ocsd predictive maintenance program - cwea

30
Santiago Escobar & Adam Newsom Predictive Maintenance Team Orange County Sanitation District Fountain Valley, CA OCSD Predictive Maintenance Program

Upload: others

Post on 03-Feb-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Santiago Escobar & Adam Newsom

Predictive Maintenance Team Orange County Sanitation District

Fountain Valley, CA

OCSD Predictive Maintenance Program

Orange County Sanitation District Facilities in

Southern California

Reclamation Plant No. 1

Fountain Valley Treatment Plant No. 2

Huntington Beach

Los Angeles

San Diego

OCSD Service Area 471 square miles

221 million gallons per day

2.5 million population

21 cities, 3 special districts

2 treatment plants

15 pump stations

Orange

County

OCSD PdM History

• 2002 – Baseline Vibration Monitoring with

consultant assistance

• October 2006 – Comprehensive Vibration Analysis

Program Implementation

– Both treatment plants and our 15 pump stations

– Predictive Maintenance Team – Engineer, 4 Predictive

Maintenance Technicians

Program Strategy

• Trained Predictive Maintenance personnel on

PM / PdM Best Practices

• OCSD Predictive Maintenance Program self

assessment performed in 2007

• Continuous improvement based on annual

assessment results

Mission Statement

“Effective implementation of Predictive

Maintenance technologies to provide

reliable process equipment by having

the ability to plan maintenance and repair

activities, and by reducing treatment

process interruptions and overall

maintenance costs”

Program Key Elements

• Training Program for Predictive Maintenance Team

• Equipment Criticality and Coverage

• Program Procedures and Standards

• Predictive Maintenance Process

• Root cause analysis

• PM optimization

• Solid Communication Strategy

• PdM reliability metrics and benchmarks

• PdM cost-benefit and return on investment

Personnel Qualifications & Training

In-House Vibration Analysis

• Train qualified technicians in Vibration analysis

• Hands-on training on laser alignment for direct and belt

driven machines without impacting the plant process

• equipment

• Vibration Trending, Analysis and Report Writing

Procedure, OCSD 2008.

• Laser Shaft Alignment Procedure, OCSD 2009

• Condition Monitoring and Diagnostics of Machines –

Requirements for Training and Certification of

Personnel – Part 2: Vibration Condition Monitoring

and Diagnostics – ISO 18436-2, 2003

Procedures and Standards

Predictive Maintenance Process

Root Cause Analysis

• Identifies lasting improvements

• Avoids recurring adverse events

PM Optimization Rotating Machinery

Asset

Type

Current PM

Man-hours

Recommended PM

Man-hours

PdM VA/OA

Man-hours

Annual Impact

Man-hours

Pumps 5127 1578 1734 1815

Fans 2320 662 312 1346

Others 1217 531 392 294

TOTAL 8664 2771 2438 3455

Based on this study 3,455 man-hours can be

reassigned to other needed areas every fiscal year.

Representing savings for $172,750 (man-hour @ $50)

annually.

Solid Communication Strategy

• Monthly Predictive Maintenance reports: Plant 1, Plant 2

and Pump Stations

• Quarterly Update report

• Annual Predictive Maintenance Reports

• Detailed Diagnostic Reports

• Formal internal presentations to promote program

effectiveness (findings, case histories and documented

savings)

Solid Communication Strategy

Program Reliability Metrics & Benchmarks FY07-11

Return on Investment (ROI) FY07-11

Predictive Maintenance Program

Master Plan FY12-15

Comprehensive PdM program Implementation

Projected Return on Investment (ROI) FY12-15

PdM Initiatives – Vibration Analysis

PdM Initiatives – PMT Truck

READY TO GO !!!

Vibration Analyzer

Strobe Light

Ultrasound Kit

Thermal Imager

Accelerometers, Cables, Tachometer, etc.

PdM Initiatives – Oil Analysis

Oil Analysis

Oil Analysis program implemented at OCSD

Oil sampling and analysis of all types of oil shipped to OCSD

Oil Analysis routes for critical equipments at Plant 1 and 2

Oil Sampling Techniques

Gas Compressors

Turblex Blowers

100% of High critical assets with oil sample ports

Machines running under normal operating

conditions

Sampling on return line zone

Safe to conduct oil sampling up to 50 psi

PdM Initiatives – Lubrication Program

Storage / Handling

Containers are properly labeled

Lubricant facility well organized

and clean

Lubrication Practices

Ultrasound grease guns

Clear grease container

PdM Initiatives – Lubrication Program

Lubricant storage facility is well

designed and organized

New oil pre-filtration system

using 10 micron filters

Oil containers and drums labeled

(numbers) based on type of

lubricant

Installed desiccant breathers on

oil containers and drums

Reference oil samples are taken

before each tote is replenished to

ensure the additive packages are

still within the specified range

and to avoid mislabeling of

vender supplied oil.

PdM Initiatives – Thermography

• Acquisition of several thermal imagers for reliability and

maintenance personnel

• Thermal images support vibration readings for machinery

troubleshooting

Precision Maintenance Initiatives – Laser Alignment

• Acquisition of two laser alignment systems for Plant 1 and 2

• Laser alignment procedure in place

• The primary objective of accurate alignment is to increase the operating

life span of rotating machinery.