operating manual (1 mb)

1
“Quick instructions” are an extract of the inverter technical manual, which should be read in full before using the product. Install the inverter in the hydraulic circuit near the electric pump, using the three pieces joint. They Must be performed by qualified personnel in accordance with the appli- cable rules. Before making the con- nections, make sure that the electric power supply network is not live, and the electric power supply network is protected by ground connections in complian- ce with the Standard. 2.1 Connect as shown below: A = power connection cable, B = motor connection power. 2.2 Plug the connector and fasten the cable gland support. 2.3 Power the inverter using the switch and wait for the STARTING time (10 sec.) STARTING UP QUICK INSTRUCTION SINGLE-PHASE PUMPS: • MOD. ST M/M 07 • MOD. ST M/M 10 • MOD. ST M/M 11D • MOD. ST M/M 13D PUMP INVERTER 1 2 Hydraulic connection Electric connections STARTING 3.2 SET1 access is activated; press ENTER within 10 seconds to confirm the access in SET1 menu; pressure P can be set at desired value. 3.3 Set the desired operating pressure using the button “+” to increase or “-“ to decrease. 3.4 Go to next parameter (current A) by pressing the arrow + SET 1 P ..... P 0.0 P = Pressure A = Current 3 A B Parameters setting in menu SET 1 SET 1 3.1 Pressure “P” is displayed; press both the buttons shown in the picture to enter in SET1 menu. P ... Pressure Current P .... A .... 3.5 Set the operating Current (indicated in motor plate) using the button “+” to encrea- se or “-“ to decrease. A ... 3.6 Exit the SET1 menu using the arrow until the word “EXIT” appears. EXIT The inverter will now work at the desired pressure and the maximun current is limited as set. L N 230V Monophase motor terminal board Inverter clamps N L GND GND W V U EN 4.2 Connect the Expansion-signal Board female connector to the correspondent male connector located on the inverter electronic board. 4.3 Lock the expansion signal board, by screwing the 4 screws. 5.1 Signal connection between inverters (RS 485 signal) Connect together the terminals 8 and 9 of the different inverters. 5.2 Connection of the Alarm Signal (on the MASTER inverter). 5.3 Connection of level sensor or other input signal (to the MASTER inverter). 5.4 Lock the cable gland and close the Expansion board cover. NC (normally closed). Connect the signal cable to terminals 2 and 3. Connect the signal cable to terminals 4 and 5. NO (normally open). Connect the signal cable to terminals 1 and 2. Clamps Description/Function: 10. not connected 9. Rs485+ 8. Rs485- 7. not connected 6. not connected 5. level signal 4. Gnd 3. NC (relay alarm output) 2. N (relay alarm output) 1. NO (relay alarm output) 10 9 8 7 6 5 4 3 2 1 5 Expansion signal board connection for models with “E” and “P” suffix. 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 The expansion board allows: • a RS485 signal to connect the inverter in parallel with other inverters (max 3 inverters connected in parallel) • an input signal (ex.: Level signal) • an output signal (ex.: Alarm output signal) 4.1 Remove the signal board cover, loca- ted on the back of the unit, by unscrewing the 4 screws indicated on the picture. 4 Expansion board installation for inverter connections for the models with “E” and “P” suffix. Before connecting, make sure that the electric power supply network is not live. Before removing the inverter cover or starting intervention on it, the system must be disconnected from the mains electricity and you must wait for 5 mins until the intermediate cir- cuit capacitors have the time to discharge via the built-in discharge resistors. DGFLOW srl 46100 Bigarello (MN) Italy - tel. +39 0376 340922 - www.dgflow.it Made in Italy by 10031407A.01 Cable 3 x 2,5 230V

Upload: ngodung

Post on 12-Feb-2017

228 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Operating Manual (1 MB)

“Quick instructions” are an extract of the inverter technical manual, which should be read in full before using the product.

Install the inverter in the hydraulic circuit near the electric pump, using the three pieces joint.

They Must be performed by qualified personnel in accordance with the appli-cable rules. Before making the con-nections, make sure that the electric power supply network is not live, and the electric power supply network is protected by ground connections in complian-ce with the Standard.

2.1 Connect as shown below: A = power connection cable, B = motor connection power.

2.2 Plug the connector and fasten the cable gland support.

2.3 Power the inverter using the switch and wait for the STARTING time (10 sec.)

STARTING UP QUICK INSTRUCTION

SINGLE-PHASE PUMPS: • MOD. ST M/M 07 • MOD. ST M/M 10 • MOD. ST M/M 11D • MOD. ST M/M 13D

PUMP INVERTER

1

2

Hydraulic connection

Electric connectionsSTARTING

3.2 SET1 access is activated; press ENTER within 10 seconds to confirm the access in SET1 menu;

pressure P can be set at desired value.

3.3 Set the desired operating pressure using the button “+” to increase or “-“ to decrease.

3.4 Go to next parameter (current A) by pressing the arrow

+

SET 1

P .....

P 0.0

P = PressureA = Current

3

A

B

Parameters setting in menu SET 1

SET 1

3.1 Pressure “P” is displayed; press both the buttons shown in the picture to enter in SET1 menu.

P ...

Pressure Current

P .... A ....

3.5 Set the operating Current (indicated in motor plate) using the button “+” to encrea-se or “-“ to decrease.

A ...

3.6 Exit the SET1 menu using the arrow until the word “EXIT” appears.

EXIT

The inverter will now work at the desired pressure and the maximun current is limited as set.

LN

230V Monophase motor terminal board

Inverter clamps

NL

GNDGND

WVU

EN

4.2 Connect the Expansion-signal Board female connector to the correspondent male connector located on the inverter electronic board.

4.3 Lock the expansion signal board, by screwing the 4 screws.

5.1 Signal connection between inverters (RS 485 signal)Connect together the terminals 8 and 9 of the different inverters.

5.2 Connection of the Alarm Signal (on the MASTER inverter).

5.3 Connection of level sensor or other input signal (to the MASTER inverter).

5.4 Lock the cable gland and close the Expansion board cover.

NC (normally closed).Connect the signal cable to terminals 2 and 3.

Connect the signal cable to terminals 4 and 5.

NO (normally open).Connect the signal cable to terminals 1 and 2.

Clamps Description/Function:

10. not connected 9. Rs485+ 8. Rs485- 7. not connected 6. not connected 5. level signal 4. Gnd 3. NC (relay alarm output) 2. N (relay alarm output) 1. NO (relay alarm output)

10987654321

5 Expansion signal board connectionfor models with “E” and “P” suffix.

10987654321

10987654321

10987654321

10987654321

10987654321

10987654321

10987654321

The expansion board allows:

• a RS485 signal to connect the inverter in parallel with other inverters (max 3 inverters connected in parallel)• an input signal (ex.: Level signal)• an output signal (ex.: Alarm output signal)

4.1 Remove the signal board cover, loca-ted on the back of the unit, by unscrewing the 4 screws indicated on the picture.

4 Expansion board installation for inverter connections

for the models with “E” and “P” suffix.

Before connecting, make sure that the electric power supply network is not live.

Before removing the inverter cover or starting intervention on it, the system must be disconnected from the mains electricity and you must wait for 5 mins until the intermediate cir-cuit capacitors have the time to discharge via the built-in discharge resistors.

DGFLOW srl 46100 Bigarello (MN) Italy - tel. +39 0376 340922 - www.dgflow.it

Made in Italy by10031407A.01

Cable3 x 2,5 230V