O O Forn3160-3 FORMAPPROVED (April2004) OMB No. 1004-0137 ExpiresMarch 31, 2007 UNITED STATES DEPARTMENT OF THE INTERIOR 5. LeaseSerialNo. UTU-84051 BUREAU OF LAND MANAGEMENT APPLICATION FOR PERMIT TO DRILLOR REENTER 6 IfIndian,AlloteeorTribeName NA O 2 If Unitor CAAgreement, Name and No. la. Typeofwork: DRILL REENTER NA 8. Lease Name and WellNo. lb. TypeofWell: Oil Well Gas Well Other SingleZone MultipleZone Greentown Federal #35-12D 1 NameofOperator 9. API Well . Delta Petroleum Corporation ..gj . Ô I 3a. Address 370 17th Street, Suite 4300 - Denver, CO 80202 3b. Phone No. (include area code) 10.FieldandPool,or Exploratory 303-575-0323 Wildcat 4. LocationofWell(Report lo tion clearly and in accordance with any State requirements.*) 11.Sec.,T.R.M. or Blk.andSurvey or Area At surface ( TO Ô NW, 1878' FNL & 857' FWL ) <‡'.9( Û Section 35-T21S-R16E At proposedprod.zone Same As Above g, o ii 0, I 14. Distanceinmilesanddirectionfromnearesttownor post oiliœ* 12. CountyorParish 13. State 3 miles south of Green River, Utah Grand UT 15. Distance from proposed* 16. No.of acres inlease 17.SpacingUnitdedicatedtothiswell location to nearest propertyorleaseline,ft. (Alsotonearest drig.unit line,if any) 1878' 924.05' 40 acres 18. Distancefromproposed location* 19. ProposedDepth 20. BLM/BIA Bond No.onfile to nearest well,dnlling, completed, appliedfor,onthislease,ft. 137' (Drilling) 9784' UTBOOO200 21. Elevations(Show whether DF,KDB,RT,GL, etc.) 22. Approximate date work will start* 23. Estimatedduration 4339' GL 07/23/2007 60 Days 24. Attachments Thefollowing, completed in accordance with the requirements ofOnshoreOiland GasOrderNo.1, shall be attached to this form: 1. Wellplatcertifiedbyaregisteredsurveyor. 4. Bond to cover the operations unless covered by an existing bondon file(see 2. ADrillingPlan. Item20 above). 3. A SurfaceUse Plan (if the locationis on NationalForestSystemLands,the 5. Operatorcertification SUPO shallbefiledwith theappropriateForestService Office). 6. Suchothersitespecificinformationand/orplansas may be required bythe authorizedofficer. E. Signatu Name (Printed/Typed) Date . Terry L. Hoffman 07/17/2007 Title Regul er ved Name(Printed/T ed Date BRADL G. HILL PR-26<Q Title OENVIRONMENTAL MANAGER Applicationapprovaldoesnotwarrantor certify that the applicant holds legalor equitable title tothoserights inthesubjectleasewhich wouldentitletheapplicantto conductoperations thereon. Conditionsofapproval, ifany,are attached. Title18U.S.C.Section1001 andTitle43 U.S.C.Section1212,makeit a crime for any personknowingly and willfully to make to any department or agency ofthe United States any false,fictitiousorfraudulentstatementsor representations as to any matter within itsjurisdiction. *(Instructions onpage 2) RECE1VED y em JUL 1 8 2007 pyral gaary Action ** DN.0FOIL, GAS&

Upload: phungbao

Post on 22-Mar-2018

237 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O OForn3160-3 FORMAPPROVED(April2004) OMBNo.1004-0137

ExpiresMarch31,2007UNITED STATES

DEPARTMENT OF THE INTERIOR 5. LeaseSerialNo.UTU-84051

BUREAU OF LAND MANAGEMENT

APPLICATION FOR PERMIT TO DRILLOR REENTER6 IfIndian,AlloteeorTribeName

NA

O 2 IfUnitor CAAgreement,Nameand No.la. Typeofwork: DRILL REENTERNA

8. Lease Nameand WellNo.lb. TypeofWell: OilWell Gas Well Other SingleZone MultipleZone Greentown Federal #35-12D

1 NameofOperator 9. API Well .

Delta Petroleum Corporation ..gj . ÔI3a. Address 370 17th Street, Suite 4300 - Denver, CO 80202 3b. PhoneNo.(include area code) 10.FieldandPool,orExploratory

303-575-0323 Wildcat

4. Locationof Well(Report lo tion clearly and in accordancewith any Staterequirements.*) 11.Sec.,T.R.M. or Blk.andSurveyor AreaAtsurface( TO Ô NW, 1878' FNL & 857' FWL ) <‡'.9( Û

Section 35-T21S-R16EAtproposedprod.zone Same As Above g, o ii 0, I

14. Distanceinmilesanddirectionfromnearesttownorpost oiliœ* 12. Countyor Parish 13. State3 miles south of Green River, Utah Grand UT

15. Distancefromproposed* 16.No.of acres inlease 17.SpacingUnitdedicatedto thiswelllocationtonearestpropertyor leaseline,ft.(Alsotonearest drig.unit line,if any) 1878' 924.05' 40 acres

18. Distancefromproposedlocation* 19. ProposedDepth 20. BLM/BIABond No.onfiletonearest well,dnlling,completed,appliedfor,on this lease,ft. 137' (Drilling) 9784' UTBOOO200

21. Elevations(Showwhether DF,KDB,RT,GL,etc.) 22. Approximatedatework will start* 23. Estimatedduration4339' GL 07/23/2007 60 Days

24. AttachmentsThefollowing,completed inaccordance with therequirements of OnshoreOiland GasOrderNo.1, shall beattached to thisform:

1. Wellplatcertifiedbya registeredsurveyor. 4. Bondtocover the operationsunless covered by anexisting bondon file(see2. A DrillingPlan. Item20 above).3. A SurfaceUse Plan(if the locationis on NationalForestSystemLands,the 5. Operatorcertification

SUPOshallbefiledwith theappropriateForestServiceOffice). 6. Suchothersitespecificinformationand/orplansas may be required bytheauthorizedofficer.

E. Signatu Name(Printed/Typed) Date. Terry L. Hoffman 07/17/2007

TitleRegul er

ved Name(Printed/T ed DateBRADL G. HILL PR-26<Q

Title OENVIRONMENTALMANAGER

Applicationapprovaldoesnotwarrantor certify thattheapplicant holdslegalorequitabletitletothoserights inthesubjectleasewhich wouldentitletheapplicanttoconductoperationsthereon.Conditionsof approval,ifany,areattached.

Title18U.S.C.Section1001andTitle43 U.S.C.Section1212,makeit a crime forany personknowinglyand willfully tomake to any departmentor agency ofthe UnitedStatesany false,fictitiousor fraudulentstatementsor representations as to any matter within itsjurisdiction.*(Instructionsonpage 2)

RECE1VED

y em JUL182007pyral gaaryAction**

DN.0FOIL,GAS&

Page 2: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

SECTION 85, T.21 S., R.16 E., S.L.B. & M.Narstwe masw4;rg

Paoxer

sTo2e'¯¯¯ 2Teeas. -- DELTA PETROLEUMCOROPORATION

NORTHWEtT CORNER I WELL LOCATl0N, LOCATED AS SHOWNSECTION 5. T 21TS NORTH QUAR R CORNER IN THE SW 1/4 OF THE NW 1/4 OFR.16 E., ELS. &lM' SECTION 35, 21 s., SECTION 35. T.21 S., R.16 E., S.LB. & M.FOUNDR( CX PIL R,16 S., S.LB & M. GRANDCOUNTY, UTAH

FOUNDROCK ILEz $ LEGEND

l• SECTION CORNER AS NOTED.......... .. ...

QUARTERCORNERAS NOTEDPROPOSEDWELL LOCATION

NORTHEA T CORNER NOTE: THEPURPOSEOF THISSURytyWASTO Pt.AT857, SECTION , T.21 S., OELTAGTF135-120 WELI.

FR R.16 E., .LB, & M.

DELTAGIF -120

NOT FOUN RE ABLSO D GRANDCOUNTY,UTAR

ELEV. UNGRADE OUND= 4339.40 BASIS OF ELEVATIONELEV. GRADEDG UND = 4338.90

ELEVA710NBASEDOM TRIANGLK.ATideiSTATION AllRESt.OCATEDIN THE SE 1/4 OF SECTION 31. I.21 S .

R.17 E.. S.LB. A M.EAST QUARTERCORNEg ELEVAllON USED 4451.95

WESTGUARTERC NER SECTI 26, T.21 SSECTION35, T 21 R.16 E S.LB. & M CERTIFICATE

FU ES BLISHEDFOU D ROCK PILE US 15 TO CmTIPr INAT 1NIS PLAT WASPREPAREOPROM

T ROCK TH NOTCHES FIELDNOTESOF ACTUAL SURWYS MAGE BY ME UNDʾFROMBLMNOTES MYSUPSVISlÔN. AND THATTHESAME ARE TRUEAND

.. ... ......-

CORRECT10 TNE M VÆEDGEAND BELIEF

SOUTM QU TER CORNERSECTI 35. T 21 S.,RA6 , S.LB. & M.

NOT FOUND EESTABUSHEo SAVAGEFR M BLMNOTES

2007.12° 2867.12'

SOUTHWEST CORNER SouTHEAST CORNER GRAPH C SCALESECTION35. T.21 S., SECTION 35. T.21 S., looo o soo toon

2' I R CKC& M. 16 E , S . &

FLAGGINGAND LATH 1 inch = 1000ft

BASIS OF BEARING Sav s voying, INC. WELL tocATion PLAT EOR

BASIS Gr BEARING USED WASNBa'5740°E BETWEENTHENîCRTWESTCORugR DELTAPETROLEUMANDTHENORTH 1/4 CORNERSOF SECTION35, T.21 s., R-16 E., S-LS, de M.

8470f funnene ma sena a snaar mean Mt wwtmWELLLAllTUDE: 38'$6T43,9BBINOR 3494555250 Loccom f- tona' -17-07

WELULONSITUDE:f117DT4i2BB*W OR -11&t29241tl use s, tammun e acces si oma ae 0704-0015 1

f.a ! T M.a Ras,

Page 3: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O OBureau of Land Management

Moab DistrictApplication for Permit to DrillDrillingand Surface Use Plan

Company: Delta Petroleum Corporation Well No.: Greentown Federal #35-12D

Location:SW NW Section 35-T21S-R16E Lease No.: UTU-840511878' FNL & 85T FWL

On-Site Inspection Date: 3-6-06 (On-site date for the original Greentown Federal #35-12)

Alloperations willbe conducted in such a manner thatfullcompliance is made withapplicablelaws, regulations (43 CFR § 3100 & 43 CFR § 3160), Onshore Oil and Gas Orders, theapproved plan of operations and the conditionsofapproval. The operator is fullyresponsible forthe actions of his subcontractors. A copy of these conditions will be furnished to the fieldrepresentative to ensure compliance.

A. DRILLING PROGRAM

1. Surface Formation and Estimated Formation Tops

Surface Formation: Mancos

Forrnation MD SubseaMorrison 0 ' 4,354'Entrada 448' 3,906'Navajo 1,113' 3,241'Kayenta 1,505' 2,849'Wingate 1,622' 2,732'Chinle 2,050' 2,304'Shinarump 2,275' 2,079'Moenkopi 2,378' 1,976'Sinbad Is. 2,849' 1,505'White Rim 3,067' 1,287'Cutler 3,432' 922'Hermosa 4,813' (459')Paradox Salt 5,534' (1,180')Total Depth 9,784' (5,430')

2. Estimated Depth at Which Oil, Gas, Water or Other Mineral Bearinq Zones areExpected to be Encountered

Expected Primary Oil Zones: NoneExpected Primary Gas Zones: Paradox Salt @5,534' - Subsea -1180'

Expected Primary Water Zones: Entrada 448'; Navajo 1113'; White Rim3067'; Cutler 3432'; Hermosa 4813'

Expected Secondary Oil, Gas & Water Zones: None

Allfresh water and prospectively valuable minerals encountered during drillingwill be recorded by depth and will be cased and cemented. When possible,water flow rates willbe measured and samples willbe takenand analyzedwiththe results being submitted to BLM. All oil and gas shows will be tested todetermine commercial potential.

Page 4: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O O3. Pressure Control Equipment - Included schematic of BOP and Choke

Manifold, and described testingprocedures:

See attached schematic diagram of the blowout preventer equipment. An13-5/8" 10,000 psi Double gate Hydraulic BOP with one (1) blind ram andtwo(2) pipe rams and Annular Preventer; equipped with a 10,000 psimanual choke manifold. The BOP will be tested and charted using BOPtester and test plug to 4,100 psi for 10 minutes. The Annular Preventer willbe tested to 2,500 psi for 10 minutes. Alltests will be recorded in theDriller's log book. Pipe rams willbe function tested daily and blind ramstested on each trip.

BOP systems will be consistent with API RP 53 and Onshore Oil and GasOrder No. 2. Pressure tests of the surface casing and all BOP equipmentpotentiallysubject to pressure will be conducted before drilling the surfacecasing shoe. Blowout preventer controls will be installed prior to drilling thesurface casing shoe and will remain in use until the well is completed orabandoned. Ram preventers shall be inspected and operated each trip(nomore thanonce a day is necessary), and annular preventers shall be inspectedand operated weekly to ensure good mechanical working order. Theseinspections shall be recorded in the drilling log and in the daily drilling report.

4. Casing Proqram and AuxiliaryEquipment - Included casing size, weight, grade,thread and coupling, setting depth and condition (new or acceptablyreconditioned).Approximately 9784' total. (See Casing Design Below)

5. Cement - Included thecement type,density, yield,and amount used in settingeach casing string. Also included the anticipated top of cement. If stagecementing, describe techniques. (See Cementing Design Below)

Proposed Casing and Cementing Programs

Hole Setting \/Veight, GradeSize Depth Size (OD) & Joint Condition30" 40' 24" Conductor New20" 1600' 16" 65#, H-40, STC New14-3/4" 5500' 10-3/4" 45.5#, N-80, STC New9-7/8" 9784' 7" 35#, P-110, LTC New

Cementing Program

Surface Casinq (16", 65#, H-40, STC)Tail: 1500 sxs Type G, 1.16 yield, 15.6# density, estimated TOC: Surface

Intermediate Casing (10-3/4", 45.5#, N-80, STC)Lead: 1835 sxs 85/15/8, 2.14 yield, 12,5# density, estimated TOC: SurfaceTail: 600 sxs Type Ill, 1.41 yield, 14.6# density, estimated TOC: 4500'

Production Casinq (7", 35#, P-110, LTC)Lead: 150 sxs 50/50/6 Poz "G", 1.5 yield, 13.5# density, estimated TOC:4500'Tail: 1475 sxs "G", 1.3 yield, 14.8 density, estimated TOC: 5000'

Page 5: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O OThe following shall be entered in the driller's log:

1. Blowout preventer pressure tests, includingtest pressures and results;2. Blowout preventer tests for proper functioning;3. Blowout prevention drills conducted;4. Casing run, including size, grade, weight, and depth set;5. How the pipe was cemented, including amount of cement, type,whether

cement circulated, location of the cementing tools,etc.6. Waiting on cement timefor each casing string;7. Casing pressure test after cementing, including test pressures and results

6. Mud Proqram and Circulatinq Medium - Included mud components andweights. When air drilling, also included: length and location of blooie line;description of the auto ignitor; description of the de-duster equipment; andamounts, typesand characteristics of stand-by mud: Hole will be drilled withair with the blooie line extending to the large pit.

The typeand characteristics of the proposed circulatinq muds

Depth Tvoe Weiqht Viscosity Water Loss1,600' . Air/Water +/-8.5 +/-28 NC5,500' . Air +/-8.5 +/-28 NC9,784' NaCI Mud +/-13.5 +/-44 +/-10

7. Coring, Loqqinq and Testinq Proqram

Testing: DST's - None plannedLogging: Platform ExpressCoring: None planned

Initial opening of drill stem test toolswill be restricted to daylight hours.

8. Abnormal Conditions, Bottom Hole Pressures and Potential Hazards -

Included anticipated bottom hole pressure and/or pressure gradient.

The potential exists for pore pressures to reach up to .72 psilft in theParadox Salts ·- formation top5534'.

9. Any Other Aspects of this Proposal that should be addressed:None

Page 6: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O O

Exhibit E

B. THIRTEEN POINT SURFACE USE PLAN

The dirt contractor will be provided with an approved copy of the surface useplan of operations before initiating construction.

1. Existinq Roads:

a. Proposed route to location (submit a map depicting access and welllocation, 1:100,000 scale). See attached Vicinity Map Exhibit

b. Location of proposed well in relation to townor other reference point: 3miles South of Green River, Utah.

c. Plans for improvement and/or maintenance of existing roads: Existing countyroads willbe upgraded and maintained as necessary. An Encroachment Permithas been obtained by the Grand County Road & Bridge Department.

d. Plans for improvement and/or maintenance of existing roads: Upgradeand maintain existing state or county roads.

e. Other:

2. Planned Access Roads:

a. Proposed new roads are built and in place.

b. Length of new and/or existing roads which lie outside the leaseboundary for which a BLM right-of-wayis required: None

c. Other:

Surface disturbance and vehicular travelwill be limited to the approved locationaccess road. Any additionalarea needed must be approved by the Area Manager inadvance.

Ifa right-of-way is necessary, no surface disturbing activitiesshall take place on thesubject right-of-way untilthe associated APD is approved. The holder willadhere toconditions of approval in the Surface Use Program of the approved APD, relevant toany right-of-wayfacilities.

If a right-of-way is secured, boundary adjustments in the lease or unit shallautomaticallyamend this right-of-wayto include that portion of the facility no longercontained within the lease or unit. In the event of an automatic amendment to thisright-of-waygrant, the prioron-leaselunit conditionsofapprovalofthisfacilitywillnotbe affected even thoughtheywouldnow apply to facilities outside of the leaselunitas a result of a boundary adjustment. Rental fees, if appropriate shall berecalculated based on the conditions of thisgrant and the regulations in effectat thetimeof an automatic amendment.

Ifthe well is productive, theaccess road willbe rehabilitated or brought to Resource(Class Ill) Road Standards within60 days of dismantling the rig. If upgraded, theaccess road must be maintained at these standards until the well is properlyabandoned. If thistimeframe cannot be met, the Area Manager will be notifiedsothat temporarydrainage control can be installed along the access road.

3. Location of Existinq Wells - On a map, show the location of all water, injection,disposal, producing and drillingwells withina one mileradius ofthe proposed well,and describe.the status of each: See Exhibit A

Page 7: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O O4. Location of Production Facilities:

a. On-site facilities: If the well is a producer, installation of production facilities willfollow.

b. Pipelines: If the well is a producer, flowlineswill follow the proposed accessroute. The length of the pipelinewillbe approximately6000' long. The flowlineswillbe brought to the Tie in location withflowlines at theGreentown State#36-11location.

AIIpermanent (in place for six months or longer) structures constructed or installed(including oilwell pump jacks)willbe painted a flat, non-reflectivecolor to match thestandard environmental colors, as determined by the Rocky Mountain Five-StateInteragency Committee. Allfacilities willbe painted within six months of installation.Facilities that are required to complywith the Occupational Safety and Health Act(OSHA) may be excluded. Colorswillbe as follows: Color willmatch thesurroundinqsoils and vegetation.

If a gas meter run is constructed, it will be located on lease within 500 feet of thewellhead. The gas flowline willbe buried from the wellhead to the meter and willbeburied downstream of the meter until it leaves the pad. Meter runs will be housedand/or fenced. The gas meter shall be calibrated prior to first sales and shall becalibrated quarterly thereafter.All gas production and measurement shall complywith the provisions of 43 CFR § 3162. 7-3, Onshore Oiland Gas Order No.5, andAmerican Gas Association (AGA) Report No.3.

If a tank battery is constructed on this lease, it will be surrounded by a dike ofsufficientcapacity tocontain 1 1/2 timesthe storage capacity of the largest tank.Allloading lines and valves willbe placed inside the berm surrounding the tankbattery.AIIoil production and measurement shall conform to the provisions of 43 CFR §3162.7-3 and Onshore Oiland Gas Order NO.4

Production facilities on location may include a lined produced water pit as specifiedin NTL-2B. If water is produced from the well, an NTL-28 application must besubmitted.

5. Location and Type of Water Supply:

Allwater needed for drilling purposes will be obtained from a municipal sourcein Green River, Utah.

6. Source of Construction Material:Proposed new roads and pad are built and in place.

7. Methods of Handlinq Waste Disposal:

Describe the methods and locations proposed for safe containment and disposalof waste material, e.g. cuttings, produced water, garbage, sewage, chemicals,etc.

A reserve pit will be lined with (native material, bentonite, synthetic material): Areserve pit willbe constructed and a closed system, including an external solids pit,will be utilized. The pit will be lined witha synthetic liner 12 mil thickor greater (asper UDOGM guidelines).

The reserve pit shall be located in cut material, with at least 50% of the pitvolume being below originalground level. Three sides of the reserve pitwillbefenced before drilling starts. The fourth side willbe fenced as soon as drillingis completed, and shall remain untilthe pit is dry. As soon as the reserve pithas dried, all areas not needed for production will be rehabilitated.Wastewater willnot be discharged on the surface at this site and the drillingof the well willnot require a wastewater management plan.

All rubbish and debris will be kept in containers on the well site, and will be

Page 8: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O Ohauled to an approved disposal site upon completion of drilling andcompletion operations and as needed during such operations. There will beno chemical disposal of any type.

Self-contained, portable toiletswill be used for human waste, and the wastewillbe disposed at an approved landfill. Sanitation willcomplywith local andstate regulations for the disposal of human waste.

8. Ancillary Facilities: Temporary Trailers, Garbage containers and portable toilets.

9. Rig Layout /Construction Diaqram - depicts the pit, rig, cut and fill,and topsoil.

See attached Pad Layout Exhibit

Allwells, whether drilling, producing, suspended, or abandoned, will beidentified in accordance with 43 CFR 3162.6.Access to the well pad willbe from: East of location.

The blooie line will be located in the Northwest, at least 100 feet from the wellhead.

To minimizethe amount of fugitive dust and spray escaping from the blooie pit,the following blooie line deflection method will be employed: Water injection.

10. Plans for Restoration of the Surface:

The top 4" to 6" inches of topsoilmaterial will be removed from the location andstockpiled separately .on: adjacent land for both thepad location and theexternalpitlocation. Topsoil along the access road will be reserved in place adjacent to theroad.

Immediately upon completion of drilling, all equipment that is not necessary forproduction shall be removed.

The external solids pit and that portion of the well location not needed forproductionwill be reclaimed.

Reclaimed roads will have the berms and cuts reduced and will be closed tovehicle use.

AIIdisturbed areas will be re-contoured to replicate the natural slope.

The stockpiled topsoilwill be evenly distributed over the disturbed area.

Prior to reseeding, all disturbed areas, including the access road, and the externalsolids pit, will be scarified and left witha rough surface.

Seed will be broadcast or drilled between October 1 and December 15 or at a timespecified by the BLM. If broadcast, a harrow or some other implement will bedragged over the seeded area to cover the seed.

The following seed mixturewillbe used:

BLM recommended mixture:

Indian Ricegrass 4 Ibs/acreFourwing Saltbrush 4 IbslacreShadscale 4 Ibs/acreSand Drop seed 1 Ibs/acre

The abandonment marker willbe one of the following, as specified by BLM:1) At least four feet above ground level,2) At restored ground level, or3) Below ground level.

Page 9: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O OIn any case the marker shall be inscribed with the following: operator name, leasenumber, well name and surveyed description (township,range, section and eitherquarter-quarter or footages).

Additional requirements:

11. Surface and Mineral Ownership: BLMSurface/BLM Subsurface

12. Other Information:

a. Archeological/Paleo Concerns: none

Cultural and paleo surveys have been conducted to protect and provideavoidance measures if any sites and or artifacts were identified.

b. Threatened and Endangered Species Concerns: No

c. Wildlife Seasonal Restrictions (yes/no): No

d. Off Location Geophysical Testing: N/A

e. Drainage crossings that require additional State or Federal approval: N/A

f. Other: N/A

Page 10: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

. O O13. Lessee's or Operators Representative and Certification

Representative:

Name: Terry L. Hoffman

Title: Regulatory Manager

Address: 370 17thStreet, Suite 4300 - Denver, Co. 80202

Phone: 303-575-0323

Certification:

I hereby certify that I, or persons under my direct supervision, haveinspected the proposed drill site and access route; that I am familiar with theconditions which currentlyexists; that the statements made in thisAPD packageare, to the best of my knowledge, trueand correct; and that the work associatedwith the operations proposed herein will be performed by Delta PetroleumCorporation and its contractors and subcontractors in conformitywith thisAPDpackage and the terms and conditions under which it is approved. I also certifyresponsibilityfor the operations conducted on that portionof the leased landsassociated with is application,with bond coverage being provided under BLM BondUTB-000200. This statement is subject to the provisions of 18 U.S.C. 1001 for thefiling of a false statement.

Terry L. H anRegulato anagerJuly 18, 2007

Page 11: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

11 11 m 7 12

18 15

LegendDelta Petroleum

GreentownFederal 35-12D

Other Well Location US HWY BLM NPS . TribalW E

Well SR DOD Private USFS s

Interstate ----- Other Roads Water State USFWS , , ,

1:100,000Richt 1 NFI470 3 6 5501

Vicinity Map Exhibit 2.-- p.,

Page 12: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O

GTF 31-262 16

BLM

GTF 26-43S 25

1215 R16E I

33

T22S R 6E 1

Legend Delta PetroleumOtherProposed Wells DOD E Greentown Federal 35-12DWell NPSVWIIIn Progress PRIVATE S í

--- Access Roads STATE WESTERNLANDSERVICESLeases TRIBAL

1:24,000 Richfield, UT 84701 (435) 896-550197/7] imiWelIBuKer USFS CON¥IDENTIAL

BLM USFWS Exhibit A l'monwasy: DTJ Dair

Page 13: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

LlN SOblDS

APHI LF

DELTA PETROLEUM CORPORATIONGREENTOWNFEDERAL //35-12DSECTION 35, T.21 S., R.16 E., S.L.B. & M.

ELEV. UNGRADED GROUND AT WELL = 4339.40 IN F ET )ELEV. GRADED GROUND AT WELL = 4338.90 " 1 inch 60sgL

APPROXIMATE YARDAGE Sa Surveying, INC. PAD LAYOUTFOR GREENTOWNFEDERAL #35-120(6") TOPSOIL STRIPPING = 1,889 CU. YDS- Ryan avage,PLS

MAINICNUTLOCATION 86,23356CCU.YDDS. Po 2, DELTA PETROLEUMCORPORATIONTOTAL FILL = 4,610 CU. YDS. g,°,Í DRAWNGNAME SCALE DATE PROJECT NUMBER SHEET NUMBER

*FILL IS UNADJUSTED 0220CS 2 1"= 60 04/19/07

1345DEGGNEDBY: SURVEYEDBY: CHECKEDBY: DRAWNBY: 0704--001$ 1

R.W.S. T.K.S. R.W.S.

Page 14: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

TYPICAL 10,000# p.s.i. TYPICAL 10,000# p.s.i.BLOWOUT PREVENTER CHOKE MANIFOLDSCHEMATIC SCHEMATIC

Flow Line

Fill-UP Lin

I Adjustable ChokePAr vne err

) To Mud GasSeparator

o2" Nominal

O @ O

3" Kill Lin 3"Choke Line Bleed Line to Pit

Check --Valve 3" Nominal

To Mud GasSepa ator

2" Nominal

Adjustable

Page 15: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 07/18/2007 API NO. ASSIGNED: 43-019-31551

WELL NAME: GREENTOWN FED 35-12D

OPERATOR: DELTA PETROLEUM CORP ( N2925 ) PHONE NUMBER: 303-575-0323

CONTACT: TERRY HOFFMAN

PROPOSED LOCATION: INSPECT LOCATN BY: / /SWNW 35 210S 160E .Tech Review Initials DateSURFACE: 1878 FNL 0857 FWL

BOTTOM: 1878 FNL 0857 FWL Engineering

COUNTY: GRANDGeology

LATITUDE: 38.94510 LONGITUDE: -110.1303

UTM SURF EASTINGS:575372 NORTHINGS: 4310836 Surface

FIELD NAME: WILDCAT ( 1 )

LEASE TYPE: 1 - Federal

LEASE NUMBER: UTU-84051 PROPOSED FORMATION: PRDX

SURFACE OWNER: 1 - Federal COALBED METHANE WELL? NO

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

/' Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit:

(No. UTBOOO200 )Potash (Y/N) 97 R649-3-2. General

.

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

Water Permit R649-3-3. Exception

(No.MUNICIPAL )Drilling Unit

L RDCC Review (Y/N)Board Cause No:(Date: )Eff Date:

Al Fee Surf Agreement (Y/N) Siting:

LAW Intent to Commingle (Y/N) R649-3-11. Directional Drill

COMMENTS:

Page 16: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

T21S R16E

GREENTOWNFED35-515 g GREENTOWN 5F 36-11

GREENIOWN SF 36-MS

GREENTOWNFED$5•¤D

GREENFOWNFED35 G

MARI.AND OR, GREEMEOWNCOMPANY I * FED55·43S

EN RUBYE AL I-X *

T22S R16E

AMERADA eGREEN RlVER U I

OPERATOR: DELTA PETRO CORP (N2925)

SEC• 35 T.21S R. 16E

FIELD: WILDCAT (001)

COUNTY: GRAND

SPACING:R649-3-2/GENERALSITINGwel1G

IGOEN Utah OilGas and Mining× LOCATION ABANDONED

NEW LOCATION NField Status Unit Status 4 PLUGGED & ABANDONEDABANDONED EXPLORATORY 4 PRODUCING GASACTIVE GAS STORAGE PRODUCING OILNF PP OIL g SHUT-IN GASCOMBINED NF SECONDARY

-e- SHUT-IN OIL W EINACTIVE NDING ):( TEMP. ABANDONEDPROPOSED o TEST WELLSTORAGE THERML & WATER INJECTION STERMINATED

PP OIL g WATER SUPPLY PREPARED BY. DIANA MASONSECONDARY WATER DISPOSAL DATE:25-JULY-2m7TERMINATED

Page 17: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

State ÊUtahDEPARTMENT OF NATURAL RESOURCES

MICHAEL R. STYLERExecutiveDirector

JON M. HUNTSMAN, JRDivision of Oil Gas and Mining

Governor JOHN R. BAZADivision Director

GARY R. HERBERTLieutenant Governor

July 25, 2007

Delta Petroleum Corporation370 17th St., Ste. 4300Denver, CO 80202

Re: Greentown Federal 35-12D Well, 1878' FNL, 857' FWL, SW NW, Sec. 35, T. 21 South,R. 16 East, Grand County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 et seq., UtahAdministrative Code R649-3-1 et seq., and the attached Conditions of Approval, approval to drillthe referenced well is granted.

This approval shall expire one year from the above date unless substantial and continuousoperation is underway, or a request for extension is made prior to the expiration date. The APIidentification number assigned to this well is 43-019-31551.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Grand County AssessorBureau of Land Management, Moab Office

UTAH

DNR

1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone (801) 538-5340 • facsimile (801) 359-3940 •TTY (801) 538-7458 • www.ogm.utah.gov OIL, GAS &

Page 18: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

O O

Operator: Delta Petroleum CorporationWell Name & Number Greentown Federal 35-12D

API Number: 43-019-31551Lease: UTU-84051

Location: SW NW Sec.__3_5_ T. 21 South R. 16 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division with 24 hours of spudding the well.

• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dustin Doucet at (801) 538-5281 office (801) 733-0983 home

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of the Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion of its analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the Board.

6. The Greentown Federal #35-12D shall not be completed in any productive zones found inthe Greentown Federal #35-12

Page 19: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

RECEIVEDFerm3160-3 MOABFIELOOF2\CE FORM APPROVED(April2004) OMBNo.1004-0137

ExpresMarch31,2007UNITED STATES

DEPARTMENTOF THE INTERIOR 88 ,.llLI9 PMI:0 keaseSerialNo.UTU-84051

BUREAU OF LAND MANAGEMENT

APPLICATION FOR PERMIT TO DRILL OR REENTER6 IfIndian,AlloteeorTribeName

NA

la. Typeofwork: DRILL REENTER NUnitor CAAgreement,NameandNo.

8. Lease NameandWellNo.Ib. TypeofWell: 00 Wen GasWell O&er SingleZone MultipleZone Greentown Federal #35-12D1 Nameof Operator 9. P ellNo

Delta Petroleum Corporation V

3a. Address 370 17th Street, Suite 4300 - Denver, CO 80202 3b. PhoneNo.(inciate area code) 10.FieldandPool,or Exploratory303-575-0323 Wildcat

4. Locationof Well(Report location clearly andin axoniance with any Saa aqidonents.*) l1. Sec.,T. R.M. or Bik.andSurveyorAreaAtsurface SW NW, 1878' FNL & 857' FWL

Section 35-T218-R16EAtproposedprod.zone Same As Above

14 Distanceinmilesanddirectionfromnearesttown or postoñice* 12.Countyor Parish 13. State3 miles south of Green River, Utah Grand UT

15 Distancefromproposed* 16. No.of acresin lease 17 SpacingUnitdedicated10thiswelllocation10nearestproperty orleaseline,ft(Alsotonearestdrig.unitline,if any) 1878' 924.05' 40 acres

18.Distancefromproposedlocation* 19. ProposedDepth 20 BLM/BIABondNo.onfiletonearestwell,dnlling,completed,appliedfor,on thislease,ft 137' (Drilling) 9784' UTBooo200

21. Elevations(Showwhether DF,KDB,RT,GL,etc.) 21 Approximatedateworkwillstart* 23. Estimatedduration4339' GL 07/23/2007 60 Days

24. AttachmentsThefollowing,completedin accordancewith therequirementsof OnshoreOiland GasOrderNo.1, shallbeattachedto thisfonn:

1. Wellplatcertified bya registered surveyor. 4. Bondtocoverthe operations unlesscoveredby anexistingbondon file(see2. A DrillingPlan. Item20 above).3. A SurfaceUse Plan(if the locationis on National ForestSystemLands,the 5. Operatorcertification

SUPO shall be filedwith theappropriate Forest ServiceOffice). 6. Suchother site specific informationand/or plansas may be required bytheauthorized officer.

25. Signatur Name (Printed/Typed) Date. Terry L Hoffman 07/17/2007

TitleRegul Manager

Approvedby (Signatm) Name (Printed/Typed) Date

Title Office IVÍSIOil0 6SOUTC6SApplicationappr t% AM icantholdslegalorequitabletitletooenbgh te asewhichwouldentitletheapplicanttoconductoperationsthereon.Conditionsof apptoval,ifany,are attached.

Title 18U.S.C.Section1001andTide43 U.S.C.Seclion1212,make it a crimeforany personknowinglyand willfully to make to anydepartmentor agency ofthe UnitedStatesany false,fictitiousor fraudulentstatementsor representationsas to any matterwithinitsjurisdiction.

*(Instructionson page 2)

CONDITIONSOFAPPROVALATTACHED

RECElVEDAUSOJ2007

DIV.0F0lL,GAS&

Page 20: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

SECTION 35, T.21 S., R.16 E., S.L.B. & MPROJECT

---

NBirBT40"E NSOSidO"E--- DELTA PETROLEUMCOROPORATION

NORTFIWEtTCORm 2 ·

W£LL LOCÄTION, LOCATED AS SHOWNSECTION : 5. T.21 S-• - NORTH QUAR CORNER IN THE SW 1/4 OF THE NW 1/4 OFR.16 E., 5,LB. & M. SECTION35, 21 S. SECTION 35. T.21 S., R.16 E,. S.L.B. & M.FOUND RECK PIL R.16 S., S,LB & y, GRANDCOUNTY, UTAN

FOUNDROCK LE,Zo LEGEND

ni• SECT10NCORNER AS NOTEDQUARTERCORNERAS NOTEDPROPOSEDWELL LOCATION

NORTHEAT CORNER NOTE: THEPURPOSEOF THI$ SURVEY WASTo Pt.ATSECTION , T.21 S., oELTAc1F 935-120acto857 o a e 8,0CATEDIN THESW 1/4 OF 111ENW 1/4 OFFWL "- * • A' ' - SECTION 35. T.21 a. A16 E,, S.LO. & aNOT FOUNDREE BUSHED GRANDCOUNTY,UTARDELTAGTF #85-128 reou ou notesELEV.UNGRADEDGROUND= 4339.40 'BASIS OF REVATIONELEV.GRADEDGROUND= 4338.90

ELgvAlt0N BASEDON TRIANGULATIONSTATIONABRESI t.OCATED1N THESE 1/4 OF $€CTION 31. T.21 8.... -... . ... ---"~

R.17 E.. S.LB. dc M.EAST GUA ITER CORNER ELEVATIONUSED 4451.95WESTQUARTERC NER I SECTIO 26, T.21 S.SECTION 35, T.21 R.16 E S.LS. & u.' y CERTIFICATER.16 E., S.LB. & FOU D ROCK PIL£ Tuss is To csatir THAT Tais etAT «As PREPAaro PaonNOT FOUND REES USHED ROCK TH NOTCHES F1Ei.0NOTESOF A0TUAI. SURWYSMADE BY MEUNDÊRFROM BLM NOTES My suPERMSON. ANOTHAYTHESAMEARE TRUEANO

..... ....... - ..... .

CORRECT70 WI E M MN E ANDBEUET.

SOUTH QU RTER CORNER AN , ASECTI 35. T.21 S.,R.16 .. S.LB. & M.

NOT FOUNO EESTABUSHEO 3 MVAC9EFR BLMNOTES

2567.12' 2867.12'SOUTHWEST CORNER SOUTHEAST coRNER GRAPHIC SCALESECTION35, T.21 S., SECTION35. T.21 S., 1000 o soo looo26

I R CPFOUNÔ16E 5.L

FLAGGINGAND LATI-! 1 inch - 1000ft

BASIS OF BEARING Sumping, I WELLLOCATION PLAT FORBAsis or BENUNGUEEDWASNBG'ST'4¾ BETWEEN THENCRTWEST CCHNER

DELTA PETROLEUMANDTHENCRIN 1/4 CORNER5OF $ECTION35. T.21 S., R.16 E., $.00. A Mamt

WEU. I.ATRUDE: ,16'$5 43.988"N OR 31L9455S200 E Œ9ent n-gr'

WEL.LLCNCITUDE: 110tD745.200°W OR -110.12924111 won af smena e menn se av 0704-001$ 1f.IL TKR RAS.

Page 21: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Delta Petroleum CorporationGreentown Federal 35-12DLease UTU-84051SW/NW Sec. 35, T21S, R16EGrand County, Utah

A COMPLETE COPY OF THIS APPROVED PERMIT and Conditions of Approval shall bemaintained on location during all construction and drilling operations, and shall beavailable to contractors to ensure compliance.

CONDITIONS OF APPROVAL

Approval of this application does not warrant or certify that the applicant holds legal or equitabletitle to those rights in the subject lease which would entitle the applicant to conduct operationsthereon.

Be advised that Delta Petroleum Corporation is considered to be the operator of the above well andis responsible under the terms and conditions of the lease for the operations conducted on theleased lands.

Bond coverage for this well is provided by UTBOOO200(Principal - Delta Petroleum Corporation)via surety consent as provided for in 43 CFR 3104.2.

This office willhold the aforementioned operator and bond liable until the provisions of43 CFR 3106.7-2 continuing responsibility are met.

This permit willbe valid for a period of two years from the date of approval. After permittermination, a new application must be filed for approval.

All lease operations willbe conducted in full compliance withapplicable regulations (43 CFR3100), Onshore Oil and Gas Orders, lease terms, notices to lessees, and the approved plan ofoperations. The operator is fully responsible for the actions of subcontractors. Failure to complywith the provisions of this permit, including applicable regulations, stipulations, and/or approvalconditions, will be considered a violation subject to the enforcement provisions of 43 CFRSubpart

Page 22: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

A. DRILLING PROGRAM

1. The proposed 10M BOP system is adequate for anticipated conditions.Installation, testing and operation of the system shall be in conformance withOnshore Oil and Gas Order No. 2. Testing of the system to 5M standards isadequate.

2. A remote kill line, rated and tested to a minimumof 5000 psi working pressure,shall be installed. The remote killline shall run unobstructed to the edge of thesubstructure.

3. A pipe ram shall be installed on the BOP stack to fit each size of drill pipe thatmay be used.

4. A mud-gas separator shall be installed prior to drilling out the intermediate casingshoe.

5. Concurrent approval from the State of Utah, Division of Oil, Gas & Mining(DOGM) is required before conducting any surface disturbing activities.

6. Drilling reports, which describe the activities of each day, shall be submitted tothe BLM Moab Field Office on a weekly, or more frequent, basis. In addition to adaily summary of activities, drilling reports shall include the drilling fluid weight,details of casing and cement, water flows, lost circulation zones and any otherinformation that would contribute to our understanding of drilling conditions.

7. The requirements for air drilling, found in Onshore Oil and Gas Order No. 2, partIll, E (Special Drilling Operations), shall be followed.

8. Should water be encountered while air drilling, sufficient tankage shall beavailable for water containment. Water shall not be spewed all over causing ourinspector to lose another pair of boots.

9. If cement does not circulate to surface on the intermediate casing, a CementBond Log (CBL) or other appropriate tool to verify cement placement shall be run.

10. A pressure integrity test of the intermediate casing shoe shall be conducted priorto drilling more than 20 feet below the shoe (Onshore Order #2.Ill.B.1.i). The testshall expose the shoe to the mud weight equivalent anticipated to control theformation pressure at total well depth. This is not a bleed-off test and is notintended to fracture the formation, but rather, is intended to ensure the surfacecasing can withstand anticipated pressures. The test shall be recorded in thedriller

Page 23: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

C. REQUIRED APPROVALS, REPORTS AND NOTIFICATIONS

Required verbal notifications are summarized in Table 1, attached.

Buildinq Location- Notify the Moab Field Officeat least 48-hours prior to commencingconstruction of location.

Spud- Notify the Moab Field Office24-hours prior to spud. Submit written notification (SundryNotice, Form 3160-5) to the Moab Field Office within24-hours after spud, regardless of whetherusing a dry hole digger or big rig.

Daily Drillinq Reports- Daily drilling reports that describe the progress and status of the wellshallbe submitted to the Moab Field Office on at least a weekly basis. This report may be in anyformat customarily used by the operator.

Oil and Gas Operations Reports (OGORs)- Production from this well shall be reported toMinerals Management Service (MMS) on a monthly basis.

Sundry Notices- Any modification to the proposed drilling program shall be submitted to theMoab Field Office on a Sundry Notice (Form 3160-5). Regulations at 43 CFR 3162.3-2 describewhich operations require prior approval, and which require notification.

Drilling Suspensions- Operations authorized by this permit shall not be suspended for more than30 days without prior approval of the Moab Field Office. All conditions of this approval shall beapplicable during any operations conducted with a replacement rig.

Undesirable Events- Spills, blowouts, fires, leaks, accidents, or any other unusual occurrencesshall be immediately reported to the BLM in accordance with requirements of NTL-3A.

Cultural Resources- Ifcultural resources are discovered during construction, immediately notifythe Moab Field Office,and work that might disturb the cultural resources shall cease.

First Production- A first production conference will be scheduled as soon as the productivity ofthe well is apparent. This conference should be coordinated through the Moab Field Office.

Notify the Moab Field Office when the well is placed into production. Initial notificationmay beverbal, but must be confirmed in writing within five business days. Please include the dateproduction started, the producing formation and production volumes.

Well Completion Report- Whether the well is completed as a dry hole or as a producer, a WellCompletion or Recompletion Report and Log (Form 3160-4) shall be submitted to the MoabField Office within thirty-days after completion of the well. Two copies of all logs, coredescriptions, core analyses, well test data, geologic summaries, sample description, and allother surveys or data obtained and compiled during the drilling, workover, and/or completionoperations, will be filed with Form 3160-4. When requested, samples (cuttings and/or samples)will be submitted to the Moab Field

Page 24: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

VentinqlFlarinq of Gas- Gas produced from this well may not be vented/flared beyond an initial,authorized test period of 30 days or 50 MMcf,whichever first occurs, without the prior, writtenapproval of the Moab Field Office. Should gas be vented or flared without approval beyond theauthorized test period, the well may be ordered to be shut-in until the gas can be captured oruntil approval to continue the venting/flaring pursuant to NTL-4A is granted. Compensation shallbe due for gas that is vented/flared without approval.

Produced Water- An application for approval of a permanent disposal method and location willbe submitted to the Moab Field Office for approval pursuant to Onshore Oil and Gas Order No.7.

Off-Lease Measurement, Storaqe, Comminqlinq- Prior approval must be obtained from the MoabField Office for off-lease measurement, off-lease storage and/or commingling of production priorto the sales measurement point. The term "commingling" describes both the combining ofproduction from different geologic zones and/or combining production from different leases oragreement areas.

Pluqqinq and Abandonment- If the well is a dry hole, plugging instructions must be obtained fromthe Moab Field Office prior to initiating plugging operations.

A "Subsequent Report of Abandonment" (Sundry Notice, Form 3160-5) will be filed with theMoab Field Office within thirty-days following completion of the well for abandonment. Thisreport will indicate where plugs were placed and the current status of surface restoration. Uponcompletion of approved plugging, a regulation marker willbe erected in accordance with 43 CFR3162.6. Final abandonment will not be approved until the surface reclamation work required bythe approved APD or approved abandonment notice has been completed to the satisfaction ofthe Moab Field Office or the appropriate surface managing agency.

TABLE 1NOTIFICATIONS

Notify Jack Johnson (435-259-2129) of the BLM Moab Field Office for the following:

1 day prior to spud;

50 feet prior to reaching the surface casing setting depth;

3 hours prior to testing BOP equipment.

If the person at the above number cannot be reached, notify the BLM Moab Field Office at435-259-2100.

Well abandonment operations require 24-hour advance notice and prior approval. In the case ofnewly drilled dry holes, verbal approval can be obtained from:

Eric Jones, Petroleum Engineer Office: 435-259-2117Home:

Page 25: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

DIVISION OF OIL, GAS AND MINING

SPUDDING INFORMATION

Name of Company: DELTA PETROLEUM CORPORATION

Well Name: GREENTOWN FED 35-12D

Api No: 43-019-31551 Lease Type: FEDERAL

Section 35 Township 21S Range 16E County GRAND

Drilling Contractor DHS RIG # 11

SPUDDED:Date 08/01/07

Time

How DRY

Drilling will Commence:

Reported by CHARLIE

Telephone # (281) 833-2312 CELL (307) 840-2903

Date 08/02/07 Signed

Page 26: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

AUG-01-2007WED08:39 ANDELTAPETROLEUM FAXNO.3035750471 P. 02

..mo· s UNITEDSTATES SON MHOVED

(Aonnooo DEPARTMENTOFTIIB INTERIOR OMBNo. 1004-GW

BUREAUOF LAND MANAGEMENT " =

5. Imase SeriaiNo.SUNDRYNOTICES AND REPORTS ONWELLS ure-s4osiDo not use this fann kr proposals to kia or to te·enter en 6, if IMHan,Allones, or tribeName

abandoned weß. Use Fonn 3160-3 (APD)kr such NA

SURMITIN TRIPLICATE - Other Instru¢tloneon reverse side. 7. IfUafter CA.AsseomentName**Ilor No.

l. ofWell NAOllwd 8. W-MNo

2. Nameof Operator ENLL GroenlownFedo¢al#35-12D

Dohn Petroleumcorporatina p 9. Art Wel1No.

3a. Address 3b, Phone No. finchafamva cods) 43-019-31551

370 17thSneet. Suite4300 - Denvar,CO 80202 303.573-0397 10. Fieldand Pool, or Explommry Ares

4. 14cationofWeR (Foodage,Sec,, 7LR. M., or SurveyDucription) Wildcat11. Countyor Parish,State

SWNW, Scotion-35-T218·RI6E,1878'FNL& 857' FWL GramiCo., Utah

12. CHECKAPPROPRIATEBOX(S)To INDICATENATUREOFNOTICE,REPORT,CR OTHER DATA

TYPEOFSUBMISSION TYPSOFACTION

Notionof Intent e Dæpm hededo (Mm) Waw¾

O-c.... O-»... ORocinandon pay

0-··••••·-. Oc..an..= On-e-a- O-Oca....r:- OngMando hmpon & Cha is

O---w•==. Oc-- O- Ow.-=- -•'13. DanctiboProposedor Comples opendon(eleary stas au perdnentdetailsincludiusädmatedstardus detsof anyproposedworkand approshnatadeinda thereof.

If theproposalisto deependiseodonallyor scomplete hadramally,g[vesubsurfaceincationsand mensmedami bue verdealdepda or penfeentmaikersand sands.AttachIheBond underwhichthe workwat parkemed or psovidethe liond No. on10ewidtAs Bl.M/ BIA. Requimd subsequerareportashanbe fHedwitbln30 dayakilowing complodou ofthe inyvivedopendus. If1hooperadonresultain a amidple compludonor recompletionina newinterval,a Fossa 3140-4shallbe illedoncetestinghas buoncompleted.PinalAbsadonmentNodos shallbe filed onlyaftersti requhanonia, ineindingrectemantion,havebeencompleted,and thoopantor hasdeterminedthat thesite is stady for fmalimpocdon.)

Delta Petroleum Corporationwould like to request thattheGreentown Federal 35-12Dbe classifiedasa Tight Hole.

RECEIVEDAUSO12007

DN.0FOLGAS

14. I herebycuttifythat the itnogningis tras and correct.Namagw.te¿tópeg

Ute Sitilley ' RegulatoryTechnician

signatur, n.,, 8/1/2007

certifythattheagilkantholdslegalor ' is ik1e10 thoserightsla IbasubjoutInase OMoewhieb would sehtle the at to gtinni11§ Ï00TÄND Titli43 U.S.C. saation1212,make it a crimekr anypiiisan knowinglyendwlllAllyto makespydepartmenFeresency¯aftheUniend

ta or sagesemadens as to say manerwitiin

Page 27: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

AUG-01-2007NED08:39 ANDELTAPETROLEUN FAXNO.3035750471 P. 01

e

RECEIVEDAU60 1 2007

DNOFOILGASXw

$10 if Street, Seite4800Denver,CO 80202

(303)293-9135(303)298.8261 Fax

Date: Ë l 07Attention: Û½<3 £5

Company: \ 70 MYL

¾ighiamber: \ - AOI WS† - 39 O

ber of Pages: (IncludingCover

Page 28: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

STATE OF UTAH FORM6DEPARTMENT OF NATURAL RESOURCES

DIVISIONOF OIL,GAS ANDMINING

ENTITY ACTION FORM

Operator: Delta Petroleum Corporation Operator Account Number: N 2925

Address: 370 17th Street, Suite 4300

city Denver

state CO zip 80202 Phone Number: (303) 575-0323

WelI41301931551

Greentown Federal 35-12D SWNW 36 21S 16E GrandAction Code Clarrent Entity New Entity . Spud Date Eritity Assignment

Nuniber Number Effective Date

A 8/7/2007Comments: Pieb>< CONFllENilAL

weilA'PINumber Well Name QQ Sec Twp Rng County

Action Code Current Entity New Entity Spud Date Entity AssignmentNumber Number Effective Date

Comments:

wellA3PINumber Well Name QQ Sec Twp Rng County

Action Code Current Entity New Entity Spud Date Entity AssignmentNumber Number Effective Date

Comments:

ACTION CODES:A - Establish new entity for new well (single well only) Terry H ffmanB - Add new well to existing entity (groupor unit well) Namf( ease Print) .

C - Re-assign well from one existing entity to another existing entityD - Re-assign well from one existing entity to a new entity Signature tE - Other (Explain in 'comments' section) RECE IVED Regulato nager 8/8/2007

Title Date

(5/2000) AUSO8 2007

DIV.0FOIL,GAS&

Page 29: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Form 3160- 5 UNITED STATES FORM APPROVED(April2004) DEPARTMENT OF THE INTERIOR OMBNo.1004-0137

BUREAU OF LAND MANAGEMENT Expires: March 31, 2007

5. Lease Serial No.SUNDRY NOTICES AND REPORTS ON WELLS UTU-84051

Do not use this fonn for proposals to drIll or to re-enter an 6. If Indian, Allottee, or Tribe Nameabandoned weH. Use Form 3160-3 (APD) for such proposals. NA

SUBMIT IN TRIPLICATE - Other Instructions on reverse side. 7. If Unit or CA. Agreement Name and/or No.1. Type of Well NA

Oil Well Gas well Other 8. Well Name and No.

2. Name of Operator Greentown Federal #35-12DDelta Petroleum Corporation 9. API Well No.3a. Address 3b. Phone No. (include area code) 43-019-31551

370 17th Street, Suite 4300 - Denver, CO 80202 303-575-0397 10. Field and Pool, or Exploratory Area4. Incation ofWell (Footage, Sec., T., R., M., or SurveyDescription) * Wildcat

11. County or Parish, StateSW NW, Section-35-T21S-R16E, 1878'FNL & 857'FWL Grand Co., Utah

12. CHECK APPROPRIATE BOX(S) TO INDICATE NATURE OF NOTICE, REPORT, Ot OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/ Resume) Water Shut-off

Altering Casing Fracture Treat Reclamation Well Integrity

Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and abandon Temporarily Abandon Surface Casing Change

Final Abandonment Notice Convert to Injection Plug back Water Disposal

'13. Describe Proposed or Completed Operation (clearly state all pertinent details including estimated starting date ofany pmposed work and approximate duration thereof.Ifthe proposal is to deepen directionallyor scomplete horizontally, give subsurface locations and measured and true vertical depths or pertinent markers and sands.Attach the Bond under which the work will performed or provide the Bond No. on file with the BLM/ BIA. Required subsequent reports shall be filed within 30 daysfollowingcompletion of the involved operations. If the operation æsults in a multiple completion or recompletion in a new interval, a Form 3160-4 shall be filed oncetesting has been completed. Final Abandonment Notice shall be filed only after all requirements, includingreclamantion, have been completed, and the operator hasdetermined that the site is ready for fmal inspection.)

TIGHT HOLE STATUS

Delta Petroleum Corporation is proposing to change the approved TD of 9784' to a new TD of 9984'.The cementinaodesi ap7prov for theOpCro4 eG)PD wiId n4#etoOLCæ984'130 sxs

4 Gas andMiningRECEIVED

f. DIVOFOIL,GAS&MIMNGI

14. I hereby certify that the foægoing is tme and correct.Name (}¥inted/Typed)

Terry Ho **Regulatory Manager

sig=tme L - *** 8/7/2007

Approved by Title DateConditions of approval, if any are attached. Approval of this notice does not warrant orcertify that theapplicant holds legal or equitable title to those rights in the subject lease Officewhich would entitle theapplicant to conduct operations thereon.Title 18 U.S.C. Section 1001 AND Title 43 UIS.C. Section 1212, make it a crime for any person knowinglyand willfully tomake any department or agency ofthe UnitedStates any false, fictitiousor fraudulent statements or repmsentations as to any matter within its

Page 30: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Form 316os UNITED STATES o°Ð

N 10 -

3D7(Fe ary ) DEPARTMENT OF THE INTERIOR Expires: March 31, 2007BUREAU OF LAND MANAGEMENT 5. Lease Serial No.UTU84051SUNDRY NOTICESAND REPORTS ON WELLS 6. If Indian, Allottee or Tribe NameDo not use this form for proposals to dri/I or to re-enter an NAabandoned well. Use Form 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2 7. If Unit of CA/Agreement, Name and/or No.NAl. Type of HOil

Well Gas Well O OtherG

l eFaenNa35-12D2. Name of Operator

9. API Well No.Delta Petroleum Corporation43019315513a. Address 3b. Phone No. (include area code) 10. Field and Pool or Exploratory Area370 17th Street, Suite 4300

Denver, co ao2o2 (303) 820-0144 Wildcat4. Location of Well (Footage, Sec., T.,R.,M.,or Survey Description) 11. Country or Parish, State1878' FNL & 857' FWLSWl/NWSection 35 T21S R16E Grand, UT

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTIONNotice of Intent Q Acidize O Deepen Production (Start/Resume) Water Slun-OfO^itercasing O Fracture Treat Reclamation WeHIntegrhyO Casing Repair New Construction Recomplete Other Weekly ReportSubsequentReport

O Change Plans Plug and Abandon Temporarily AbandonO Final Abandonment Notice O Convert to Injection Plug Back Water Disposal13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. Ifthe proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion orrecompletion in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandonment Notices must be filed only aner all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

TIGHT HOLE STATUS

See attached "DrillingChronological Report for 8/25/07 thru 8/31/07.

RECEIVEDSEPO6 2007

DIV.0FOIL,GAS&MINING14. I herebycertify that the foregoing is true and correct.Name (Printed/Typed)

CherylJohnsoTit1te 9e/g0la2toryTechnician

THIS SPACE FOR FEDERALOR STATE OFFICE USEApproved by

fitle DateÕonãÏtÏëfsiIapprval, if any, are attached. Approval of this notice does not warrant or certifythat the applicant holds legal or equitable title to those rights in the subject lease which would Officeentitle the applicant to conduct operations thereon.Title 18 U.S.C.Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowinglyand willfully to make to any department or agency of the United States any false,fictitious or fraudulent statements or representations as to any matter within its jurisdiction.(Instructions on page

Page 31: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Fiëld Närne! Wildcat S/T/R 35/21S/16E Coun þtate; Grand, UTOperator elta Petroleum Corporatio Location Desc: Permitted footages Olátricti Northem

ActivityDate : 8/24/2007 Days From Spud : 17 CurreratDepth: 1935 Ft 24 HObbtage Made : 156 FtRig Company : DHS Drilling CO Rig Narbe: DHS Rig 11

Formation : Wingate WeatherOperations

Start Hrs Code Remarks startDepth EridDepth Run

6:00 2.50 02 DRLG FI 1779' TO 1935' 1779 1935 5

8:30 2.50 05 MIX&PUMP PILL TO KILLWATER FLOW,DIDN'T WORK, MIXANOTHER PILL 1935 1935 5

11:00 1.50 06 TOOH, PULL ROT HEAD RUBBER 1935 1935 5

12:30 3.00 22 WORK ON BOP LINES, ANNULAR WON'T OPEN AFTER CLOSINGIT WHILE GETTING 1935 1935 5ROT HEADRUBBEROUT

15:30 1.00 06 FINISH TOOH 1935 1935 5

16:30 4.00 22 WAIT ON BOP MACHANIC 1935 1935 5

20:30 0.50 07 RIG SERVICE 1935 1935 5

21:00 2.50 06 P/U 14-5/8" IBS &OPEN ANNULAR, L/D AIR HAMMER, 9" DC; P/U 8" MUD MOTOR 1935 1935 5

23:30 1.50 22 WEATHERFORD SERVICEHAND LOOKING AT ANNULAR, FINDS NOTHINGWRONG, 1935 1935 5ANNULAR IS OPENING & CLOSING FINE

1:00 5.00 06 P/U NEW BHA &TlH 1935 1935 6Totat 24.00

Mud PropertlesDe th Time Wt in Wt Out Vis PV YP Gels FL HTFL FC HTEC Solki Water Oil Sand1935 2:00 8.40 0.00 27 1 1 1/1/1 0.0 0.0 0 0.00 0.0% 99.9% 0.0% 0.1%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total Sat CaCl2 EDTA O/W Ratio MudLoss0.0 8.20 0.00 0.00 3.40 9000 840 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp Remarks0.0 92

DRLG. WI WATER.

Activity ate 8/25/2007 pays From Spud : 18 CurrerdDepth : 2338 Ft 24 Hr. Footage Made : 403 FtIg Conthany: DHS Drilling CO RigNamé DHS Rig 11Forrühtlon : Moen kop! Weathar

OpératiorisStart Hrs Code Remarks Start Depth End Depth Run

6:00 2.50 06 TlH, L/D10 JT 1935 1935 6

8:30 0.50 03 REAM FI 1708' TO 1740' 1935 1935 69:00 0.50 07 RIGSERVICE 1935 1935 6

9:30 1.50 03 REAM Fl 1740' TO 1935' 1935 1935 611:00 7.00 02 DRLGFl 1935' TO 2149' 1935 2149 6

18:00 0.50 07 RIG SERVICE 2149 2149 6

18:30 1.00 08 REPLACE PACKING IN #1 CHARGER PUMP, SUCKINGAIR 2149 2149 6

19:30 10.50 02 DRLG F/ 2149' TO 2338' 2149 2338 6

Totat 24.00Mud Propertiés

Depth Tune Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1935 2:00 8.40 0.00 27 1 1 1/1/1 0.0 0.0 0 0.00 0.0% 99.9% 0.0% 0.1%MBT pH Pm Pf Mf CI Ca ES Pom Lime TotatSat CaCl2 EDTA O/W Ratio Müd Loss0.0 7.10 0.00 0.00 1.30 8000 640 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FLTemp Römerks0.0 92 |

DRLG. W/ WATER.

Page 12 of 18 Powered by Production Access

Page 32: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Fléld Nãëel Wildcat S/T/R 35/218/16E County,State: Grand, UTOperator elta Petroleum Corporatio Location Desc: Permitted footages District: Northem

ActivityDate : 8/26/2007 Days From Spud : 19 Current Depth : 2618 Ft 24 Hr. Fòoingé Made: 280 FtRig Company : DHS Drilling CO Rig Name: DHS Rig 11

Formation : Moenkopi WeatherOperations

Start Hrs Code Remarks Stari Depth End Depth Run6:00 6.50 02 DRLG2338' TO 2432' 2338 2432 6

12:30 0.50 07 RIG SERVICE 2432 2432 613:00 0.50 10 WIRE LINE SURVEY @2332' =

.5 DEG 2432 2432 613:30 9.50 02 DRLG2432' TO 2559' 2432 2559 623:00 1.00 10 WIRE LINESURVEY @2365' = 1.75 DEG 2559 2559 6

0:00 6.00 02 DRLG2559' TO 2618' 2559 2618 6Totali 24.00

luludPro¡iertiesDepth Time Wt in Wtúut vië PV VP Gels FL HTFL FO HTFG Solid Water Oil Sand2392 9:10 8.60 8.70 28 2 1 1/1/1 0.0 0.0 0 0.00 3.0% 97.0% 0.0% 0.2%

MBT pH Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA OlW Ratio Mud Loss0.0 9.50 0.20 0.20 4.30 8000 640 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FLTemp Rernarks0.0 88

DRLG.W/ WATER.

Rig Compan : DHS Drilling CO Rig Name: DHS Rig 11Formatioñ : Moenkopi Weather:

OperationsStart Hrs Code Remarks Start Depth End Depth Run

6:00 1.50 02 DRLG2618' TO 2637' 2618 2637 67:30 8.50 06 TOOH, XO BIT, MOTOR, MWD, L/D IBS's 2637 2637 6

16:00 1.50 06 TIH TO SHOE 2637 2637 717:30 1.00 09 CUT DRLG LINE 2637 2637 718:30 1.00 06 TIH 2637 2637 719:30 1.00 10 CHECKMWD 2637 2637 720:30 0.50 06 TlH 2637 2637 721:00 0.50 03 REAM30' TO BOTTOM 2637 2637 721:30 8.50 02 DRLG2637' TO 2765' 2637 2765 7Totali 24.00

Mud PropertlesDebth Time Wt Irt Wt Oút Vis PT YP Gels FL HTFL FC HTFC Solid Water Oil Sand2636 9:50 8.60 0.00 27 1 1 1/1/1 0.0 0.0 0 0.00 2.3% 97.7% 0.0% 0.5%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio MydLoss0.0 8.10 0.00 0.00 0.20 7800 760 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Teinp marks0.0 87

DRLG. WI WATER.

Page 13 of 18 Powered by Production Access

Page 33: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Field Natné: Wildcat $17/R 35/218/16E Coun State: Grand, UTOperator elta Petroleum Corporatio Location Desc: Permitted footages District: Northem

ActlvityDate : 8/28/2007 Gäÿëfû¾úŠpúd 21 Current Depth : 3135 Ft 24 Hr. Fõotagé Made 370 FtRig Company: DHS Drilling CO Rig Name: DHS Rig 11

Formation : Weather:Operations

Start Hrs Code Remarks Start Deþth End Depth Run6:00 9.50 02 DRLG2765' TO 2921' 2765 2921 7

15:30 0.50 07 RIGSERVICE 2921 2921 716:00 11.50 02 DRLG2921' TO 3110' 2921 3110 73:30 1.00 05 WORK TIGHT CONNECTION 3110 3110 74:30 1.50 02 DRLG3110' TO 3135' 3110 3135 7

Totat 24.00Mud Properties

D pth Time Wt ín Wt Out Via PV XP Gpis PL HTFL FC HTËC Solid Water Oil Sand2856 12:00 8.90 0.00 28 1 1 1/1/1 0.0 0.0 0 0.00 4.5% 95.5% 0.0% 1.0%

MBT pH Pin Pf Mf CI Ca ES Pom I ime Total SaL CaCl2 EDTA O/W Ratio Mud Loss0.0 8.10 0.00 0.00 0.80 7800 760 0 0.00 0.00 0 0 0.00

Watér Loss LCM ECD FLTeinp Remarks0.0 97

DRLG.W/ WATER. START MUD UP 3110'.

ActlŸifyDate 8/29/2007 Days From Spud : 22 C fréntDépth : 3342 Ft 2 H F otége Mäde 207 FtRig Comþany DHS Drilling CO Rië14afnet DHS Rig 11

Formation : White Rim Weather:Opèrations

Start Hrs Code Rennarks Start Depth End Depth Run6:00 6.00 02 DRLG 3135 TO 3206 3135 3206 7

12:00 0.50 07 RIGSERVICE 3206 3206 712:30 17.50 02 DRLG3206 TO 3342 3206 3342 7Total: 24.00

Mud PropertiesDepth Time Wt in WtOut Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand3185 9:45 9.00 9.10 36 7 8 14/22/30 18.0 0.0 2 0.00 5.3% 94.7% 0.0% 1.5%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio MudLoss12.5 8.00 0.00 0.00 0.20 7000 800 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp Remarks0.0 9.0 100 MUD UP @3110.

Page 14 of 18 Powered by Production Access

Page 34: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

rée oi icief I ss-ûDFlé1dNarne: Wildcat S/T/R 35/218/16E Coun ,State: Grand, UT

Operator elta Petroleum Corporatio Location Desc: Permitted footages District: Northem

ctivityDaté 8/30/2007 DáýšftúnfSóúd : 23 Current Depth : 3503 Ft 24 HfRoðtägMade: 161 FtIg Córhyaný DHS Drilling CO Rig Name: DHS Rig 11Formation : Cutler Weather

OperationsStart Hrs Code Remarks Start Depth End Depth Run

6:00 1.50 02 DRLG 3342 TO 3361 3342 3361 77:30 1.00 05 CIRC, MIX&PUMP PILL 3361 3361 78:30 2.50 06 TOOH, PULL ROT HEAD RUBBER 3361 3361 7

11:00 1.00 20 XO BITS, ORIENT TOOLS 3361 3361 712:00 3.00 06 TlH, INSTALL ROT HEADRUBBER,TEST MWD 3361 3361 815:00 3.50 03 REAM 3233 TO 3361 3361 3361 818:30 11.50 02 DRLG3361 TO 3503 3361 3503 8Totali 24.00

Mud PropertiesDepth Time Wt in Wt Out Via PV YP Gets FL HTFL FC HTFC Solid Wate? 011 Sand3361 9:00 9.00 9.10 33 5 5 7/10/14 18.0 0.0 2 0.00 5.3% 94.7% 0.0% 4.0%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total SaL CaCl2 EDTA O/W Ratio Mud Loss10.0 8.70 0.10 0.05 0.20 7000 440 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FLTemp Remarks0.0 | 9.0 104 |

Activity Date : 8/31/2007 Daÿs From Spud 24 Corrënt Degth 3725 Ft 24 Hr. Footage Made : 222 FtRig Company ; DHS DrillingCO Rigiante: DHS Rig 11

Formation : Cutler Weatheriiperat16ris

Start Hrs Code Remarks Start Depth End Depth Run6:00 2.00 02 DRLG3503 TO 3530 3503 3530 88:00 1.50 07 RIG SERVICE 3530 3530 89:30 15.50 02 DRLG 3530 TO 3702 3530 3702 81:00 1.00 08 WORK ON PUMP, XO LINER & SWAB 3702 3702 82:00 4.00 02 DRLG3702 TO 3725 3702 3725 8

Total: 24.00Mud Properties

ÕŒth Time Wt in Wt Out Vis RV YP Gels FC HTFL FC HTFC Solid Water Oil Sand3530 9:00 9.30 9.30 39 8 8 8/12/16 15.6 0.0 2 0.00 6.2% 93.8% 0.0% 4.0%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total SaL CaCl2 EDTA O/W Ratio Mud Loss10.0 9.10 0.36 0.11 0.41 8000 460 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Tem marks0.0 9.3 102

Page 15 of 18 Powered by Production Access

Page 35: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

( e 5)UNITED STATES ç°W

1 7DEPARTMENT OF THE INTERIOR Expires: March 31, 2007

BUREAUOF LAND MANAGEMENT 5. Lease SerialNo.UTU 84051

SUNDRY NOTICES AND REPORTS ON WELLS 6.Iffndian,AllotteeorTribeName

Do not use this form for proposals to drill or to re-enter an NA

abandoned well. Use Form 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement,Name and/or No.

I.Typeof HOilWell

GasWell O.- CONFllENTIALt.e----J.N35-12D

3a. Address 3b. Phone No. (include area code) 10. Field and Pool or ExploratoryArea3 Street, SA 4300

(303) 820-0144 Wildcat

4. Location of Well (Footage, Sec., T.,R.,M.,or SurveyDescription) 11.Country or Parish, State1878' FNL & 85T FWLSWIINW Secuan 35 T218 R16E Grand, UT

12. CHECK THE APPROPRIATEBOX(ES) TO INDICATENATUREOF NOTICE, REPORT OR OTHERDATA

TYPE OF SUBMISSION TYPE OF ACTION

O Nodce onntent O Acidize Deepen Pmducdu (Stad/Remme) Water Shut-Off

O Aker Casing Fracture Treat Rec1mtion WeH Integrity

Subsequent Report Casing Repair Nw Construcdo Recomplee Othe Weeldy Update

O Change Plam Plug and Abandon Temporarily Abandon

O Final Abandonment Notice Conven to Injodon Plug Back Water Disposal

13. Describe Proposed or CompletedOpention: Clearly state all pertinent details, includingestimated starting date of any proposed work and appmximate duration thereo£ If

the poposal is to deepen directionallyor recomplete horizontally, give subsurface locations and measuæd and true vertical depths of all pertinent markers and zones.

Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involvedoperations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 mustbe filed once

testing has been completed. Final AbandonmentNotices must be filed only aner all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for fmal inspection.)

TIGHT HOLE STATUS

See attached "DrillingChronological Regulatory Report" for 8/7/07 thru 8/24/07.

RECEIVEDSEPI O2007

DIV.0FOIL,GAS&MINING14. I hereby certify that the foregoing is true and correct.

Name (Printed/Typed)Cheryl Johnson Tide Regulatory Tech

THIS SPACE FOR FEDERAL OR STATE OFFICE USE

Approved by

fitle DateConditionsof approval, if any, are attached. Approval of this notice does not warrant or certifythattheapplicant holds legal or equitable titleto thoserights in the subject lease which would OfBceentitle the applicant to conduct operations thereon.

Title 18 U.S.C. Section1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United Statesany false,

fictitious or fraudulent statements or representations as to any matter within itsjurisdiction.(Instructions on page 2) '

Page 36: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Delta Petroleum Corporation

370 17th St. Suite #4300 ,

D Denver,Go so2o2 Drillmq Chronological(303) 293-9133 RegulaÍOry

ActivityDate: 8/1/2007 Days Fiom Spud : -7 CurientDepthÏ 0 F 14 Hr.Footége Mede: 0 Ft

R Com y ; RigName:Föhtiation : Whather.

OpérationsStart Hrs Code Rémárks Start Depth End Depth Run

6:00 24.00 01 RIGGINGDOWN, READING RIG FOR SKID, WAITINGON RAT HOLE RIG. 0 0 NIH

Total: 24.00

ActMty Date : 8/2/2007 Days From Spud : -6 Ctirreñt Deptif : 0 Ft 24 Hr. Footage Made : 0 Ft

Rig Coinpany : RigName:Föritiation : Weather:

OperationsStart Hrs Code Remarks Start Depth End Depth Run

6:00 24.00 24 PETE MARTINRAT HOLE DLRG.DRILLINGCONDUCTOR HOLE. 0 0 NIH

ggg 24.00

ActMty Date : 8/3/2007 Days FromSpud ; -5 Cúltent Depth : 0 Ft 24 Hr.Footage Made : 0 Fi

Rig Cònipany : Rig Name:Formation : Weather

OperationsStart Hrs Code Remarks Stãrt Depth End Depth Run

6: 24, 24 DRLG.CONDUCTOR TO 45', CELLAR, RAT HOLE & MOUSE HOLE. 0 0 NIH

Total 4.00

ActivityDate : 8/4/2007 Days From Spud : -4 Current Deßth : 0 Ftl 24 Hr. Footage Made : 0 Ft

Rig Company : Rig Name:Formation : Weather

3perationsStart Hrs Cöde Remarks Start Depth End Depth Run

6:00 24.00 24 FINISH UP RAT HOLE, MOUSE HOLE,CEMENT CONDUCTOR. O O NIH

24.00

ActivityDate : 8/5/2007 Days Fmm Spud : -3 Cûrmnt Depth : 0 Ft| 24 Hr.Footage NIade : 0 Ft

Rig Gompany ; Rig Naine:Forrhation : Weather

Operationsstart Hrs Code Remarks Start Depth End Depth Run

6:00 13.00 01 SET RIG OVERHOLE,RIG UP. 0 0 NIH

0 RIG IDLE. 0 0 NIH

Total: 24.00

RECEIVEDPage 1 of 13 Powered by Production Access

SEP1 0 20078/24/2007

DIV.0F0lL,GAS&

Page 37: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Field Name: Wildcat S/TIR 35/218/16E Courity,State: Grand, UTOperator, elta Petroleum Corporatio Location Desc: Permitted footages District Northem

ActlitifyDate i 8/6/2007 Days Fmm Spud : -2 Cuivänt Depth : 0 Ft 24 Hr. Footäge Made : 0 FtRig Götn¡Satiy: RigName:

Fórmátion: WeathenOperationd

Stad Hrs Code Retúarks startDepth End Depth Run

6:00 14.00 01 RIG UP .O O NIH

20:00 10.00 24 RIG IDLE O O NIH

Total:24.00

Antièlty Date : 8/7/2007 Days FrontSpùd : -1 Critrent Depth : 0 Ft 24 Hr.Föotage Mede : 0 FtRig Cdmpariy: DHS DrillingCO RigNaine: DHS Rig 11

Fomiatiori : Wèather:Opérations

Start.

Hrs Code Remarks.

Start Depth End Depth Run

6:00 7.00 01 RIG UP .0 0 NIH

13:00 5.00 14 NIPPLE UP. O O NIH

18:00 4.00 01 RIG UP O O NIH

22:00 4.00 14 NIPPLE UP, WELD SPOOL FOR ROT. HEAD. WORK ON BLOW DOWN LINES. 0 0 NIH

2:00 4.00 08 RIG REPAIR, WORK ON ACCUMMULATOR. 0 0 NIH

Total: 24.00

MERMMMMERWWSWWW BERWWWWERWERWWWWT&WROMIMMERActivity Date : 8/8/2007 Days From Spud : i Current Depth : 140 Ft 24 Hr. Footage Made : 80 FtRig Company : DHS DrillingCO Rig Name: DHS Rig 11

Formation : Morrison Weather:

6:00 6.00 20 P.U. AIR TOOLS, WELD FLOW LINE. 0 0 NIH

12:00 3.00 22 INSTALLROT. HEAD. 0 0 NIH

15:00 3.00 02 DRLG. FI 60' TO 140' 60 140 1

18:00 1.00 08 SWlVEL OIL SEALS OUT. 140 140 1

19:00 0.50 22 BLOW HOLE CLEAN. 140 140 1

19:30 0.50 06 PULL 1 STAND. 140 140 1

20:00 10.00 08 RIG REPAIR, WAIT ON SWIVEL OUT OF CASPER. 140 140 1

Tõiëlj24.00

RECEIVEDPage 2 of 13 Powered by Production Access 8/24/2007

SEP1 0 2007DIV.0FOIL,GAS&

Page 38: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

FieldName: Wildcat , /T/R 35/218/16E Cóun ,State: Grand, UT

O rator; elta Petroleum Co ratio EòcatforiDesc: Permitted foota es Diebict: Northem

iAótivityDate : 8/9/2007 GaysFtômSpud i 0 CurrentRéptin 202 Ft 24 Hr.Fodtage Made: 62 Ft

RigCoinpany: DHS Drilling CO Rig Name! DHS Rig 11Formation: Morrison Weather

OperationsStatt Hrs Code Rematics Start Depth End Depth Run

6:00 1.50 08 RIG REPAIR,( WAIT ON SWIVEL.) 140 140 1

7:30 2.00 03 WASH &REAMTO BTM. 140 140 1

9:30 1.50 02 DRLG.FI 140' TO 202'. 140 202 1

11:00 0.50 06 TRIP OUT. ( SWIVEL PACKING.) 202 202 1

11:30 15.00 08 RIG REPAIR,( WAIT ON SWIVEL.) 202 202 1

2:30 0.50 07 RIG SERVICE. 202 202 1

3:00 0.50 06 TRIP IN. 202 202 1

3:30 1.00 08 RIGREPAIR,( SWIVEL PACKINGLEAKING.) 202 202 1

4:30 0.50 06 TRIP UP INTO SHOE. 202 202 1

5:00 1.00 08 RIG REPAIR,(REPACKSWIVEL PACKING.) 202 202 1

li 24.00

Rig Company : DHS Drilling CO Rig Name: DHS Rig 11Formation : Entrada Weather:

6:00 4.50 08 RIG REPAIR,( REPAIR SWIVEL PACKING.) 202 202 1

10:30 0.50 06 TRIP IN HOLE. 202 202 1

11:00 0.50 03 WASH &REAMTO BOTTOM. 202 202 1

11:30 3.00 02 DRLG. FI 202' TO 331'. 202 331 1

14:30 2.50 20 REPLACE D.C.ROT. HEAD WI NEW ROT. HEAD. 331 331 1

17:00 2.50 02 DRLG. FI 331' TO 454'. 331 454 1

19:30 0.50 07 RIG SERVICE. 454 454 1

20:00 1.00 02 DRLG.FI454' TO 515'. 454 515 1

21:00 0.50 10 SURVEY @495', ( MISSRUN.) 515 515 1

21:30 1.00 02 DRLG. FI 515' TO 576'. 515 576 1

22:30 0.50 10 SURVEY @556', (MISSRUN.) 576 576 1

23:00 0.50 02 DRLG. F/ 576' TO 606'. 576 606 1

23:30 0.50 10 SURVEY @556', 1/4 DEGREES. 606 606 1

0:00 6.00 02 DRLG.FI 556' TO 1076'. 606 1076 1

Total: 24.00Mud Properties

Depth: Time Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand

202 9:00 8.70 0.00 42 9 12 4/7/9 10.6 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%

Water Loss LCM ECD FL Temp RemarksO 0.0 0.0 0 Build Mud In Tanks To 38 Vis, 8.8 Wt.

RECEIVEDPage 3 of 13 Powered by ProducGon Access

SEP1 0 2007

DIV.0F0lL,GAS&

Page 39: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Field Name: Wildcat S/T/R 35/218/16E Coùn ,State' Grand, UTOperator Ita Petroleum C oratio Location Desc: Permitted foota es District Northem

iActivityDate : 8/11/2007 Dagshorri Spud : 4 Curiënt Daßth : 1092 Ft 24 Mr.Fontage Made : 16 FtRigCornpany: DHS DrillingCO ,Rin Nanie: DHS Rig 11

Formatidnt Entrada Vyeather.Oþerations

Start Hrs Code Remadts Start Depth End Depth Run

6:00 0.50 05 BLOW HOLE CLEAN. 1076 1076 1

6:30 0.50 10 SURVEY @1014', 1/2 DEGREE. 1076 1076 1

7:00 2.00 05 CIRC. DISPLACE HOLE W/ MUD, CONDITION HOLE,( FULLRETURNS.) 1076 1076 19:00 3.00 06 TRIP OUT, LAYDOWNAIR HAMMER. 1076 1076 1

12:00 0.50 07 RIG SERVICE. 1076 1076 1

12:30 3.00 20 PICK UP 9.5" MUD MOTOR, IBS. 1076 1076 2

15:30 6.50 22 WAIT ON CROSS OVER SUB.(9"DC.IS6-625 NOT 7.625) 1076 1076 2

22:00 1.00 06 TRIP IN W/ 20" TRICONE.(GTX-03 ) 1076 1076 2

23:00 1.00 20 INSTALLROT. HEAD. 1076 1076 20:00 0.50 06 TRIP INTO 1016'. 1076 1076 2

0:30 0.50 03 WASH &REAM Fl 1016' TO 1076'. 1076 1076 2

1:00 5.00 02 DRLG. FI 1076' TO 1092'. 1076 1092 2

Total; 24.00Mud Propertles

me Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1076 : 9:00 8.70 0.00 42 9 12 4/7/9 10.6 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%

pH Pm Pf Mf CI Ca ES Pom - Lime Total Sal. CaCl2 EDTA O/W Ratio MudLoss7.5 ¡9.60 0.60 0.40 1.10 2600 200 0 0.00 0.00 0 0 0.00 0

Water Loss LCM ECD FLTemp RemarksO 0.0 | 0.0 0 Build Mud in Tanks To 38 Vis, 8.8 Wt.

ActivityDate : 8/12/2007 Days From Spud : 5 Current Depth : 1209 Ft 24 Hr. Footage Made : 117 FtRig Company : DHS DrillingCO Rig Name: DHS Rig 11

Formation: Navajo WeetherOperations

Start Hrs Code Remarks Start Depth End Depth Run

6:00 1.00 02 DRLG. Fl 1092' TO 1099'. 1092 1099 2

7:00 0.50 07 RIG SERVICE. 1099 1099 2

7:30 20.00 02 DRLG. FI 1099' TO 1209'. 1099 1209 2

3:30 2.50 22 INDUCE FLOW W/ AIR, FILLALLTANKS. 1209 1209 2

970täli24.00Mud Properties

De th Time Wt in Wt Out vis PV YÞ Gels FL HTFL FC HTFC Solid Water Oil Sand1111 10:00 8.75 0.00 49 10 7 6/8/9 12.4 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%MBT

_pH Pm Pf Mf CI Ca ES Pom Lime TotalSal. CaCl2 EDTA OlW Ratio Mud Loss

7.5 9.10 0.25 0.12 1.00 2300 180 0 0.00 0.00 0 0 0.00Water Loss LCM ECD FL Temp emarks

2500 0.0 8.8 89 OSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.RLG. W/ WATER.

RECEIVEDPage 4 of 13 Powerect by Pmduction Access 8/24/2007

SEP1 0 2007

DIV.0FOIL,GAS&

Page 40: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

FieldName: Wildcat S/T/R 35/218/16E - Coun ,State: Grand, UTO or: elta Petroleum Co ratio Location Desc: Permitted foota es District Northem

ActlŸltyDate : 8/13/2007 DaysBomSpud : 6 Curient Depth : 1283 Ft 24 Hr. Footage Made : 74 FtRig Compny : DHS DrillingCO RigNañie: DHS Rig 11

Fonnation: Navajo WeátherOperations

Start Hhs Code Remarka Start Depth End Depth Run

6:00 2.00 02 DRLG. Fl 1209°TO 1223'. 1209 1223 2

8:00 1.50 20 X-OUT ROT HEAD RUBBER. 1223 1223 2

9:30 0.50 07 RIG SERVICE. 1223 1223 2

10:00 5.00 02 DRLG. F/ 1223' TO 1247. 1223 1247 2

15:00 1.00 22 FILLMUDTANKS FI TANK BATTERIES. 1247 1247 2

16:00 4.50 02 DRLG.Fl 124T TO 125T. 1247 1257 2

20:30 1.50 06 TRIP OUT FOR BIT. 1257 1257 2

22:00 0.50 20 X-OUT BIT. 1257 1257 2

22:30 2.00 06 TRIP IN HOLE. 1257 1257 3

0:30 0.50 03 WASH & REAM FI 1229' TO 1257. 1257 1257 3

1:00 1.50 02 DRLG.Fl 1257 TO 1271'. 1257 1271 3

2:30 0.50 07 RIGSERVICE. 1271 1271 3

3:00 0.50 20 INDUCE FLOW WI AIR. 1271 1271 3

3:30 1.50 02 DRLG. F/ 1271' TO 1283'. 1271 1283 3

5:00 1.00 08 RIG REPAIR, ( WORK ON#1 PUMP.) 1283 1283 3

Total; 24.00Mud Properties

Water Loss LCM ECD FLTemp Remarks0.0 92 LOSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.

DHLG.W/ WATER.

ActivityDate : 8/14/2007 Days From Spud : 7 Cufrent Depth : 1393 Ft 24 Hr. Footage Made : 110 FtRig Company : DHS DrillingCO Rig Name: DHS Rig 11

Formation: Navajo Weather.Operations

Start Hrs Code Remarks Start Depth End Depth Run

6:00 5.00 02 DRLG.FI 1293' TO 1303'. 1283 1303 311:00 0.50 10 SURVEY @1203', 1/4 DEGREE. 1303 1303 3

11:30 3.00 02 DRLG. Fl 1303' TO 1323'. 1303 1323 3

14:30 0.50 07 RIGSERVICE, GREASECROWN. 1323 1323 3

15:00 2.00 08 RIGREPAIR, SCR HOUSE OVERHEATED. 1323 1323 3

17:00 13.00 02 DRLG. Fl 1323' TO 1393', 1323 1393 3

Total: 24.00MudProperties

Depth Time Wf In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water OII Sand1283 2:00 8.75 0.00 40 11 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%

MBT pH Pm Pf Mf CI Ca ES Pom Lime ISal. CaCl2 EDTA O/W Ratio Mud Loss7.5 8.90 0.22 0.10 0.9 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp Remarks0.0 92 LOSS OF MUD,INDUCEWATER FLOW,FILL ALLTANKS,

DRLG. WIWATER.

Page 5 of 13 Powered by Production Access RECEIVED 8/24/2007

SEP1 O2007

DIV.OFOIL,GAS&

Page 41: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

. Field Name: Wildcat S/T 35/218/16E Coun ,State: Grand, UTOperator elta Petroleum Co oratio Location Desc; Permitted footages District: Northem

Actlíritý Date : 8/15/2007 Days Frûm Spud : 8 CurrentDepth : 1614 Ft 24 Hr. Footage Made : 221 FtRig Cömþany : DHS DrillingCO Rigblame: DHS Rig 11

Forriiatioñ: Kayenta Weather0perations

Start Hrs Code Remadts Start Depth End Depth Run

6:00 1.00 02 DRLG. FI 1393' TO 1398'. 1393 1398 3

7:00 0.50 07 RIG SERVICE. 1398 1398 3

7:30 15.50 02 DRLG. F/ 1398' TO 1556'. 1398 1556 3

23:00 0.50 20 WORK TIGHT HOLE. 1556 1556 3

23:30 6.50 02 DRLG. FI 1556' TO 1614'. 1556 1614 3

6:00 0.00 1614 1614 3Total: 24.00

Water Loss LCM ECD FL Temp Reniarks0.0 92 LOSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.

DRLO. W/ WATER.

Activity Date : 8/16/2007 Days From Spud : 9 Current Depth : 1636 Ft 24 Hr. Footage Made : 22 FtRig Company : DHS DrillingCO Rig Name: DHS Rig 11

Formation: WeathecOperations

Start Hrs Code Remarks Start Depth End Depth Run

6:00 1.00 02 DRLG FI1614' TO 1620' 1614 1614 3

7:00 0.50 07 RIG SERVICE 1614 1614 3

7:30 2.00 02 DRLG Fl 1620' TO 1636' 1614 1636 3

9:30 1.00 05 PUMP SWEEP, BLOW HOLE CLEAN W/ AIR 1636 1636 3

10:30 3.00 06 WIPER TRIP TO 330', MONITOR HOLE Fl 1 HR 1636 1636 3

13:30 0.50 10 SURVEY @ 1519', .25 DEG 1636 1636 3

14:00 5.00 06 TOOH, L/D BIT, MOTOR, IBS, XO 1636 1636 3

19:00 8.00 12 R/U & RUN 1638.66' OF 16", 75#, BUTTRESS CASING,(SHOE @ 1605', FLOAT COLLAR 1636 1636 31555, 10 CENTS; i ON EACH OF THE 1st 10 JTS IN HOLE)

3:00 3.00 22 HOOKING UP CIRCULATINGHEAD, FIXTHREADS 1636 1636 3

Total: 24.00Mud Properties

De th Time Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1614 2:00 8.75 0.00 40 i i 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%

MBT pH Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA OlW Ratio MudLoss7.5 8.90 0.22 0.10 0.95 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp emarks0.0 92 OSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.

RLG. W/ WATER.

Page 6 of 13 Powered by Production Access RECE IVED 8/24/2007

SEP1 0 2007DIV.0FOIL,GAS&

Page 42: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

lel¢ Name: Wildcat S/T/R 35/21S/16E Coun ,State: Grand, UTOpérator Ita Petroleum Corporatio Location Désc: Permitted foota es District Northem

Activity Date : 8/17/2007 Däyè FroinSúud : 10 Currer)t Depth : 1636 Ft 24 Hr. Footage Made : 0 FtRig Company: DHS DrillingCO RigNamét DHS Rig 11

Formatlön: WeatherOperätlons

Start Hrs Code Remarks Start Dëpth End Depth Run6:00 2.00 12 WASH 100' OF CSG DOWN, PIPE STUCK @ 1605', 1636 1636 38:00 1.00 05 CIRCULATECASING 1636 1636 39:00 6.50 12 R/U & CEMENT W/ HALLIBURTON: 775sx TYPE 3 ROCKIES LT 12.3#, 2.34 YIELD, 13.41 1636 1636 3

GAUSK LEADCONTAINING .125pps POLY FLAKE;380sx TYPE 3 ROCKIES LT 12.8#, 2.08YIELD11.45 GAUSKTAIL CONTAINING.125pps POLY FLAKE, DISPLACE 360 BBLWATER, (CALC = 353) DID NOT BUMP PLUG, FINALCIRC PRESS = 175 @3 BBUMIN

15:30 2.50 13 WAITON CEMENT, R/U EQUIP FI TOP OUT 1636 1636 318:00 0.50 12 CMNTTOP JOB Wl200sx TYPE 5 NEAT 15.6#, 1.2 YIELD,5.2 GAUSK CONTAINING 1% 1636 1636 3

L,ACL,18:30 4.00 13 WAIT ONCEMENT 1636 1636 322:30 1.00 12 CMNTTOP JOB W/200sx TYPE 5 NEAT 15.6#, 1.2 YIELD,5.2 GAL/SK CONTAINING 1% 1636 1636 3

GACL23:30 6.50 13 WAITON CEMENT 1636 1636 3

i 24.00Mud Propertles

Depth Time Wt In to Vis PV YP Gels FL HTFL FC HTFC Solid Water Oll Sand1614 2:00 8.75 0.00 40 11 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%MBT pH Pm Pf Mf CI Ca ES Pom Lime i Sal. CaCl2 EDTA O/W Ratio Mud Loss7.5 8.90 0.22 0.10 0.9 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp Remarks0.0 92 LOSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.

URLG. WI WATER.

ActivityDate : 8/18/2007 Days Fiom Spud : 11 CurrentDepth : 1636 Ft 24 Hr. Footage Made : 0 FtRig Company : DHS DrillingCO Rig Name: ' DHS Rig 11

Formation : WeatherOperations

Start Hrs Code Remarks Start Depth End Depth Run6:00 1.50 13 WAIT ON CEMENT - 1636 1636 37:30 2.00 12 CEMENT TOP JOB W/ 225sx TYPE 5 NEAT 15.6#, 1.2 YIELD,5.2 GAL/SK CONTAINING 1636 1636 3

1% CACL, RETURNS TO SURFACE-5BBL TO PIT9:30 20.50 14 N/D CONDUCTOR DIVERTOR, CUT OFF CSG & CONDUCTOR, WELD ON 16-3/4" HEAD 1636 1636 3

\ \ be I TO 1000psi F/ 15 MIN), NIU 20"X 3M BOPsTotal: 24.00

Mud PropertiesDepth Time Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1614 2:00 8.75 0.00 40 11 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total Sat CaCl2 EDTA O/W Ratio Mud Loss7.5 8.90 0.22 0.10 0.95 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp Remarks0.0 92 LOSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.

DHLG. W/ WATER.

Page 7 of 13 Powered by Production Acc.,, RECE IVED 8/24/2007

SEP1 0 2007DIV.0FOIL,GAS&

Page 43: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Field Name: Wildcat SIT/R 35/218/16E Coun ,State: Grand, UTO erator elta Petroleum Corporatio LocatlânDek: Permitted footages Olgtri : Northem

ActMtý Date : 8/19/2007 _ Dàys From S;iud : 12 Current Depth : 1636 Ft 24 Nr. Footage Made : 0 Ft

RigCompany : DHS DrillingCO Rig Name: DHS Rig 11

Formattori; .Weáther

OperàttonsStart Mrs Code Remarks Start Depth End Depth Run

6:00 2,00 14 N/U BOPs 1636 1636 3

8:00 2,00 11 RUN CBL, (LOGGERS TD = 1540'), 1st READ @ 1530' SHOW'S50% BOND & INCREASES 1636 1636 310 95% @ 1520' TO 1220'. THEN DECREASES TO 50% UP TO 910'. 90 TO 100% BONDTO SURFACE F/ THERE.

10:00 2.00 14 FINISH N/UBOPs 1636 1636 3

12:00 6.00 15 TESTBOPs: TO 3000# F/ 15 MIN;BLINDS,PIPES, KILLLINESIDE VALVES, CHOKE LINE 1636 1636 3SIDE VALVES, CHOKE LINE, CHOKE MANIFOLD,KELLY,KELLYCOCKS, FLOORVALVES.TO 1500# Fl 15 MIN;ANNULAR,

18:00 12.00 22 WAITINGON PACKER TO TESTCASING 1636 1636 3

Total: 24.00Mud Properties

Time Wt in Wt O Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1636 2:00 8.75 0.00 40 11 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%MBT pH Pm Pf M( CI Ca ES Pom Lime TotalSal. CaCl2 EDTA O/W Ratio MudLoss7.5 8.90 0.22 0.10 0.9 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FLTemp eniarks0.0 92 OSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.

RLG. W/ WATER.

ActivityDate : 8/20/2007 WWä!E¾iA 13 Current Depth : 1636 F ggB $ il I 0 FRig.Company: DHS DrillingCO Rig Narie: DHS Ri 11

Formation : Weather.Operations

Start Hrs Code Remarks Start Depth End Depth Run

6:00 9.00 22 WAIT ON 15" PACKER TO TEST CSG 1636 1636 3

15:00 2.00 06 P/U PACKER, TlH 1636 1636 3

17:00 2.00 15 SET PACKER, TEST CSG TO 1500psi Fl 30 MIN, (HADA LEAKON KILLLINESIDE CHECK 1636 1636 3VALVE& HADTO REMOVE IT)

19:00 4.00 06 TOOH - 1636 1636 3

23:00 1.50 06 L/D PACKER ASSEMBLY 1636 1636 4

0:30 5.50 06 P/U BIT, BIT SUB &TIH, INSTALLROT HEAD RUBBER 1636 1636 4

Total: 24.00Mud Propertles

Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solld Water Oll Sand

1636 2:00 8.75 0.00 40 11 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%MBT pH Pm Pf Mf CI Ca ES Pom Lime Total Sal. CaCl2 EDTA OlW Ratio Mud Loss7.5 8.90 0.22 0.10 0.95 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp emarks0.0 92 OSS OF MUD, INDUCEWATER FLOW,FILL ALLTANKS.

RLG. W/ WATER.

Page 8 of 13 Powered by Production Access RECE IVED 8/24/2007

SEP1 0 2007DIV.0F0lL,GAS&

Page 44: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

FieldName: Wildcat . . S/T 35/218/16E County,State; Grand, UTO tor: elta Petroleum Co oratio Location Degd: Permitted footages District Northem

AcilvitÿDafe : 8/21/2007 Daÿ¿FitimSpud : 14 Current Depth : 1636 Ft 24 Hr.Footáfjë Made : 0 FtRig Corrípany : DHS DrillingCO RI()Naine: DHS Rig 11

Formation: ,Weather

3peiptionsStart Hrs Code Remarks Start Depth End Depth Run

6:00 1.00 06 INSTALLROT HEAD RUBBER 1636 1636 4

7:00 2.00 22 TAG @ 1555', DRLG FLOAT, CMNT, SHOE &CLEAN HOLE OUT TO 1636' 1636 1636 4

9:00 1.00 05 MIX& PUMP SWEEP 1636 1636 4

10:00 2.00 06 TOOH, PULL ROT HEAD RUBBER 1636 1636 4

12:00 2.00 06 TIH OPEN ENDED W/ DP, P/U 21 JT TO 1600' 1636 1636 4

14:00 1.00 12 R/U HALLIBURTON&CEMENT W/ 100sx NEET 15.8#, 1.16 YiELD CONTAINING 2% CACL, 1636 1636 4DISPLACED 27bbi WATER FINALCIRC PRESS = 123#

15:00 3,50 13 WOC,(TOOH180') 1636 1636 4

18:30 1.50 06 TOOH 1636 1636 4

20:00 2.00 06 P/U 14.75" BIT & BIT SUB & TIH, TAG CMNT @1532' 1636 1636 4

22:00 6.50 22 DRLG 104' OF CMNT &10' OF NEW FORMATION 1636 1636 4

4:30 0.50 15 F.I.T. TO 10# EMW FI 15 MIN, 135# DECREASED TO 117# IN15 MIN 1636 1636 4

5:00 1.00 06 TOOH 1636 1636 4

Total:24.00Mud Properties

Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1636 2:00 8.75 0.00 40 11 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%

MBT . pH Pm Pf Mf CI Ca ES Pom Lime Total Sal. CaCl2 EDTA OlW Ratio Mud Loss7.5 8.90 0.22 0.10 0.95 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp marks0.0 92 OSS OF MUD, INDUCEWATER FLOW,FILLALLTANKS.

RLO. WI WATER.

Page 9 of 13 Powered by Production Access RECE IVED 8/24/2007

SEP1 O2007DIV.0FOIL,GAS&

Page 45: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

FieldName: Wildcat S/T/R 35/218/16E Coun ,State: Grand, UT.

O fatpr elta Petroleum Corporati Lpcation Desc Permitted footages Disttict: Northem

AútivityDate: 8/22/2007 Dayshopi Spad : 15 Cifr i Depth : 1713 Ft 24 Hr.Footáýe Made : 77 FtRigCompäny: DHS DrillingCO 'Rig Name: ' DHS Rig 11

Formation : Wingate WëatherOperations

Start Hra Code Rentarks Stårt Depth End Depth Run6:00 0.50 06 TOOH 1636 1636 46:30 3.50 06 TIH, INSTALLROT HEAD RUBBER, L/D 20 JT DP USED TO CMNTTHROUGH 1636 1636 5

10:00 1.50 05 BLOW HOLE DRY & REAM TO BOTTOM 1636 1636 511:30 1.50 02 DRLG FI1636' TO 1713' 1636 1713 513:00 2.00 05 CIRC WITRYING TO GET AIR HAMMERTO HIT 1713 1713 516:00 0.50 06 TOOH 1713 1713 515:30 2.50 05 KILLWATER FLOW 1713 1713 518:00 4.00 06 TOOH, L/D HAMMER 1713 1713 522:00 0.50 07 RIG SERVICE 1713 1713 522:30 2.50 06 TIH W/ OPEN ENDED DP, P/U 21 JT DP 1713 1713 5

1:00 5.00 22 WAIT ON CEMENT TRUCKS&CMNT TO PUMP PLUG 1713 1713 5Total: 24.00

Mud PropertlesDepth; Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1636 - 2:00 8.75 0.00 40 11 8 7/10/11 12.8 0.0 0 0.00 2.5% 97.5% 0.0% 0.1%

1 pH Pm Pf Mf C1 Ca ES Pom Lime Total Sal. CaCl2 EDTA OlW Ratio Mud Loss7.5 8.90 0.22 0.10 0.95 2400 220 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp Remarks0.0 92 LOSS OF MUD, INDUCEWATER FLOW,FILLALLTANKS.

DRLG. W/ WATER.

RECEIVEDPage 10 of 13 Powered by Production Access 8/24/2007

SEP1 0 2007DIV.0FOIL,GAS&

Page 46: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

FieldName: Wildcat S/T/R 35/218/16E Cou ,State: Grand, UTOperator elta Petroleum Corporatio LodationDesc: Permitted footages Di ct Northem

ActivityDate : 8/23/2007 Dayé Frorrífpud : 16 CuirontDepth : 1779 Ft 24 Hr. FootààeMade : 66 FtRig Cornpany : DHS DrillingCO Rig Nanie: DHS Rig 11

Formation: Wingate WeathefOperatioñs

Start Hrs Code Reniarke Start Depth Erid Depth Run6:00 2.00 12 R/U HALLIBURTON& CEMENT Wl250 SK OF 15#, 1.17 YlELD, 5.02 GALISK NEET CLASS 1713 1713 5

b CMNT CONTAINING2% CACL. DISP 25 BBLWATER8:00 0.50 06 TOOH 5 STANDS 1713 1713 58:30 2.00 12 PUMP 7 BBL,PRESSURE UP W/ HALLIBURTONPUMPS TO 300 psi, HOLD FI 15 MIN,psi 1713 1713 5

bLEAD BACKTO 85 psI, PUMP .25 BBL = 300psi, HOLD Fl 1 HR-psi = 180. PUMP .25 BBL,psi= 300 & STAYS

10:30 1.50 06 TOOH, L/D21 JT DP 1713 1713 512:00 0.50 07 RIG SERVICE 1713 1713 512:30 3.00 06 P/UHAMMER,TlH, INSTALLROTHEADRUBBER,L/D7 JT DP, TAG@1520 1713 1713 515:30 1.00 05 UNLOADHOLE W/ AIR 1713 1713 516:30 4.50 22 FLOW LINECAME APART NEAR RESERVE PIT, WAITON WELDER, REPAIR LINE 1713 1713 521:00 0.50 08 REPAIR RIGAIR LINE 1713 1713 521:30 6.50 23 DRLG CMNT, FI 1520' TO 1615', SHUT DOWN 15 MIN,CHECK FOR INFLUXOF FORM 1713 1713 5

WATER, THERE IS WATER, CATCH WATER SAMPLE, DRLG CMNT4:00 2.00 02 DRLG Fl 1713' TO 1779' 1713 1779 5

Total: 24.00Mud Properties

Depth Time Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water OII Sand1713 2:00 8,40 0.00 27 1 1 1/1/1 0.0 0.0 0 0.00 0.0% 99.9% 0.0% 0.1%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total Sat CaCl2 EDTA O/W Ratio Mud Loss0.0 8.20 0.00 0.00 3.4 6800 840 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FLTemp Remarks0.0 92

DRLG. WIWATER.Depth Time Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand1779 0.00 0.00 0 0 0 0/0/0 0.0 0.0 0 0.00 0.0% 0.0% 0.0% 0.0%

MBT pH Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaC12 EDTA O/W Ratio Mud Loss0.0 0.00 0.00 0.00 0.00 6800 840 0 0.00 0.00 0 0 0.00 0

Water Loss LCM ECD FL Tem RemarksO 0.0 0.0 0 -

RECEIVEDPage 11 of 13 Powered by Production Access 8/24/2007

SEP1 O2007DIV.0FOIL,GAS&

Page 47: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Fleid Name: Wildcat S/f/R 35/218/16E Couri ,State: Grand, UTOpemtòr elta Petroleum Corporatio Location Desc: Permitted foo es District: Northem

ActMtýDate : 8/24/2007 DaysFiornS;iud : 17 CurräntDépth ! 1935 Ft 24 Hr.Footage Made : 156 FtRig Coinpany : DHS DrillingCO RigNarne: DHS Rig 11

Eonnation: Wingate ,- WeatherOpèrations

Start His Code Remarks Start Depth End Depth Run6:00 2.50 02 DRLG F/ 1779' TO 1935' 1TT9 1935 58:30 2.50 05 MIX& PUMP PILLTO KILLWATER FLOW, DIDN'TWORK, MIXANOTHER PILL 1935 1935 5

11:00 1.50 06 TOOH, PULL ROT HEAD RUBBER 1935 1935 512:30 3.00 22 WORK ON BOP LINES, ANNULARWON'T OPEN AFTER CLOSING IT WHILE GETTING 1935 1935 5

ROTHEAD RUBBER OUT15:30 1.00 06 FINISH TOOH 1936 1935 516:30 4.00 22 WAIT ONBOP MACHANIC 1935 1935 520:30 0.50 07 RIG SERVICE 1935 1935 521:00 2.50 06 P/U 14-5/8" IBS&OPEN ANNULAR, L/DAIR HAMMER,9" DC; P/U 8" MUD MOTOR 1935 1935 523:30 1.50 22 WEATHERFORD SERVICE HAND LOOKINGAT ANNULAR,FINDSNOTHING WRONG, 1935 1935 6

ANNULARIS OPENING & CLOSING FINE1:00 5.00 06 P/U NEW BHA &TlH 1935 1935 6g 24.00

Mud PropertietDepth Time Wt in Wt.Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oli Sand1935 2:00 8.40 0.00 27 1 1 1/1/1 0.0 0,0 0 0.00 0.0% 99.9% 0.0% 0.1%

MBT H Pm Pf Mf CI Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Loss0.0 8.20 0.00 0.00 3.40 9000 840 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Temp marks0.0 92

RLG. WI WATER.

Page 12 of 13 Powered by Producdon Access RECE IVED8/24/2007

SEP1 O2007DIV.0F01L,GAS&

Page 48: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Form 3160-5 UNITED STATES FORMAPPROVED(Febru 2005) OMB No. 1004-0137DEPARTMENT OF THE INTERIOR Expires: March 31, 2007BUREAU OF LAND MANAGEMENT 5. Lease Serial No.UTU84051SUNDRY NOTICES AND REPORTS ON WELLS 6. If Indian, Allottee or Tribe NameDo not use this form for proposals to dr/H or to re-enter an NAabandoned weH. Use Form 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/or No.NA1. Type of Well

O oiiwen O o. wen O om L,*geFaeddeNrË35-12D2. Name of Operator

9. API Well No.Delta Petroleum Corporation4301931551

3a. Address 3b. Phone Ño. (include area code) 10. Field and Pool or Exploratory Areaco

o'Êtte4aco

(303) 820-0144 Wildcat4. Location of Weß (Footage, Sec., T.,R.,M.,or Survey Description) 11. Country or Parish, State1878' FNL & 85T FWLSWl/NWSection 35 T218 R16E Grand, UT

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acida Deepen Production (Start/Resume) Water Shut-OffG Alter Casing Fracture Treat Reclamation Well IntegrityO Casing Repair New Construction Recomplete Other WeeklyReportSubsequent ReportO Chage Plans Plug and Abandon Temporarily AbandonO Final Abandonment Notice O Convert to Injection Plug Back WaterDisposal

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. Ifthe proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator hasdetennined that the site is ready for final inspection.)

TIGHT HOLESTATUS

See attached "DrillingChronologicalReport for 8/25/07 thru8/31/07,

RECEIVEDSEP10 2007

DIV.0FOlL,GAS&MINING14. I hereby certify that the foregoing is true and correct.

Name (Printed/Typed)Che Jaohnson Title Re/gula2toryTechnician

THIS SPACE FOR FEDERAL OR STATE OFFICE USEApproved by

fitle Dateó$$ãÏtWAÏÃpprovaÏ,ÎfÅy¾Ô$ÏtÂcË$Ï.pprâÅÏ$ÏtËinÑtÏcA50AA$taÑantor certifythat the applicant holds legal or equitable title to those rights in the subject lease which would Officeentitle the applicant to conduct operations thereon.Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any departmentor agency of the United Statesany false,fictitious or fraudulentstatements or representations as to any matter within its jurisdiction.(Instructions on page

Page 49: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

fã1)¾ame:GreentoWriFedera135<I2DFièld Ñãñie: Wildcat S/T/R 35/218/16E County,State: Grand, UT

Operator elta Petroleum Corporatio Location Desc: Permitted footages District: Northem

ActivityDate : 8/24/2007 Days From Spud : 17 Current Depth : 1935 Ft 24 Hr. Footage Made : 156 FtRigCompany DHS Drilling CO RigName: DHS Rig 11

Fonnation : Wingate WeatherOperations

Start Hrs Code Remarks Start Depth End Depth Run

6:00 2.50 02 DRLGFI 1779' TO 1935' 1779 1935 5

8:30 2.50 05 MIX& PUMP PILL TO KILLWATER FLOW, DIDN'T WORK, MIXANOTHER PILL 1935 1935 5

11:00 1.50 06 TOOH, PULL ROT HEAD RUBBER 1935 1935 5

12:30 3.00 22 WORK ON BOP LINES, ANNULAR WON'T OPEN AFTER CLOSINGIT WHILE GETTING 1935 1935 5ROT HEADRUBBEROUT

15:30 1.00 06 FINISH TOOH 1935 1935 5

16:30 4.00 22 WAIT ON BOP MACHANIC 1935 1935 5

20:30 0.50 07 RIG SERVICE 1935 1935 5

21:00 2.50 06 P/U 14-5/8" IBS &OPEN ANNULAR, L/D AIR HAMMER, 9" DC; PIU 8" MUD MOTOR 1935 1935 5

23:30 1.50 22 WEATHERFORDSERVICE HANDLOOKINGATANNULAR,FINDSNOTHINGWRONG, 1935 1935 5ANNULAR IS OPENING& CLOSINGFINE

1:00 5.00 06 P/U NEW BHA &TlH 1935 1935 6

Totab 24.00Mud Propertles

De th Time Wt Iri WiÕúlVis PV YP Gels FL HTFL FC HTFC SoHd Water Oil Sand1935 2:00 8.40 0.00 27 1 1 1/1/1 0.0 0.0 0 0.00 0.0% 99.9% 0.0% 0.1%MBT H Pm Pf Mí CI Ca Ei Pom Linie Total Sal. CaCl2 EÓTA OlW Ratio Mud Loss0.0 8.20 0.00 0.00 3.40 9000 840 0 0.00 0.00 0 0 0.00

Water toss LCM ECD FL Temp Remarks0.0 92

DRLG. W/ WATER.

Activity Date : 8/25/2007 Days From Spud : 18 Current Depth : 2338 Ft 24 Hr. Footage Made : 403 Ft

Rig Company: DHS DrillingCO Rig Name: DHS Rig 11Formation : Moenkopi Weathen

OperationsStart Hrs Code Remarks Start DepthEnd Depth Run

6:00 2.50 06 TIH,L/D10 JT 1935 1935 68:30 0.50 03 REAM F/ 1708' TO 1740' 1935 1935 6

9:00 0.50 07 RIG SERVICE 1935 1935 6

9:30 1.50 03 REAM F/ 1740' TO 1935' 1935 1935 6

11:00 7.00 02 DRLGF/ 1935' TO 2149' 1935 2149 6

18:00 0.50 07 RIG SERVICE 2149 2149 6

18:30 1.00 08 REPLACE PACKING IN #1 CHARGER PUMP, SUCKINGAIR 2149 2149 6

19:30 10.50 02 DRLGFI2149' TO 2338' 2149 2338 6

Toisili24.00NíudPropsittles

Desith Tiine Wt in Wf Out Via PV NP Gels FL TEL FC HTFC Solid Waté Oil Sind1935 2:00 8.40 0.00 27 1 1 1/1/1 0.0 0.0 0 0.00 0.0% 99.9% 0.0% 0.1%iWBT pli Pm Rf IW Ci Ca E$ Pörn Limè TotalS 1. CaCl2 EDTA OlW Ratió IWudLoss

0.0 7.10 0.00 0.00 1.30 8000 640 0 0.00 0.00 0 0 0.00Water Loss LCM ECD FLTemp Remärks

0.0 92 | DRLG.W/ WATER.

RECEIVEDSEP1 0 2007

Page 12 of 18 Powered by Prociuç(fon AccessDIV.OFOIL,GAS&MINING

Page 50: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

WetWome:Greentown Federal 35-12DField Name: Wildcat S/T/R 35/21S/16E County,State: Grand, UT

Operator )elta Petroleum Corporatio Location Desc: Permitted footages District: Northem

A vityDate : 8/26/20 7 D ys to $ ud 19 C'unent pth : 2618 Ft 24 Hr. Footage Made : 280 FtRig Company : DHS Drilling CO Rig Name: DHS Rig 11

Formation : Moenkopi Weather.

Start Hrs Códà ReMancé Sfärt Dé¡itli End Depth Run6:00 6.50 02 DRLG2338' TO 2432' 2338 2432 6

12:30 0.50 07 RIGSERVICE 2432 2432 613:00 0.50 10 WIRE LINE SURVEY @2332' =

.5 DEG 2432 2432 613:30 9.50 02 DRLG 2432' TO 2559' . 2432 2559 623:00 1.00 10 WIRE LINESURVEY@2365' = 1.75 DEG 2559 2559 6

0:00 6.00 02 DRLG 2559' TO 2618' 2559 2618 6Totgl;24.00

Mud PropertiesDepth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oli Sand2392 9:10 8.60 8.70 28 2 1 1/1/1 0.0 0.0 0 0.00 3.0% 97.0% 0.0% 0.2%

IWBT H im jf I 01 da ES Porn IJme Totai Gal. CaCl2 E TA OMPRatio Mod Loss0.0 9.50 0.20 0.20 4.30 8000 640 0 0.00 0.00 0 0 0.00

Wätei L¼ss i CM ËCD FL†ëmp Marks0.0 88

RLG.WI WATER.

AptivityDate : 8/27/2007 Days From Spud : 20 Current Depth : 2765 Ft 24 Hr. Footage Made : 147 FtRig Corppany : DHS Drilling CO Rig Name: DHS Rig 11

Fonnatiën Moenkopi WeatherOperations

Start Hrs Code Remarks Start Dëpth End Depth Run6:00 1.50 02 DRLG 2618' TO 263T 2618 2637 67:30 8.50 06 TOOH, XO BIT, MOTOR, MWD, L/D IBS's 2637 2637 6

16:00 1.50 06 TlH TO SHOE 2637 2637 717:30 1.00 09 CUT DRLGLINE 2637 2637 718:30 1.00 06 TIH 2637 2637 719:30 1.00 10 CHECK MWD 2637 2637 720:30 0.50 06 TIH 2637 2637 721:00 0.50 03 REAM 30' TO BOTTOM 2637 2637 721:30 8.50 02 DRLG263T TO 2765' 2637 2765 7Totah 24.00

Mud PropertlesDepth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HÍFC Solid Water Oil Sand2636 9:50 8.60 0.00 27 1 1 1/1/1 0.0 0.0 0 0.00 2.3% 97.7% 0.0% 0.5%

MBT pH Pm Pf Mf CI Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Loss0.0 8.10 0.00 0.00 0.20 7800 760 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FLTemp Remarks0.0 87

DRLG. WI WATER.

RECEIVEDSEP1 0 2007

Page 13 of 18 Powered by Producjipn AccessOlv.0FOIL,GAS&MINING

Page 51: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Well blamd:Gréentown Federal 85-12DField Name: Wildcat S/T/R 35/21S/16E County,State: Grand, UT

peratoc Jelta Petroleum Corporatio Location Dese; Permitted footages District Northem

I rú#4ny DHS Drilling CO Mig Nå e DHS Rig 11Forrhation Weather

OperationsStart Hrs Code Remarks Start Depth End Depth Run

6:00 9.50 02 DRLG 2765' TO 2921' 2765 2921 715:30 0.50 07 RIGSERVICE 2921 2921 716:00 11.50 02 DRLG2921' TO 3110' 2921 3110 7

3:30 1.00 05 WORK TIGHT CONNECTION 3110 3110 74:30 1.50 02 DRLG3110' TO 3135' 3110 3135 7

Totek 24.00Mud Proporties

Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand2856 12:00 8.90 0.00 28 1 1 1/1/1 0.0 0.0 0 0.00 4.5% 95.5% 0.0% 1.0%

IWBT þH m Pi Mf CI Ga 15 Poni Linnò Töni Sal CaCl2 EDTA O/W Ratië NIud Loss0.0 8.10 0.00 0.00 0.80 7800 760 0 0.00 0.00 0 0 0.00

Watar Loss LCM ECII ML Te Rernarkä0.0 97

.. . . . .

DRLG. WI WATER. START MUD UP 3110'.

MaHyg ûtaryActivity Date : 8/29/2007 (Days From Spud : 22 Current Depth : 3342 Ft 24 Hr. Fpptage Made : 207 FtRigCoápany DHS Drilling CO Rig Name: DHS Rig 11foiination: White Rim Weather

OperationsBiäri Hrs ode Remarks StartDedth ËndDépth Run

6:00 6.00 02 DRLG3135 TO 3206 3135 3206 712:00 0.50 07 RIG SERVICE 3206 3206 712:30 17.50 02 DRLG 3206 TO 3342 3206 3342 7Tótgli 24.00

Mäd PionertiesDe th TIrné Wt in WtOut NIš PV YP Gel FL HTF1. FC HÏFC S lid Water Qil Sand3185 9:45 9.00 9.10 36 7 8 14/22/30 18.0 0.0 2 0.00 5.3% 94.7% 0.0% 1.5%

NIBT pH Pm Pf Mi Ci Ca ËS Pom Lirne Total SaL CaCl2 EOTA O/W Ratio MudLoss12.5 8.00 0.00 0.00 0.20 7000 800 0 0.00 0.00 0 0 0.00

Water Los LCM ECD LTemp Remarks0.0 9.0 100 MUD UP @3110.

RECEIVED

Page 14 of 18 Powered by Production AccessSEP1 0 2007

9/4/2007

DIV.0FOIL,GAS&

Page 52: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Well Namè$reentown Faderal $5-12D,

Field 19ame; Wildcat S/T/R 35/218/16E County,State: Grand, UTÖgèraign)elta Petroleum Corporatio L Dés : Permitted footages District: Northem

C n e 3503 Ft 24 r. otage MaL: 161 FtAlgCöni¡Sän DHS Drilling CO Rig Name: DHS Rig 11

Formation : Cutler WeatherOperations

Start Hrs Code Remarks Start Depth End Depth Run6:00 1.50 02 DRLG 3342 TO 3361 3342 3361 77:30 1.00 05 CIRC, MIX&PUMP PILL 3361 3361 78:30 2.50 06 TOOH, PULL ROT HEAD RUBBER 3361 3361 7

11:00 1.00 20 XO BITS, ORIENT TOOLS 3361 3361 712:00 3.00 06 TlH, INSTALL ROT HEAD RUBBER, TEST MWD 3361 3361 815:00 3.50 03 REAM 3233 TO 3361 3361 3361 818:30 11.50 02 DRLG 3361 TO 3503 3361 3503 8Totg 24.00

Mud PropertiesDepth Time Wt in Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand3361 9:00 9.00 9.10 33 5 5 7/10/14 18.0 0.0 2 0.00 5.3% 94.7% 0.0% 4.0%MBT þH Pin Pf Mf CI C ES Tom Lim TotafSat CaCl2 EOTA OlW Ratio Mud Loss10.0 8.70 0.10 0.05 0.20 7000 440 0 0.00 0.00 0 0 0.00

Water Loss LOM EQD FLTeni mäkä0.0 9.0 104

ActivityDate : 8/31/2007 Days From Spud : 24 Current Depth : 3725 Ft 24 Hr. Footage Made : 222 FtRig Company : DHS DrillingCO RigName: DHS Rig 11

Fonnation : Cutler Weather:Operations

Start Hrs Code Remarks Starthepth End Depth Run6:00 2.00 02 DRLG3503 TO 3530 3503 3530 88:00 1.50 07 RIGSERVICE 3530 3530 89:30 15.50 02 DRLG3530 TO 3702 3530 3702 81:00 1.00 08 WORK ON PUMP, XO LINER & SWAB 3702 3702 82:00 4.00 02 DRLG3702 TO 3725 3702 3725 8

Total: 24.00Mod Proßerges

Deptli Time Wt în Wt Øút Vis PV YP Gèls FL HTFL FC HTFO Solid Watà OiE Sarid3530 9:00 9.30 .9.30 39 8 8 8/12/16 15.6 0.0 2 0.00 6.2% 93.8% 0.0% 4.0%

MBT pH Pm Pf Mf CI Ca ES Pom Lime TotafSat CaCl2 EDTA OlW Ratio MudLóss10.0 9.10 0.36 0.11 0.41 8000 460 0 0.00 0.00 0 0 0.00

Water Loss LCM ECD FL Témp Remarks0.0 | 9.3 102 |

RECElVEDSEP1 O2007

Page 15 of 18 Powered by Production Access DIV.0FOIL,GAS&MINING

Page 53: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

NOTICE

Utah Oil and Gas Conservation General Rule R649-3-21 states that,

> Awell is considered completed when thewell has been adequatelyworked tobe capableof producing oil or gas or when well testingas required by the division is concluded.

> Within 30 days after the completion or plugging of a well, the followingshall be filed:• Form 8, Well Completion or Recompletion Report and Log• A copy of electric and radioactivity logs, if run• A copy of drillstem test reports,• A copy of formation water analyses, porosity, permeability or fluid saturation

determinations• A copy of core analyses, and lithologic logs or sample descriptions if compiled• A copy of directional, deviation, and/or measurement-while-drilling survey for

each horizontal well

Failure to submit reports in a timelymanner willresult in the issuance of a Notice ofViolationby the Divisionof Oil, Gas and Mining,and may result in the Divisionpursuing enforcementaction as outlined in Rule R649-10, Administrative Procedures, and Section 40-6-11 of theUtah Code.

As of the mailingof this notice, the division has not received the required reports for

Operator: Delta Petroleum Corp Today's Date: 02/14/2008

Well: API Number: Drilling Commenced:

Greentown Fed 35-12D drlg rpts/wcr 4301931551 08/01/2007

To avoid compliance action, required reports should be mailed within 7 business days to:Utah Division of Oil, Gas and Mining1594 West North Temple, Suite 1210P.O. Box 145801Salt Lake City, Utah 84114-5801

Ifyou have questions or concerns regarding thismatter, please call (801) 538-5284.

cc: Well FileCompliance

Page 54: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

or¿n -316g4

(August 2007)UNITED STATES FORMAPPROVED

DEPARTMENT OF THE INTERIOR jf g OMB NO. 1004-0137BUREAU OF LAND MANAGEMENT 4 Expires: July 31, 2010

WELL COMPLETION OR RECOMPLETION REPORT AND LOG 5. Lease SerialNo.UTU84051

la. Type of Well OilWell Gas Well Dry O Other 6. If Indian, Allottee or Tribe Nameb. Type of Completion: 2 New Well Work Over Deepen O Plug Back DifEResvr., NA

Other: 7. Unitor CA Agreement Name and No.NA

2. Name of Operator 8. Lease Name and Well No.Delta Petroleum Corporation Greentown Federal #35-12D3. Address 3a. Phone No. (include area code) 9. AFI Well No.

370 17th St., Ste. 4300, Denver, CO 80202 (303) 575-0323 43019315514. Location of Well (Report location clearly and in accordance with Federal requirements)* I0. Field and Pool or Exploratory

1878' FNL & 857' FWL WildcatAt surface 11. Sec.,T., R., M., on Block and

Same as AboveSurvey or Area

SWNW 35 215 16E

At top prod. interval reported below 12. County or Parish 13. State

At total depth Grand UT

14. Date Spudded 15. Date T.D. Reached 16. DateCompleted 10/10/2007 (774) 17. Elevations (DF, RKB, RT, GL)*08/07/2007 09/21/2007 D & A Ready to Prod. 4339' GL18. Total Depth: MD 5731' 19. Plug Back T.D.: MD 3290' cmt plug 20. Depth Bridge Plug Set: MD 3495'

TVD 5731' TVD 3290' cmt pluq TVD 3495'21. Type Electric & Other Mechanical Logs Run (Submit copy of each) 22. Was well cored? 2 No Yes (Submit analysis)

CBL's & other logs Was DST run? No Yes (Submit report)Directional Survey? No Yes (Submit copy)

23. Casing and Liner Record (Report all strings set in well)

Hole Size Size/Grade Wt. (#/ft.) Top (MD) Bottom (MD) Stage Cementer of SCk & SluœrL) Cement Top* Amount Pulled

30" 24" J-55 24# 0 45' Redi Mix 10 O' None

20" 16" J-55 75# 0 1636' 1555 sks O' NoneClass G

14-3/4" 10.75" 45.57# O 5459' 4320 sks 500' NoneHCN-80 Class G

24. Tubing RecordSize Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD)

NA25. Producing Intervals 26. Perforation Record

Formation Top Bottom . Perforated Interval Size No. Holes Perf. StatusA) NA NAB)

C)D)

27. Acid, Fracture, Treatment, CementSqueeze,etc.Depth Interval | Amount and Type of Material

Cement Plug 375 sks of Class G- 5500'-5460'Cement Plug 353 sks of Class G- 5450'-3880'CIBP Set at 3495'Cement Plug 100 sks of Class G- 3490'-3290'28. Production - Interval ADate First Test Date Hours fest Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr.API Gravity

Choke Tbg. Press, Osg. 24 Hr 3il Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio

SI T&A'd

28a. Production - Interval BDate First Test Date Hours fest Dil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity

Choke fbg. Press. Osg 24 Hr. Oil Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio RECEIVED

SI

*(See instructionsand spaces for additional data on page 2) APR1 1 2008DIV.OFOIL,GAS&

Page 55: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

28b. Production- IntervalCDate First Test Date Hours Test Dil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr.API Gravity

Choke Tbg. Press. Osg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio

SI

28c. Production - Interval DDate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity

Choke Tbg. Press. Osg. 24 Hr. Oil Gas Water Gas/Oil WellStatusSize F1wg. Press. Rate BBL MCF BBL Ratio

SI

29. Disposition of Gas (Solid,used forfuel,vented, etc.)

30. Summary of Porous Zones (Include Aquifers): 31. Formation (Log) Markers

Showall importantzones of porosity and contents thereof: Cored intervals and all drill-stemtests,including depth interval tested,cushion used, time tool open, flowing and shut-in pressures andrecoveries.

TopFormation Top Bottom Descriptions, Contents, etc. Name

Meas.Depth

Entrada 452'

Navajo 1087'

Shinarump 2206'

Kaibab 3057'

Cutler 3426'

32. Additional remarks (include plugging procedure):

Logs will be sent shortly

33. Indicate which items have been attached by placing a check in the appropriate boxes:

Electrical/Mechanica1Logs (1 full set req'd.) Geologic Report DST Report Directional Survey

Sundry Notice for plugging and cement verification Core Analysis O Other:

34. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records (see attached instructions)*

Name (please print) Kate Shirley,, Title Regulatory Technician

Signature / Date 04/10/2008

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States anyfalse, fictitious or fraudulentstatements or representations as to any matter within its jurisdiction.(Continued on page 3) (Form 3160-4, page

Page 56: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

STATEOFUTAH FORM9DEPARTMENT OF NATURAL RESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATlONANDSERIALNUMBER:

UTU 84051

SUNDRY NOTICES AND REPORTS ON WELLS 6NI NDIAN,ALLOTTEEORTRlBENAME:

7. UNITor CA AGREEMENT NAME:Do not use thisform for proposals to ddll new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to NAdrill horizontal laterals. Use APPLICAT10N FOR PERMIT TO DRILLform for such proposals.

1. TYPE OF WELL 8. WELL NAMEand NUMBER:OIL WELL GAS WELL OTHER Greentown Federal 35-12D

2.NAMEOFOPERATOR: 9.APINUMBER:

Delta Petroleurn Corporation 43019315513. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELD AND POOL, OR W)LDCAT:

370 17th Street, Ste 4300 ciTY Denver CO as 80202 (303) 575-0386 Wildcat4. LOCATIONOF WELL

FOOTAGESATSURFACE:18¯/8'FNL & 85T FWL COUNTY: Grand County

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SWNW 35 21S 16E STATE:UTAH

11. CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTACIDIZE DEEPEN REPERFORATE CURRENT FORMAT10N

(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL

Approximate date work willstart: CASlNG REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBING REPAIR

CHANGE TUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of work completion:

COMMINGLEPRODUClNG FORMATIONS RECLAMATIONOF WELL SlTE OTHER: Request to ExtendCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION T&A Status

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Delta Petroleum Corporation requests an extension of Temporarily Abandoned status for the Greentown Federal 35-12D welluntil September 30, 2009, which is an additional year from the current TA expiration date. Delta is requesting the extension toallow additional timeto evaluate the potential future utilityof the wellbore. The production casing was cemented from 5,459' to500' (up throughthe surface casing shoe). Mechanical integrity of the casing is believed to be sound based on observing zero(0)psi on the casing head on 9/30/08. Please advise if further mechanical integrity testing (MIT)such as pressure testingw/chart recorder is necessary.

The well was temporarilyabandoned by placing the following plugs in the 10.75" production casing, effectively isolating any oil,gas, or water encountered by the well bore (see attached federal sundry for fullT&Aprocedure which began on 10/1/2007):1) 375 sx. cement plug @5,700' - 5,460'2) 353 sx. Cement plug @5450' - 3880'3) CIBP @3,495' COPYSENTTOOPERATOR4) 100 sx cement plug @ 3,490'- 3,290'

TIGHT HOLE STATUSinitials:

NAME(PLEASE PRINT) Brian J. Macke TITLE Regulatory Compliance Manager

SIGNATURE Of DATE 9/30/2008

(This space for State use only) Accepted by the alOfTMS

OiGasD

d n ngFe e ecessaa RECElVED

.

' OCTO2 2008(5/2000) (See lnstructions on Reverse Side)

DIV,OFOIL,GAS&

Page 57: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Form 3160-5 o UNITED STATES FORM APPROVED(Feb 0 ) OMBNo.1004-0137

ARTMENT OF THE INTERIOR I e b. pires; March 31, 2007

AU OF LAND MANAGEMENT 5. Lease Serial No.UTU84051

ÛCT22S DRY(N[¶)TICES AND REPORTS ON WELLS 6.Iffndian, Allottee or Tribe NameDo not use thisform for proposals to dri/I orto re-enter an NA

abandoned we/I. Use Form 3160-3 (APD) for such proposals.

SUBNJ/TIN TRIPLICATE- Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/or NNA

1 Type of Well

O onwen lZ]caswen O other Rfdia¶"je235-12D2 Name of Operator 9. API WelINo.Delta Petroleum Corporation 4301931551

3a Address 3b PhoneNo. (include area code) 10,Fieldand Pool or Exploratory Area370 17th Street. Suite 4300Denver, CO 80202 (303) 820-0144 Wildcat4. Locationof Well (Footage, Sec, T.,R.,M, or Swoey Description) 11 Countryor Parish, State1878' FNL & 85TFWLSWMNW Section 35T21S Ries Grand, UT

12. CHECK THE APPROPRIATE BOX(ES)TO INDICATENATURE OF NOTICE,REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPEOFACTION

O Noticeof Intent C Acidize Deepen Production (Start/Resume) Water Shut-Off

C Alter Casing FractureTreat Reclamation Well Integrity

Casing Repair New construction Recomplete other Procedure to TASubsequentReport

O cuaserians O Plug and Abandon Temporarily Abandon Well

Final Abandonmem Notice O Conved to injecdon O Plug Back Water Disposal Tight HoleStatus

13. Describe Proposed or Completed Operation:Clearly state all pertinent details, including estimated starting dateof any proposed work and approximate duration there fthe proposal is to deepen directionally or recomplete horizontally, give subsurface locationsand measured and true vertical depths of all pertinent markers and zonesAttach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowingcompletion ofthe involved operations. Ifthe operation results in a mulliple completion or recompletion in anew interval,a Form 3160-4 must be filed oncetesting has been completed Final Abandonment Noticesmust be filedonly a13erall requirements, including reclamation, have been completed and theoperatorhasdetermmed that the site is ready for final mspection )Ron Schuyler with Della Petroleum contacted Eric Jones in lhe Moab BLM office on October 1, 2007 and was granted verbal approvat to TemporarilyAbandon the above mentioned weit The well was TA'd as follows:1. TlH wlopen ended 4-1/2" DP to 5700'.2. RU Halliburton,pumped 34.5 bbis of 17.5 ppg spacer, followed by 59 bbis (375 sxs) of 18 ppg Class "G"cmt (0.89cult/sx yield @2.99 gats wtr/sx)3. Displaced omt w/6 bbis 17 ppg spacer &68.5 bble drlg mud.4. TOOHwl930' (15 stds) of DP (wel), circulaled hole clean, WOC.5. TOOH,TlHw/9-1/2" bit on 4-1/2" DP. Tagged cmt stringers @4835'. Top of hard cmt @4824'. TOOH.6. TlH, cmt top @5045'. TOOH lo check pipe tally.7. Strapped DP intohole, drilled hard cmt (30'!hr) from 501T to 5460'.8. TOOH,TlHw/open ended 4-1/2" DP lo 5450', pumped 34 bbls of 17.5 ppg spacer, 353 sxs (56 bbis) 18 ppg Class "G° cmt w/yield of .89 cuft/sx.

Displaced wl63 bbleof 17.5 ppg mud.9. TOOH w/16 sids DP (1,000'), circulated clean. TOOH.

10. TlH wl9-1/2* bit, lagged cmt @3880'. TOOH.11. PU 9-1/2" CIBP &set @ 3495'. TlH to 3490' w/open ended DP, circulated 17.5 ppg mud wlfresh wtr.12. Cmt'd w/Halliburton100 s×s (20.5 bbls) of 15.8 ppg Class "G" cmt @1.15 cutt/sx (calculated TOC @327T). Displaced wl46 bbis fresh wir. TOOH

LD DP.13. ND BOPE, released rig.

14. I hereby certify that the foregoing is true and correct.Natae (PrintedGpped)

Ter

b a

Title Regu9Iato0ryManager

THIS SPACE FOR FEDERALOR STATE OFFICE USE

Conditions of approval, if any, are attach oval of i notice does not warrant or certify WSb n Ol rBSO UiGoathat the applicant holds legal or equitable title ese rig in the subject lease which would iceentitle the applicantto conduct operations thereon.

Title 18 U.S.C. Section 1001 and Thle 43 U.S.C. Section 1212, make it a crime for any person knowinglyand willfully to make to any departinent or agency of the United States any false,ctjtious or fraudulent statementsor representations as to any matter within its jurisdiction.

(Instructions on page 2)COPYSENTTOOPERATOR CONDITIONSOFAPPROVALATTACHSECENEDDate:

Initials:

DN.0FOIL,GAS&

Page 58: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Temporary AbandonmentDelta Petroleum CorporationGreentown Federal 35-12DLease UTU-84051Section 35 T21S, R16EGrand County, Utah

NOTE:This well was plugged-back, with BLM concurrence, for the purpose of reestablishingwell control after encountering a high-pressure salt water flow prior to reaching the intendedtarget formation.

CONDITIONS OF APPROVAL

1. Temporary Abandonment (TA)status is approved through September 30, 2008, to allowthe operator an opportunity to evaluate further drilling options

2. Prior to September 30, 2008 the operator shall submit either a Notice of Intent toAbandon the well or a proposal to continue drilling

Page 59: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

. FORM APPROVEDForm3160-5 UNITE. -TATESOMB No. 1004-0137(Februarv 2005)

DEPARTMENT OF THE INTERlOR Expires: March 31, 2007BUREAU OF LAND MANAGEMENT 5. Lease Serial No.

UTU 84051SUNDRY NOTICES AND REPORTS ON WELLS . 6. If indian. Allottee or Tribe NameDo not use this form for proposals to dri/I or to re-enter an NA

abandoned well. Use Form 3160-3 (APO) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement. Name and/or ÑoNAI. Type of Well

Oil Well Gas Well Other Gree tnnFaendde

a 35-12D2. Nanie of Operator 9. API Well No.Delta Petroleum Corporation 43-019-31551-003a. Address 3b. Phone No. (include area code) 10. Field and Pool or Exploratory Area370 17th Street, Suite 4300

WilDenver, CO 80202 (303) 575-0386 dcat4. Location of Well (Footage. Sec.. T.R..M. or SurveyDescription) 11. Country or Parish. State1878' FNL & 85T FWLSW//NW Section 35 T21S R16E Grand, UT

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATENATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Acidize Deepen Production (Start/Resume) Water Shut-OffNotice of IntentAlter Casing Fracture Treat Reclarnation Well Integrity

Subsequent Report Casing Repair New Construction Recomplete Other ReclaimReserve PitChange Plans Plug and Abandon Temporarily Abandon

Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13. Describe Proposed or Completed Operation.Clearly state all pertinent details, including estimated starting date ofany proposed work and approximate duration thereof. Ifthe proposal is to deepen directionally or recomplete horizontally. give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BlA. Required subsequent reports must be filed within 30 daysfollowing coinpletion of the involved operations. If the operation results in a multiple completion or recompletioti in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandoliment Notices must be filed only after all requirements, including reclamation. have been completed and the operator hasdetermined that the site is ready for final inspection.)

Delta Petroleum Corporation plans to close the pit at the Greentown Federal #35-12D in the following manner:

A minimum of 8 truck loads of soil and cuttings will be removed frorn the pit area which has high salt content and liner exposed. The material willbe hauledfor disposal to the ECDC facility located between Greenriver and Price. Once the rnaterial is removed from the pit, the pit will be backfilled and re-contouredback to natural grade. The well location on the west side of the wellheads willhave topsoil re-contoured back to natural grade. Both wellheads on the locationwill rernain in place, and the cellar ring will be removed frorn the Greentown Federal #35-128 shallow well and the cellarwillbe backfilled arourid wellhead.Any mouse and rat holes on the location willbe backfilled. The rest of the location will be left intact for future use.

Accepted by theUtah Division of

Oil, Gas and MiningTIGHT HOLE STATUS

FORRECORDONLY

14. I hereby certify that the foregoing is true and correctName (Printed/Typed)

Brian J. Macke Title Regulatory Compliance Manager

Signature Date 10/17/2008

THIS SPACE FOR FEDERAL OR STATE OFFICE USEApproved by

Title DateConditions of approval, if any. are attached. Approval of this notice does not warrant or certifytliat the applicant holds legal or equitable title to those rights in the subject lease which would Officeentitle the applicant to conduct operations thereon.

Title 18 U.S.C.SectÏo¯t¯l00¯1

and Title 43 U.S.C. Section 1212. make it a crime for any person knowingly and willfully to make to any d a.

United States any false.fictitious or fraudulent statements or representations as to any matter within its jurisdiction. -

(Instructions on page 2)OCT28 2008

DIV.0FOIL,GAS&

Page 60: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Porm 3160-5 UNITED STATES Om N 1 -

3D7(August 2007) DEPARTMENT OF THE INTERIOR Expires: July 31, 2010O BUREAU OF LAND MANAGEMENT 5. Lease SerialNo.

UTUB4051SUNDRY NOTICES AND REPORTS ON WELLS 6.IfIndian,AllotteeorTribeName

Do not use this form for proposals to drill or to re-enter an N/Aabandoned well. Use Form 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE -- Other ínstructions on page 2. 7. If Unit of CA/Agreement, Name and/or No.N/A

1. Type of Well

Oil Well Gas Well Other Weelnl eFaeneNa#35-12D

2. Name of Operator 9. API Well No.Delta Petroleum Corporation 43-019-31551-00

3a. Address 3b. Phone No. (include area code) 10. Field and Pool or Exploratory Area370 17th St. Suite 4300, Denver, CO 80202

303-293-9133 Wildcat

4. Location of Well (Footage, Sec., T.,R.,M, or Survey Description) 11. Country or Parish, State1,878' FNL & 85T FWL, Sec. 35, T21S, R16E, SW-NW Grand County, Utah

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Alter Casing Fracture Treat Reclamation Well Integrity

Casing Repair New Construction Recomplete Other Well History ReportSubsequent Report

Change Plans Plug and Abandon Temporarily Abandon

Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. Ifthe proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

Tight Hole Status

Current Status: Temporarily Abandoned on 10/12/07

No other well activity as been done.

Wellbore schematic is attached

14. I hereby certify that the foregoing is true and correct.Name (Printed/Typed)

Richard Bonham Title Completions Engineer

Signature Date

THIS SPACE FOR FEDERAL OR STATE OFFICE USEApproved by

fitle DateConditions of approval, if any, are attached. Approval of this notice does not warrant or certifythat the applicant holds legal or equitable title to those rights in the subject lease which would Officeentitle the applicant to conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and illfu y ent or agency of the United States any false,fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

(Instructions on page 2)

DIROFOIL,GAS&

Page 61: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,
Page 62: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Orm 3 - UNITED STATES o°Ð

N -

D7gu

DEPARTMENT OF THE INTERIOR Expires: July 31, 2010BUREAU OF LAND MANAGEMENT 5. Lease Serial No.

UTU84051SUNDRY NOTICES AND REPORTS ON WELLS 6.IfIndian, AllotteeorTribeName

Do not use this form for proposals to drill or to re-enter an N/Aabandoned well. Use Form 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/or No.N/A1. Type of Well

Oil Well Gas Well O Other 8c. eelntN eF ddea #35-12D

2. Name of Operator 9. API Well No.Delta Petroleum Corporation 43-019-31551-00

3a. Address 3b. Phone No. (include area code) 10. Field and Pool or Exploratory Area370 17th St. Suite 4300, Denver, CO 80202

303-293-9133 Wildcat4. Location of Well (Footage, Sec., T.,R.,M., or Survey Description) 11. Country or Parish, State1,878' FNL & 857' FWL, Sec. 35, T21S, R16E, SW-Nw Grand County,Utah

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Alter Casing Fracture Treat Reclamation Well Integrity

Subsequent Report Casing Repair New Construction Recomplete Other Request to Extend

Change Plans Plug and Abandon Temporarily Abandon T&AStatusFinal Abandonment Notice Convert to Injection Plug Back Water Disposal -Tight Hole Status

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. Ifthe proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

Tight Hole Status

Delta Petroleum Corporation requests an extension of Temporarily Abandoned status for the Greentown Federal #35-12D well until September 30, 2010,which is an additional year from the current T&Aexpiration date. Delta is requesting the extension to allow additional time to evaluate the potential futureutility of the wellbore.

The well was temporarilyabandoned by placing the following plugs in the 10.75" production casing, effectively isolating any oil, gas, or water encountered bythe wellbore: COPYSENTTOOPERATOR REQUESTDENIED1) 375 sx. cement plug @5,700' - 5,460' ÛÍSAOlVÎSion Of2) 353 sx. cement plug @5,450' - 3880 Date: ' Û80Süd Minin* RECENED$

sx cee9n5'

plug @3,490' - 3,290' initiais: ÛSIS

sy OCTOIN ADelta willrun a Mechanical Integrity Test on thiswell within thenext 30 days.

14. I hereby certify that the foregoing is true and correct.Name (Printed/Typed)

Richard Bonham Title CompletionsEngineer

Signature Date

THIS SPACE FOR FEDERAL OR STATE OFFICE USEApproved by

litle DateConditions of approval, if any, are attached. Approval of this notice does not warrant or certifythat the applicant holds legal or equitable title to those rights in the subject lease which would Officeentitle the applicant to conduct operations thereon.Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the UnitedStates any false,fictitious or fraudulent statements or representations as to any matter within its jurisdiction.(Instructions on page

Page 63: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Form 3160-5 UNITED STATES o°WN 1

3D7(August

DEPARTMENT OF THE INTERIOR Expires: July 31, 2010BUREAU OF LAND MANAGEMENT 5. Lease Serial No.

UTU84051SUNDRY NOTICESAND REPORTS ON WELLS 6.IfIndian,AllotteeorTribeName

Do not use this form for proposals to drill or to re-enter an N/Aabandoned well. Use Form 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/or No.N/A1. Type of Well

Oil Well Gas Well Other e eF#35-12D

2. Name of Operator 9. API Well No.Delta Petroleum Corporation 43-019-31551-003a. Address 3b. Phone No. (include area code) 10. Field and Pool or Exploratory Area370 17th St. Sulte 4300, Denver, CO 80202

303-575-0376 Wildcat4. Location of Well (Footage, Sec., T.,R.,M.,or SurveyDescription) 11. Country or Parish, State1,878' FNL & 85T FWL, Sec.35, T21S, Ri6E, SW-Nw Grand County, Utah

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATENATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Noticeof Intent Acidize Deepen Production (Start/Resume) WaterShut-OffAlter Casing Fracture Treat Reclamation Well IntegrityCasing Repair New Construction Recomplete OtherSubsequent ReportChange Plans Plug and Abandon Temporarily Abandon

Final Abandonment Notice Convert to Injection Plug Back WaterDisposal

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. Ifthe proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion orrecompletion in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

Tight Hole Status

Delta Petroleum Corporation proposes to P&A this well which was T&A'd on 10/12/2007.

The wellwas temporarilyabandoned by placing the following plugs in the 10.75" production casing, effectivelyisolating any oil, gas, or water encountered bythe wenbore:

1) 375 sx. cement plug @5,700' - 5,460'2) 353 sx. cement plug @5,450'- 3880'

sx cee9n5'plug

@3,490'- 3,290'COPYSENTTOOPERATOR RECEIVED

Please see attached P&A procedure and wellbore diagram NOVO4 2U9Initials: 45 DIV.0F0lL,GAS&MINING

14. I hereby certify that the foregoing is true and correct.Name (Printed/Typed)

Signature

Linda Cool Tittee Sr. Regulato ician

T S SPACE FOR FEDERAL OR STATE OFFICE USEApproved by

TitleConditionsof approval, if any, are attached. Approval of this notice does not warrant or certify FedÈAµpiova Of lathat the applicant holds legal or equitable title to those rights in the subject lease which would Office ActÍ0nIsNecessaryentitle the applicant to conduct operations thereon.Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any false,fictitiousor fraudulent statements or representations as to any matter within itsjurisdiction.(Instructions on page

Page 64: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Delta Petroleum CorporationGreentown Federal 35-12D

P&A Procedure (for Intent Sundry)November 4, 2009

Existing Conditions:

Conductor 24" @45'Surface casing 16" @1,605', TOC @surfaceLong String 10 ¾" @5,458', TOC @500'Tubing: NonePerfs: None

Cement Plugs: 375 sack plug @5,700' - 5,460'353 sack plug @5,450' - 3,880'CIBP @3,495'100 sack plug @3,490' - 3,290'

P&A procedure:

1) MIRU2) NUBOP3) Pickup Tubing RIH and tag TD4) POH to 1,686' (50' below the base of surface)5) Spot 100' plug across casing shoe6) POH to 100'7) Circulate cement to surface8) RIH in 16" X 10 ¾" annulus with 1" tubing to 100'9) Circulate cement to surface10) Cut off wellhead11) Top off cement12) Weld a plate with well information

*All cement will be 15.8# Class G

Page 65: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

Greentown Federal 35-120 COMPLETIONStraight hole to 5,73¾ NOTE5:

Grand County, Utah No completion(16" SOW head x 16 3/4"5MX 13 5/8"10M ) 04/15/09 CJN ettempted.

Hele S ze: 30" Casing: 45, 24" 174 ppf J55 22.6" ID, butt weld (bbl/ft: 0.4814 csg / 0.2985 OH ann)auger drill I spud mud Cement: (est 50% OH excess) 17.9 bbi / 3.72 yd=of 3500 psi Redi-Mix, fumished w/ conductorpipe Dry hole tree on well

ng: ob o p Ist B i G (bbutt- U.2222 csg voi / 0.1399 UH ann voi I 0 3565 GH ann vo0

Hole Size: 20" Cmt Loau: (1,100) (100% OH excess) 775 sx Rockies Lt + 0 125 ppb Poly-e-flake, 2 34 yid, 12 3 ppg slurryYi 24 / 72 hr compressivestrength (est 80°F): 1000 I 2000 psi

5 4 - 8 5 ppg Cmt Tail: (500') (100% OH excess) 380 sx Rockies Lt + 0 125 ppb Poly-e-flake, 2 08 yld, 12 8 ppg slurryFresh 24 / 72 hr compressive strength (est 80°F): 400 / 800 psiWater Top job: 625 sx Class G + 1 % CaCI, 1 2 yld, 15 6 ppg slurry in three stages

Cag. Test: 1,500psi for30 minFIT i LOT: 10.0 ppg emwNotes: 1. bowspring centralizers:top offirst 10 joints

(Ibp mavaa) f.f fr 7VD /MD est TOCsu 1 105 TVD I MD 2. One shoe joint3. Run CBL, (Loggers TD = 1540'), 1st READ @1530' SHOW'S50% BOND &INCREASESTO95% @1520'TO 1220'. THEN DECREASES TO 50% UP TO 910'. 90 TO 100% BOND TO SURFACE Fl THERE.

1,636 TVD i MDCasing: b,458 , 1>JM 45.5 ppt HUW-80B IL (obltt. u.0Btil esg vol I 0,0991 OH ann vol I 0,1066 CH ann vol)

Hole Size: 14-3/4" Cmt Lead: (2,155') (100% OH excess) 2845 sks of Halliburton hght + 1%gel + 0 125Ibm poly-e-flake + 0 251bm kwick seal,2 17 yld, 12 0 ppg slurry 24 / 72 hr compressive strength (est 80 F) 400 / 800 psi

Cmt Tail: (1,500') (100% OH excess) 1475 sks class G + 0 3 % Halad-344, 1 15 yld, 15 8 ppg slurry8 4 -S 0 e WBM 24 / 72 hr compressive strength (est 80°F): 1000 / 2000 psi

Top job:CIBP CSg. Test:

FITILOT: 133ppgemwNotes: 1. bowspring centralizers:1-10'up on shoe jt. Every 2nd jt. up to top of the white rim sands, 21 centralizers.

TOcin . , 3,958" TVD i MD 3 centralizers, 1st @1599', 2nd @1554', 3rd @1508'2. One shoe joint3 Ran CBL Top of cement +I- 500"

(rep wheean) 3,esr7VoldlioPEX 5 466' TVD I MD - - -

Drilled to 5,737 and tookkick. Shut well In and ralsed mud in stages to 17.5 ppg to kill weH, Flowed well up DP - 100% salt water.tioleSite: 9 1/2" i Killed well. Set Cement plug #1 from 5,700' to 5.460' with 375 sx cement, 18.0 ppg, 0.89 yid. Cleaned out to 5,460'.

9 0 - 17 5 pg WBM Set cement plug #2 from 5,450' to 3,880' with 353 ax coment. 18.0 ppg, 0.89 yid.Set cast Iron bridge plug @3,495'. Set cement plug # 3 from 3,490' to 3,290' with 100 sx cement, 15.8 ppg, 1.15 yld.

{TopParader sam)45M'77D

Page 66: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

FORMAPPROVEDForm 3160-5 UNITED STATES OMB No. 1004-0137(August 2007) DEPARTMENT OF THE INTERIOR Expires: July 31, 2010BUREAU OF LAND MANAGEMENT 5. Lease Serial No.

UTU84051SUNDRY NOTICES AND REPORTS ON WELLS 6. If Indian, Allottee or Tribe Name

Do not use this form for proposals to drill or to re-enter an N/Aabandoned well. Use Form 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/or No.N/A

1. Type of Well

Oil Well Gas Well O Other teFaendeNa

#35-12D2. Name of Operator 9. API Well No.

Delta Petroleum Corporation 43-019-31551-00

3a. Address 3b. Phone No. (include area code) 10. Field and Pool or Exploratory Area370 17th St. Suite4300, Denver, CO 80202

303-575-0383 Wildcat

4. Location of Well (Footage, Sec., T.,R.,M., or SurveyDescription) 11. Country or Parish, State1,878' FNL & 857' FWL, Sec. 35, T21S, R16E, SW-Nw Grand County, Utah

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Alter Casing Fracture Treat Reclamation Well Integrity

Casing Repair New Construction Recomplete OtherSubsequent ReportChange Plans Plug and Abandon Temporarily Abandon

Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. Ifthe proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

Tight Hole Status

Delta Petroleum Corporation plugged and abandoned the Greentown Federal 35-12D on 11/8/2009 as follows:

11/8/2009- ND wellhead. PU 2-7/8" tubingand TIH. Tagged cement cap @3271'. TOH to 1701'. Mixed and pumped 60 sacks of Class G cement, 15.8Ib/gal, 1.15 ft3/sack yield across shoe. TOH to 100'. Mixed and pumped 60 sacks of Class G, 15.8 lb/gal, 1.15 ft3/sack yield cement to surface. TOH,RDMO. Dug up wellhead and cut off. TlH 1" in annulus. Mixed and pumped 70 sacks of Class G, 15.8 Ib/gal, 1.15 ft3/sack yield cement to surface ofannulus. Welded on cap and information marker.

14. I hereby certify that the foregoing is true and correct.Name (Printed/Typed)

Richard Bonham Title Completions Engineer

THIS SPACE FOR FEDERAL OR STATE OFFICE USEApproved by

Title DateConditions of approval, if any, are attached. Approval of this notice does not warrant or certifythat the applicant holds legal or equitable title to those rights in the subject lease which would Officeentitle the applicant to conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any false,fictitious or fraudulent statements or representations as to any matter within its j diction.

(Instructions on page 2)

DECD3

Page 67: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

4 y Delta Petroleum Corporation13 E LT A 37017thSt. SuiteW3oo

WelIWork LOEDenver, CO 80202 Chronological(303) 293-9133 Regulatorv

Well Name : Greentown Federal 35-12DProspect: Greentown API #: 43019315510000

SeclTwp/Rge: 35 / 21S / 16E County,St.: Grand, UT Work Type: DrillingField: Wildcat Supervisor: WI: 1

Operator: Ita Petroleum Corporat Phone: 303-575-0324 NRI: 0.865Production Current/Expected Oil: 0 / 0 Gas: 0 / 0 Water: 0 / 0

Job Purpose : Skid rig, redrill and complete Paradox salt well.Date:11/8/2009 Activity Type:'P&A DaysOnWellWork:1

Daily Detail : ND wellhead. PU 2 7/8 tubing and TIH. Tagged Cement Cap 3271' (CIBP@3495'). TOH to 1701'. Mixed andpumped 60 sacks cement across shoe. TOH to 100'. Mixed and pumped 60 sacks cement to surface. TOH RDMODug up wellhead and cut off. TlH 1" in annulus. Mixed and pumped 70 sacks cement to surface of annulus. Weldedon cap and information marker.Moved equipment to town. Will load out tubing, casing and wellheads on road trucks in am.

11/18/2009 10:37 AM Powered by Production

Page 68: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

API Well No: 43019315510000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-84051

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME:

1. TYPE OF WELL

8. WELL NAME and NUMBER: GREENTOWN FED 35-12D

2. NAME OF OPERATOR: DELTA PETROLEUM CORP

9. API NUMBER: 43019315510000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 370 17th Street, Suite 4300 , Denver, CO, 80202 303 293-9133 Ext

9. FIELD and POOL or WILDCAT: WILDCAT

4. LOCATION OF WELL FOOTAGES AT SURFACE: 1878 FNL 0857 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: SWNW Section: 35 Township: 21.0S Range: 16.0E Meridian: S

COUNTY: GRAND

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

SUBSEQUENT REPORTDate of Work Completion:

10/28/2010

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Per BLM approvals the site was reclaimed as follows from Oct. 13-15 and Oct28, 2010. 1. Dig up and haul off rig anchors and oilfield trash 2. Back fill andgrade location to near natural contours and to minimize possible erosion. 3.Evenly distribute top soil on reclaimed area. 4. Fully reclaim access road by

pulling boarder materials on both sides of road across the road runningsurface. Rip road. 5. Reseed location and access road with BLM seed mix andback drag to cover seed BLM Seed Mix: 4 lbs/ac: Indian Ricegrass, 4 lbs/ac:fourwing saltbrush; 4 lbs/ac: shadscale & 1 lbs/ac: sand drop seed, Please

contact Richard Bonham at 303.575.0383 if you should have any questions orconcerns

NAME (PLEASE PRINT) PHONE NUMBER Linda Cool 303 575-0376

TITLE Senior Regulatory Technician

SIGNATURE N/A

DATE 12/28/2010

December 28, 2010

12/29/2010

iPI Well No: 43019315510000

FORM 9

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING 5.LEASE OD5ESIGNATION AND SERIAL NUMBER:

SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen e×isting wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:

DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER:GREENTOWN FED 35-12D

2. NAME OF OPERATOR: 9. API NUMBER:DELTA PETROLEUM CORP 43019315510000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:370 17th Street, Suite 4300 , Denver, CO, 80202 303 293-9133 Ext WILDCAT

4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: GRAND

1878 FNL 0857 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr: SWNW Section: 35 Township: 21.05 Range: 16.0E Meridian: S UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAMEApproximate date work will start:

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SDat ofUWENrkRCEPmOption: DEEPEN FRACTURE TREAT NEW CONSTRUCTION

10/28/2010 OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

sPuD REPORTPRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

Date of Spud:REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

O DRILLING REPORTReport Date: WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Per BLM approvals the site was reclaimed as follows from Oct. 13-15 and Oct28, 2010. 1. Dig up and haul off rig anchors and oilfield trash 2. Back fill anAccepted by thegrade location to near natural contours and to minimize possible erosion. 3Utah Division ofEvenly distribute top soil on reclaimed area. 4. Fully reclaim access road 0TI, Gas and Mining

pulling boarder materials on both sides of road across the road runsurface. Rip road. 5. Reseed location and access road with BLM seed $¾g RE CORD(ON LYback drag to cover seed BLM Seed Mix: 4 lbs/ac: Indian Ricegrass, 4 lbs/ac:fourwing saltbrush; 4 lbs/ac: shadscale & 1 lbs/ac: sand drop seed, Please

contact Richard Bonham at 303.575.0383 if you should have any questions orconcerns

NAME (PLEASE PRINT) PHONE NUMBER TITLELinda Cool 303 575-0376 Senior Regulatory Technician

SIGNATURE DATEN/A 12/28/2010

RECEIVED December 28,

Page 69: O O - oilgas.ogm.utah.gov O 3. Pressure Control Equipment-Included schematic of BOP and ... BOP systems will be consistent with API RP 53 and Onshore Oil and ... When air drilling,

UNITED STATES B 03D7

DEPARTMENT OF THE INTERIOR Expires: July 31, 2010BUREAU OF LAND MANAGEMENT 5. Lease Serial No.

UTU84051SUNDRY NOTICES AND REPORTS ON WELLS 6.IfIndian,AllotteeorTribeName

Do not use this form for proposals to dri/I or to re-enter anabandoned well. Use Porm 3160-3 (APD) for such proposals.

SUBMIT IN TRIPLICATE - Other instructions on page 2. 7. If Unit of CA/Agreement, Name and/or No.

1. Type of Well8. Well Name and No.Oil Well Gas Well Other P &A Greentown Fed 35-12D

2. Name of Operator 9. API Well No.Delta Petroleum Corporation 43-019-315510000

3a. Address 3b. Phone No. (include area code) 10. Field and Pool or Exploratory Area370-17th Street, Suite 4300, Denver, CO 80202

303-293-9133 X 1076 Wildcat

4. Location of Well (Footage, Sec., T.,R.,M.,or Survey Description) l1. Country or Parish, State1878' FNL & 857' FWL (SWNW) Seciton 35, T21S, R16E, Merid¡an S

Grand County, Utah

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

O Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-OffAlter Casing Fracture Treat Reclamation Well Integrity

Subsequent Report Casing Repair New Construction Recomplete Other Request final

Change Plans Plug and Abandon Temporarily Abandon inspection

Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof Ifthe proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed oncetesting has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

Final reclamation workand seeding was completed by October 28, 2010. Delta Petroleum respectfully requests inspection for approval of final abandonment.

o RECEIVEDNOV2 1 2011

DIV.0FOIL,GAS&MINING

14. I hereby certify that th oregoing is true and correct. Name (Printed/Typed)Linda Cool 1

Title Senior Regulatory Technician

Signature Date 11/17/2011

THIS SPACE FOR FEDERAL OR STATE OFFICE USEApproved by

Title DateãënãÏtÏotisoËapprovaÏ,ÍÍanyaie $ËtiËle . Äp ro $Ï ËiliinotÏcedoAsr ot akani or cirtiËythat the applicant holds legal or equitable title to those rights in the subject lease which would Officeentitle the applicant to conduct operations thereon.Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United Statesany false,fictitious or fraudulent statements or representations as to any matter within its jurisdiction.(Instructions on page