Pipeline Integrity Management
May 20, 2015
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Agenda
2
•Rolta Introduction•Rolta OneView™•Integrity Management•Dashboard Examples•Proof of Concept Approach
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
About Rolta� Established public company, 30 years young
� Global company – Projects in 40+ Countries
� 3,500 employees & growing
� Annual Revenue of $600 MM
� Forbes Global 200 Best Companies – 4 times in 6 years
� SAP Pinnacle Award winner in 2014
3
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Engineering GIS IT
ROLTA OneView – Innovative Solution3 decades of expertise in Engineering, GIS and IT
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Rolta OneView
5
Rolta OneView
Operation Insights
Production
Consumption
Operating Risks
Operating Cost
Maintenance & Reliability
Insights
Maintenance
Equipment Reliability
Inspection
Maintenance Cost
Asset Insights
Facilities, Assets
Asset Historian / performance
Asset Explorer
Asset Management
HSE Insights
HSE Management
Health
Safety
Environment
Sustainability
Insights
Planet
People
Profit
Practices
Supply Chain Insights
Inventory Management
Service Contracts
Spares
Logistics Execution
Project Insights
Planning
Progress Tracking
Resources
Project Cost
Business Insights
Finance
Contracts, Entitlement, Interest set
HR
Sales & Marketing
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
6
Standards Based Data Model
ISO62264, Open O&M, PPDMMaintenance
Operations
Engineering
Manual Input
Capital Projects
Supply Chain
Finance
• SAP
• JDE
• Oracle
• SAP APO
• Aspen
• Primavera
• MS Project
• SharePoint
• Intergraph
• AspenTech
• AutoCAD
• Bentley
• Aveva
• ESRI
• IP21
• OSI Pi
• Honeywell
• Yokogawa
• Siemens
• Emerson
• DB
• Excel
•SAPPM
• Maximo
•Oracle EAM
• Passport
• DataStream
•Linear Asset
Management
• Meridium
• Capstone
• DB / Excel
HSE
• SAP
• IHS
Reliability
• SAP QM
• Labware
• StarLIMS
• Sample Manager
Quality
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Integrity Management Overview
7
#1#1
#2#2
#3#3
Regulatory compliance is not on the decline. Quite the opposite, it is on the rise.
Operators are accountable to Documented IM programsOperators are accountable to Documented IM programs
If you have to do it, why not make it work for you?If you have to do it, why not make it work for you?
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Integrity Management System
8
KnowledgeKnowledge
Identify ThreatsIdentify Threats
Evaluate and Rank Risk
Evaluate and Rank Risk Identify and
Implement Measures to Address Risk
Identify and Implement
Measures to Address Risk
Measure Performance and Monitor
Results
Measure Performance and Monitor
Results
Periodic Evaluation and Improvement
Periodic Evaluation and Improvement
Reporting Results
Reporting Results
Distribution
Model
Distribution
Model
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Pipeline Integrity Management System
192.1007 Regulation Element Rolta Compliance
1 Knowledge
2 Identify Threats
3 Evaluate and Rank Risk
4 Identity and Implement Measures to Address Risks
5 Measure Performance, Monitor Results and Evaluate Effectiveness
6 Periodic Evaluation and Improvement
7 Report Results
9
192 Sub Part Pipeline- DIMP 192.1007
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Pipeline Integrity Management System
192.911 Elements Rolta Compliance
1 ID HCA Continuously
2 Identify Threats
3 Data Integration
4 Risk Assessment
5 Integrity Assessment
6 Repair Remediation
7 Continuous improvement P&M and QA/QC and ongoing communication in reporting
10
Operators TIMP 192.901-951
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Keeping away from the IM overload
• New and revised regulations are elevating pipeline safety requirements—grandfathered pipe is being eliminated, and integrity management requirements are being expanded in CFR Title 49.
• Proactive Integrity Monitoring And Mitigation Can Expedite Integrity Improvements While Physical Assets Are Being Upgraded
11
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Implementing Management Systems improves
Integrity and Profitability which equals Data, Asset
and Lifecycle Management
• Material and construction defects, e.g. defective longitudinalpipe seam, pipe body or joint welds;
• Mechanical damage from construction, maintenance or third-partyexcavation;
• Incorrect operation;• Corrosion, creep and cracking mechanisms;• Device failures and malfunctions; Operation of ASV’s• Earth forces such as earthquakes, land slips or telluric currents and
weather related threats such as high winds, rain, hurricanes, tornadoes or any other circumstances that place an Operator in irregular operating environments.
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Pipeline RisksTime Dependent
Threats
External Corrosion
•Coating Condition Degradation
•Inadequate Cathodic Protection
Internal Corrosion
•Material Composition / Contaminants
•Material Erosive Characteristics
Stress / Cracking
•Stress Corrosion Cracking
•Embrittlement
•Operating Temperature Impact
•Vibration Impact
•Reduction In Pipeline Support
Stable Threats
Manufacturing Related
•Long Seam Defects
•Pipe Defects
Construction/ Fabrication Related
•Girth Weld Girth Weld Brittleness
•Coupled Welds
•Wrinkle Bends
•Branch Connections
Equipment Related
•Gaskets
•Relief Valves/ Regulators
Time Independent Threats
Excavation Damage
•Physical Damage Dents
•Breakage
Incorrect Operations
•Human error, inadequate training, failure to follow procedures
•Internal pressure operations to Design Max and HCA
•Stress factors (cycling from steady state operations)
Weather & Outside
•Geological Impact
•Thermal Displacements (Flash Freeze or Heat)
13
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Risk Analysis and Mitigation Process
14
Risk Models
Maintenance
Management
Data
Asset Data
Pipeline
Geospatial
Data (ESRI)
Engineering
DataFinancial Data
Inspection
Data
Monitoring /
Operations
Data
Evaluate RisksProject Risk Over Time
Implement Mitigation Measures
Monitor Mitigation Measures
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Collaborating to find the path to IM complianceand operational excellence
15
Ma
inte
na
nce
Spe
nd
ing
Qu
ality C
on
trol a
nd
Qu
ality A
ssura
nce
Initiating Aware Understanding Competence Excellence
Asset Management Maturity
Timeline
Monitoring
quality of
repairs/data
tracking
Ongoing
documented M&R
or Reactive to
internal and
external causes
IM Processes
for
preventative
and proactive
maintenance Ongoing
maintenance
and
reporting
Monitoring of
QA / QC WO
requests /
maintenance
Lifecycle and
asset
management
Real-time
data for IM
compliance
Focus IM for
improved
process and
operational
excellence
Increased operational value through
improved capital investment
Decrease cost, improve quality,
reduction in cycle time.
Repair
monitoring
and
compliance
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
16
Collaborating to find the path to IM complianceand operational excellence
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Challenges Rolta OneView Addresses Impacting IM Programs
• Structured and unstructured data—cumbersome manual processes
• Operational complexity—reviewing related data from many sources
• Location/Coordinates/GPS
• Buffer zones for HCAs—maintaining GIS data, required compliance measures and timelines
• Stationed Centerlines/Routes/Series/Line Hierarchy
• Training / Skills / Certifications
• Contractor / Service provider work management
• Right information/right time
‘Situational Awareness’
AssetData
EngineeringData
ProcessSafetyData
PeopleData
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Dashboard Examples of IM KPIs
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
19
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
20
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
21
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Proof of Concept (POC) Approach in validating Rolta OneView
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Typical On-Premise POC Approach
• Connectors to
source system
• Data certification
• Meta data
mapping
• KPIs
• Dashboards
• Access Control
• Connectors to
source system
• Data certification
• Meta data
mapping
• KPIs
• Dashboards
• Access Control
• Data source
mapping
• Connectivity to
source systems
• Additional Work
Process Design
• Documentation
• Sign-off & Release
for Configuration
• Data source
mapping
• Connectivity to
source systems
• Additional Work
Process Design
• Documentation
• Sign-off & Release
for Configuration
• KPI scope
finalization
• Calculation
Methods
• Source System
Analysis
• Prototyping
• Infrastructure
• Use case sign-off
• KPI scope
finalization
• Calculation
Methods
• Source System
Analysis
• Prototyping
• Infrastructure
• Use case sign-off
Discovery Blue PrintingConfiguration &
Customization
• Unit Testing
• Integration
Testing
• System Testing
• User Reviews
• Unit Testing
• Integration
Testing
• System Testing
• User Reviews
Test
• Training
• Acceptance
Testing
• UAT Sign Off
• Data Migration
• Go-Live
• Production
Support
• Training
• Acceptance
Testing
• UAT Sign Off
• Data Migration
• Go-Live
• Production
Support
Deploy
Week 1 Week 3 Week 4 Week 8 Week 10
Resource Usage
Equivalent of 0.5 FTE needed for the duration of the POC
Maint. & Reliability LeadProduction Lead
OSI-PI OwnerIT Support Personnel
Pilot Project Manager
Project Stakeholder(s)
23
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
Q & A
•Question and answer session
Rolta Proprietary & Confidential
ROLTA Where Expertise & Technology Meet
NOTICE: Proprietary and Confidential. This material is proprietary to Rolta and contains trade secret and confidential information which is solely the property of Rolta. This material is solely for
Client's internal use. This material shall not be used, reproduced, copied, disclosed, and transmitted, in whole or in part, without the express consent of Rolta.
Thank You!
For any additional questions, please contact Ricky Barrera [email protected]