on cascading of goccs for the based bonusgcg memorandum circular no. 2012 ‐11 interim...

41
SeminarWorkshop on Cascading Performance Targets of GOCCs for the Interim PerformanceBased Bonus

Upload: others

Post on 07-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Seminar‐Workshop on CascadingPerformance Targets of GOCCs for the Interim Performance‐Based Bonus

Page 2: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Program of ActivityTime Morning Session Responsible

8:00‐8:30 Registration

8:30‐8:45 Welcome Remarks Chairman Cesar L. Villanueva, GCG8:45 – 9:30 AO 25, s. 2011 and the Results ‐Based 

Performance Management System

Adoption of Performance‐BasedIncentive System for Government Employees (EO 80, s. 2012)

Usec. Laura B. Pascua, DBM

9:30‐9:45 Viewpoints of the President on the Performance‐Based Bonus

Usec. Ferdinand B. Cui, PMS

9:45‐10:15 Interim Performance‐Based Incentive for GOCCs 

SVP Magdalena L. Mendoza, DAP

10:15‐10:45 Organizational Performance Indicator Framework as a Results‐Based Management Tool

DESFA Nora S. Oliveros, OP‐OES

10:45‐12:00 Open Forum

Page 3: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Program of ActivityTime Afternoon Session Responsible

12:15‐12:30 Workshop Guidelines Dir. Imelda C. Caluen, DAPDir. Alvin P. Principe, DAP

12:30‐1:15 Lunch Break1:15‐4:00 Workshop  GOCCs, Facilitators

4:00‐600 Plenary Presentation & Critiquing Selected GOCCs per Sector

Panelists: GCG, ODESFA, DOF, PMS, DBM, COA, CSC

6:00‐6:30 Next StepsClosing Remarks

Page 4: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Cascading Performance Targets. More fun in the Philippines. 

Page 5: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Outline of Presentation

• AO No. 25 and Results‐Based Performance Management System

• Performance‐Based Incentive System for Government Employees

• Guidelines on the Cascading of Department Performance Targets in Line with EO No. 80, s.2012

• Viewpoints of the President on the Performance‐Based Bonus• Interim Performance‐Based Bonus for GOCCs Covered by R.A. 

No. 10149• Organizational Performance Indicator Framework

Page 6: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

AO No. 25, s.2011 and the Results‐Based Performance 

Management System

Page 7: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

7

Inter‐Agency Task Force on Harmonization of National Government Performance Monitoring, Information and Reporting Systems (Administrative Order No. 25, s. 2011)

NEDA DBM OP DOF PMS

Government Oversight Partners:

Task Force Members:

GCG CHED

Technical Secretariat:

COA Ombudsman NCCCESBCSC

Page 8: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Objectives of AO No. 25

• Rationalize, harmonize, streamline, simplify, integrate and unify the efforts of government agencies relative to the National Leadership’s Agenda

• Establish a unified and integrated Results‐Based Performance Management System (RBPMS) 

• Use RBPMS as basis for determining entitlement to performance‐based allowances, incentives, or compensation of personnel

Page 9: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Outputs of the Task Force

1. Harmonized Results‐Based Performance Management System (RBPMS)• Using the Five KRAs, OPIF and Results Matrix as underlying frameworks

• RBPMS as basis and transparency mechanism of the performance‐based incentives

2. Performance‐Based Incentive (PBI) System

Page 10: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Strategic Performance Management System (Individual) 

Organizational  Outcomes

GoodGovernance and Anti‐Corruption

Human Development & Poverty Reduction

Economic Development

Security, Justice, and 

Peace

Climate Change 

Adaptation

Societal Goals/Outcomes

Sectoral Goals/Outcomes

Financial Stewardship Internal Process  Leadership, Learning and Growth

Major Final Outputs  (Citizen‐focused Service & Product Results)

STR/SERSocio‐Economic Report 

PPARCPriority Program Accountability Report Card

MARC‐ IMFO Accountability Report Card

MARC‐ IIManagement Accountability Report Card

Harmonized Results‐Based Performance Management System (RBPMS) 

To quality for PBB, agencies must meet at least 90% of PPARC  and MARC‐I, and satisfy MARC‐II (good governance conditions)

Page 11: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Executive Order No. 80, s. 2012Directing the Adoption of a 

Performance‐Based Incentive (PBI) System for Government Employees

Page 12: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

There is a need to:

Premises

1. Rationalize the current incentive system in government which isgenerally characterized by across‐the‐board bonuses

2. Strengthen performance monitoring and appraisal systems basedon existing systems like the OPIF, the Strategic PerformanceManagement System of the CSC and the RBPMS

3. Improve service delivery by the bureaucracy by linking personnelincentives to the bureau or delivery unit’s performance

4. Establish a Performance‐Based Incentive (PBI) System that willmotivate higher performance and greater accountability

Page 13: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

PBI system consisting of the Productivity EnhancementIncentive (PEI) and the Performance‐Based Bonus (PBB) shall beadopted in the national government beginning FY 2012.

1. PEI at P5,000 shall continually be granted across‐the‐ board

2. PBB, which is a top‐up bonus, shall be given to personnel ofbureaus or delivery units in accordance with theircontribution to the accomplishment of their Department’soverall targets and commitments

Performance‐Based Incentive System

Page 14: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Adoption of a PBI System

• Flexibility shall be given to heads of departments to suit the PBB system to the nature of their operations

• Adoption of a communications strategy and publication of performance targets and accomplishments in the website to ensure transparency and accountability

Page 15: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Criteria and Conditions to Qualify for PBB1. Achievement by the Departments of performance 

targets under their respective Major Final Outputs (MFOs)

2. Priority Program/Project commitments agreed with the President under the five Key Result Areas of EO 43

3. Meet the good governance conditions/ requirements set by the AO 25 Task Force annually under the performance drivers of the RBPMS (and conditions set by the GCG in the case of GOCCs)

1515

Page 16: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

PBB Rates of Incentives

Bureau Category

Individual Category

BestPerformer

BetterPerformer

GoodPerformer

Best Bureau 35,000 20,000 10,000

Better Bureau 25,000 13,500 7,000

Good Bureau 15,000 10,000 5,000

Page 17: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

All Departments/Agencies, other Offices of the National Government, State Universities and Colleges (SUCs), and Government‐Owned or‐Controlled Corporations (GOCCs) are covered.

The Governance Commission on GOCCs (GCG) is encouraged to adopt the policies and principles in the EO and issue guidelines for GOCCs covered under RA 10149, pending formulation of a compensation system for GOCCs.

Coverage

Page 18: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Funding for PBB

• The PEI and PBB top‐up bonus shall be sourced from the Miscellaneous Personnel  Benefits Fund (MPBF) 

• For GOCCs, the same shall be sourced from their corporate funds

18

Page 19: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Phases of PBB Implementation

19

Setting the  pre‐conditions

Pilot implementation

Refinement & Harmonization

Institutionalization

2nd  to 3rd Q 2012

3rd to 4thQ 2012

FY 2013

FY 2014

19

FY 2015

Stabilization

Page 20: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Thank you.

20

For more information, send e‐mail to [email protected]

Page 21: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

GCG Memorandum Circular No. 2012‐11Interim Performance‐Based Bonus for 

GOCCs Covered by R.A. No. 10149

21

Page 22: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Background

• In line with Sec. 8 of RA 10149, GCG is currently developing a Compensation and Position Classification System (CPCS) which will include a Performance‐Based Incentive Scheme for directors and employees of GOCCs; expected to be completed in 2013

• Interim PBI (I‐PBI) for GOCCs for FY 2012 adopted a parallel system with NGAs under EO 80

Page 23: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Important Features of the I‐PBI 

• Pursuant to EO 80, no other form of performance‐based incentives shall be granted to officers and employees of GOCCs for FY 2012 outside of the PBI

• PEI in the amount of P5,000 shall continually be granted across‐the‐board

• PBB shall be characterized by a system of ranking units and personnel within an organization according to the performance as measured by verifiable, observable, credible, and sustainable indicators

Page 24: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

GCG Conditions to Qualify for I‐PBB

• Achievement of at least 90% of promised Major Final Outputs/Priority Program targets in support of KRAs per EO 43

• Meeting 100% of four good governance conditions for FY 2012 set by AO 25 Task Force– Agency Transparency Seal– PhilGEPS posting of all Invitation to Bid and awarded contracts– Liquidation of CA to officials and employees within the reglementary 

period– Establishment of Citizen’s Charter or its equivalent

• Compliance with Section 10 of RA 10149– Full payment of all taxes due to the Government– Declaration and payment of all dividends required to be paid under its 

Charter and/or any other laws

Page 25: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Translating Corporate Objectives into MFOs

• GOCCs shall translate existing corporate targets and objectives for FY 2012 as embodied in their 2012 Corporate Plans or in their Corporate Operating Budget (COB) submitted to the DBM– Should relate to the Supervising Agency’s commitments to the President under EO 43

– Should include meeting targets on fiscal discipline and/or financial performance

Page 26: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Guidelines in Cascading Performance Targets, per MC No. 2012‐1 (1)

• Identify the MFOs • Select three (3) performance indicators for each MFO to capture the dimensions of quantity, quality, and timeliness

• Select two (2) performance indicators for STO• Select two (2) performance indicators for GASS• Key programs/projects with performance targets for FY 2012 agreed with the President shall also be included  

26

Page 27: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

• Identify component bureaus/delivery units responsible for the delivery of the MFOs and those belonging to STO & GASS

• Indicate the performance targets of bureaus/delivery units

27

Guidelines in Cascading Performance Targets, per MC No. 2012‐1 (2)

Page 28: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Forms to be Accomplished re: Cascading of Performance Targets

• Form A – Cascading of Department/Agency Performance Targets by MFO

• Form A1 – Cascading of Targets to Delivery Units

• Form B – Department/Agency Priority Program Targets (under KRA per EO 43)

Page 29: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Performance Categories (1)

Delivery UnitsDistribution/Ranking Rating

10% Best80% Better10% Good 

29

For 2012, the GOCC Governing Board or designatedofficers shall rank the units according to theirperformance following a normal distribution.

Units with Below Satisfactory Performance Rating – No PBB 

Page 30: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Performance Categories (2)

Officers/Employees within the Delivery Units

Distribution/Ranking Rating10%  Best80% Better10% Good

Individuals with Below Satisfactory Performance Rating – No PBB 

Officers and employees shall each be ranked also following a normal distribution.

Page 31: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

P15,000(max)

P15,000(max)

P25,000 (max)

P25,000 (max)

P35,000(max)

P35,000(max)

P5,000P5,000P5,000

I‐PBB for “BEST” Unit

(Top 10% of ranked units)

I‐PBB for “BETTER” Unit(Next 80% of ranked units)

I‐PBB for “GOOD” Units (Next 10% of ranked units)

I‐PBB Distribution

31

PEI

I‐PBB

No PBB for Units whose accomplishment is less than 90% of targets 

No I‐PBB for “POOR” units that 

did not meet 90% of targets

P5,000

Page 32: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

I‐PBB Sample Distribution (GOCC)Performance Category

BestPerformer

BetterPerformer

GoodPerformer

Best Unit(100 employees)

35,000(10)

20,000(80)

10,000(10)

Better Unit(800 employees)

25,000(80)

13,500(640)

7,000(80)

Good Unit(100 employees)

15,000(10)

10,000(80)

5,000(10)

Assumption: 1,000 employees in the GOCC; 100% accomplished their respective targets

Page 33: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Role of Department Heads• Lead their respective Departments and attached agencies in cascading/aligning their performance targets and in adopting the PBI system

• Determine the level of delivery units to reward and the strategic performance indicators to use

• Adopt a communications strategy and engage employees in the process

• Ensure publication of performance targets and accomplishments of the Department

• Ensure adherence to the criteria and guidelines on the PBB

Page 34: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Implementation Schedule of I‐PBB for GOCCs

Approval of GCG MC 2012‐11

(Sept.18, 2012)

Issuance of GCG MC 2012‐11 issuance to 

GOCCs(Oct.8, 2012)

Seminar‐Workshop on Cascading Performance 

Targets of GOCCs(Oct. 15‐16, 2012)

Accomplishment of Forms A, A1 & B by GOCCs (Oct. 17‐29, 

2012) 

GOCC Submission of Forms A, A1 & B to GCG 

(Oct. 30, 2012)

Transmittal of GOCC submissions to AO 25 

IATF(Nov. 2012)

Confirmation of Compliance  with I‐PBB Criteria and Conditions 

(1st Qtr 2013)

Grant of 2012 I‐PBB (EO 1st Qtr 2013)

Page 35: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Thank you.

35

For more information, send e‐mail to [email protected]

Page 36: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Workshop Proper

36

Page 37: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Workshop Objectives• Select or prioritize three (3) strategic performance indicators per Major Final Output (MFO);

• Identify two (2) performance indicators each for “Support to Operations” and “General Administrative and Support Services”; 

• Allocate the strategic performance indicators to responsible delivery units; and

• Identify key programs/projects with performance targets for CY 2012 agreed with the President (as applicable).

Page 38: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

MFOs ANDPPERFORMANCE INDICATORS

(1)

GOCC FY2012 BUDGET(2) GOCC

FY 2011 ACTUAL ACCOMPLISHMENT

(3)

GOCCFY 2012 TARGET

(4)

RESPONSIBLE DELIVERY UNITS

(5)

FY 2012 QUARTERLY TARGETS(6)

REMARKS

A. Major Final Output 1 Q1

Q2 Q3 Q4

Performance Indicator 1:

Performance Indicator 2:

Performance Indicator 3:

A. Major Final Output 2

Performance Indicator 1:

Performance Indicator 2:

Performance Indicator 3:

A. Major Final Output 3:

Performance Indicator 1:

Performance Indicator 2:

Performance Indicator 3:

Form ACASCADING OF GOCC PERFORMANCE TARGETS

CORPORATION: __________________________________________________________

Page 39: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Major Final Outputs/Responsible Delivery Unit

(1)Performance Indicator 1

(2)

CY 2012 Quarterly Targets (3)

Performance Indicator 2

(4)

CY 2012 Quarterly Targets (5)

Performance Indicator 3

(6)

CY 2012 Quarterly Targets (7)

Remarks(8)

A. Major Final Outputs/Operations

Q1 Q2 Q3 Q4 T Q1 Q2 Q3 Q4 T Q1 Q2 Q3 Q4 T

DEVLIVERY UNIT 1

DELIVERY UNIT 2

DELIVERY UNIT 3

A. Support to Operations (STO)

DELIVERY UNIT 1

DELIVERY UNIT 2

DELIVERY UNIT 3

A. General Administration and Support Services (GASS)

DELIVERY UNIT 1

DELIVERY UNIT 2

DELIVERY UNIT 3

Prepared by:____________________________ _________________ ______________________ ________________Planning Officer Date Budget Officer Date

Approved by:_____________________________ _________________GOCC C.E.O./Agency Head Date

Form A-1DETAILS OF DELIVERY UNIT PERFORMANCE INDICATORS AND TARGETS

CORPORATION: ___________________________________

Page 40: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Key Programs/ Projects(1)

Description of Program/ Project Objectives

(2)

GOCC FY 2011 Actual

Accomplishment(3)

GOCC FY 2012 Targets/ Milestones

(4)

Total Program/Project Budget

(5)

Program/Project Budget for

FY2012 6)

Responsible Delivery Units

(7)

FY 2012 Delivery Unit Targets/ Milestones

(8)

Remarks

Q1 Q2 Q3 Q4

Prepared by:____________________________ _________________ ______________________ ________________Planning Officer Date Budget Officer Date

Approved by:_____________________________ _________________GOCC C.E.O./Agency Head Date

Form B

GOCC TARGETS ON KEY PROGRAMS AND PROJECTS

CORPORATION: __________________________________________________

Page 41: on Cascading of GOCCs for the Based BonusGCG Memorandum Circular No. 2012 ‐11 Interim Performance‐Based Bonus for GOCCs Covered by R.A. No. 10149 21 Background • In line with

Thank you.

41

For more information, send e‐mail to [email protected]