PROJECT ON AMUSEMENT PARK

OPM PROJECTTERM – II

AUGUST 2009

BY RAVI AGARWALROLL NO. 19EPGDM – 4

Page 2: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 2/11

PROJECT ON AMUSEMENT PARK 

GLOBSYN BUSINESS SCHOOL

1. PRODUCT -  AMUSEMENT PARK

Amusement park is the generic term for a collection of rides  and other  entertainment 

attractions assembled for the purpose of entertaining a large group of people. Anamusement park is more elaborate than a simple city park or playground, usually providing

attractions meant to cater to children, teenagers, and adults.

Amusement parks evolved in Europe from fairs and pleasure gardens which were created

for people’s recreation. The oldest amusement park of the world (opened 1583) is Bakken, at

Klampenborg, north of Copenhagen, Denmark. In the United States, world's fairs and

expositions were another influence on development of the amusement park industry.

2. PROCESS/STEPS

Following are the necessary steps required to build a New Amusement Park;

• Feasibility study is the first step in building a new amusement park.

• The study provides market and financial analysis and projections

• Financial Closures of the required fund by Banks or Investors.

• Finalization of the Layout

• Completion of site survey, design of plant buildings, auxiliary & ancillary buildings,

mechanical utilities, electrical services and system.

• Planning for enabling works, like construction waterlines, power lines and sewerage,

office, labour camp; go down, communication facility etc.

• Approach Road

• Order for Machinery and Rides

• Water supply arrangements.

• Trial Run and Commissioning

RAVI AGARWAL, EPGDM 4 2

Page 3: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 3/11

PROJECT ON AMUSEMENT PARK 

3. LOCATION: SILIGURI, WEST BENGAL

The chosen location for the Amusement Park is Siliguri, West Bengal which is considered to

be ideal and quite suitable.

Map showing location of Siliguri

 Why Siliguri?

Siliguri is a city in the  Indian  state of  West Bengal. It is advantageously connected with

Sikkim, Bhutan, Nepal and Bangladesh. Siliguri is strategically located in the Chicken's 

Neck — a narrow strip of land linking India to its north eastern states. It is also the transit

point for air, road and rail traffic to Nepal, Bhutan and Bangladesh. The town hosts over 40

Lakh domestic and 2 Lakh foreign visitors annually. Siliguri is situated in Darjeeling district, 

and though it is the district's largest city, the district headquarters is Darjeeling.

• Geography Advantages: It is the largest town in the area and connects the hill station 

towns of Gangtok, Kalimpong and  Darjeeling with the rest of India. The climate ofSiliguri is temperate in nature. Summers are not very hot and a temperature normally

does not exceed 35°C. During this season, tourists from all over India stop in Siliguri.

Winters are cool and temperatures range from a high of 15°C to a low of about 10°C.

• Transport: Local public Transport includes buses, cycle rickshaws and tempos. Two

railway stations Siliguri and New Jalpaiguri which connect the town to the north

RAVI AGARWAL, EPGDM 4 3

Page 4: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 4/11

PROJECT ON AMUSEMENT PARK 

eastern. Bagdogra airport, situated about 15 kilometres. The Siliguri Central Bus stop is a

major stop in the region. Bhutan also operates buses from Siliguri to the Bhutanese

capital Thimphu. Direct road connection to Bhutan and Nepal and other North- Eastern

states has prompted Siliguri to become a buzzing modern international trade centre.

National Highway (NH-31), connecting Siliguri to Kolkata and Assam.

Hill cart road- connecting the hills, which comprise the tourist centers of West Bengal and

Sikkim.

State Highway (SH) 12A linking Siliguri to Jalpaiguri.

• Population: Siliguri has consistently shown a high rate of population growth. In 1991,

Siliguri Municipal Corporation area had a population of 0.37 million, while the

population of the Siliguri Urban area was 0.47 million. Advantageous location of Siliguri

made it an ideal center of trade, commerce & transit tourist traffic. As Siliguri lies on the

traditional trade route to Sikkim, Nepal, Bhutan and Tibet, even in its initial period of

growth, it attracted people from its vast hinterland stretching as far as Bihar, eastern

fringes of Uttar Pradesh and Assam. As a result Siliguri has acquired a cosmopolitan

character. Present population of Siliguri is more than 0.60 million.

• Infrastructure: The city roads are being developed, upgraded and strengthened to

improve and ease connectivity within the city and the region. A new township near is

being proposed in this location. Based on the upcoming economic opportunities, the

State Government has proposed for the development of Bagdogra Airport into an

‘International Airport’.

• Keeping the dilemma of today’s lifestyle in mind, proposing a space in the heart of the

city, where people from all the walks of life can spend quality time with the entire

family leaving behind all tensions and worries. This place is also going to be a pause

point for travelers who are moving towards hills and northeast, a place with exciting

and alluring range of activities, where people of all ages will find something or more tomeet their interests, idea of having fun, relaxing, all at one place.

Looking at the above unique advantages and backed up by the tourist projections it may be

observed that there is a convergence of need gap and expectations of the quality

entertainment center and facilities and the proposed products, services and the offerings.

RAVI AGARWAL, EPGDM 4 4

Page 5: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 5/11

PROJECT ON AMUSEMENT PARK 

4. PROPOSED LAYOUT

The concept:

It is proposed to create a “Water and Amusement park with Indian and Western Heritage

multiple activities”, which besides being a city feature by itself; will give complete

entertainment with proposed food and passive recreational activities…a solution to

today’s urban lifestyle.

It is proposed to have a range of activities that will enhance the ambience, bringing them all

at one place and to make the Park as only of its kind in the Region. Here cultural,

amusement and shopping activities are well blend together with multi cuisine food joints,

keeping in mind the complementary nature of these activities. We would like to classify the

activities broadly under the following heads,

Parking and entrance plaza

Central plaza

Water park and Amusement zone

Kids city

Party lawn

River edge

Service and miscellaneous activities

ZONING AND ACTIVITY FLOW PLAN LAYOUT

RAVI AGARWAL, EPGDM 4 5

Central

Plaza

 Water ParkAmusement

Park

Miscel laneou s

Act ivities

Kids

City

Entrance

Page 6: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 6/11

PROJECT ON AMUSEMENT PARK 

The major activities of the site are the Central plaza, Water Park and Amusement Park,

which occupy major portion of the site. The rest of the activities are secondary and

complementary.

PARKING AND ENTRANCE PLAZA:

PARKING ENTRANCE PLAZA

A large stretch of band is reserved forthis purpose abutting the site entrance.The dry activity of parking has beenadded a life by the virtue of shadegiving trees. The in between pocketsare provided with greenery and the in-situ seating for drivers.

The entrance plaza, which is centrallylocated, is the welcoming portion of thesite. As one enters the main buildingthe ticketing counter and theinformation desk are the prominentfeatures placed on either sides of theplaza.

CENTRAL PLAZA:

The entrance plaza opens into the central plaza. Thus, the central plaza as the name suggests

forms the center of all the activities and also the pedestrian traffic is diverted in different

directions through this plaza.

• Atrium

• Administration and changing rooms

• Product launching area

• Restaurant

Outdoor Restaurant area• Services block for Restaurant

• Indoor kids video games

• Other Entertainment activities

 WATER PARK AND AMUSEMNT ZONE:

The water park with all the activities are in a natural set up provides for all water related

RAVI AGARWAL, EPGDM 4 6

Page 7: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 7/11

PROJECT ON AMUSEMENT PARK 

activities but flows through the entire campus in some way or the other visually connected

to different space. Following are the facilities:

Lazy River Wave Pool Family Pool

 

 Water Rides

 Thrill & Family Rides

TRADITIONAL ACTIVITY NOOKS

• Mehendi

• Bangle maker

• Embroidery and terracotta work

• Fortune teller

• Puppet show / Story telling

Tattoo marking• Magician

• Photo point

FOOD COURT

In between the Water Park and Amusement Zone is the food court, which is adjacent to the

RAVI AGARWAL, EPGDM 4 7

Page 8: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 8/11

PROJECT ON AMUSEMENT PARK 

river edge. The informal restaurant will serve a number of cuisines. The food court with

different types of food stalls in form of self sufficient and autonomous cubicles serving fast

food and snacks.

KIDS ZONE

This area is placed near the main party lawn area and is basically reserved for all the kid’s

birthday parties, which are arranged in the outdoor area. This contains a small stage also for

performance and a place for buffet arrangement and inflated toys.

 Facilities at Kids Zone

PARTY LAWN

A party lawn with stage and buffet arrangement, all food facilities and state of art

equipments is proposed for marriage parties and similar events. The river is the most

inevitable and prominent part of the site and can be developed easily by paving and

plantation. Also at certain intermediate levels the benches are placed.

 

SERVICES AND MISCELLANEOUS ACTIVITIES:

These are the activities and the allied services, which are essential for the smooth

functioning of the campus.

• Ticket counters

• Store room

• First aid room

• Generator/ Transformer room

• Various Filtration rooms / tanks

• Workshop area

5. CAPACITY PLANNING

Park Capacity:

RAVI AGARWAL, EPGDM 4 8

Page 9: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 9/11

PROJECT ON AMUSEMENT PARK 

The estimated capacity or footfall for the park is estimated as follows at 4500 visitors per

day. The Park is expected to remain open for 350 working days in a year. The total number

of visitors during a year based on computation of rainy days, vacations and Sundays come

to 558500.

ENTRY FOR VISITORS DAYS VISITORS/DAY TOTAL

SUNDAYS 52 3,500 182,000

SATURDAYS 52 2,500 130,000

GOVT/BANK HOLIDAYS 27 2,500 67,500

VACATION DAYS 45 2,500 112,500

AVERAGE DAYS 104 500 52,000

EXAM. DAYS 40 250 10,000

RAIN/ DRY DAYS 45 100 4,500

TOTAL FOR THE YEAR 558,500

Average no of visitors per day 1,530

6. PRODUCTION AND OPERATION PLANNING

Year % Capacity Utilization

1st year 60%2nd year 70%3rd year 80%

4th year 80%5th year 90%

Demand Analysis

Target segment for the Park: The primary target segment will comprise the following:

• Families who are permanent residents of the city of Siliguri

• Families in hill townships like Gangtok, Darjeeling, Kurseong and Kalimpong

• Families in other townships in North Bengal and Eastern Bihar liker Jalpaiguri,Coochbehar, Alipurduar, Kishanganj etc.

• School students on conducted tour through school in and around Siliguri

• Tourists• Corporate Seminars

• Individual celebration events like Birth days, Marriages etc.

• Movie/Serial/Television Software makers

7. QAUALITY REQUIREMENT

RAVI AGARWAL, EPGDM 4 9

Page 10: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 10/11

PROJECT ON AMUSEMENT PARK 

The nature of consumer tastes and preferences is changing. A number of trends have

emerged that influence tourist lifestyles, and leisure and tourism choices –

• Focus on increasing personal needs;

• More active travel participation;

More emphasis on educational experience of leisure;• Increasing need for pleasure and food at one place

• Variety in entertainment in one place

At present there are a fewer number of amusement parks both in big and as well as small

cities. But the demand is immense therefore, to cater to this outgrowing demand; there is

imperative need for setting up more number of amusement parks.

8. QUALITY ASSURANCE AND CONTROL PLAN

Quality control (QC) is a procedure or set of procedures intended to ensure that a manufactured

product or performed service adheres to a defined set of quality criteria or meets the

requirements of the client or customer. QC is similar to, but not identical with, quality assurance 

(QA). QA is defined as a procedure or set of procedures intended to ensure that a product or

service under development (before work is complete, as opposed to afterwards) meets specified

requirements. QA is sometimes expressed together with QC as a single expression, quality

assurance and control (QA/QC).

Quality Planning is a critical part of any project. It enables to agree a set of quality targets withthe customer. It then helps to monitor and control the level of quality produced by the project;

ensure to meet the quality targets set.

Quality Plan to set quality targets by:

Identify Standards and Guidelines

Evaluate Requirements Analysis Process

Feasibility Study

Identifying the customers’ requirements

Listing the services deliverables to the customers

RAVI AGARWAL, EPGDM 4 10

Page 11: Opm Project Amusement Prk

8/14/2019 Opm Project Amusement Prk

http://slidepdf.com/reader/full/opm-project-amusement-prk 11/11

PROJECT ON AMUSEMENT PARK 

Setting quality criteria for these services

Defining quality standards for the services.

RAVI AGARWAL, EPGDM 4 11