oleh : d supply system (wss) is proposed to fulfill the water · 1. dhanis woro fittrin selo nur...
TRANSCRIPT
![Page 1: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/1.jpg)
1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas Teknik, Universitas Gadjah Mada tahun 2010
1467Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Oleh :1)Dhanis Woro Fittrin Selo Nur Giyatno
engkeng, Kobango, Giriloyo, and Nogosari II are places in
Wukirsari Village which experience water scarcity. Water
Supply System (WSS) is proposed to fulfill the water Dnecessity of the local people. WSS at Wukirsari Village makes use of ground water
resource so that it needs pumping. Water pumps in WSS of Wukirsari Village need
DC's daily energy as much as 88.47 kWh.
Fulfilling energy need as much as 88.47 kWh by using fossil fuel can
produce pollutant amount of 82.28 kg for 25 years. Solar energy which can be
produced by photovoltaic system is energy with zero pollutant. Sun radiants which
come to earth surface comprise 3 types, those are sun direct radiant, sun indirect
radiant, and sun reflected radiant. Because of these, sun energy potency is
calculated by adding 3 kinds of sun radiants. After calculating, we obtain that the
average of sun radiants in one month is 3.466 kWh per m2.day. Based on that value,
we can figure out that the Peak Sun Hours (PSH) is 3.466 hours/day. Furthermore,
we can obtain that AC's daily energy is 23.15 kWh per day, DC's load total is 27.24
kWh per day, voltage system is 48 V, and total current is 567.50 Ah/day. Then, we
can count that the current to inverter is 13.76 Ah/day-parallel branch, 42 parallel
branch of module, 2 modules with series connection, battery charging is 11.21
days, and 4 batteries with connection series.
Photovoltaic system of WSS project in Wukirsari uses 98 Sharp 170
modules with VR 34,80 V, IR 4,90 A, and $ 843,50. Furthermore, we get battery
capacity of 8.48 Ah, inverter capacity of 7,858.82 W, and regulator capacity of
411.60 A per module. Thus, the total module costs 909,293,000.00 rupiahs, the
building of photovoltaic system costs 139,891,230.77 rupiahs, the inverter costs
209,836,846.15 rupiahs, and others cost 139,891,230.77 rupiahs. Thereby, the
total cost to build photovoltaic system for WSS in Wukirsari is 1,398,912,307.69
rupiahs.
PERANCANGAN SISTEM FOTOVOLTAIK
SEBAGAI SUMBER KETENAGAAN
SISTEM PENYEDIAAN AIR MINUM (SPAM)
(Studi Kasus : Desa Wukirsari, Kecamatan Imogiri,
Kabupaten Bantul, Propinsi D.I. Yogyakarta)
Perancangan Sistem Fotovoltaik
![Page 2: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/2.jpg)
1468Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Gambar 1. Letak geografis Desa Wukirsari (Kabupaten Bantul, 2010)
![Page 3: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/3.jpg)
1469Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Gambar 2. Dusun Dengkeng, Kobango, Nogosari II, dan Giriloyo merupakan daerah yang terletak di Desa
Wukirsari yang menjadi sasaran daerah layanan SPAM. Dalam peta ini, Dusun Kobango belum tercantum.
Gambar 3a. Prosentase kebutuhan dropping air bersih untuk Desa Wukirsari
periode Agustus - November 2009 (PAMDES Kabupaten Bantul, 2009) [3] 3b. Prosentase penerima BLT tahun 2009 di Desa Wukirsari
(Dinas Sosial Kabupaten Bantul, 2010) [4]
Desa Wukirsari
31%
Desa Wukirsari
26%
a b
![Page 4: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/4.jpg)
1470Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Arahan PemanfaatanKarakteristikNo.
1.
2.
Tabel 1. Karakteristik air tanah bebas di Desa Wukirsari, Kecamatan Imogiri,
Kabupaten Bantul, Propinsi Daerah Istimewa Yogyakarta
Sifat
Arahan pemanfaatan
Sifat fisik air tanah (rasa, warna, dan bau) dominan baik
Peruntukkan air tanah untuk air minum dan lokasi pemukiman
Sumber : Anonim (2010)
![Page 5: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/5.jpg)
1471Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Gambar 4. Desain teknis SPAM Desa Wukirsari
![Page 6: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/6.jpg)
1472Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Keterangan Meta : Aktualisasi diri atau kebutuhan
untuk merealisasikan potensi diriEgo : Kebanggaan, penghormatan,
penghargaan, dan statusSosial : Kasih sayang, persahabatan, dan
kepemilikanKeamanan : Tempat berlindung atau
keamananPsikologi : Makan, air, tidur, dan lain-lain
Gambar 5. Hierarki kebutuhan Maslow (Stephen Scott, 1997)
Kenaikanprepotensi
![Page 7: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/7.jpg)
1473Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Tabel 2. Energi harian sistem pemompaan SPAM Desa Wukirsari
No.
1.
2.
Jenis pompaDaya penggerak
mula (kW) Jumlah pompa Daya total (kW)Energi harian
(kWh) DC
Pompa penyadap
Pompa distribusi
6,08
0,20
1
3
6,08
0,60
6,68
86,99
1,48
88,47Jumlah
Tabel 4. Perkiraan laju emisi genset
No.
1.
2.
3.
4.
5.
Polutan EF (kg/kWh)
PM10
NOx
SOx
CO
CO2
Jumlah
-44,38 x 10
-36,69 x 10
-43,59 x 10
-12,67 x 10
-16,56 x 10
-19,30 x 10
Sumber : Deputi Bidang Tata Lingkungan (2007) [19]
![Page 8: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/8.jpg)
1474Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
![Page 9: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/9.jpg)
Gambar 7. Rangkaian elektronika solar pumping system
Sistem Fotovoltaik
Inverter Motor Inverter Pompa
Gambar 6. Susunan dasar PV (Fathoni, 2009)
1475Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
![Page 10: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/10.jpg)
1476Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
(2.4)
(2.5)
= Beban AC( )Whhari
Efisiensi inverter(2.6)
Tabel 5. Tegangan sistem yang direkomendasikan
(I = 100 A)max
Daya AC maksimum Tegangan sistem DC
<1200 W
1200 - 2400 W
2400 - 4800 W
12 V
24 V
48 V
Sumber : Fathoni (2009)
Total beban (Ah/hari)
Beban DC total ( )Whhari
Tegangan Sistem= (2.7)
![Page 11: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/11.jpg)
Kapasitas inverter = Daya SistemEfisiensi
![Page 12: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/12.jpg)
Mulai
Menghitung totalbeban DC
Perancangan teknissistem fotovoltaik
(PV)
Tidak
Selesai
Tidak
Optimasi rancangansistem fotovoltaik
Tidak
Tidak
Selesai
Perhitungan biayasistem fotovoltaik
Selesai
Gambar 9. Perancangan sistem fotovoltaik SPAM Desa Wukirsari
1478Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
BAB III
METODOLOGI PENELITIAN
![Page 13: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/13.jpg)
1479Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Menghitung waktupengisian baterai
Tidak
Tidak
Tidak
Tidak
Tidak
Tidak
Tidak
Tidak
Menentukanspesifikasi baterai
yang akan digunakan
SpesifikasiBaterai
MenentukanKonfigurasi Baterai
Menghitungkapasitas inverter
Menentukan Spesifikasi Inverter
MenemukanSpesifikasi Regulator
Menentukan kapasitas regulator
Menhitungkeluaran
komponen sistemfotovoltaik
SpesifikasiInverter
SpesifikasiRegulatro
Perancangan teknis sistemfotovoltaik (PV)
Mulai
Membuat asumsi waktupenyinaran maksimal
matahari per hariTidak
Selesai
Menghitung energibeban harian AC
Tidak
Selesai
Menentukan tegangansistem
Tegangansistem
Tidak
Tidak
Tidak
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Menghitung beban totalsistem (Ah/hari)
Menentukan spesifikasimodul surya yang akan
digunakan
Arus modul surya
Menentukan konfigurasi
bangunan panel surya
Tidak
Tidak
Menentukan tingkatprosentase ketersediaan
energi di baterai%
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Gambar 10. Perancangan teknis sistem fotovoltaik SPAM Desa Wukirsari
![Page 14: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/14.jpg)
Menentukankonfigurasi
bangunan panelsurya
Mulai
Arus totalke inverter
Membandingkan arustotal ke inverter dengan
arus total sistem
Arus total keinverter > Arus
total sistem
Arus total keinverter < Arus
total sistem
Tidak ada cabangMenghitung jumlah
cabang pararel
Tidak
Selesai
Tegangan modalsatuan
Membandingkantegangan modul satuandengan tegangan sistem
Tegangan modulsatuan > Tegangan
sistem
Tegangan modulsatuan < Tegangan
sistem
Tidak ada cabangMenghitung jumlah
cabang seri
Tidak
Selesai
1480Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Gambar 11. Perancangan konfigurasi sistem fotovoltaik SPAM Desa Wukirsari
![Page 15: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/15.jpg)
1481Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Menentukankonfigurasi baterai Mulai
Tegangan bateraisatuan
Membandingkan tegangan sistem dengan tegangan
baterai satuan
Tegangan sistem <Tegangan baterai satuan
Tegangan sistem >Tegangan baterai satuan
Tidak ada cabangMenghitung
jumlah bateraiterhubung seri
Tidak
Selesai
Kapasitasbaterai satuan
Membandingkan kapasitasbaterai total dengan
kapasitas baterai satuan
Kapasitas baterai total <kapasitas baterai satuan
Kapasitas baterai total >kapasitas baterai satuan
Tidak ada cabang
Selesai
Menghitungjumlah baterai
terhubung pararel
Tidak
Gambar 12. Perancangan konfigurasi baterai sistem fotovoltaik SPAM Desa Wukirsari
![Page 16: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/16.jpg)
Menghitungkeluaran
komponen sestemfotovoltaik
Mulai
Menghitung aruskeluaran PV
Selesai
Menghitung aruskeluaran baterai
Selesai
Menghitungenergi keluaran
inverter
Selesai
Tidak
Tidak
Tidak
1482Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Gambar 13. Perhitungan keluaran komponen sistem fotovoltaik SPAM Desa Wukirsari
![Page 17: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/17.jpg)
1483Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Gambar 14. Prosentase penerima Bantuan Langsung Tunai (BLT) tahun 2009
di Kecamatan Imogiri, Kabupaten Bantul, Propinsi Daerah Istimewa Yogyakarta
![Page 18: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/18.jpg)
1484Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Tabel 6. Intensitas dropping air bersih periode Agustus-November 2009
di Kecamatan Imogiri, Kabupaten Bantul, Propinsi Daerah Istimewa Yogyakarta
Prosentase droppingWilayahNo.
1.
2.
Desa Wukirsari
Desa Selopamioro
Jumlah
50
112
162
30,86
69,14
100,00
Intensitas dropping
Jumlah polutan = 88,47 kWh x (EFPM10 + EFNOx + EFSOx + EFCO + EFCO2)= 88,47 kWh x 9,30 x 10 1 kg/kWh= 82,28 kg
Air Tanahdalam
Head totalSPAM Desa
Wukirsari
Daerah layananSPAM Desa
Wukirsari
Energiterbarukan
Energi bahanbakar fosil(ninyak)
Polutan
Kelangkaanbahan bakar
fosil(minyak)
Gambar 15. Latar belakang pemanfaatan energi terbarukan dalam perancangan SPAM Desa Wukirsari
di Kecamatan Imogiri, Kabupaten Bantul, Propinsi Daerah Istimewa Yogyakarta
![Page 19: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/19.jpg)
1485Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
IV.3. Potensi Energi Matahari Desa Wukirsari
Tabel 7. Data potensi energi matahari di Kecamatan Imogiri, Kabupaten Bantul,
Propinsi Daerah Istimewa Yogyakarta
1
2
3
4
5
6
7
8
9
10
11
12
Rata-rata
Bulan ke -
Temperatur udara (°C) TOTH CLEAR DIFFH DIRH BTILT DTILT RTILT REFL
25,10
25,10
25,30
25,30
25,00
24,50
24,20
24,50
25,00
25,40
25,20
25,00
25,00
4,280
4,470
4,590
4,720
4,730
4,550
4,800
5,250
5,540
5,390
4,710
4,570
4,800
0,390
0,410
0,430
0,480
0,530
0,530
0,550
0,560
0,540
0,500
0,430
0,420
0,525
2,449
2,460
2,425
2,235
1,980
1,905
1,904
2,025
2,258
2,434
2,488
2,464
2,252
1,831
2,010
2,165
2,485
2,750
2,645
2,896
3,225
3,282
2,956
2,222
2,106
2,548
0,480
0,480
0,480
0,480
0,480
0,480
0,480
0,480
0,480
0,480
0,480
0,480
0,480
0,993
0,993
0,993
0,993
0,993
0,993
0,993
0,993
0,993
0,993
0,993
0,993
0,993
0,007
0,007
0,007
0,007
0,007
0,007
0,007
0,007
0,007
0,007
0,007
0,007
0,007
0,200
0,200
0,200
0,200
0,200
0,200
0,200
0,200
0,200
0,200
0,200
0,200
0,200
Sumber : Atmospheric Science Data Center, 2010 [22]
Berdasarkan data-data di atas, maka diperoleh hasil analisis sebagai berikut.
Tabel 8. 2Analisis potensi energi matahari (kWh/m .hari)
1
2
3
4
5
6
7
8
9
10
11
12
Jumlah
Bulan ke -
0,879
0,965
1,039
1,193
1,320
1,270
1,390
1,548
1,575
1,419
1,066
1,011
14,676
DIRH x BTILT
2,432
2,442
2,408
2,219
1,966
1,891
1,891
2,011
2,242
2,417
2,471
2,447
26,836
DIFFH x DTILT
0,006
0,006
0,006
0,007
0,007
0,006
0,007
0,007
0,008
0,008
0,007
0,006
0,081
TOTH x REFL x RTILT
3,317
3,414
3,454
3,419
3,293
3,167
3,287
3,566
3,825
3,843
3,544
3,464
41,593
3,466
TOTCOL
Rata-rata radiasi sinar matahari per bulan
![Page 20: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/20.jpg)
Cabang paralel =
13,76Ah
HariCabang Pararel
567,50 Ah/hari
41,24 cabang paralel r
42 cabang paralel
1486Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Tabel 9. Spesifikasi beberapa produk modul surya
Kyocera KC85T
Kyocera KC120
Kyocera KC175 GT
Sharp 170
17,40
16,90
23,60
34,80
5,02
7,10
7,42
4,90
449,95
535,95
770,00
843,50
Sumber : Fathoni (2009)
VR (V) IR (A) Harga ($)Produk
![Page 21: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/21.jpg)
1487Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Kapasitas baterai (Ah) =
: (0,75 x 48 V) = 8,48 Ah11,21 hari
27,24kWhhari
= 412 V
48 V=
Kapasitas Baterai satuan (Ah)
Kapasitas baterai total (Ah)=
Jumlah Cabang Pararel
Tabel 10. Jumlah cabang paralel baterai
No.
1.
2.
3.
4.
5.
6.
Aki likuid 35 Ah
Aki likuid 70 Ah
Aki likuid 100 Ah
Aki likuid 120 Ah
Aki likuid 150 Ah
Aki likuid 200 Ah
241
121
85
71
57
43
Jenis baterai Jumlah cabang paralel
![Page 22: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/22.jpg)
1488Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
Tabel 11. Optimasi sistem teknis fotovoltaik SPAM Desa Wukirsari
84
80
75
70
65
60
55
50
49
1.283,95
1.222,80
1.146,38
1.069,95
993,53
917,10
840,68
764,25
748,97
1.155,55
1.100,52
1.031,74
962,96
894,18
825,39
756,61
687,83
674,07
47.146,46
44.901,39
42.095,06
39.288,72
36.482,38
33.676,04
30.869,71
28.063,37
27.502,10
27.240,00
27.240,00
27.240,00
27.240,00
27.240,00
27.240,00
27.240,00
27.240,00
27.240,00
1,73
1,65
1,55
1,44
1,34
1,24
1,13
1,03
1,01
Cabang paralel
Ah keluaran PV
Ah keluaran baterai
Wh/hari inverter
Wh/hari beban
Rasio output inverter/beban
Jumlah total modul surya
Harga modul surya
Pajak pembelian modul surya
Biaya total modul surya
Biaya pembangunan sistem fotovoltaik
Biaya inverter
Biaya lain-lain
Biaya total pembangunan sistem fotovoltaik
= 98
= Rp 826.630.000,00
= Rp 82.663.000,00
= Rp 909.293.000,00
= Rp 139.891.230,77
= Rp 209.836.846,15
= Rp 139.891.230,77
= Rp 1.398.912.307,69
Dengan optimasi tersebut, dapat dilakukan penghematan sebagai berikut.
Jumlah total modul suryaHarga modul surya Pajak pembelian modul suryaBiaya total modul suryaBiaya pembangunan sistem fotovoltaikBiaya inverter Biaya lain-lainBiaya total pembangunan sistem fotovoltaik
= 168= Rp 1.401.960.000,00= Rp 140.196.000,00= Rp 1.542.156.000,00= Rp 237.254.769,23= Rp 355.882.153,85= Rp 237.254.769,23= Rp 2.372.547.692,31
Penghematan = Rp 2.372.547.692,31 - Rp 1.398.912.307,69 = Rp 973.635.384,62
Prosentase penghematan = (Rp 973.635.384,62/Rp 2.372.547.692,31) x 100%
= 41,04%
![Page 23: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/23.jpg)
1489Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
![Page 24: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/24.jpg)
Anonim, Bab IV Studi Hidrogeokimia Airtanah pada Berbagai Kondisi Akuifer Bebas Kec Imogiri Kab Bantul Prov., Diakses dari http://www.scribd.com/doc/ 12406697/Bab-IV-Studi-Hidrogeokimia-Airtanah-pada-Berbagai-Kondisi-Akuifer-Bebas-Kec-Imogiri-Kab-Bantul-Prov-Yogyakarta, 20 Juli 2010.
Anonim, Dari Aspek Transfer Teknologi, Kelembagaan, dan Partisipasi Masyarakat Mei 2009, www.gtz.de Indonesia.
Anonim, Kecamatan Imogiri, Diakses dari www.googlemaps.com, 26 Mei 2010.
Atmospheric Science Data Center, Surface meteorology and Solar Energy, Diakses dari , 17 Mei 2010.
Deputi Bidang Tata Lingkungan, Memprakirakan Dampak Lingkungan Kualitas Udara, Kementrian Negara Lingkungan Hidup, Jakarta, 2007.
Dinas Sosial Kabupaten Bantul, Jumlah Penerima Blt Tahun 2009 Kabupaten Bantul, Diakses dari http://sosial.bantulkab.go.id/index/p/20, 17 Juli 2010.
El Bassam, Nassir dan Preben Maegaard, Integrated Renewable Energy for Rural Communities, Elsevier, Amsterdam, 2004.
F. Kreider, Jan, Solar Heating and Cooling Active and Passive Design, McGraw-Hill Company, New York, 1982.
H. Salimy, Djati, Ida N., Finahari, Elok S., dan Amitayani, Analisis Biaya Eksternal PLTU Batubara, D iakses dar i h t tp:// jurna l .s t tn-batan.ac . id/wp-content/uploads/2010/03/C-18, 10 Juli 2010.
Kabupaten Bantul, Peta Administrasi Kabupaten Bantul, Diakses dari http://bantulkab.go.id/data-publikasi/peta_adm_bantul.pdf, 12 Juni 2010.
Kurniawan, Dody, Pemenuhan Kebutuhan Air Bersih bagi Masyarakat di Perumnas Pucanggading, Tugas Akhir, Jurusan Perencanaan Wilayah dan Kota, Fakultas Teknik, Universitas Diponegoro, 2008.
Menteri Pekerjaan Umum, Peraturan Pemerintah Republik Indonesia Nomor : 18/PRT/M/2007 tentang Penyelenggaraan Pengembangan Sistem Penyediaan Air Minum, Departemen Pekerjaan Umum, Jakarta, 2007.
Moussi, A., A. Saadi, A. Betka, dan G.M. Asher, Photovoltaic Pumping Systems Technologies Trends, Diakses dari http://www.larhyss.net/pdf/journal/2/9-Moussi.pdf, 25 April 2010.
DAFTAR PUSTAKA
1490Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik
![Page 25: Oleh : D Supply System (WSS) is proposed to fulfill the water · 1. Dhanis Woro Fittrin Selo Nur Giyatno, S.T adalah alumnus Program Studi Fisika Teknik, Jurusan Teknik Fisika, Fakultas](https://reader030.vdocuments.mx/reader030/viewer/2022040420/5e074a521ef5d406f403ba10/html5/thumbnails/25.jpg)
Muhammad Fathoni, Andhy, Perancangan dan Analisa Ekonomi Solar Pumping System di Sumber Air Kaligede, Skripsi, Jurusan Teknik Fisika, Fakultas Teknik, Universitas Gadjah mada, 2010.
Paguyuban PAMDES, Proposal Dropping Air Bersih sebagai Aksi Pengurangan Risiko Bencana Kekeringan di Daerah Kabupaten Bantul, Paguyuban PAMDES Kabupaten Bantul Provinsi DIY, Bantul, 2009.
Pemerintah Republik Indonesia, Peraturan Pemerintah Republik Indonesia Nomor 16 Tahun 2005 tentang Pengembangan Sistem Penyediaan Air Minum, Diakses dari http://www.bpkp.go.id/unit/hukum/pp/2005/016-05.pdf, 9 Maret 2010.
Purwitasari, Agni, Studi Kelayakan Sumber Mata Air Kali Bajak sebagai Pemenuhan Air Bersih Warga di Wilayah Kelurahan Karanganyar Gunung Kecamatan Candisari Semarang Tahun 2006, Skripsi, Jurusan Ilmu Kesehatan Masyarakat, Fakultas Ilmu Keolahragaan, Universitas Negeri Semarang, 2007.
Salim Dasuki, Agus, Arah Kebijakan, Program, dan Kegiatan Bidang Peningkatan Pembangunan Infrastruktur di Daerah Tertinggal, Diakses dari http://www.ceem.unsw.edu.au/content/user/Docs/3AgusSalimDasukiPVandKPDT.pdf, 4 April 2010.
Scott, Stephen, Civil Engineering Practice, ARNOLD, London, 1997.
Sugiyono, Agus, Analisis Pengambilan Keputusan untuk Perencanaan Pembangkit Tenaga Listrik, Diakses dari http://reocities.com/Athens/academy/1943/ paper/p0501.pdf, 7 Maret 2010.
Suryono, Komunikasi Pribadi, 7 April 2010.
W. Sinton, Christopher, Demonstration and Marketing of Photovoltaic Powered Water Pumping System in New York State, Diakses dari http://ceer.alfred.edu/ research/solarpumpingreport.pdf, 25 April 2010.
1491Jurnal Riset Daerah Vol. X, No.2. Agustus 2011
Perancangan Sistem Fotovoltaik