - 1993) Water Resources Act - 1992 (Regulations-1993) Environment Protection Act - 1997 (Regulation-1997) Industrial Policy - 1992 Industrial Enterprises Act - 1992 Foreign Investment & One-Window Policy-1992 Foreign Investment and Technology Transfer Act
1992
Department of Electricity Development
Department of Electricity Development (DOED) hasbeen established as One Window for :
Issuance of licenses
Providing concessions & incentives
Assistance in importing goods, obtaining land,
obtaining permits, approvals etc.
-
8/7/2019 Opportunities for Investment in Hydro Power
8/31
APPLICATION PROCEDURES FORPOWER PROJECT DEVELOPMENT
IN
NEPAL
Application process
Hydropower project with Installed Capacityfrom 100 kW 1000 kW
Hydropower project with Installed Capacitymore than 1000 kW
-
8/7/2019 Opportunities for Investment in Hydro Power
9/31
Application Process for Hydropower Projects
with Installed Capacity from 100 kW up to 1000kW
No license required
Need to submit information related to the projectto MOWR through DOED
Submit desk study report,[ topographicmap,area of distribution, number of beneficiary,information of other water use, boundaries of
survey area, recommendation fromVDC/Municipality/;work schedule;LOI for PPA,Financial evidence.]
Steps to be taken by the proponent after
obtaining an approval letter from the DOED:
If the approval letter from the DOED is for surveyonly- submit six monthly progress reportandFeasibility Study Report.
If the approval letter from DOED is forGeneration, Transmission and Distribution, theproponent: Completes survey, submits Feasibility Study to DOED
and starts construction Submits 6- monthly progress reportsuntil construction
complete.
-
8/7/2019 Opportunities for Investment in Hydro Power
10/31
Application Process for
Generation Survey License
License Application Process for HydropowerProjects more than 1000 kW
A. Survey License (to study Generation,transmission, distribution survey of project)
B. Operation License
a. Production License(for construction andoperation of a production facility).
b. Transmission License(for construction andoperation of a transmission)
C. Distribution License(for construction andoperation of a distribution facility)
-
8/7/2019 Opportunities for Investment in Hydro Power
11/31
Supporting documents required toobtain Generation Survey License
Topographical map showing all the majorcomponents of the project (1:25000 or 1:50000);Desk study report as per Guidelines for Study of HPProjects, 2003.
Survey area in longitude and latitude includingrelated VDC / Municipalities.
Estimated cost of project; Work schedule; Financialevidence to support survey activities ; Company-Certificate of registration, Memorandum of
Association, Memorandum of Articles, PermanentAccount Number (PAN);Individual - Citizenshipcertificate.
Supporting documents required toobtain Generation Survey License
Detail of other water uses in the requestedsurvey area like water supply, irrigation, watermill, etc or details of licenses issued by DWRCregarding such uses
Details of in-house technical capability ofapplicant to conduct survey or details oftechnical capability of consultant in caseconsultants to be hired
-
8/7/2019 Opportunities for Investment in Hydro Power
12/31
Application Procedure for Surveylicense
Proponent submits application package toDOED
If the area overlap with other project-DOEDreject the proposal and inform in writing-if notand document is complete DOED forwards thedocument with a license format to MOWR, ( ifdocument incomplete DOED asks Proponent tosubmit required document with in 35 days and) -MOWR issues the license to the proponent
through DOED.
Supporting documents required toobtain license Cont...
a. Feasibility Study Report including: Detaileddescription of the project; Description of relatedtransmission line to evacuate power; ApprovedIEE/EIA Report from concerned Ministry
b. Names of partners in the project and type oftheir association, full name and address of the
person or corporate body and its directors withwhom the ownership of the project shall bevested at last.
-
8/7/2019 Opportunities for Investment in Hydro Power
13/31
Supporting documents required to
obtain license Cont....
c. Detail Financing Plan( Estimated cost of theproject;Financial capability of the investors of theproject; Commitment of the financial institutionsto be involved directly in the project; Percentageof liability of investor; Equity and debt ratio.)
Supporting documents required toobtain license Cont...
d. Power Purchase Agreement (PPA)
e. Other requirements: Certificate of registration,Memorandum of article, Memorandum ofAssociation, Industrial Registration Certificate,PAN ( Permanent Account Number),Details ofin-house technical capability of applicant to
implement construction works or the technicalcapability of contractor/construction company incase contractor/construction company is to behired for construction works.
-
8/7/2019 Opportunities for Investment in Hydro Power
14/31
Application Procedure for Generation,Transmission and Distribution license
Proponent submits application package toDOED-DOED reviews document- if documentadequate and complete-a public notice, statingthe particulars published (for 35 days) invitingcomments from the public-upon consideration ofpublic reactions, the condition that should befollowed by the applicant shall be mentioned inthe license format- DOED review document andforwards the document with a license format to
MOWR, - MOWR issues the license to theproponent through DOED with in 120 days.
Steps to be taken by the proponentafter obtaining License
Starts construction work within 1 year
Completes financial closure within 1 year oflicense issued date
Submits bi-annual progress report untilconstruction is completed
Testing and Commissioning Starts commercial operation
Pay Royalty
-
8/7/2019 Opportunities for Investment in Hydro Power
15/31
His Majesty's Government shall levy a royalty on a corporate body Licensed togenerate more than 1 MW capacity of hydro-electricity on the basis of theinstalled capacity and the energy produced.
ROYALTY
(a) Internal consumption project:
Up to 15 years After 15 years*Electricity Capacity Annual capacity
Royalty, per kWEnergy
Royalty,per kWh
Annual capacityRoyalty, per kW
EnergyRoyalty, per
kW h
1 Up to 1 MW - - - -
2 From 1 MW to 10 MW Rs. 100/- 1.75% Rs. 1000/- 10%
3 From 10 MW to 100 MW Rs. 150/- 1.85% Rs. 1200/- 10%
4 Above 100 MW Rs 200/- 2.00% Rs. 1500/- 10%
5 For captive use Rs. 1500/- - Rs. 3000/- -
(b) Ex po r t -o r iented hy dro po wer pro jec t:
Up to 15 years After 15 years*
Type Annual capaci tyroyal ty, per kW
Energyroyal ty, per
kW h
Annual capaci tyroyal ty, per kW
Energyroyal ty, per
kW h1. Export-oriented run-of-
the-river projectRs. 400/- 7.5% Rs. 1800/- 12%
2. Export-oriented storageproject
Rs. 500/- 10% Rs. 2000/- 15%
* After 15 years from the date of comm ercial operation.
Special Provision:Exemption on energy royalty for the first fifteenyears of the commercial production for the rural
electrification.
-
8/7/2019 Opportunities for Investment in Hydro Power
16/31
NEA Policy On Power Purchasesfrom Small Projects
Project Size Total Capacity to beaccepted
100 Kw to 5 MW No Limit
NEA has fixed the buy-back rate for small projects:
NRs. 4.25 per kWh (Paush,Magh,Falgun,Chaitra)
NRs. 3.00 per kWh
Base year 2055/56, 6% escalation, up to 2060/61.
Transmission line Connectionswith India 33 KV 14 No
132KV 2 No
400KV 3 No*
*Proposed:
Butwal- Anandnagar,Duhabi- Purnia,
Dhalkebar- Muzaffarpur
-
8/7/2019 Opportunities for Investment in Hydro Power
17/31
Survey License Fee
1-5 Mega Watt -50,000 NRs/Year.
5-100 MW -10,000 NRs/MW/Year
100-500 MW -1,000,000 NRs/Year
> 500 MW -2,000,000 NRs/year
Construction License Fee
1-5 M W -100,000 NRs
5-100 MW -500,000 NRs
100-500 MW -1,000,000 NRs
500-1000 MW -2,500,000 NRs
>500 MW -5,000,000 NRs
-
8/7/2019 Opportunities for Investment in Hydro Power
18/31
Projects Inventory
Master Plan Studies
MHSP
NEA
DOED
Identified by Promoters
Survey License Issued
1-5 M W -91
5-20 MW -28
21-100 MW -16>100 MW -13
-------------------------------------
Total 148 No.
Construction License -21 No. Source: DOED, May 2007
-
8/7/2019 Opportunities for Investment in Hydro Power
19/31
Rahughat Khola
LocationType
Installed Capacity
Gross Head
Design Discharge
Weir Height
Power House Type
Desander Type
Tunnel Length & Dia.
Average Annual Energy
Firm Energy
Access Road Length
Transmission LengthProject Cost
Status: Reconnaissance Study 1996
Feasibility Study 1998
:
:
:
:
:
:
:
:
:
::
::
:
Western RegionRun-of-River
27 MW
249 m
13 m3/s
10 m
Surface
Surface
5.8 km & 3.5 m
164.6 GWh
119.6 GWh
10 km
22 km (132 kv)US$ 56.1 million (1998)
Kabeli ALocation
Type
Installed Capacity
Gross Head
Design Discharge
Weir Height
Power House Type
Desander Type
Tunnel Length & Dia.
Average Annual Energy
Firm EnergyAccess Road Length
Transmission Length
Project Cost
Eastern Region
Run-of-River
30 MW
110.2 m
34 m3/s
13 m
Surface
Surface
4.43 km & 4.2 m
164 GWh
118 GWh12 km
77 km (132 kv)
US$ 65.3 million (1998)
Status: Reconnaissance Study 1996
Feasibility Study 1998
:
:
:
:
::
:
:
:
::
:
:
:
-
8/7/2019 Opportunities for Investment in Hydro Power
20/312
Upper Karnali
Location :Type :Installed Capacity :
Gross Head :
Design Discharge :
Weir Height
Power House Type :
Desander Type :
Tunnel Length & Dia. :
Average Annual Energy :
Firm Energy :
Access Road Length :
Transmission Length :
Project Cost :
Mid/Far Western RegionRun-of-River (Pondage)300 MW
141 m
236 m3/s
27 m
Underground
Surface
2.2 km & 11.35 m
1915 GWh
1159 GWh
22 km
215 km (220 kv)
US$ 454.3 million (1998)
Status: Feasibility Study 1998
ChameliyaFar-Western Development
Darchula
Pondage Run-of-River30 MW ( 3x10 MW )
104 m
35.5 m3/s23 m
Surface
Surface4.075 km
4.3 m* 4.3 m
196.83 GWh18.0 km
127 km (132 Kv)
US$ 77.55 million (1998)
LocationRegion :
District :
Type :Installed Capacity :
Gross Head :
Design Discharge :Dam Height :
Desander Type :
Power House Type :
Tunnel Length :
Tunnel Cross SectionAverage Annual Energy :
Access Road Length :
Transmission Length :
Project Cost :`
Status: Feasibility & EIA Study Completed
Detail Design on Going
-
8/7/2019 Opportunities for Investment in Hydro Power
21/312
Budhi Ganga
Far-Western Development
AchhamPondage Run-of-River
20 MW ( 2 x 10 )
90 m
27.63m3/s
25 m
Surface
Surface
5.6 km / (3.9-5.1)m
106.28 GWh
36.139 GWh
44.58 GWh
2.76 km88.6 km (132 kv)
US$ 50.64 million (1995)
Location
Region :District :
Type :
Installed Capacity :
Gross Head :Design Discharge :
Weir Height :
Power House Type :Desander Type :
Tunnel Length & Dia :
Average Annual Energy :
On peak Firm Energy :
Off peak Firm Energy :
Access Road Length :
Transmission Length :
Project Cost :
Status: Feasibility & EIA Study,1998
)
Kabeli-ALocation
Region :
District :
Type :Installed Capacity :
Gross Head :
Design Discharge :Dam Height :
Power House Type :
Desander Type :
Tunnel Length & Dia. :
Average Annual Energy :On peak Firm Energy :
Off peak Firm Energy :
Access Road Length :
Transmission Length :
Project Cost :Status: Feasibility Study and EIA, 1998
Eastern Development
Panchthar and Taplejung
Pondage Run-of-river
30 MW ( 3x10 MW)
110.2 m
34 m3/s
12.6 m
Surface
Surface
4.43 Km/(4.2-5.0)m
164 GWh
54 GWh64 GWh
12.58 km
77 km (132 kv)
US$ 65.3 million (1998)
-
8/7/2019 Opportunities for Investment in Hydro Power
22/312
Likhu-4
Central/Eastern Development
Ramechhap and Okhaldunga
Pondage Run-of-River
51 MW ( 3x17 MW )
240 m
25.5 m3/s
43 m
Surface
Surface
4.5 km /(3.6-4.37)m
275 GWh
36 km
22 km (132 kv)
US$ 75.5 million (1998)
LocationRegion :
District :
Type :
Installed Capacity :
Gross Head :
Design Discharge :
Dam Height :
Power House Type :
Desander Type :
Tunnel Length &Dia :
Average Annual Energy :
Access Road Length :Transmission Length :
Project Cost :
Status: Feasibility and EIA Study,1998
Tamur-Mewa
Eastern Development
Taplejung
Run-of-River
83 MW
110.7 m
85 m3/s
5.0 m
Underground
Surface
4.74 km/(5.4-7.2)m
484 GWh
98.5 GWh
89.7 GWh14 km
132 km (132 kv)
double circuit
US$ 158.3 million (1998)
Location
Region :
District :
Type :
Installed Capacity :
Net Rated Head :
Design Discharge :
Weir Height :
Power House Type :
Desander Type :
Tunnel Length & Dia :
Avg. Annual Energy :
On Peak Firm Energy :
Off Peak Firm Energy :Access Road Length :
Transmission Length :
Project Cost :
(including transmission)
Status: Feasibility & EIA Study, 1998
Tamur MewaEastern Development
Taplejung
Run-of-River
18 MW
132 m
15.4 m3/s
5.0 m
Surface
Surface
4.2 km/(2.75-3.6)m
117 GWh
23.5 GWh
70.1 GWh4.8 km
8 km (132 kv)
single circuit
US$ 33.7 million (1998)
-
8/7/2019 Opportunities for Investment in Hydro Power
23/312
a
Rahughat
Western Development
Myagdi
Pondage Run-of-River
27 MW (3 x 9 MW)
249 m
13.0 m3/s
25 m
Surface
Surface
5.81 km (2.65-3.5)m164.6 GWh
58 GWh
61.6 GWh
10 km22 km (132 kv)
US$ 59.3 million (1998)
Location
Region :District :
Type :Installed Capacity :
Gross Head :
Design Discharge :Dam Height
Power House Type :
Desander Type :
Tunnel Length & Dia :
Average Annual Energy :
On-peak Firm Energy :
Off-peak Firm Energy :Access Road Length :
Transmission Length :
Project Cost :
Status: Feasibility and EIA Study, 1998
Andhi Khola
LocationRegion
District
Type
Installed Capacity
Dam Height
Power House Type
Tunnel Length & Dia.
Average Annual Energy
Access Road Length
Transmission Length
Project Cost
Central/Western Region
Shyanga
Storage
176 MW (4 x 44)
162 m
Surface
3.28 km & 6.3 m
663 GWh
10.5 km
10 km (132 kv)
US$ 463.4 million(1997)
Status: Feasibility and EIA study on going
:
:
:
:
:
:
:
:
:
:
:
-
8/7/2019 Opportunities for Investment in Hydro Power
24/312
Arun III
Eastern DevelopmentSankhuwasabha
Pondage Run-of-River402 MW ( 6 x 67 MW )
303.8 m
320 m3/sec68 m
Underground
Underground
11.5 km/7.5 m
2891 GWh
1558 Gwh
116.8 km432.2 km(220 kv double crt.)
US$ 859.09 million (1995)
Location
Region :District :
Type :
Installed Capacity :
Gross Head :
Design Discharge :
Dam Height :
Power House Type :
Desander Type :
Tunnel Length & Dia. :
Average Annual Energy :
Firm Energy :
Access Road Length :Transmission Length :
Project Cost :
Status: Detailed Design Study, 1991
Dudh KoshiLocation
Region :District :
Type :
Installed Capacity :
Net Rated Head :
Design Discharge :
Dam Height :
Live Storage :Tunnel Length& Dia :
Power House Type :
Average Annual Energy :On Peak Firm Energy :
Off Peak Firm Energy :Access Road Length :
Transmission Length :
Project Cost :
Eastern DevelopmentOkhaldunga, Khotang
Storage
300 MW (5x60 MW)
249.3 m
136 m3/s
180 m
442.1 million cubic metre
13.26 km & (7.3 -9.0) m
Underground1806 GWh
552 GWh
920 GWh43.2 km
93 km (220kv Duble crt.)
135 km (220 kv Single crt.)US$ 690.1 million (1998)
`Status: Feasibility Study, 1998
-
8/7/2019 Opportunities for Investment in Hydro Power
25/312
Upper Arun
Location
Region :
District :
Type :
Installed Capacity :
Net rated Head :
Dam Height :
Design Discharge :
Power House Type :
Tunnel Length & Size :Average Annual Energy :
Access Road Length :Transmission Length :Project Cost :
Eastern Development
Sankhuwasabha
Run-of-River (Daily Pondage)
335 MW ( 4 x 83.75 )
492 m
37 m
78 m3/Sec
Underground
7.84 km & 5.5 m2050 GWh
45 km from Arun-3 damsite200 km (220 kv)US$ 508.8 million (1991)
Status: Feasibility Study, 1991
KankaiLocation
Region
District
Type
Installed CapacityMaximum Head
Rated Head
Design DischargeTunnel Length & Dia.
Average Annual Energy
Access Road LengthTransmission Length
Project Cost
Eastern Development
Ilam, Jhapa
Storage
60 MW
79 m
59 m
121m3/s
0.43 km/4.5 m
200 GWh
3.8 km
15 km
US$ 285 million (1984)
Status: Feasibility Study, 1978
Updated by Edf(France) in 1984
::
:
:
:
:
:
:
:
:
:
:
-
8/7/2019 Opportunities for Investment in Hydro Power
26/312
Central Development
Ramechhap and Dolkha
Pondage Run-of-River
27.2 MW
275 m
11.1 m3/s
14 m
3.9 km
12.0 m2
155 GWh
1.4 km16 km (132 kv)
US$ 93 million
(to be confirmed)
Location
Region :
District :
Type :
Installed Capacity :
Rated Head :Design Discharge :
Dam Height :
Tunnel Length :Tunnel Cross Section :
Average Annual Energy :
Access Road Length :Transmission Length :
Project Cost (Nov. 1999) :
Status: Pre-Feasibility Study, 1997
Khimti-II
Lower Arun
Eastern Development
Sankhuwasabha
Run-of-River (Daily Pondage)
308 MW ( 4x77 MW )
212.2 m
171.5 m3/Sec
10.5 m
Underground
15.2 km / 8.4m
2275.9 GWh1436.5 GWh
25 km from Arun-3 damsite
100 km (220 kv)
US$ 481.4 million (1990)
Location
Region :
District :
Type :
Installed Capacity :
Net Rated Head :
Design discharge :
Weir Height :
Power House Type :
Power Tunnel Length & Dia :
Average Annual Energy :Firm Energy :
Access Road Length :
Transmission Length :
Project Cost :
Status: Pre-Feasibility Study, 1990
-
8/7/2019 Opportunities for Investment in Hydro Power
27/312
Kali Gandaki-2
Western Region
Nawalparsi and Tanahu
Storage
660 MW (6 x 110 MW)
128.3 m
585 m3/Sec
177 m
Surface
322 m /6 m3470 GWh
20 km40 km (220 kv)US$ 772 million (1985)
LocationRegion :
District :
Type :
Installed Capacity :
Net Rated Head :
Design Discharge :
Dam Height :
Power House Type :
Tunnel Length & Dia :
Average Annual Energy :
Access Road Length :Transmission Length :
Project Cost :
Status: Pre-Feasibility Study, 1985
Budhi Gandaki
Central/Western Development
Dhadhing/Gorkha
Storage600 MW ( 4 x150 MW )
185 m
430 m3/s225 m
2755 million cubic meter
Rockfill with inclined core
Underground
276 m /12m2495 GWh
2.5 km
65 km (220 kv)
US$ 774 million (1983)
LocationRegion :
District :
Type :Installed Capacity :
Net Head :
Design Discharge :Dam Height :
Live storage :
Dam Type :
Power House Type :
Tunnel Length & Dia :Average Annual Energy :
Access Road Length :
Transmission Length :
Project Cost :
Status: Pre-Feasibility Study, 1984
-
8/7/2019 Opportunities for Investment in Hydro Power
28/312
Upper Trisuli -2
Central DevelopmentRasuwa
Run-Of-River300 MW
298 m
119.7 m3/Sec13 m
Underground
Underground
8.2 km /8.6m
1747 Gwh
1391 Gwh
10 km50 Km (132kv)
US$ 271 million (1996)
Location
Region :District :
Type :Installed Capacity :
Gross Head :
Design Discharge :Dam/weir Height
Power House Type :
Desander Type :
Tunnel Length & Dia :
Average Annual Energy :
Firm Energy :
Access Road Length :Transmission Length :
Project Cost :
Status: Reconnaissance, 1996
Mai Loop
Eastern DevelpomentIlam
Storage
60 MW
104 m
68.8 m3/s
125 m
Surface
0.6 km/6.4 m
255 Gwh
110 Gwh13 km
35 km (132 kv)
US$ 149 million (1996)
Location
Region :
District :
Type :
Installed Capacity :
Gross Head :
Design Discharge :
Dam/Weir Height
Power House Type :
Tunnel Length & Dia :
Average Annual Energy :
Firm Energy :Access Road Length :
Transmission Length :Project Cost :
Status: Reconnaissance, 1996
-
8/7/2019 Opportunities for Investment in Hydro Power
29/312
Tama Koshi-2
Central Development
Dolkha
Run-Of-River (Regulated)
207 MW
141 m
174.6 m3/S
Underground
9.5 km/9.6 m
938 Gwh450 Gwh
1 km85 km(132kv)US$ 169 million (1996)
Location
Region :
District :
Type :
Installed Capacity :
Gross Head :
Design Discharge :
Power House Type :
Tunnel Length & Dia :
Average Annual Energy :Firm Energy :
Access Road Length :Transmission Length :Project Cost :
Status: Reconnaissance, 1996
Upper Marsyangdi-3
Western Development
Lamjung
ROR121 MW
244 m
59 m3/Sec6 m
Underground
Underground
6.2 km/6.3 m
692.6 Gwh549.4 Gwh
26 km
57 km
US$ 110 million (1996)
LocationRegion :
District :
Type :Installed Capacity :
Gross Head :
Design Discharge :Dam/Weir Height :
Power House Type :
Desander Type :
Tunnel Length & Dia :
Average Annual Energy :Firm Energy :
Access Road Length :
Transmission Length :
Project Cost :
Status: Reconnaissance 1996
-
8/7/2019 Opportunities for Investment in Hydro Power
30/313
Tila River -2
Mid WesternKalikot
ROR203 MW
500 m
48.3 m3/s14 m
Underground
Underground
6.6 km/6 m
950 Gwh
536 Gwh
75 km100 km (220 kv)
US$ 161 million (1996)
Location
Region :District :
Type :Installed Capacity :
Gross Head :
Design Discharge :Dam/Weir Height
Power House Type :
Desander Type :
Tunnel Length & Dia :
Average Annual Energy :
Firm Energy :
Access Road Length :Transmission Length :
Project Cost :
Status: Desk Study, 1996
Naumare
Mid Western Development
Argakhachi/ Pyuthan
Storage
245 MW (3*81.7 MW)
154.5 m
185.6 m3/s
190 m
Rockfill
580 million cubic metre
0.125 km/7 m932 Gwh
604 Gwh
18 km
US$ 419.9 million (1990)
Location
Region :
District :
Type :
Installed Capacity :
Net Head :
Design Discharge :
Dam/Weir Height
Dam :
Live Storage :
Tunnel Length & Dia :Average Annual Energy :
Firm Energy :
Access Road Length :
Project Cost :
Status: Pre-feasibility Study, 1990
-
8/7/2019 Opportunities for Investment in Hydro Power
31/31
Tama Koshi-3
Location
Region
District
Type
Installed Capacity
Gross Head
Design Discharge
Dam Height
Power House Type
Tunnel Length & Dia.Average Annual Energy
Firm EnergyAccess Road LengthTransmission Length
Project Cost
Central Development
Dolkha
Storage
309 MW
208 m
164.3 m3/s
120 m
Underground
9.4 km & 9.6 m1324 GWh
631 GWh6 km95 km (220 kv)
US$ 414million (1996)
:
:
:
:
:
:
:
:
:
:
::
:
: