operator’s manual service/documentation first...v2000 operator’s manual (fanuc) part no:...

154
Machine Type: V2000 Machine Number: Approve: 確認者 Drawn Approve Date Edition Note 張秀萍 林明宏 陳富吉 25,Jun.2009 A01 V2000 OPERATOR’S MANUAL (FANUC) Part No: V2000-7713-100 LONG CHANG MACHINERY CO., LTD No.52 Charn An East Road, Taiping Taichung, Taiwan Tel: +886 4 2392 1001 Fax: +886 4 2392 1037 [email protected] www.first.com.tw O O P P E E R R A A T T O O R R S S M M A A N N U U A A L L V V 2 2 0 0 0 0 0 0 FANUC

Upload: others

Post on 07-Feb-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

  • Machine Type:

    V2000 Machine Number:

    機 號

    Approve:

    確認者

    Drawn Approve Date Edition Note

    張秀萍 林明宏

    陳富吉 25,Jun.2009 A01

    V2000 OPERATOR’S MANUAL (FANUC)

    Part No: V2000-7713-100

    LONG CHANG MACHINERY CO., LTD No.52 Charn An East Road, Taiping

    Taichung, Taiwan Tel: +886 4 2392 1001

    Fax: +886 4 2392 1037 [email protected]

    www.first.com.tw

    OOPPEERRAATTOORR’’SS MMAANNUUAALLVV 22000000 FANUC

  • CONTENTS: PAGE 2 / 5

    V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC

    CONTEN 1. SAFEYTY INTRODUCTION ............................................................................................ 1 

    1.1 FOREWORD ..................................................................................................................... 1 1.2 USING RESTRICTION ...................................................................................................... 2 

    1.2.1 THE FORESEEN USE OF THE MACHINE ........................................................................................ 2 1.2.2 THE FORESEEN OTHER REASONABLE USE OF THE MACHINE ................................................. 2 1.2.3 THE FORESEEN UNREASONABLE USE OF THE MACHINE .......................................................... 2 

    1.3 SAFETY INSTRUCTIONS ................................................................................................. 3 1.3.1 REACTION WITH EMERGENCY SITUATION: .................................................................................. 3 1.3.2 SETTING UP THE MACHINE AND POWER ...................................................................................... 3 1.3.3 WHEN OPERATING ........................................................................................................................... 4 1.3.4 LUBRICATION, AIR AND COOLANT ................................................................................................. 6 1.3.5 HEALTHY AND SAFETY PROTECTION ........................................................................................... 7 1.3.6 MAINTENANCE AND CHECK ............................................................................................................ 7 1.3.7 RESCUE THE PERSON WHO TRAPPED INTO MACHINE .............................................................. 8 

    1.4 WARNING LABEL AND POSITION .................................................................................. 9 1.5 OPERATION AREA ......................................................................................................... 18 1.6 DISPOSE OF WASTE ..................................................................................................... 19 1.7 OTHER NOTICES ........................................................................................................... 20 

    2. GENERAL INFORMATION ........................................................................................... 21 2.1 GENERAL DESCRIPTION OF THE MACHINE .............................................................. 21 2.2 DETAILS OF PRINCIPAL COMPONENT ....................................................................... 23 

    2.2.1 SPINDLE HEAD ............................................................................................................................... 23 2.2.2 COLUMN .......................................................................................................................................... 23 2.2.3 BED .................................................................................................................................................. 23 2.2.4 TABLE .............................................................................................................................................. 23 2.2.5 ATC (AUTOMATIC TOOL CHANGER)............................................................................................. 23 2.2.6 OPERATION PANEL ........................................................................................................................ 23 2.2.7 NC SYSTEM ..................................................................................................................................... 24 2.2.8 ELECTRIC CABINET ....................................................................................................................... 24 2.2.9 PNEUMATIC UNIT ........................................................................................................................... 24 

    2.3 MACHINE SPECIFICATIONS ......................................................................................... 25 2.4 MACHINING AREA ......................................................................................................... 28 2.5 TOOL SHANK AND STUD .............................................................................................. 30 

    3. TRANSFER AND INSTALLATION OF MACHINE ....................................................... 35 3.1 HANGING OF MACHINE ................................................................................................ 35 3.2 REFERANCE DIMENTIONS FOR HANGING ................................................................ 37 3.3 MACHINE TRANSPORT BY FORK LIFT ........................................................................ 38 3.4 HANGING OF PARTS AND ACCESSORIES ................................................................. 39 

    3.4.1 FRONT COOLANT TANK ................................................................................................................. 39 3.4.2 SIDE COOLANT TANK..................................................................................................................... 40 3.4.3 CHIP CONVEY ................................................................................................................................. 41 3.4.4 COOLANT SYSTEM ......................................................................................................................... 42 3.4.5 OTHER ACCESSORIES .................................................................................................................. 42 

    3.5 INSTALLATION SPACE .................................................................................................. 43 3.6 INSTALLATION ............................................................................................................... 45 

    3.6.1 FOUNDATION .................................................................................................................................. 45 3.6.2 INSTALLATION ................................................................................................................................ 45 

    3.7 INSTALLATION ENVIRONMENT ................................................................................... 47 4. ASSEMBLY PROCEDURE AND TEST RUN ............................................................... 48 

    4.1 CLEANING OF MACHINE ............................................................................................... 49 4.2 REMOVAL OF LOCKING DEVICES ............................................................................... 49 4.3 LUBRICATION AND AIR PIPING .................................................................................... 52 

  • CONTENTS: PAGE 3 / 5

    V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC

    4.3.1 LUBRICATION .................................................................................................................................. 52 4.3.2 AIR PIPING ....................................................................................................................................... 53 

    4.4 SWITCHING ON THE POWER SOURCE AND CHECKING .......................................... 54 4.4.1 WIRING CABLE AND PLACE SEE FIG 4.4.1 .................................................................................. 54 4.4.2 TO CONNECT THE POWER CABLE ............................................................................................... 54 

    4.5 TAKE OFF SPINDLE HEAD SUPPORT DEVICE ........................................................... 57 4.5.1 OPERATE IN DOOR OPEN STATUS WITH NON CE DOOR INTERLOCK SWITCH (OPTION) .... 57 4.5.2 OPERATE IN DOOR OPEN STATUS WITH CE DOOR INTERLOCK SWITCH (OPTION) ............. 57 4.5.3 PROCEDURE TO TAKE OFF .......................................................................................................... 58 4.5.4 MOVE AXIS TO REFERENCE POINT ............................................................................................. 58 

    4.6 MACHINE LEVELING SET UP ....................................................................................... 60 4.6.1 PROCEDURE TO SET UP MACHINE LEVEL ................................................................................. 60 4.6.2 CIRCULAR AND RIGHT ANGLE ACCURACY CHECK ................................................................... 61 

    4.7 SETTING UP OF OTHER EQUIPMENT AND ACCESSORIES ..................................... 62 4.8 ASSEMBLE OF PARTS AND DEVICEDS ...................................................................... 63 

    FIG. 4.7.1 ASSEMBLE OF PARTS AND DEVICES .................................................................................. 63 4.8.1 MOTORS .......................................................................................................................................... 66 4.8.2 .CABLE CHAIN ................................................................................................................................. 67 4.8.3 SIDE COOLANT TANK AND MOTORS ........................................................................................... 68 4.8.4 FRONT COOLANT TANK ................................................................................................................. 69 4.8.5 CHIP CONVEYOR (OPTION) ........................................................................................................... 70 4.8.6 SPINDLE CHILLER .......................................................................................................................... 71 4.8.7 EXHAUST (VACUUM) SYSTEM (OPTION) ..................................................................................... 72 4.8.8 OTHER OPTIONS ............................................................................................................................ 73 

    4.9 DEVICE PIPING INSTRUCTION .................................................................................... 74 4.9.1 PAPER FILTER CART & COOLANT TANK 20BAR ......................................................................... 74 4.9.2 POWER CONNECTOR ON ELECTRIC CABINET ........................................................................... 75 

    4.10 COOLANT ..................................................................................................................... 76 4.10.1 QUANTITY OF COOLANT ............................................................................................................. 76 4.10.2 TYPE OF COOLANT ...................................................................................................................... 76 4.10.3 SAFETY NOTICE ........................................................................................................................... 76 

    5. OPERATION OF MACHINE .......................................................................................... 77 5.1 SWITCHING ON THE POWER SOURCE TO MACHINE ............................................... 77 

    5.1.1 APPLY THE POWER SOURCE TO THE MACHINE ITSELF AS FOLLOWS: ................................. 77 5.1.2 MOVE AXIS TO REFERENCE POINT (MANUALLY) ...................................................................... 77 

    5.2 SWITCHING OFF THE POWER SOURCE ..................................................................... 78 5.3 EMERGENCY STOP ....................................................................................................... 78 5.4 EXPLANATION FOR USE OF OPERATION PANEL ..................................................... 80 5.5 OTHER SWITCHES AND SIGNAL ................................................................................. 91 5.6 OPERATE IN DOOR OPEN STATUS ............................................................................. 93 

    5.6.1 OPERATE IN DOOR OPEN STATUS WITH NON CE DOOR INTERLOCK SWITCH (OPTION) .... 93 5.6.2 OPERATE IN DOOR OPEN STATUS WITH CE DOOR INTERLOCK SWITCH (OPTION) ............. 93 

    5.7 WHEN TOOL CHANGE MOVEMENT IS INTERRUPTED BY EMERGENCY STOP OR RESET ................................................................................................................................... 95 

    5.7.1 20 TOOLS ATC (UMBRELLA TYPE) ............................................................................................... 95 5.7.2 24 / 32 / 40 TOOLS ATC (ARM TYPE) ............................................................................................. 96 

    5.8 WHEN INSTALL OR REMOVE THE TOOL MANUALLY ................................................ 97 5.9 WHEN OVERTRAVEL IS DETECTED BY 2ND LIMIT SWITCH. ................................... 98 5.10 FANUC OPERATION PANEL ....................................................................................... 99 

    5.10.1 MD1 KEYBOARD AND CRT .......................................................................................................... 99 5.10.2 LIST OF OPERATION .................................................................................................................... 99 5.10.3 MDI KEYBOARD FUNCTIONS .................................................................................................... 102 

    5.11 M CODE LIST .............................................................................................................. 104 5.12 S (SPINDLE) FUNCTION ............................................................................................ 108 5.13 T ( TOOL ) FUNCTION ................................................................................................ 109 5.14 SPECIAL TOOL ASSIGNMENT STEPS (M16/M61) ................................................... 110 

  • CONTENTS: PAGE 4 / 5

    V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC

    5.14.1 DESCRIPTION ............................................................................................................................. 110 5.14.2 EXAMPLE ..................................................................................................................................... 110 

    6. CHECKING AND MAINTENANCE OF MACHINE ...................................................... 111 6.1 DAILY CHECKING ........................................................................................................ 112 

    6.1.1 SAFETY CIRCUIT AND DVICE CHECK ........................................................................................ 112 6.1.2 MACHINE DAILY CHECKING SCHEDULE .................................................................................... 114 

    6.2 6 MONTH CHECKING .................................................................................................. 115 6.3 YEARLY CHECKING .................................................................................................... 116 6.4 LUBRICATION OF MACHINE ....................................................................................... 117 

    6.4.1 LUBRICATION ................................................................................................................................ 117 6.4.2 REOILING ....................................................................................................................................... 117 6.4.3 PARAMETER FOR LUBRICATION ................................................................................................ 119 

    6.5 LUBRICATION TABLE .................................................................................................. 120 6.5.1 APPLICABLE LUBRICANTS .......................................................................................................... 121 6.5.2 CAUTIONS ON OILING .................................................................................................................. 121 6.5.3 MAINTENANCE AND ADJUSTMENT OF LUBRICATION PUMP .................................................. 122 

    6.6 MAINTENANCE AND ADJUSTMENT OF AIR SOURCE AND PNEUMATIC UNITS ... 123 6.6.1 AIR SOURCE ................................................................................................................................. 123 6.6.2 AIR LINE LUBRICATOR ( FIG. 6.6.2 )............................................................................................ 125 6.6.3 AIR TANK ....................................................................................................................................... 125 6.6.4 JOINT AND HOSE .......................................................................................................................... 125 6.6.5 CIRCUIT DIAGRAM OF AIR SYSTEM ........................................................................................... 127 

    7. TROUBLE SHOOTING ............................................................................................... 128 1. ATC ................................................................................................................................. 128 

    1.1 WRONG TOOL NUMBER (ARM TYPE) ............................................................................................ 128 1.2 WRONG TOOL NUMBER (ARMLESS TYPE) ................................................................................... 128 1.3 ATC ARM NOT IN POSITION (ARM TYPE) ...................................................................................... 128 1.4 ATC NOT IN POSITION (ARMLESS TYPE) ...................................................................................... 129 1.5 ATC HOME NOT IN POSITION (ARM TYPE) ................................................................................... 129 1.6 ATC MAGAZINE CAN NOT ROTATE OR NOT SMOOTH (ARMLESS TYPE) ................................. 130 

    2. AIR SYSTEM ................................................................................................................... 130 2.1 AIR PRESSURE LOW ....................................................................................................................... 130 

    3. SPINDLE COOLANT SYSTEM ....................................................................................... 130 3.1 CAN NOT REACH THE SETTING TEMPERATURE. ....................................................................... 130 3.2 FUNCTION FAILED ........................................................................................................................... 131 

    4. CHIP FLUSH AND COOLANT ........................................................................................ 131 4.1 COOLANT FLOW RATE TO LOW .................................................................................................... 131 4.2 FUNCTION FAILED ........................................................................................................................... 131 

    5. COOLANT THROUGH SPINDLE .................................................................................... 131 5.1 COOLANT FLOW RATE TO LOW .................................................................................................... 131 5.2 FUNCTION FAILED ........................................................................................................................... 132 

    6. CHIP CONVEYOR .......................................................................................................... 132 6.1 NOISE OR RUNNING NOT SMOOTH .............................................................................................. 132 6.2 FUNCTION FAILED ........................................................................................................................... 133 

    7. VACUUM DUST COLLECTOR ....................................................................................... 133 7.1 WEAK VACUUM POWER ................................................................................................................. 133 7.2 FUNCTION FAILED ........................................................................................................................... 133 

    8. ALARM MESSAGE ..................................................................................................... 134 

  • CONTENTS: PAGE 5 / 5

    V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC

    MODIFICATION RECORDS

    DATE PAGE ORIGINAL MODIFIED ED MEMO

    2010/02/04 P22

    P30~32

    FIG. 2.1.2 APPEARANCE AND PRINCIPAL

    DIMENSION OF THE MACHINE

    TOOL SHANK AND STUD

    A01

    P34 FIG 3.1.1 HANGING THE MACHINE P36

    P41~42

    FIG 3.3.1 MACHINE TRANSPORTED BY

    POWER FORK LIFT

    FIG 3.5.1 INSTALLATION SPACE

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 1 / 149

    1. SAFEYTY INTRODUCTION WARNING: FAILURE TO FOLLOW THESE RULES MAY CAUSE

    RESULT IN SERIOUS PERSONAL INJURY IN ORDER TO MAINTAIN THE INITIAL MACHINING ACCURACY AND

    PERFORMANCE, THE MACHINE MUST BE CORRECTLY USED UNDER

    THE FAVORABLE ENVIRONMENTAL CONDITIONS.

    INADEQUATE OPERATION MAY CAUSE DAMAGES TO THE MACHINE

    ITSELF AND EXTREME CAUSE SERIOUS ACCIDENT TO OPERATOR.

    TO PREVENT SUCH TROUBLES, PLEASE READ THIS INSTRUCTION

    MANUAL CAREFULLY UNTIL YOU REACH COMPLETE UNDERSTANDING

    AND THEN OPERATE THE MACHINE.

    THE FOLLOWING CAUTIONS ARE PARTICULARLY IMPORTANT TO BE

    OBSERVED FOR SAFE OPERATION.

    1.1 FOREWORD

    THE V2000 MACHINING CENTER IS IN THE RANGE OF PROFESSIONAL

    MACHINERY FOR WORKING OF METAL CUTTING, MADE BY LONG

    CHANG MACHINERY CO., LTD.

    SINCE THE MODEL DESIGN IS NOT ONLY FOR THE DOMESTIC MARKET

    BUT ALSO THE EUROPEAN MARKET. DURING DESIGN &

    CONSTRUCTION OF THIS MACHINE, THE ADDITIONAL RELATIVE

    EUROPEAN STANDARD, FOR THE SAFETY REGULATION HAS BEEN

    TAKING INTO ACCOUNT BEFORE THE APPLICATION OF

    CERTIFICATION.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 2 / 149

    1.2 USING RESTRICTION 1.2.1 THE FORESEEN USE OF THE MACHINE

    A. THE PERSON TO USE THIS MACHINE:

    ONLY THE TECHNICIAN WHO HAVE BEEN TRAINE TO USE THE MILLING MACHINE AND TO USE THE CNC CONTROL SYSTEM AND ELDER THEN 18 YEARS OLD CAN USE THIS MACHINE.

    B. MACHINING MATERIAL:

    CASTING, CARBON STEEL, STANDLESS STEEL, COPPER, AND ALUMINUM.

    A. MACHINING METHOD : a. MACHINING BY PROGRAM:

    1. MILLING: FACE, OBLIQUE, END, SIDE MILLING, ETC.

    2. DRILLING: FRONT AND OBLIQUE DRILLINGS.

    3. BORING: FRONT AND OBLIQUE BORINGS BY CUTTERS INSTALLED.

    4. MOLDING: PROCESSING OF IRREGULAR CURVES AND MOLD REMOVING ANGLES.

    5. POLISHING: SURFACE POLISH ON METALLIC PARTS.

    1.2.2 THE FORESEEN OTHER REASONABLE USE OF THE MACHINE A. THE PERSON TO USE THIS MACHINE:

    THE PERSON WHO HAS JUST TRAINED SOME SIMPLE FUNCTIONS (CYCLE START, FEED HOLD, EMERGENCY STOP ...) ----- MUST DIRECT BY TECHNICIAN PERSON DESCRIBED ABOVE.

    B. MACHINING MATERIAL:

    WOOD ----- THE WOOD DUST MIGHT RUNS INTO BEARING, SIDEWAYS AND CAUSE SOME DAMAGE.

    C. MACHINING METHOD: MACHINING BY MANUAL. ----- SHOULD WEAR THE GOGGLES AND ONLY TECHNICIAN PERSON DESCRIBED IN 1.1.1 CAN OPERATE.

    1.2.3 THE FORESEEN UNREASONABLE USE OF THE MACHINE A. THE PERSON TO USE THIS MACHINE :

    THE PERSON WHO HAVE NOT BEEN TRAINED OR UNDER 18 YEARS OLD.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 3 / 149

    1.3 SAFETY INSTRUCTIONS 1.3.1 REACTION WITH EMERGENCY SITUATION:

    A. IN CASE OF ANY EMERGENCY, PUSH THE EMERGENCY STOP BUTTON TO STOP ALL THE MOVEMENT AND THE POWER.

    B. ALL OF THE EMERGENCY STOP BUTTONS ARE COLORED RED, AND YELLOW BACKGROUND.

    C. THE STANDAR MACHINE PROVIDES ONE EMERGENCY STOP BUTTON IN THE OPERATION PANEL.

    D. FOR DIFFERENT OPTIONS THERE COULD BE MORE EMERGENCY STOP BUTTONS SUCH AS:

    a. TOOL CHANGER b. FLAP TYPE CHIP CONVEYOR. c. REMOVEABLE HANDWHEEL (MPG.)

    E. AFTER EMERGENCY STOP, FOLLOW THE NORMAL START UP PROCEDURE AND SUITABLE OPERATION.

    1.3.2 SETTING UP THE MACHINE AND POWER A. THE ENVIRONMENT TO SET UP THE MACHINE

    a. THAT THIS MACHINE CANNOT BE USED IN THE POTENTIAL EXPLOSIVE ENVIROMENT. GENERALLY, THIS MACHINE WILL BE INSTALLED ON THE FOLLOWING CONDITION. 1. AMBIENT TEMPERTURE:5°~40°C

    2. RELATIVE HUMIDITY: NOT EXCEED 50% AT 40°C

    (HIGHER RELATIVE HUMIDITY MAY BE PERMITTED AT LOWER TEMPERTURE, E.G. 90% AT 20OC)

    3. ATMOSPHERE: FREE FROM EXCESSIVE DUST, ACID FUME, CORROSIVE GASES AND SALT.

    4. AVOID ECPOSING TO DIRECT SUNLIGHT HEAT RAYS WHICH CAN CHANGE THE ENVIRONMENTAL TEMPERTURE.

    5. AVOID EXPOSING TO ABNORMAL VIBRATION.

    6. HAVE TO CONNECT TO EARTH.

    ( A TERMINAL FOR THE CONNECTION IF THE EXTENAL GROUND CONDUCTOR IS PROVIDED IN THE VICINITY OF THE ASSOCIATED PHASE CONDUCT TERMINAL WITH MARKED “ PE”. IT SHOULD MAKE SURE THE “PE” TERMINAL BEING CONNECTION BEFORE MACHINE OPERATE)

    7. THE LIMITE OF ATTITUDE: 0-1000 METER.

    8. ELECTRICAL EQUIPMENT SHALL WITHSTAND THE EFFERTS OF TRANSPORTATION AND STORAGE TEMPERTURE WITHIN A RANGE OF -25°C TO 55°C.

    B. CONNECTION AND DISCONNECTION OF POWER CABLE a. SUPPLY VOLTAGE: 0.9 - 1.1 NOMINAL SUPPLY VOLTAGE b. SOURCE FREQUENCY: 0.99 - 1.01 NOMINAL FREQUENCY c. WHEN THE POWER CABLE IS DISCONNECTED AND CONNECTED

    AGAIN, CARE SHOULD BE EXERCISED TO CONNECT EACH TERMINAL IN THE CORRECT PHASE (L1, L2, L3 PHASES).

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 4 / 149

    d. FOR DETAILS OF THE CONNECTION OF THE POWER CABLE, REFER TO CHAPTER 4.4 SWITCHING ON THE POWER SOURCE AND CHECKING."

    1.3.3 WHEN OPERATING A. THE OPERATOR SHOULD WEAR SAFETY SHOES AND GOGGLES. B. WARM THE MACHINE 15 - 30 Min. DAILY, BEFORE OPERATION. C. CHECK IF THE WORKPIECE IS SECURELY LOCKED ON THE TABLE

    BEFORE MACHINING. D. MOVE THE TOOLS AWAY FROM WORKPIECE BEFORE STARTS THE

    SPINDLE. E. MANUAL REFERENCE POINT RETURN AFTER TURNING ON THE POWER

    SWITCH.

    AFTER THE POWER SWITCH IS TURNED ON, DO NOT FORGET TO RETURN THE SPINDLE HEAD, SADDLE AND TABLE TO THE REFERENCE POINT IN MANUAL OPERATION MODE.

    F. INSTALL PULL STUD TIGHTLY a. THE PULL STUD SHOULD BE SECURELY INSTALLED TO THE

    GIVEN TOOL SHANK. b. IF THE PULL STUD IS LOOSEND DURING CUTTING, THE TOOL

    CANNOT BE SECURELY CLAMPED IN THE SPINDLE. SINCE LOOSENED TOOL IS VERY DANGEROUS, BE SURE TO CHECK THE PULL STUD BEFORE STARTING THE OPERATION.

    G. USE OF SPECIFIED PULL STUD a. DO NOT USE A PULL STUD NOT SPECIFIED BY US, OTHERWISE

    THE TOOL CANNOT BE SECURELY CLAMPED IN THE SPINDLE. b. THEREFORE, ALWAYS USE ONLY THE PULL STUD CONFORMED

    TO THE STANDARD. c. DO NOT USE A PULL STUD MADE IN YOUR FACTORY.

    H. INSTALLATION AND REMOVAL OF TOOL TO AND FROM SPINDLE BY HAND

    a. WHEN TOOL IS INSTALLED TO THE SPINDLE, CARE SHOULD BE TAKEN AS FOLLOWS: 1. THE TOOL AND SPINDLE BORE TAPERS SHOULD BE CLEAN.

    2. DO NOT RELEASE HAND FROM THE TOOL UNTIL IT IS ASSURED THAT THE TOOL IS SECURELY CLAMPED IN THE SPINDLE.

    3. INSTALL THE TOOL UPRIGHT, BUT DO NOT TILT.

    NOTICE: SINCE AIR FOR CLEANING OF THE SPINDLE BORE AND TOOL TAPER BLOWS FROM THE SPINDLE BORE WHEN THE UNCLAMP SWITCH ON THE OPERATION PANEL IS PRESSED, CAREFULLY AND SECURELY HOLD THE TOOL BY HAND AND PREVENT FROM DROPPING OF THE TOOL.

    I. WHEN THE TOOL IS REMOVED FROM THE SPINDLE BY HAND, CARE SHOULD BE TAKEN AS FOLLOWS:

    a. AT THE SAME TIME AS THE UNCLAMP SWITCH ON THE OPERATION PANEL IS PRESSED, THE PULL STUD IS PRESSED DOWN AND THE TOOL GOES DOWN APPROXIMATELY 0.5MM (0.02 INCH). SINCE AIR BLOW PRESSURE ENHANCES PRESSING DOWN MOVEMENT OF THE TOOL, SECURELY HOLD THE TOOL BY HAND.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 5 / 149

    b. AS MENTIONED ABOVE, THE TOOL GOES DOWN WHEN IT IS REMOVED, BE SURE TO RAISE THE SPINDLE HAND AT A POSITION HIGH ENOUGH TO PREVENT CONTACT OF THE TOOL WITH THE WORK OR TABLE.

    J. DO NOT ALLOW HAND TO GAIN ACCESS WITHIN THE MOVABLE RANGE OF ATC UNIT.

    IT IS VERY DANGEROUS TO ALLOW YOUR HAND TO GAIN ACCESS WITHIN THE MOVABLE RANGE OF THE ATC UNIT OR TO TOUCH THE PERIPHERY OF THE ATC UNIT.

    K. WHEN THE SPINDLE IS UNDER ORIENTATION, DO NOT INSTALL AND REMOVE THE TOOL, WHICH IS PROHIBITED FROM USING A HOLDER IN THE SPINDLE UNDER ORIENTATION, TOGETHER WITH TOOL HOLDER, OTHERWISE THE SPINDLE MIGHT BE DAMAGED.

    L. DO NOT USE A HEAVY TOOL. a. THE MAXIMUM WEIGHT OF THE TOOLS APPLICABLE TO THE

    MACHINE IS 7KG ( 20 TOOLS ATC ) AND 8 KG ( 24 / 32 TOOLS ATC ) .

    b. DO NOT USE TOOLS HEAVIER THAN 7 KG OR 8 KG. c. REFER TO PAGE 2-8

    M. DO NOT USE A LARGE TOOL.

    a. FOR 20 TOOLS ATC

    THE MAXIMUM DIAMETER OF THE TOOLS APPLICABLE TO THE MACHINE IS 100 mm (3.1 inch) WHEN TOOLS ARE ADJACENTLY ACCOMMODATED IN THE MAGAZINE. HOWEVER, THE TOOL HAVING THE MAXIMUM DIAMETER OF 140 mm (5.5 inch) IS APPLICABLE WHEN IT IS PLACED IN A MAGAZINE TOOL POST, BOTH THE ADJACENT TOOL POSTS OF WHICH ARE VACANT.

    DO NOT USE TOOLS LARGER THAN THESE DIAMETERS.

    b. FOR 24 / 32 TOOLS ATC

    THE MAXIMUM DIAMETER OF THE TOOLS APPLICABLE TO THE MACHINE IS 100 mm ( 3.9 inch )

    c. REFER TO PAGE 1-8 N. THE FRONT DOOR PROTECTION

    a. NORMALLY OPERATOR SHOULD CLOSE THE DOOR BEFORE DOING ANY MOVMENT OF THE MACHINE.

    b. IF OPERATED BY OPENING THE FRONT DOOR AND MACHINING BY MANUAL, BE SURE TO WEAR THE GOGGLES, AND ONLY TECHNICIAN PERSON WHO HAS BEEN TRAINED CAN OPERATE IN THIS WAY.

    c. FOR MACHINE WITH CE MARK, THERE ARE SECURITY SWITCH FOR DOOR OPEN OPERATION, REFER TO CHPTER 5 FOR MORE INFORMATION.

    O. CAUTION TO USE 10,000 /min SPINDLE

    IN ORDER TO HAVE LONGER LIFE TIME OF THE HIGH PRECISION SPINDLE, WE RECOMMEND TO WARM UP THIS SPINDLE EVERYDAY BEFORE PUT INTO HIGH SPEED MACHINING. PLEASE RUN THE SPINDLE

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 6 / 149

    IN LOWER SPEED BETWEEN 1,000 TO 3,000 /min ABOUT 15 - 30 min. AFTER THAT YOU ARE FREE TO RUN THE MAX. SPEED 10,000 /min.

    P. SPINDLE CHILLIER SETTING

    THIS OPTIONAL SYSTEM IS TO KEEP THE HEAD STOCK MORE STABLE. WE RECOMMEND TO SET THE TEMPERATURE TO 0 ~ -2OC DEGREE. THIS SYSTEM MAY OPERATE AUTOMATICALLY COMPARE WITH THE ROOM TEMPERATURE.

    1.3.4 LUBRICATION, AIR AND COOLANT A. LUBRICATING OIL SHORTAGE

    a. IF LUBRICATING OIL RUNS SHORT, THE SLIDE WAYS AND BALL SCREWS IN X, Y AND Z AXIS WILL BE RAPIDLY WORN AND THE MACHINE IS DEGRADED.

    b. BE SURE TO CHECK AMOUNT OF LUBRICATING OIL EVERYDAY AND REPLENISH IF NECESSARY.

    c. IF THE LAMP LUBRICATION LEVEL LIGHTS, IMMEDIATELY REPLENISH.

    B. AIR SOURCE a. SINCE EACH PNEUMATIC UNIT AND DEVICE IS DESIGNED TO

    WORK ON THE AIR SOURCE AT 5.5 BAR, ALWAYS SUPPLY COMPRESSED AIR AT 6 BAR TO THEM.

    b. THE AIR SOURCE SHOULD BE AT CONSTANT PRESSURE. ALTHOUGH AIR FILTER IS INSTALLED AT THE AIR INTAKE TO PROTECT THE PNEUMATIC UNIT, THE SUPPLIED AIR SHOULD BE FREE FROM MOISTURE, OIL AND DUST, AND PURIFIED BY AIR FILTER OF 5 MICRONS MESH.

    NOTICE: FOR LONG-TERM USAGE OF THE MACHINE, THE QUALITY OF THE AIR IS VERY IMPORTANT. BED QUALITY OF THE AIR MAY DAMAGE THE PNEUMATIC DEVICES AND CAUSE FAILURE OF MECHANICAL MOTION

    c. TOO HIGH OR LOW AIR PRESSURE 1. THE REQUIRED PRESSURE OF THE AIR SOURCE GIVEN TO

    THE MACHINE IS 5.5 BAR.

    2. TOO HIGH AIR PRESSURE CAN CAUSE TROUBLE WITH PNEUMATIC UNIT OR DEVICE.

    3. WHILE TOO LOW AIR PRESSURE CAN RESULT IN UNSTABLE OPERATION OF PNEUMATIC UNIT OR DEVICE.

    4. IF AIR PRESSURE GOES DOWN BELOW 4 BAR, THE LAMP AIR PRESSURE ON THE OPERATION PANEL LIGHTS, THE ALARM BUZZER SOUNDS AND TOOL CHANGE BECOMES IMPOSSIBLE.

    5. SEE CHAPTER 6 FOR MORE INFORMATION.

    C. COOLANT

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 7 / 149

    a. DO NOT TURN ON THE COOLANT PUMP, UNLESS THERE IS ENOUGH COOLANT IN THE TANK, OR THE COOLANT PUMP WILL BROKEN SHORTLY.

    b. WHEN CHANGE THE COOLANT, IT IS SUGGESTING OPERATED WITH PUMP EQUIPMENT TO FILL IN AND EMPTY THE LIQUID TO REACH THE LEVEL.

    c. IF THE LIQUID FLOW OVER TO GROUND, USE CLOTH TO CLEAN THE LIQUID IN ORDER TO PREVENT FORM ACCIDENT.

    d. IT IS SUGGEST USING COOLANT LIQUID WITH ENVIRONMENTAL PROTECTION APPROVAL.

    D. PREVENT FROM FIRE

    TO PREVENT FIRE, OBEY THE FOLLOWING INSTRUCTIONS FOR UN-MANNED OPERATION AT NIGHT OR FOR CASES WHEN OPERATOR HAS TO BE AWAY FROM THE MACHINE FOR A LONG TIME.

    1. USE NON-FLAMMABLE COOLANT ONLY.

    2. CHECK THAT LUBRICATION OIL AND COOLANT ARE SUFFICIENT AND ARE WORKING PROPERLY.

    3. CHECK THE TOOL TIPS, CUTTING CONDITIONS, CYCLE TIME, TOOL LIFE, ECT.

    4. NEVER PLACE FLAMMABLE ITEMS, SUCH AS WOODEN BLOCKS, PAPER, CLOTH, ECT., ARROUND THE MACHINE.

    1.3.5 HEALTHY AND SAFETY PROTECTION A. NOISE OF THE MACHINE

    a. CONDITIONS : 1. PLACEMENT/INSTALLATION : FLOOR-STANDING

    2. HIGHT ABOVE THE FLOOR : STANDING OPERATOR.

    3. MEASUREMENT DISTANCE D = 1M

    4. MEASUREMENT TIME PER POSITION = 30S

    5. MESUREMENT POSITION = 26 POSITIONS

    b. SUMMERY 1. A WEIGHTED SOUND PRESSURE UNDER NO LOAD

    2. LP,EQ= 73.9 DB(A).

    3. A WEIGHTED SOUND PRESSURE UNDER LOAD

    4. LP,EQ= 79.4 DB(A).

    NOTICE: CUTTING DIFFERENT WORKPIECE MAY CAUSE LOUDER NOISE. WHEN WORKING LONG TIMES IN CUTTING WORKPIECE BE WARE TO WEAR EARPLUGS.

    1.3.6 MAINTENANCE AND CHECK A. MOVE THE TOOLS AWAY FROM WORKPIECE BEFORE MAINTENANCE OR

    ANY CHECK OF THE MACHINE OR WORKPIECE. B. SWITCH OFF THE MAIN POWER BEFORE MAINTANCE.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 8 / 149

    1.3.7 RESCUE THE PERSON WHO TRAPPED INTO MACHINE IF OPERATOR FALLS INTO MACHINE SHUT OFF THE EMERGENCY

    SWITCH IMMEDIATELY AND KEEP THE FRONT DOOR OPEN. THEN

    SAVE THE PERSON FROM FRONT DOOR OR SIDE WINDOWS.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 9 / 149

    1.4 WARNING LABEL AND POSITION

    WARNING

    entanglement hazard.Moving scre w can cause

    Do n ot touch this part

    operation.and keep away during

    1000-C 177

    WARNING

    D o n ot peel off or dirty this label 1000-C110

    1.Before opera ti ng th e mach ine , read i nte nsiv ely the Instructi on Manual. In particular, readcarefully the descripti on for safety an d maintena nce, and fol low its instructi on.

    2.During operat ion, close the d oors and covers, a nd a void acces s to the rotating and moving

    removed.3.Do not op erate the mach ine with pro tect ive covers. lnter locks and the other safety dev ices

    4.Be sure to c lamp th e w orkpi ece and cutt ing tool s, and do not pl ace a used tool on the movingparts. Als o, for p roper machi ni ng, se lect the optimum feedrate and spindle speed.

    safety work.5.Wear prop er h abi liments (working cl othe s, shoes, cap, pro tect ive gl as ses, etc.) to ensure

    6.R epai r the machi ne onl y b y the appr oved personnel foll owing the Instruction Manual.in add it io n, turn the pow er switch OFF during repair.

    Execute safety work on user's own res ponsib ility by observi ng the s afety precau tions providedon the Instruct ion Manua l and the W AR NING lab el at tached on the machine. Negl igence of warningcou ld cause personal injury or machine damage.

    Do not p eel of f or dirty this plate. 1000 -C109B

    V2000

    2000

    -232

    710

    00C

    187B

    1000

    -C58

    1A

    DANGER

    H azar dous vol tage wi llcause serious injury orde ath.

    before mainte nance.turn of f the power

    1 00 0- C179

    TEL: +886-4-2392-1001 FAX: +886-4-2392-1037 http://www. fi rst.com.tw

    Fu ll lo ad cur rent:

    Spind le sp eed ran ge:Pneumatic p ress ure:

    Mach ine weight:

    Power sup ply:

    Rated p ower:

    N O.52,C HARN A N EAST ROAD, TAIPING, TAICH UNG, TAIWAN ,R.O.C.

    LONG CHANG MACHINERY CO., LTD.

    MFG NO:

    MODEL:

    MFG Date:> 5 .5

    Max.

    b ar

    /min

    kg

    V3~ Hz

    kVA

    A

    18VH-C2 70E

    50R-C822

    ECD

    FGN

    M

    M

    L

    MMM M

    MA

    HIJK

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 10 / 149

    WA

    RN

    ING

    SAF

    ETY

    INST

    RU

    CTI

    ON

    S

    DA

    NG

    ER

    Haz

    ard

    ous

    vo

    ltage

    will

    cau

    se s

    erio

    us

    inju

    ry o

    rd

    eath

    .

    bef

    ore

    ma

    inte

    nan

    ce.

    turn

    off

    the

    pow

    er

    MM M M

    AB

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 11 / 149

    FIG. 1.4.1 WARNING LABEL POSITION

    LABEL A

    LABEL B (OPTION)

    Hazardous voltage willcause serious injury ordeath.turn off the powerbefore maintenance.

    1000-C179

    DANGER

    Keep hands and body away from thetool operating area to prevent seriousinjury during auto mode operation.

    SAFETY INSTRUCTIONS1.Be sure to switch to the manual mode at tool replacement.2.Be sure to turn off the power source at maintenance .3.Check if pull-stud is securely tightened to tool holder at tool loading.4.Load the tools in the magazine in a good balance

    1000-C178

    WARNING

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 12 / 149

    LABEL C

    LABEL D

    WARNING

    Do not peel off or dirty this label 1000-C110

    Do not open thefront cover duringmachine run.

    1.Before operating the machine, read intensively the Instruction Manual. In particular, read carefully the description for safety and maintenance, and follow its instruction.2.During operation, close the doors and covers, and avoid access to the rotating and moving parts of the machine.4.Be sure to clamp the workpiece and cutting tools, and do not place a used tool on the moving parts. Also, for proper machining, select the optimum feedrate and spindle speed.5.Wear proper habiliments (working clothes, shoes, cap, protective glasses, etc.) to ensure safety work.Execute safety work on user's own responsibility by observing the safety precautions providedon the Instruction Manual and the WARNING label attached on the machine. Negligence ofwarningcould cause personal injury or machine damage.

    Do not peel off or dirty this plate. 1000-C109B

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 13 / 149

    LABEL E (OPTION)

    LABEL F

    1000

    C18

    7B

    1000-C177

    WARNING

    Moving screw can causeentanglement hazard.Do not touch this partand keep away duringoperation.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 14 / 149

    LABEL G

    LABEL H

    Max.

    LONG CHANG MACHINERY CO., LTD.NO.52,CHARN AN EAST ROAD, TAIPING, TAICHUNG, TAIWAN,R.O.C.TEL: +886-4-2392-1001 FAX: +886-4-2392-1037 http://www.first.com.tw

    MODEL:

    MFG Date:

    MFG NO:Power supply:

    Machine weight:

    Pneumatic pressure:

    Spindle speed range:

    Full load current:3~

    Rated power: kVA

    18VH-C270E

    > 5.5

    V

    bar

    /min

    A

    Hz

    kg

    V2000

    2000

    -232

    7

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 15 / 149

    LABEL I (OPTION)

    LABEL J

    8VH-C310

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 16 / 149

    LABEL K

    LABEL L

    50R-C822

    1000

    -C58

    1A

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 17 / 149

    LABEL M

    LABEL N

    2000-2338

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 18 / 149

    1.5 OPERATION AREA DIFFERENT OPTION MAY HAVE DIFFERENT OPERATION PLEASE REFER TO “INSTALLATION AREA”

    MACHINE TOP VIEW Unit:mm

    FIG 1.5.1 OPERATOR POSITION

    875

    875

    875

    800 MAINTENANCE AREA

    MA

    INTE

    NA

    NC

    E A

    REA

    MA

    INTE

    NA

    NC

    E A

    REA

    OPERATION PANEL R545

    1000

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 19 / 149

    1.6 DISPOSE OF WASTE A. ALL THE WASTE SHOULD BE TAKEING CARE BY THE RULE OF LOCAL

    GOVERNMENT. B. THE CUTTING CHIP WASTE IS ALWAYS SHARP, DO NOT TOUCH, OR

    CLEAN THE CHIPS DIRECTLY BY HAND. C. MOST OF THE CUTTING CHIP ARE RECYCLABLE IT IS SUGGESTE TO

    RECYCLE THE CUTTING CHIP BY LOCAL RECYCLE AGENT. D. DISPOSE OF LIQUID WASTE SUCH AS WASTE OIL AND COOLANT IS

    NECESSARY TO ASSOCIATE WITH LOCAL RECYCLE AGENT.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 20 / 149

    1.7 OTHER NOTICES A. IF THE WORK PIECE IS HEAVIER THAN 10kg, PLEASE USE SHOP

    HANGING EQUIPMENT TO MOVE THE WORK PIECE.

    FIG 1.7.1 HEAVY PART HANGING

    B. IN CASE OF MAINTENANCE, SERVICING, AND PARTS CHANGES, PLEASE CONTACT OUR SALES AGENCIES OR BUSINESS DEPARTMENT DIRECTLY.

    C. SUGGESTIONS FOR IMPROVEMENTS OF THE MACHINE STRUCTURE AND / OR INQUIRIES, INCLUDING PLANT VISITATIONS, ARE CORDIALLY WELCOME.

    D. THE MANUFACTURER REVERSES THE RIGHT TO MODIFY THE DESIGN, OPERATIONS, STRUCTURE ETC. ALL OF THE MACHINE WITHOUT ANY PRIOR NOTICE.

    IN / OUT

    Working Part

    Hanging Equipment

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 21 / 149

    2. GENERAL INFORMATION 2.1 GENERAL DESCRIPTION OF THE MACHINE

    A. THE MODEL V2000 IS THE VERTICAL SPINDLE MACHINING CENTER FEATURING ELECTRONIC CONTROL EQUIPMENT BUILT-IN COMPACT DESIGN, PERFORMANCE, ACCURACY AND RELIABILITY.

    B. THE MODEL BASICALLY CONSISTS OF THE FOLLOWINGS: a. MACHINE BODY (INCLUDING SPINDLE HEAD, SPINDLE, COLUMN,

    BED, SADDLE AND ATC) b. OPERATION PANEL c. NC SYSTEM d. ELECTRIC (POWER SUPPLY) CABINET e. PNEUMATIC UNIT

    C. THE APPEARANCE AND PRINCIPAL DIMENSIONS OF THE MACHINE AND THE NAME OF EACH PRINCIPAL COMPONENT ARE AS SHOWN IN FIG. 2.1.1AND 2.1.2

    FIG. 2.1.1 PRINCIPAL COMPONENT NAME

    WARNING

    entang lement hazard.M ov ing sc rew can caus e

    D o not touch this part

    o peration.and k eep aw ay during

    1000- C177

    WARNING

    Do n ot p ee l o ff o r di rty th is la be l 1000- C110

    1 .Be fore op era tin g th e ma c hine , rea d i nte ns iv el y th e In stru cti on Ma nu al . In particu la r, re adca refu ll y th e d es cri p ti on for s afe ty a nd ma in te n an ce , an d fo ll ow its ins tru ctio n.

    2 .Du rin g o p erati o n, cl o se th e d oo rs a n d c ov ers , an d a vo id a cc es s to the rota ti ng a nd mo vin g

    rem ov ed.3 .Do no t op era te th e ma ch ine wi th p ro te cti v e co v ers . ln te r lo ck s and th e othe r sa fe ty dev ic es

    4 .Be su re to cl am p th e work piec e an d c utti ng to o ls , a n d d o n ot p la ce a us ed too l on the movingpa rts. Als o , fo r prop e r m ac hinin g, se lec t t he o p timu m fee d rate and s pindle sp eed .

    sa fe ty wo rk .5 .We ar pro p er h ab il im en ts (work in g c l othe s , s ho e s, ca p , p ro te ct iv e glas ses , e tc .) to ens ure

    6 .Re p ai r th e ma c hine on ly b y the ap p rov ed pe rso nn el fol lo wing t he In s truc ti on Ma nu al.in ad di tio n , tu rn the p ower s witc h OFF du rin g re pai r.

    Exe c ute s a fety wo rk o n u s er's o wn res po n sibi li ty b y o bs erv ing t he s afety pre cau ti on s prov ide do n th e Ins truc tio n Ma n ua l a nd the WARNING lab el atta ch ed on the ma ch in e . Ne gl ig enc e of warnin gc ou ld ca us e p er so na l i nj ury or ma ch in e d ama ge.

    Do n ot pe e l o ff o r di rty thi s pl ate. 1000- C109B

    MCV2000

    200

    0-2

    327

    100

    0C1

    87B

    DANGER

    Haz ardo us v oltage wil lcaus e s erious injury ordeath.

    bef ore maintenance.turn off the power

    TE L: +886- 4- 2392-1001 F AX: +886- 4-2392- 1037 htt p: // ww w.f ir st. co m.t w

    Full load curre nt:

    Spindle spee d range:

    Pneum atic p res sure:

    Ma c hine weight:

    Powe r supply:

    Rated powe r:

    NO. 52,C HARN AN EA ST R OAD, T AIPI NG, TAI CHUN G, TAI WA N, R.O. C.

    LONG CHANG MACHINERY CO., LT D.

    MF G NO:

    MODEL:

    M FG Date:> 5 .5

    M a x.

    ba r

    /min

    kg

    V3~ H z

    k VA

    A

    1 8V H -C270E

    50R -C 822

    ATC

    SPINDLE HEAD

    OPERATIONPANEL

    SPINDLE

    CHIP CONVEYER

    TABLE

    CHIP CART

    COOLANT TANK

    COLUMN

    ELECTRIC CABINET

    BASE

    Y

    X

    Z

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 22 / 149

    TYPE #40 #50

    TOOL STORAGE CAPACITY

    30T 40T 60T 32T 40T 60T

    W 1870 1220 0

    D 1250 1250 1200

    Unit:mm

    FIG. 2.1.2 APPEARANCE AND PRINCIPAL DIMENSION OF THE MACHINE

    W ARN ING

    entang lement hazard.Mov ing scr ew can cause

    Do not touch this p art

    operation.and keep away during

    1000- C177

    WARNING

    Do not pee l o ff or d irty this labe l 1000- C 110

    1 .B efore opera ting the mach ine , read in tens iv e ly the Instruction M anual . In particu lar, readc arefu l ly t he des crip tion fo r s afe ty and maintenanc e, and fo llow its instruc tion .

    2 .D uring operation, c los e the doors and c ov er s, and avo id acc ess to the ro ta ting and moving

    remov ed.3 .D o not opera te the mach ine with p ro tectiv e c ov ers. lnte r loc ks and the other s afe ty dev ic es

    4.B e s ure to c lam p the work piece and cu tting too ls, and do no t plac e a us ed tool on the mov ingparts . Also , fo r p roper mac hining , s elect the op tim um f eedra te and sp indle speed.

    s a fe ty work.5 .Wear p roper hab il im ents (work ing clo thes, s hoes , cap, p ro tec tiv e glas ses, e tc.) to ens ure

    6 .R epai r the mac h ine on ly by the approved personnel fol lowing the Instruc tion Manua l.in addi tion , turn the power s witc h O FF during repa ir.

    Exec ute s afe ty work on us er's own res pons ib il ity by obs er ving the sa fety p recautions prov idedon the Inst ruc tion Manual and the WARNING labe l a ttac hed on the m ac h ine . Neg l igenc e o f warn ingc ou ld c aus e per sona l in ju ry o r mac h ine damage.

    Do no t pee l o ff o r d i rty th is p la te . 10 00- C109B

    MCV2000

    200

    0-2

    32

    710

    00C1

    87B

    DANGER

    H az ar dous v oltage wi llcause ser ious injury ord eath.

    b ef ore maintenance.turn o ff the power

    TE L: +88 6-4 -2392-1001 F AX : +8 86- 4-2392- 1037 h tt p: / /ww w. fi rst .com .tw

    F ull load cur rent:

    Spindle speed range:

    Pneumatic p ressur e:

    M achine weight:

    Power supp ly:

    R ated power:

    N O.52, CHA RN AN EA ST ROAD, TAI PI NG, T AI CHUN G, T AI WA N,R. O. C.LO NG CHANG M ACHINERY CO., LTD.

    MF G NO:

    MO DEL :

    M FG Date:> 5.5

    M ax.

    bar

    /min

    kg

    V3~ Hz

    kVA

    A

    18 V H-C270E

    5 0R-C822

    31503287

    2279

    335

    5565 3005865

    2150

    2205

    3013

    1562

    1397

    355

    335

    328

    Door open 2050

    Hig

    hest

    poi

    nt 4

    181

    D

    W

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 23 / 149

    2.2 DETAILS OF PRINCIPAL COMPONENT 2.2.1 SPINDLE HEAD

    A. THE SPINDLE HEAD IS MOUNTING ON THE SQUARE SLIDE WAYS, WHICH IN TURN ARE VERTICALLY INSTALLING ON THE SADDLE FRONT.

    B. THE SPINDLE HEAD IS VERTICALLY (IN Z AXIS) MOVES ALONG THE SLIDE WAYS.

    C. A PRACTICALLY MAINTENANCE-FREE AC BRUSHLESS MOTOR IS USED TO DRIVE THE SPINDLE ASSURING IN ASSOCIATION WITH LARGE DIAMETER BEARING SYSTEM, EXTREMELY HIGH PERFORMANCE.

    D. CARTRIDGE SPINDLE IS SUPPORTING BY ACCURATE AND GREASED PACKED BEARINGS.

    E. TOOL HOLDER RETAINER AND AIR BLOW THAT REMOVES CHIPS FROM THE SPINDLE AND TOOL TAPER ARE INCORPORATE IN THE SPINDLE.

    F. THE SPINDLE HEAD FEATURES SIMPLE STRUCTURE AND RELIABLE PERFORMANCE.

    2.2.2 COLUMN A. THE COLUMN IS FIRMLY BOLTED TO THE BED, AND DESIGNED TO HAVE

    PARTICULAR RIGIDITY. THE SLIDE WAYS ALONG WHICH THE SPINDLE HEAD MOVES ARE OF SQUARE TYPE, AND ELABORATELY GROUND.

    B. THE ATC (AUTOMATIC TOOL CHANGER) IS LOCATED AT THE LEFT OF THE COLUMN AND THE PNEUMATIC VALVES IS AT THE BACK OF THE ATC.

    C. THE MOTOR THAT DRIVES THE SPINDLE HEAD IN Z AXIS (VERTICAL MOVEMENT) IS INSTALLE ON THE TOP OF THE SADDLE.

    2.2.3 BED A. THE BED IS PROVIDE WITH LEVELING BOLTS AT ITS FEET, AND HAS THE

    SECTION WHERE THE COLUMN IS INSTALLE AS WELL AS THE SLIDE WAYS OF SQUARE TYPE ON THE TOP OF THE BED.

    B. THE X AXIS (CROSSWISE MOVEMENT) FEED MOTOR ARE INSTALLE ON THE BACK WALL OF THE BED.

    C. SINCE THE BED SUSTAINING THE WEIGHT OF THE COLUMN MUST ASSURE RELIABLE X AXIS MOVEMENT, AND LARGELY AFFECTS CUTTING ACCURACY, IT IS DESIGNE TO HAVE EXTREME RIGIDITY.

    D. IT IS ALSO CONSIDER IN DESIGNING THE BED THAT CHIPS AND CUTTING OIL CAN BE READILY ELIMINATED AND COLLECTED.

    2.2.4 TABLE A. THE TABLE IS THE ONLY PLACE WHERE YOU CAN LOCK YOUR WORK

    PIECE ON IT AND MACHINING, IT MOVES ON THE BED IN LENGTHWISE DIRECTION (X AXIS).

    2.2.5 ATC (AUTOMATIC TOOL CHANGER) A. THE ATC IS INSTALLE ON THE LEFT WALL OF THE COLUMN. THE ATC

    PERMITTING DIRECT TOOL CHANGE; ANY TOOL CAN BE IMMEDIATELY AND RELIABLY CHANGED.

    B. THE FEATURES OF THE ATC INCLUDE PNEUMATICALLY DRIVE SYSTEM, SIMPLE STRUCTURE, FAST MOVEMENT, AND RAPID BI-DIRECTIONAL RANDOM TOOL SELECTION IS DIRECTLY DESIGNATED TOOL NO. WITH T CODE. ( 24 / 32 TOOLS CAM TYPE ATC ARE AVAILABLE AS AN OPTION )

    2.2.6 OPERATION PANEL A. THE OPERATION PANEL IS LOCKED IN THE RIGHT FRONT OF THE

    MACHINE, AND BASICALLY CONSISTS OF THE NC OPERATION PANEL, IN WHICH PROGRAM LOADING FROM TAPE TO THE MEMORY, PROGRAM EDITION AND MID OPERATION ARE PERFORMED, AND THE OPERATION PANEL (OPERATOR'S STATION) HAVING CONTROL SWITCHES AND

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 24 / 149

    PUSH BUTTONS ON THE PANEL AND FUNCTIONAL SWITCHES IN THE PANEL.

    B. ALMOST ALL CONTROL SWITCHES AND PUSH BUTTONS NECESSARY TO OPERATE THE MACHINE ARE INSTALLE ON THE OPERATION PANEL, THUS THE OPERATOR CAN READILY CONTROL THE MACHINE OPERATION AT THE FRONT OF THE OPERATION PANEL.

    2.2.7 NC SYSTEM A. THE NC SYSTEM READS SIGNIFICANT INFORMATION FROM THE

    PROGRAM, AND PRODUCES COMMAND OR INSTRUCTION TO SEQUENTIALLY CONTROL THE MACHINE MOVEMENT AND OPERATION.

    B. THE NC SYSTEM IS NORMALLY LOCATED IN THE ELECTRIC CABINET. 2.2.8 ELECTRIC CABINET

    A. THE ELECTRIC CABINET RECEIVES THE COMMAND SIGNALS FROM THE NC SYSTEM, AND DRIVES THE MACHINE. IN THE ELECTRIC CABINET, RELAY CIRCUIT AND POWER SOURCE CIRCUIT ARE INCORPORATED.

    2.2.9 PNEUMATIC UNIT A. THE FUNCTIONS OF THE PNEUMATIC UNIT INCLUDE

    a. TOOL UNCLAMPING AT THE SPINDLE, b. AIR BLOWING FOR CLEANING THE SPINDLE AND TOOL TAPER. c. ATC CROSSWISE MOVEMENT AND ATC MAGAZINE VERTICAL

    MOVEMENT.(20 ATC) d. TOOL POT UP/DOWN (24/32 ATC)

    B. ONLY STRICTLY SELECTED PARTS AND DEVICES ARE USED IN THE PNEUMATIC UNIT, THUS ASSURING STABLE AND RELIABLE OPERATION

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 25 / 149

    2.3 MACHINE SPECIFICATIONS SPECIFICATION MAY DIFFERENT ACCORDING TO CUSTOM REQUEST OR OPTIONS.

    TABLE

    WORKING SURFACE ( X x Y ) 2,200 mm x 1,000 mm ( 86.61 x 39.37" )

    T SLOT ( NO. x WIDTH x PITCH ) 6 x 22 mm x 160 mm ( 6 x 0.86" x 6.29" )

    TABLE STROKE ( X x Y ) 2,050 mm ( 80.7" ) x 1,150 mm ( 45.27" )

    CUTTING FEED RATE 1 ~ 10,000 mm/min ( 0.04 ~ 393.7" /min )

    RAPID TRAVERSE ( X ) 20,000 mm/min

    RAPID TRAVERSE ( Y ) 30,000 mm/min

    RAPID TRAVERSE ( Z ) 16,000 mm/min

    X,Y FEED MOTOR ( AC SERVO UNIT ) 30 Nm AC MOTOR

    Z FEED MOTOR ( AC SERVO UNIT ) 22 Nm AC MOTOR

    TABLE LOAD CAPACITY 3,000 Kgs ( 6600 Lbs )

    FIG. 2.3.1 PRINCIPAL DIMENSIONS OF TABLE

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 26 / 149

    FIG. 2.3.1A PRINCIPAL DIMENSIONS OF TABLE (O.P T SLOT NO. 8)

    SPINDLE

    STROKE ( Z ) 700 mm ( 27.55" )

    TABLE TO SPINDLE END (MIN./MAX.)

    200 ~ 900 mm ( 7.87 ~ 35.43" )

    SPINDLE MOTOR

    40# 50#

    AC VARIABLE FREQUENCY MOTOR INFINITELY VARIABLE 15 kw CONTINUOUS RATING / 30 MINUTES RATING 18.5 kW

    (FOR OPTION)

    AC VARIABLE FREQUENCY MOTOR INFINITELY VARIABLE 22 kw CONTINUOUS RATING / 30

    MINUTES RATING 26 Kw

    (FOR OPTION)

    SPINDLE ROTATION SPEED RANGE

    10,000 / (OP)12,000 / 15,000 rpm /min10,000 / (OP ZF GEAR BOX) 6,000 /

    10,000 rpm /min

    MAX. SPINDLE MOMENT OF INERTIA

    95 Nm (FOR OPTION)

    140 Nm (FOR OPTION)

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 27 / 149

    AUTOMATIC TOOL CHANGE

    TYPE 40# 50#

    TOOL STORAGE CAPACITY

    24 /(OP) 40 / 60 T (OP) 90 / 120T 32 /(OP) 40 / 60 T (OP) 90 / 120 T

    TOOL CHANGE TIME

    ( TOOL TO TOOL ) 2.5 SEC 1.6 SEC 3.8 SEC 3.57 SEC

    TOOL CHANGE TIME

    ( CHIP TO CHIP ) 5.5 SEC 9.6 SEC 6.8 SEC 11.57 SEC

    MAX. ADJACENT TOOL DIAMETER

    76 mm (2.99") 90 mm (3.54") 127 mm (5") 127 mm (5")

    MAX. TOOL WEIGHT 7 KG ( 15 lbs ) 7 KG ( 15 lbs ) 15 KGS ( 33 lbs) 15 KGS ( 33 lbs)

    TOOL TOTAL WEIGHT150/200/300 kgs (330/440/661 lbs)

    450/600 kgs

    (992/1322 lbs)

    320/400/600 kgs

    (705/881/1322 lbs)

    900/1200 kgs

    (1984/2645 lbs)

    MAX. TOOL LENGTH 350 mm (13.7" ) 350 mm (13.7" ) 400 /400 /350 mm (15.7 /15.7 /13.7" )

    400 mm (15.7" )

    GENERAL INFORMATION

    AIR POWER REQUIRED

    6.0 kgf/c㎡ (85psi) (0.6MPa)

    SPINDLE CENTER TO COLUMN

    During double columns:1200 mm ( 47.2 " )

    FLOOR TO TABLE 830 mm (32.67")

    MACHINE HEIGHT 3481 mm (137")

    MACHINE WEIGHT 19500 kgs

    ( 8845 Lbs )

    22942 kgs

    ( 10406 Lbs )

    22110 kgs

    ( 10029 Lbs )

    23660 kgs

    ( 10732 Lbs )

    FLOOR AREA REQUIRED

    7,315(W) x 4,962(D) mm ( 288" x 195” )

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 28 / 149

    2.4 MACHINING AREA IT IS RECOMMEND TO PUT THE MACHINING PARTS OR FIXTURE NEAR THE CENTER OF THE TABLE.

    BIG FIXTURE OR PARTS MAY HIT MACHINE BODY OR COVER WHEN TRAVELLING AXIS. MAKE A SLOW TEST RUN REFORE MACHINING.

    BIG OR LONG TOOLS MAY HIT MACHINE BODY OR COVER WHEN TRAVELLING AXIS. MAKE A SLOW TEST RUN REFORE MACHINING.

    BEFORE STOP MACHINE, IT IS RECOMMEND MOVING THE TABLE TO THE CENTER OF X, Y AXIS. TO PERVENT FROM BENDING OF THE MACHINE.

    FIG. 2.4.1 MACHINING AREA

    FIG. 2.4.2 GRAVITY CENTER

    GRAVITY CENTER

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 29 / 149

    FIG. 2.4.3 WORKING AREA

    50 R-C82 2

    1000 752200 6642635

    100100

    Z:20

    0~90

    0

    X:2050585

    575

    Y:1150

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 30 / 149

    2.5 TOOL SHANK AND STUD BT SHANK

    Unit:mm

    Model NO. D1 D2 D3 d4 T L1 L2 L3 L4 L5 L6 b

    BT 40 44.45 53 63 17 M16 65.4 25 2 10 16.6 22.6 16.1

    BT 50 69.85 85 100 25 M24 101.8 35 3 15 23.2 35.4 25.7

    BT STUD ( MAS )

    Unit:mm

    Model NO. L1 L2 L3 L4 L5 L6 D1 D2 D3 D4 D5 d6 T S

    P40T-1 60 35 28 6 5 4 15 10 23 17 13 4 M16 19

    P50T-1 85 45 35 10 8 5 23 17 38 25 20 5 M24 30

    d6= Cooling Though Spindle

    D1

    D2

    D3d4

    7/24 TAPER

    L1 L3 L2

    L4

    L5

    L6

    b

    L6

    T

    D1

    D2

    D4

    T

    D5D

    3

    L2L1

    L5 L6L4L3

    S

    d645

    °

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 31 / 149

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 32 / 149

    CAT SHANK ( ANSI B5.50 )

    Unit:mm

    Model NO. D1 D2 D3 D4 d5 L1 L2 L3 b T

    CAT 40 1.75 2.219 2.5 1.75 0.641 2.687 0.985 0.89 0.645 5/8”-11

    ( UNC 28 ) 44.45 56.36 63.5 44.45 16.28 68.25 25.01 22.60 16.38

    CAT 50 2.75 3.594 3.875 2.75 1.031 4 1.485 1.39 1.02 1”-8

    ( UNC 28 ) 69.85 91.28 98.42 69.85 26.18 101.6 37.71 35.30 25.90

    CAT STUD

    Unit:mm

    Model NO. D1 D2 D3 d4 L1 L2 L3 S T

    CAT 40 0.74 0.49 0.94 0.281 1.5 0.64 0.44 0.75 5/8”-11

    ( UNC 28 ) 18.8 12.45 23.88 7.14 38.1 16.26 11.17 19.05

    CAT 50 1.14 0.82 1.44 0.468 2.3 1 0.7 1.25 1”-8

    ( UNC 28 ) 28.96 20.83 36.58 11.89 58.42 25.4 17.78 31.75

    d4= Cooling Though Spindle

    L2

    L1

    L3S

    D1 d4

    D2

    D3 T

    45°

    T

    L1

    0.625"0.125"

    1.375"

    L2 L3

    bD1

    D3

    D2

    D4d5

    7/24 TAPER60°

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 33 / 149

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 34 / 149

    DIN SHANK ( 69871 A )

    Unit :mm

    Model NO. D1 D2 D3 d4 T L1 L2 L3 b L4

    DIN 40 44.45 56.25 63.55 17 M16 68.4 22.8 25 16.1 18.5

    DIN 50 69.85 91.25 97.50 25 M24 101.75 35.5 37.7 25.7 30

    DIN STUD ( 69872 TYPE A)

    Unit :mm

    Model NO. D1 D2 D3 D4 d5 T L1 L2 L3 L4 L5 S

    DIN 40 19 14 23 17 7 M16 54 26 20 21 5 19

    DIN 50 28 21 36 25 11.5 M24 74 34 25 30 5 30

    d5= Cooling Though Spindle

    d4 T D1

    D2

    D3

    L1

    3.2

    19.1

    L2 L3

    b

    L4

    L460°7/24 TAPER

    L3

    L2

    L1

    Td5D1

    D3

    D2

    S L5 L42D

    4

    45°30

    °

    15°

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 35 / 149

    3. TRANSFER AND INSTALLATION OF MACHINE 3.1 HANGING OF MACHINE

    BEFORE HANGING AND TRANSFERRING THE MACHINE, BE SURE TO CHECK THE TRANSFERRING ROUTE FOR SAFETY. LOCATE THE SADDLE BY THE COLUMN, AND THE TABLE AT THE CENTER OF ITS STROKE TO BALANCE THE MACHINE. WE BALANCED THE MACHINE BEFORE SHIPPING. MACHINE WEIGHT:

    40# 50#

    304 / 40 / 60 T 90 /120 T 32 / 40 / 60 T 90 / 120 T

    19,500 KGS

    ( 8,845 LBS )

    22,942 KGS

    ( 10,406 LBS )

    22,110 KGS

    ( 10,029 LBS )

    23,660 KGS

    ( 10,732 LBS )

    A. CHECK THE HOOK, HANGING DEVICE AND LIFT FORK CAREFULLY BEFORE HANGING AND LIFTING FOR SAFTY OPERATION.

    B. DURING MOVING THE MACHINE, FOR SAFTY OPERATION, EVACUATE THE MACHINE MOVING AREA, NO PEOPLE SHOULD NEAR THE MACHINE.

    C. WHEN LOCATE THE MACHINE BE WARE TO CLEAR THE LOCATION AREA (MAKE SURE THERE IS NO PIPE, CABLE … )

    D. BEFORE HANGING THE MACHINE, TAKE OFF THE BACK COVER OF COLUMN AS SHOWN IN FIG. 3.1.1 TO PREVENT FROM DAMAGE OF THE MACHINE.

    E. THE MACHINE HAS HOOKS. TO HANG THE MACHINE, APPLY TWO WIRE ROPE, OR SLING, TO THE HOOKS AS SHOWN IN FIG. 3.1.2.

    F. BEFORE HANGING THE LEFT AND RIGHT POINT OF THE MACHINE, TAKE OFF THE LEFT AND RIGHT COVER OF X AXIS TO FIND OUT THE HANGING POINT.

    G. BE SURE TO USE A WIRE ROPE OF A SIZE LARGER THAN HOOK SIZE AND MAKE SURE THAT THE WIRE ROPE DOES NOT LEAVE THE HOOKS DURING TRANSFERRING OF THE MACHINE.

    H. PUT A RUBBER SHEET OR RAG ON THE MACHINE SURFACE WITH WHICH THE WIRE ROPE CAN COME INTO CONTACT TO PREVENT DAMAGE TO THE MACHINE SURFACE (PAINT).

    I. DURING HANGING AND TRANSFERRING OF THE MACHINE, USE CARE NOT TO GIVE DETRIMENTAL VIBRATION OR SHOCK TO THE MACHINE, AND TO MAINTAIN THE MACHINE UPRIGHT.

    NOTICE: THAT THE MACHINE IS LIABLE TO TILT BECAUSE THE ELECTRICAL UNIT EQUIPPED VERTICAL MACHINING CENTER HAS THE CENTER OF GRAVITY RELATIVELY HIGH POSITION.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 36 / 149

    FIG 3.1.1 HANGING THE MACHINE

    50R-C822

    BASE HOOKED BASE HOOKED

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 37 / 149

    3.2 REFERANCE DIMENTIONS FOR HANGING

    * D19mm(3/4”) steel wire.

    * Length 3650mm (not include the circle).

    * make an adjustable circle on the side to the base hooked (Be ware to secure the circle tightly).

    FIG 3.2.1 HANGING DIMENSIONS AND POSITION

    The O type hookedShould sustain more then 10,000kgs.

    A

    AA - A

    200*200mm H shape steelWeld supported steel on both side

    9201250

    Bx2 Bx2

    3650

    mm

    Adjustable

    Bx4

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 38 / 149

    3.3 MACHINE TRANSPORT BY FORK LIFT USE A FORK LIFT WITH MINIMUM CAPACITY OF 20 kN THE LENGTH OF THE FORK MUST LONGER THEN 2400 mm. WHEN MOVING MACHINE KEEP THE POSITION LOWER AND MOVE IT SMOOTH AND SLOWER.

    FIG 3.3.1 MACHINE TRANSPORTED BY POWER FORK LIFT

    LIFT HERE

    5 0R -C822

    3371

    2200 5869

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 39 / 149

    3.4 HANGING OF PARTS AND ACCESSORIES 3.4.1 FRONT COOLANT TANK

    ( TOP VIEW )

    FIG 3.4.1 HANGING OF FRONT COOLANT TANK

    M10 EYEBOLT

    M10 EYEBOLT

    NET WEIGHT ABOUT:100kg

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 40 / 149

    3.4.2 SIDE COOLANT TANK

    ( TOP VIEW )

    FIG 3.4.2 HANGING OF SIDE COOLANT TANK

    M10 EYEBOLTM10 EYEBOLT

    NET WEIGHT ABOUT:140kg

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 41 / 149

    3.4.3 CHIP CONVEY

    ( TOP VIEW )

    FIG 3.4.3 CHIP CONVEYER HANGING

    NET WEIGHT ABOUT:210kg

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 42 / 149

    3.4.4 COOLANT SYSTEM

    FIG 3.4.4 COOLANT SYSTEM HANGING

    3.4.5 OTHER ACCESSORIES FOR OTHER ACCESSORIES NOT LIST HERE, CHECK WITH YOUR

    MACHINE AGENT FOR SAFETY HANGING INFORMATION.

    NET WEIGHT ABOUT:80kg

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 43 / 149

    3.5 INSTALLATION SPACE RESERVED SPACE FOR OPERATION AREA AND MAINTENANCE AREA IS

    NECESSARY FOR SAFTY AND EFFENCY USE OF THE MACHINE AFTER

    INSTALLATION, FIG 3.5.1.

    IF YOU HAVE ANY QUESTION ABOUT INSTALLATION SPACE, CHECK

    WITH YOUR MACHINE AGENT BEFORE INSTALLATION.

    MA

    INTE

    NA

    NC

    E A

    REA

    MA

    INTE

    NA

    NC

    E A

    REA

    OPERATION PANEL

    R545

    3105 35458551

    MAINTENANCE AREA

    875600

    800

    VAC

    UU

    MSY

    STEM

    W

    D

    1340

    800

    2120

    1000

    4950

    900810

    460

    400

    2110

    WARNING

    entanglement hazard.Mov ing screw can cause

    D o not touch this part

    oper ation.and keep away during

    WARNING

    Do not peel off or dir ty this label

    1.B efor e oper ating the machine, read intensively the Instr uction Manual. In particular, readcarefully the description for safety and maintenance, and follow its instruction.

    2.D uring operation, close the door s and covers, and avoid access to the rotating and moving

    r emoved.3.D o not oper ate the machine w ith protective covers. lnter locks and the other safety devices

    4.B e sur e to c lamp the w orkpiece and cutting tools, and do not place a used tool on the movingparts. Also, for pr oper machining, select the optimum feedr ate and spindle speed.

    safety work.5.Wear proper habil iments (w ork ing c lothes, shoes, cap, protective glasses, etc.) to ensure

    6.R epair the machine only by the appr oved per sonnel following the Instruction Manual.in addition, turn the power switch OFF during repair.

    E xecute safety w or k on user's ow n responsibil i ty by obser ving the safety precautions providedon the Instr uction Manual and the WAR N IN G label attached on the machine. N egligence of w arningcould cause personal injury or machine damage.

    D o not peel off or dirty this plate.

    MCV2000

    2000

    -232

    71

    000

    C18

    7B

    D ANGER

    Haz ard ous v ol tage wi llcause ser ious injury ordeath.

    befor e maintenance.turn off the power

    TEL: +8 86- 4- 2392 -1001 F AX: +8 86- 4-2 392-1037 ht tp: / / www. f irs t. com. tw

    Ful l load current:

    S pindle speed ra nge:

    Pneum atic p ressure:M ach ine we ight:

    Power sup ply:Rat ed power:

    NO . 52 , CHA RN AN EAST RO AD, T AI PI NG , TA I CH UNG , T AIWAN, R. O. C.

    LO NG CHANG MACH IN ERY CO ., LTD.

    MFG NO:MO DEL:

    MFG Date:> 5.5

    Max.

    bar

    / min

    kg

    V3~ Hzk VA

    A

    18V H -C 270E

    5 0R -C 822

    5565 3005865

    2150

    2205

    3013

    Door open 2050

    Hig

    hest

    poi

    nt 4

    181

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 44 / 149

    TYPE #40 #50

    TOOL STORAGE CAPACITY

    30T 40T 60T 32T 40T

    W 2445 1795

    D 811 811

    Unit:mm

    FIG 3.5.1 INSTALLATION SPACE

    Unit:mm

    FIG 3.5.1A INSTALLATION SPACE(OPTION ATC#50x60T)

    MA

    INTE

    NA

    NC

    E A

    REA

    MA

    INTE

    NA

    NC

    E A

    REA

    OPERATION PANEL

    1340

    800

    2120

    1000

    R545

    4950

    1870 35457616

    810.

    7

    V2000 50#*60T

    MAINTENANCE AREA

    875875

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 45 / 149

    3.6 INSTALLATION THIS INSTALLATION IS ROUGHLY PUT THE MACHINE APPROPRIATELY ON THE SUPPORTING PADS, FOR DETAIL ADJUSTING LEVELING REFER TO CHAPTER 4. 3.6.1 FOUNDATION

    A. THE FOUNDATION ON WHICH THE MACHINE INSTALLED SHOULD BE RIGIDLY CONSTRUCTED WITH CONCRETE.

    B. SINCE MACHINING ACCURACY IS LARGELY GOVERNED BY THE ADEQUACY OF FOUNDATION AND INSTALLATION, ELABORATELY CONSTRUCT THE FOUNDATION AND INSTALL THE MACHINE ON IT.

    C. THE MACHINE SHOULD BE LOCATED WHERE IS NOT SUBJECTED TO VIBRATION FROM OTHER MACHINERY, AND TO DIRECT SUNBEAM.

    D. THE THICKNESS AND SIZE OF THE CONCRETE FOUNDATION SHOULD BE DETERMINED CONSIDERING THE GROUND CONDITION.

    E. WHEN FOUNDATION BOLT IS NOT USED, USE LEVELING PADS FURNISHED TO THE MACHINE TO INSTALL THE MACHINE.

    3.6.2 INSTALLATION A. CLEAN THE REVERSE SURFACE OF THE LEVELING PADS AND THE

    SUPPORTING PADS. AND PLACE THE LEVELING PADS AND THE SUPPORTING PADS ACCORDING TO THE FLOOR PLAN FIG 3.6.1

    B. CAREFULLY LOWER THE HUNG MACHINE SO THAT EACH FOOT OF THE MACHINE CAN REST ON THE RECESS OF EACH LEVELING PADS. THEN ADJUST THE LEVEL OF THE MACHINE BY THE LEVELING BOLTS.

    C. WHEN ANCHOR BOLT IS USED, INSTALL THE MACHINE ACCORDING TO THE PLAN.

    D. BECAUSE MORTARED HOLD MAY SINK WITH TIME UNTIL THE MORTAR IS COMPLETELY SET, PERIODICALLY CHECK THE LEVEL OF THE MACHINE FOR 16 MONTHS AFTER THE INSTALLATION AND READJUST IF NECESSARY.

    E. FOR CHECKING THE LEVEL, USE A LEVEL VIAL WITH SCALE OF 0.02mm / 1000mm.

    FIG. 3.6.1 FLOOR PLAN

    350 620 610 645 220 610 220 620 256

    4151

    1340

    290

    290

    5045

    2015

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 46 / 149

    FIG. 3.6.1A FLOOR PLAN (OPTION ATC #50x60T)

    FIG. 3.6.2 FOUNDATION DRAWING

    350 620 610 645 220 610 220 620 256

    4151

    1340

    290

    290

    5045

    2015

    485135465615

    625

    105

    101.5 58050#*60T

    120 2

    40

    500

    350

    450

    130

    150

    Leveling pads

    Leveling boltLock nut

    Leveling pads

    Concrete

    Mortar

    Concrete

    Mortar

    75

    150

    145

    220

    15

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 47 / 149

    3.7 INSTALLATION ENVIRONMENT PLEAASE RERFER TO CHAPTER 1.3.2 FOR MORE INFORMATION.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 48 / 149

    4. ASSEMBLY PROCEDURE AND TEST RUN WARRING: ALL ELECTRIC, HYDRAULIC, COOLANT SYSTEM,

    PNEUMATIC CONNECTING, AND MACHINE ASSEMBLY

    MUST BE DONE BY QUALIFIED TRAINED AND

    AUTHORIZED TECHNICAL PERSON.

    QUICK REFERANCE

    1. CLEANING OF MACHINE 2. REMOVAL OF LOCKING DEVICES 3. LUBRICATION AND AIR PIPING 4. SWITCHING ON THE POWER SOURCE AND

    CHECKING 5. TAKE OFF SPINDLE HEAD SUPPORT DEVICE 6. LEVELING CHECK 7. ASSEMBLE OF PARTS AND DEVICEDS 8. DEVICE PIPING INSTRUCTION 9. COOLANT

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 49 / 149

    4.1 CLEANING OF MACHINE A. ANTICORROSIVE AGENT HAS BEEN APPLIED ON THE MACHINE TO

    PREVENT CORROSION. B. REMOVE THE ANTICORROSIVE AGENT BEFORE STARTING TEST RUN.

    NOTICE THAT ANY MOVABLE PART OF THE MACHINE, SUCH AS TABLE, SPINDLE HEAD AND ATC, SHOULD NOT BE MOVED BEFORE THE ANTICORROSIVE AGENT HAS BEEN THOROUGHLY REMOVED.

    C. PARTICULAR CARE SHOULD BE GIVEN TO THOROUGHLY REMOVE THE ANTICORROSIVE AGENT FROM THE SLIDE WAYS, ATC AND SPINDLE TAPER.

    4.2 REMOVAL OF LOCKING DEVICES A. ACCORDING TO THE DRAWING, REMOVE ALL LOCKING DEVICES USED

    TO SECURE THE MOVABLE COMPONENTS OF THE MACHINE DURING THE TRANSPORT, SUCH AS X AXIS LOCKING DEVICES (1 . 2 ) Y AXIS LOCKING DEVICES ( 3 ),

    B. HOWEVER, DO NOT REMOVE THE SPINDLE HEAD LOCKING WOOD BLOCK ( 4 ) WHICH SHOULD BE REMOVED AFTER THE POWER SOURCE IS GIVEN TO THE MACHINE. (SHOULD CONTINUE TO READ THIS MANUAL UNTIL 3.5.5 FOR REMOVING ALL LOCKING DEVICES.)

    C. TAKE OFF THE BASE HOOKERS ( 11 ) ( 4 OF THEM ) D. IF THE SURFACE IS FOUND FOUL AFTER THE REMOVAL OF LOCKING

    DEVICE OR SCREW THOROUGHLY CLEAN. E. ONCE REMOVED PACKING MATERIAL. AND LOCKING DEVICES ARE NO

    LONGER USED.PUT THEM ASIDE FOR SAFE WORK.

    NO LOCKING DEVICES TYPE REMOVAL IMPLEMENT

    1 X AXIS LOCKING DEVICE 4 HEXAGON KEYS 4

    2 TABLE LOCKING DEVICE 1 HEXAGON KEYS 8

    3 Y AXIS LOCKING DEVICE 1 HEXAGON KEYS 6

    4 SPINDLE HEAD LOCKING DEVICE 1 HEXAGON KEYS 14

    5 OPERATION PANEL LOCKING DEVICE 1 HEXAGON KEYS 5 & 14

    6 LEFT DOOR DEVICE 1 HEXAGON KEYS 5

    7 OPERATION DOOR -1 1 HEXAGON KEYS 5

    8 OPERATION DOOR -2 1 HEXAGON KEYS 5

    9 OPERATION DOOR -3 1 HEXAGON KEYS 5

    10 OPERATION DOOR -4 1 HEXAGON KEYS 5

    11 BASE HOOKED 4 HEXAGON KEYS 17

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 50 / 149

    FIG. 4.2.1 LOCKING DEVICE

    1 12 34511 11

    6

    78

    910

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 51 / 149

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 52 / 149

    4.3 LUBRICATION AND AIR PIPING 4.3.1 LUBRICATION

    A. BEFORE STARTING THE OPERATION, THE MACHINE SHOULD BE PROPERLY OILED.

    B. USE A HIGH QUALITY, PURE OIL SPECIFIED IN THE LUBRICATION TABLE AND FILL EACH PART. BEFORE STARTING THE TEST RUN,

    C. THE FOLLOWING PARTS SHOULD BE OILED

    PART TO BE OILED Q'TY LUBRICANT REMARKS

    LUBRICATION PUMP 4.6L 1

    LUBRICATOR OF PNEUMATIC 0.17L 2

    LUBRICANT SHELL ESSO MOBIL

    1 SHELL TONNAOIL FEBIS K68 MOBIL VACTRA OIL

    NO.2

    2 SHELL TURBIN OIL T32 TERESSO 32 MOBIL DTE OIL LIGHT

    FIG. 4.3.1 LUBRICATION

    02010102

    潤滑油泵浦油箱LUBRICATION PUMP OIL TANK

    空壓系統內之給油器PNEUMATIC UNIT LUBRICATOR

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 53 / 149

    4.3.2 AIR PIPING A. CONNECT THE PIPES TO THE AIR INLET OF THE PNEUMATIC UNIT. B. THE PNEUMATIC DEVICES ARE DESIGNED TO WORK WITH

    COMPRESSED AIR AT 5.5 bar. C. THEREFORE, USE AN AIR SOURCE AT CONSTANT PRESSURE OF AT

    LEAST 6 bar. D. THE AIR PRESSURE HAVE BEEN PROPERLY SET UP BEFORE SHIPPING

    OUT THE MACHINE, IF ANY PROBLEM PLEASE CHECK CHAPTER 6.

    NOTICE: FOR LONG-TERM USAGE OF THE MACHINE, THE QUALITY OF THE AIR IS VERY IMPORTANT. BED QUALITY OF THE AIR MAY DAMAGE THE PNEUMATIC DEVICES AND CAUSE FAILURE OF MECHANICAL MOTION

    FIG. 4.3.2 AIR PIPING

    02010102

    排水口DRAINAGEOUT

    空壓源入口AIR IN(TO AIR HOSE)

    空壓源出口AIR OUT

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 54 / 149

    4.4 SWITCHING ON THE POWER SOURCE AND CHECKING FOR TRANSPORT REASON, SOMETIMES THE Z AXIS MOTOR, Y AXIS

    MOTOR OR OTHER MOTOR COULD BE TAKEN OFFBEFORE SHIPPING,

    IN THIS CASE, ACCEMBLE THESE MOTORS BEFORE THIS PROCEDURE.

    ONLY OTHERIZED PERSON CAN DO THE MOTOR ASSEMBLE.

    4.4.1 WIRING CABLE AND PLACE SEE FIG 4.4.1 NOTICE: MAKE SURE THE VOLTAGE AND CAPACITY IS SAME AS

    REQUIRED BEFORE WIRING.

    PE WIRE mm2 SUPPLY WIRE mm2

    25.0 25.0

    A. SUPPLY VOLTAGE: 0.9 - 1.1 NOMINAL SUPPLY VOLTAGE B. SOURCE FREQUENCY: 0.99 - 1.01 NOMINAL FREQUENCY C. WHEN THE POWER CABLE IS DISCONNECTED AND CONNECTED AGAIN,

    CARE SHOULD BE EXERCISED TO CONNECT EACH TERMINAL IN THE CORRECT PHASE (L1, L2, L3 PHASES).

    MAKE SURE THAT CLEANING OF MACHINE OILING AND OIL PIPING

    HAVE BEEN COMPLETED

    4.4.2 TO CONNECT THE POWER CABLE OPEN ELECTRIC CABINET AND CONNECTED TO QF1 AND PE IN THE

    ELECTRIC CABINET. THE POWER CABLE SHOULD HAVE CRAMP

    TERMINALS AND EACH TERMINALS SHOULD BE FULLY TIGHTENED

    WITH PLUS SCREWDRIVER,

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 55 / 149

    POWER SOURCE

    ALIMATION:3PH 50/60HZ L1,L2,L3+PE

    SUPPLY:WIRRING VOLTAGE MAY DIFFERENT PLEASE CHECK

    CABLE LENGTH:MAX: 3M

    SUPPLY VOLTAGE: 0.9 - 1.1 NOMINAL SUPPLY VOLTAGE

    SOURCE FREQUENCY: 0.99 - 1.01 NOMINAL FREQUENCY

    FIG. 4.4.1 POWER SOURCE DRAWING

    TURN ON THE POWER SWITCH TO “ON" POSITION MAKE SURE INTO

    THE CONTROL POWER SOURCE IS REQUIRED AND FAN WILL ON.

    HOLD DOWN THE PUSH-BUTTON "POWER ON" ON THE NC CONTROL

    PANEL FOR 2-3 SEC. DURING WHICH THE POWER SOURCE WILL BE

    GIVEN TO THE SERVO SYSTEM, INVERTER AND OTHER ELECTRIC

    UNITS AND DEVICES, THEN PERFORM THE FOLLOWING CHECKING

    WARNING

    entanglement hazard.Moving screw can cause

    Do not touch this part

    op eration.and keep away during

    1000-C177

    WARNING

    Do not peel off or dirty this label 1000-C110

    1.B ef ore operat ing the machine, read int ens ively the Inst ruct ion Manual. I n particular, readcaref ul ly t he descript ion for saf et y and maintenance, and follow its inst ruction.

    2.During operation, close the doors and covers, and avoid access to the rotat ing and mov ing

    removed.3.Do not operat e the machine wi th protect ive covers . lnter locks and the ot her safety devices

    4.Be sure to c lamp t he workpiece and cut ting tools, and do not place a used tool on t he movingparts . Also, for proper machining, select the opt imum f eedrat e and spindle speed.

    saf et y work.5.Wear proper habil iment s (work ing clot hes, shoes, cap, protect ive glasses, etc. ) t o ensure

    6.Repair the machine only by the approved personnel f ol lowing t he Instruc tion Manual.in addi tion, turn t he power switch OF F during repair.

    Execute saf et y work on user's own responsibilit y by observ ing the saf et y precautions prov idedon the Ins truc tion Manual and t he WARNI NG label att ached on t he machine. Negligence of warningcould cause personal injury or machine damage.

    Do not peel off or dirty this plate. 1000 -C109B

    MCV2000

    2000

    -232

    71

    000C

    187B

    50R-C822

    NO FUSEBREAKER

    CONNECT POWERCABLE HERE

    CABLEQF1

    GROUNDWIRE

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 56 / 149

    A. CHECK IF ANY ALARM MESSAGE APPEARS? (CRT OR OP PANEL LED) B. CHECK COOLANT PUMP ROTATION, SPINDLE FAN ROTATION, OR ATC

    ROTATION FOR CORRECT DIRECTION OF POWER SOURCE.

    C. IF ALARM MESSAGE OCCURS REFER TO CHAPTER 7 TROUBLE SHOOTING USING ERROR MESSAGE#, TNC MESSAGE AND ELIMINATE THE CAUSE OF THE ALARM

    D. IF MOTOR DIRECTION RUN WRONG DIRECTION STEP AS NEXT a. TURN POWER OFF ON OPERATION PANEL b. ALSO TURN MAIN POWER SWITCH OFF c. OPEN CABINET (LEFT SIDE) CHANGE POWER CABLE

    CONNECTION 2 OF 3 WIRES (L1,L2,L3) AGAIN CHECK MOTOR DIRECTION

    NOW POWER CABLE CONNECTION HAS BEEN COMPLETED

    Phase Rotation Mark.

    Coolant Pump

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 57 / 149

    4.5 TAKE OFF SPINDLE HEAD SUPPORT DEVICE 4.5.1 OPERATE IN DOOR OPEN STATUS WITH NON CE DOOR

    INTERLOCK SWITCH (OPTION) A. WHEN NON CE DOOR INTERLOCK SWITCH IS MOUNTED, PRESS THIS

    KEY TO RELEASE DOOR INTERLOCK. B. RELEASE DOOR INTERLOCK IN ANY MODE. C. CAN OPERATE ONLY IN JOG AND HANDWHEEL MODE WHEN DOOR

    OPENED D. DUE TO SAFETY REASON, WHILE DOOR OPEN THE MACHINE CAN ONLY

    OPERATE IN FOLLOWING STATUS. a. SPINDLE SPEED UNDER 50/MIN b. CAN OPERATE ONLY IN JOG AND HANDWHEEL MODE. c. AXIS FEED RATE UNDER 2000MM/MIN.

    E. CLOSE DOOR TO RESUME SYSTEM. 4.5.2 OPERATE IN DOOR OPEN STATUS WITH CE DOOR INTERLOCK

    SWITCH (OPTION) A. CONDITION IN DOOR OPEN STATUS

    DUE TO CE REGULATION AND SAFETY REASON, WHILE DOOR OPEN THE MACHINE CAN ONLY OPERATE IN FOLLOWING STATUS.

    a. SPINDLE SPEED UNDER 50 /MIN. b. CAN OPERATE ONLY IN JOG AND HANDWHEEL MODE. c. AXIS FEEDRATE UNDER 2000 MM/MIN

    B. HOW TO OPERATE IN DOOR OPEN STATUS

    a. PUSH DOOR OPEN BUTTON. b. AFTER ENABLE THIS BUTTON, THE LAMP IN THE BUTTON

    LIGHTS.

    NOTICE: ONCE YOU PUSH THIS BUTTON, YOU MUST EXCUTE OPEN AND CLOSE DOOR PROCEDURE TO RESUME THE SYSTEM.

    c. OPEN THE DOOR. d. CLOSE DOOR TO RESUME SYSTEM.

    C. MOVE THE AXIS OR TURN THE SPINDLE IN MANUAL MODE.

    a. SWITCH KEY TO MODE ENABLE.

    b. SWITCH MODE TO “MANUAL” (HANDLE, JOG.)

    NOTE: MAKE SURE NOW MAGAZINE ON INITIAL POSITION.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 58 / 149

    c. BEFORE ANY MOVEMENT, KEEP PUSHING THE PERMISSIVE

    BOTTON

    PER-MISSIVE

    FOR MACHINE WITH REMOVEABLE HANDWHEEL, THE BUTTON IS ON THE SIDE OF THE HANDWHEEL.

    FOR MACHINE WITHOUTREMOVEABLE HANDWHEEL, THIS BUTTON IS ON THE OPERATION PANEL.

    d. DURING ANY MOVEMENT, YOU MEST KEEP PUSHING PERMISSIVE BUTTON TO ENABLE THE MOVEMENT.

    NOTICE: DON’T RELEASE THE PERMISSIVE BUTTONS BEFORE STOP THE MOVEMENT. IT WILL CAUSE THE FAILURE OF THE MOVEMENT.

    4.5.3 PROCEDURE TO TAKE OFF

    A. SELECT MODE TO HANDLE X10 MODE , AND ADJUST FEEDRATE OVERRIDE LOWER

    B. USE HANDWHEEL Z+ (OR PUSH Z+ BUTTON) TO RAISE THE HEAD, AND THEN TAKE OFF THE SUPPORT DEVICE.

    C. IF YOUR MACHINE IS WITH OPTION OF Z AXIS COUNTERWEIGHT, PROCESS FOLLOWING…

    a. USE HANDWHEEL Z- , UNTIL THE COUNTERWEIGHT CHAIN HAS TIGHTEN .

    b. REFER TO FIG 4.2.1 TAKE OFF LOCK SCREW 7 AND 8. ( ADJUST PROPER Z AXIS POSITION FOR EASIER TAKE OFF LOCK SCREW )

    4.5.4 MOVE AXIS TO REFERENCE POINT MOVE SPINDLE HEAD (Z AXIS), SADDLE (Y AXIS), TABLE (X AXIS)TO

    THE REFERENCE POINT (COORDINATE ZERO)

    A. SWITCH KEY TO MODE ENABLE

    B. SET THE MODE SWITCH TO ZERO POSITION.

    C. SET THE SWITCH "RAPID OVERRIDE" TO 25%.

    D. PRESS THE PUSH BUTTON UNTIL THE ZERO (REFERENCE

    POINT) LAMP "Z" LIGHTS (THEN, FOR X AXIS AND FOR Y AXIS)

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 59 / 149

    E. WHEN THE LAMP LIGHTS, THE SPINDLE HEAD REACHES THE REFERENCE IN Z AXIS. REPEAT THE STEPS ABOVE TO RETURN THE SADDLE AND TABLE TO THE REFERENCE POINT IN Y AXIS X AXIS RESPECTIVELY.

    NOTICE: WHEN OPERATION IS RESUMED AFTER THE POWER SOURCE IS ONCE TURNED OFF OR EMERGENCY STOP BUTTON PUSHED PERFORM THE OPERATION TO RETURN THE REFERENCE POINT AND THEN START THE OPERATION AGAIN

    NOTE: AFTER ZERO RETURN COMPLETED ON/OFF AGAIN TO MAKE SURE EVERYFIME SAME POSITION.

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 60 / 149

    4.6 MACHINE LEVELING SET UP 4.6.1 PROCEDURE TO SET UP MACHINE LEVEL

    TOOLS:LEVELING GAUGE (GRADIENTER) x2, LIFT JACK x1, 24mm

    OPENING WRENCH x2, 46mm OPENING WRENCH x2, (BETTER

    OPERATE BY TWO PERSON)。

    A. ROUGH ADJUSTMENT.

    CLEAN THE TABLE PROPERLY.

    PUT TWO LEVELING GAUGE ON THE CENTER OF TABLE(AS FIG

    BELOW).

    MOVE THE TABLE TO THE POSITION BELOW COLUMN.

    ADJUST LEVELING FROM THE POINT OF ○7 ○8 ○5 ○6 THEN ADJUST

    OUTBOUND POINT, LIFT JACK WILL BE HELPFUL DURING

    ADJUSTMENT.

    ADJUST THE LEVEL WITHIN 0.08mm

    B. ACCURATE ADJUSTMENT

    PROCEDURE AS ABOVE

    ADJUST THE LEVEL X AXIS WITHIN 0.06mm Y AXIS WITHIN 0.05mm.

    C. WHILE DOING FINE ADJUSTMENT, ADJUST FROM OUTBOUND POINT, BECAUSE THE FOUR POINT BELOW COLUMN SUFFERING MASS WEIGHT OF THE MACHINE.

    D. MULTI POINT CHECK

    SLIGHTLY SECURE THE NUT ON THE LEVELING BOLT.

    MOVE THE TABLE SLOWLY TO THE PLACE OF ○15 ○16 AS THE START

    POINT.

    THEN MOVE EVERY TIME 500mm TO OPPOSITE DIRECTION ○1 ○2 AND

    RECORDS THE ACCURACY VALUE. THERE ARE 5 STOP POSITION EACH

    POSITION ACCURACY SHOULD BE X AXIS WITHIN 0.06mm Y AXIS

    WITHIN 0.05mm.

    E. GEOMETRY ACCURACY: HOWEVER AFTER ADJUSTMENT WITHIN THE ACCURACY VALUE, THE CENTER POSITION NEAR ○5 ○6 ○7 ○8 SHOULD BE HIGHER THEN OUTBOUND POSITION. (CENTER POSITION SUFFERING THE MASS WEIGHT OF WORK PIECE)

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 61 / 149

    4.6.2 CIRCULAR AND RIGHT ANGLE ACCURACY CHECK A. AFTER CHECK THE LEVELING, CHECK THE 4 POINT OF SPINDLE

    ROTATION ON TABLE AS FIG 4.6.2. THE FINAL ACCURACY IS WITHIN 0.015mm/300mm.

    B. AND COLUMN ANGLE TO TABLE A FIG 4.6.3. THE FINAL ACCURACY IS WITHIN 0.025mm/600mm

    C. WHEN THE ABOVE ACCURACY IS OUT OF RANGE, ADJUST LEVELING BUT REMAN THE LEVELING ACCURACY. THIS METHOD ONLY FOR X Z AXIS.

    D. EXAMPLE: REFER TO FIG 4.6.1 ~ 6.4.3

    A2 A4 Angleα Adjust 1 Adjust 2 -0.03 0 >90 ○1 ○2 ○3 ○4 lower ○9 ○10 ○11 ○12 higher

    0 -0.03

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 62 / 149

    FIG. 4.6.2 CIRCULAR CHECKING ON TABLE

    α

    600

    FIG. 4.6.3 RIGHT ANGLE CHECKING OF TABLE AND COLUMN

    4.7 SETTING UP OF OTHER EQUIPMENT AND ACCESSORIES SHUTDOWN THE MAIN POWER BEFORE ASSEMBLY.

    FOR THE HANNING OF ACCESSORIES PLEASE REFER TO CHAPTER 3.

    A1

    A2

    A3

    A4

  • V2000 OPERATOR’S MANUAL

    CE-V2000-OP-ENG-FANUC-A01 V2000-7713-100.DOC Page 63 / 149

    4.8 ASSEMBLE OF PARTS AND DEVICEDS BE WARE TO SWITCH OFF THE MAIN POWER WHILE ASSEMBLE OF

    PARTS AND DEVICESES.

    FOR HANNING INFORMATION OF PARTS AND DEVICES PLEASE REFER

    TO CHAPER 3.

    FIG. 4.7.1 ASSEMBLE OF PARTS AND DEVICES

    WA RNI NG

    en ta n gl em en t h az ard .Mov in g s cre w c an ca use

    Do n ot to uc h thi s part

    opera ti o n.an d k e ep a wa y duri ng

    1000-C177

    WARNING

    Do no t pe e l of f o r d irty th is la be l 1000- C110

    1.Befo re op erat i ng th e ma ch in e, re ad in te ns ive ly th e In st ruct i on Manu al. In p artic ula r, rea dc arefu lly th e d esc ri pt io n for sa fety an d ma in te na n ce, a nd fol lo w its inst ru ct ion .

    2.Durin g op era ti on , cl ose th e do ors an d co ve rs, an d av oi d acc ess to the ro ta ti ng a nd movi ng

    remo ve d.3.Do n ot op erate th e ma ch in e wi th p ro te ct iv e co ve rs . ln ter lo cks a nd the othe r sa fety de vice s

    4.Be su re to cl amp th e workp iec e an d cu t tin g too ls, an d do no t p lac e a us ed too l o n th e movi ngp arts. Al so , for prop er ma chi ni ng , s el ect the o pt i mum fee drate an d spin dle s pee d.

    s afety work.5.We a r pro pe r h ab il ime nts (workin g c lo th e s, sh o es, ca p, p rote ct ive gl asse s, etc. ) to e nsu re

    6.Rep ai r the ma ch in e o n ly by th e a p prove d p erso nn el fol lowi ng th e Inst ru ct io n Ma nu al.i n ad d it io n, tu rn the p owe r s wi tch OF F d uring rep ai r.

    Exec ute sa fety work o n us er's o wn res po ns ibi li ty b y o bse rvin g the safety p re cau ti ons prov ide don th e In st ru ct io n Man ua l an d the WARNING l ab el a t ta che d o n the ma chi ne . Neg li ge nc e of wa rni ngcou ld c au se p erso na l i nj ury or mac hin e d ama ge .

    Do n o t pe e l of f o r d irty th is pl ate. 1000-C109B

    MCV2000

    2000

    -232

    710

    00C

    187B

    1000

    -C58

    1A

    DANGER

    Ha zar do us vo l ta ge wil lc au se s eri ou s i nj ury ordea th.

    before ma in te n anc e.tur n o ff the power

    1 00 0 - C1 7 9

    TEL: +886-4- 2392-1001 FAX: +886-4- 2392-1037 h ttp: // www. fi rs t. com .tw

    Full load c ur re nt:

    Spindle s pee d ra nge:

    Pne uma tic pres sure:Ma chine we ight:

    Powe r s upply:

    Rate d power:

    NO .52,C HARN AN EAST ROAD, TAI PING , TAI CHUN G, TAI WAN, R. O.C .LONG C HA NG M AC HIN ER Y CO., LTD.

    MFG N O:

    MODEL: