DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
DPWH, Bukidnon 3rd District Engineering OfficeDicklum, Manolo Fortich, Bukidnon
NOTICE TO PROCEED
______________ Date
Mr. RUPLINO R. SEISMUNDOProprietorR.R. SEISMUNDO CONSTRUCTION & SUPPLYNational Highway, Visayan VillageTagum City, Davao del Norte
Dear Mr. Seismundo:
Since the attached Contract Agreement with you for the above-stated Contract has been approved, we hereby instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Contract Agreement, including the Conditions of the Contract, Specifications, and Drawings.
Please acknowledge your receipt and acceptance of this Notice by signing both copies thereof in the space provided below. Keep one copy and return the others to us.
Very truly yours,
DENISE MARIA M. AYAGDistrict Engineer
I acknowledge receipt of this Notice on _________________________________________________________Name and Signature of Contractor’s Representative __________________________Position:
DPWH, Bukidnon 3rd District Engineering Office----------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-52-2016 Page 1 of 1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
Dicklum, Manolo Fortich, Bukidnon
NOTICE OF AWARD___________ Date
Mr. RUPLINO R. SEISMUNDOProprietorR.R. SEISMUNDO CONSTRUCTION & SUPPLYNational Highway, Visayan VillageTagum City, Davao del Norte
Dear Mr. Seismundo: We hereby accept your bid for the above-stated Contract and, therefore, award the Contract to you, as the Bidder with the Lowest Calculated Responsive Bid, at a total Contract Price equivalent to Fourteen Million Eight Hundred Seventy Four Thousand Four Hundred Sixty Two Pesos and 13/100 (P 14,874,462.13).
You are, therefore, required, within ten (10) calendar days from your receipt of this Notice of Award, to submit to us the following documents as conditions for the signing of the Contract:
a. Notice of Award (NOA) with the bidder’s signed “conforme”b. Authority of Signing Official/Board Resolution /Secretary’s Certificatec. For a joint venture (JV), Contractor’s PCAB Special JV License and JV
Agreement.d. Performance Security in any of the forms specified in the Instructions to
Bidders (Use Form DPWH-INFR-43 or dpwh-INfR-44, as applicable).e. Construction Methods (Use Form DPWH-INFR-45)f. Construction Schedule in form of PERT/CPM Diagram or Precedence
Diagram and Bar Chart with S-Curve and Cash Flow (Use Form DPWH-INFR-49).
g. Manpower Schedule (Use Form DPWH-INFR-47).h. Equipment Utilization Schedule (Use Form DPWH-INFR-48).i. Construction Safety and Health Program (Use Form DPWH-INFR-49).j. Contractor’s All Risk Insurance (CARI)k. Latest Income Tax and Business Returns duly stamped and received by
BIR and duly validated with the tax payments made. Tax Clearance from BIR to prove full and timely payment of taxes
l. For a local contractor, Certification under oath stating the Contractor is free and clean of all tax liabilities
m. For a foreign bidder, valid PCAB License and Registration for the type and cost of the contract at hand as pre-condition to the NOA.
n. Integrity Pledge under Department Order No. 86, series of 2013.
------------------------------------------------------------------------------------------------------------------------------------------------------------- DPWH-INFR-41-2016 Page 1 of 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
You are also required, within the said ten (10) calendar days, to formally sign the Contract Agreement.
Your failure to comply with these requirements shall constitute a sufficient ground for the cancellation of this award and the forfeiture of your Bid Security.
Very truly yours,
DENISE MARIA M. AYAGDistrict Engineer
Conforme:______________________________________Name and Signature of Bidder’s RepresentativePosition________________________________ Name of Bidder__________________________ Date: _____________________________
FORM OF CONTRACT AGREEMENT-------------------------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-41-2016 Page 2 of 2
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
KNOWN ALL MEN BY THESE PRESENTS:
This CONTRACT AGREEMENT, made this _________ day of ____________________, by and between:
The GOVERNMENT OF THE REPUBLIC OF THE PHILIPPINES through the Department of Public Works and Highways (DPWH) represented herein by DENISE MARIA M. AYAG , District Engineer, duly authorized for this purpose, with main office address at Bukidnon 3rd District Engineering Office, Dicklum, Manolo Fortich, Bukidnon, hereinafter referred to as the “PROCURING ENTITY”;
andR.R. SEISMUNDO CONSTRUCTION & SUPPLY, single Proprietorship organized and existing under and by virtue of laws of the Republic of the Philippines, with main office address at National Highway, Visayan Village, Tagum City, Davao del Norte, represented herein by RUPLINO R. SEISMUNDO, duly authorized for this purpose, hereinafter referred to as the “CONTRACTOR;”
WITNESSETH:
WHEREAS, the PROCURNG ENTITY is desirous that the CONTRACTOR execute the Works under 18KC0010: CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS QUALITY CONTROL BUILDING, BUKIDNON 3RD DEO, DICKLUM, MANOLO FORTICH, BUKIDNON hereinafter called “the Works”, and the PROCURING ENTITY has accepted the Calculated Bid of the CONTRACTOR for the execution and completion of the Works within One Hundred Eighty (180) Calendar Days at the calculated unit bid prices shown in the attached Bill of Quantities, or a total Contract price of Fourteen Million Eight Hundred Seventy Four Thousand Four Hundred Sixty Two Pesos and 13/100 (P 14,874,462.13).
Item No. Description Unit Quantity Unit
PriceTotal
Amount (Php)
PART B OTHER GENERAL REQUIREMENTS (VOL. II)B.5 Project Billboard/Signboard each 1.00 9,159.15 9,159.15B.7 Safety and Health Program month 6.00 16,189.25 97,135.50B.9 Mobilization & Demobilization l.s 1.00 21,260.00 21,260.00
B.16 Recognition Plate Project Marker (DPWH Logo) each 1.00 339,849.30 339,849.30
TOTAL PART B 467,403.95
Item Description Unit Quantity Unit Total ----------------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-51-2016 Page 1 of 6
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
No. Price Amount (Php)
PART A EARTHWORK (VOLUME II)801(1) Removal of Structure and
Obstruction l.s 1.00 467,949.30 467,949.30
803(1)a Structure Excavation (Common Soil) cu.m 177.95 314.65 55,991.97
804(1)a Embankment From / Structure Excavation cu.m 266.36 145.23 38,683.46
804(1)b Embankment ( from borrow) cu.m 37.83 1,854.69 70,162.92804(4) Gravel Fill cu.m 21.58 2,808.49 60,607.21
TOTAL PART A 693,394.86PART B PLAIN & REINFORCED CONCRETE WORK
900(7) Reinforced Concrete cu.m 225.67 17,852.89 4,028,861.69903(1) Forms and False Works l.s 1.00 764,731.38 764,731.38
TOTAL PART B 4,793,593.07PART C FINISHING VOLUME1000(1) Soil Poisoning liter 20.76 311.73 6,471.511001(8) Sewer Line works l.s 1.00 46,103.19 46,103.191001(9) Storm Drainage and Downspout l.s 1.00 54,173.49 54,173.491002(8) Plumbing Fixtures l.s 1.00 108,744.09 108,744.09
1002(28) Cold Water Lines l.s 1.00 46,231.29 46,231.291003(1)a1 Ceiling (Metal Fiber cement board) l.s 451.00 942.74 425,175.741004(2)g Finishing Hardware, hinges set 36.00 591.18 21,282.481004(2)e Finishing Hardware, knobs set 12.00 2,734.29 32,811.481007(1)a Aluminum Glass Doors (Sliding Type) sq.m 4.80 15,922.83 76,429.581007(1)b Aluminum Glass Doors, Swing Type sq.m 16.32 13,306.39 217,160.28
1008(1)a Aluminum Glass Windows, Sliding Type sq.m 58.80 5,974.17 351,281.20
1008(1)c Aluminum Glass Windows, Awning Type sq.m 7.50 7,953.47 59,651.03
1008(1)d Aluminum Glass Window (Fixed Glass) sq.m 61.78 5,917.69 365,594.89
1010(1) Frames Jambs. Sills, Head, Transom and Mullions set 23.00 3,897.58 89,644.34
1010(2)b Doors, Wood Panel sq.m 37.38 6,428.65 240,302.941016(1)a Waterproofing (cement base) sq.m 261.44 638.27 166,869.31
1018() Glazed Tiles and Trim sq.m 89.48 973.58 87,115.941018(2) Unglazed Tiles sq.m 26.00 1,083.76 28,177.761018(3) Granite Tiles sq.m 681.44 858.27 584,859.511027(1) Cement Plaster Finish sq.m 2,447.71 164.87 403,553.95
1032(1)a Painting works masonry/concrete sq.m 2,999.71 103.23 309,660.061032(1)b Painting works, wood sq.m 71.40 338.48 24,167.471033(1) Metal Deck Panel l.m 538.56 1,287.17 693,218.281039(1) Aluminum Cladding sq.m 241.35 6,151.85 1,484,749.00
1046(2)a2 CHB Non Load Bearing (Including Reif. Bars), 150mm thk sq.m 872.29 940.89 820,728.94
1051(1) Railing meter 10.36 8,826.78 91,445.44TOTAL PART C 6,835,603.19
Item Description Unit Quantity Unit Total ----------------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-51-2016 Page 2 of 6
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
No. Price Amount (Php)
PART D. ELECTRICAL VOLUME (VOLUME III)1100(30) Conduits, Boxes, & Fittings l.s 1.00 109,513.80 109,513.801101(42) Wires and Wiring Devices l.s 1.00 150,635.35 150,635.35
1102(1)b1 Panel Board with Main & Branch Breakers, Bolt on set 24.00 21,550.26 517,206.24
1102(10)b Pole Mounted Transformer (OISC) set 3.00 187,694.68 563,084.041101(42) Lighting Fixtures l.s 1.00 127,181.29 127,181.29
1102(1)b1 Fire Alarm System l.s 1.00 309,803.45 309,803.451102(10)b Grounding System l.s 1.00 307,042.89 307,042.89
TOTAL PART D 2,084,467.06TOTAL 14,874,462.13
NOW, THEREFORE, for and consideration of the foregoing premises, the parties hereto agree as follows:
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
--------------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-51-2016 Page 3 of 6
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be attached, deemed to form, and be read and construed as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority:a.This Contract Agreement b.Documents forming part of the Contract Agreement(1)Notice of Award (NOA) with the Contractor’s signed “conforme”(2)Contractor’s Bid in the Form of Bid, including its Technical and
Financial Proposals, as calculated by the Procuring Entity and conformed to by the Contractor through the NOA.
(3)Bidding Documents with Bulletins(4)Specifications(5)Drawings(6)Special Conditions of Contract (SCC)(7)General Conditions of Contract (GCC)(8)Performance Security(9)Integrity Pledge under Department Order No. 86, series of 2013(10) Other Documents
(a) Construction Methods(b)Construction Schedule in the form of PERT/CPM Diagram or
Procedure Diagram and Bar Chart with S-Curve, or other approved tools of projects scheduling, and Cash Flow.
(c)Manpower Schedule(d)Equipment Utilization Schedule(e)Construction Safety and Health Program initially approved
by the Head of Procuring Entity(f)Contractor’s All Risk Insurance (CARI)
3. In consideration of the payments to be made by the PROCURING ENTITY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the PROCURING ENTITY to execute and complete the Works and remedy any defects therein in conformity with the provisions of this CONTRACT AGREEMENT in all aspects.4. In consideration of the execution and completion of the Works by the CONTRACTOR, the PROCURING ENTTY hereby covenants to pay the CONTRACTOR the unit prices in the CONTRACTOR’s Calculated Bid, as applied to the actual quantities accomplished as certified by the PROCURING ENTITY under the provisions of this CONTRACT AGREEMENT, at all times and in the manner prescribed by this CONTRACT AGREEMENT.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-51-2016 Page 4 of 6
REEZ
AH D
. MAD
ALE-
DIA
NAL
, CPA
Ac
coun
tant
III
Ch
ief,
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
IN WITNESS WHEREOF, the parties hereto set their respective hands on the day, month and year first above written.
PROCURING ENTITY:DPWH BUKIDNON 3RD DEO
CONTRACTOR:R.R. SEISMUNDO CONSTRUCTION & SUPPLY
Represented by: Represented by:
DENISE MARIA M. AYAGDistrict Engineer
RUPLINO R. SEISMUNDOProprietor
Witnessed by:
REEZAH MADALE-DIANAL ROMULO F. ANDRESAccountant III Chief, Construction Section
APPROVED (if the contracting party for the Procuring entity is not the approving authority):
________________________________
Date Approved: ___________________
---------------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-51-2016 Page 5 of 6
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
REPUBLIC OF THE PHILIPPINES) ________________________) S.S.
ACKNOWLEDGEMENT
BEFORE ME, as the Notary Public for and within the City of _________________________, personally appeared DENISE MARIA M. AYAG, District Engineer, representing the REPUBLIC OF THE PHILIPPINES (Department of Public Works and Highways), with TIN No. 000-553-164-211, and R.R. SEISMUNDO CONSTRUCTION & SUPPLY with 102-302-952-000, known to me to be the same persons who executed the foregoing CONTRACT AGREEMENT and they acknowledged to me that the same is their true act and deed for and in behalf of the parties they represented.
This instrument consists of six (6) pages, on which this acknowledgement is written duly signed by the contracting parties and their witnesses on the left margin of the other pages.
IN WITNESS WHEREOF, I have hereunto affixed my Signature and Official Seal this ___________________ .
________________
(Notary Public)
Doc. No. ____________
Page No. ____________
Book No. ____________
TO: The Budget Officer
Republic of the PhilippinesDepartment of Public Works and Highways
BUKIDNON 3RD
DISTRICT ENGINEERING OFFICEREGIONAL OFFICE X
Dicklum, Manolo Fortich, Bukidnon
---------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-51-2016 Page 6 of 6
___________________________(Notary Public)
Repu
blic
of th
e Ph
ilippi
nes
R
.R. S
EISM
UN
DO
CO
NST
RUCT
ION
& S
UPP
LY W
itnes
s:De
partm
ent o
f Pub
lic W
orks
and
Hig
hway
s
Buk
idno
n 3rd
DEO
B
Y:
DEN
ISE
MAR
IA M
. AYA
G
RU
PLIN
O R
. SEI
SMU
ND
O
REE
ZAH
D. M
ADAL
E-D
IAN
AL, C
PA
ROM
ULO
F. A
ND
RES
D
istric
t Eng
inee
r
Prop
rieto
r
Ac
coun
tant
III
Ch
ief,
Cons
truct
ion
Sect
ion
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
Budget Section This Office
This is to request for the issuance of Obligation Request for the following:
Request No. :Date :Fund :Amount : P 14,874,462.13Payee : R.R. SEISMUNDO CONSTRUCTION & SUPPLYAddress : National Highway, Visayan Village, Tagum City,
Davao del NorteParticulars : To obligate payment for the Contract 18KC0010:
CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS QUALITY CONTROL BUILDING, BUKIDNON 3RD DEO, DICKLUM, MANOLO FORTICH, BUKIDNON
Project : Project ID#Source of Fund/Legal Basis :SARO # / SAA # :P.A.P. :Account Code :Fiscal Year of Allotment
: FY 2018
I certify that the charges for appropriation/allotment are necessary, lawful and under my direct supervision.
I further certify that the supporting documents are valid, proper and legal.
Your prompt attention to this matter will be greatly appreciated.
RONALDO C. PAHANG,
AEr Assistant District Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
DPWH, Bukidnon 3rd District Engineer OfficeDicklum, Manolo Fortich, Bukidnon
POSTQUALIFICATION REPORTDate: ____________________
1. Name of Bidder: R.R. SEISMUNDO CONSTRUCTION & SUPPLY2. Rank in the List of Complying Calculated Bids: Ist Rank3. Bid Price: P 14,874,462.134. Period of Postqualification: 5. Results of Postqualification:
Requirements Parties Consulted FindingsLegal Requirements
PCAB License DPWH-Central BAC, PCAB
OK, verified
SEC/DTI/CDA Registration DPWH-Central Office OK, verifiedMayor’s/Business Permit DPWH-Central Office OK, verifiedJV A if applicable N/A N/ASub-contract agreement if applicable N/A N/ALatest Income and Business Tax Returns
DPWH-Central Office OK, verified
Not in Blacklist N/A N/ATechnical Proposal
Bidder’s stated competence and experience, including required SLCC
DPWH-Central Office OK, verified
Key personnel’s stated competence and experience vs requirements in BDS
Attached OK
Availability, commitment, capacities and operating conditions of eqpt units owned/leased/under purchase for the contract, vs requirements in BDS
Attached OK
Performance in on-going gov’t. and private contracts:•No slippage of at least 15% in 1 project•No slippage of at least 10% in 2 or more projects•Repair works done on time•No substandard work•No unsatisfactory performance•No liquidated damages
Verified
VerifiedN/AVerifiedVerifiedVerified
OK
OKN/AOKOKOK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
Sufficiency of Bid Security as to type, amount, form, wording, and validity period
DPWH-Central Office OK, verified
Financial RequirementsExamination of latest Financial Statements, especially current assets and liabilities
Attached OK
Latest value of uncompleted portions of on-going/awarded contracts coinciding with the subject contract
Attached OK
Updated NFCC vs ABC NFCC=P Ok, verified
1. Findings:
[ / ] Responsive [ ] Non-Responsive
Prepared by:
ANTOLIN M. TENESTRANTE MARIA DESIREE G. GARAYHead of BAC TWG Unit Head of BAC SecretariatDate:___________________ Date: ___________________
Noted by:
RONALDO C. PAHANG, AEr Assistant District EngineerBAC ChairmanDate: _________________
--------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-37-2016 Page 1 of 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Bukidnon 3rd District Engineering OfficeDicklum, Manolo Fortich, Bukidnon
OUTLINE OF BID EVALUATION REPORTDate: October 27, 2017
1.0 CONTRACT DESCRIPTIONNarrative description of Contract under Procurement
Table 1. Basic Contract Information1.1 Approved Budget for the Contract Php 15,667,740.001.2 Contract Duration 180 Calendar Days1.3 Method of Procurement Competitive Bidding
2.0 INITIAL STEPS IN THE BIDDING PROCESSNarrative description of the Bidding Process
Table 2. Initial Steps in the Bidding Process2.1 Pre-Procurement Conference
Date of Conference October 3, 20172.2 Invitation to Bid
(a) Date of advertisement October 4, 2017 to October 10, 2017(b) Name of Newspaper for (a) The Manila Times Publishing
Corporation(c) Date of posting in DPWH website and
PhilGEPS, IFI October 4, 20172.3 Issuance of Bidding Documents (BDs)
(a) Period of availability of BDs(b) Number and Name of Bidders that Purchased hard copies of BD
October 4, 2017 to October 24, 20171.R.R. SEISMUNDO CONSTRUCTION & SUPPLY2. LLM UNIFIED BUILDERS TRADING CORPORATION3. NASCON BUILDERS
2.4 Amendments to BDs, if any(a) List all Bid Bulletins by subject NONE
2.5 Pre-bid Conference, if any(a) Date of Conference October 12, 2017(b) Dates of Minutes sent to bidder October 13, 2017
3.0 RECEIPT, OPENING, AND PRELIMINARY EXAMINATION OF BIDS
Table 3. Bids Receipt and Opening3.1 Bid Receipt Deadline
(a) Original date, time October 24, 2017, 12:00PM(b) Extensions, if any, NONE
-----------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-37-2016 Page 2 of 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
3.2 Eligibility Check(a) Date of Eligibility Check October 24, 2017(b) Number and Names of Eligible Bidders 1.R.R. SEISMUNDO CONSTRUCTION
& SUPPLY2. LLM UNIFIED BUILDERS TRADING CORPORATION3. NASCON BUILDERS
(c) Number and Names of Ineligible Bidders NONE3.3 Bids opening date and time October 24, 2017, 2:00PM3.4 Minutes of Bid’s Opening, Date sent to Bidders October 25, 20173.5 Bid Validity Period
(a) Originally specified 180 Calendar days(b) Extensions/Revisions, if any
3.6 Number and Names of Bidders that Submitted Bids
1.R.R. SEISMUNDO CONSTRUCTION & SUPPLY2. LLM UNIFIED BUILDERS TRADING CORPORATION3. NASCON BUILDERS
3.7 Number and Names of Bidders that Withdrew Bids
NONE
3.8 Number and Names of Bidders that Submitted Letters of Non-Participation NONE
Table 4. Bidders’ Compliance (Presence) or Non-Compliance (Absence) of documentary Requirements of Technical and Financial Proposals
Bidders’ NameComplyin
g/Passes
Non-Complying/
Failed
Reasons for Non-Compliance/
Failure1. R.R. SEISMUNDO CONSTRUCTION & SUPPLY
/
2. LLM UNIFIED BUILDERS TRADING CORPORATION
/
3. NASCON BUILDERS /
----------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-36-2016 Page 1 of 3
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
Table 5. Bids Prices as Read of Complying BiddersBidders’ Name Amount of Bid as Read
(P)1. R.R. SEISMUNDO CONSTRUCTION & SUPPLY P 14,874,462.132. LLM UNIFIED BUILDERS TRADING CORPORATION P 14,943,838.893. NASCON BUILDERS P 15,657,684.16 4.0 EVALUATION OF BIDS Narrative description of the Bidding Process
Table 6. Correction of Bids
Bidders’ NameTotal Amount of Bid as Read
(P)
Total Amount of Bid as
Calculated (P)Reasons for
Variance1. R.R. SEISMUNDO CONSTRUCTION & SUPPLY
P 14,874,462.13
P 14,874,462.13
5.06%
2. LLM UNIFIED BUILDERS TRADING CORPORATION
P 14,943,838.89
P 14,943,838.89
4.62%
3. NASCON BUILDERS P 15,657,684.16
P 15,657,684.16
0.06%
Prepared by BAC-TWG:
ORLANDO V. MANCAO, JR.
ROBERT M. VALLES JANET D. PELAYO
TWG Member TWG Member TWG Member
ANTOLIN M. TENESTRANTEHEAD, BAC/TWG
Submitted by:
MARIA DESIREE G. GARAYHEAD, BAC Secretariat
--------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-36-2 Page 2 of 3
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
DPWH, Bukidnon 3rd District Engineering OfficeDicklum, Manolo Fortich, Bukidnon
NOTICE OF POSTQUALIFICATION
_________________ Date
Mr. RUPLINO R. SEISMUNDOProprietorR.R. SEISMUNDO CONSTRUCTION & SUPPLYNational Highway, Visayan VillageTagum City, Davao del Norte
Dear Mr. Seismundo:
After determining your bid as the Lowest Calculated Bid for the above-stated Contract and after conducting the post qualification of your firm, involving the examination, validation and verification of the eligibility, technical and financial requirements that you have submitted for the bidding for this Contract, we are pleased to inform you that you have passed the post-- qualification and, therefore, consider your bid as the Lowest Calculated Responsive Bid for the said Contract.
Upon the approval of this finding by the Head of the Procuring Entity, we will issue to you the Notice of Award for this Contract.
Very truly yours,
RONALDO C. PAHANG, AEr Assistant District EngineerBAC Chairman
Received by:______________________________________Name and Signature of Bidder’s RepresentativePosition _______________________________
--------------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-36-2016 Page 3 of 3
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
Date received: ____________
DPWH, Bukidnon 3rd District Engineering OfficeDicklum, Manolo Fortich, Bukidnon
RESULT OF ELIGIBILITY CHECK
October 24, 3017 Date
Based on the evaluation of the information about the legal, technical and financial capabilities, as indicated in your Contractor’s Information of the bidders as recorded in our computerized Registry of Contractors for Civil Works, vis-à-vis the requirements of the abovementioned contract as indicated in the Contract Profile submitted by DPWH, Bukidnon 3 rd DEO, Dicklum, Manolo Fortich, Bukidnon we find the following bidders eligible to participate in the bidding for the contract.
1. R.R. SEISMUNDO CONSTRUCTION & SUPPLY2. LLM UNIFIED BUILDERS TRADING CORPORATION3. NASCON BUILDERS
RONALDO C. PAHANG, AEr Assistant District EngineerBAC Chairman
--------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-38-2016 Page 1 of 1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
DPWH, Bukidnon 3rd District Engineering OfficeDicklum, Manolo Fortich, Bukidnon
NOTIFICATION OF BIDDING RESULTS
________________ Date
Mr. LLEWELLYN L. MANGILET, JR.ProprietorLLM UNIFIED BUILDERS & TRADING CORPORATIONLLM Building, Coral Street,Marfori Subd., Davao City
Dear Mr. Mangilet:
We regret to notify you that the above-stated Contract has been awarded to a competing contractor, R.R. SEISMUNDO CONSTRUCTION & SUPPLY, at its bid Fourteen Million Eight Hundred Seventy Four Thousand Four Hundred Sixty Two Pesos and 13/100 (P 14,874,462.13), which has been determined as the Lowest Calculated Responsive Bid for the Contract.
We look forward to your participation in the bidding for our other projects.
Very truly yours,
RONALDO C. PAHANG, AEr Assistant District EngineerBAC Chairman
-----------------------------------------------------------------------------------------------------------------------------------------------------------------DPWH-INFR-29-2016 Page 1 of 1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 18KC0010Contract Name: : CONSTRUCTION OF TWO-STOREY OF SOIL AND MATERIALS
QUALITY CONTROL BUILDING, BUKIDNON 3RD DEOLocation of the Contract : DICKLUM, MANOLO FORTICH, BUKIDNON
DPWH, Bukidnon 3rd District Engineering OfficeDicklum, Manolo Fortich, Bukidnon
NOTIFICATION OF BIDDING RESULTS
_________________ Date
Mr. NASRODIN L. MITMUGProprietorNASCON BUILDERS63, Rizal St., Moncado Colony, Marawi City, Lanao del Sur
Dear Mr. Mitmug:
We regret to notify you that the above-stated Contract has been awarded to a competing contractor, R.R. SEISMUNDO CONSTRUCTION & SUPPLY, at its bid Fourteen Million Eight Hundred Seventy Four Thousand Four Hundred Sixty Two Pesos and 13/100 (P 14,874,462.13), which has been determined as the Lowest Calculated Responsive Bid for the Contract.
We look forward to your participation in the bidding for our other projects.
Very truly yours,
RONALDO C. PAHANG, AEr Assistant District EngineerBAC Chairman
----------------------------------------------------------------------------------------------------------------------------------------------------------------- DPWH-INFR-42-2016 Page 1 of 1
----------------------------------------------------------------------------------------------------------------------------------------------------------------- DPWH-INFR-42-2016 Page 1 of 1